process diagram templatesapidp/...sap mii 15.0 production supervisor production operator send...
TRANSCRIPT
M10 - Manufacturing of Bulk Products without Process Management
(i.e. without Using PI Sheets), Sample Material MII-3000
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 3
M10 - Manufacturing of Bulk Products without Process Management
(i.e. without Using PI Sheets), Sample Material MII-3000
Shop Floor Scheduler
SAP ERP ECC 6.07 SAP MII 15.0
Quality Specialist Production Operator
Create Process Order
1
Record In-Process Usage Decision
C
Post Goods Movements
7
Production Supervisor
Create and Release Process Order
2 A
Record In-Process Control Result
B
Confirm Process Order
4 D
Post Goods Movements
6 D
Record Post-Process Usage Decision
C
Record Post-Process Control Results
B
Check Material and Batch (availability) in
Stock
E
3
Warehouse Specialist
Confirm Process Order
5
M10 - Manufacturing of Bulk Products with Process Management (i.e.
using PI Sheets), Sample Material MII-3200 - 1 of 4
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 5
M10 - Manufacturing of Bulk Products with Process Management (i.e.
Using PI Sheets), Sample Material MII-3200 (1/4)
SAP MII 15.0
Production Operator
Create Control Recipe
9
Determine Batches and Generate Control Recipe
F
Read Inspection Lots
11
Production Supervisor
Create and Release Process Order
A
Send Order and Control Recipe
8 G
Select Order and Identify Material Batches
D
Review Process Order
D
Show Work Instruction for Order Execution
H
Read Inspection Lot Characteristics
12
Next Page
Shop Floor Scheduler Production Supervisor
SAP ERP ECC 6.07
Quality Specialist
10
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 6
M10 - Manufacturing of Bulk Products with Process Management (i.e.
Using PI Sheets), Sample Material MII-3200 (2/4)
Shop Floor Scheduler
SAP MII 15.0
Production Supervisor Production Operator
Send Process Messages
13
Update Process Order
14
Production Supervisor
Sign off Work Instruction Execution
H
Review In-Process Result Recording
J
Review In-Process Usage Decision
L
Update Inspection Lot
16
Previous Page
Send QM Messages
15
Confirm In-Process Result Recording
17 I
Post Result Recording
18
Record In-Process Usage Decision
19 K
Post Result Recording
20
Next Page
Quality Specialist
SAP ERP ECC 6.07
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 7
M10 - Manufacturing of Bulk Products with Process Management (i.e.
Using PI Sheets), Sample Material MII-3200 (3/4)
Shop Floor Scheduler
SAP MII 15.0
Production Supervisor Production Operator
Confirm Process Order
5
Post Goods Movements
7
Production Supervisor
Confirm Process Order
4 D
Post Goods Movements
6 D
Record Post-Process Control Results
N
Review Process Order Confirmation
M
Previous Page
Next Page
SAP ERP ECC 6.07
Quality Specialist
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 8
M10 - Manufacturing of Bulk Products with Process Management (i.e.
Using PI Sheets), Sample Material MII-3200 (4/4)
Shop Floor Scheduler
SAP ERP ECC 6.06 SAP MII 15.0
Warehouse Specialist Production Operator Production Supervisor
Create Instruction from Message
P
Create a message in Shift Book
O
Review Process Order Status
Q
Previous Page
Review KPI Gauges
Q
SAP ERP ECC 6.07
Quality Specialist
Record Post-Process Usage Decision
C
Check Material and Batch (availability) in
Stock
E
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 9
M10 - Manufacturing of Bulk Products Icon Legend (1/2)
Icon Name
COR1
QE51N
QA11
Operation Cockpit -> Production
Confirmation
MMBE
COR2
CO53
Operation Cockpit - > Work Instructions
Operation Cockpit - > Quality Control ->
Results Recording
QA03
Production Supervision -> Usage
Decision
Icon Legend
A
B
C
D
E
F
G
H
I
J
K
Icon Name
QA13
COR3
QPR4
Operation Cockpit - > Shift Book->
Current Messages
Operation Cockpit - > Shift Book->
Current Instructions
Production Supervision
L
M
N
O
P
Q
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 10
M10 - Manufacturing of Bulk Products Icon Legend (2/2)
Icon Name
Transaction: LoadConfirmationTable
Synchronous RFC:
BAPI_PROCORD_GET_LIST
Synchronous RFC:
RFC_READ_TABLE
Transaction:ProcessOrderHeaderConf
Synchronous RFC:
BAPI_PROCORDCONF_CREATE_HDR
Transaction:GoodsMovementPosting
Synchronous RFC: BAPI_GOODSMVT
_CREATE
ABAP Report RCOCB006
tRFC CONTROL_RECIPE_DOWNLOAD
Transaction:
ReadControlRecipeFromQueue
Batch job: parseControlRecipe
Synchronous RFC:
QIRF_SEND_INSP_REQUIREMENTS
Icon Legend
Icon Name
Synchronous RFC:
QIRF_REQUIREMENTS_GET_DAT2
Transaction: sendInformationToSAP
Synchronous RFC:
BAPI_PROCESS_MESSAGE_CREATE
MLT
Transaction: SendQMInformationToERP
Synchronous RFC:
QIRF_GET_ALL_DATA_VALUES2
Transaction: ProcessRecordResults
Synchronous RFC:
BAPI_INSPOPER_RECORDRESULTS
Transaction: setUsageDecision
Synchronous RFC:
BAPI_INSPLOT_SET_USAGEDECISION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 12
Integration with Other SAP Best Practice Processes and
Scope Items
The process diagram might contain links to preceding, succeeding, or other related SAP Best Practice Processes or scope items.
Note that these scope items may or may not be part of the solution package.
Refer to the Prerequisite Matrix for the definition which scope items are part of the solution package.
Note: this slide is optional. For more
information how to deal with this slide,
refer to the guideline.
© 2015 SAP SE or an SAP affiliate company. All rights reserved. 18
© 2015 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an
SAP affiliate company.
SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE
(or an SAP affiliate company) in Germany and other countries. Please see http://global12.sap.com/corporate-en/legal/copyright/index.epx for additional
trademark information and notices.
Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.
National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind,
and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or
SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and
services, if any. Nothing herein should be construed as constituting an additional warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related
presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated
companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be
changed by SAP SE or its affiliated companies at any time for any reason without notice. The information in this document is not a commitment,
promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various risks and uncertainties
that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking
statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.