Description of the Implementation Strategy for Process Certification (Six Sigma) at Hamilton Sundstrand, United Technologies Corporation
Mark Milward & Pete Teti, IIE Annual Conference & Expo 2009Hamilton Sundstrand, UTC May 30 – June 3rd
Windsor Locks, Connecticut Doral Golf Resort & SpaMiami Florida
2
Speaker Bio
Mark D. Milward, CSSMBBSix Sigma Master Black BeltFmr. Manager, Process CertificationHamilton Sundstrand,Windsor Locks, ConnecticutUnited Technologies CorporationEMAIL:[email protected]
Mark Milward has nineteen (19) years experience in Manufacturing and Quality Engineering. He was a pioneer in the introduction, development and application of Surface Mount Technology principles and practices. His experience covers work within the Aerospace, Electronics, and Medical Devices industries. Mark received his Principal Black Belt in Lean manufacturing in 2001. He is a ASQ certified Six Sigma Black Belt (2003) and an IIE certified Six Sigma Master Black Belt (2009). Mark joined Pratt & Whitney, UTC in 2004 where he led cross-functional teams implementing Process Certification in the Supply Base at domestic and international locations. At Hamilton, Mark was responsible for implementing Process Certification at the Windsor Locks manufacturing facility for internal operations. His responsibilities included training, coaching, mentoring Black Belts/Green Belts, project and standard work development, infrastructure design, and implementation of the Statistical Process Control (SPC) system for data collection, SPC Proficy 5.5 ; GE Fanuc.
Mark has a B.S. in Manufacturing Engineering Technology from Barry University, Miami Fl, and an MBA from Nova Southeastern University, where he is on leave from Doctoral studies in Business Administration.
3
Process Certification is a primary element of UTC’s Operating System, ACE(Achieving Competitive Excellence). It isan application that enables us to delivervalue to our Customers and Investors. It isthe highest state of process maturity inACE.
The objective of Process Certification is toestablish process capability of 1.33 Cpk orbetter on those key part characteristics(KPCs) that have been defined by Design and Mfg Review teams. It seeks tocontrol variation so that processes alwaysachieve acceptable results. The aim is toestablish robust processes with controlplans and reaction plans to out-of-controlconditions.
Levels of Competitive Excellence:
ACE BronzeACE SilverACE Gold
Process Certification and the ACE Operating System
4
Process Certification Milestones Model vs DMAIC Model
• Create problem statement.• Identify CTQs.• Define Performance standards.• Identify Customers• CT trees• Financial analysis• Define project objectives.• Project Charter
• Collect data• Evaluate measurement system.• Determine process capability.• Graphical techniques• Identify process inputs/outputs.• Control charts on process y’s• Fishbone diagram
• Hypothesis tests• Multi-Vari analysis• Correlation• Regression• SPC• Brainstorming• Identify sources of variation.• MSA on x’s
• Design exp.• Cost/benefit analysis.• ANOVA• Process maps• Corrective actions.• Control Charts• Determine new process capability.
• Implement process control• Mistake proofing• Financial validation• Lessons learned communicated.• Control plan SPC• System changes to establish improvements.• Standard procedures• Final deliverables• Communicated project success.
*
* The Black Belt Memory Jogger – Six Sigma Academy
5
October 2006 – Process Certification Kaizen Event
6
Process Certification Steering CommitteesProcess Certification Executive Sponsors and Steering Teams
Executive SponsorsJoe Adams - VP EngineeringDon McDonald - VP QualityDave Galuska - VP Operations
Steering CommitteeDir Engineering Roger StammDir Electronic Op’s Rocky LaporteDir Mechanical Eng. Gregg AbbottDir Supply Base Ron SepeTech. Fellow Pete Teti
Process Certification CouncilAMS Dean HalterES Dana RagallerPS Matt KeoghFlight Paul CarvalhoKidde Terry SimpsonElectronic Op’s Roland HadeMechanical Ops (RKFD) Dave MoserTech. Consultant Pete TetiASE Walt ScottJSF Luke WissmanMechanical Ops (WLOX) Mark MilwardSupplier Dev John GaughanEngineering Carl HoukProcCert Standard Work Dave SladewskiQuality Technologies Mark VoislowP&WA Fellow Eric Taylor
HS Working Together Team (WTT) Chairman: Bob Leduc, President, Flight SystemsCo-Chairman: Joe Triompo, President, Engine SystemsCo-Chairman: Tim Morris, President, Aerospace SystemsCo-Chairman: Mike Dumais, VP & GM Customer Service
WTT Meeting Weekly to Drive Quality Strategy
Standard Work Process CertificationHigh Impact ACE Teams Mfg Process ReviewsCorrective Action Boards Certified Quality Clinics
7
Outlining the Challenge – Multiple Plant sites
York, NEPlant site
HSunpac BedokPlant site
RockfordMFG
Plant site
HSunpac ChangiPlant site
RockfordAssemblyPlant site
WLOXMFG
Plant site
8
• 3P Formula (Production, Planning, Preparation)– Standard Work and Procedures Team– Engineering Classification of Characteristics Team– Process Certification Systems Team
• UTCQR-09.1 (Process Certification Requirements)– Pratt & Whitney
– Hamilton Sundstrand
– Sikorsky Aircraft
– Otis Elevator
– Carrier
– UTC Power
– UTC Research Center
Outlining the Challenge – Team Approach
9
Key System Components & Infrastructure Design
Procedures
Standard Work
Data Collection & Reporting Systems
Training
INTERNAL HS SUPPLIERS
Process Certification
10
Process Certification Training Status
Mechanical Operations, Bldgs I &II (WLOX) 7/18/07
Training Levels
Total
Total Comp.
%
Complete
Target Population
PC
100/101
755
755
100%
Required for all
associates in the organization
PC 201
55
55
100%
All Manufacturing/ Quality Engineers;
Selected Supervisors
PC 301
3
3
100%
Selected
Manufacturing/Quality Engineers
PC 100/101 – 1 hr. Orientation PC 201 – 24 hrs training – UTC Green Belt Certification PC 301 – 96 hrs training – UTC Black Belt Certification
11
Standard Work and Procedures – HT0985/HT0990/PR9103
How to do a Gage R&R Study in SPC Proficy 5.5 How to do a Gage R&R Study in MinitabHow to perform a Gage Repeatability Study on a Test Rig
Six Sigma Green Belt Project Template
How to Create an Xbar-R Control Chart in Minitab
How to Read SPC Control Charts
How to Perform a Normality Test in Minitab
How to Create a Capability Sixpack in Minitab
How to Call Up a Data Report List Part no. in SPC Proficy 5.5
QC0911 Form RRCACause & Effect Diagram5 Why AnalysisGreen Belt Project TemplateFault Tree Analysis*
How to Perform a Box CoxTransformation in Minitab
How to Fill Out the KPI/KPO Form
12
• “How do we select what’s important”– HSC16199
Engineering Classification of Characteristics
Engineering Discretion
HSC Designed Items
CTQ PARTSFlight/Industrial Safety Parts
Benefit from Variation
Management?
KPC1Characteristic
FSC(Frozen Process)
Could Characteristic Create an Unsafe
Condition?
No Yes
Does the
Characteristic Affect CTQ Elements?
KPC2Characteristic
Yes
No Minor Characteristic
No
Decision at Part/Assembly Level
Does the Part/Assembly Impact
CTQ Elements?
Safety Part/Assembly?
No
Non CTQ Part
No
Box 2
Benefit to Increased
Inspection?
Box 0
YES
YES
NO
Yes
All Parts/Assemblies
CTQ Elements
Analysis & VOC
Customer Turnback Data
Customer Complaints/MFA
Customer Requirements
Benefit from Variation
Management?
Yes
No
Source Control/Vendor Item DrawingsCTSC CTQC
YesYes
• Overlap between HSC16199, HS15000 & QC13.01-03.
– Confusion exists regarding proper selection and classification of characteristics.
– Confusion with regards to minor characteristics.
• No standardized identification of FSC/KPC among the various engineering groups.
– Lack of standard work and robust design guidelines creates confusion.
• Perceived vagueness concerning KPC2 designation.
– Current definition too broad and all encompassing.
• No process for manufacturing characteristics.
13
• “Tools & logistics supporting execution of what’s important”
• KPC Database– Primary Control Plan– Milestone activity status– Key Characteristics (KPC1, KPC2)– Internal/Supplier CTQs/KPCs– Customer Program Status CTQ/KPC (i.e. Boeing, Northrop, etc.)
• Process Certification Database– Training Status– Black Belt/Green Belt Project status– Standard Work– SPC Data Collection/Low Cpk Reports– Stop Light Charts
• SPC Data Collection System– SPC Proficy 5.5 (GE Fanuc)– Monitor– 50 Licenses 5 Administration
Process Certification Systems
14
Process Certification Database – HS Internal Operations
15
Supplier Quality & Development
OVERVIEW OF SYSTEM FUNCTIONALITY
Primary Control Plan- KPC gets loaded- Email notification
to Supplier- Milestone tracking
Site Specific Plan- Supplier fills in Control- KPIs, Gage Study
and Initial ProcessCapability resultsrecorded
Provides real-time SPC analysis
Visu
al S
PC S
yste
m
Real-Time SPC- Supplier collects
data at machine
KPC Entry Web-Page- Supplier accesses KPC
Webpage to select P/N(s)from pick-list they are authorizedto report on
Supplier Upload Tool- Supplier enters ProCert
data into Upload Tool- Alerts will be generated
depending on Cpk performance
ABC CompanyABC Company
12345 ABC Company12345 ABC Company
16
• Leadership of Top Management 6.29– WTT
• Statistical/Analytical tool Usage 6.10– SPC Proficy 5.5
• Managerial Process 5.76
• Six Sigma (ProCert) training programs 5.54– PC100, PC201, PC301
• Black Belt’s background– Career path in quality 3.30– Education background (engineering/business) 3.50– Education level ND– Quality organization affiliation ND– Personality 5.74– Managerial capability 5.69– Personnel with experience 4.89
• Previous quality programs adoption 4.33
• Full-time and part-time Black Belt ND
*Critical Success Factors
* Critical Success Factors of Six Sigma Implementation (Lee, 2002)
Propositional Factors Likert scale (1-7)
17
Process Certification Training Center
18
Implementation Results
Pro Cert Black Belts
Pro Cert Green Belts
COPQ/SRR Reduction
Variation Reduction
ProCert Standard Work
Customer Satisfaction
Boeing AS9103 GOLDVariation Management
ACE SILVER
Black Belt Projects
Green Belt Projects
Supplier Quality & Development Program
19
Phase II - Manufacturing to ProCert Business Applications