Privately owned by working directors, we employ a skilled technical design and production team with a wealth 

of experience in bespoke metal fabrication. 

Established in 12TH JULY 2012 EPCF PRIMA SDN BHD (formally known as Efficiente Process Sdn Bhd) has built a 

reputation as one of the leading steel fabricators in Malaysia. We are Bumiputra Company that was formed by 

a  group  of  Project Managers  and  Engineers.  Lead  by  the Managing Director,  Executive Director,  Technical 

Director, General Manager, Project Manager and project & production engineers giving us the scale, scope and 

breadth of expertise that a global organization can offer. 

 

Our facilities provide sufficient technical staff that can be mobilized to client site on 24hrs basis. We also have 

fabrication  facilities  in Puchong  for our  in‐house service, manufacturing,  fabrication,  testing  instruments and 

equipment and warehousing storage area. Mainly to develop an all‐in‐one management system that provides 

records,  service  schedule,  spare part or engineering consumable plan  that enables EPCF PRIMA SDN BHD  to 

provide robust and very cost effective solutions. 

 

Today, EPCF PRIMA SDN BHD is one of the registered key solutions and service provider in General Industries, 

Oil  and Gas  and  Power & Utilities  industry  in Malaysia. We  have  covered  a  large  range  of  projects which 

include building complete new skid piping systems and upgrading existing piping and structural systems. We 

also provide continuous after sales support to major oil and gas companies in Malaysia and overseas.  

 

 

Co. Registration Number: 1009739‐A 

GST ID Number  : 002014642176 

 

   

 

 

 

 

 

  

 

 

    

 

 

 

 

 

 

 

   

 

  

 

 

 

 

 

 

 

 

 

QA/QC

TEAM 

GENERAL MANAGER 

TIM MAU KIT 

HUMAN 

RESOURCE 

BOARD OF DIRECTORS

ACCOUNT  

ADMIN & 

PROCUMENT 

SERVICE 

TEAM 

MARKETING

TEAM 

SR. TECH. COORDINATOR 

HASRIL ENNUAR 

PROJECT MANAGER SYAHMI 

SR. PROJECT ENGINEER 

‐ HAMIDI 

‐ MOHAMAD NAZIRI 

PRODUCTION TEAM LEADER

WONG  LAI HUAT / LOH LOY 

PRODUCTION 

WORKER

QA/QC

MOHD ARIFF

BRANCH SALES TEAM(JB)  

CHEW MING THAI 

ENG. DESIGN MANAGER 

‐ NICHOLAS PANG 

‐ SYAHRIL AMIR 

ENGINEERING DESIGN 

TEAM 

SUPERVISOR

TIM HEIP HING 

SUB‐CONTACTOR

TECH. PROPOSAL MANAGER 

MOHAMMAD DZYHAN 

MARKETING MANAGER

CALVEN CHONG 

HSE COMMITEE

STORE 

WELDER FOREMAN

LIEW KUAN YEW 

SITE INSTALLATION 

TEAM 

 

EPCF PRIMA Sdn Bhd delivers high quality, commercially viable solution for international and local based 

industrial developments, focusing on generating maximum value for our clients. Specialist teams offer a 

comprehensive scope of services, encompassing initial concept studies through full engineering and 

constructions contract. Our key project and engineering staff include personnel experience in construction and 

fabrication work environment, helping to ensure that we provide innovative & operable solution to challenging 

project without compromising regulation and requirement guideline standard. Our offer services: 

 Design , Engineering , Construction & Commissioning Services 

Project Management & Erection Services 

Plan And Un‐Plan Plant Major Turnaround /Shutdown Work Services. 

Tanks, Pressure Vessel, Separators & Exchanger 

Pipeline, Structural Installation & Hook Up Services (Onshore or offshore) 

Piping And Structural Design Analysis Services. (With or without design calculation endorsement) 

Electrical & Instrumentation Design, Installation, Maintenance And Commissioning 

Package (Sets) Welding And Steel Work Fabrication 

Corrosion Protection Services: Research and Development, Engineering Design and Manufacturing Of 

Pre‐Impregnated and Filed Saturated Composite Strengthening Systems That Restore, Protect and Re‐

Inforce Pipes, Pipeline, Structures and marines. 

Blasting & Painting Work Services (In‐Situ or in our facilities)  

Non Destructive Test Services 

Testing and Commissioning Services 

Insulation Services 

Material & Equipment Rental 

Rigging & General Man‐Power Supply 

DNV 2.7‐1 , DNV 2.7‐2 or EN12079‐1 : Offshore Container , Cargo Carrying Units & Skid Structure 

Re‐Certification Of Offshore Container, Cargo Carrying Units & Lifting Gears 

Design And Built Of Custom Made Office Cabin And Container 

 

 

EPCF PRIMA SDN BHD 

 

QHSE DEPARTMENT 

 

EPCF PRIMA Sdn Bhd committed to conduct all our work activities in a manner which safeguards the quality, health, safety and welfare of all the persons and preserves the natural environment, as far as it practicable. 

 

It  is the responsibility of management to review and continually  improve our QHSE management systems, business, services, organizational and employees’ performance through: 

 

Meeting  the  needs  of  client,  shareholders,  employees,  surrounding  community,  applicable regulation and statutory authorities’ requirements 

Endure co‐operate and act responsibly among employees, clients, and contractors in implement best practice and working environment pollution 

Prevent damage to equipment, items, plant, properties and environment 

Promote QHSE awareness, program and provide training to EPCF PRIMA employees to achieve our objectives. 

Deliver our service on time with meeting client’s expectations 

 

         

………………………………………….. 

(Tim Mau Kit) 

General Manager, 

EPCF PRIMA Sdn Bhd 

Date: 20.06.2012 

 

 

 

 

 

 

 

 

 

 

Yard Built Up : 12,000 sf   

Office Built Up : 1,600 sf 

 

 

 

Item  Description  Quantities 

1  Straweld MMA400 Welding Machine (3 Phase)  6  Units 

2 ESAB Buddy MIG 500i Inverter Controlled Power MIG Power Source Welding Machine (3 Phase)  6  Units 

3  MMA 200i Portable Welding Machine  5  Units 

4  Electrode Baking & Holding Oven  2  Units 

5  5 Kgs Electrode Quiver  6  Units 

6  Metal Cutting Band‐Saw Machine  ‐ MODEL : UE‐712A (3 Phase)  2  Units 

7  Makita Heavy Duty Hand Drill  1  Unit 

8  Bosch Heavy Duty Hand Drill  1  Unit 

9  DCA Heavy Duty Hand Drill  1  Unit 

10  Makita Heavy Duty 14" Speed Cutter  5  Units 

11  Skill Heavy Duty 14" Speed Cutter 1  Unit

12  DCA 7" Grinder  5  Units

13  DCA 4" Grinder  30  Units

14  Straight Grinder  5  Units 

15  Pipe Chain Type Auto Cutter  2  Units 

16  Plate Straight Line Auto Cutter  1  Unit 

17  Oxygen & Acetylene Cutting Tool c/w Regulator and Hose  6  Sets 

18  Argon Torch c/w Regulator and Hose  6  Sets 

19  500 Bar Hydrostatic Test Pump  1  Unit 

20  100 Bar Hydrostatic Test Pump  2  Units 

21  150 Psi Electrical Hydrostatic Test Pump  1  Unit 

21 Hydrostatic Test Pressure Gauges, Hoses, Valves, Fittings, Blind Flanges and ETC.  1  Lot 

22  200mm Digital Caliber  1  Unit 

23  150mm Dial Caliber  1  Unit 

24  Counter Weight (for Load Test)  32  Tones 

25  Makita Heavy Duty Concrete Hacking Machine  1  Unit 

26  Bosch Heavy Duty Concrete Hacking Machine  1  Unit 

27  Hitachi Heavy Duty Concrete Hacking Machine  1  Unit 

28  Makita 4" Heavy Duty Concrete Cutting Machine  2  Units 

29  Bench Drill Machine  2  Units 

30  Air Compressor  2  Units 

31  Toyota Forklift 2.5 Ton (Petrol)  1  Unit 

32  Toyota Forklift 4.5 Ton (Diesel)  1  Unit 

33  Overhead Crane 6.3 Ton  1  Unit

34  Overhead Crane 5 Ton   1  Unit

 

Corrosion Protection Services 

 

 

 

 

 

 

 

 

 

 

Measuring instrument. 

 

 

 

High Pressure Fitting and Hoses  

 

 

Integrated Treating Ironwork Product. 

 

 

 

 

 

Plug valves with several different connections, bores and  pressure ratings. 

Valves are available in standard service or Sour (H2S) service or  lo‐temp. 

The proven floating plug design is the basis for all valves. This assures tight sealing under high pressures and long service life. 

Most valves are available with hydraulic, pneumatic or gear actuators—please consult factory. 

 

DATA HEADERS            Treating Iron 

   

 

 

1502 DATA HEADER 3 EA – ½” NPT OUTLET  

Instrument Valve. 

 

 

   

   

 

                           

    

 

 

 

 

 

Grease and Lubrication. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Item  Client  Project  Scope  Year 

1.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 3'11 CHANGE ORDER NO.1 (5 UNITS) : Dry Gas Filter 4" 300#RF ‐ 2 Units & Dry Gas Filter 2" 300#RF ‐ 8 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jul.  2012 

2.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 3'12 CHANGE ORDER NO.1 & 2 (5 UNITS) : Dry Gas Filter 3" 300#RF ‐ 8 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jul.  2012 

3.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 5'12 (5 UNITS) : Dry Gas Filter 3" 300#RF ‐ 4 Units & Dry Gas Filter 4" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2012 

4.  Frontken Malaysia Sdn Bhd  Manpower Supply For Shaft Welding Work 

Manpower Supply  Aug. 2012 

5.  Redox Polymer Sdn Bhd  Carbon Steel Piping Maintenance & Repair Work 

Manpower Supply  Aug. 2012 

6.  Petronas Gas Berhad /  Technotest Engineering Sdn Bhd / ENI Integrated Works Sdn Bhd 

Metering Station Maintenance & Painting Work EPCC Of Pokok Sena New City Gate 

Manpower Supply Materials Supply, Fabrication, Testing, Blasting & Painting, Site Installation & Commissioning. 

Aug. 2012 

7.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 8'12 (3 UNITS) : Dry Gas Filter 3" 300#RF ‐ 6 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Sep. 2012 

8.  Frontken Malaysia Sdn Bhd  Manpower Supply For Valve Disc Welding Work 

Manpower Supply  Sep. 2012

9.  Frontken Malaysia Sdn Bhd  Manpower Supply For Pipe Sleeves Welding Work 

Manpower Supply  Oct. 2012 

10.   Petronas Carigali Sdn Bhd / Shapadu Energy & Engineering Sdn Bhd /  Dermaga Oil & Gas Sdn Bhd 

Provision For Hook‐Up And Commissioning For PCSB‐SKO Pipeline Rejunavation Project (PL 369 & PL 370) ‐ Nitrogen Rack : 6 Cylinders (1 Unit) & 4 Cylinders  (1 Unit) 

Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting. 

Oct. 2012 

11.  Akashi Kikai Industry (M) Sdn Bhd  LPG Tank Farm Piping Work At Seremban  Materials Supply, Fabrication & Installation, Testing & Painting. 

Oct. 2012 

12.  Vantage Oilfield Solutions Sdn Bhd  Sand Screen Box Skid  Design, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting. 

Oct. 2012 

13.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 9'12 (4 UNITS) : Dry Gas Filter 2" 300#RF ‐ 2 Units, Dry Gas Filter 3" 300#RF ‐ 4 Units & Dry Gas Filter 4" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Oct. 2012 

14.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'12 (5 UNITS) : Dry Gas Filter 2" 300#RF ‐ 2 Units & Dry Gas Filter 3" 300#RF ‐ 4 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Oct. 2012 

15.  Baker Hughes (M) Sdn Bhd /  Stbro Niaga Sdn Bhd 

10 Units Tote Tank Lifting Frame For 2000L & 1000L as per BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Oct. 2012 

16.  Mettube Sdn Bhd  Manpower Supply For Mandrel Bar Welding Work 

Manpower Supply  Oct. 2012 

17.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Temungo Metering Improvement Project  Materials Supply, Fabrication, Testing, Blasting & Painting. 

Oct. 2012 

 

Item  Client  Project  Scope  Year 

18.  Baker Hughes (M) Sdn Bhd /  Stbro Niaga Sdn Bhd 

28 Units Tote Tank Lifting Frame For 2000L & 1000L as per BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Nov. 2012 

19.  Vantage Oilfield Solutions Sdn Bhd  SS316L 6" & 3" Axial Test Column  Materials Supply, Fabrication & Testing. 

Nov. 2012 

20.  Petronas Carigali Sdn Bhd / Carimin Eng. Services Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Design & Engineering Service For Pipeline Replacement Project For PCSB‐SKO Nitrogen Bottle Rack (A ‐ 5921 SDV) : 4 Cylinders (3 Units)

Materials Supply, Fabrication, Testing, Load Test, Blasting &  Painting. 

Nov. 2012 

21.  Petronas Carigali Sdn Bhd /  Iicorr Asia Sdn Bhd 

6" OD 6000PSI Testing Rig c/w Electrical Motor Pump And Control Panel (1588/12) 

Design, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT. 

Nov. 2012 

22.  Iicorr Asia Sdn Bhd  Supply & Fabricate of SS316L Mounting Bracket For Sumandak Platform 

Materials Supply & Fabrication.  Dec. 2012 

23.  Redox Polymer Sdn Bhd  Plant Expansion : Piping Modification Work, Relocation Of New Piping Route, Civil Work And Shelter Steel Structure Work at Semenyih, Selangor. 

Engineering, Procurement, Construction & Commissioning (EPCC). 

Dec. 2012 

24.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

P225 ‐ Instrument Mounting Stand  Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec. 2012 

25.  Gas Malaysia Bhd /  Tech Infinity Engineering Sdn Bhd 

Dry Gas Filter 2" 300#RF ‐ 7 Units & Dry Gas Filter 4" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec. 2012 

26.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 10'12 (11 UNITS) : Dry Gas Filter 2" 300#RF ‐ 6 Units , Dry Gas Filter 3" 300#RF ‐ 10 Units & Dry Gas Filter 4" 300#RF ‐ 4 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec. 2012 

27.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project ‐ Piping & Supports 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec. 2012 

28.  Frontken Malaysia Sdn Bhd  Manpower Supply For 14" Valve Disc Repair & Welding Work ( 2 Units) 

Manpower Supply  Dec. 2012 

29.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project ‐ Instrument Stand Pole 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec. 2012 

30.  Gas Malaysia Bhd /  Alpha Flowtech Sdn Bhd 

Natural Gas Piping Works : 63 Units Rumah Teres Awam 2 Tingkat, 10E, Persint 11, Putrajaya

Materials Supply, Fabrication, Installation, Testing, Painting & Commissioning. 

Jan. 2013 

31.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

FCV Piping Modification – SBGAST  Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2013 

32.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Jan. 2013 

33.  Frontken Malaysia Sdn Bhd  Manpower Supply For 14" Valve Disc Repair & Welding Work ( 2 Units) 

Manpower Supply  Jan. 2013 

34.  Gas Malaysia Bhd /  Tech Infinity Engineering Sdn Bhd 

Dry Gas Filter 4" 300#RF ‐ 2 Units  Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2013 

 

 

Item  Client  Project  Scope  Year 

35.  Dermaga Oil & Gas Sdn Bhd  Electrical Wiring Work & 1" Air Compressor Piping at Seremban 

Materials Supply, Fabrication, Testing, Commissioning & Painting. 

Jan. 2013 

36.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project / CPF ‐ Piping & Supports 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2013 

37.  Flowgas Sdn Bhd  LPG Piping Work at Japanese Restaurant, SS15 Subang Jaya 

Materials Supply, Fabrication, Testing & Painting. 

Jan.  2013 

38.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project ‐ Materials Supply, Rental Of Cool Cutting & Beveling Machine, Hydrostatic Testing Equipment & Tools 

Materials Supply & Rental Services. 

Jan.  2013 

39.  Vantage Oilfield Solutions Sdn Bhd  SS316L Cap For 6" Test Column Screen  Materials Supply & Fabrication.  Feb. 2013 

40.  Vantage Oilfield Solutions Sdn Bhd  ESD Frame Skid For FC Gate Valve as per BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Feb. 2013 

41.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project ‐ Valve Leak Test 

Manpower, Equipment & Tools for Valve Leak Testing. 

Feb. 2013 

42.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project / CPF ‐ Piping & Supports ‐ Additional Work Order 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Feb. 2013 

43.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Feb.  2013 

44.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Feb. 2013 

45.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 10'12 (11 UNITS) : Dry Gas Filter 6" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Feb. 2013 

46.  Petrotechinal Inspection (M) Sdn Bhd /  SGS (M) Sdn Bhd 

2 Units Offshore Tool Box as per   BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Mar. 2013 

47.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Mar. 2013 

48.  Upstream Downstream Process & Services Sdn Bhd /  Ceraminas (M) Sdn Bhd 

80 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 (certify by DNV) 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Mar. 2013 

49.  Murphy Oil /  Stbro Niaga Sdn Bhd 

20 Units Tote Tank Lifting Frame For 2000L & 1000L as per BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Mar. 2013 

50.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Mar. 2013 

51.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Upgrade SMP‐A Operational Meter To Allocation Standard Liquid Skid For Petronas Carigali Sdn Bhd : Semarang 'A' Metering System

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Mar. 2013 

52.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (4 UNITS) : Dry Gas Filter 2" 300#RF ‐ 2 Units, Dry Gas Filter 3" 300#RF ‐ 2 Units, Dry Gas Filter 4" 300#RF ‐ 2 Units & Dry Gas Filter 6” 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Apr.  2013 

 

Item  Client  Project  Scope  Year 

53.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply.  Apr. 2013 

54.  Gas Malaysia Bhd /  Alpha Flowtech Sdn Bhd 

PROPOSED DEVELOPMENT PHASE 4C (BLOCK B) WITH 1 BLOCK OF 3 1/2 STOREY CARPARK WITH PODIUM & 1 BLOCK OF 15 STOREY DENGAN PODIUM DAN 4 BLOCK APARTMENT 15 WITH 120 UNIT APARTMENT AT PART OF LOT 44028 CYBERJAYA, SELANGOR DARUL EHSAN ‐ BLOK B (FASA 4C) 

Materials Supply, Fabrication, Installation, Testing, Painting & Commissioning. 

Apr.  2013 

55.  Petronas Carigali Sdn Bhd /  Carimin Eng. Services Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

SUPPLY AND DELIVERY OF NITROGEN BOTTLE RACK 036B/085 FOR BKP‐A  (EQP NO. A5931) : 4 Cylinders (1 Unit) 

Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

May  2013 

56.  Gas Malaysia Bhd / Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (5 UNITS) : Dry Gas Filter 3" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

May  2013 

57.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Upgrade SMP‐B Operational Meter To Allocation Standard Liquid Metering Skid For Petronas Carigali Sdn Bhd and Provision To Upgrade SMP‐C Operational Meter To Allocation Standard Liquid Metering Skid For Petronas Carigali Sdn Bhd : SMP‐C 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

May  2013 

58.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

May  2013 

59.  Enco Systems Sdn Bhd  Manpower Supply For OD 2.4(mtr) X 10(mtr) L  Boiler Fabrication Work 

Manpower Supply  May  2013 

60.  Iicorr Asia Sdn Bhd  Material Supply & Fabricate Work For Sumandak Platform 

Materials Supply & Fabrication.  Jun. 2013 

61.  Petronas Carigali Sdn Bhd / Rohrback Cosasco Systems Pte Ltd 

6" S/XXS Testing Rig c/w 4" 1502 FIG Weco Union Both End (10,000Psi) 

Design & Calculation, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jun. 2013 

62.  Petronas Carigali Sdn Bhd / Carimin Eng. Services Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Design & Engineering Service For Pipeline Replacement Project For PCSB‐SKO Nitrogen Bottle Rack (A ‐ 5921 SDV) : 4 Cylinders (1 Unit)  

Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting.  

Jun. 2013 

63.  Dermaga Oil & Gas Sdn Bhd  Vise Clamp Holder ‐ Internal Use  Materials Supply, Fabrication & Painting. 

Jun. 2013 

64.  Tech Infinity Engineering Sdn Bhd  Testing Spool 4" X 2" and Testing Spool 6" X 2" 

Materials Supply & Fabrication.  Jun. 2013 

65.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 3'13 (4 UNITS) : Dry Gas Filter 3" 300#RF – 2 units, Dry Gas Filter 4" 300#RF ‐ 4 Units & Dry Gas Filter 6" 300#RF ‐ 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jun. 2013 

 

Item  Client  Project  Scope  Year 

66.  Dermaga Oil & Gas Sdn Bhd  P713 ‐ Materials Supply and Fabrication Work 

Materials Supply, Fabrication & Painting. 

Jun.  2013 

67.  Dermaga Oil & Gas Sdn Bhd  P713 ‐ Materials Supply : 1" ANSI 600# Ball Valve (1 Unit) 

Materials Supply  Jun.  2013 

68.  Dermaga Oil & Gas Sdn Bhd  P578 ‐ Materials, Equipment and Tools Supply For Samarang Valve Replacement Project 

Materials Supply  Jun. 2013 

69.  Redox Polymer Sdn Bhd  1/2" Hot‐Dipped Galvanized Air Piping Work and Steel Canopy Fabrication Work 

Materials Supply, Fabrication & Painting. 

Jul.  2013 

70.  Tiong Nam Logistics Solution Sdn Bhd /  Bumi‐Mas Activity Sdn Bhd  

Memasang Pipe Spool Bagi Sistem Paip Retikulasi Gas Asli Berserta Turbine Meter Tolok 

Materials Supply, Fabrication & Painting. 

Jul. 2013 

71.  SUDD Petroluem Operating Company /  Dermaga Oil & Gas Sdn Bhd 

Return Line Flow Measurement For That Jath Metering Project ‐ Rental Services Of Hydrostatic Test Pressure Recorder and Tools For Hydrostatic Test 

Rental Services  Jul.  2013 

72.  Frontken Malaysia Sdn Bhd  Manpower Supply – Fitter  Manpower Supply  Jul. 2013 

73.  ZK Petro Sdn Bhd  2" S/40 Carbon Steel Pipe Spool Modification Work 

Materials Supply, Fabrication & Painting. 

Jul. 2013 

74.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (4 UNITS) CHANGE ORDER 1 (5 UNITS), SERVICE STATION FABRICATION WORK 

Fabrication Work  Jul. 2013 

75.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ Additional Flare Header Spool For Allocation Metering System

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2013 

76.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

SUPPLY, ENGINEERING INSTALLATION TESTING & COMMISIONING OF BASE SEDIMENT &WATER (BS&W) ANALYSER FOR CRUDE OIL PROJECT WEST LUTONG 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2013 

77.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

P303 : SMP‐A Additional Spool  Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2013 

78.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 2'13 (8 UNITS) : Dry Gas Filter 2" 300#RF – 6 units & Dry Gas Filter 3" 300#RF – 4 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2013 

79.  Ceraminas (M) Sdn Bhd  10 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 (certify by DNV) 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Blasting & Painting. 

Aug.  2013 

80.  Dermaga Oil & Gas Sdn Bhd  Blasting & Painting Work For T813 Ball Valves : 2" 1500# ‐ 4 Units & 3/4" 1500# ‐ 2 Units 

Blasting & Painting  Aug. 2013 

81.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ Supply, Fabrication & Installation Of SS316L Mounting Bracket For Limit Switch and Ball Valves Leak Testing & Pneumatic Testing 

Materials Supply, Fabrication, Installation & Testing. 

Aug.  2013 

 

 

Item  Client  Project  Scope  Year 

82.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ 1 Unit Juntion Box Stand 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug.  2013 

83.  White Horse Ceramic Industries Sdn Bhd 

Natural Gas Piping Repair, Maintenance & Painting Work 

Materials Supply, Fabrication, Testing & Painting. 

Aug.  2013 

84.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ 2 Units Mounting Support For X3301‐1R Flame Detector 

Materials Supply, Fabrication, Testing, Blasting & Painting 

Aug. 2013 

85.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ 1 Unit PT Mounting Support 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2013 

86.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

P926 ‐ Materials Supply For Hook‐Up & Commissioning 

Materials Supply  Aug. 2013 

87.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Install Booster Compressor Discharge Allocation Metering System For Petronas Carigali Sdn Bhd : LGAST ‐ Ball Valves Blasting & Painting Work 

Blasting & Painting  Aug.  2013 

88.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (8 UNITS) ‐ SS316 Meter Enclosure 

Materials Supply & Fabrication Work. 

Sep.  2013 

89.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Upgrade SMP‐A Operational Meter To Allocation Standard Liquid Skid For Petronas Carigali Sdn Bhd : Semarang 'A' Metering System ‐ Sampling Skid Piping and Sampling Skid Functional Test 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Sep. 2013 

90.  Dermaga Oil & Gas Sdn Bhd  P241 : Materials Supply, Blasting & Painting Work 

Materials Supply, Blasting & Painting. 

Sep. 2013 

91.  Dermaga Oil & Gas Sdn Bhd  S691 : Materials Supply  Materials Supply  Sep. 2013 

92.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 3'13 (4 UNITS) SERVICE STATION FABRICATION WORK 

Fabrication Work  Sep. 2013 

93.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (8 UNITS) SERVICE STATION FABRICATION WORK 

Fabrication Work  Oct. 2013 

94.  Vantage Oilfield Solutions Sdn Bhd 

VOS‐CE‐1300005 : Materials Supply  Materials Supply  Oct. 2013 

95.  Gas Malaysia Bhd /  Tech Infinity Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION MODIFICATION WORK FOR RENAI ENVIRO SERVICE STATION 

Materials Supply, Fabrication, Testing, Blasting & Painting,. 

Oct. 2013 

96.  

Panglima Power Station Sdn Bhd / Tech Infinity Engineering  Sdn Bhd 

Dismantle and Install Of 10" 300#RF Gas Flow Meter 

Manpower, Equipment & Tools.  Oct. 2013 

97.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd  

Provision To Upgrade SMP‐A Operational Meter To Allocation Standard Liquid Skid For Petronas Carigali Sdn Bhd : Spreader Bar c/w Slings & Shackles and PT Mounting Stand 

Materials Supply, Fabrication, Testing, Pull Testing, Blasting & Painting. 

Oct. 2013 

 

Item  Client  Project  Scope  Year 

98.  Petronas Gas Bhd /  Hammer Engineering Sdn Bhd 

AFV Replacement For Petronas Gas Berhad : Pipe Spool 

Fabrication Work.  Oct. 2013 

99.  Flowgas Sdn Bhd  Preparation Of Welding Procedure Specification (WPS), Procedure Qualification Record (PQR) & Welder Qualification Test (WQT) 

Materials Supply, Consultation, NDE, Mechanical Testing. 

Oct. 2013 

100.  Hammer Engineering Sdn Bhd  Pipe Spool Fabrication Work : 1 ½” S/40 SS316L 

Fabrication Work   Oct. 2013 

101.  Petronas Gas Bhd /  Hammer Engineering Sdn Bhd 

Regulator Replacement At M503 And M518  Fabrication Work   Oct.  2013 

102.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 2'13 (8 UNITS) Change Order 1 : Dry Gas Filter 3" 300#RF – 2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Oct.   2013 

103.  Smart Glove Corporation  Sdn Bhd  Natural Gas Piping : 4” 150# & 3” 150# ‐ 105mtr(L) 

JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Commissioning & Painting. 

Oct. 2013 

104.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 3'13 (11 UNITS)  : Dry Gas Filter 2" 300#RF – 2 units , Dry Gas Filter 3" 300#RF – 4 units & Dry Gas Filter 6" 300#RF – 2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Nov.   2013 

105.  Tech Infinity Engineering Sdn Bhd  Instrument Stand  Materials Supply, Fabrication, Testing, Blasting & Painting, 

Nov. 2013 

106.    

Petronas Carigali Sdn Bhd / Vantage Oilfield Solutions Sdn Bhd 

5K K.O.P Vessel Skid : Pressure Vessel as per ASME U2 & Skid Frame as BS EN 12079‐1 (Rental Equipment)

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code,  Blasting & Painting.  

 Dec. 2013 

107.  Sarawak Shell Berhad /  Mido Platform (Philippines) /  Vantage Oilfield Solutions Sdn Bhd 

90 BBL Surge  Vessel Skid : Pressure Vessel as per ASME Sect. VIII Div. 1  & Skid Frame as BS EN 12079‐1 (Rental Equipment) 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code,  Blasting & Painting.  

Dec. 2013 

108.  Amaniaga Resources(M)  Sdn Bhd  Petrofac : Crude Transfer Tank And ROV (Equipment Rental) 

Equipment Rental & Manpower Supply. 

Dec. 2013 

109.   Stbro Niaga Sdn Bhd  40 Units Tote Tank Lifting Frame For 2000L & 1000L as per BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting.  

Jan. 2014 

110.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'13 (8 UNITS) Change Order No. 1 ‐ SS316 Meter Enclosure 

Materials Supply &Fabrication Work. 

Jan. 2014 

111.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 3'13 (11 UNITS) ‐ SS316 Meter Enclosure 

Materials Supply &Fabrication Work. 

Jan. 2014 

112.  Petronas Gas Bhd /  Hammer Engineering Sdn Bhd 

Teluk Kalong City Gate Upgrading Works  ‐ SS316 Meter Enclosure 

Materials Supply &Fabrication Work. 

Jan. 2014 

 

Item  Client  Project  Scope  Year 

113.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Provision To Upgrade SMP‐B Operational  Meter To Allocation Standard Liquid  Metering Skid For Petronas Carigali Sdn Bhd :SMP‐B Downstream Spool Modification 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Mar. 2014 

114.  Mersing Construction & Engineering Sdn Bhd 

Projek Penggantian Paip Air Dasar Laut ke Pulau Ketam,2,000Mtr(L) 

Materials Supply, Fabrication, Testing, Internal Blasting & Painting. 

Mar. 2014 

 

115.  Bijak Aktif Sdn Bhd /  Synery Corp. Sdn Bhd 

EPDC OF 2 UNITS DIESEL TANK FOR PETRONAS CHEMICAL METHANOL SDN BHD – SS316 DIESEL TANK (2 Units) 

Design & Calculation, Materials Supply, Fabrication & Testing. 

Apr.   2014 

116  

 

Petronas Gas Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Pokok Sena City Gate Ultrasonic Removal For Calibration 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Apr. 2014 

117.  Duta Klasik Sdn Bhd  6” Air Manifold (Design Pressure : 16 Barg) – 20 Units 

Design & Calculation, Materials Supply, Fabrication, Testing,  Blasting & Painting. 

 Apr. 2014 

118.  Polypacific Polymers Sdn Bhd / Heat Engineering Sdn Bhd  

Vacuum Condenser & Vacuum Pot   Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting.   

May 2014 

119.  Upstream Downstream Process & Services Sdn Bhd  

6” Air Manifold ‐ Design Pressure : 16 Barg (Rental Equipment) – 15 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting.   

May 2014 

120.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 2'14 (8 UNITS)  : Dry Gas Filter 3" 300#RF – 4 units & Dry Gas Filter 4" 300#RF –4 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jun. 2014 

121.  Petrofac Malaysia Limited / Dermaga Oil & Gas Sdn Bhd 

Provision To Carry Out Modification At The Gas Outlet Of Test Separator For Installation Of Flow Meter To Measure Natural Gas Flow Rate And Execute Well Test Operation 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jun. 2014 

122.  Upstream Downstream Process & Services Sdn Bhd 

100 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 : certify by DNV‐GL (Rental Equipment) 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting.  

Jun. 2014 

 

123.  Dermaga Oil & Gas Sdn Bhd  3” 600# Ball Valve – 2 Units  Blasting & Painting  Jun. 2014 

124.  Transwater API Sdn Bhd  SS316 Meter Enclosure  Materials Supply &Fabrication Work. 

Jun.  2014 

125.  Deleum Chemical Sdn Bhd  Water Injection Booster  To Provided And Install The Pumping System To Boost The Water Injection System From Sumandak B To Sumandak A. 

Jun.  2014 

126.  Deleum Chemical Sdn Bhd  Actuator Valve Installation  To Supply And Install The Actuator Valve For The Pipeline On The Sumandak A Platform 

Jun.  2014 

 

Item  Client  Project  Scope  Year 

127.  Deleum Chemical Sdn Bhd  Pnuematic Valve Installation  Supply Manpower And Install The Pneumatic Valve On The Instrument Line At Sumandak A 

Jul.    2014 

128.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'14  (8 UNITS) ‐ SS316 Meter Enclosure 

Materials Supply &Fabrication Work 

Jul.    2014 

129.  Petronas Gas Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

Pokok Sena City Gate Ultrasonic Removal For Calibration : Site Installation &  Commissioning

Equipment Rental, Site Installation & Commissioning. 

Jul.  2014 

130.    

Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 2'14  (8 UNITS)  : Dry Gas Filter 3" 300#RF – 2 units & Dry Gas Filter 6" 300#RF –2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug.   2014 

131.    

Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 3'14 (11 UNITS)  : Dry Gas Filter 3" 300#RF – 8 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug.   2014 

132.  Vantage Oilfield Solution Sdn Bhd  Treating Ironwork Supply  To Supply The Weco Treating Ironwork For Various VOS Operation. 

Aug. 2014 

133.  Baker Hughes (M) Sdn Bhd  9 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 : certify by DNV‐GL 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting.  

Sep.  2014 

 

134.  TOTAL BORNEO E&P BV  / TECHNIP FAREAST SDN BHD /  OAKWELL ENGINEERING (M) SDN BHD 

MAHARAJA LELA SOUTH PROJECT : Onshore Processing Plant Energizer Make‐Up (Agitator Storage Tank Skid) as per ASME Sect. VIII Div. 1  

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting And Commissioning. 

Sep. 2014 

 

135.  Amaniaga Resources(M)  Sdn Bhd  Test Blind 20” 150# ‐ 4Pcs & 16” 150# ‐ 2Pcs  Materials Supply  Oct.  2014 

136.  Petronas Carigali Sdn Bhd  /  Vantage Oilfield Solutions Sdn Bhd 

10K PSI Choke Manifold Skid : Skid Frame as BS EN 12079‐1 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code,  Blasting & Painting.  

Oct.  2014  

137.  Petronas Carigali Sdn Bhd  /  Vantage Oilfield Solutions Sdn Bhd 

Adjustable Pipe Support (50 Sets)  Design & Calculation, Materials Supply, Fabrication, Testing,  Blasting & Painting.  

Oct.  2014 

138.  Uzma Engineering Sdn Bhd  Manpower Supply  To Supply Manpower For Well Testing Operation At Sarawak Water Operation 

Oct.  2014 

139.  Baker Hughes M Sdn Bhd  Clamp On Metering  Supply And Install The Clamp On Metering For Baker Hughes Coil Tubing Operation In Shell Sarawak Water. 

Nov.  2014 

140.  Petronas Carigali Sdn Bhd / Dermaga Oil & Gas Sdn Bhd 

To Conduct WPS/PQR/WQT As Per  AWS D1.1 : 2010 

Preparation Of Pre‐WPS, Supply Of Materials, Equipment, Tools, Consumables & Manpower c/w Supervision And Mechanical Testing As Per Code.  

Nov.  2014 

141.  HB LABORATORIES Sdn Bhd  2 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 : certify by DNV‐GL 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting.  

Nov.  2014 

 

 

Item  Client  Project  Scope  Year 

142.  HESS EXPLORATION AND PRODUCTION (MALAYSIA) B.V 

6 Units Tote Tank Lifting Frame For 2000L as  per DNV 2.7‐1 : certify by DNV‐GL 

Design & Calculation, Materials Supply, Fabrication, Testing, Load Test, Certification As Per Code, Blasting & Painting.  

Dec.  2014 

 

143.  Petrofac Malaysia Limited / Dermaga Oil & Gas Sdn Bhd 

Provision To Supply, Install And Commissioning UClamp‐On For West Desaru 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Dec.  2014 

 

144.  Petronas Carigali Sdn Bhd (SKO) / Transwater API Sdn Bhd 

Petronas Carigali Sdn Bhd (SKO) : BNDP‐I Pipe  Spools (Upgrading Project)

Materials Supply, Fabrication, Testing, Blasting & Painting.

Dec. 2014

145.  

Schlumberger Petroluem Equipment Supplies Sdn Bhd 

Equipment Racks, Trolley, MTR Rack, Work  Bench And Extender Rack. 

Materials Supply, Fabrication, Testing, Blasting & Power Coating. 

Jan.  2015 

 

146.  Petronas Gas Berhad / Dermaga Oil & Gas Sdn Bhd 

P1723‐Instrument Stand Pole c/w Transmitter Mounting Clamp 

Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan.  2015 

147.  Gas Malaysia Bhd / Transwater API Sdn Bhd 

 Dry Gas Filter 4" 300#RF –2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2015 

148.   

Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/FD/DR PHASE42'14 (10 UNITS)  : Dry Gas Filter 3" 300#RF – 2 units & Dry Gas Filter 4" 300#RF –6 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2015 

149.  

Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

F2500 Dry Gas Filter 2" 300#RF – 1 unit 

Design & Calculation, JKKP submission & approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Feb. 2015 

150.  Vantage Oilfield Solution Sdn Bhd 

Treating Ironwork Supply  To Supply The Weco Treating Ironwork For Various VOS Operation. 

Feb. 2015 

151.  Vantage Oilfield Solution Sdn Bhd 

Oil in Water Instrument  To Supply The Oil In Water Instrument Unit For VOS Operation. 

Feb. 2015 

152.  Uzma Engineering Sdn Bhd  Manpower Supply  Supply The Manpower for the Well Testing Operation For Sarawak Water Operation 

Mar. 2015 

 

153.  Petronas Carigali Sdn Bhd/ Dermaga Oil & Gas Sdn Bhd 

POLE LAMP MOUNTING, ELECTRIC SUPPORT AND INSTRUMENT SUPPORT AND INSTRUMENT SUPPORT FOR LIQUID ALLOCATION METRING SYDTEM AT D18, D35, BAYAN AND TEMANA PLATFORM. 

Materials Supply, Fabrication, Blasting &Painting. 

Mar. 2015 

 

154.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 1 ’15 (5 UNITS) Dry Gas Filter 2" 300#RF – 4 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Mar. 2015 

155.  MMC GAMUDA KVMRT (T)  Sdn Bhd / CSRG ENGINEERING (M) Sdn Bhd 

PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH – KAJANG : TUNNEL AUXILIARIES CABLE & PIPE BRACKET (45,890 SETS) 

Materials Supply, Fabrication, Testing, Hot Dipped Galvanized And Site Installation. 

Mar. 2015 

 

156.  MMC GAMUDA KVMRT (T)  Sdn Bhd / CSRG ENGINEERING (M) Sdn Bhd 

PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH – KAJANG : MUZIUM NEGARA – BLOCK WALL 

Manpower Supply To Erect Block Wall And Civil Work. 

Apr. 2015 

 

157.  Uzma Engineering Sdn Bhd  Pressure Testing unit and Manpower supply  To Assist The Well Testing Operation For Uzma Engineering 

Apr. 2015 

 

 

Item  Client  Project  Scope  Year 

158.  PETRONAS Carigali Sdn Bhd/ MMHE/ Dermaga Oil & Gas Sdn Bhd 

BESAR PROJECT (BsDPA) : SUPPLY & DELIVERY OF WET GAS METERING FOR  BsDPA  (6” SCH40s DUPLEX STAINLESS STEEL –  FLOW METER CALIBRATION SPOOL) 

Fabrication, Testing, Blasting & Painting. 

May 2015 

 

159.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 2 ’15 (4 UNITS) Dry Gas Filter 2" 300#RF – 2 units & Dry Gas Filter 3" 300#RF – 6 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

May 2015    

160.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 1 ’15 (10 UNITS)  Dry Gas Filter 6" 300#RF – 2 units , Dry Gas Filter 4" 300#RF – 2 units & Dry Gas Filter 3" 300#RF – 6 units  

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jun. 2015    

161.  PETRONAS Carigali Sdn Bhd/ MMHE/ Dermaga Oil & Gas Sdn Bhd 

BESAR PROJECT (BsDPA) : SUPPLY & DELIVERY OF WET GAS METERING FOR BsDPA (SS316 INSTRUMENT STAND    2” Ø – 14 UNITS) 

Fabrication, Testing, Blasting & Painting. 

Jun. 2015 

 

162.  Kejuruteraan Gosan (M) Sdn Bhd  VAPORIZER SKID : PIPING & CAGE FRAME SKID  Materials Supply, Fabrication, Testing, Blasting & Painting And FAT. 

Jun. 2015 

 

163.  PETRONAS Gas Bhd/ Dermaga Oil & Gas Sdn Bhd 

ALOR GAJAH CITY GATE RECTIFICATION WORKS : PIPE SPOOLS UPGRADING 

JKKP Submission & Approval (PTI & PTO), Materials Supply, Fabrication, Testing, Blasting & Painting, Site Installation And SAT 

Jul. 2015 

 

164.  Gas Malaysia Bhd. / Tranwater API Sdn. Bhd. 

Dry Gas Filter 300#RF = 22 Units Dry Gas Filter 2” 300# = 6 Units Dry Gas Filter 3” 300# = 10 Units Dry Gas Filter 4” 300# = 6 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Aug. 2015 

 

165.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 3 ’15 (10 UNITS)  Dry Gas Filter 6" 300#RF – 6 units , Dry Gas Filter 4" 300#RF – 4 units  Dry Gas Filter 3" 300#RF – 6 units Dry Gas Filter 2" 300#RF – 2 units  

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Aug. 2015    

166.  PETRONAS Gas Bhd/ Dermaga Oil & Gas Sdn Bhd 

ALOR GAJAH CITY GATE RECTIFICATION WORKS : PIPE COATING SYSTEM – APPLY AND INSTALLATION OF  VISCOTAQ AT INLET & OUTLET RISERS.  

Manpower, Material Supply, Installation & Testing 

Aug. 2015 

 

167.  Tabung Haji Heary Engineering / Dermaga Oil & Gas Sdn Bhd 

PROVISION FOR THE SUPPLY OF V‐CONE ELEMENT SYSTEM (HPHT) FOR KINABALU NAG PHAASE 2 ‐ SS316L PROCONE 26” WT37 600# (ASTM A358‐316L) = 2 Units ‐ SUPER DUPLEX PROCONE 20” S/40 600# (ASTM A790‐CL1 UNS S32760)  = 2 Units 

Fabrication, Testing, Blasting & Painting 

Aug. 2015 

  

168.  EXXONMOBIL / Sapura Kencana/ TURCOMP Engineering Services Sdn Bhd 

PROVISION DETAILEDDESIGN ENGINEERING SERVICE FOR TAPIS EOR AND REJUVENATION PROJECT – BROWNFIELD : CHEMICAL INECTION PUMP AND CI FEED TANK 672‐3‐P‐508/509 

Design & Calculation, Materials Supply, Fabrication, Testing, Blasting & Painting And FAT 

Sep. 2015 

169.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 5’15 (10 UNITS)  Dry Gas Filter 6" 300#RF – 2 units , 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Oct. 2015 

 

Item  Client  Project  Scope  Year 

170.  Gas Malaysia Bhd. / Tranwater API Sdn. Bhd. 

Dry Gas Filter 300#RF = 12 Units Dry Gas Filter 2” 300# = 8 Units Dry Gas Filter 3” 300# = 2 Units Dry Gas Filter 4” 300# = 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Oct. 2015 

171.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 5'15  (1 UNIT)  : Dry Gas Filter 6" 300#RF –2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Oct. 2015 

172.  SIEMENS / DAELIM / PETROFAC / IM KINETIC PTE LTD / TURCOMP 

Oman Oil Refineries & Petroleum Industries Company SAOC : SOHAR Improvement Project – Poly Electrolyte Dosing Skid A, B, C & D (4 Units) 

Design & Calculation, Materials Supply, Fabrication, Testing, Blasting & Painting And FAT 

Nov. 2015 

173.  PETRONAS Gas Bhd/ Dermaga Oil & Gas Sdn Bhd 

TANJUNG KLING METER STATION RECTIFICATION WORK : STATION PIPE SPOOLS UPGRADING 

JKKP Submission & Approval (PTI & PTO), Materials Supply, Fabrication, Testing, Blasting & Painting, Site Installation and SAT 

Nov. 2015 

174.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION PHASE 6'15  (3 UNITS)  : Dry Gas Filter 3" 300#RF –4 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Dec. 2015 

175.  Gas Malaysia Bhd /  Tech Infinity Engineering Sdn Bhd 

Dry Gas Filter 300#RF = 8 units  Dry Gas Filter 2” 300# = 2 Units Dry Gas Filter 3” 300# = 4 Units Dry Gas Filter 6” 300# = 2 Units

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting

Jan. 2016 

176.   Synery Corp. Sdn Bhd  1550 Gallon Air Receiver (2 units)  Design & Calculation, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2016 

178.  HESS Exploration & Production Malysia B.V / Sapura Kencana Petroleum / Marine Energy S/B 

Diesel Transfer Pump Skid – 3 Units  Design & Calculation, Materials Supply, Fabrication, Testing, Blasting & Painting. 

Jan. 2016 

179.  BJ Services (M) Sdn. Bhd.  C0271‐15 : SAIPEM PORTUGAL COMERCIO MARITIMO‐LIWAN PROJECT‐ (TEST PRESSURE = 6250PSI) 

Materials Supply, Fabrication, NDE, Testing & Painting. 

Feb. 2016 

180.  Gas Malaysia Bhd. / Tranwater API Sdn. Bhd. 

Dry Gas Filter 300#RF = 10 Units Dry Gas Filter 3” 300# = 8 Units Dry Gas Filter 6” 300# = 2 Units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Feb. 2016 

181.  Petronas Carigali Sdn. Bhd. / Maser Marine Engineering Sdn. Bhd. 

FABRIC EXPANSION JOINT SS316L Size : OD 2,032mm X ID 1,829mm X 730mm (H) 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Mar. 2016 

182.  Murphy / RAM‐BYTES Sdn. Bhd.  SA‐AA LIVING QUATERS – MainPotable Water Storage Tank (T‐5230) Size : 6,020mm X 4,420mm X 3,827mm 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Mar. 2016 

183.  Anticorrrosion Protective Systems (M) Sdn. Bhd. / Emerging EPC Sdn.  Bhd. 

Offshore Frame Structure (Wind Drum) Size : 5,544mm X 4,400mm X 4,400mm 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Mar. 2016 

 

 

Item  Client  Project  Scope  Year 

184.  Petonas Carigali Sdn. Bhd. / Malaysia Marine And Heavy Engineering Sdn. Bhd. / Turcomp Engineering Services Sdn. Bhd. 

Provision of Feed Services for F12 Gas Development Project : Chemical Injection Package 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Apr. 2016 

185.  Petronas Carigali Sdn. Bhd. / Sapurakencana Petroleum Bhd./ Marine Energy Sdn. Bhd. 

BNJT‐K And TTJT‐A Wellhead Platform (WHP) –  AODD Pump Skid: ‐Closed Drain Pump Skid (A‐6420A) ‐Closed Drain Pump Skid (A‐6420B) ‐Diesel Fuel Transfer Pump Skid (A‐6730) ‐Open Drain Caisson Pump Skid (A‐6520) 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Apr. 2016 

186.  Gas Malaysia Bhd /  Hammer Engineering Sdn Bhd 

EPCC OF THE SERVICE STATION SS/F/DR PHASE 2'16 (3 UNITS)  : Dry Gas Filter 8" 300#RF –2 units 

Design & Calculation, JKKP Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting 

Apr. 2016 

187.  Talisman Malaysia LTD / Marine Energy Sdn. Bhd. 

Oil Transfer Pump Skid : ‐BS‐A ‐BR‐C ‐BK‐C 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Jun. 2016 

188.  Talisman Malaysia LTD / Intech O&G Sdn. Bhd. 

Diesel Transfer Pump & Service Water Pump  Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Jun. 2016 

189.  Sapurakencana Energy /  Top Mix Engineering Sdn. Bhd. 

Supply of portable Water Tank Package For SK310 B15 Development 

Design & Calculation, Submission & Approval, Materials Supply, Fabrication, Testing, Blasting & Painting, FAT 

Jun. 2016 

 

 

 

   

100 Units Tote Tank Lifting Frame For 2000L as per DNV 2.7‐1 : certify by 

DNV‐GL (Rental Equipment) 

 

Dry Gas Filter 2”,3”,4”,6”  300#RF

6" OD 6000PSI Testing Rig c/w Electrical Motor Pump And Control Panel 

(1588/12) 

 

 

   

 Projek Penggantian Paip Air Dasar Laut ke Pulau Ketam,2,000Mtr(L) 

 

  

  Metering Station EPCC Of Pokok Sena New City Gate 

   

 

      

 

 

 

 

 

 

90 BBL Surge Vessel Skid : Pressure Vessel as per ASME Sect. VIII Div. 1  &

Skid Frame as BS EN 12079‐1 (Rental Equipment)

28 Units Tote Tank Lifting Frame For 2000L & 1000L as per BS EN 12079‐1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ESD Frame Skid For FC Gate Valve as per BS EN 12079‐1 

EPDC OF 2 UNITS DIESEL TANK FOR PETRONAS CHEMICAL METHANOL SDN 

BHD – SS316 DIESEL TANK (2 Units)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5K K.O.P Vessel Skid : Pressure Vessel as per ASME U2 & Skid Frame as BS 

EN 12079‐1 (Rental Equipment)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Offshore Tool Box as per BS EN 12079‐1 

 

 

 

 

 

 

 

 

 

Provision To Upgrade SMP‐A Operational Meter To Allocation Standard Liquid 

Skid For Petronas Carigali Sdn Bhd : Semarang 'A' Metering System 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Honda, Melaka ‐ Steel Structure (Load Structure Assembly, Load Hanger Rail

Assembly, Load Cat Walk, Safety Fence Layout Installation, Unload Structure 

Assembly, Unload Hanger Rail Assembly, Unload Cat Walk) 

 

10K PSI Choke Manifold Skid: Skid Frame as BS EN 12079‐1 

   

 

Maharajalela South Project, Onshore Processing Plant, Energizer Make‐Up Skid 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chemical Injection Skid 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alor Gajah City Gate Rectification Works.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POLY ELECTROLYTE DOSING SKID 4 UNITS 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C0271‐15(Saipem Portugal Comercio Maritimo‐LIWAN Project) –  (Test Pressure 6250psi) 

   

   

HQ & Fabrication Yard:           Branch: 

No. 5, Jalan TPP 5/10,          No. 39, Jalan Asli 17, Taman Perindustrian Puchong,        Taman Pasir Putih, 47100 Selangor, Darul Ehsan. Malaysia.      811700 Pasir Gudang, 

                Johor, Darul Takzim, Malaysia. 

 

Contact Us:              Contact Us: 

T: +603‐8066 9739            Person In‐charge : Chew Ming Thai     F: +603‐8066 9736            T: +607‐2560 086 M: +6012‐2365 238            M: +6016‐7115 971 

 Email: [email protected]             [email protected] Website: www.epcfprima.com                                                                                                    

Updated : 20/6/2016