principal investigator – primary collaborators –

9
Principal Investigator Primary Collaborators – Hardmast Study MO FE P Carrie Steen Larry Vangilder Randy Jensen Steve Sheriff

Upload: ewa

Post on 22-Feb-2016

33 views

Category:

Documents


0 download

DESCRIPTION

MOFEP. Hardmast Study. Principal Investigator – Primary Collaborators – . Carrie Steen Larry Vangilder Randy Jensen Steve Sheriff. Study Design. 38.5m. 7.7m. Plot = . 20 traps 4 x 5 grid. 8.7m. 2002 m 2 (1/2 acre). 52m. 130 plots randomly placed in 4 ELT groups. Ridgetops - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Principal Investigator  –  Primary Collaborators –

Principal Investigator – Primary Collaborators –

Hardmast StudyMOFEP

Carrie SteenLarry VangilderRandy JensenSteve Sheriff

Page 2: Principal Investigator  –  Primary Collaborators –

130 plots randomly placed in 4 ELT groups

RidgetopsExposed (S-W) SlopesProtected (N-E) Slopes

Other

7.7m8.

7m52

m38.5m

20 traps 4 x 5 grid2002 m2 (1/2 acre)

Plot = Study Design

Page 3: Principal Investigator  –  Primary Collaborators –

SpeciesPlot

Wildlife

Damage

Yes (1)No (0)

# and wt.by group

Non-Oak

1w/ohusk

0w/ohusk

Sub-sample

Soundness

Acorns Maturity

Mmature

1w/ocap

0w/ocap

Uunknown

1withcap

0withcap

Iimmature

1withcap

0withcap

IWimm/wild. value

1withcap

0withcap

unsound

# and wt. # and wt.

1 sound

2 partial

0 unsound

# and wt.by group

# insect damage# other damage

Mast Processing

Page 4: Principal Investigator  –  Primary Collaborators –

Mast Processing

Page 5: Principal Investigator  –  Primary Collaborators –

Current ProgressFinished

Updated plot GPSPast protocols collated

Overstory QA

1993

20021993 – 2002

Original tables

?√

Corrected

acorn data

Page 6: Principal Investigator  –  Primary Collaborators –

Current/In-ProgressCurrent Progress

Summarized

acorn

Corrected, original non-oakSummarized non-oak Acorn ID document

Field truth overstory

Page 7: Principal Investigator  –  Primary Collaborators –

Complete overstory corrections

Add summarized,

corrected data to

current dataset

Complete database, protocol and

metadata

Archive uploaded data and

replace with Access file

FutureCurrent Progress

Page 8: Principal Investigator  –  Primary Collaborators –

Integration

MOFEP

Non-MOFEP

Small Mammals

OverstoryCarbon Flux

Deer dataWeather

dataMast index

Page 9: Principal Investigator  –  Primary Collaborators –

Study and BudgetCollect mast – begin overstory data

collection

Overstory dataCollect mast dataMark -remove plots in treated areas

Collect mast data in control plots

Re-install treated plotsOverstory data

Finish overstory dataContinue mast collection on all plots

Continue mast collection - analyses

CS13 2000 hrs 22,318

CS8 320 hrs 2,717

CS13 2000 hrs 22,318

CS8 2000 hrs 16,980

CS13 2000 hrs 22,318

CS8 2000 hrs 16,980

CS13 2000 hrs 22,318

CS8 1200 hrs 10,188

CS13 2000 hrs 22,318

CS8 1200 hrs 10,188

$25,035

$39,298

$39,298

$32,506

$32,506

FY10

FY11

FY12

FY13

FY14