Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2. Silke Dierer and Francis Schubiger MeteoSwiss. Outline. Work in Task 1.1 Sources for cases with bad precipitation forecast Preliminary list of cases Further steps Work in Task 1.2 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/1.jpg)
Verification
Priority Project ‘Quantitative Precipitation Forecast’
Progress report Task 1.1 and 1.2
Silke Dierer and Francis SchubigerMeteoSwiss
![Page 2: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/2.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 2
VerificationOutline
Work in Task 1.1Sources for cases with bad precipitation forecastPreliminary list of casesFurther steps
Work in Task 1.2Verification for Winter 04/05 and Dec.05/Jan.06Example of a characteristic periodFurther steps
![Page 3: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/3.jpg)
Verification
Task 1.1 Selection of single test cases
![Page 4: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/4.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 4
VerificationSelection of test cases: sources I
Information from forecasters about bad precipitation forecast
Not objectiveFor different forecast ranges
Verification of precipitation by forecastersdaily average for 15 regions in Switzerlandforecast, model results and observationsdisadvantage: currently no automatic evaluation possible
=> Situations with bad precipitation forecast in Switzerland
![Page 5: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/5.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 5
VerificationSelection of test cases: sources II
SYNOP-Verification- surface verification for Europe with SYNOP data
=> Situations with bad precipitation forecast for the aLMo domain
![Page 6: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/6.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 6
VerificationSelection of test cases
Preliminary list of test cases includes periodsthat are reported by forecasters or have a bad forecast for several regions (forecasters‘ verification)and show high deviation in SYNOP verification
![Page 7: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/7.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 7
VerificationSelection of test cases: Preliminary list for 2005
Date Source Under-/Overestimation classification (based on NCEP data)dd at 500 hPa surface pressure
(high, low, flat)19.-22.1. FV + NW/NW/NW/NW L/H/H/L22.-23.1. FV + NW/NW L/L11.-15.2. FV + W/W/NW/NW/N H/H/L/L/L24.3. FV - SW H, flat9.4. FV + NO L16./17.4. FV - SO/O L,flat23.-25.4. Fo/FV +/+ W/W/SW H16./17.5. Fo/FV ?/+ SW H21.-23.5. FV - SW H14.6. FV + SW H25.6. FV +/- SW H,flat2.7. Fo + W L18.7. FV + SW H29.7. FV + SW H,flat2./3.8. FV + SW/S H->L, inbetween6.8. FV + W H11.8. Fo + W H14.-22.8. Fo/FV ?/+ (mainly) W/NW/N/N/N/W/SW/SO/O
H/L/L/H,flat/H,flat/H/L/L/L28.8. Fo + NW H,flat2.9. FV + S H,flat8.-12.9. Fo/FV -/- (mainly) S/S/?/SW/SWH,flat/H,flat/L,flat,/L/L16./17.9. FV -, dann + W/SW L/L1.-3.10. Fo/FV +, dann –/- N/W/W H/L/L18.10. Fo erst -/dann + SW H22./23.10. Fo - SW/SW L/L3.11. Fo ? SW L6.11. Fo - SW H,flat
![Page 8: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/8.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 8
VerificationANETZ verification for 21st January 05
full line: obs (ANETZ); dashed: black: aLMo,
red: LM
![Page 9: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/9.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06 9
VerificationSelection of test cases: next steps
Complete list for 2004 and 2006Check if insufficient forecast is due to deviations of the synoptic situation
Might be necessary to rerun simulations due to missing output plots that can be compared with analysisPossibly ANETZ verification
=> skip these casesSpecify different kinds forecast errors (e.g. synoptic conditions) and select characteristic test cases
![Page 10: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/10.jpg)
Verification
Task 1.2. Seasonal verification
![Page 11: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/11.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
11
VerificationVerification of aLMo Winter 04/05 SYNOP
![Page 12: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/12.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
12
VerificationVerification of aLMo Winter 04/05 over Switzerland
full line: obs (ANETZ); dashed: black: aLMo,
red: LM
![Page 13: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/13.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
13
VerificationVerification of aLMo: December 05 – January 06
full line: obs (ANETZ); dashed: black: aLMo
![Page 14: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/14.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
14
VerificationFebruary 2005
full line: obs (ANETZ); dashed: black: aLMo,
red: LM
![Page 15: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/15.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
15
VerificationANETZ verification for 10th -14th February 05
full line: obs (ANETZ); dashed: black: aLMo,
red: LM
![Page 16: Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2](https://reader035.vdocuments.net/reader035/viewer/2022070404/56813c2d550346895da5a89a/html5/thumbnails/16.jpg)
franci
s.sc
hubig
er@
Mete
osw
iss.
chC
OSM
O P
P Q
PF W
ork
shop,
Langen,
08
.03
.20
06
16
VerificationSeasonal verification: next steps
Selection of characteristic days Based on scatter plots for winter 2004/2005 and 2005/2006 (measurement vs. simulation)
24h area averages for Switzerland, for different heights (0-800m, 800m-1500m and above 1500m)Selecting days with bad precipitation forecastSpecifying synoptic situationSelect characteristic periods