production drawing of we 6 element
DESCRIPTION
Wooden wall element drawing - production phaseTRANSCRIPT
45
5000
45
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---45
125
45
45
45
295
568
295
45
1302
1212
295
45
125
45
1082
2384
2838
4055
4910
295
205
295
45
295
45
45
45
45
45
A-A
B-B
613
45
45
2055
45
295
5000
451212
45145
2384
295
Tolerance
Lenght/height
Width
Stud height
Diagonalmeasurement
Curvature
+/- 6mm
+/- 3mm
+/- 1,5%
+/- 5mm
+/- 5mm
Cutting list
Symbol Quantity Dimensions (mm)
S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
S11
S12
BE01
S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
S11
S12
BE01
2
1
1
1
1
2
1
1
2
2
2
4
1
693/295/45
1212/295/45
1302/295/45
1212/125/45
1302/125/45
1982/295/45
2384/205/45
2384/295/45
2838/295/45
4055/45/45
4910/70/45
4910/295/45
2384/168/90
S01
S03
S05
S02
S04
S06
S07
S08
S09 S09
S10S10
Material information
Wood type
Strenght class
Humidity level
Screws
Rope
C18
S06
S01
Nordic wood
2384
BE01
90 205
205
90
1082 900
1857
4010 900
2384 90
168
S11S11
496 449 449 449 496
168
125
250
45
125
125
693
1982
12%
45
70
45 45
45 45
451 45
70
45
45
205
45
45
4910
70
45
45
250
295
45
2384
295
45
RANDERS REBO nr. 11-0120-064B 12mm
Class 3 Outdoor
NKT nr.136676 M6,0x120mm screwingS06/07 to vertical studs; S02 to S04 and S03 to S0527 stk.
NKT nr.136674 M5,0x80mm screwing S11 to S12 C/C 200S09/S12 to each other132 stk.
NKT nr.136675 M6,0x100mm screwingS10 to S1148 stk.
VBA TF POZI 6X200/64 Z.BLANCBE01 to S1112 stk.
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
125
1302
125
45
1212
295
45
S12 S12 S12 S12
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002
AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 1 - Studs
Agnieszka Machalska
12/08/11
AN-15(205 01)037
CAHS31
Horsens
AN-15(205 01)037
1 : 20
Step 1 - studs
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
A-A
B-B 45
DPM
Material
Quantity
Dimensions
1
150
150
150
150
Staples
Dimension/roll size
Quantity
Size
410 stk.
Polyethylene
4568/2384/0.2 mm
Galvanized, Würth
10/10/3 mm
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
Tæt
Quantity
Dimension
1 roll
Isover
95x20 mm
150
150
Data
Producer
soft ISOVER strips of plastic film with big airand diffusion resistance for sealing b/wconstructuion element
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 2 - DPM
Agnieszka Machalska
12/08/11
AN-15(205 01)038
CAHS31
Horsens
AN-15(205 01)038
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
Tolerance
Lenght
Width
Thickness
+/- 3mm
+/- 2mm
+/- 5mm
Cutting list
Symbol Quantity Dimensions (mm)
SP 01 2434/90/45
Material information
Sole plate
Strenght class
Humidity level
Screws
C18
45
90
90
2384
Nordic wood
SP 01
A-A
B-B
90
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
12%
NKT nr.119294 5,0x90mm screwing tovertical studs with a distance of 200 mm6 stk.
SP 01
1
STEP 12 - CLADDING
45
90
Class 3 Outdoor
2384
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002
AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 3 - Sole plate
Author
12/08/11
AN-15(205 01)039
Horsens
AN-15(205 01)039
1 : 20
Step 3 - sole plate
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
45
732
300
300
300
300
300
300
300
300
300
300
300
300
300
368
5045
Tolerance
Lenght
Width
Thickness
+/- 3mm
+/- 2mm
+/- 5mm
Cutting list
Symbol Quantity Dimensions (mm)
B01
B02
B03
B04
B05
B06
B07
B08
B09
13
1
7
7
1
2
2
8
1
255/45/45
278/45/45
496/45/45
541/45/45
687/45/45
1302/45/45
2055/45/45
2339/45/45
2384/90/45
Material information
Wood type
Strenght class
Humidity level
Screws
C18, T1
45
45
541
45
45
45
45
1302
2055
45
45
45
45
45
45
45
95
95
4910
2339
B01
B02
B03
B04
B05
B06
B07
B08
B09
B05
B01
B04B05
45
45
255
45
B02
45
45
45
278Nordic wood
B06
B07
A-A
B-B
45
2055
45
45
45
45
45
45
591 1302 541
95 45 45
45
45
687
45
B08
12%
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
2433.69
NKT nr.119294 5,0x80mm screwing tostuds with a distance of 200 mm150 stk.
NKT nr.136676 M6,0x120mm screwingbatten B09 to horizontal battens14 stk.
Class 3 Outdoor
45
45
496
45
B03
---AN-15(205)001
AN-15(205)001
---
AN-15(205)002
AN-15(205)002AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 4 - Battens
Agnieszka Machalska
01/06/12
AN-15(205 01)040
Horsens
AN-15(205 01)040
1 : 20
Step 4 - battens
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
Cutting list
Symbol Quantity Dimensions (mm)
IN01
IN02
IN03
IN04
IN05
IN06
IN07
5
1
16
10
2
1
1
255/249/45
275/249/45
255/451/45
255/1000/45
275/1000/45
95/1302/45
115/1302/45
Material information
Thermal conductivity
Heat resistance
Fire class
0.04 in temperature of 25 degrees
IN01
IN02
IN03
IN04
IN05
IN06
IN07
lambda = 0,037 W/mK
255
278
255
278
95
255
115
1302
1000
1302
1000
451
249
249 45
045
45
45
45
45
Euro class 1
IN04 IN01
IN03
IN05 IN02
IN06
IN07
A-A
B-B
B08
IN04
IN05
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
255
95
115
255
278
1000 1000
1302 45149645
249
---AN-15(205)001
AN-15(205)001
---
AN-15(205)002
AN-15(205)002
AN-15(205)003
---
AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 5 - Insulation between battens
Agnieszka Machalska
01/06/12
AN-15(205 01)041
CAHS31
Horsens
AN-15(205 01)041
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
Cutting list
Symbol Quantity Dimensions (mm)
P01
P02
P03
P04
P05
2
1
1
1
1
2055/542/12.5
2055/611/12.5
2364/185/12.5
2364/828/12.5
2364/1200/12.5
Material information
Thermal conductivity
Density
Fire class
Screws
1150 +/- 50kg/m3
P01
P02
P03
P04
P05
lambda = 0,034 W/mK
2055
542
828
1200
185
2364
2364
2364
Euro class A2
12.5
828
12.5
1200
12.5
12.5
185
Tolerance
Lenght
Width
+/- 1mm
+/- 1mm
P01
P04
P05
P03
A-A
B-B
B08
12.5
1200
185
2055
828
12.5
611
P02
3,9x 25 mm, distance 300 mm, 100 stk.
25
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
542
2055 12.5
611
2364
542
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002
AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 6 - 1st layer of gypsum
Agnieszka Machalska
01/06/12
AN-15(205 01)042
CAHS31
Horsens
AN-15(205 01)042
Step 6 - gypsum board
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Cutting list
Symbol Quantity Dimensions (mm)
P01
P02
P03
P04
P05
2
1
1
1
1
586/1755/12.5
611/1755/12.5
435/2364/12.5
1015/2364/12.5
1100/2364/12.5
Material information
Thermal conductivity
Density
Fire class
Screws
1150 +/- 50kg/m3
P01
P02
P03
P04
lambda = 0,034 W/mK
1755
541
1100
435
2364
2364
Euro class A2
12.5
541
1100
12.5
435
12.5
Tolerance
Lenght
Width
+/- 1mm
+/- 1mm
P05
P01
P04
P03
P05
A-A
B-B
95
P02
12.5
12.5
611 1212 541
978
2364
978
12.5
611 1212 541
3,9x 35 mm, distance 100 mm onright from first layer, 3rd layer onsite (45mm)85 stk.
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
25
150
150
2364
435
1100
1755
978
611 541
1755
611
12.5
611
2364
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002
AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 7 - 2nd layer of gypsum
Author
01/06/12
AN-15(205 01)043
Horsens
AN-15(205 01)043
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
A-A
B-B
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
FLIP
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 8 - Flip the element
Agnieszka Machalska
01/06/12
AN-15(205 01)044
CAHS31
Horsens
AN-15(205 01)044
1 : 20
Step 8 - flip the element
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
Cutting list
Symbol Quantity Dimensions (mm)
I01
I02
I03
I04
I05
I06
I07
2
2
1
3
2
3
6
455/451/295
738/359/295
738/404/205
404/168/205
451/168/205
1200/404/295
1200/451/295
Material information
Thermal conductivity
Heat resistance
Fire class
0,04 in temperature of 25 degrees
I01
I02
I03
I04
I05
I06
lambda = 0,037 W/mK
Euro class 1
455
451
738
404
168
404
451
168
1200404
295
295
404
205
404
205
449.5
295
738
359
295
359
451
1200 295
451I07
A-A
B-B
451
404
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
I05 I05I04I04I04
I07 I07I06I06I06
I07 I07
I07 I07
I01 I01I01 I01 I01
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 9 - Insulation between studs
Agnieszka Machalska
01/06/12
AN-15(205 01)045
CAHS31
Horsens
AN-15(205 01)045
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
B-B
Cutting list
Symbol Quantity Dimensions (mm)
WB01
WB02
WB03
WB04
1
1
1
2
1212/805.5/10
2384/917/10
2384/468/10
2860.5/586/10
Material information
Thermal conductivity
Density
Fire class
Screws
1150 +/- 50kg/m3, wind proof gypsum
WB 01
WB 02
WB03
WB 04
lambda = 0,034 W/mK
Euro class A2
1212
805.5
2384468
2860.5
586
A-AA-AA-AA-A
2384
917
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
10
10
4245.5
2384
10
10
10
586 1212 586
805.5
2860.5
4245.5
468
917
10
3,5 x 35 mm, 76 stk.
WB 03
WB 02
WB 01
WB 04 WB 04
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 10 - Wind breaker
Agnieszka Machalska
01/06/12
AN-15(205 01)046
CAHS31
Horsens
AN-15(205 01)046
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
B-B
Cutting list
Symbol Quantity Dimensions (mm)
D01
D02
D03
D04
DPC 01
2
2
2
2
2
805.5/45/25
1385/45/25
4245.5/45/25
4245.5/70/25
4245.5/70/25
Pressurized wooden list
Wooden class
Screws Class 3 Outdoor
NKT nr.119274 4,0x60 mmevery 300 mm82 stk.
D 01
D 02
D03
D 04
C18
805.5
45
4245.5
45
4245.5
70
A-AA-AA-AA-A
1385
45
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING10
25
25
805.5
1340
4245.5
70 7045454545
45
25
45
25
45
25
70
D01
D02D03D04 D03 D04
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002AN-15(205)003
---AN-15(205)003
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 11 - Distance laths
Agnieszka Machalska
01/06/12
AN-15(205 01)047
CAHS31
Horsens
AN-15(205 01)047
Step 11 - distance laths
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Section A-A
---
Section A-A
---
Section B-B
---Section B-B
---
B-B
Cutting list
Symbol Quantity Dimensions (mm)
C01
C02
C03
32
14
1
503/135/25
2218/135/25
2218/135/25
Pressurized wooden list
Cladding
Screws Stainless steel, class 3 Outdoor
NKT nr.119272 4,0x45 mmevery cladding160 stk.
NKT nr.136675 M6,0x100mmscrewing6 stk.
C 01
C02
C04
SUPER WOOD ™:SW1 AART, moisture content : 12-20%,suitable for outdoor use
503
135
A-AA-AA-AA-A
2218
135
STEP 1 - STUDS
STEP 2 - DPM
STEP 3 - SOLE PLATE
STEP 4 - BATTENS
STEP 5 - INSULATION B/W BATTENS
STEP 6 - 1ST LAYER OF GYPSUM
STEP 8 - FLIP THE ELEMENT
STEP 7 - 2ND LAYER OF GYPSUM
STEP 9 - INSULATION B/W STUDS
STEP 10 - WIND BREAKER
STEP 11 - DISTANCE STRIPS
STEP 12 - CLADDING
C01
C02
C01
503 503
25
135
135
C03
2218
135
25
25
135
135
25
2218
---AN-15(205)001
AN-15(205)001
---AN-15(205)002
AN-15(205)002
AN-15(205)003
---AN-15(205)003
- 2 layers of gypsum board (2*12,5 mm)- battens with mineral wool b/w 45x45mm- DPM 0,2 mm- vertical studs with mineral wool b/w295x45 mm- horizontal studs and battens: 295x45mm and 45x45 mm as a framing for thewindow- wooden batten acting as a drip edgewith flashing on top of it- windproof gypsum 10 mm- vertical pressurized wooden lists 25x50mm- horizontal cladding 25x135 mm
10 mm space is left for better ventilationand snow catch is placed betweencladding and windproof gypsum
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Production drawing of WE6 - Skejby
Step 12 - Cladding
Agnieszka Machalska
01/06/12
AN-15(205 01)048
CAHS31
Horsens
AN-15(205 01)048
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT