PROCESS PLANT DIVISION
General Presentation
-
Capabilities
Total Project Management with IT System
Experience
General Information
Company Overview Company Location Vision & Philosophy Business Area Field of Service Our Clients Organization Overseas Distribution Manpower Resources Research and Development Quality Control & Assurance/HSE Major Reference for Process Plant Projects Project Document Control System Engineering Data Management 3D CAD System Procurement & Material Management System Schedule and Progress Control Construction Management System Pre-Commissioning & Commissioning Management SystemContents
-
Company Overview
Year Established
1974 as an Engineering Arm of Hyundai Group
President & CEO
Dong Wook Kim
Manpower Strength
1,765 Staff (As of March 2009)
Business Area
Process Plant- Power & Energy Plant
- New Industrial Plant
Infrastructure & EnvironmentGlobalization
Engaged mostly in overseas projects
(about 75%)
-
Business Area
2
- Onshore Production & Gathering Offshore (Fixed Facilities
&
Floating Mobile Unit)
Oil & Gas ProcessingUpstream
PetrochemicalChemicalsFertilizerDownstream
Refinery Aromatics LNGMidstream
Field of Service
FULL RANGE OF SERVICE
EPC
EP
FEED
PMC
E
EP,CM
Feasibility Study
Conceptual
Engineering
FEED
PMC Services
Total Project Management
Construction Management
Commissioning & Start-up
Operation & Maintenance
Basic & Detail
Engineering
Procurement
Procurement Service
Construction
3
-
Our Clients (Overseas)
OIL MAJOR COMPANY
4
-
Our Clients (Overseas)
STATE OWNED OIL & GAS COMPANY
5
-
Our Clients (Domestic)
6
-
Organization
7
Technology Innovation
& Development Office
Upstream Oil&GasLNG FacilitiesOil RefineryOil TerminalPetrochemicalFertilizer &ChemicalsOk-chul Kim
Nam-wook Park
Thermal Power PlantCombined Cycle Power PlantCogeneration Power PlantDiesel Power PlantGeothermal/Wind Power PlantHydro & Pumped StoragePower Pant
Transmission, Substation &Distribution
Nuclear Power PlantNew & Renewable EnergyPower System StudiesInfra
RoadStructureUrban PlanningArchitectureEnvironment
Water Supply & SewerageWater PowerUnderground WaterEnvironmentNew Business Opportunitiesin the era of GDP $ 30,000,
Strategic future
Business to Create newcontents
Dong-kyu Paik
technology development Quality managementProcess ManagementAnalysis
Wee-chul Kim
Yoon-young Lee
Planning Business Analysis Public Relation (PR)Industrial Environment DesignCreative Value for ClientsPlanning Office
Dae-young Ji
HR Planning, HRD, HSEAccounting, Budget Control
Personnel, Employee Welfare,
Domestic and Foreign-
constriction management
Won-keuk Lee
OUTSOUR. & PROCUREMENT
Jong-ho Lee
Material ProcurementTransportation, L/CCustoms InspectionOutsourcing Partner (Vendor)Selection
POWER & ENERGY PLANT
PROCESS PLANT
INFRA & ENVIRONMENT
INDUSTRIAL PLANT
BUSINESS & MARKETING
GEN. ADMIN. & MGT.
Sang-wook kim
Domestic & InternationalMarketing & Contract
Marketing DevelopmentNational Risk ManagementIntegrated Marketing fornew markets
-
Overseas Distribution
Korea :
HDO Clean Fuels Project
Hyundai Oil Refinery Phase I & II
Hyundai Petrochemical Complex I & II
Incheon LNG Project
Yongduk Wind Power Plant
FGD Facility for Pyongtaek TPP
Brazil :
Porto Velho 340 MW CCPP
China :
Chishui Urea Plant
Pingdingshan Urea Plant
Shaanxi Urea Plant
Libya :
Attahaddy Gas Field Development (350 MMSCFD)
Ras Lanuf Petrochemical Complex Phase II
Misurata Thermal Power Plant
Nigeria :
Bonny Terminal Integrated Project
India :
HPCL Hydrogen Generation Plant
GMR MADRAS DPP
Mangalore Barge Mounted CCPP
Iran :
South Pars Phase 4 & 5 (2,000 MMSCFD)
South Pars Phase 2 & 3 (2,000 MMSCFD)
Kuwait :
KNPC New Oil Pier Project
Petroleum Hydrotreatin Catalyst Plant
Qatar :
QGPC NGL-4 Plant
Philippines :
Petron TCCU Revamp & Mixed Xylene
NPC-1159 230KV Substation
Indonesia :
Suban I & II Gas Project
Sumpal Gas Project
Miwon CPP
Malaysia :
GPP Stage II & III, IV (each 500 MMSCFD)
TAWAU DPP
Thailand :
NPK Fertilizer Complex
Bangladesh :
Kailashtilla LPG Plant
Meghnaghat CCPP
Pakistan:
Pirkoh Gas Compression
Project
Saudi Arabia :
Makkah Taif TPP
Romania :
Petrobrazi CPP
UAE :
UAE Rebar Mill
Vietnam : Pha Lai II Thermal Power Plant
Ba Ria add-on CCPP
Greece :
Crude & Vacuum Distillation
Taiwan : Fomosa Lube Base Oil
Yemen :
Ras Issa Refinery Project
Republic of Equatorial Guinea :
The Potable Water Supply Project,
Colombia:
Colombia Diesel Unit(HDT)
Overseas Projects
(75%)
Domestic Projects
(25%)
8
Mexico:
FEED of Sempra Baja LNG Terminal Project
-
Human Resources
PERMANENT EMPLOYEES
As of March, 2009
186
115
714
ADMINISTRATIVE
1,552
MARKETING
& PROPOSAL
Staff Location
----------------------------------
Head Office 1,461
Overseas 151
Domestic Site 123
Task Force Office 30
----------------------------------- Total 1,765
Staff Experience
-----------------------------------
Over 20 Years (20%)
10~20 Years (47%)
0 ~10 Years (33%)
----------------------------------- Average Experience : 13 Years
107
106
ENGINEER
Overall Manpower Breakdown
-------------------------------------
Project Management 179
Engineering (Subtotal) 1,041
Process & Safety 126
Civil & Arch 130
Piping 155
Mechanical 215
Electrical 102
C&I 105
Infra & Environmental 176
Nuclear 32
Construction Management 148
Procurement 46
Technical Planning 11
R&D / IT 39
QA/QC & HSE 53
Commissioning 35
Marketing & Proposal 106
Administrative 107
-------------------------------------
TOTAL 1,765
-
Korea Research Institute of Chemical Technology
MTO
Development of manufacture of light olefin from methanol and DME
2006. 11 ~ 2009. 10
Korea Electric Power Research Institute
CO2 2nd Stage
Scale up and Optimization Study on the CO2 recovery Process utilizing high performance absorbents of CO2
2006. 11 ~ 2009. 9
Korea Institute of Energy Research
GTL
Development of manufacture of FT synthetic oil with natural gas
2006. 8 2009. 7
Research & Development on Process Technology
Principal
Subject
Period
KICTEP
LNG
Detailed Planning on LNG plant Area
2007.10 2008. 2
10
-
Quality Control & Assurance
INSPECTION CONTROL MEASURING CONTROL TEST EQUIPMENT CONTROL QUALITY RECORDS CONTROL INTERNAL QUALITY AUDIT QUALITY POLICY CONTROL MANUAL QUALITY PROCEDURES WORK PLAN PROCEDURES INSPECTION AND TEST PLANS DESIGN&DOCUMENT CONTROL(DRN, 3D REVIEW)
PROCUREMENT CONTROL(SPMAT)
SPECIAL PROCESS CONTROL FIELD MATERIAL CONTROL CONSTRUCTION CONTROL COMMISSIONING &STARTUP CONTROL(FSI)
PLAN
PRACTICE & ACTION
AUDIT & MONITORING
QUALITY IMPROVEMENT
COST REDUCTION
CUSTOMER VALUE MAXIMIZATION
11
-
PS - Online Review & Electronic Markup
On-Line Design Review
- Online DRN (Design Review Notice)
- Verification by related Discipline
Comment Method Change
- Hard Copy (paper) => Electronic Markup
Online Review
Elect. Markup
Quality Control & Assurance
12
-
Quality Control & Assurance
Q-Captains System
Q-CAPTAINS
Critical
Area
Critical Point Focused Quality Control System by Experienced Quality Engineer
(Q-Captains) during Preparation and Execution of the Project
QCaptains are responsible for identified
critical areas taking care of;
Mechanical Hauling & Access Plan (MH&AP) Safety in Design (SID) Constructability Consistency Check with P&ID Spec. Safety and HAZOPCritical
Area
Critical
Area
Critical
Area
Critical
Area
Critical
Area
13
-
Quality Control & Assurance
Flawless Startup Initiative (FSI)
- Lead the implementation of FSI in the respective Q Area
- Monitor the execution of the potential flaws mitigating action
Q-CAPTAINS - Ensure that FSI is considered in the relevant project activities
RESPONSIBILITY - Own the Q Area registers and documents
- Report regularly to management
- Take corrective actions if targets for FSI Plan are not met
- Identify and participate in Q Syndicate
FSI Q-Captains System
14
FSI ORGANIZATION
AWARENESS TRAINING
FLAW-LIST & MITIGATION
ACTION PLAN
LESSONS LEARNED
WORKSHOP
PREPARE Q AREA
WORK PLAN
PREPARE Q AREA
PROCEDURES
PROGRESS MONITORING
HEALTH CHECK
(FSI READINESS)
QUALITY SYSTEM
for
COMMSIONING & START UP
99.9% of ALL TESTED FUNCTIONALITY
is
FIRST TIME RIGHT
-
Health, Safety, Environment
15
ISO 14001
OHSAS 18001
HSE
Harmonizing between the Plant and Environment
Maintaining a Safe Working Environment
Integrated Implementation Plan
Compliance with all HSE Legislation
Achieving the Target Established
Program for Self Motivation
on HSE
*
-
Integrated Project Management with IT System
Internal Communication
Procurement Management
SPMAT (Intergraph), HiPCS, HPWCS
Schedule & Progress Measurement
PRIMAVERA
HECOS (In-house )
Project Document Control System(EDMS)
ProjectSpace (EDMS)
Engineering Management
EDIS (In-house), 3D CAD
Pre-Commissioning & Commissioning
HPCM
Construction Management
WJCS
HECs IT SOLUTION
16
-
Data Consistency : Single Entry Data Input
Total Project Management with IT System
EDIS
3D CAD
(PDS/PDMS)
LLM
ISO DWG
EDM
Electrical
IDM
Instrument
LDM
SAM
Line
Equipment
ELM
HPCM
HPMAC
SPI
SPPID
ProjectSpace - Project Deliverables (P&ID, MDR etc)
Tag No
(Line, Equipment, Instrument Tag)
Tagged Item w/System No.
Process Data
APTools
Piping Design Data
SPMAT
Design Data
Equipment ListList ListInstrument ListMotor ListPR
E&I
Check ListInspectionSheets
BOMMaterial CodeInstrument IndexHook-up DrawingLoop DiagramPI
All
PI
SP Explorer
(EDIS + SPPID + SPI + SPMAT + HPCM + 3D CAD + ProjectSpace)
ELD
17
P&IDs
2D Nav (P&ID & Documents Browsing)
-
Project Document Control System
Project Document Control System (ProjectSpace/EDMS)
Electronic Document Management System (EDMS) from DocumentumCustomizing of Documentum Software to PDCS in 1998ProjectSpace is web based project portal system to enhance performance of data management by achieving real time logging and distribution of various data to numerous participants (vendors and subcontractors) located at various working places.18
*
-
Example of EDMS and Network Configuration
Project Document Control System
19
-
Engineering Data Management
EDIS System Configuration
3D CAD
(PDS/PDMS)
Engineering Data in Plant Life Cycle
D
A
T
A
B
A
S
E
IDM
Line
Data
Instrument
Data
Equipment
Data
Eqp. Tag
Inst. Tag
Project Common Data
M
O
D
U
L
E
R
E
P
O
R
T
Setup
Project
Import
Export
ProjectSpace
CAESAR II
Line ListPackage ListEquipment ListLoading D/SNozzle ListInstrument
Process D/S
LDM
SAM
Line Tag
Legend
existing
future
ELD
2D Nav
EDM
LLM
P&IDs
File
ISO DWG
Load List Motor ListElectrical
Instrument
Line
Equipment
ELM
SPF
EAM(CMMS)
SP Materials
HPMAC
COMMERCIAL & IN-HOUSE
SYSTEM INTERFACE
SPI
SPPID
Qualified Document & Asset Database for Client
20
Why EDIS?
HECs In-house Package to integrate, manage and share engineering data among disciplines
Process & Piping : Line List, Stress Analysis Data Vendor Piping Specialty
Mechanical : Equipment List
Instrumentation : Instrument Index, Instrument Data Sheet, Vendor Instrument Data
Electrical : Electrical Load List
Civil & Construction : Equipment Loading Data
*
-
3D CAD System
HECs 3D Modeling system has been introduced to improve efficiency of engineering, reduce construction error and assure operation satisfactory.All disciplines are assigned in the 3D Modeling system and over 90% of Engineering Works are designed and reviewed by 3D Modeling system.3D Modeling System
21
System & Specifications
Line List
Material
Spec.
Plot Plan
(ELP)
P&ID
Inst.
Index
Equip.
List
Loading
Data
SPMat
RCM
IDCM
ISO Drawing
Control Module
MPM
Modling
Progress Module
PSMT
CRM
Clash Review
Module
Plan Drawing
Spool BOM
Spool Drawing
Purchase BOM
Isometric Drawing
LDM
Line Data
Management
ELD
Equipment
Loading Data
EDM
Electrical Data
Management
ELM
Equipment List
Management
IDM
Instrument Data
Management
SAM
Stress Analysis
Management
Catalog
Design Review
Structural
Equipment
Piping
Hanger & Support
HVAC
Electrical
Drawing & Report
Space Management
e-Draw /
Plantwave
Spool GEN
Report Control
Module
Pipe Support
Material Take-Off
Equipment Detail
Inline Instrument
Manhole
Pipe Support Module
Penetration Hole
U/G Module
Joint Detail
Engg
Data
EDIS
3D
In-House
Program
-
3D CAD System
3D Modeling Review System in 3 Phase for Accessibility, Operability, Maintainability (AOM) Objective of each PhasePhase #1 (30%) -To verify the plot plan
Phase #2 (60%) -To define the piping and cable layout to the required detail for starting the preparation
of construction drawings
Phase #3 (90%) -To assure that the model contains sufficient information for the production of final
documents for fabrication and erection and for the final check of the material requirements.
Facilitator & Q-CaptainsFacilitator is charge of overall management through the whole 3D Modeling Review Process.
Q-Captains are responsible for the accuracy of 3D Model Review on the their assigned Area.
3D Modeling Review System - Smart Plant Review
22
*
-
Procurement Management System
Planning and scheduling Standardization Quantification Supplier management Inquiry process andpurchasing
Tracking Progress measurement Inventory and warehousemanagement
Construction planningSPMAT Integrated Life Cycle Material and
Supply Chain Management Solution
Material libraries
on project or
Enterprise level
Material Life Cycle
Library
(MLCL)
Inventories,
Forecasts &
Issues
Site Management
(SM)
Turn engineers
into Procurement
Knowledge
Engineering &
Procurement
Integration
(E&PI)
Procurement
Traffic Expediting
& Inspection
Material Supply Chain
Management
(MSCM)
23
*
-
Schedule & Progress Management System
EDMS
(Project Space)
PRIMAVERA
PMSA
24
Schedule Control
Work Breakdown Structure
Project Master Schedule
Project Detail Schedule
Schedule Analysis
Resource Control
Document Control
Master Document Register
Material Status Report
Construction BOQ Sheet
Progress Control
Project S-Curve
Progress Summary Progress
Progress Calculation Sheet
Behind Report
Work Done (or To Be Done) Report
-
Check List
Punch List
Status Report
Progress Report
Welding Control
Pressure Test Control
NDE/PWHT Control
Spool Control
Short/Stock/Surplus
Spool B/M
PO/BM/DWG
Tracking
Project Space
(EDMS)
Schedule & Progress
Construction Progress Control
Pre-Commissioning & Commissioning
Construction Management System
PRIMAVERA
Punch Control
Procurement Control
Real Time Performance
HPCM
WJCS
SPMAT
Work Breakdown Structure
Project Master Schedule
Project Detail Schedule
Schedule Analysis
Resource Control
25
-
INPUT
OUTPUT
HPCM
* HPCM (Hyundai Pre-commissioning & Commissioning Management System)
Import/Export
Export
Project Start
Ready for Construction
Mechanical
Completion
Ready for
Start-up
Ready for
Operation
Engineering
Pre-commissioning
Commissioning
Start-up
Project Data
Engineering Data
(Equipment, Line,
Cable, Instrument)
Subsystem Data
Geographical Data
Scheduling Data
Data Management
Pre-Comm. & Comm.
Job Generation
Check List Generation
Punch List Management
Report Generation
Progress Calculation
Check List
Punch List
Status Report
Progress Report
Pre-comm. and Commissioning Management System
26
- Check/Test Sheets Data Reports Progress Chart
Output Reports
Pre-comm. and Commissioning Management System
27
-
References for Major Process Plant Projects
REFERENCE FOR MAJOR PROJECTS OF PROCESS PLANT
OIL REFINERY PLANTPETROCHEMICAL PLANTCHEMICALSOIL & GAS PRODUCTION/PROCESSING LNG FACILITIESOFFSHORE FACILITIESAs an EPC contractor or Engineering Contractor, we have executed over 400 process plant projects with a total installed value cost far exceeding $15 billion.
28
HYUNDAI
-
CLIENT
NAFTEC Spa/ Algeria
LOCATION
Arzew, AlgeriaCONTRACT PERIOD
2009. 01 ~ 2011. 11CAPACITY
- Rehabilitation Project (Revamping)
Atmospheric Distillation
(60,000 BPSD 90,000 BPSD)
- Adaptation Project (New)
LNHT & ISOM
(7,500 BPSD, RON=88, UOP)
References for Major Process Plant Projects
Oil Refinery Plant
ARZEW Refinery Project
29
*
-
CLIENT
Hyundai Oilbank Co., Ltd.Korea
CAPACITY
Heavy Oil Upgrading Plant
ARDS : 66,000 BPDS- RFCC : 52,000 BPDS
LOCATION
Daesan , Korea
CONTRACT PERIOD
2008. 5 ~ 2011. 6HDO #2 HOU Project
Oil Refinery Plant
References for Major Process Plant Projects
30
Project Site
-
CLIENT
Map Ta Phut Olefins Co., Ltd.Thailand
CAPACITY
Benzene : 193,000 MTPA
Toluene : 101,000 MTPA
Mixed Xylene : 139,000 MTPA
LOCATION
Rayong , Thailand
CONTRACT PERIOD
2008. 1 ~ 2010. 1Aromatics Recovery Unit Project
Oil Refinery Plant
References for Major Process Plant Projects
31
-
CLIENT
Pak Arab Refinery Ltd. (PARCO)Pakistan
CAPACITY
Diesel Hydro Desulfurizer Facilities
DHDS Unit : 26,000 BPSD
LOCATION
Mahmood Kot, Pakistan
CONTRACT PERIOD
2008. 6~ 2010. 9MCR DHDS Project
Oil Refinery Plant
References for Major Process Plant Projects
32
-
*
CLIENT
Kuwait National Lube Oil Company, KuwaitCAPACITY
Hydroisomerisation (HIU) : 7,000 BPSD
Hydrofinishing (HFU) : 6,500 BPSD
Hydrogen Plant (HPU) : 4 package
Amine Treating (ATU) : 2 TPD
LOCATION
Shuaiba, Kuwait
CONTRACT PERIOD
2007. 10 ~ 2011. 4Oil Refinery Plant
Base Oil Plant Project
References for Major Process Plant Projects
33
*
61
-
*
CLIENT
SK ENERGY, KOREA
CAPACITY
Alkylation : 18,000 BPSDSulfur : 620 TPD
Spent Acid Recovery: 150 TPD
Butamer : 13,000 BPSD
LOCATION
Ulsan, Korea
CONTRACT PERIOD
2006. 2 ~ 2008. 4Oil Refinery Plant
SK NO. 2 FCC Project
References for Major Process Plant Projects
34
*
61
-
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
CAPACITY
#1 Mogas Hydrotreating Unit : 20,000 BPSD
#2 Hydrogen Manufacturing Unit : 45,000 Nm3/hr
#3 Gas Oil Hydrotreating Unit : 25,000 BPSD
LOCATION
Daesan, Korea
CONTRACT PERIOD
2003. 12 ~ 2005. 10Oil Refinery Plant
HDO CLEAN FUELS PROJECT
References for Major Process Plant Projects
35
-
Phase 1
(Grass Root)
Phase 2
Capacity (BPSD) Licensor
CDU #1100,000-
VDU44,000-
LPG Merox 2,000UOP
Kerosene Merox 7,000UOP
Naphtha Hydrotreater #16,000UOP
Catalytic Reformer #1 4,000UOP
Gas Oil Hydrotreater #1 16,000UOP
Hydrocracker 22,000UOP
Delayed Coker19,000F/W
Hydrogen Generation (MMSCFD)54KTI
Sulfur Recovery (MT/D) 180JGC
Capacity (BPSD) Licensor
CDU #2200,000-
Gas Oil Hydrotreater #132,000EXXON
Kerosene / Gas Oil-
Hydrotreater 24,000EXXON
Kerosene Hydrotreater 24,000EXXON
Naphtha Hydrotreater #2 20,000UOP
Platformer #2 20,000UOP
Sulfur Recovery (MT/D) 180JGC
HYUNDAI OIL REFINERY PROJECT
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
LOCATION
Daesan, KoreaCONTRACT PERIOD
Phase 1(Grass Root) 1986 ~ 1988Phase 2 1994 ~ 1996
Oil Refinery Plant
References for Major Process Plant Projects
36
-
Oil Refinery Plant
CLIENT
Formosa Petrochemical Co.CAPACITY
Base Oil : 10,000 BPSD#2 VDU : 57,000 BPSD
LHDC : 25,000 BPSD
MSDW : 14,000 BPSD
WOU : 10,000 BPSD
LOCATION
Taiwan
CONTRACT PERIOD
2005. 2 ~ 2007. 6Lube Base Oil Project
References for Major Process Plant Projects
37
-
CLIENT
HELLENIC ASPROPYRGOSREFINERY S.A.
CAPACITY
Atmospheric :54,000 BPSDVacuum :15,000 BPSD
LOCATION
Attica, Greece
CONTRACT PERIOD
1997. 7 ~ 2001. 12CRUDE & VACUUM DISTILLATION
UNIT
Oil Refinery Plant
References for Major Process Plant Projects
38
-
CLIENT
Hyundai Oilbank Co., Ltd.Korea
CAPACITY
Paraxylene : 300,000 MTPABenzene : 108,000 MTPA
LOCATION
Daesan, Korea
CONTRACT PERIOD
1996 ~ 1997HYUNDAI OIL AROMATICS PROJECT
Oil Refinery Plant
References for Major Process Plant Projects
39
-
*
CLIENT
Petro Vietnam, Vietnam
CAPACITYPolypropylene : 150,000 MTPA
LOCATION
Dung Quat, Vietnam
CONTRACT PERIOD
2008. 1 ~ 2010. 4Petrochemical Plant
Dung Quat PP Project
References for Major Process Plant Projects
40
Site
Hanoi
Site
Hochi minh
Refinery
*
61
-
*
CLIENT
Arabian Amines Company
CAPACITYEthyleneamine : 27,200 MTPA
LOCATION
Al-Jubail, Saudi Arabia
CONTRACT PERIOD
2007. 12 ~ 2010. 1Petrochemical Plant
AAC Ethyleneamines Project
References for Major Process Plant Projects
41
*
61
-
CLIENT
Daesan MMA Corporation, Korea
CAPACITY
MMA (Methyl Methacrylate) : 90,000 MTPA- MMA Purification Unit
LOCATION
Daesan, Korea
CONTRACT PERIOD
2007. 5 ~ 2009. 2MMA Project
References for Major Process Plant Projects
Petrochemical Plant
42
*
61
-
CLIENT
Daesan MMA Corporation, Korea
CAPACITY
PMMA (Poly Methyl Methacrylate) : 40,000 MTPA- Polymerization Unit
- Extrusion Unit
- Monomer Recovery Unit
- Pelletizing & Packing Unit
- Utility & Offsite Facilities
LOCATION
Yeosu, Korea
CONTRACT PERIOD
2007. 4 ~ 2008. 6PMMA Project
References for Major Process Plant Projects
Petrochemical Plant
43
*
61
-
Phase I
Phase II
Capacity (MTPA)Licensor
- Ethylene 350,000MW Kellogg
- Butadiene 57,000Nippon Zeon
- SM100,000Raytheon (Badger)
- LDPE (Tubular)100,000 BASF
- LLDPE 60,000 Stamicarbon
- HDPE100,000 Phillips
- PP170,000 Himont
- EO/EG 100,000 Scientific Design
- RPG Hydrotreating430,000 IFP
- Benzene Recovery140,000HRI
Capacity (MTPA)Licensor
- Ethylene 450,000MW Kellogg
- Butadiene104,000Nippon Zeon
- MTBE 100,000 CD-Tech
- SM 200,000 Raytheon (Badger)
- EO/EG 200,000 Scientific Design
- EVA/LDPE (Autoclave) 85,000 Exxon
- HDPE/LLDPE130,000 UCC
- PP160,000 Technipol
- VCM 50,000 Mitsui Toatsu
- PVC 150,000 Geon
- Benzene Recovery 190,000 IFP
- SBR 82,000 Goodyear
CLIENT
Hyundai Petrochemical Co., Ltd.
LOCATION
Daesan, KoreaCONTRACT PERIOD
Phase I 1988 ~ 1991Phase II 1995 ~ 1998
Petrochemical Plant
HYUNDAI PETROCHEMICAL
COMPLEX I & II
References for Major Process Plant Projects
44
-
CLIENT
Ras Lanuf Oil & Gas Processing Co.
CAPACITY
HDPE : 80,000 MTPA (UCC UNIPOL Process)LLDPE : 80,000 MTPA (UCC UNIPOL Process)
LOCATION
Ras Lanuf, Libya
CONTRACT PERIOD
1991 ~ 1998RAS LANUF PETROCHEMICAL COMPLEX
Petrochemical Plant
References for Major Process Plant Projects
45
-
*
Chemicals
S-2 Project
References for Major Process Plant Projects
CLIENT
Kumgang Korea Chemical Co., Ltd.
(KCC), Korea
CAPACITY
Methyl Chloro Silane Monomer : 50,000 MTPA- Distillation, Hydrolysis, Polymer,
- HTV, Gum, Polymer Storage (2nd)
LOCATION
Daesan, Korea
CONTRACT PERIOD
2005. 8 ~ 2007. 1046
*
61
-
*
Chemicals
CLIENT
Kumgang Korea Chemical Co., Ltd.
(KCC), Korea
CAPACITY
Methyl Chloro Silane Monomer
: 25,000 MTPALOCATION
Jeonju, Korea
CONTRACT PERIOD
2001 ~ 2004KCC SILICON PROJECT
References for Major Process Plant Projects
47
*
61
-
*
CLIENT
SAUDI ARAMCO
CAPACITY
1) FEED Gas Inlet Facilities2) Gas Treatment Facilities
(600 MMSCFCD x 3 Trains)
- Acid Gas Removal Unit
- Acid Gas Enrichment Unit
- TEG Gas Drying Unit
- Propane Refrigeration Unit
3) Offsite
LOCATION
Karan Gas Field, Saudi Arabia
CONTRACT PERIOD
2009. 3 ~ 2012. 1Oil & Gas Production/Processing
KARAN Gas Facilities Project
References for Major Process Plant Projects
48
*
61
-
*
CLIENT
QATAR SHELL GTL LIMITED
CAPACITY
LPU Package Product: 140,000 BPSDNaphtha: 17,800 BPSD
Gas Oil: 32,684 BPSD
Base Oil: 16,616 BPSD
LOCATION
Ras Laffan, Qatar
CONTRACT PERIOD
2006. 7 ~ 2010. 9Oil & Gas Production/Processing
Pearl GTL C5 Project
References for Major Process Plant Projects
48
*
61
-
*
CLIENT
Saudi Aramco
CAPACITY
Sour associated Gas : 563 MMSCFDHydrocarbon Condensate : 18.8 MBD
315 MMSCFD of associated Gas
70 MBPCD of C3+ NGL Production
LOCATION
Khurais, Saudi Arabia
CONTRACT PERIOD
2006. 9 ~ 2009. 5Oil & Gas Production/Processing
Khurais Project
References for Major Process Plant Projects
49
*
61
-
CLIENT
Agip Iran BV
CAPACITY
500 MMSCFD x 4 TrainsLOCATION
Assaluyeh, Iran
CONTRACT PERIOD
2002. 3 ~ 2005. 2SOUTH PARS GAS FIELD
DEVELOPMENT PHASES 4&5
Oil & Gas Production/Processing
References for Major Process Plant Projects
50
-
CLIENT
Total Fina Elf NIOC
CAPACITY
500 MMSCFD x 4 TrainsLOCATION
Assaluyeh, Iran
CONTRACT PERIOD
1999. 3 ~ 2003. 3SOUTH PARS GAS FIELD
DEVELOPMENT PHASES 2 & 3
Oil & Gas Production/Processing
References for Major Process Plant Projects
51
-
Oil & Gas Production/Processing
References for Major Process Plant Projects
CLIENT
PETRONAS GAS SDN. BHD., Malaysia
CAPACITY
Sales Gas : 250 MMSCFD x 3
LOCATION
Kerteh, Terengganu State, Malaysia
CONTRACT PERIOD
1990 ~ 1994GAS PROCESSING PLANT
2 & 3, 4 (GPP-2/3,4)
52
-
CLIENT
Qatar Petroleum Corporation
CAPACITY
NGL : 10,200 TPDEthane : 3,150 TPD
Propane : 3,000 TPD
Butane : 2,100 TPD
LOCATION
Dukhan & Mesaieed, Qatar
CONTRACT PERIOD
1999. 8 ~ 2003. 6NGL-4 PROJECT
Oil & Gas Production/Processing
References for Major Process Plant Projects
53
-
CLIENT
Sirte Oil Company
CAPACITY
Gas Treatment : 350 MMSCFDCondensate : 31,000 BPD
LOCATION
Attahaddy, Libya
CONTRACT PERIOD
1999. 9 ~ 2004. 2CLIENT
Saudi ARAMCO
CAPACITY
Gas Processing Facilities : 1,600 MMSCFDLOCATION
Hawiya, Saudi Arabia
CONTRACT PERIOD
1998. 8 ~ 2002. 4ATTAHADDY GAS FIELD
DEVELOPMENT PROJECT
Hawiyah Inlet and
Auxiliary Facilities
Oil & Gas Production/Processing
References for Major Process Plant Projects
54
-
NEW OIL PIER AND ASSOCIATED
TOP SIDE FACILITIES
CLIENT
Kuwait National Petroleum Company
CAPACITY
Trestle 2,960m, Berth 4 units,Loading Arm 36 units
LOCATION
Mina Al-Ahmadi, Kuwait
CONTRACT PERIOD
2001. 3 ~ 2004. 4Oil & Gas Production/Processing
References for Major Process Plant Projects
CLIENT
Shell Petroleum Development Company
CAPACITY
Oil Treatment : 1,510,000 BPDLOCATION
Bonny, Nigeria
CONTRACT PERIOD
2002. 3 ~ 2006. 2BONNY TERMINAL INTEGRATED PROJECT
55
-
References for Major Process Plant Projects
CLIENT
Tokyo Gas Engineering Co., Ltd.Japan
CAPACITY
Terminal and Trunk Line
Phase I : 3,370 KTPA
LOCATION
Zhuhai, China
CONTRACT PERIOD
2007. 10 ~ 2008. 6LNG Facilities
Zhuhai LNG Terminal FEED Services
56
-
CLIENT
Korea Gas Corporation
CAPACITY
Berth Facilities : 75,000 Ton
LNG Storage Tank : 100,000 K x 3 Units
LNG Vaporization & Sendout Facilities
LOCATION
Inchon, KoreaCONTRACT PERIOD
1991. 5 ~ 1996. 12INCHON LNG RECEIVING TERMINAL
INCHON LNG RECEIVING TERMINAL(1st Extension)
CLIENT
Korea Gas Corporation
CAPACITY
LNG 7.5 x 10^6 MTPA
Send-Out : 3,060 Ton/Hr
STORAGE TANK
- Above-ground : 10 Units
- In-ground : 8 UnitsLOCATION
Inchon, KoreaCONTRACT PERIOD
1991 ~ 1998LNG Facilities
References for Major Process Plant Projects
57
-
DONGHAE-1 NATURAL GAS PRODUCTION FACILITIES
CLIENT
Korea National Oil Corp., Korea
CAPACITY
4 Legged Jacket with 8 Skirt Piles4 Legged 4 Level Deck
Gas : 50 MMSCFD
Condensate : 15 BBL/MMSCFD
LOCATION
KoreaCONTRACT PERIOD
2001. 3 ~ 2003. 11CLIENT
UNOCAL Makassar Ltd.
CAPACITY
TLP (Tension Leg Platform)FPU (Floating Production Unit)
60,000 bbl/Oil & 150 MMSCFD Gas Processing
LOCATION
IndonesiaCONTRACT PERIOD
2001 ~ 2003WEST SENO FIELD DEVELOPMENT PROJECT
Offshore Facilities
References for Major Process Plant Projects
58
-
CLIENT
ONGC, India
CAPACITY
Gas : 30 MMSCFDLOCATION
India
CONTRACT PERIOD
1997 ~ 1999BCP-A & BCP-B BOOSTER COMPRESSOR
PLATFORM PROJECT
ONGC NEELAM PROCESS COMPLEX PROJECT
CLIENT
ONGC, India
CAPACITY
Oil : 128,460 BPSD Gas : 2.56 MMSCFD
Process Platform :Water Injection Platform :
229 BWPD Well Platform
LOCATION
India
CONTRACT PERIOD
1992 ~ 1994Offshore Facilities
References for Major Process Plant Projects
59
-
References for Major Process Plant Projects
Oil Refinery Plant
60
Nation
Project
Plant Description
Period
Algeria
Arzew Refinery Project
- Rehabilitation Project (Revamping)
Atmospheric Distillation
(60,000 BPSD 90,000 BPSD)
- Adaptation Project (New)
LNHT & ISOM
(7,500 BPSD, RON=88, UOP)
2009. 01 ~ 2011. 11
Korea
SK HCC Project
VDU : 70,000 BPSD
HCK : 40,000 BPSD
VB : 40,000 BPSD
H2 : 85MMSCFD
SRP : 300TPSD
2008. 10 ~ 2011. 2
Korea
HDO#2 HOU Project
(FEED & LLI Procurement)
ARDS : 66,000 BPSD (CLG)
RFCC : 52,000 BPSD (UOP)
GHT : 40,000 BPSD (SHELL)
LMX : 25,400 BPSD (UOP)
ALK : 16,000 BPSD (DuPont)
KMX : 15,000 BPSD (UOP)
SHU : 12,500 BPSD (UOP)
PRU : 10,000 BPSD (UOP)
BTU : 8,100 BPSD (UOP)
SRU : 500 TPSD (CB&I)
SAR : 150 TPSD (MECS)
HMU : 110 MMSCFD (HTAS)
2008. 5 ~ 2011. 6
*
-
References for Major Process Plant Projects
Oil Refinery Plant
61
Nation
Project
Plant Description
Period
Pakistan
MCR DHDS Project
DHDS : 26,000 BPSD
2008. 6 ~ 2010. 9
Thailand
Aromatics Recovery Project
Benzene : 193,000 MTPA
Toluene : 101,000 MTPA
Mixed Xylene : 139,000 MTPA
2008. 1 ~ 2010. 1
Kuwait
Base Oil Plant Project
Hydroisomerisation (HIU)
:7,000 BPSD
Hydrofinishing (HFU)
:6,500 BPSD
Hydrogen Plant (HPU)
:4 package
Amine Treating (ATU)
:2 TPD
2007. 10 ~ 2011. 4
Indonesia
PERTAMINA DUMAI Revamping
Project
(Process Design Package)
CDU Revamping
(100,000 BPSD to 200,000 BPSD)
VDU : 50,000 BPSD
PSA : 12,000 Nm3/h
2008. 3 ~ 2008. 8
*
-
Reference List for Major Process Plant Projects
Nation
Project
Plant Description
Period
Oil Refinery Plant
62
Korea
Clean Fuels Project
1 Mogas Hydrotreating Unit
: 20,000BPSD
2 Hydrogen Manufacturing Unit
:45,000 Nm3/hr
3 Gas Oil Hydrotreating Unit
:25,000 BPSD
2003. 12 ~ 2005. 10
Korea
Hydrogen Plant Project
Hydrogen : 29,000 MTPA
2002. 7 ~ 2004. 7
Korea
SK No.2 FCC Project
Alkylation (Stratco) : 18,000 BPSD
Sulfur (TPA) : 620 TPSD
2006. 2 ~ 2008. 4
Taiwan
Lube Base Oil Project
Base Oil : 10,000 BPSD
#2 VDU : 57,000 BPSD
LHDC : 25,000 BPSD
MSDW : 14,000 BPSD
WOU : 10,000 BPSD
2005. 2 ~ 2007. 6
Kuwait
Crude Export Facility Project
Crude Oil Production : 3MMBOPD
Increase Oil Export Potential
: 2MMBOPD
2005. 10 ~ 2008. 9
-
Korea
Hyundai Oil Refinery Project
(Phase1 & Phase 2)
Phase 1 CDU : 100,000 BPSD
VDU : 44,000BPSD
Phase 2 CDU : 200,000 BPSD
Phase 1 : 1986 ~ 1988
Phase 2 : 1994 ~ 1996
Oil Refinery Plant
Korea
Hyundai Aromatics
Complex Project
Paraxylene : 300,000 MTPA
Benzene : 108,000 MTPA
1996 ~ 1997
Philippines
Petron TCCU Revamp &
Mixed Xylene Unit
TCCU Revamping: 3,000 BPSD
(12,000 BPSD to 15,000 BPSD)
Mixed Xylene : 7,200 BPSD (UOP)
1998.11 ~ 2000. 2
Reference List for Major Process Plant Projects
India
HPCL Hydrogen
Generation Unit
Hydrogen : 14,500 MTPA
(Haldor Topsoe)
1998. 1 ~ 2000.12
Greece
Crude & Vacuum
Distillation Unit
VDU : 15,000 BPSD
ADU : 44,000 BPSD
1997. 7 ~ 2001.12
63
Nation
Project
Plant Description
Period
-
Vietnam
Dung Quat PP Project
Polypropylene : 150,000 MTPA
2008. 1 ~ 2010. 4
Saudi Arabia
AAC Ethyleneamines Project
Ethyleneamine : 27,200 MTPA
2007. 12 ~ 2010. 1
Reference List for Major Process Plant Projects
Petrochemical Plant
Korea
MMA Project
MMA (Methyl Methacrylate)
: 90,000 MTPA
-MMA Purification Unit
2007. 5 ~ 2009. 2
Korea
PMMA Project
PMMA (Poly MethylMethacrylate)
: 40,000 MTPA
- Polymerization Unit
- Extrusion Unit
2007. 4 ~ 2008. 6
64
Vietnam
PV TEX PET Project
Polyester 500 Ton/Day
(Staple Fiber 400 T/D, Filament 100 T/D)
2009. 7 ~ 2011. 7
Nation
Project
Plant Description
Period
-
Petrochemical Plant
Reference List for Major Process Plant Projects
Indonesia
UAB#3 Plant
Linear & Branched Alkyl Benzene
: 60,000 MTPA
(UOP HF Alkylation Process )
1996. 9 ~ 1998. 4
Korea
Lotte Offsite Expansion Project
Naphtha Tank : 25,000 M3 x 2
Benzene Tank : 10,000 M3 x 1
2005. 10 ~ 2006. 11
Korea
D-7 Project
SM Cap. Upgrade: 70,000 MTPA
(100,000 MTPA -> 170,000 MTPA)
2004. 1 ~ 2005. 12
65
Iran
Ethylene Plant of 11th Olefin Project
Ethylene Plant: 1,200 MTPA
Low Temp. Storage Tank: 10,000 ton
2006. 1 ~ 2009. 12
Nation
Project
Plant Description
Period
-
Petrochemical Plant
Reference List for Major Process Plant Projects
Korea
Yukong-Arco POSM Complex
Propylene Oxide : 100,000 MTA
Styrene Monomer: 225,000 MTA1988. 6 ~ 1990. 6
66
Korea
Hyundai Petrochemical
Complex I & II
Phase I
Ethylene 350,000 MTPA
SM 100,000 MTPA LDPE 100,000 MTPA-LLDPE 60,000 MTPA
HDPE 100,000 MTPA PP 170,000 MTPAPhase II
Ethylene 450,000 MTPA
SM 200,000 MTPA-HDPE/LLDPE 130,000 MTPA
PVC 150,000 MTPA Benzene Recovery 190,000 MTPA- PP 160,000 MTPA
Phase I
: 1988 ~ 1991
Phase II
: 1995 ~ 1998
Nation
Project
Plant Description
Period
Libya
Ras Lanuf Petrochemical Complex
HDPE : 80,000 MTPA
LLDPE : 80,000 MTPA
1991 ~ 1998
-
Korea
H Project
Ethylene Glycol Monobutyl Ether (BG) :54 MTPD
Diethylene Glycol MonobutylEther(BDG):14 MTPD
2004. 5 ~ 2005. 6
Korea
S-2 Project
Methyl Chloro Silane Monomer :
50,000 MTPA
2005. 8 ~ 2007. 10
Chemicals
Reference List for Major Process Plant Projects
Korea
KCC Silicon Project
Methyl Chloro Silane Monomer
: 25,000 MTPA2001 ~ 2004
67
Nation
Project
Plant Description
Period
Korea
P-2 Project
Polysilicon: 3,000 MTPA
2008. 2 ~ 2010. 5
Vietnam
PVTEX PET Project
Polyester: 500 TPD
- Polycondensation Unit (Process Unit)
- Staple Fiber Unit
- Filament Unit
- UT/OS Unit
2009. 5 ~ 2011. 5
-
China
Chishui Urea Plant
Urea : 500 MTPD
1993. 6 ~ 1996. 6
Chemicals
China
China Shaanxi Urea Plant
Urea : 400 MTPD
1995. 6 ~ 2000. 6
Reference List for Major Process Plant Projects
China
China Pingdingshan
Urea Plant
Urea : 400 MTPD
1996. 1 ~ 2000. 6
68
Nation
Project
Plant Description
Period
-
Reference List for Major Process Plant Projects
Oil & Gas Production/Processing
69
Qatar
Pearl GTL C5 Project
LPU Package Product: 140,000 BPSD
Naphtha : 17,800 BPSD
Gas Oil : 32,684 BPSD
Base Oil : 16,616 BPSD
2006. 7 ~ 2010. 9
Saudi Arabia
Khurais Gas Processing Facilities
Sour associated Gas : 563 MMSCFD
Hydrocarbon Condensate : 18.8 MBD
315 MMSCFD of associated Gas
70 MBPCD of C3+ NGL Production
2006. 9 ~ 2009. 5
Kuwait
DOW-PIC Olefin Project
Berth 31,32 Upgrade
New Berth 34,35 and Topside Installation,
Construct 4 Buildings
2006. 4 ~ 2008. 3
Nation
Project
Plant Description
Period
Saudi Arabia
KARAN Gas Facilities Project
1) FEED Gas Inlet Facilities
2) Gas Treatment Facilities
(600 MMSCFCD x 3 Trains)
- Acid Gas Removal Unit
- Acid Gas Enrichment Unit
- TEG Gas Drying Unit
- Propane Refrigeration Unit
3) Offsite
2009. 3 ~ 2012. 1
-
Kuwait
KNPC BERTH # 5&6 Expansion Project
Berth: 20,000 to 120,000 DWT x 2
- Marine Loading Arm : 12 Sets
- Metering System : 12 Sets
- Automatic Gangway : 2 Sets
- Quick Release Hook : 24 Sets2005. 9 ~ 2007. 6
Kuwait
Kuwait Facility Upgrade Project
LP Separator, TV/HP Gas compressor,
Hydro-Cyclone, Desalter Package,
Chemical
2005. 5 ~ 2007. 6
Indonesia
Suban II Gas Project
Well Site Facilities & Gathering Station Trunk Line (26/43.5km)
Revamping Work at existing Grissik Central Gas Plant
2004. 9 ~ 2006. 8
Nigeria
Bonny Terminal Integrated Project
Oil Treatment : 1,510,000 BPSD
2002. 3 ~ 2006. 2
Reference List for Major Process Plant Projects
Oil & Gas Production/Processing
70
Kuwait
New Ethane Recovery Plant Project
Ethane Recovery : Ethane 96% (Recovery from 1,140 MMSCFD Gas)
2005. 6 ~ 2007. 11
Nigeria
EGP-3 Project
Gas Processing Facility : 395 MMSCFD
(285 MMSCFD -> 680 MMSCFD)
Slug Catcher, Dehydration, NGL Extraction, LPG Fractionation
2005. 6 ~ 2007. 12
Nation
Project
Plant Description
Period
-
Reference List for Major Process Plant Projects
Oil & Gas Production/Processing
71
Nation
Project
Plant Description
Period
Indonesia
Suban Gas Project
Gas Processing : 2 x 150 MMSCFD
Well Site Facilities & Gathering Station
2001. 3 ~ 2003. 4
Kuwait
KOC Pipeline Facilities
Pipeline from Kuwait North to CMM Area in KOC : 48 Inch x 121 KM
2002. 10 ~ 2004. 6
Kuwait
VSM Driven Crude Transit Pumps at 11 GCs
10 Pumps : 160,000 BOPD
1 Pump : 120,000 BOPD
Control System Modification
2003. 1 ~ 2004. 7
Kuwait
New Oil Pier & Associated Topside Facilities at MAA Refinery
New MAA Pier
(Trestle 2,962m, Berth 4 Units, Loading Arm 36 Units)
2001. 3 ~ 2004. 4
Iran
South Pars Field Development Phase 4&5
Gas Processing Facilities :
500 MMSCFD x 4 Trains
2002. 3 ~ 2005. 2
-
Oil & Gas Production/Processing
Reference List for Major Process Plant Projects
72
Nation
Project
Plant Description
Period
Qatar
NGL-4 Project
NGL : 10,200 TPD
Ethane : 3,150 TPD
Propane : 3,000 TPD
Butane : 2,100 TPD
1999. 8 ~ 2003. 6
Libya
Attahaddy Gas Development Project
Gas Treatment : 350 MMSCFD
Condensate : 31,000 BPD
1999. 9 ~ 2004. 2
Iran
South Pars Field Development Phase 2&3
Gas Processing Facilities :
500 MMSCFD x 4 Trains
1999. 3 ~ 2003. 3
Indonesia
Sumpal Gas Project
Well Site Surface Piping, Flowlines Trunklines (16 / 4.5Km, 28 / 9 Km)
Grissik Central Gas Plant Expansion
2001. 3 ~ 2002. 12
-
Oil & Gas Production/Processing
Reference List for Major Process Plant Projects
73
Nation
Project
Plant Description
Period
Malaysia
Gas Process Plant 2&3,4
Sales Gas : 250 MMSCFD x 3
1990 ~ 1994
Saudi Arabia
Hawiyah Inlet and Auxiliary Facilities
Gas Processing : 1,600 MMSCFD
1998. 8 ~ 2002. 4
Pakistan
Pirkoh Gas Field Development Project
Gas Compression Plan: 250 MMSCFD
1997 ~ 1999
-
Korea
Inchon LNG Receiving Terminal (2nd Extension)
Berth Facilities : 75,000 Ton
LNG Ship Jetty & Trestle
Above LNG Storage Tank :100,000kl x 4 Units
In-ground LNG Tank :
140,000kl x 2 units
In-ground LNG Tank :
200,000kl x 8 units
LNG Vaporization & Send-out Facility : 2,730 ton/h1995. 12 ~ 2009. 11
China
Zhuhai LNG Terminal FEED
Services
Terminal and Trunk line
Phase I : 3370 KTPA
2007. 10 ~ 2008. 6
LNG Facilities
Korea
Kwang Yang LNG Terminal Extension Project
LNG Tank: 8 Unit
Send-Out: 2,020 T/H
2004. 9 ~ 2005. 6
Mexico
Sempra Baja LNG Terminal Project
Receiving Terminal : 220,000m3 LNG Tankers
(Unloading Arms : 3 Sets)
2001. 3 ~ 2003. 8
Reference List for Major Process Plant Projects
74
Nation
Project
Plant Description
Period
-
Reference List for Major Process Plant Projects
LNG Facilities
75
Korea
In-chon LNG
Receiving Terminal
Berth Facilities : 75,000 Ton
LNG Storage Tank : 100,000 K x 3
1991. 5 ~ 1996.12
Korea
In-chon LNG
Receiving Terminal
(1st Extension)
LNG : 7.5 x 10^6 MTPA,
Send-Out : 3,060 Ton/Hr,
STORAGE TANK
Above-ground : 10 Units
In-ground : 8 Units1991 ~ 1998
Nation
Project
Plant Description
Period
-
Offshore Facilities
Reference List for Major Process Plant Projects
Korea
Donghae-1 Natural Gas Production Facilities
4 Legged Jacket with8 Skirt Piles
4 Legged 4 Level Deck
Gas: 50 MMSCFD
Condensate: 15 BBL/MMSCFD
2001. 3 ~ 2003. 11
Korea
Tokdo Observation
Offshore Platform Project
Main Deck for Accommodation and Laboratory, Cellar Deck for Generator
4 Legged Jacket (Dia 32 inch)
1998.11 ~ 1999. 5
Indonesia
West Seno Field Development
Project
TLP(Tension Leg Platform)
FPU(Floating Production Unit)
Oil : 60,000 bbl/oil Gas :150 MMSCFD2001. 9 ~ 2003. 4
India
BCP-A & BCP-B Booster Compressor
Platform Project
Gas : 30 MMSCFD
1997 ~ 1999
India
ONGC Neelam Process Complex Project
Process Platform :
Oil : 128,460 BPSD Gas : 2.56 MMSCFDWater Injection Platform : 229 BWPD
Well Platform
1992 ~ 1994
76
Nation
Project
Plant Description
Period
-
Thank you
PROCESS PLANT
PROCESS PLANT
Upstream Oil & Gas
LNG Facilities
Oil Refinery
Petrochemical
Fertilizer & Chemicals
Offshore Facilities
INDUSTRIAL PLANT
INDUSTRIAL PLANT
Cement Plant
Steel Mills & Metal Plant
Material Handling
Automation System
AS/RS & Logistic System
Food Processing Plant
Auto Mobile Plant
POWER & ENERGY
PLANT
POWER & ENERGY
PLANT
Power Generation
Power Transmission
Substation & Distribution
Power System Analysis
INFRA &
ENVIRONMENT
INFRA &
ENVIRONMENT
Road, Subway, Bridge
Geotechnical Eng.
Building & Structure
Dam & Hydropower
Water Supply
Sewage Treatment
Industrial Wastewater
Treatment
Harbor & Coastal Eng.
PROCESS PLANT
PROCESS PLANT
Upstream Oil & Gas
LNG Facilities
Oil Refinery
Petrochemical
Fertilizer & Chemicals
Offshore Facilities
INDUSTRIAL PLANT
INDUSTRIAL PLANT
Cement Plant
Steel Mills & Metal Plant
Material Handling
Automation System
AS/RS & Logistic System
Food Processing Plant
Auto Mobile Plant
POWER & ENERGY
PLANT
POWER & ENERGY
PLANT
Power Generation
Power Transmission
Substation & Distribution
Power System Analysis
INFRA &
ENVIRONMENT
INFRA &
ENVIRONMENT
Road, Subway, Bridge
Geotechnical Eng.
Building & Structure
Dam & Hydropower
Water Supply
Sewage Treatment
Industrial Wastewater
Treatment
Harbor & Coastal Eng.