process & product audit check sheet

Upload: prakashrai

Post on 02-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Process & Product Audit Check Sheet

    1/6

    DEPARTMENT / AREA Date of Audit DOC NO. : IQA/CS/11Auditor(s): Auditee: REV NO./DATE : 00 / DEC'06Description of Process Audited: APP. BY : Unit Head

    S.No. CHECK POINT SCORE AUDITOR OBSERVATION REMARKS

    Availability of Control Plan & Work Instruction / Work

    standard.

    Availability of Monitoring and Measureing Devices.

    Calibration status of monitoring and Measuring Devices.

    Doing monitoring and Measuring of product and process

    characteristics at defined frequency and their compliance.

    Preventive maintenance status of Machine

    History of tooling (Jig, Fixture and gauges)

    Doing the Process by using specified process Equipment

    Handling, Preservation and movement of product.

    Set up Approval (where needed).

    PAGE 1 OF 6

    SHARDA MOTOR INDUSTRIES LTD.

    9

    10

    6

    7

    8

    MANUFACTURING PROCESS & PRODUCT AUDIT

    House keeping & cleanliness.

    1

    2

    3

    4

    5

  • 8/10/2019 Process & Product Audit Check Sheet

    2/6

    DEPARTMENT / AREA Date of Audit DOC NO. : IQA/CS/11Auditor(s): Auditee: REV NO./DATE : 00 / DEC'06Description of Process Audited: APP. BY : Unit Head

    S.No. CHECK POINT SCORE AUDITOR OBSERVATION REMARKS

    SHARDA MOTOR INDUSTRIES LTD.MANUFACTURING PROCESS & PRODUCT AUDIT

    Competence level of operator and Line Leader

    Identification of the product including Nonconforming

    product

    Validation / Revalidation of Processes.

    Process capability analysis

    Use of personel protective equipment.

    Monitoring & Measuring of the Product.

    Availability of reworks instructions.

    Adherence to sampling Plan & methed

    Knowledge of statistical techniques (optional).

    20

    12

    13

    14

    15

    16

    17

    18

    19

    PAGE 2 OF 6

    Corrective Action.

    11

  • 8/10/2019 Process & Product Audit Check Sheet

    3/6

    DEPARTMENT / AREA Date of Audit DOC NO. : IQA/CS/11Auditor(s): Auditee: REV NO./DATE : 00 / DEC'06Description of Process Audited: APP. BY : Unit Head

    S.No. CHECK POINT SCORE AUDITOR OBSERVATION REMARKS

    SHARDA MOTOR INDUSTRIES LTD.MANUFACTURING PROCESS & PRODUCT AUDIT

    Continual Improvement.

    Production Rate / Productivity

    Awareness to the Operators about their roles &

    responsibility.24 Awareness about the Quality objectives.

    25 Awareness about the defects & their effect.

    26 Other please specifies.

    27 Product Characterstics & specification at manufacturing processstep

    a)

    b)

    c)

    d)

    PAGE 3 OF 6

    21

    22

    23

  • 8/10/2019 Process & Product Audit Check Sheet

    4/6

    DEPARTMENT / AREA Date of Audit DOC NO. : IQA/CS/11Auditor(s): Auditee: REV NO./DATE : 00 / DEC'06Description of Process Audited: APP. BY : Unit Head

    S.No. CHECK POINT SCORE AUDITOR OBSERVATION REMARKS

    SHARDA MOTOR INDUSTRIES LTD.MANUFACTURING PROCESS & PRODUCT AUDIT

    e)

    f)

    g)

    PAGE 4 OF 6

    Maximum Attainable Scores

    Scores Attained

    % Score

  • 8/10/2019 Process & Product Audit Check Sheet

    5/6

  • 8/10/2019 Process & Product Audit Check Sheet

    6/6

    DEPARTMENT / AREA Date of Audit IQA/CS/11

    Auditor(s): Auditee: 00 / DEC'06

    Description of Process Audited: APP. BY : Unit Head

    S.No. Trg. Date

    DatePAGE 6 OF 6

    DOC NO. :

    Action PlanAuditee- Action Plan Auditors- Remark

    SHARDA MOTOR INDUSTRIES LTD.

    REV NO./DATE :

    S I G N Auditee Auditor

    MANUFACTURING PROCESS & PRODUCT AUDIT