Product and Process Design,Sourcing, Equipment Selection

and Capacity Planning

Page 2: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Major Topics

• Product and Process Design• Documenting Product and Process Design• Sourcing Decisions:

– A simple “Make or Buy” model

– Decision Trees: A scenario-based approach

• Equipment Selection and Capacity Planning

Page 3: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Product Selection and Development Stages(borrowed from Heizer & Render)

Page 4: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Quality Function Deployment (DFD) and the House of Quality

• QFD: The process of

– Determining what are the customer “requirements” / “wants”, and

– Translating those desires into the target product design.

• House of quality: A graphic, yet systematic technique for defining the relationship between customer desires and the developed product (or service)

Page 5: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

House of Quality Example(borrowed from Heizer & Render)

Page 6: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

The “House of Quality” Chain(borrowed from Heizer & Render)

Page 7: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Concurrent Engineering: The current approach for organizing the product and process development• The traditional US approach (department-based):

Research & Development => Engineering => Manufacturing => ProductionClear-cut responsibilities but lack of communication and “forward thinking”!

• The currently prevailing approach (cross-functional team-based):Product development (or design for manufacturability, or value engineering)

teams: Include representatives from:– Marketing– Manufacturing– Purchasing– Quality assurance– Field service– (even from) vendors

Concurrent engineering: Less costly and more expedient product development

Page 8: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

The time factor: Time-based competition

• Some advantages of getting first a new product to the market:– Setting the “standard” (higher market control)– Larger market share– Higher prices and profit margins

• Currently, product life cycles get shorter and product technological sophistication increases => more money is funneled to the product development and the relative risks become higher.

• The pressures resulting from time-based competition have led to higher levels of integrations through strategic partnerships, but also through mergers and acquisitions.

Page 9: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Additional concerns in contemporary product and process design

– promote robust design practicesRobustness: the insensitivity of the product performance to small variations in the production or assembly process => ability to support product quality more reliably and cost-effectively.

– Control the product complexity– Improve the product maintainability / serviceability– (further) standardize the employed components

Modularity: the structuring of the end product through easily segmented components that can also be easily interchanged or replaced => ability to support flexible production and product customization;increased product serviceability.

– Improve job design and job safety– Environmental friendliness: safe and environmentally sound products,

minimizing waste of raw materials and energy, complying with environmental regulations, ability for reuse, being recognized as good corporate citizen.

Page 10: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Documenting Product Designs• Engineering Drawing: a drawing that shows the dimensions, tolerances, materials and

finishes of a component. (Fig. 5.9)• Bill of Material (BOM): A listing of the components, their description and the quantity of

each required to make a unit of a given product. (Fig. 5.10)• Assembly drawing: An exploded view of the product, usually via a three-dimensional or

isometric drawing. (Fig. 5.12)• Assembly chart: A graphic means of identifying how components flow into subassemblies

and ultimately into the final product. (Fig. 5.12)• Route sheet: A listing of the operations necessary to produce the component with the

material specified in the bill of materials.• Engineering change notice (ECN): a correction or modification of an engineering drawing

or BOM.• Configuration Management: A system by which a product’s planned and changing

components are accurately identified and for which control of accountability of change are maintained

Page 11: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Documenting Product Designs (cont.)

• Work order: An instruction to make a given quantity (known as production lot or batch) of a particular item, usually to a given schedule.

• Group technology: A product and component coding system that specifies the type of processing and the involved parameters, allowing thus the identification of processing similarities and the systematic grouping/classification of similar products. Some efficiencies associated with group technology are:– Improved design (since the focus can be placed on a few critical

components– Reduced raw material and purchases– Improved layout, routing and machine loading– Reduced tooling setup time, work-in-process and production time– Simplified production planning and control

Page 12: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Engineering Drawing Example(borrowed from Heizer & Render)

Page 13: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Bill of Material (BOM) Example(borrowed from Heizer & Render)

Page 14: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Assembly Drawing & Chart Examples(borrowed from Heizer & Render)

Page 15: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Operation Process Chart Example(borrowed from Francis et. al.)

Page 16: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Route Sheet Example(borrowed from Francis et. al.)

Page 17: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

“Make-or-buy” decisions

• Deciding whether to produce a product component “in-house”, or purchase/procure it from an outside source.

• Issues to be considered while making this decision:– Quality of the externally procured part– Reliability of the supplier in terms of both item quality and

delivery times– Criticality of the considered component for the

performance/quality of the entire product– Potential for development of new core competencies of

strategic significance to the company– Existing patents on this item– Costs of deploying and operating the necessary infrastructure

Page 18: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

A simple economic trade-off model for the “Make or Buy” problem

Model parameters:• c1 ($/unit): cost per unit when item is outsourced (item price, ordering and receiving costs)• C ($): required capital investment in order to support internal production• c2 ($/unit): variable production cost for internal production (materials, labor,variable overhead charges) • Assume that c2 < c1• X: total quantity of the item to be outsourced or produced internally

X

Total cost asa function of X

C

C+c2*X

c1*X

X0 = C / (c1-c2)

Page 19: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Example: Introducing a new (stabilizing) bracket for an existing product

• Machine capacity available• Required “infrastructure” for in-house production

– new tooling: $12,500– Hiring and training an additional worker: $1,000

• Internal variable production (raw material + labor) cost: $1.12 / unit• Vendor-quoted price: $1.55 / unit• Forecasted demand: 10,000 units/year for next 2 years

X0 = (12,500+1,000)/(1.55-1.12) = 31,395 > 20,000

Buy!

Page 20: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Evaluating Alternatives through Decision Trees

• Decision Trees: A mechanism for systematically pricing all options / alternatives under consideration, while taking into account various uncertainties underlying the considered operational context.

• Example– An engineering consulting company (ECC) has been offered the design of a

new product.The price offered by the customer is $60,000.– If the design is done in-house, some new software must be purchased at the

price of $20,000, and two new engineers must be trained for this effort at the cost of $15,000 per engineer.

– Alternatively, this task can be outsourced to an engineering service provider (ESP) for the cost of $40,000. However, there is a 20% chance that this ESP will fail to meet the due date requested by the customer, in which case, the ECC will experience a penalty of $15,000. The ESP offers also the possibility of sharing the above penalty at an extra cost of $5,000 for the ECC.

– Find the option that maximizes the expected profit for the ECC.

Page 21: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Decision Trees: Example

1

2

3

0.8

0.2

0.8

0.2

60K-25K-2*15K=10K

10K

60K-40K=20K

60K-40K-15K=5K

17K

60K-45K=15K

60K-45K-7.5K=7.5K

13.5K

17K

Page 22: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Technology selection

• The selected technology must be able to support the quality standards set by the corporate / manufacturing strategy

• This decision must take into consideration future expansion plans of the company in terms of– production capacity (i.e., support volume flexibility)– product portfolio (i.e., support product flexibility)

• It must also consider the overall technological trends in the industry, as well as additional issues (e.g., environmental and other legal concerns, operational safety etc.) that might affect the viability of certain choices

• For the candidates satisfying the above concerns, the final objective is the minimization of the total (i.e., deployment plus operational) cost

Page 23: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Production Capacity

• Design capacity: the “theoretical” maximum output of a system, typically stated as a rate, i.e., product units / unit time.

• Effective capacity: The percentage of the design capacity that the system can actually achieve under the given operational constraints, e.g., running product mix, quality requirements, employee availability, scheduling methods, etc.

• Plant utilization = actual prod. rate / design capacity• Plant efficiency = actual prod. rate / (effective capacity x

design capacity)• Notice that actual prod. rate = (design capacity) x (utilization) =

(design capacity) x (effective capacity) x (efficiency)

Page 24: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Capacity Planning

• Capacity planning seeks to determine– the number of units of the selected technology that needs to be deployed

in order to match the plant (effective) capacity with the forecasted demand, and if necessary,

– a capacity expansion plan that will indicate the time-phased deployment of additional modules / units, in order to support a growing product demand, or more general expansion plans of the company (e.g., undertaking the production of a new product in the considered product family).

• Frequently, technology selection and capacity planning are addressed simultaneously, since the required capacity affects the economic viability of a certain technological option, while the operational characteristics of a given technology define the production rate per unit deployed and aspects like the possibility of modular deployment.

Page 25: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Quantitative Approaches to Technology Selection and Capacity Planning

• All these approaches try to select a technology (mix) and determine the capacity to be deployed in a way that it maximizes the expected profit over the entire life-span of the considered product (family).

• Expected profit is defined as expected revenues minus deployment and operational costs.• Typically, the above calculations are based on net present values (NPV’s) of the expected costs

and revenues, which take into consideration the cost of money: NPV = (Expense or Revenue) / (1+i)N

where i is the applying interest rate and N the time period of the considered expense. • Possible methods used include:

– Break-even analysis, similar to that applied to the “make or buy” problem, that seeks to minimizes the total (fixed + variable) cost.

– Decision trees which allow the modeling of problem uncertainties like uncertain market behavior, etc., and can determine a strategy as a reaction to these unknown factors.

– Mathematical Programming formulations which allow the optimized selection of technology mixes.

Page 26: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Technology Selection and Capacity Planning through Mathematical Programming (MP)

• Model Parameters:– i {1,…,m}: technology options– j {1,…,n}: product (families) to be supported in the considered plant– D_j : forecasted demand per period for product j over the considered

planning horizon– C_i: fixed production cost per period for one unit of technology option i– v_ij: variable production cost for of using one unit of technology i for one

(full) period to produce (just) product j– a_ij: number of units of product j that can be produced in one period by one

unit of technology option i.

• Model DecisionVariables:– y_i: number of units of technology i to be deployed (nonnegative integer)– x_ij: production capacity of technology i used at each period to produce

product j (nonnegative real, i.e., it can be fractional)

Page 27: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

The MP formulation

jix

iZy

iyx

jDxa

ts

xvyC

ij

iijj

jijiji

ijijjiiii

i

,,0

,

,

,

..

min

Page 28: Product and Process Design, Sourcing, Equipment Selection and Capacity Planning

Reading Assignment• Chapter 1: Section 1.11 and Appendix 1-A.• Also you are encouraged to read Chapter 1:Section1.10.