prisma space frameprisma.ae/downloads/psf_prequalification.pdf · wind loads should be calculated...

40
              PRISMA ®  SPACE FRAME L. L. C. COMPANY PROFILE P. O. Box: 37916, Dubai/UAE,  Phone: +971 4 8802969,  Fax: +971 4 8802967 Email: [email protected],  Web Site: http://www.prisma.ae 

Upload: dinhdang

Post on 03-Apr-2018

230 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

 

    

 

 

 

 

 

 

 

 

 

PPRRIISSMMAA®®  SSPPAACCEE  FFRRAAMMEE  LL..  LL..  CC..  

CCOOMMPPAANNYY  PPRROOFFIILLEE  

P. O. Box: 37916, Dubai/UAE,  Phone: +971 4 8802969,  Fax: +971 4 8802967 

E‐mail: [email protected],  

Web Site: http://www.prisma.ae 

Page 2: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 2 of 40  

INTRODUCTIONPRISMA Space Frame LLC exists for more than 24 years in Dubai/UAE. Among its vast history 

the company has developed a quality management system, for better satisfaction of the 

needs of its clients and to improve the management system of the company. 

The purpose of this prequalification document is to highlights the company’s vast 

experience quality, workmanship and perfection in the execution of contracted jobs. 

 

    UAE University, Al Ain‐ Student Activity Center 

PROJECTEDBUSINESSACTIVITIESThe scope of the company activities covers the Management of design, fabrication and 

installation for the various structures listed below: 

Metal space frames. 

Roof and wall claddings. 

Skylights and sun shading structures. 

Frameless glazing and tension cable structures for façades . 

Architectural Glazed stainless steel furniture. 

Stainless steel mesh features 

Decorative perforated panels 

Page 3: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 3 of 40  

  

                    La Cigale Hotel‐ Qatar 

TheCompanyAt PRISMA, we have built our reputation on quality, credibility and professionalism. Keeping 

abreast  of  the  worlds  latest  technological  advancements,  we  managed  to  attain  a 

distinguished and leading position in the highly specialized field at the international level. 

Today,  PRISMA  has  the  competence  confidence  and  facilities  to design manufacture  and 

erect  space  frames  of highly  complex  geometry  and  to provide  efficient  solutions  to  the 

industry’s most challenging structural engineering problems. 

Our  Quality  management  systems,  highly  educated  staff,  skilled  manpower  and 

sophisticated computerized machinery enable us to meet the most stringent quality control 

standards, tough deadlines and tight budgets. 

Our honesty, positional approach, delivered promises and timely completion of projects paid us back in repeated contracts from our valued grateful clients.    

 

 

 

 

 

 

 

          Emirates Aviation Line Bridge‐ Dubai 

Page 4: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 4 of 40  

Ownership:The company is owned by:  

EMIVEST UNITED LLC – 58.00% 

EMIVEST INTERNATIONAL LTD – 42.00% 

TheKeyPersonsoftheCompany: 

Name Position Mr. Butti Saeed Al Ghandi Chairman

Mr. Arif Khan   EIDC Mgt Committee 

Engr. Anand Kumar  General Manager 

Engr. Jose Lenoroch  Projects Manager 

Engr. Vivek Loyola  Structural Engineer 

Engr. Rayan Pamintuan Estimation

Mr. Rajesh Pallakkat  Procurement Officer 

Mr. Pradeep kumar  Senior Accountant 

Mr. Mohanad Khalaf  Collection & Legal  

  

 

                                           Hyatt Regency Hotel‐ Dubai 

Page 5: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                   

Page 5 of 40  

ORGANIZATIONALSTRUCTURE

Page 6: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 6 of 40  

RESOURCESPRISMA  SPACE  FRAME  offices  are  equipped  with  state  of  the  art  equipment.  Design 

software packages are available to meet all engineering demands. 

Furthermore  our  offices  are  equipped  with  a  communication  network  that  facilitates 

communication between staff in the office and between Dubai and Abu Dhabi offices via a 

ISDN internet connection. 

Our staff and offices are linked with the outside world through an E‐mail service. 

 

                                    Royal Retreat. Al Aryam Island 

HardwareList Intel i7 Computer w/ 6 GB RAM & 1 MB Display 2 Nos. 

Intel Core 2 Duo Computer w/ 2 GB RAM  13 Nos. 

Intel Dual Core Computer w/ 1 GB RAM 05 Nos. 

HP PROLIANT Server w/ Windows SBS 1 No. 

Fujitsu Siemens Primergy server w/ Win 2003 1 No. 

19” Monitor LCD  3 Nos. 

17” Monitor LCD 17 Nos. 

HP Design jet Plotter HP800 (color‐ A0) 1 No.

HP 5200 Printer A3 Laser        1 No. 

HP 1018 Printer          8 Nos. 

HP 1005 Printer           8 Nos. 

Page 7: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 7 of 40  

HP Fax Machine 5610         1 Nos. 

Brother MFC J6910DW Printer, Scanner    1 No. 

Brother HL‐317OCDW Color Printer      1 No. 

HP 7163 Color Printer         1 No. 

Hisense LED TV 40”          1 No. 

 

                                                     Gulf Bank‐ Kuwait 

SoftwareList AutoCAD Software 

SAP 2000 

STAAD PRO  

Microsoft Office 2007 

Ms Windows SBS Server 

Ms Windows 2003 Server 

MS SQL Server 

Microsoft Navison ERP System 

Ms Windows XP 

Dbase In‐house SP Component Software 

Page 8: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 8 of 40  

Machinery&EquipmentListCNC Work Shop 

 CNC 5 Axis Milling Machine DMU 50      1 No. 

CNC Universal Milling Machine DART 2100    1 No. 

CNC Milling Machine ROMI 760        1 No. 

CNC Milling Machine ARROW 500      1 No. 

CNC Lathe Romi 420          1 No. 

CNC Lathe Romi 260          1 No. 

CNC Lathe Falcon 250          1 No. 

CNC Lathe Hawk 200          1 No. 

 

                                                                                          Jeddah TV Tower‐ KSA 

Fabrication Unit 

Press Brake 3 mt x 8 mm capacity      1 No. 

Plate Bending Machine 3 mt x 8 mm      1 No. 

Combination Sheering Bending Machine    1 No. 

Pipe Rolling Machine Heavy Duty Upto dia 200  1 No. 

Pillar Type Drilling Machine        1 No. 

ARC Welding Machine 400 amps      4 No. 

Page 9: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 9 of 40  

 

                                                                           Thuraya Primary Gateway‐ Sharjah 

Conventional Machine Shop 

Center Lathe            4 Nos. 

Milling Machine          1 No. 

Surface Grinder          1 No. 

Tool Grinders            2 Nos. 

Automated Band Saw Machine      2 Nos 

Painting and Polishing 

Airless Spray Paint Unit        1 No. 

Air Compressor Spray Painting Unit      1 No. 

Motorized Puffing Machine        4 Nos. 

 

Raffles Hotel‐ Dubai 

Page 10: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 10 of 40  

SYSTEMSPrisma has the following products systems: 

Metal space frame structures. 

Skylights and sun shading structures. 

Frameless glazing and tension cable structures for façades. 

Architectural Glazed stainless steel furniture. 

Decorative perforated panels 

Roof and wall claddings. 

 

                               Kuwait International Airport 

PrismaMetalSpaceFrameStructuresA Space Frame is a structure of linear elements so arranged in a configuration that internal 

forces are transferred in a three dimensional manner. 

Space Frame can be produced in steel, aluminum and stainless steel. 

The System comprises 4 main elements namely: 

1. Tubular members with welded endplates. 

2. Bolts and ball bearings. 

3. Inner plates. 

4. Ball‐joints. 

Page 11: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 11 of 40  

Tubular members  are  circular  hollow  steel  section  and  are  the most  efficient  structural 

elements on a Compression Capacity to Weight Ratio.  The Ball‐joints are solid steel spheres, 

produced from shaft material confirming to Steel grades C45 or equivalent. 

 

        Al Raha Beach Mall‐ Abu Dhabi 

 

SpecialFeaturesofPrismaSpaceFrameStructures: Multiple use of ball joints, freedom of configuration (tailor made designs). 

Multiple layers possible. 

Hot dipped galvanizing after welding. 

No holes in the tube for inserting bolts (avoiding accumulation of water, dirt  and 

debris). 

Dynamic loaded Structures possible. 

No slotted holes in the Hexagonal nuts. 

Experienced supervision provided by Prisma. 

Tailor made Space Frame Structures, matching client's specific requirements. 

Page 12: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 12 of 40  

 

                                     Business Park‐ Dubai 

STRUCTURALDESIGNSpace frame components should be design for the most critical load combinations obtained 

from the structural analysis output. 

Design should be made in accordance with the relevant Sections of BS 5950: Part 1: 1990. 

 

                                   Nissan Showroom‐ Dubai 

Page 13: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 13 of 40  

 

STRUCTURALANALYSISThe space frame is to be analyzed as a three dimensional frame structure subjected to the 

following loads: 

1. DeadLoad Self weight of space frame      :  Actual 

Weight of Roofing Materials      :  Actual   

2. LiveLoadSince the roof is accessible only for cleaning and maintenance, a live load of 0.6 KN / 

mm2 is considered. 

3. TemperatureVariationThe structure is to be designed for a temperature variation of +/‐ 35 otherwise; the 

supports may be designed to allow for free expansion and contraction of the space 

frame. 

4. WindLoadsWind loads should be calculated in accordance with British Code CP3, Chapter V for a 

basic wind speed of 45 m / s. 

Appropriate load factors and load combinations are taken according t0 BS 5950: Part 

1: 1990. 

 

                            Dubai Airport Free Zone 

 

Page 14: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 14 of 40  

FABRICATIONNodes should have a machined smooth surface and should be faced, drilled and tapped to 

accept connecting bolts with due allowance  for sufficient bolt  insertion  length  to develop 

the full tensile capacity of the bolts. 

Facing, drilling and tapping operations should be performed in a continuous operation by a 

Computer Numerical Controlled (CNC) machines in order to maintain precision accuracy. 

 

                                         Wafi Mall Ext. 1‐ Dubai 

Welding:Welding is done by Third Party certified welders. 

We use low‐hydrogen, high strength electrodes for proper welding and safety. 

Holes  are  not  allowed  to  be  present  in  the  space  frame  tubular members  in  order  to 

maintain a pleasant appearance of the space frame. 

CorrosionProtection

GalvanizingSpace frame members:   Hot dipped galvanized minimum thickness of galvanization  layer  is 

85 microns. Hot‐dip  galvanizing  should  be  carried  out  after  completion  of  all  fabrication 

processes cutting, welding, drilling, etc.  

The  Use  of  pre‐galvanized  tubes  is  strictly  not  allowed  because  the  weld  locations  will 

remain un protected. 

Threaded parts  like Nodes,  hex nuts &  bolts  are  to be  Electro  galvanized with minimum 

thickness of 15 to 18 microns according to JIS H8610. 

Page 15: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 15 of 40  

 

                                                                         Seef Mall Extension‐ Bahrain 

Painting:

Polyurethanecoating: The most suitable paint system for galvanized steels as per recommendations of M/s JOTUN 

Paints is as follows: 

First Coat          :  “PENGUARD SPECIAL” Zink‐phosphate rich 2 coat epoxy Primer 

with min. dft. 85 microns. gives excellent adhesion on the galvanized surface 

Second Coat     :  “DURATHANE”/ “HARDTOP” which is the Polyurethane top coat 

min. dft. 35 microns, provides excellent gloss and color with ultra violet (U‐V) 

resistance. 

 

                                      Etoile Realty‐ Beirut 

Page 16: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 16 of 40  

MATERIALSPECIFICATION

1. MildSteelSpaceFrame1. Pipes:  Are Steel tube with minimum yield strength of 240 N/mm2 

5. Ball Joints, Hexagonal Nuts & Inner plates: are made of Steel Grade C‐45 with 

Minimum yield strength of 360 N/mm2. Node is made of solid spherical steel. 

2. End plates are solid round Steel plates welded at each end of the tubular pipe 

and are of the same quality of the tube for reason of weld ability  

3. Bolts: are securing the member between the endplate and the ball joints. Bolts of 

Grade 10.9 & 12.9 are used as required in the design. 

4. Ball‐Bearing Interfacing the hex‐nut & bolt.  Material is High Tension Chrome‐ 

Nickel Steel. 

 

                                     Dubai Internet City 

2. AluminumSpaceFrame1. Pipes:  Extruded from Aluminum Alloy 6061‐T6 or the equivalent 6351.1‐T6 with 

minimum yield strength of 240 N/mm2 

2. Ball joints (Nodes): Hexagonal Nuts and End Plates are produced out of 

Aluminum Alloy 6061‐T6 or the equivalent of 6351.1‐T6 solid shaft material with 

minimum yield strength of 240 N/mm2. The End Plates are threaded in pipes (No 

welding allowed) 

3. Bolts: minimum grade 10.9 as required in the design. The bolt connection is 

completely concealed. No holes in the hexagonal nuts will be made. 

Page 17: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 17 of 40  

4. Structural analysis to be carried out according to the relevant BS 8118 (Structural 

use of aluminum) 

5. Loading conditions are according to the prevailing British Standards. 

6. No holes are made in the pipe for bolt insertion. 

7. Aluminum space frame members are provided in powder coated finish  

 

                              Royal Retreat‐ Dubai 

3. StainlessSteelSpaceFrame1. Pipes Stainless steel tube grade 316  

2. Ball Joint, Hexagonal Nuts are machined from stainless steel shafts grade 316  

3. End Plates Same chemical composition as the pipes 

4. Bolts Galvanized steel Bolts Grade 10.9 as required in the design 

All components are machined on Computer Numerical Controlled (CNC) 

All members and nodes are polished to mirror or satin finish. 

BRITISHSTANDARDSUSED:

1. BritishStandard(BS6399:Part2:1995)"Loading for Buildings ‐ Wind loads" 

2. BritishStandard(BS6399:Part3:1990)"Load for Buildings ‐ Imposed load on Roofs" 

3. BritishStandard(BS5950:Part1:1990)"Structural use for steelwork in Buildings" 

Page 18: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 18 of 40  

 

                              Sharjah Court Complex 

INSTALLATIONSpace  frame  installation  should  be  carried  out  by  skilled  personnel working  to  properly 

detailed and referenced assembly drawing. Installation crew should pay particular attention 

to ensure that bolts are tightened to the required torque  levels. Care should also be taken 

to ensure that support releases are placed in the correct directions. 

 

                           Al Raha Beach Mall‐ Abu Dhabi 

 

Page 19: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 19 of 40  

QUALITYCONTROLThe Quality Control  Plan  covers  all  activities of  the  company  such  as  design,  fabrication, 

galvanizing, painting & installation of the space frame. 

PRISMA can submit a copy of the Q.C. Manual with every tender, for consultant approval. 

SKYLIGHTSPECIFICATIONSThe skylight consists of a steel ring beam supported on a peripheral truss of variable height, 

as  shown  on  the  drawings,  and  a  single  layer  pre‐tensioned  high  strength  steel  rods 

supporting the glass via a special fitting placed at inter‐section between tension rods. 

 

                                                                                 Boomerang Office Bldg., Cairo 

 

The steel structure transfers the tension forces in the tension rods into a compression force 

absorbed by the steel ring beam. 

Tension rods should be pre‐tensioned to the appropriate  level  in order to keep deflections 

within  acceptable  limits.  Glass  fittings  should  be made  of  stainless  steel  grade  316  and 

should be  capable of  accommodating  the deflection &  rotation of  glass without  inducing 

additional stresses into the glass panels. 

The skylight manufacturer should submit evidence that he has designed, manufactured and 

installed at least one skylight of this type. 

Page 20: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 20 of 40  

GlassSpecifications:The glass used in the skylight as well as on top of the space frame should be high 

performance reflective limited tempered glass having the following properties: 

Light transmission      :  Depending on 

Shading Co‐efficient      :  Customer Requirement 

Relative Heat Gain      :   

BOLTEDGLAZINGSYSTEMPrisma Bolted Glazing System comprises the following components: 

1. SpiderArms:These arms are made from stainless steel material grade 304/316.  The function of 

these arms is to fix the glass panels to the supporting structure. 

The arms are placed at either side of a steel fin plate welded to the supporting steel 

structure, as shown on attached details. 

2. GlassFittings:These fittings are machined from stainless steel material grade 316.  The function of 

these fittings is to fix the glass panel onto the spider arms. 

The fittings penetrate the glass panels at each corner through 36 mm / 25 mm 

diameter holes. 

3. PlasticSleevesandRubberWashers:The function of these components is to prevent contact between glass and stainless 

steel and to ensure water & air tightness. 

 

        Emirates Aviation College, Dubai 

Page 21: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 21 of 40  

ProductionProcess:All  components  of  Prisma  Bolted  Glazing  System  are machined  on  Computer  Numerical 

Controlled (CNC) Machines in order to achieve maximum accuracy and minimum tolerances. 

ProvisionforExpansionandContraction:Prisma Bolted Glazing System is designed to allow free expansion and contraction of glass 

due to temperature variation. 

 

STANDARDSPACEFRAMECOMPONENTS 

 

 

Page 22: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 22 of 40  

ANNEXURE‐‘A’

PROJECTSEXECUTED/INPROGRESSPROJECT NAME  LOCATION CONSULTANT SCOPE

Chicago Beach Hotel  Dubai  W.S. Atkins & Partner  Space Frame 

Hamarain New Factory  Dubai  Shadid Engineering  S. Frame / Cladding 

Emirates Cooperative Society  Dubai  Al Hatmy  Space Frame 

Marriott Hotel Extension  Dubai Test Consultant  Frameless S.F. Roof

Dubai National School  Dubai Al Waha Engineering S. Frame / Cladding

Used Cars Exhibition‐157 Columns  Dubai Zaabeel Consultant Space Frame Towers

Hatta Sports Club Facility  Dubai Arif & Bintoak  S. Frame / Cladding

Sheikha Maryam Palace  Dubai Test Consultant  Space Frame

Grand Mercury Hotel‐Deira City Cent  Dubai Robinson Conn  Space Frame

Al Mussabah Hotel  Dubai Test Consultant  Space Frame Canopy

Mr. Obaid Mohammad Al Hilo Hotel  Dubai  A.R.T. Consultants  Space Frame 

Union Co‐Operative Society  Dubai  Civic Designs  Space Frame 

Al Mutawe Villa  Dubai  n/a  Space Frame 

Dubai Poly Film Company  Dubai  Dar Consultants  Space Frame 

Ysmail Aqeel Al Janahi Building  Dubai  Artec  Space Frame 

Al Rostamani Showroom  Dubai  Al Hashemi  S. Frame / Skylight 

Commercial & Residential Bldg./Karama  Dubai  Archon  Space Frame 

Department of Immigration Car Parks  Dubai  Artec  S. Frame / Membrane 

Bu Haleeba Tower  Dubai  Test Consultant  S. Frame / Skylight 

Mohd. Saleh Zarouni Hotel  Dubai Dubai Consultants  S. Frame / Glazing

Saif Rashid Abdullah Al Huraiz Villa  Dubai Archon S. Frame / Membrane

Dubai Airshow 2000  Dubai Dar Al Handasah  Space Frame

Page 23: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 23 of 40  

Shk. Hamdan Residential Building  Dubai  Al Hashemi  S. Frame / Skylight 

Mustafa Bin abdulatif Resl. Bldg.  Dubai  Arif & Bin Toak  S.F. / Steel Box 

Al Ghurair Center Refurbishment  Dubai  Norr consultant  Space Frame 

Bel Obaidah Commercial & Off. Bldg.  Dubai Dar Consultants  Space Frame

Obaid Bin Khalfan Bin Saeed  Dubai Arif & Bin Toak  Space Frame

Mr.Almur Bin Saeed Residential Bldg.  Dubai Al Emara Sharquia Space Frame

Jumeirah Plaza Entrance Canopies  Dubai  Al Gurg Consultant  Space Frame 

Al Mazaya Center Steel Structure  Dubai Ramesh & Associate Steel Trusses

H.H. The Ruler Villa at Um Sequim  Dubai  Al Turath  S. Frame / Glazing 

Mr. Rashid Al Majid Bin Qariban  Dubai  Arif & Bin Toak  Skylight 

Dubai Internet City  Dubai  W.  S.  Atkins  Tension Cable Struc. 

Center Of Leaders  Dubai  Min. of Public Work  Space Frame 

Dubai International airport  Dubai  Abdul Jalil Crocker  S. Frame / Skylight 

Khayriyah Abdul Rahman  Hotel  Dubai  Bin Dalmouk  Skylight/V. Glazed Screen 

Roof Skylight for Fitra International  Dubai  Robert Mathew  Elliptical Skylight 

Alteration Work‐Jebel Ali Base  Dubai  n/a  St. Steel /Cladding 

Dubai Police Training Institute  Dubai  Arenco Consultants  Skylights 

Dubai Shopping Festival SF Arches  Dubai  Dubai Municipality  Space Frame 

Refurbishment of Al Ghurair Towers  Dubai n/a Stainless Steel Canopy

Hilton Dubai Creek Tower  Dubai Arenco Consultants Entrance Canopy + glazing

Wafi Mall Extension  Dubai Arif & Bintoak  Skylights + glazing

Dubai Internet City, Phase 1B  Dubai W.S.Atkins SS Tension Rod Assembly

comprehensive Technical School  Dubai Gibb Middle East  Space Frame

Bank Melli Iran Regional HQ Building  Dubai W.S.Atkins & Partners Overseas Tension Rod assemblies

Dome for Dubai Shooping Festival  Dubai n/a Space Frame

Dubai Shopping Festival Arches  Dubai  n/a  Space Frame 

Mr. Mohd. Hussain Ali Res. Building  Dubai  Chawla Engineering Consultants  Space Frame 

Al Nasr Sports Club Residentail Bldg.  Dubai  Engineering Consultants Group  Space Frame 

Page 24: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 24 of 40  

Global village Space Frame Trusses  Dubai  RMJM  Space Frame Trusses 

Dubai Global Village Figures  Dubai  n/a  Steel Figures 

Al Mulla Plaza Refurbishment  Dubai  The Frazer Nag Partnership  Space Frame 

Emirates Aviation Training Center  Dubai Frazer Nag Partnership Frameless Glazing

Dubai Car Showroom‐Islamic Finace  Dubai Dar Consultants  Space Frame

Private Villa of HH The Ruler  Dubai Space Consult  Space Frame (Dance Floor)

Dubai Womens Association  Dubai  Shadid Engineering Consultant  Space Frame + Skylight 

Private Villa of HH the Ruler  Dubai Space Consult  Space Frame + Glazing

Renovation of Shk. Hamda Building  Dubai  Barajeel Consultant  Space Frame + Flag Poles 

Dubai Central Fruit & Veg. Market  Dubai  Al Turath Engineering Con.  Space Frame for Entrance 

Private Villa for HH The Ruler  Dubai  Space Consult  Space Frame (Ent. Canopy) 

Mr. Arif Bushaqer Villa  Dubai  n/a  Space Frame + Glazing 

Dubai Media City (Leo Burnett Bldg)  Dubai  n/a  SST Truss Tension Rod Assy 

Emirates Aviation Bridge Link  Dubai  Frazer Nag  Bridge Link 

Anchor Store Extension at Wafi City  Dubai  Arif & Bin Toak  Glazed Pyramid 

Perfume Factory at Al Goze  Dubai  RMJM  Steel Support + Spiders 

Street Lighting Poles for Main Roads  Dubai  n/a  Street Poles for Main Roads 

Smart Pole for Dubai Marina, Phase 2  Dubai  n/a  Smart Poles 

Street Lighting Poles for Main & Internal Road Dubai n/a Street Lighting Poles

J217 Louis Vuitton  Dubai n/a Supply of SST Tods & Framings

Al Mankhool Towers  Dubai W.S. Atkins & Partners Overseas Steel Supports and Canopy

Alum/Smart Pole for Dubai Marina, Phase 2 Dubai n/a Smart Poles for Dubai Marina

Private Villa for HH Shk. Nahyan Bin Zayed Dubai n/a Glazed Skyight

AL ABDULLA ATE TECOM, HOTEL APARTMENT Dubai  Al Ajmi Engineering Consultant   Glass Façade 

MR. ABDULLA BIN THANEYA VILLA  (2009)  Dubai  ARENCO Architectural & Engr.   Glass Façade 

ARBIFT TOWER (2009)  Dubai  Hegazy Engineering Consultant  Space Frame 

SPINE MOSQUE AT PALM JUMEIRAH (2009) Dubai Dr. Yarhmour Consulting & Engineering Skylight Dome

CUSTOMER SERVICE OFFICED BLDG. (2009)  Dubai  Access Engineering Consultancy  S.Frame/Skylight 

Page 25: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 25 of 40  

KARAMA SHOPPING CENTER SKYLIGHTS    Dubai  Design Center Engg. Consultants   S.Frame/Skylight 

Mr. Abdulla Bin Thaneya Villa (2010)  Dubai  ARENCO Architectural & Engr.  Modification Of Skylight 

AL SHAMSI COML. OFFICE BLDG. (2010) Dubai Technical Supplies & Services Co. Space Frame 

CHOPSTICK Restaurant at DUBAI MALL (2010)  Dubai  Fawzi Faghali  S.Frame/Skylight 

JW‐MARRIOTT HOTEL – DUBAI (2011)  Dubai N/a Sky Dome Repairs and Inspect

HH Shk. Hamdan Al Maktoum Bldg (2011)  Dubai  Design Center  Skylight 

FABSON IMPORT EXPORT BLDG. (2011)  Dubai  NARESCO  S. Frame/Skylight 

AL SHAABIYA POLICE STATION (2011)  Dubai  Petra Gulf Co.   Skylight  

CANADIAN UNIVERSITY  Dubai  CUD   Skylight 

ATLANTIC TOWER AT DUBAI MARINA  Dubai Kaveri General Trading Glazed Skylight

Lockwood Wood Manufacturing  Dubai  N/a  Skylight / Glass Balustrades 

Al Aryam Resort Glass Floor  Abu Dhabi n/a Glass Floor

GIC Head Office  Abu‐Dhabi National Eng.Bureau S. Frame / Glazing

Mr. Sayed Abdullah Al Hashemi  Abu‐Dhabi n/a Steel Trusses

Salem Skylight Project  Abu‐Dhabi  n/a  Skylights 

BMW Showroom & 28 Villas  Abu‐Dhabi  n/a  Skylights 

HH Shk. Saeed Bin Zayed Pvt. Office  Abu Dhabi  APG Consultant  Glass Room Encl. 

Swimming Pool Cover‐Hamad Villa  Abu Dhabi  Al Salaam  SS Trusses / Glazing 

Abu Dhabi Industrial City (C 1 & 3)  Abu Dhabi  WS Atkins & Partners Overseas  Space Frame/Acrylic Domes 

Shk. Hassa Bin Zayed Al Nahyan Pal.  Abu Dhabi  n/a  Space Frame 

ADWEA New Headquarter Building  Abu Dhabi  n/a  Space Frame 

Al Raha Beach Resort Shopping Mall  Abu Dhabi  Test Consultant  Glazed Skylights 

International Tennis Complex  Abu Dhabi  Crane & Brook Inc.  Space Frame 

Health Club for Shk. Hassa Palace  Abu Dhabi n/a Space Frame

Al Aryam Private Retreat Glass Enclo.  Abu Dhabi n/a Glass Enclosures

Al Aryam Glass Enclosure (West Pav.)  Abu Dhabi n/a Glass Enclosure

New Police Station at Mussafah City  Abu Dhabi Arex Consultant  Stainless Steel Space Frame

Page 26: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 26 of 40  

New Police Station at Khalifa City  Abu Dhabi  Arex Consultant  Stainless Steel Space Frame 

Abu Dhabi Blood Bank  Abu Dhabi  James Cubitt & Partners  Glazed Skylight 

Shk. Juma Hassan Al Zaabi Commercial Bldg.  Abu Dhabi  n/a  Space Frame 

Residential Towers for Shka. Fatima  Abu Dhabi n/a Space Frame

THINET ‐ EXT. OF MADINAT ZAYED SHOPPING Abu Dhabi Morganti Group INC. Space Frame

YAHSAT SATELLITE GROUND STATION  (2009) Abu Dhabi Althurat Engineering Consultant S.Frame/Skylight

MINISTRY OF INTERIOR BLDG. ‐ MCM GROUP  Abu Dhabi  Bayaty Consultant  S.Frame/Skylight 

PARIS SORBONNE UNIVERSITY (2010)  Abu Dhabi Doummar Contracting  S. Stucture for Orchestra Pit

AL RAHA MALL (2010)  Abu Dhabi  N/a  Skylight 

DOME SPACE FRAME STRUCTURE (2011)  Abu Dhabi  Al Shamma Engg. Const  Dome Space Frame 

LICENSE & INFO. TECHNOLOGY BLDG  Abu Dhabi  Al Shamma Engg. Const  Space Frame  

SHAZA KINDERGARTEN SCHOOL (2011)  Abu Dhabi  Winner Consultant  S. Frame / Skylight DISMANTLE & RE‐INSTALL SPACE FRAME  ADNOC  Abu Dhabi  N/a  Space Frame  

UAE ARMAD FORCE COMMAND OF MILI.  Abu Dhabi  CRC Engg.   S. Frame / Skylight 

UAE Ministry of Interior  (2011)  Abu Dhabi  Dar Al Khaleej Engg. Cons.   Skylight 

NEW ASSAB ACCOMMODATION ‐ GASCO  Abu Dhabi  N/a  S. Frame / Skylight 

Military Works   Abu Dhabi  Al Diyar Gen. Contr.   Glazed Pyramid Skylight 

MINA PALACE GYM EXTENSION  Abu Dhabi  Trojan  Space Frame 

ADISC Res. Leisure. Comm. Developmenmt Abu Dhabi Fibrex  S. Frame / Skylight

SHAMS BEACH TOWERS  Abu Dhabi FOLCRA BEACH  Skylight

UAE ARMAD FORCE COMMAND OF MILI.  Sharjah CRC Engg.  S. Frame / Skylight

ROYAL BEACH HOTEL  (2011)  Sharjah N/s Skylight

Al Thuraya Primary Gateway  Sharjah Al Turath Con.  Space Frame

Al Taawun Shopping Center  Sharjah  C.A.B.  S. Frame / Cladding 

Etisalat Telecom Bldg. at Al Majaz  Sharjah  Bin Dalmouk  Space frame 

Al Ghuwair Plaza (Tower 2000)  Sharjah  Adnan Safarini  Space Frame Tower 

Sharjah Ladies College  Sharjah  Horizon Consultant  Space Frame 

Factory & Office Building For SKM  Sharjah  JM Regnault & Part.  Space Frame 

Page 27: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 27 of 40  

Al Futtaim Workshop Exp. & Mod.  Sharjah  Concept  Steel Trusses / Fabric 

Sharjah Traffic Police HQ Building  Sharjah  Halcrow Intl. Partnership  Cladding + glazing 

Arabic Club  Sharjah  Horizon Engineering Consultant  Space Frame 

Central Area City for Human. Services  Sharjah n/a Space Frame

BMW Showroom for Shk. Al Qasimi  Sharjah Horizon Consulting Engineers Stainless Steel Space Frame

Al Sharjah Courts Complex  Sharjah Al Bayaty Consultant Space Frame

MOWEILAH MOSQUE  (2009)  Sharjah  Faisal Holding  Skylight 

AL ROSTAMANI CAR SHOWROOM (2009) Sharjah QHC‐Sharjah  S.Frame/Skylight

Gulf Glass Industries (2011)  Sharjah  N/a  Skylight 

Shk Majed Bin Rashid Naeemi Villa  Ajman  n/a  Space Frame 

City Police Station  Ajman  Concept Consulting Engineers  Skylight + glazing MURUR MIXED USE COMPLEX (2009)  Ajman  Al Design  Glass Façade 

Jebel Haffit Hotel  Al‐Ain  Tallibert Gulf Env.  S. Frame / Skylight 

Bin Ham Commercial Center  Al Ain  Parc International  Space Frame 

Jebel Haffit Hotel Reception &C. Shop  Al Ain  Taillibert Gulf Environment  Space Frame 

Teaching Facility & Student Activity  Al Ain  Keo International  Structural Steel 

Glass House for Sheikh Dhiab Villa  Al Ain  APG Consultant  Space Frame + Glazing 

Al Ain Grandstand  Al Ain  n/a  Frameless Glazing 

Modification of Al Ain Club VIP Area  Al Ain n/a Space Frame + Spiders

Al Ain Blood Bank  Al Ain James Cubitt & Partners Glazed Skylight

Manar Mall  Ras Al Khaimah P.T.Peventjena Djaja Curved Steel Trusses

Comprehensive Technical School  Ras Al Khaimah Gibb Middle East  Space Frame

Frameless Glazing for Al Arabi Alum.  Ras Al Khaimah n/a Frameless Glazing

Traffic Police Department at Ras Al Khaimah, RAK, Fujairah, Ajma Winner Consultant Space Frames

City Police Station  Fujairah/Sarah Concept Consulting Engineers Skylight + glazing

Comprehensive Technical School  Fujairah  Gibb Middle East  Space Frame 

Umm Al Quwain, Fujairah and Ajman  Umm Al Quwain     

Petrol Station  Qatar  n/a  Space frame 

Page 28: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 28 of 40  

PETRA GULF SKYLIGHT DOME‐ QATAR (2013)  Qatar  PETRA GULF  Skylight Dome 

TAWAR MALL PROJECT (2013)  Qatar QATAR MATE COATS S. Frame / SkylightBridges, Arts & Sciences Bldg. Project  Qatar n/a Tension Rod Support system

Al Udeid Project  Bahrain n/a Technical Services

Citibank Headquarter Building  Bahrain Hasan Mansouri  Atrium Roof SkyliteARAB REGIONAL CENTER FOR WORLD HERITAGE  Bahrain  Almoayyed Air Conditioning  Skylight 

Commercial Center in Kuwait  Kuwait  n/a  Space Frame 

Al Enma Tower  Kuwait  Kuwait Tech.  Space Frame 

Electronic Showroom for Ganim Ind.  Kuwait  Abdullah Qabazard  F.less glazed screen 

KGL Office Bldg. & Bus Terminal  Kuwait  n/a  Space Frame 

Kuwait International Airport  Kuwait  n/a  Space Frame 

Public Institution for Public Security  Kuwait  n/a  Bolted Glass Assemblies 

Flex Health Club – Shaab  Kuwait n/a Space Frame

Kuwait Intl. Airport Roofing & Fascia  Kuwait K.U.C.M. Roofing & Fascia

Kuwait Airport Car park Building  Kuwait n/a Cladding & Glazing Works

Kuwait Oil Sector Complex  Kuwait n/a Supply of AZ‐Hm Fittings

Four Point Sheraton Hotel  Kuwait  n/a  Frameless Glass Facade 

Skylight for Kuwait University  Kuwait n/a Skylight Dome

Mega Showroom  Kuwait n/a Glass Façade

Skylight for Kuwait University  Kuwait  n/a  Glazed Skylight 

Mega Showroom  Kuwait  n/a  Frameless Glazing 

GULF BANK BRANCH AT HAWALLI  (2009)  Kuwait  N/a  Tension Rods 

Makkah Steel Bridges  Saudi Arabia  n/a  Steel Bridges 

Spiders & Fittings for Delmon Project  Dammam, KSA  n/a  Spiders & Fittings 

N.D.F. Office Building  Dammam  n/a  Tension Rods & Spiders 

Tension Rods, Couplers, Pipes, Eyelets  Dammam  n/a  Tension Roads & Couplers 

Stainless Steel Pressure Pipes & Eyelet  Dammam  n/a  SST pipes & Eyelets 

Drums, Brackets and Guide Blocks  Dammam  n/a  Drums, Brackets, G. Blocks 

Page 29: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 29 of 40  

Stainless Steel Fittings for Sultan Mall  Jeddah  n/a  Stainless Steel Fittings 

National Commercial Bank Project (2010)  Riyadh KSA  Ramah Aluminium & Metal Coating  S.S. Spider Fittings  

SWIMMING POOL COVER – OLAYA HOTEL  KSA   N/a   Space Frame  

Friday Market  Syria n/a Spiders & Fittings

Spiders & Fittings for Exhibition Hall  Syria n/a Spiders & Fittings

Joud Showroom  Syria n/a Frameless Glazing

Spiders and Fittings for Stock  Syria  n/a  SST Spiders & Fittings 

Sahara Hotel Skylight  Syria n/a Space Frame

COML. & RESL. BLDG.  (2009)  TAQAH, SALALA  OMAN N/A  Skylight 

COML. & RESL. BLDG. AT GHALA (2009)  Muscat, Oman  Arab Engineering Burue  Skylight Dome 

Commercial & Residential (2010)  Salalah Oman  Qais Omani Est.   Skylight 

SS CANOPIES & CLEANING LADDER (2011)  Salalah Oman  Arab Engg. Bureau   SS Canopies  

Sudatel Headquarters Building  Sudan  Centecs  Space Frame / Dome 

DASHEN BANK IN JIMMA ETHIOPIA (2009)  Addis Ababa, Ethiopia  N/A  Skylight/Space Frame 

GENSHU BEYENE INTL. HOTEL (2009)  Ethiopia   N/a  S.Frame/Skylight 

Tracon Hotel and High Vision Tower (2010)  Addis Ababa, Ethiopia  N/a  Canopy /Glazed Skylight 

Unity Shopping Mall   Addis Ababa, Ethiopia  Code Aluminum & Trading   Lobby Façade  

SIMEX PROJECT    Ethiopia  Pioneer Star General Trading  Vertical Façade  

SNAP HOTEL (2013)  Ethiopia N/a S. Frame / Skylight

STAINLESS STEEL DECORATIVE CAGE (2009)  Ukraine  AATI CONTRACTS   DECORATIVE CAGE 

Presidential Swiiming Pool Skylight  Turkmenistan  n/a  Swimming Pool Cover 

Crested Tower Building  Uganda  Gulf Glass Industries  Stainless Steel Fittings 

Imperial Beach Hotel at Entebbe  Uganda n/a Glazed Skylight

Al Sanaa Five Star Hotel Canopies  Yemen  n/a  Entrance Canopies 

Palacio De Justicia (2009)  Guinee Equatorial, Bata Horizontal International Contracting  Glass Façade 

ABM Amro Bank ‐ Karachi  Pakistan  Mushtaq & Bilal  Space Frame SAHARA STAR HOTEL MUMBAI  Mumbai, India Petra Gulf Co. LLC   Skylight

Page 30: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 30 of 40  

RECENTLY COMPLETED PROJECT 

PROJECT  : MURUR MIXED USE COMPLEX, PLOT NO. 58, AL SAWAN, AJMAN CONSULTANT  : A.J. DESIGN CONSULTANCY & TOWN PLANNING  CONTRACTOR  : M/S ALI MOOSA & SONS CONTRACTING  

 

 

Page 31: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 31 of 40  

PROJECT  : (3B+G+4+Gym) COMM/RESIDENTIAL BUILDING ON PLOT NO. 318‐131     AT AL KARAMA DUBAI 

CONSULTANT  : M/S DUBAI INTERNATIONAL REAL ESTATE  CONTRACTOR  : M/S AL HABBI CONTRACTING 

 

 

 

Page 32: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 32 of 40  

PROJECT  : 2B+G+M+4 BUILDING ON PLOT NO. 318‐864 AT AL KARAMA DUBAI CONSULTANT  : DESIGN CENTRE CONSULTANT  CONTRACTOR  : M/S AL HUDIBA CONTRACTING LLC GLAZING CONTRACTOR   : M/S PETRA GULF CO. LLC   

 

 

 

Page 33: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 33 of 40  

PROJECT  : B+G+1 SHOPPING MALL ON PLOT NO. 376‐2460 AT AL BARSHA 2ND FOR     M/S UNION COOPERATIVE SOCIETY 

CONSULTANT  : M/S ARCHDOME  CONTRACTOR  : M/S BU HALEEBA CONTRACTING 

 

 

 

Page 34: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 34 of 40  

PROJECT  : NOOR SCHOOL CONSULTANT  : GREEN STYLE ARCHITECTURE  CLIENT    : CANADIAN UNIVERSITY, DUBAI 

 

 

 

Page 35: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 35 of 40  

PROJECT  : CONSTRUCTION, COMPLETION AND MAINTENANCE OF GEN. ADMIN. BUILDING OF        MINISTRY OF INTERIOR – GLAZED SKYLIGHT CONSULTANT  : M/S BAYATY ARCHITECTS, ABU DHABI  CONTRACTOR  : M/S MCM GROUP 

 

 

 

Page 36: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 36 of 40  

PROJECT  : ADISC – RESIDENTIAL, LEISURE AND COMMERCIAL DEVELOPMENT CONSULTANT  : ATKINS  CONTRACTOR  : M/S FIBREX CONSTRUCTION GROUP  

 

 

Page 37: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 37 of 40  

 

 

 

Page 38: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

                 

 

Page 38 of 40  

Page 39: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 39 of 40  

 

 

 

Page 40: PRISMA SPACE FRAMEprisma.ae/downloads/PSF_Prequalification.pdf · Wind loads should be calculated in accordance with British Code CP3, Chapter V for a basic ... Part 2 : 1995) "Loading

     

Page 40 of 40