program kota tanpa kumuh satker ...kotaku.pu.go.id/files/media/laporan/contract...
TRANSCRIPT
Nomor & Periode Invoice : No. 50 Periode (Februari 2018) - FINAL PAYMENT
Realisasi Invoice : 22 Maret 2018
Nomor Loan : NSUP IDB Loan
Nama Konsultan : PT. Adhicipta Engineering Consultant
Paket Pekerjaan : Oversight Consultant (OC) Regional Management For Package 3
(DKI Jakarta, Banten and West Kalimantan)
Nomor & Tanggal Kontrak : HK.02.03/OC-3/IDB-ICDD/SATKER-PKP/019/2013, Tanggal 07 Maret 2013
Periode Kontrak : 07 Maret 2013 s/d 28 Februari 2018
CONTRAC
AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
INVOICE S/D SAAT
INI SISA KONTRAK
I REMUNERATION ( SUB TOTAL I ) 43.403.836.000 42.728.986.000 669.500.000 43.398.486.000 5.350.000
1.1 PROFESSIONAL STAFF 37.054.416.000 36.506.856.000 544.300.000 37.051.156.000 3.260.000
1.2 SUPPORTING STAFF 6.349.420.000 6.222.130.000 125.200.000 6.347.330.000 2.090.000
II DIRECT REIMBURSABLE COST ( SUB TOTAL I I ) 19.436.973.000 19.005.387.843 329.762.188 19.335.150.031 101.822.969
2.1 MOBILIZATION / DEMOBILIZATION 33.995.000 12.604.038 7.386.120 19.990.158 14.004.842
2.2 HOUSING ALLOWANCE 311.000.000 305.500.000 5.000.000 310.500.000 500.000
2.3 DUTY TRAVEL EXPENSES DKI JAKARTA 226.600.000 222.474.233 - 222.474.233 4.125.767
2.4 DUTY TRAVEL EXPENSES BANTEN 282.732.000 272.911.366 - 272.911.366 9.820.634
2.5 DUTY TRAVEL EXPENSES KALIMANTAN BARAT 404.308.000 390.259.406 - 390.259.406 14.048.594
2.5.1 DUTY TRAVEL EXPENSES KALIMANTAN UTARA 151.658.000 141.613.323 - 141.613.323 10.044.677
2.6 OFFICE OPERATIONAL EXPENSES 3.440.271.500 3.362.970.393 68.441.693 3.431.412.086 8.859.414
2.7 OFFICE EQUIPMENT EXPENSES 1.202.383.500 1.168.620.000 13.900.000 1.182.520.000 19.863.500
2.8 RENTAL EXPENSES 13.326.217.500 13.089.730.084 235.034.375 13.324.764.459 1.453.041
2.9 REPORTING EXPENCES 57.807.500 38.705.000 - 38.705.000 19.102.500
III TOTAL TRAINING ACTIVITY EXPENSES [ 3.1 + 3.2 ] 4.860.373.250 4.518.921.845 - 4.518.921.845 341.451.405
3.1 TRAINING ACTIVITY 4.860.373.250 4.518.921.845 - 4.518.921.845 341.451.405
IV TOTAL SOCIALIZATION ACTIVITY EXPENSES [ 4.1 + 4.2 ] 2.992.595.750 2.992.345.750 - 2.992.345.750 250.000
4.1 SOCIALIZATION ACTIVITY IN PROVINCIAL LEVELS 296.100.000 296.059.000 - 296.059.000 41.000
4.2 SOCIALIZATION ACTIVITY IN CITY/REGENCY LEVELS 1.404.995.750 1.404.786.750 - 1.404.786.750 209.000
4.3 FIX COST 1.291.500.000 1.291.500.000 - 1.291.500.000 -
TOTAL V ( I + II + III + IV ) 70.693.778.000 69.245.641.438 999.262.188 70.244.903.626 448.874.374
ADVANCE PAYMENT 2.132.376.000 2.132.376.000
SUB TOTAL 70.693.778.000 71.378.017.438 999.262.188 72.377.279.626 -
REPAYMENT OF ADV.PAYMENT 2.132.376.000 - 2.132.376.000 -
POTONGAN TEMUAN BPKP (*) 100.120.010 - 100.120.010
GRAND TOTAL 70.693.778.000 69.245.641.438 999.262.188 70.244.903.626 448.874.374
PROGRAM KOTA TANPA KUMUH
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018
PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN
DIREKTORAT JENDERAL CIPTA KARYA
KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
NO KOMPOSISI BIAYA
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
I. 1 PROFESSIONAL STAFF 37.054.416.000 36.506.856.000 544.300.000 37.051.156.000 3.260.000
1.1.1
2.210.516.000 2.210.516.000 - 2.210.516.000 -
Ir. Deni Hasman 16,0 16,00 - 16,00 -
Deni Jauhari 28,7 28,67 - 28,67 -
Dede Hariyadi - -
Kurnia Robi 11,0 11,00 - 11,0 -
13,5 13,50 - 13,5 -
5,0 5,00 - 5,0 -
Amirul Hadi S,E 13,0 13,00 - 13,0 -
Dedi Alparidi, S.H 16,6 16,60 - 16,60 -
Adenan Amar 28,0 28,00 - 28,00 -
B
11.590.500.000 11.423.200.000 167.300.000 11.590.500.000 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Drs. M. Ichwan Kalimasada 17,0 17,00 - 17,00 -
9,0 9,00 - 9,00 -
19,0 19,00 - 19,00 -
Tony Suryaman, S.Kom - - - -
24,5 24,50 - 24,50 -
19,0 19,00 - 19,00 -
Drs. Ari Hariadi Soelaeman 17,0 17,00 - 17,00 -
Sri Yulaiti 9,5 9,50 - 9,50 -
Inayatullah 17,8 17,80 - 17,80 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Ir. Yudi Prayuda 3,0 3,00 - 3,00 -
20,8 20,80 - 20,80 -
19,0 19,00 - 19,00 -
Opi Firdaus Dewanto, SE 25,5 25,50 - 25,50 -
Firman Yoga Lesmana 1,0 1,00 - 1,00 -
Acep Mawardi 18,0 18,00 - 18,00 -
Puji Rahayu, SE, AKT. 12,6 12,60 - 12,60 -
M. Nurdin 13,5 13,50 - 13,50 -
Sri Hartati 19,0 19,00 - 19,00 -
M. Dadi Japandi 16,0 16,00 - 16,00 -
Daniel Dewantara 20,5 20,50 - 20,50 -
to be name - - - -
16,5 16,50 - 16,50 -
10,0 10,00 - 10,00 -
to be name - - - -
16,5 16,50 - 16,50 -
10,0 10,00 - 10,00 -
Ida Ayu Ratna Murti, SE 14,6 14,60 - 14,60 -
R. Hernandi Suherman, S.kom 30,8 30,80 - 30,80 -
Jaenudin, SE 16,6 16,60 - 16,60 -
Dedi Alparidi, S.H 29,0 29,00 - 29,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
10 Rosly Syamsul Rizal, ST 11,6 11,60 - 11,60 -
Propinsi DKI Jakarta (Jakarta)
1 Denny Jauhari 14,00 13,00 1,0 14,00 -
2 Jaenudin 14,00 13,00 1,0 14,00 -
3 Rosly Syamsul Rizal, ST 14,00 13,00 1,0 14,00 -
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALU
Hepi Widowati
M. Fikri R
5 Drs. Syaiful Arif
4
6Ir. Irmansyah
7
Jaenudin, SE
3Nayyiri Habib
9 Hari Untoro, SE
8
CONTRAC AMENDEMENT - 21
2
I. BREAKDOWN OF REMUNERATION
NO URAIAN
Puji Rahayu, SE, AKT.
1 Ir. Saharudin
1
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
4 Ir. Irmansyah 14,00 13,00 1,0 14,00 -
5 Drs. Syaiful Arif 13,00 12,00 1,0 13,00 -
6 Adi Jaya Putra 14,00 13,00 1,0 14,00 -
7 Noor Iwan Ramdhoni / Inayatullah 13,00 12,00 1,0 13,00 -
8 Hari Untoro, SE 14,00 13,00 1,0 14,00 -
9 Rangga 11,00 11,00 - 11,00 -
10 Azis Fatihah 11,00 11,00 - 11,00 -
11 Dedi Alfaridi, SH 11,00 11,00 - 11,00 -
12 Sri Hartati 14,00 13,00 1,0 14,00 -
13 Asmiran 14,00 13,00 1,0 14,00 -
11.912.300.000 11.772.240.000 136.800.000 11.909.040.000 3.260.000
Ir. R. Suherman Djajaredja 6,7 6,70 - 6,70 -
19,5 19,50 - 19,50 -
19,0 19,00 - 19,00 -
Kesemlastus Petrus, SP 10,6 10,60 - 10,60 -
13,5 13,50 - 13,50 -
19,0 19,00 - 19,00 -
Asep Wisnuadjie 19,1 19,10 - 19,10 -
M. Nurdin 19,0 19,00 - 19,00 -
Ir. Heldi Fahrani 11,6 11,60 - 11,60 -
12,5 12,50 - 12,50 -
19,0 19,00 - 19,00 -
Lulus Pujianti, S.Sos / Asep Wisnuadjie 17,0 17,00 - 17,00 -
Asep Wisnuadjie 27,1 27,10 - 27,10 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Ir. Bambang Tri Laksono - - - -
24,5 24,50 - 24,50 -
19,0 19,00 - 19,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Wahyudin 26,0 26,00 - 26,00 -
Asep Deni Suherman/Wawan Rintana/Ary Pribadi 18,0 18,00 - 18,00 -
Adhelya P Anugrahini 15,0 15,00 - 15,00 -
1,0 1,00 - 1,00 -
8,0 8,00 - 8,00 -
Dirga Suganda 9,6 9,60 - 9,60 -
14,5 14,50 - 14,50 -
10,0 10,00 - 10,00 -
26,5 26,50 - 26,50 -
10,0 10,00 - 10,00 -
to be name - - - - -
26,5 26,50 - 26,50 -
10,0 10,00 - 10,00 -
Fajar Alamsyah 26,5 26,50 - 26,50 -
Adhelya P Anugrahini / Mamduda 19,0 19,00 - 19,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Moh. Mir Purnama - - - - -
Achmad Fauzi 23,2 23,20 - 23,20 -
Asep Deni Suherman 19,0 19,00 - 19,00 -
10 Diky Setiabudi, ST 11,6 11,60 - 11,60 -
Syahrizal Tazakka 7,5 7,50 - 7,50 -
Dini Yusron 7,5 7,50 - 7,50 -
Mamduda
8 Achmad Bahtiar, M.Si
9
R. Puji Widodo
Verra Wahyana A
7
6 Andri Wahyuno
Tateng Sutardi, SE
5 Iwa Kartiwa, SE
3
4
Fajar Alamsyah
1 Noor Ramdhoni Iwan S
2 Kurnia Roby
Dimas Sirin Madefanny, S.Kom
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
Nuzulla 7,5 7,50 - 7,50 -
Propinsi Banten (Serang)
1 Kurnia Roby 14,00 13,00 1,0 14,00 -
2 Achmad Bahtiar, M.Si 14,00 13,00 1,0 14,00 -
3 Diky Setiabudi, ST 14,00 13,00 1,0 14,00 -
4 Andri Wahyuno 14,00 13,00 1,0 14,00 -
5 Iwa Kartiwa, SE 13,00 12,00 1,0 13,00 -
6 M. Nurdin 12,00 11,00 1,0 12,00 -
7 Dimas Sirin Madefanny,S.Kom/Ahlami 14,00 13,00 1,0 14,00 -
8 Asep Deni Suherman 11,00 11,00 - 11,00 -
9 Ary Pribadi 14,00 13,00 1,0 14,00 -
10 Tateng Sutardi,SE / Mamduda 14,00 13,00 1,0 14,00 -
9.238.600.000 9.101.400.000 137.200.000 9.238.600.000 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Ali Satin - - - - -
Elisanta Sutarjono 9,0 9,00 - 9,00 -
16,0 16,00 - 16,00 -
19,0 19,00 - 19,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
26,5 26,50 - 26,50 -
19,0 19,00 - 19,00 -
Agus Subardi, SE 26,5 26,50 - 26,50 -
Irwin Noeriman 18,0 18,00 - 18,00 -
26,6 26,60 - 26,60 -
19,0 19,00 - 19,00 -
Etsa Perwani 6,0 6,00 - 6,00 -
Ernita Febrianti / Lidya Anggraini 29,0 29,00 - 29,00 -
Muslih, SP 9,8 9,80 - 9,80 -
16,5 16,50 - 16,50 -
19,0 19,00 - 19,00 -
Syarief Ahmadin - - - - -
25,5 25,50 - 25,50 -
19,0 19,00 - 19,00 -
9 Ir. Ahmad Dinawan - - - - -
Propinsi Kalimantan Barat (Pontianak)
1 Ir. Komala Erwan, MT 14,00 13,00 1,0 14,00 -
2 Muslih, SP 14,00 13,00 1,0 14,00 -
3 Vetty 14,00 13,00 1,0 14,00 -
4 Ir. Suhartono 14,00 13,00 1,0 14,00 -
5 Ir. Saharuddin 13,00 12,00 1,0 13,00 -
6 Irwin Noeriman 12,00 11,00 1,0 12,00 -
7 Taufan Yoga Hertayana, S.Kom 14,00 13,00 1,0 14,00 -
8 Effendi 11,00 11,00 - 11,00 -
9 Renny Maryuni 14,00 13,00 1,0 14,00 -
10 Lidya Anggraini 14,00 13,00 1,0 14,00 -
Propinsi Kalimantan Utara (Tarakan) 1.568.500.000,00 1.465.500.000 103.000.000,00 1.568.500.000 -
1 Ir. Firman Riyadi 13,50 12,50 1,0 13,50 -
2 R. Hernandi Suherman, S.Kom 13,50 12,50 1,0 13,50 -
3 Uray / Mulyadi Muzier 13,00 12,00 1,0 13,00 -
6
Renny Maryuni, S.Sos
3
5
4
Ir. Suhartono
Ir. Firman Riyadi
Taufan Yoga H, S.Kom
1
2
Muslih, SP
Ir. Komala Erwan, MT
Agus Sarwoko
Effendi
7
8
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
4 Muh. Amin / Mulyono 13,00 12,00 1,0 13,00 -
5 Adenan Amar 12,50 11,50 1,0 12,50 -
6 Hendra Efendi, SE. - - - - -
7 Oswari Surya Negara 11,50 10,50 1,0 11,50 -
8 Nur Siyamin 5,50 5,50 - 5,50 -
9 Tesia Halim 10,50 10,50 - 10,50 -
10 Irma Adriani 5,50 5,50 - 5,50 -
C TIM PERCEPATAN (OC)
C.1 Kabupaten tangerang
1 Adi Jaya Putra 3,00 3,00 - 3,00 -
2 Rosly Syamsul Rizal, ST 3,00 3,00 - 3,00 -
3 Dicky Ssetiabudi, ST 3,00 3,00 - 3,00 -
4 Oliviani Husaeni 3,00 3,00 - 3,00 -
5 Rangga P 2,00 2,00 - 2,00 -
6 Rangga P / Mardiansyah 3,00 3,00 - 3,00 -
7 Hanny 3,00 3,00 - 3,00 -
8 Juli Zahroni 1,00 1,00 - 1,00 -
9 Mohamad Qodi 1,00 1,00 - 1,00 -
10 Ahmad Ferry F 1,00 1,00 - 1,00 -
11 Juli Zahroni 1,00 1,00 - 1,00 -
12 Mohamad Qodi 1,00 1,00 - 1,00 -
13 Nikon Dinarjaya 1,00 1,00 - 1,00 -
14 Deni Hidayat 1,00 1,00 - 1,00 -
15 Andi Sona 1,00 1,00 - 1,00 -
16 Rofandi Mahdi 1,00 1,00 - 1,00 -
17 Andy Hermawan 1,00 1,00 - 1,00 -
18 Riyan Mulyana 1,00 1,00 - 1,00 -
19 Nikon Dinarjaya 1,00 1,00 - 1,00 -
20 Deni Hidayat 1,00 1,00 - 1,00 -
21 Andi Sona 1,00 1,00 - 1,00 -
22 Rofandi Mahdi 1,00 1,00 - 1,00 -
C.2 Kota Pontianak
1 Agung Satriyo Permadi 3,00 3,00 - 3,00 -
2 Erika Amsyah, st 3,00 3,00 - 3,00 -
3 Vetty Puryanti 3,00 3,00 - 3,00 -
4 Rizky Putranto 3,00 3,00 - 3,00 -
5 Uray Wardani 2,00 2,00 - 2,00 -
6 Kurnia Yulianto 3,00 3,00 - 3,00 -
7 Andina Syafrina 3,00 3,00 - 3,00 -
8 Alfi Fajarisqi 1,00 1,00 - 1,00 -
9 Ari Kusnadi 1,00 1,00 - 1,00 -
10 Tomi Baruna 1,00 1,00 - 1,00 -
11 Desy Yani 1,00 1,00 - 1,00 -
12 Gathot Galih 1,00 1,00 - 1,00 -
13 Putri Nurul 1,00 1,00 - 1,00 -
14 Mas Heryanto 1,00 1,00 - 1,00 -
15 Noviansyah Putra 1,00 1,00 - 1,00 -
16 Yayat Sudrajat 1,00 1,00 - 1,00 -
17 Hendra Aulia 1,00 1,00 - 1,00 -
18 Mulbariq Famil 1,00 1,00 - 1,00 -
19 Ali Nasroli 1,00 1,00 - 1,00 -
20 Alfikri 1,00 1,00 - 1,00 -
21 Asmara 1,00 1,00 - 1,00 -
22 Mulyoto 1,00 1,00 - 1,00 -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
I. 2 SUPPORTING STAFF 6.349.420.000 6.222.130.000 125.200.000 6.347.330.000 2.090.000
624.250.000 613.350.000 10.900.000 624.250.000 -
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 31,95 1,0 32,95 0,00
26,5 26,50 - 26,50 -
33,0 31,95 1,0 32,95 0,00
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 31,95 1,0 32,95 0,00
26,5 26,50 - 26,50 -
33,0 31,95 1,0 32,95 0,00
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
26,5 26,50 - 26,50 -
1,3 1,25 - 1,25 -
29,8 28,75 1,0 29,75 0,03
26,5 26,50 - 26,50 -
1,3 1,25 - 1,25 -
29,8 28,75 1,0 29,75 0,03
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
5 Propinsi Kalimantan Utara
1 Asep Misbahudin 13,5 12,50 1,0 13,50 -
2 Dian Ika Sari 13,5 12,50 1,0 13,50 -
2 Yuyun Fitriani
4
3
Ana Ratna Savitri
Laila Utama Sari
1
2
3
6
5
4
6
5
Jamaludin / Agustami /Khoiri / Syahrill Effendi
Agustami / Lilis / Sulistiawati / Anggri Witanto
Sutoyo Dipradja / Eka / Saepul / Adam S
Lili Damili / Anton
Enu Tasdik
Abdi Arafi/Abdul Gofur/Defiyanti
Susilowati / M. Tomi / Yuni S
Reva Yuna
Selvia Gita P / Susilowati
Martono / Andika / M. Husni
5
4
3
2
1
Asep Misbahudin / Saepulloh / Hendra / Solah
Agus Salim / Fajar Kunhandoyo
Yudhi Siwabessy / Irwan Sugandi / Asep Misbahudin /
Oki Darmadi
3
1 Yuyun Fauzi / Louise Natalia
Andika / Irwan Sugandi
Rita Farhatulu / Sutoyo Dipradja 2
1 Ahmad Munzir
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
3 Ani Fitriani / Riske R 13,5 12,50 1,0 13,50 -
4 Fajrin Khalid 13,5 12,50 1,0 13,50 -
5 Supian Syahputra / Gatot A 13,5 12,50 1,0 13,50 -
JAKARTA TIMUR
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
20,0 20,00 - 20,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
JAKARTA BARAT
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
JAKARTA SELATAN
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
20,0 20,00 - 20,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
JAKARTA PUSAT
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
20,0 20,00 - 20,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
JAKARTA UTARA
Dendi Andrea H. 11,0 10,00 1,0 11,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
KEP. 1.000
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
KAB. TANGERANG
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
Dina Oktaviana / Siti Nurhayati / Sefti Dwi Setyo /
Delia Maesa / Ade Yusuf
Taufiq R / Alfi Yuwansah / Ulfa M / Totong S
Tri Suryadi /Taufik R/Alfi Yuwansah
Helyanti / Totong S / Dadang P
Fitriana / Annisa R / Bayu Susanto
Muhammad Jaya / Jakfar Sodiq
Dendi Andrea H. / Alfi Yuwansah / Annisa R
Rita Eryani / Dendi Andrea H.
Adi Saputra / Jakfar Sodiq / Dadang Permana / Adi
Saputra / Hendra
Halimatu Sa'diyh / Irda Rosa
Bayu Susanto
Buang Susanto / Cece Wahyudin
M Ryan K. R/ Rosyidah Khairiyah / Fadli Bakhtiar /
Halimatu Sa'diyh
Tommy Ferdian / Rosyidah Khairiyah
Misna / Iim Rohimah / Adi Saputra
Irda Rosa / Adam Setiawan / Fadli Bakhtiar
M. Idris / Irda Rosa
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
CILEGON
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
20,0 20,00 - 20,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
KOTA TANGERANG -
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
27,0 26,00 1,0 27,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
KOTA SERANG
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,0 30,00 1,0 31,00 -
26,5 26,50 - 26,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
TANGERANG SELATAN
28,0 28,00 - 28,00 -
0,50 0,50 - 0,50 -
20,0 20,00 - 20,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
PANDEGLANG
Ratu Yahya Romdiah 11,00 10,00 1,0 11,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
LEBAK
Sri Sugiarti 11,00 10,00 1,0 11,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 - Nurhasanah / Sukmaeni
Reni Apriani / Rini Fedina Sari / Abd Wahab / Ilma
Amalia
Nandang Sunardi/Septiana Herawan
Saefun Nufus / TB Maulana Nugraha
Suwardi / Misro / Fatoni S
Pupud Sarifudin / Saefuloh / Agung Tio / M. Rizqi
Indah Mei Nurafiani / Dinny C / Madsari / Maulana
Malik I / Madsari
Gustina Syarief / Nurjami'ah / Yatmini / Widia N
Ade Ria T / Anisya Jawpa / Ali Topan
Raudatul Janah
Ishak Fauzi / M. Fajar Abijaya / M. Najib / Madi
Selly Maulida / Uswatun Hasanah / Putri Nurul Aisah
Siti Al Suaibah / Tia Anggraeni / Uswatun Hasanah
Jenal Komarudin / Komar Setiadi
Hendry Heryadi / Ade Yusuf / Nur Euis N / Della
Maesa
Sofan / Yati Nurhayati / Desy Damayanti
Desy Damayanti / Raudatul Janah
Anisya Jawpa / Nufus K / Tuti Ulwiyah / Hendrik
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
KOTA PONTIANAK
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
31,5 30,50 1,0 31,50 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
KETAPANG
26,5 26,50 - 26,50 -
1,5 1,50 - 1,50 -
20,0 20,00 - 20,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
- -
SINGKAWANG
26,5 26,50 - 26,50 -
- - - - -
31,5 30,50 1,0 31,50 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
to be name - - - - -
SAMBAS
Ema, A.Md 12,00 11,00 1,0 12,00 -
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
26,0 26,00 - 26,00 -
33,0 32,00 1,0 33,00 -
BENGKAYANG
25,5 25,50 - 25,50 -
33,0 32,00 1,0 33,00 -
26,0 26,00 - 26,00 -
33,0 32,00 1,0 33,00 -
Gustina Syarief - 1.500.000 - - - - - - - -
to be name - 1.250.000 - - - - - - - -
to be name - 1.000.000 - - - - - - - -
Netti / Nurlaila / Sada Sari
Udawati / Krisminarsih S
Pipin Tasripin/Hariandini/Masula
Fitriana / Ema, A.Md / Hariandini
Sri Wahyuningsih / Elis / Dewi Sartika / Erti Warniyah
Detya Amandasari / Desi Rasyidah / Wisnu W / Nila
Miazurianti
Fitri Andriani
Sutrisno / Dede / Adek Sumpeno
Syf. Hiefrida / Sri Sulastri Pangestu / Eva Lesmana
Indrawati Dumaningsih
Alfian / Julia W
Yoga Kusworo / Julia W / Ikasari Ginting
Ikasari Ginting
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
I. BREAKDOWN OF REMUNERATION
NO URAIAN
KOORDINATOR KOTA dan Askot CD
KALIMANTAN UTARA
TARAKAN
Yeni Kombong 14,0 13,00 1,0 14,00 -
Adrianus 14,0 13,00 1,0 14,00 -
Maria Jenny 14,0 13,00 1,0 14,00 -
NUNUKAN
Novena P 11,0 10,00 1,0 11,00 -
Yuliana A 14,0 13,00 1,0 14,00 -
Bonefasius P 14,0 13,00 1,0 14,00 -
MALINAU
Afan 14,0 13,00 1,0 14,00 -
Aji Saputra 14,0 13,00 1,0 14,00 -
BULUNGAN
Novianty 14,0 13,00 1,0 14,00 -
Ibnu Hajar 14,0 13,00 1,0 14,00 -
1.2.1 TIM PERCEPATAN (September 2016-Desember 2016)
1.2.1.1 Kab. Tangerang
a Hartika 3,0 3,00 - 3,00 -
b Winny S 3,0 3,00 - 3,00 -
c Dullah 3,0 3,00 - 3,00 -
1.2.1.2 Kota Pontianak
a Louise Natalia 3,0 3,00 - 3,00 -
b Neni Rumiyanti 3,0 3,00 - 3,00 -
c Darmansyah 3,0 3,00 - 3,00 -
43.403.836.000 42.728.986.000 669.500.000 43.398.486.000 5.350.000TOTAL REMUNERATION
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
1 MOBILIZATION / DEMOBILIZATION
1 Jakarta - Serang - 100.000 - - - - - - -
2 Jakarta - Pontianak 1 1.750.000 995.000 1 995.000 - 1 995.000 - -
3 Jakarta - Serang - 100.000 - - - - - - -
4 Jakarta - Pontianak - 1.750.000 - - - - - - - -
5 Jakarta - Kalimantan Utara - 7.000.000 - - - - - - - -
5 Jakarta - Kalimantan Utara 9 4.000.000 33.000.000 - 11.609.038 7 7.386.120 7 18.995.158 2 14.004.842
33.995.000 12.604.038 7.386.120 19.990.158 14.004.842 TOTAL OF MOBILIZITION / DEMOBILIZATION
No URAIAN INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
II. DIRECT REEIMBURSABLE COST
2.1. MOBILIZATION / DEMOBILIZATION
INVOICE LALUCONTRAC AMENDEMENT - 21
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
1 HOUSING ALLOWANCE
OC Level
1 Ir. Deni Hasman 16,0 500.000 8.000.000 16 8.000.000 - - 16 8.000.000 - -
Deni Jauhari - 500.000 - - - - - - - - -
-
Province Level (DKI Jakarta) -
1 Ir. Saharudin 46,0 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
Drs. M. Ichwan Kalimasada 16,0 500.000 8.000.000 16 8.000.000 - - 16 8.000.000 - -
Jaenudin, SE 28,0 500.000 14.000.000 28 14.000.000 - - 28 14.000.000 - -
3 Nayyiri Habib 46,0 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
Drs. Ari Hariadi Soelaeman 16,0 500.000 8.000.000 16 8.000.000 - - 16 8.000.000 - -
Sri Yulaiti/Inayatulah - 500.000 - - - - - - - - -
5 Drs. Syaiful Arif - 500.000 - - - - - - - - -
Ir. Yudi Prayuda - 500.000 - - - - - - - - -
Ir. Irmansyah - 500.000 - - - - - - - - -
7 Opi Firdaus Dewanto, SE - 500.000 - - - - - - - - -
Jaenudin, SE 18,0 500.000 9.000.000 18 9.000.000 - - 18 9.000.000 - -
Dedi Alparidi, S.H - 500.000 - - - - - - - - -
9 Hari Untoro, SE - 500.000 - - - - - - - - -
10 Rosly Syamsul Rizal, ST 12,0 500.000 6.000.000 12 6.000.000 - - 12 6.000.000 - -
Propinsi Level DKI Jakarta (Jakarta) - -
1 Denny Jauhari - 500.000 - - - - - - - - -
2 Jaenudin 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
3 Rosly Syamsul Rizal, ST 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
4 Ir. Irmansyah - 500.000 - - - - - - - - -
5 Drs. Syaiful Arif - 500.000 - - - - - - - - -
6 Adi Jaya Putra - 500.000 - - - - - - - - -
7 Noor Iwan Ramdhoni / Inayatullah - 500.000 - - - - - - - - -
8 Hari Untoro, SE - 500.000 - - - - - - - - -
Province Level (Banten) - -
Ir. R. Suherman Djajaredja 7,0 500.000 3.500.000 7 3.500.000 - - 7 3.500.000 - -
Noor Ramdhoni Iwan S - 500.000 - - - - - - - -
Kesemlastus Petrus, SP - 500.000 - - - - - - - - -
Kurnia Roby 28,0 500.000 14.000.000 28 14.000.000 - - 28 14.000.000 - -
Ir. Heldi Fahrani 12,0 500.000 6.000.000 12 6.000.000 - - 12 6.000.000 - -
Dimas Sirin Madefanny, S.Kom 31,0 500.000 15.500.000 31 15.500.000 - - 31 15.500.000 - -
4 Lulus Pujianti, S.Sos / Asep Wisnuadjie 46,0 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
5 Iwa Kartiwa, SE 46,0 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
6 Andri Wahyuno - 500.000 - - - - - - - - -
7 Tateng Sutardi, SE 46,0 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
8 Achmad Bahtiar, M.Si - 500.000 - - - - - - - - -
9 Achmad Fauzi 19,0 500.000 9.500.000 19 9.500.000 - - 19 9.500.000 - -
6
8
SISA KONTRAK
II. DIRECT REEIMBURSABLE COST
2.2. HOUSING ALLOWANCE
NO. INVOICE S/D SAAT INIINVOICE LALU INVOICE SAAT INICONTRAC AMENDEMENT - 21
URAIAN
2
3
2
4
1
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
SISA KONTRAK NO.
INVOICE S/D SAAT INIINVOICE LALU INVOICE SAAT INICONTRAC AMENDEMENT - 21 URAIAN
10 Diky Setiabudi, ST - 500.000 - - - - - - - - -
Propinsi Level Banten (Serang)
1 Kurnia Roby 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
2 Achmad Bahtiar, M.Si - 500.000 - - - - - - - - -
3 Diky Setiabudi, ST 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
4 Andri Wahyuno - 500.000 - - - - - - - - -
5 Iwa Kartiwa, SE 14 500.000 7.000.000 12 6.000.000 1,0 500.000 13 6.500.000 1 500.000
Tim Percepatan
1 Diky Setiabudi, ST 3 500.000 1.500.000 3 1.500.000 - - 3 1.500.000 - -
2 Rosly Syamsul Rizal, ST 3 500.000 1.500.000 3 1.500.000 - - 3 1.500.000 - -
3 To be name - 500.000 - - - - - - - - -
4 To be name - 500.000 - - - - - - - - -
Province Level (Kalimantan Barat)
1 Ir. Komala Erwan, MT - 500.000 - - - - - - - - -
2 Elisanta Sutarjono - 500.000 - - - - - - - - -
Additional Housing Allowance - 500.000 - - - - - - -
3 Taufan Yoga H, S.Kom 46 500.000 23.000.000 46 23.000.000 - - 46 23.000.000 - -
4 - 500.000 - - - - - - - - -
5 Ir. Firman Riyadi - 500.000 - - - - - - - - -
6 Ir. Suhartono - 500.000 - - - - - - - - -
7 Agus Subardi, SE - 500.000 - - - - - - - - -
8 Muslih, SP / Agus Sarwoko - 500.000 - - - - - - - - -
9 Effendi - 500.000 - - - - - - - - -
10 Ir. Ahmad Dinawan - 500.000 - - - - - - - - -
Propinsi Level Kalimantan Barat (Pontianak)
1 Ir. Komala Erwan, MT - 500.000 - - - - - - - - -
2 Muslih, SP - 500.000 - - - - - - - - -
3 Vetty - 500.000 - - - - - - - - -
4 Ir. Suhartono - 500.000 - - - - - - - - -
5 Ir. Saharuddin - 500.000 - - - - - - - - -
Tim Percepatan
1 To be name - 500.000 - - - - - - - - -
2 To be name - 500.000 - - - - - - - - -
3 To be name - 500.000 - - - - - - - - -
4 To be name - 500.000 - - - - - - - - -
Propinsi Level Kalimantan Utara (Tarakan)
1 Ir. Firman Riyadi 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
2 R. Hernandi Suherman, S.Kom 14 500.000 7.000.000 13 6.500.000 1,0 500.000 14 7.000.000 - -
3 Uray / Mulyadi Muzier 13 500.000 6.500.000 12 6.000.000 1,0 500.000 13 6.500.000 - -
4 Muh. Amin / Mulyono 13 500.000 6.500.000 12 6.000.000 1,0 500.000 13 6.500.000 - -
5 Adenan Amar 13 500.000 6.500.000 12 6.000.000 1,0 500.000 13 6.500.000 - -
311.000.000 305.500.000 5.000.000 310.500.000 500.000 TOTAL OF HOUSING ALLOWANCE
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
II.3 IN PROVINCE
3.1.1 IN PROVINCE
3.1.1.1 DUTTY TRAVEL PROJECT DIRECTORE FOR SPOTCHECK
(OTHER) 3.950.000 - - - 3.950.000
a. From Jakarta to Banten
Transport - 100.000 - - - - - - -
- 50.000 - - - - - - -
b From Jakarta to Pontianak
Air Transport - 4.000.000 - - - - - - -
In Land Travel - 350.000 - - - - - - -
Hotel Accomodation - 350.000 - - - - - - -
OSA - 300.000 - - - - - - -
Kossolidasi / KBIK Provinsi (Oktober 2016 - Juni 2017)
a From Jakarta to Banten
Transport - 100.000 - - - - - - -
In Land Travel - 200.000 - - - - - - -
Hotel Accomodation - 350.000 - - - - - - -
Osa - 300.000 - - - - - - -
b From Jakarta to Pontianak
Air Transport 1 4.000.000 2.000.000 - - - - 1 2.000.000
In Land Travel 1 350.000 350.000 - - - - 1 350.000
Hotel Accomodation 2 350.000 700.000 - - - - 2 700.000
Osa 3 300.000 900.000 - - - - 3 900.000
3.1.1.2 FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x Number of Kelurahan) 1.550.000 1.550.000 - 1.550.000 -
a From Jakarta Pusat to Jakarta Barat (56 kel x 5% = 6 kel)
Lumpsum 1 50.000 50.000 1 50.000 - - 1 50.000 - -
b From Jakarta Pusat to Jakarta Selatan (64 kel x 5% = 6 kel)
Lumpsum 1 50.000 50.000 1 50.000 - - 1 50.000 - -
c From Jakarta Pusat to Jakarta Timur (65 kel x 5% = 6 kel)
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
d From Jakarta Pusat to Jakarta Utara (31 kel x 5% = 3 kel)
Lumpsum - 50.000 - - - - - - - - -
e From Jakarta Pusat to Jakarta Pusat (44 kel x 5% = 3 kel)
Lumpsum 1 50.000 50.000 1 50.000 - - 1 50.000 - -
f To Kepulauan Seribu
Transport by Sea 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation 2 300.000 600.000 2 600.000 - - 2 600.000 - -
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
OKTOBER 2016 - JUNI 2017
a. From Jakarta Pusat to Jakarta Barat (56 kel x 5% = 6 kel)
Lumpsum - 50.000 - - - - - - -
b. From Jakarta Pusat to Jakarta Selatan (64 kel x 5% = 6 kel)
Lumpsum - 50.000 - - - - - - -
c. From Jakarta Pusat to Jakarta Timur (65 kel x 5% = 6 kel)
Lumpsum - 50.000 - - - - - - -
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
d. From Jakarta Pusat to Jakarta Utara (31 kel x 5% = 3 kel)
Lumpsum - 50.000 - - - - - - -
e. From Jakarta Pusat to Jakarta Pusat (44 kel x 5% = 3 kel)
Lumpsum - 50.000 - - - - - - -
f. To Kepulauan Seribu
Transport by Sea - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
April 2017 - Juni 2017
a. MONITORING OSP PADA LEVEL KOTA
KOTA KUMUH
KOTA KUMUH INFRA SKALA KOTA
Dari Kota Jakarta ke Jakarta Utara
Lumpsum - 50.000 - - - - - - -
KOTA KUMUH NON INFRA SKALA KOTA
Dari Kota Jakarta ke Jakarta Barat
Lumpsum - 50.000 - - - - - - -
Dari Kota Jakarta ke Jakarta Pusat
Lumpsum - 50.000 - - - - - - -
Dari Kota Jakarta ke Jakarta Timur
Lumpsum - 50.000 - - - - - - -
Dari Kota Jakarta ke Jakarta Selatan
Lumpsum - 50.000 - - - - - - -
Dari Kota Jakarta ke Kepulauan Seribu
Lumpsum - 50.000 - - - - - - -
3.1.1.3 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 4.000.000 4.000.000 - 4.000.000 -
A. For City Coordinator and Assistance City Coordinator
(266 Kel x 50%) x 4 13 50.000 650.000 13 650.000 - - 13 650.000 - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel - 50.000 - - - - - - -
B. For Ass. City Coordinator Infrastructure and FM in the city
(266 Kel - 37 Kel luar kota) x 50%) x 14 57 50.000 2.850.000 57 2.850.000 - - 57 2.850.000 - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel 10 50.000 500.000 10 500.000 10 500.000 - -
C. For City Coordinator Infrastructure and FM out of the town
1 From Jakarta Pusat to Kepulauan Seribu
Transport - 50.000 - - - - - - -
2 From Jakarta Pusat to Jakarta Utara
Transport - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. For City Coordinator and Assistance City Coordinator
(266 Kel x 20%) x 4 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
b. For Ass. City Coordinator Infrastructure and FM in the city
(266 Kel - 37 Kel luar kota) x 20%) x 14 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
c. For City Coordinator Infrastructure and FM out of the town
From Jakarta Pusat to Kepulauan Seribu
Transport - 50.000 - - - - - - -
From Jakarta Pusat to Jakarta Utara
Transport - 50.000 - - - - - - -
April 2017 - Juni 2017
a. MONITORING KORKOT PADA LEVEL KELURAHAN/DESA
Monitoring Tim Korkot Jakarta Utara di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Jakarta Utara Ke (1) Jakarta Selatan, (2) Jakarta Pusat
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Jakarta Barat di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Jakarta Barat Ke (1) Jakarta Timur, (2) Kepulauan Seribu
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
3.1.1.4 FOR CB ACTIVITY BY ASKOT TO FASKEL - - - - -
a From Jakarta Pusat to Kepulauan Seribu
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
b From Jakarta Pusat to Jakarta Utara
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. From Jakarta Pusat to Kepulauan Seribu
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
b. From Jakarta Pusat to Jakarta Utara
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
3.1.1.5 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING - - - - -
a From Jakarta Barat To Jakarta Pusat
OSA - 50.000 - - - - - - -
b From Jakarta Selatan To Jakarta Pusat
OSA - 50.000 - - - - - - -
c From Jakarta Timur To Jakarta Pusat
OSA - 50.000 - - - - - - -
d From Jakarta Utara To Jakarta Pusat
OSA - 50.000 - - - - - - -
e From Kepulauan Seribu To Jakarta Pusat
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
3.1.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO JAKARTA 106.400.000 106.400.000 - 106.400.000 -
For Training
Inland Transport for Korkot&Askot (7 Kota/Kab) on OC
Consolidation
a From Jakarta Barat To Jakarta Pusat
Transport 23 200.000 4.600.000 23 4.600.000 - - 23 4.600.000 - -
b From Jakarta Selatan To Jakarta Pusat
Transport 23 200.000 4.600.000 23 4.600.000 - - 23 4.600.000 - -
c From Jakarta Timur To Jakarta Pusat
Transport 23 200.000 4.600.000 23 4.600.000 - - 23 4.600.000 - -
d From Jakarta Utara To Jakarta Pusat
Transport 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
e From Kepulauan Seribu To Jakarta Pusat
Transport 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
Inland Transport for SF, FT, FE, FS (7 Kota/Kab)
a From Jakarta Barat To Jakarta Pusat
Inland Transport 109 200.000 21.800.000 109 21.800.000 - - 109 21.800.000 - -
b From Jakarta Selatan To Jakarta Pusat
Transport 127 200.000 25.400.000 127 25.400.000 - - 127 25.400.000 - -
c From Jakarta Timur To Jakarta Pusat
Transport 130 200.000 26.000.000 130 26.000.000 - - 130 26.000.000 - -
d From Jakarta Utara To Jakarta Pusat
Transport 56 200.000 11.200.000 56 11.200.000 - - 56 11.200.000 - -
e From Kepulauan Seribu To Jakarta Pusat
Transport 15 200.000 3.000.000 15 3.000.000 - - 15 3.000.000 - -
OKTOBER 2016 - JUNI 2017
Inland Transport for Korkot&Askot (6 Kota/Kab) on OC Consolidation KBIK Provinsi
a. From Jakarta Barat To Jakarta Pusat
Transport - 200.000 - - - - - - -
b. From Jakarta Selatan To Jakarta Pusat
Transport - 200.000 - - - - - - -
c. From Jakarta Timur To Jakarta Pusat
Transport - 200.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
d. From Jakarta Utara To Jakarta Pusat
Transport - 200.000 - - - - - - -
e. From Kepulauan Seribu To Jakarta Pusat
Transport - 200.000 - - - - - - -
Inland Transport for Amandat on OC Pelatihan SIM KOTAKU
a. From Jakarta Barat To Jakarta Pusat
Transport - 200.000 - - - - - - -
b. From Jakarta Selatan To Jakarta Pusat
Transport - 200.000 - - - - - - -
c. From Jakarta Timur To Jakarta Pusat
Transport - 200.000 - - - - - - -
Inland Transport for SF, FT, FE, FS (6 Kota/Kab) Pelatihan Penguatan Fasilitator
a. From Jakarta Barat To Jakarta Pusat
Inland Transport - 200.000 - - - - - - -
b. From Jakarta Selatan To Jakarta Pusat
Transport - 200.000 - - - - - - -
c. From Jakarta Timur To Jakarta Pusat
Transport - 200.000 - - - - - - -
d. From Jakarta Utara To Jakarta Pusat
Transport - 200.000 - - - - - - -
e. From Kepulauan Seribu To Jakarta Pusat
Transport - 200.000 - - - - - - -
Special Event (by request)
1 From Jakarta Barat To Jakarta Pusat
Lumpsum 12 50.000 600.000 12 600.000 - - 12 600.000 - -
2 From Jakarta Selatan To Jakarta Pusat
Lumpsum 12 50.000 600.000 12 600.000 - - 12 600.000 - -
3 From Jakarta Timur To Jakarta Pusat
Lumpsum 12 50.000 600.000 12 600.000 - - 12 600.000 - -
4 From Jakarta Utara To Jakarta Pusat
Lumpsum 12 50.000 600.000 12 600.000 - - 12 600.000 - -
5 From Kepulauan Seribu To Jakarta Pusat
Transport 4 200.000 800.000 4 800.000 - - 4 800.000 - -
Acomodation - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
3.1.2 TO JAKARTA
3.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 86.800.000 70.300.000 - 70.300.000 16.500.000
In land Travel in Jakarta 16 200.000 3.200.000 16 3.200.000 - - 16 3.200.000 - -
OSA 69 100.000 6.900.000 69 6.900.000 - - 69 6.900.000 - -
Januari 2016 s/d September 2016
Pelatihan OSP/OC
In land Travel in Jakarta 2 200.000 400.000 2 400.000 2 400.000 - -
OSA 15 100.000 1.500.000 15 1.500.000 15 1.500.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
Rakor PD & TL
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
ToT Pemandu Nasional
In land Travel in Jakarta 14 200.000 2.800.000 14 2.800.000 14 2.800.000 - -
OSA 111 100.000 11.100.000 111 11.100.000 111 11.100.000 - -
ToT Pemandu Nasional untuk pelatihan khusus
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
Pelatihan Koordinator Kota
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
ToT Pelatihan Penguatan dan pengembangan BDC *)
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
ToT Pelatihan pembentukan & pengembangan Federasi UPK *)
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
ToT Pembukuan UPK (Computerization) *)
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
SEPTEMBER 2016 - JUNI 2017
ToT Pembukuan UPK (Computerization) *)
In land Travel in Jakarta 3 200.000 600.000 3 600.000 - - 3 600.000 - -
OSA 16 100.000 1.600.000 15 1.500.000 - - 15 1.500.000 1 100.000
Pelatihan Pembukuan UPK (Computerization)
In land Travel in Jakarta 12 200.000 2.400.000 - - - - - - 12 2.400.000
Asesor for Asesment SF / Faskel
In land Travel in Jakarta to Jakarta Barat, Jakarta Timur, Jakarta Selatan, Jakarta Utara - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
In land Travel in Jakarta to Kepulauan seribu - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 100.000 - - - - - - -
Asesment Korkot
In land Travel in Jakarta - 200.000 - - - - - - - - -
Asesment Korkot
In land Travel in Jakarta - 200.000 - - - - - - - - -
ToT Pemandu Nasional Untuk pelatihan Fasilitator dan Askot (50 Kota Prioritas) (Pelaksana NMC)
OSA - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
TOT PPMK & APLIKASI UPK (Pelaksana NMC)
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
In land Travel in Jakarta 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
Konsolidasi Pelatihan Fasilitator
In land Travel in Jakarta - 200.000 - - - - - - -
Pelatihan PPMK (833) Kelurahan (peserta Askot Ekonomi dan Faskel Ekonomi)
Jakarta Barat to Jakarta Pusat 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Kepulauan Seribu to Jakarta Pusat 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Jakarta Timur to Jakarta Pusat 4 200.000 800.000 4 800.000 - - 4 800.000 - -
Jakarta Utara to Jakarta Pusat 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Jakarta Selatan to Jakarta Pusat 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Coaching Penyiapan Keg Infrasturktur (Korkot,Askot Mandiri, Infra, UP & IC ke OC)
Jakarta Barat to Jakarta Pusat 4 200.000 800.000 - - - - - - 4 800.000
OSA 12 100.000 1.200.000 - - - - - - 12 1.200.000
Kepulauan Seribu to Jakarta Pusat 1 200.000 200.000 - - - - - - 1 200.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Jakarta Timur to Jakarta Pusat 1 200.000 200.000 - - - - - - 1 200.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Jakarta Utara to Jakarta Pusat 4 200.000 800.000 - - - - - - 4 800.000
OSA 12 100.000 1.200.000 - - - - - - 12 1.200.000
Jakarta Selatan to Jakarta Pusat 1 200.000 200.000 - - - - - - 1 200.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Jakarta Pusat to Jakarta Pusat 1 200.000 200.000 - - - - - - 1 200.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Coaching Clinic (untuk TA ke KAB/KOTA)
Transport Jakarta Pusat to Jakarta Barat 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Jakarta Pusat to Kepulauan Seribu 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Jakarta Pusat to Jakarta Timur 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Jakarta Pusat to Jakarta Utara 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Jakarta Pusat to Jakarta Selatan 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
OSA - 100.000 - - - - - - -
Transport Jakarta Pusat to Jakarta Utara - 200.000 - - - - - - -
Kegiatan Juli 2017 - Agustus 2017
Workshop Nasional DFS
OSA - 100.000 - - - - - - -
Transport Jakarta Pusat to Jakarta Utara - 200.000 - - - - - - -
Rakor PD & TL
In land Travel in Jakarta - 200.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
OSA - 100.000 - - - - - - -
Acara Hotel Ibis
In land Travel in Jakarta 2 200.000 400.000 2 400.000 - - 2 400.000 - -
OSA 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -
ToT Pemandu Nasional
In land Travel in Jakarta 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - -
OSA 56 100.000 5.600.000 56 5.600.000 - - 56 5.600.000 - -
Loka Latih Pemerintah Daerah (40 Kota/Kab)
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
TOT Pelatihan SIM KOTKU
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
OKTOBER 2017
1 Pembahasan Draft Final dan Evkin
In land Travel in Jakarta (TL, dan TA ) 6 200.000 1.200.000 6 1.200.000 - - 6 1.200.000 - -
OSA 18 100.000 1.800.000 18 1.800.000 - - 18 1.800.000 - -
Sewa tempat fullboard 60 350.000 21.000.000 60 21.000.000 - - 60 21.000.000 - -
2 Pembahasan Laporan Final
In land Travel in Jakarta (TL) 1 200.000 200.000 1 200.000 - - 1 200.000 - -
OSA 4 100.000 400.000 4 400.000 - - 4 400.000 - -
Sewa tempat fullboard 12 350.000 4.200.000 12 4.200.000 - - 12 4.200.000 - -
3.1.2.2 FOR EGM TO JAKARTA 20.250.000 18.900.000 - 18.900.000 1.350.000
Transport
1 EGM TA/SubTA Training 1 100.000 100.000 1 100.000 - - 1 100.000 - -
2 EGM TA Sosialisasi 1 100.000 100.000 1 100.000 - - 1 100.000 - -
3 EGM TA/SubTA MK/Sub TA RLF 1 100.000 100.000 1 100.000 - - 1 100.000 - -
4 EGM TA/SubTA INFRA/Sub TA Safeguard 1 100.000 100.000 1 100.000 - - 1 100.000 - -
5 EGM TA/SubTA Monev /Sub TA Legal HCU 1 100.000 100.000 1 100.000 - - 1 100.000 - -
6 EGM TA/SubTA SIM 1 100.000 100.000 1 100.000 - - 1 100.000 - -
7 EGM TA Local Goverment 1 100.000 100.000 1 100.000 - - 1 100.000 - -
8 EGM TA Livelihood & SME's 1 100.000 100.000 1 100.000 - - 1 100.000 - -
9 EGM TA Urban Planner 1 100.000 100.000 1 100.000 - - 1 100.000 - -
In land Transport in Jakarta 10 200.000 2.000.000 10 2.000.000 - - 10 2.000.000 - -
Accomodation 3 350.000 1.050.000 3 900.000 - - 3 900.000 - 150.000
OSA 31 100.000 3.100.000 31 3.100.000 - - 31 3.100.000 - -
OKTOBER 2016 - JUNI 2017
In land Transport in Jakarta 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
Accomodation 24 350.000 8.400.000 24 7.200.000 - - 24 7.200.000 - 1.200.000
OSA 32 100.000 3.200.000 32 3.200.000 - - 32 3.200.000 - -
3.1.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 19.400.000 19.250.000 - 19.250.000 150.000
Transport 12 100.000 1.200.000 12 1.200.000 - - 12 1.200.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
2.3. DUTY TRAVEL EXPENSES PROVINCE DKI JAKARTA
INVOICE S/D SAAT INI No URAIAN
In land Transport in Jakarta 16 200.000 3.200.000 16 3.200.000 - - 16 3.200.000 - -
Hotel Accommodation 30 300.000 9.000.000 30 8.850.000 - - 30 8.850.000 - 150.000
OSA 60 100.000 6.000.000 60 6.000.000 - - 60 6.000.000 - -
3.1.2.4 DUTTY TRAVEL BY REQUEST TO OTHER 2.250.000 2.074.233 - 2.074.233 175.767
Air Transport 1 4.000.000 1.000.000 1 824.233 - - 1 824.233 - 175.767 In Land Travel 1 350.000 350.000 1 350.000 - - 1 350.000 - - Hotel Accomodation - 350.000 - - - - - - - - - OSA 3 300.000 900.000 3 900.000 - - 3 900.000 - -
Air Transport - 4.000.000 - - - - - - - In Land Travel - 350.000 - - - - - - - Hotel Accommodation - 350.000 - - - - - - - OSA - 300.000 - - - - - - -
226.600.000 222.474.233 - 222.474.233 4.125.767 TOTAL DUTY TRAVEL PROVINCE DKI JAKARTA
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
4.1.1 IN PROVINCE
4.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x No. of Kelurahan) 5.550.000 5.540.000 - 5.540.000 10.000
a From Serang to Kota Cilegon (43 kel x 5% = 5 kel)
Transport - 200.000 - - - - - - - - -
Acomodation - 150.000 - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
b From Serang to Tangerang, Kota Tangerang dan Kota Tangerang Selatan (235 kel x 5% = 12 kel)
Transport - 200.000 - - - - - - - - -
Acomodation - 150.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
c From Serang to Lebak dan Pandegelang (30 kel x 5% = 2 kel)
Transport - 200.000 - - - - - - -
Acomodation - - - - - -
Lumpsum - 50.000 - - - - - - -
d From Serang to Serang (66 kel x 5% = 6 kel)
Lumpsum - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. From Serang to Kota Cilegon (43 kel x 5% = 5 kel)
Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Acomodation 1 150.000 150.000 1 150.000 - - 1 150.000 - -
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
b. From Serang to Tangerang, Kota Tangerang dan Kota Tangerang Selatan (235 kel x 5% = 12 kel)
Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - -
Acomodation 8 150.000 1.200.000 8 1.190.000 - - 8 1.190.000 - 10.000
Lumpsum 15 50.000 750.000 15 750.000 - - 15 750.000 - -
c. From Serang to Lebak dan Pandegelang (30 kel x 5% = 2 kel)
Transport 4 200.000 800.000 4 800.000 - - 4 800.000 - -
Acomodation 1 150.000 150.000 1 150.000 - - 1 150.000 - -
Lumpsum 6 50.000 300.000 6 300.000 - - 6 300.000 - -
d. From Serang to Serang (66 kel x 5% = 6 kel)
Lumpsum - 50.000 - - - - - - -
April 2017 - Juni 2017
a. MONITORING OSP PADA LEVEL KOTA
KOTA KUMUH
KOTA KUMUH INFRA SKALA KOTA
Dari Kota Serang ke KAB. PANDEGLANG
Transport - 200.000 - - - - - - -
Akomodasi - 150.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
Dari Kota Serang ke KAB. LEBAK
Transport - 200.000 - - - - - - -
Akomodasi - 150.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
Dari Kota Serang ke KAB. TANGERANG
Transport - 200.000 - - - - - - -
Akomodasi - 150.000 - - - - - - -
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Lumpsum - 50.000 - - - - - - -
Dari Kota Serang ke KOTA SERANG
Transport - 200.000 - - - - - - -
Akomodasi - 150.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
KOTA KUMUH NON INFRA SKALA KOTA
Dari Kota Serang ke KOTA CILEGON
Lumpsum - 50.000 - - - - - - -
Dari Kota Serang ke KOTA TANGERANG
Transport - 200.000 - - - - - - -
Akomodasi - 150.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
Dari Kota Serang ke KOTA TANGERANG
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
4.1.1.2 SPOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM - - - - -
A. For City Coordinator and Assistance City Coordinator
(372 Kel x 50%) x 4 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(372 Kel - 63 Kel luar kota) x 50%) x 14 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of the town
1 From Serang To Lebak
Transport - 50.000 - - - - - - -
2 From Serang To Pandegelang
Transport - 50.000 - - - - - - -
3 From Kota Tangerang to Kota Tangerang Selatan
Transport - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. For City Coordinator and Assistance City Coordinator
(372 Kel x 20%) x 4 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
b. For Ass. City Coordinator Infrastructure and FM in the city
(372 Kel - 63 Kel luar kota) x 20%) x 14 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
c. For City Coordinator Infrastructure and FM out of the town
From Serang To Lebak
Transport - 50.000 - - - - - - -
From Serang To Pandegelang
Transport - 50.000 - - - - - - -
From Kota Tangerang to Kota Tangerang Selatan
Transport - 50.000 - - - - - - -
April 2017 - Juni 2017
a. MONITORING KORKOT PADA LEVEL KELURAHAN/DESA
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Monitoring Tim Korkot Pandeglang di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Lebak di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Tangerang di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Tangerang Ke (1) Kota Tangerang Selatan
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
4.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL - - - - -
a From Serang To Lebak
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
b From Serang To Pandegelang
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
c From Kota Tangerang to Kota Tangerang Selatan
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. From Serang To Lebak
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
b. From Serang To Pandegelang
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
c. From Kota Tangerang to Kota Tangerang Selatan
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
4.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 36.500.000 36.500.000 - 36.500.000 -
a From Cilegon to Serang
Transport 26 200.000 4.200.000 26 4.200.000 - - 26 4.200.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
b From Kota Tangerang to Serang
Transport 26 200.000 5.200.000 26 5.200.000 - - 26 5.200.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
c From Tangerang to Serang
Transport 26 200.000 5.200.000 26 5.200.000 - - 26 5.200.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
d From Kota Tangerang Selatan to Serang
Transport 26 200.000 5.200.000 26 5.200.000 - - 26 5.200.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
e From Lebak to Serang
Transport 21 200.000 3.650.000 21 3.650.000 - - 21 3.650.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
f From Pandegelang to Serang
Transport 23 200.000 4.150.000 23 4.150.000 - - 23 4.150.000 - -
Acomodation - 150.000 - - - - - - -
OSA - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. From Cilegon to Serang
Transport 6 200.000 900.000 6 900.000 - - 6 900.000 - -
b. From Kota Tangerang to Serang
Transport 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
c. From Tangerang to Serang
Transport 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
d. From Kota Tangerang Selatan to Serang
Transport 6 200.000 1.200.000 6 1.200.000 - - 6 1.200.000 - -
e. From Lebak to Serang
Transport 1 200.000 150.000 1 150.000 - - 1 150.000 - -
f From Pandegelang to Serang
Transport 1 200.000 150.000 1 150.000 - - 1 150.000 - -
eLocal Transport for Coordination (1 kota x 4 prs x 3 bln x 2 kali) (TIM
PERCEPATAN)11 300.000 3.300.000 11 3.300.000 - - 11 3.300.000 - -
Transport Pelatihan Perencaan TAPP - 300.000 - - - - - - -
4.1.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &
COORDINATION MEETING AT OC1.200.000 1.200.000 - 1.200.000 -
Workshop OC / Coordination Meeting at OC
From Bandar Serang to Jakarta
Air Transport - 2.500.000 - - - - - - -
OSA [ Fixed ] - 100.000 - - - - - - - - -
Local Transport - 100.000 - - - - - - - - -
Workshop Midterm Nasional (Lokasi Prioritas) Oktober 2016 - Juni 2017
OSA [ Fixed ] - 100.000 - - - - - - -
Local Transport - 100.000 - - - - - - -
Kegiatan Juli 2017 - Agustus 2017
Workshop Nasional BDC
Transport 2 100.000 200.000 2 200.000 - - 2 200.000 - -
In land Travel in Jakarta 2 200.000 400.000 2 400.000 - - 2 400.000 - -
OSA 6 100.000 600.000 6 600.000 - - 6 600.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Workshop Nasional DFS
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Workshop Nasional FEDERASI UPK
Transport - 100.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
4.1.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO SERANG 69.400.000 69.400.000 - 69.400.000 -
For Training
Transport for Korkot &Askot (10 Kota/Kab) on OC
Consolidation
a From Cilegon to Serang
Transport 10 200.000 2.000.000 10 2.000.000 - - 10 2.000.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
b From Kota Tangerang to Serang
Transport 18 200.000 3.600.000 18 3.600.000 - - 18 3.600.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
c From Tangerang to Serang
Transport 18 200.000 3.600.000 18 3.600.000 - - 18 3.600.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
d From Kota Tangerang Selatan to Serang
Transport 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
e From Lebak to Serang
Transport 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
f From Pandegelang to Serang
Transport 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
Acomodation - 250.000 - - - - - - -
OSA - 50.000 - - - - - - -
Inland Transport for SF, FK, FE, FS (7 Kota/Kab)
a From Cilegon to Serang
Transport 30 200.000 6.000.000 30 6.000.000 - - 30 6.000.000 - -
b From Kota Tangerang to Serang
Transport 110 200.000 22.000.000 110 22.000.000 - - 110 22.000.000 - -
c From Tangerang to Serang
Transport 108 200.000 21.600.000 108 21.600.000 - - 108 21.600.000 - -
d From Kota Tangerang Selatan to Serang
Transport 33 200.000 6.600.000 33 6.600.000 - - 33 6.600.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
e From Lebak to Serang
Transport 4 200.000 800.000 4 800.000 - - 4 800.000 - -
f From Pandegelang to Serang
Transport 4 200.000 800.000 4 800.000 - - 4 800.000 - -
OKTOBER 2016 - JUNI 2017
Pelatihan Penguatan Fasilitator
a. From Cilegon to Serang
Transport - 200.000 - - - - - - -
b. From Kota Tangerang to Serang
Transport - 200.000 - - - - - - -
c. From Tangerang to Serang
Transport - 200.000 - - - - - - -
d. From Kota Tangerang Selatan to Serang
Transport - 200.000 - - - - - - -
e. From Lebak to Serang
Transport - 200.000 - - - - - - -
f. From Pandegelang to Serang
Transport - 200.000 - - - - - - -
Transport Pelatihan Fasilitator Lokasi Penanganan Kumuh - 200.000 - - - - - - -
Special Event (by request)
1 From Cilegon to Serang
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
2 From Kota Tangerang to Serang
Transport 2 200.000 400.000 2 400.000 2 400.000 - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
3 From Tangerang to Serang
Transport 2 200.000 400.000 2 400.000 2 400.000 - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
4 From Kota Tangerang Selatan to Serang
Transport 2 200.000 400.000 2 400.000 2 400.000 - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
5 From Lebak to Serang
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
6 From Pandegelang to Serang
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
4.2.2 TO JAKARTA
4.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 121.200.000 91.400.000 - 91.400.000 29.800.000
Transport 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
In land Travel in Jakarta 30 200.000 6.000.000 30 6.000.000 - - 30 6.000.000 - -
OSA 120 100.000 12.000.000 120 12.000.000 - - 120 12.000.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Januari 2016 s/d September 2016
Pelatihan OSP/OC
Transport 9 100.000 900.000 9 900.000 - - 9 900.000 - -
In land Travel in Jakarta 9 200.000 1.800.000 9 1.800.000 - - 9 1.800.000 - -
OSA 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
Rakor PD & TL
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
ToT Pemandu Nasional
Transport 7 100.000 700.000 7 700.000 - - 7 700.000 - -
In land Travel in Jakarta 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - -
OSA 56 100.000 5.600.000 56 5.600.000 - - 56 5.600.000 - -
ToT Pemandu Nasional untuk pelatihan khusus
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA 34 100.000 3.400.000 34 3.400.000 - - 34 3.400.000 - -
Pelatihan Koordinator Kota
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA 18 100.000 1.800.000 18 1.800.000 - - 18 1.800.000 - -
ToT Pelatihan Penguatan dan pengembangan BDC *)
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
ToT Pelatihan pembentukan & pengembangan Federasi UPK *) -
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
ToT Pembukuan UPK (Computerization) *)
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
SEPTEMBER 2016 - JUNI 2017
ToT Pembukuan UPK (Computerization) *)
Transport 3 100.000 300.000 3 300.000 - - 3 300.000 - -
In land Travel in Jakarta 3 200.000 600.000 3 600.000 - - 3 600.000 - -
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
Pelatihan Pembukuan UPK (Computerization)
Inlad Transport Banten 44 200.000 7.950.000 44 7.950.000 - - 44 7.950.000 - -
Asesor for Asesment SF / Faskel
Inlad Transport Banten 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 4 300.000 1.200.000 - - - - - - 4 1.200.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Asesment Korkot
Inlad Transport Banten 5 200.000 1.000.000 - - - - - - 5 1.000.000
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Asesment Askot
Inlad Transport Banten 12 200.000 2.400.000 - - - - - - 12 2.400.000
ToT Pemandu Nasional Untuk pelatihan Fasilitator dan Askot (50
Kota Prioritas) (Pelaksana NMC)
OSA 88 100.000 8.800.000 88 8.800.000 - - 88 8.800.000 - -
Transport 11 100.000 1.100.000 11 1.100.000 - - 11 1.100.000 - -
In land Travel in Jakarta 11 200.000 2.200.000 11 2.200.000 - - 11 2.200.000 - -
TOT PPMK & APLIKASI UPK (Pelaksana NMC)
OSA - 100.000 - - - - - - - - -
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
Konsolidasi Pelatihan Fasilitator
Transport Serang (Lebak,Pandeglang,Tangerang,Tangsel, Cilegon) - 200.000 - - - - - - - - -
Pelatihan Askot dan Fasilitator (50 kota Prioritas) Wil-1
Transport Serang (Lebak,Pandeglangdan Tangerang) 62 200.000 12.400.000 62 12.400.000 - - 62 12.400.000 - -
Transport Serang (Lebak,Pandeglangdan Tangerang) 30 200.000 4.500.000 30 4.500.000 - - 30 4.500.000 - -
Pelatihan PPMK (833) Kelurahan (peserta Askot Ekonomi dan Faskel Ekonomi)
Kab. Lebak to Serang 2 200.000 300.000 2 300.000 - - 2 300.000 - -
Kab. Pandeglang to Serang 2 200.000 300.000 2 300.000 - - 2 300.000 - -
Kota Cilegon to Serang 3 200.000 450.000 3 450.000 - - 3 450.000 - -
Kota Tangsel to Serang 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Kab. Tangerang to Serang 4 200.000 800.000 4 800.000 - - 4 800.000 - -
Kota Tangerang to Serang 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Coaching Penyiapan Keg Infrasturktur (Korkot,Askot Mandiri, Infra, UP & IC ke OC)
Kab. Lebak to Serang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 250.000 2.000.000 - - - - - - 8 2.000.000
OSA 12 100.000 1.200.000 - - - - - - 12 1.200.000
Kota Cilegon to Serang 1 200.000 200.000 - - - - - - 1 200.000
Acomodation 2 250.000 500.000 - - - - - - 2 500.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Kota Tangsel to Serang 1 200.000 200.000 - - - - - - 1 200.000
Acomodation 2 250.000 500.000 - - - - - - 2 500.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Kab. Tangerang to Serang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 250.000 2.000.000 - - - - - - 8 2.000.000
OSA 12 100.000 1.200.000 - - - - - - 12 1.200.000
Kota Serang to Serang 4 200.000 800.000 - - - - - - 4 800.000
OSA 12 100.000 1.200.000 - - - - - - 12 1.200.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
Transport Serang to Lebak 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 4 250.000 1.000.000 - - - - - - 4 1.000.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Serang to Cilegon 4 200.000 800.000 - - - - - - 4 800.000
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
Acomodation 4 250.000 1.000.000 - - - - - - 4 1.000.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Serang to Kab.Tangerang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 4 250.000 1.000.000 - - - - - - 4 1.000.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Serang to Tangerang Selatan 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 4 250.000 1.000.000 - - - - - - 4 1.000.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Serang to Serang 4 100.000 400.000 - - - - - - 4 400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
OSA - 100.000 - - - - - - - - -
Transport Serang to Lebak - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Transport Serang to Pandeglang - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Transport Serang to Lebak - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Transport Serang to Tangerang - 200.000 - - - - - - - - -
Rakor PD & TL
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Acara di Hotel Ibis
Transport 2 100.000 200.000 2 200.000 - - 2 200.000 - -
In land Travel in Jakarta 2 200.000 400.000 2 400.000 - - 2 400.000 - -
OSA 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -
ToT Pemandu Nasional
Transport - 100.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
Loka Latih Pemerintah Daerah (40 Kota/Kab)
Transport - 100.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
TOT Pelatihan SIM KOTKU
Transport - 100.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
OKTOBER 2017
1 Pembahasan Draft Final dan Evkin
Transport (TL, dan TA) 5 100.000 500.000 5 500.000 - - 5 500.000 - -
In land Travel in Jakarta (TL, dan TA) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
2 Pembahasan Laporan Final
Transport (TL) 1 100.000 100.000 1 100.000 - - 1 100.000 - -
In land Travel in Jakarta (TL) 1 200.000 200.000 1 200.000 - - 1 200.000 - -
OSA 4 100.000 400.000 4 400.000 - - 4 400.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
CONTRAC AMENDEMENT - 21 No URAIAN
2.4. DUTY TRAVEL EXPENSES PROVINCE BANTEN
INVOICE S/D SAAT INI
II. DIRECT REEIMBURSABLE COST
INVOICE SAAT INI SISA KONTRAKINVOICE LALU
3 Pelatihan Khusus Tim Korkot (Gelombang 1) Pelaksana NMC
Transport (Korkot dan Askot Sub-bidang) 5 100.000 500.000 5 500.000 - - 5 500.000 - -
In land Travel in Jakarta (Korkot dan Askot Sub-bidang) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
4 TOT dan Pelatihan Khusus Tim Fasilitator dan Korkot Lokasi Kota Prioritas Non Direktif Menteri
Pandeglang to Serang (Peserta) - 200.000 - - - - - - - - -
Lebak to Serang (Peserta) - 200.000 - - - - - - - - -
Tangerang - Serang (Peserta) - 200.000 - - - - - - - - -
Tangerang - Serang (Pemandu) - 200.000 - - - - - - - - -
4.2.2.2 FOR EGM TO JAKARTA 55.100.000 55.100.000 - 55.100.000 -
Transport
EGM TA/SubTA Training 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA Sosialisasi 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA/SubTA MK/Sub TA RLF 3 100.000 300.000 3 300.000 - - 3 300.000 - -
EGM TA/SubTA INFRA/Sub TA Safeguard 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA/SubTA Monev /Sub TA Legal HCU 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA/SubTA SIM 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA Local Goverment 3 100.000 300.000 3 300.000 - - 3 300.000 - -
EGM TA Livelihood & SME's 2 100.000 200.000 2 200.000 - - 2 200.000 - -
EGM TA Urban Planner 1 100.000 100.000 1 100.000 - - 1 100.000 - -
In land Transport in Jakarta 24 200.000 4.800.000 24 4.800.000 - - 24 4.800.000 - -
Accomodation 69 350.000 24.000.000 69 24.000.000 - - 69 24.000.000 - -
OSA 116 100.000 11.600.000 116 11.600.000 - - 116 11.600.000 - -
OKTOBER 2016 - JUNI 2017
Transport 8 100.000 800.000 8 800.000 - - 8 800.000 - -
In land Transport in Jakarta 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
Accomodation 24 350.000 7.200.000 24 7.200.000 - - 24 7.200.000 - -
OSA 32 100.000 3.200.000 32 3.200.000 - - 32 3.200.000 - -
4.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 8.700.000 8.700.000 - 8.700.000 -
Transport 8 100.000 800.000 8 800.000 - - 8 800.000 - -
In land Transport in Jakarta 10 200.000 2.000.000 10 2.000.000 - - 10 2.000.000 - -
Hotel Accommodation 8 300.000 2.400.000 8 2.400.000 - - 8 2.400.000 - -
OSA 35 100.000 3.500.000 35 3.500.000 - - 35 3.500.000 - -
4.2.2.4 DUTTY TRAVEL BY REQUEST TO OTHER 5.082.000 5.071.366 - 5.071.366 10.634
Air Transport 2 4.000.000 3.472.000 2 3.471.366 - - 2 3.471.366 - 634
In Land Travel 2 350.000 700.000 2 700.000 - - 2 700.000 - -
Hotel Accomodation - 350.000 10.000 - - - - - - - 10.000
OSA 3 300.000 900.000 3 900.000 - - 3 900.000 - -
Air Transport - 4.000.000 - - - - - - -
In land Travel - 350.000 - - - - - - -
Hotel Accommodation - 350.000 - - - - - - -
OSA - 300.000 - - - - - - -
282.732.000 272.911.366 - 272.911.366 9.820.634 TOTAL DUTY TRAVEL PROVINCE BANTEN
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
5.1.1 IN PROVINCE
5.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x No. of Kelurahan) 7.447.000 7.447.000 - 7.447.000 -
a From Pontianak to Sambas (18 kel x 5% = 3 kel)
Transport - 200.000 - - - - - - - - -
Acomodation - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
b From Pontianak to Bengkayang (6 kel x 5% = 1 kel)
Transport - 200.000 - - - - - - - - -
Acomodation - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
c From Pontianak to Ketapang (9 kel x 5% = 1 kel)
Various Transport - 1.000.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
d From Pontianak to Singkawang (26 kel x 5% = 3 kel)
Transport - 200.000 - - - - - - - - -
Acomodation - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
e From Pontianak to Landak (17 kel x 5% = 3 kel)
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
f From Pontianak to Pontianak (29 kel x 5% = 3 kel)
Lumpsum - 50.000 - - - - - - - - -
OKTOBER 2016 - JUNI 2017
a. From Pontianak to Sambas (18 kel x 5% = 3 kel)
Transport 1 200.000 200.000 1 200.000 - - 1 200.000 - -
Acomodation 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
b. From Pontianak to Bengkayang (6 kel x 5% = 1 kel)
Transport 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation 2 300.000 600.000 2 600.000 - - 2 600.000 - -
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
c. From Pontianak to Ketapang (9 kel x 5% = 1 kel)
Various Transport 1 1.000.000 1.000.000 1 1.000.000 - - 1 1.000.000 - -
Acomodation 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
d. From Pontianak to Singkawang (26 kel x 5% = 3 kel)
Transport 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Acomodation 2 300.000 600.000 2 600.000 - - 2 600.000 - -
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
e. From Pontianak to Landak (17 kel x 5% = 3 kel)
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
f. From Pontianak to Pontianak (29 kel x 5% = 3 kel)
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
April 2017 - Juni 2017
a. MONITORING OSP PADA LEVEL KOTA
KOTA KUMUH
KOTA KUMUH INFRA SKALA KOTA
Dari Kota Pontianak ke KOTA PONTIANAK
Transport - 200.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
Dari Kota Pontianak ke KOTA SINGKAWANG
Transport 1 200.000 200.000 1 200.000 - - 1 200.000 - -
Akomodasi 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
KOTA KUMUH NON INFRA SKALA KOTA
Dari Kota Pontianak ke BENGKAYANG
Transport 1 200.000 200.000 1 200.000 - - 1 200.000 - -
Akomodasi 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
Dari Kota Pontianak ke KETAPANG
Transport 1 1.000.000 647.000 1 647.000 - - 1 647.000 - -
Akomodasi 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
Dari Kota Pontianak ke SAMBAS
Transport 1 200.000 200.000 1 200.000 - - 1 200.000 - -
Akomodasi 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
5.1.1.2 SPOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM - - - - -
A. For City Coordinator and Assistance City Coordinator
(105 Kel x 50%) x 4 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(105 Kel - 18 Kel luar kota) x 50%) x 14 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town
From Pontianak to Sambas
Transport - 50.000 - - - - - - -
OKTOBER 2016 - JUNI 2017
a. For City Coordinator and Assistance City Coordinator
(105 Kel x 50%) x 4 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
b. For Ass. City Coordinator Infrastructure and FM in the city
(105 Kel - 18 Kel luar kota) x 50%) x 14 - 50.000 - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
c. For City Coordinator Infrastructure and FM out of te town
From Pontianak to Sambas
Transport - 50.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
April 2017 - Juni 2017
a. MONITORING KORKOT PADA LEVEL KELURAHAN/DESA
Monitoring Tim Korkot Sambas di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Kota Singkawang di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Kota Singkawang Ke (1) Bengkayang
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Kota Pontianak di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - -
Monitoring Tim Korkot Kota Pontianak Ke (1) Ketapang
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Transport - 1.000.000 - - - - - - -
Akomodasi - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
KEL/DESA NON KUMUH
Transport - 1.000.000 - - - - - - -
Akomodasi - 300.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
5.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL - - - - -
a From Pontianak to Sambas
Transport - 200.000 - - - - - - -
Lumpsum - 50.000 - - - - - - -
5.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 9.400.000 9.352.600 - 9.352.600 47.400
a From Sambas to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
b From Bengkayang to Pontianak
Transport 2 200.000 400.000 2 400.000 2 400.000 - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
c From Ketapang to Pontianak
Various Transport 9 1.000.000 9.000.000 9 8.952.600 9 8.952.600 - 47.400
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
d From Singkawang to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
e From Landak to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
gLocal Transport for Coordination (1 kota x 4 prs x 3 bln x 2 kali) (TIM
PERCEPATAN)- 300.000 - - - - - - -
Transport Pelatihan Perencaan TAPP - 300.000 - - - - - - -
5.1.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &
COORDINATION MEETING AT OC15.864.000 15.830.100 - 15.830.100 33.900
Workshop OC / Coordination Meeting at OC
From Bandar Pontianak to Jakarta
Air Transport 4 2.500.000 8.250.000 4 8.216.100 - - 4 8.216.100 - 33.900
OSA [ Fixed ] 20 100.000 2.000.000 20 2.000.000 - - 20 2.000.000 - -
Local Transport 14 100.000 1.400.000 14 1.400.000 - - 14 1.400.000 - -
Workshop Midterm Nasional (Lokasi Prioritas) Oktober 2016 - Juni 2017
From Bandar Pontianak to Jakarta
Air Transport - 2.500.000 - - - - - - -
OSA [ Fixed ] - 100.000 - - - - - - -
Local Transport - 100.000 - - - - - - -
Kegiatan Juli 2017 - Agustus 2017
Workshop Nasional BDC
Air Transport 2 2.500.000 3.214.000 2 3.214.000 - - 2 3.214.000 - -
Transport 2 100.000 200.000 2 200.000 - - 2 200.000 - -
In land Travel in Jakarta 2 200.000 400.000 2 400.000 - - 2 400.000 - -
OSA 4 100.000 400.000 4 400.000 - - 4 400.000 - -
Workshop Nasional DFS
Air Transport - 2.500.000 - - - - - - - - -
Transport - 100.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
5.1.1.6 FOR SEVERAL TRA. & SPE. EVENT FROM KAB. TO PONTIANAK 31.414.000 31.329.700 - 31.329.700 84.300
For Training
Transport for Korkot &Askot (6 Kota/Kab) on OC Consolidation
a From Sambas to Pontianak
Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - -
b From Bengkayang to Pontianak
Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - -
c From Ketapang to Pontianak
Various Transport 8 1.000.000 7.014.000 8 7.013.600 - - 8 7.013.600 - 400
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
d From Singkawang to Pontianak
Transport 6 200.000 1.200.000 6 1.200.000 - - 6 1.200.000 - -
e From Landak to Pontianak
Transport - 200.000 - - - - - - - - -
Inland Transport for SF, FK, FE, FS (6 Kota/Kab)
a From Sambas to Pontianak
Transport 20 200.000 4.000.000 20 4.000.000 - - 20 4.000.000 - -
b From Bengkayang to Pontianak
Transport 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
c From Ketapang to Pontianak
Various Transport 10 1.000.000 10.000.000 10 9.916.100 - - 10 9.916.100 - 83.900
d From Singkawang to Pontianak
Transport 30 200.000 6.000.000 30 6.000.000 - - 30 6.000.000 - -
e From Landak to Pontianak
Transport - 200.000 - - - - - - - - -
OKTOBER 2016 - JUNI 2017
Pelatihan Penguatan Fasilitator
a. From Sambas to Pontianak
Transport - 200.000 - - - - - - -
b. From Bengkayang to Pontianak
Transport 2 200.000 400.000 2 400.000 2 400.000 - -
c. From Ketapang to Pontianak
Various Transport - 1.000.000 - - - - - - -
d. From Singkawang to Pontianak
Transport - 200.000 - - - - - - -
e. From Landak to Pontianak
Transport - 200.000 - - - - - - -
Transport Pelatihan Fasilitator Lokasi Penanganan Kumuh - 300.000 - - - - - - -
Special Event (by request)
1 From Sambas to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
2 From Bengkayang to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
3 From Ketapang to Pontianak
Various Transport - 1.000.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
4 From Singkawang to Pontianak
Transport - 200.000 - - - - - - -
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
5 From Landak to Pontianak
Transport - 200.000 - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
Acomodation - 300.000 - - - - - - -
OSA - 50.000 - - - - - - -
5.2.2 TO JAKARTA
5.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 238.352.000 202.473.933 - 202.473.933 35.872.092
Air Transport 30 1.750.000 51.250.000 30 51.245.199 - - 30 51.245.199 - 4.801
In land Travel in Jakarta 28 200.000 5.600.000 28 5.600.000 - - 28 5.600.000 - -
OSA 120 100.000 12.000.000 120 12.000.000 - - 120 12.000.000 - -
Januari 2016 s/d September 2016
Pelatihan OSP/OC
Air Transport 8 1.750.000 13.657.000 8 13.656.800 8 13.656.800 - 200
In land Travel in Jakarta 8 200.000 1.600.000 8 1.600.000 8 1.600.000 - -
OSA 30 100.000 3.000.000 30 3.000.000 30 3.000.000 - -
Rakor PD & TL
Air Transport - 1.750.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
ToT Pemandu Nasional
Air Transport 5 1.750.000 8.447.000 5 8.447.000 5 8.447.000 - -
In land Travel in Jakarta 5 200.000 1.000.000 5 1.000.000 5 1.000.000 - -
OSA 40 100.000 4.000.000 40 4.000.000 40 4.000.000 - -
ToT Pemandu Nasional untuk pelatihan khusus
Air Transport - 1.750.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA 29 100.000 2.900.000 29 2.900.000 29 2.900.000 - -
Pelatihan Koordinator Kota
Air Transport - 1.750.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA 5 100.000 500.000 5 500.000 - - 5 500.000 - -
ToT Pelatihan Penguatan dan pengembangan BDC *)
Air Transport - 1.750.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
ToT Pelatihan pembentukan & pengembangan Federasi UPK *)
Air Transport - 1.750.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
ToT Pembukuan UPK (Computerization) *)
Air Transport - 1.750.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
OKTOBER 2016 - JUNI 2017
ToT Pembukuan UPK (Computerization) *)
Air Transport - 1.750.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Pelatihan Pembukuan UPK (Computerization)
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
Inlad Transport Kalbar 9 200.000 1.800.000 9 1.800.000 - - 9 1.800.000 - -
Inlad Transport Kalbar - Ketapang 1 1.000.000 724.000 1 723.825 - - 1 723.825 - 175
Asesor for Asesment SF / Faskel
Inlad Transport Kalbar 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
Acomodation 5 300.000 1.500.000 5 1.480.000 - - 5 1.480.000 - 20.000
OSA 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -
Inlad Transport Kalbar - Ketapang 2 1.000.000 1.700.000 2 1.654.800 - - 2 1.654.800 - 45.200
Acomodation 2 300.000 600.000 2 600.000 - - 2 600.000 - -
OSA 4 100.000 400.000 4 400.000 - - 4 400.000 - -
Asesment Korkot
Transport Kalimantan Barat 10 200.000 2.000.000 10 2.000.000 - - 10 2.000.000 - -
Transport Ketapang - Pontianak 2 1.000.000 1.881.000 2 1.880.400 - - 2 1.880.400 - 600
Asesment Askot
Transport Kalimantan Barat 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
ToT Pemandu Nasional Untuk pelatihan Fasilitator dan Askot (50 Kota
Prioritas) (Pelaksana NMC)
OSA - 100.000 - - - - - - - - -
Air Transport - 1.750.000 - - - - - - - - -
Transport Singkawang - Pontianak - 200.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
TOT PPMK & APLIKASI UPK (Pelaksana NMC)
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
Air Transport 3 1.750.000 4.689.000 3 4.688.685 - - 3 4.688.685 - 315
In land Travel in Jakarta 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Konsolidasi Pelatihan Fasilitator
Transport Kalimantan Barat 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Transport Ketapang - Pontianak 1 1.000.000 300.000 1 300.000 - - 1 300.000 - -
Pelatihan Askot dan Fasilitator (50 kota Prioritas) Wil-1
Transport Singkawang - Pontianak 13 200.000 2.600.000 13 2.600.000 - - 13 2.600.000 - -
Transport Singkawang - Pontianak 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - -
Pelatihan PPMK (833) Kelurahan (peserta Askot Ekonomi dan Faskel Ekonomi)
Ketapang to Pontianak 2 1.000.000 2.000.000 2 2.000.000 - - 2 2.000.000 - -
Bengkayang to Pontianak - 200.000 - - - - - - - - -
Sambas to Pontianak 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Singkawang to Pontianak 2 200.000 400.000 2 400.000 - - 2 400.000 - -
Coaching Penyiapan Keg Infrasturktur (Korkot,Askot Mandiri, Infra, UP
& IC ke OC)
Transport Ketapang to Pontianak 1 1.000.000 1.000.000 - - - - - - 1 1.000.000
Acomodation 3 300.000 900.000 - - - - - - 3 900.000
OSA 4 100.000 400.000 - - - - - - 4 400.000
Transport Bengkayang to Pontianak 1 200.000 200.000 - - - - - - 1 200.000
Acomodation 3 300.000 900.000 - - - - - - 3 900.000
OSA 4 100.000 400.000 - - - - - - 4 400.000
Transport Sambas to Pontianak 4 200.000 800.000 - - - - - - 4 800.000
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
Acomodation 12 300.000 3.600.000 - - - - - - 12 3.600.000
OSA 16 100.000 1.600.000 - - - - - - 16 1.600.000
Transport Singkawang to Pontianak 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 12 300.000 3.600.000 - - - - - - 12 3.600.000
OSA 16 100.000 1.600.000 - - - - - - 16 1.600.000
Transport Pontianak to Pontianak 4 200.000 800.000 - - - - - - 4 800.000
OSA 16 100.000 1.600.000 - - - - - - 16 1.600.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
Transport Pontianak to Sambas 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Pontianak to Singkawang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Pontianak to Bengkayang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Pontianak to Ketapang 4 200.000 800.000 - - - - - - 4 800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Pontianak to Pontianak 4 200.000 800.000 - - - - - - 4 800.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
OSA - 100.000 - - - - - - - - -
Transport Singkawang - Pontianak - 200.000 - - - - - - - - -
Rakor PD & TL
Transport - 1.750.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
Acara di Hotel Ibis
Transport 5 1.750.000 8.448.000 5 8.447.999 - - 5 8.447.999 - 1
In land Travel in Jakarta 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 28 100.000 2.800.000 28 2.800.000 - - 28 2.800.000 - -
ToT Pemandu Nasional
Transport 9 1.750.000 14.667.000 9 14.667.000 - - 9 14.667.000 - -
In land Travel in Jakarta 9 200.000 1.800.000 9 1.800.000 - - 9 1.800.000 - -
OSA 72 100.000 7.200.000 72 7.200.000 - - 72 7.200.000 - -
Loka Latih Pemerintah Daerah (40 Kota/Kab)
Transport 5 1.750.000 7.211.000 5 7.210.200 - - 5 7.210.200 - 800
In land Travel in Jakarta 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 20 100.000 2.000.000 20 2.000.000 - - 20 2.000.000 - -
TOT Pelatihan SIM KOTKU
Transport - 1.750.000 - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - -
OSA - 100.000 - - - - - - -
OKTOBER 2017
1 Pembahasan Draft Final dan Evkin
Transport (TL, dan TA ) 5 1.750.000 6.933.000 5 6.932.015 - - 5 6.932.015 - 985
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO URAIAN
II. DIRECT REEIMBURSABLE COST
CONTRAC AMENDEMENT - 21
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN BARAT
SISA KONTRAKINVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALU
In land Travel in Jakarta (TL, TA dan Sub TA) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
2 Pembahasan Laporan Final
Transport (TL) 1 1.750.000 1.750.000 1 1.745.010 - - 1 1.745.010 - 4.990
In land Travel in Jakarta (TL) 1 200.000 200.000 1 200.000 - - 1 200.000 - -
OSA 3 100.000 300.000 3 300.000 - - 3 300.000 - -
3 Pelatihan Khusus Tim Korkot (Gelombang 1) Pelaksana NMC
Transport (Korkot dan Askot Sub-bidang) 5 1.750.000 8.095.000 5 8.095.000 - - 5 8.095.000 - -
In land Travel in Jakarta (Korkot dan Askot Sub-bidang) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
4 Pelatihan Khusus Faskel Lokasi Prioritas Non Direktif Menteri
Transport Singkawang -Pontianak (Peserta) - 200.000 - - - - - - -
5.2.2.2 FOR EGM TO JAKARTA 75.959.000 75.954.473 - 75.954.473 4.527
Air Transport
EGM TA/SubTA Training 2 1.750.000 3.457.000 2 3.456.450 - - 2 3.456.450 - 550
EGM TA Sosialisasi - 1.750.000 - - - - - - -
EGM TA/SubTA MK/Sub TA RLF 2 1.750.000 3.424.000 2 3.423.100 - - 2 3.423.100 - 900
EGM TA/SubTA INFRA/Sub TA Safeguard 3 1.750.000 5.250.000 3 5.250.000 - - 3 5.250.000 - -
EGM TA/SubTA Monev /Sub TA Legal HCU 2 1.750.000 3.424.000 2 3.423.300 - - 2 3.423.300 - 700
EGM TA/SubTA SIM 4 1.750.000 6.513.000 4 6.512.250 - - 4 6.512.250 - 750
EGM TA Local Goverment 3 1.750.000 5.098.000 3 5.097.750 - - 3 5.097.750 - 250
EGM TA Livelihood & SME's 2 1.750.000 3.374.000 2 3.373.350 - - 2 3.373.350 - 650
EGM TA Urban Planner - 1.750.000 - - - - - - - - -
In land Transport in Jakarta 21 200.000 4.200.000 21 4.200.000 - - 21 4.200.000 - -
Accomodation 21 350.000 7.200.000 21 7.200.000 - - 21 7.200.000 - -
OSA 105 100.000 10.500.000 105 10.500.000 - - 105 10.500.000 - -
OKTOBER 2016 - JUNI 2017
Air Transport 7 2.000.000 13.019.000 7 13.018.273 - - 7 13.018.273 - 727
In land Transport in Jakarta 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - -
Accomodation 21 350.000 6.300.000 21 6.300.000 - - 21 6.300.000 - -
OSA 28 100.000 2.800.000 28 2.800.000 - - 28 2.800.000 - -
2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 26.800.000 26.800.000 - 26.800.000 -
Air Transport 10 1.750.000 17.500.000 10 17.500.000 - - 10 17.500.000 - -
In land Transport in Jakarta 12 200.000 2.400.000 12 2.400.000 - - 12 2.400.000 - -
Hotel Accommodation 9 300.000 2.700.000 9 2.700.000 - - 9 2.700.000 - -
OSA 42 100.000 4.200.000 42 4.200.000 - - 42 4.200.000 - -
DUTTY TRAVEL BY REQUEST TO OTHER 21.072.000 21.071.600 - 21.071.600 400
Air Transport 3 6.500.000 9.331.000 3 9.331.000 - - 3 9.331.000 - - In Land Travel 3 350.000 900.000 3 900.000 - - 3 900.000 - - Hotel Accomodation - 350.000 - - - - - - - - - OSA 3 300.000 900.000 3 900.000 - - 3 900.000 - -
Air Transport 2 6.500.000 7.441.000 2 7.440.600 - - 2 7.440.600 - 400 In land Travel 2 350.000 700.000 2 700.000 - - 2 700.000 - - Hotel Accommodation - 350.000 - - - - - - - OSA 6 300.000 1.800.000 6 1.800.000 - - 6 1.800.000 - -
404.308.000 390.259.406 - 390.259.406 14.042.619 TOTAL DUTY TRAVEL PROVINCE KALIMANTAN BARAT
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
II.5 DUTY TRAVEL EXPENSES NOTH KALIMANTAN
5.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x No. of Kelurahan) 5.524.000 5.524.000 - 5.524.000 -
a From Tarakan to Malinau (6 kel x 5% = 3 kel)
Various Transport 1 1.200.000 1.200.000 1 1.200.000 - - 1 1.200.000 - -
Acomodation 1 350.000 350.000 1 350.000 - - 1 350.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
b From Tarakan to Bulungan (3 kel x 5% = 1 kel)
Various Transport 1 1.200.000 1.200.000 1 1.200.000 - - 1 1.200.000 - -
Acomodation 1 350.000 350.000 1 350.000 - - 1 350.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
c From Tarakan to Nunukan (9 kel x 5% = 1 kel)
Various Transport 2 1.200.000 1.324.000 2 1.324.000 - - 2 1.324.000 - -
Acomodation 2 350.000 700.000 2 700.000 - - 2 700.000 - -
Lumpsum 4 50.000 200.000 4 200.000 - - 4 200.000 - -
d From Tarakan to Tarakan (20 kel x 5% = 3 kel)
Transport - 200.000 - - - - - - - - -
April 2017 - Juni 2017
a. MONITORING OSP PADA LEVEL KOTA
KOTA KUMUH
KOTA KUMUH INFRA SKALA KOTA
Dari Kota Tarakan ke KOTA TARAKAN
Lumpsum - 50.000 - - - - - - - - -
KOTA KUMUH NON INFRA SKALA KOTA
Dari Kota Tarakan ke MALINAU
Transport - 1.200.000 - - - - - - - - -
Akomodasi - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
Dari Kota Tarakan ke NUNUKAN
Transport - 1.200.000 - - - - - - - - -
Akomodasi - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
KOTA NON KUMUH
Dari Kota Tarakan ke BULUNGAN
Transport - 1.200.000 - - - - - - - - -
Akomodasi - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
5.1.1.2 SPOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 862.000 862.000 - 862.000 -
A. For City Coordinator and Assistance City Coordinator
(38 Kel x 50%) x 4 - 50.000 - - - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(20 Kel - 18 Kel luar kota) x 50%) x 14 - 50.000 - - - - - - - - -
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
INVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALUCONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN UTARA
NO SISA KONTRAK
URAIAN
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALUCONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN UTARA
NO SISA KONTRAK
URAIAN
C. For City Coordinator Infrastructure and FM out of te town
From Tarakan to Malinau
Various Transport - 1.200.000 - - - - - - - - -
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
From Tarakan to Bulungan
Various Transport - 1.200.000 - - - - - - - - -
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
From Tarakan to Nunukan
Various Transport - 1.200.000 - - - - - - - - -
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
April 2017 - Juni 2017
a. MONITORING KORKOT PADA LEVEL KELURAHAN/DESA
Monitoring Tim Korkot Kota Tarakan di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - - - -
Monitoring Tim Korkot Kota Tarakan Ke (1) Malinau
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Tarnsport - 1.200.000 - - - - - - - - -
Akomodasi - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - - - -
Monitoring Tim Korkot Nunukan di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Lumpsum - 50.000 - - - - - - - - -
KEL/DESA NON KUMUH
Lumpsum - 50.000 - - - - - - - - -
Monitoring Tim Korkot Nunukan Ke (1) Bulungan
KEL/DESA KUMUH DI NON KOTA SKALA KOTA
Tarnsport - 1.200.000 - - - - - - - - -
Akomodasi - 300.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
KEL/DESA NON KUMUH
Tarnsport 1 1.200.000 462.000 1 462.000 - - 1 462.000 - -
Akomodasi 1 300.000 300.000 1 300.000 - - 1 300.000 - -
Lumpsum 2 50.000 100.000 2 100.000 - - 2 100.000 - -
5.1.1.3 FOR CB ACTIVITY 53.164.000 23.063.758 - 23.063.758 30.100.242
ToT Pembukuan UPK (Computerization) *)
Air Transport - 4.000.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
Pelatihan Pembukuan UPK (Computerization)
Inland Transport Tarakan - Nunukan 4 1.200.000 2.640.000 4 2.640.000 - - 4 2.640.000 - -
Inland Transport Tarakan - Bulungan 1 1.200.000 380.000 1 380.000 - - 1 380.000 - -
Inland Transport Tarakan - Malinau 1 1.200.000 700.000 1 700.000 - - 1 700.000 - -
Asesor for Asesment SF / Faskel
Transport Kalimantan Utara (Malinau, Bulungan & Nunukan) 4 1.200.000 2.162.000 4 2.162.000 - - 4 2.162.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALUCONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN UTARA
NO SISA KONTRAK
URAIAN
Acomodation 4 300.000 1.150.000 4 1.150.000 - - 4 1.150.000 - -
OSA 8 100.000 800.000 8 800.000 - - 8 800.000 - -
Asesment Korkot
Transport Kalimantan Utara (Tarakan) - 200.000 - - - - - - - - -
Transport Kalimantan Utara (Malinau, Bulungan & Nunukan) 9 1.200.000 1.742.000 3 1.742.000 - - 3 1.742.000 6 -
Asesment Askot
Transport Kalimantan Utara (Tarakan) - 200.000 - - - - - - - - -
Transport Kalimantan Utara Nunukan - Tarakan 6 1.200.000 1.700.000 3 1.700.000 - - 3 1.700.000 3 -
ToT Pemandu Nasional Untuk pelatihan Fasilitator dan Askot (50 Kota Prioritas) (Pelaksana NMC)
OSA - 100.000 - - - - - - - - -
Air Transport - 4.000.000 - - - - - - - - -
In land Travel in Jakarta - 200.000 - - - - - - - - -
TOT PPMK & APLIKASI UPK (Pelaksana NMC)
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
Air Transport 3 4.000.000 4.746.000 3 4.745.758 - - 3 4.745.758 - 242
In land Travel in Jakarta 3 200.000 600.000 3 600.000 - - 3 600.000 - -
Konsolidasi Pelatihan Fasilitator
Transport Kalimantan Utara (Malinau, Bulungan & Nunukan) 7 1.200.000 4.944.000 7 4.944.000 - - 7 4.944.000 - -
Pelatihan PPMK (833) Kelurahan (peserta Askot Ekonomi dan Faskel Ekonomi)
Nunukan to Tarakan - 1.200.000 - - - - - - - - -
Malinau to Tarakan - 1.200.000 - - - - - - - - -
Bulungan to Tarakan - 1.200.000 - - - - - - - - -
Coaching Penyiapan Keg Infrasturktur (Korkot,Askot Mandiri, Infra, UP & IC ke OC)
Nunukan to Tarakan 4 1.200.000 4.800.000 - - - - - - 4 4.800.000
Acomodation 12 300.000 3.600.000 - - - - - - 12 3.600.000
OSA 16 100.000 1.600.000 - - - - - - 16 1.600.000
Malinau to Tarakan 1 1.200.000 1.200.000 - - - - - - 1 1.200.000
Acomodation 3 300.000 900.000 - - - - - - 3 900.000
OSA 4 100.000 400.000 - - - - - - 4 400.000
Tarakan to Tarakan 1 100.000 100.000 - - - - - - 1 100.000
OSA 3 100.000 300.000 - - - - - - 3 300.000
Coaching Clinic (Untuk TA Ke KAB/KOTA)
Transport Trakan to Nunukan 4 1.200.000 4.800.000 - - - - - - 4 4.800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Trakan to Malinau 4 1.200.000 4.800.000 - - - - - - 4 4.800.000
Acomodation 8 300.000 2.400.000 - - - - - - 8 2.400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
Transport Tarakan to Tarakan 4 100.000 400.000 - - - - - - 4 400.000
OSA 8 100.000 800.000 - - - - - - 8 800.000
5.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 1.893.000 1.892.200 - 1.892.200 800
a From Tarakan to Malinau
Various Transport 1 1.200.000 852.000 1 851.200 - - 1 851.200 - 800
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
b From Tarakan to Bulungan
Various Transport 1 1.200.000 380.000 1 380.000 - - 1 380.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALUCONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN UTARA
NO SISA KONTRAK
URAIAN
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
c From Tarakan to Nunukan
Various Transport 1 1.200.000 661.000 1 661.000 - - 1 661.000 - -
Acomodation - 350.000 - - - - - - - - -
Lumpsum - 50.000 - - - - - - - - -
5.1.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION
MEETING AT OC- - - - -
Workshop Midterm Nasional (Lokasi Prioritas) Januari - Juni 2017
From Bandar Pontianak to Jakarta
Air Transport - 7.000.000 - - - - - - - - -
OSA [ Fixed ] - 100.000 - - - - - - - - -
Local Transport - 100.000 - - - - - - - - -
5.1.1.6 FOR SEVERAL TRA. & SPE. EVENT FROM KAB. TO TARAKAN 1.400.000 1.400.000 - 1.400.000 -
Pelatihan Penguatan Fasilitator
a From Malinau to Tarakan
Various Transport 2 1.200.000 400.000 2 400.000 - - 2 400.000 - -
b From Bulungan to Tarakan
Various Transport 1 1.200.000 200.000 1 200.000 - - 1 200.000 - -
c From Nunukan to Tarakan
Various Transport 4 1.200.000 800.000 4 800.000 - - 4 800.000 - -
5.2.2 TO JAKARTA
5.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 65.360.000 64.417.257 - 64.417.257 942.743
ToT Pemandu Nasional
Transport 5 7.000.000 26.403.000 5 26.402.167 - - 5 26.402.167 - 833
In land Travel in Jakarta 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 36 100.000 3.600.000 36 3.600.000 - - 36 3.600.000 - -
Acara di Hotel Ibis
Transport 2 7.000.000 5.000.000 2 4.885.150 - - 2 4.885.150 - 114.850
In land Travel in Jakarta 2 200.000 400.000 2 400.000 - - 2 400.000 - -
OSA 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -
OKTOBER 2017
1 Pembahasan Draft Final dan Evkin
Transport (TL, dan TA ) 5 7.000.000 8.944.000 5 8.943.800 - - 5 8.943.800 - 200
In land Travel in Jakarta (TL, dan TA) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 15 100.000 1.500.000 15 1.500.000 - - 15 1.500.000 - -
2 Pembahasan Laporan Final
Transport (TL) 1 7.000.000 2.413.000 1 1.621.100 - - 1 1.621.100 - 791.900
In land Travel in Jakarta (TL) 1 200.000 200.000 1 200.000 - - 1 200.000 - -
OSA 4 100.000 400.000 4 400.000 - - 4 400.000 - -
3 Pelatihan Khusus Tim Korkot (Gelombang 1) Pelaksana NMC
Transport (Korkot dan Askot Sub-bidang) 5 7.000.000 9.500.000 5 9.465.040 - - 5 9.465.040 - 34.960
In land Travel in Jakarta (Korkot dan Askot Sub-bidang) 5 200.000 1.000.000 5 1.000.000 - - 5 1.000.000 - -
OSA 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
4 Transport Pelatihan PPMK
Transport Nunukan -Tarakan (Peserta) - 1.200.000 - - - - - - - - -
Transport Malinau -Tarakan (Peserta) - 1.200.000 - - - - - - - - -
Transport Bulungan -Tarakan (Peserta) - 1.200.000 - - - - - - - - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INIINVOICE SAAT INIINVOICE LALUCONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
2.5. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN UTARA
NO SISA KONTRAK
URAIAN
5.2.2.2 FOR EGM TO JAKARTA 44.455.000 44.454.108 - 44.454.108 892
Air Transport 8 4.000.000 32.455.000 8 32.454.108 - - 8 32.454.108 - 892
In land Transport in Jakarta 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - -
Hotel Accommodation 24 350.000 7.200.000 24 7.200.000 - - 24 7.200.000 - -
OSA 32 100.000 3.200.000 32 3.200.000 - - 32 3.200.000 - -
5.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) - - - - -
Air Transport - 7.000.000 - - - - - - - - -
In land Transport in Jakarta - 200.000 - - - - - - - - -
Hotel Accommodation - 300.000 - - - - - - - - -
OSA - 100.000 - - - - - - - - -
5.2.2.4 DUTTY TRAVEL BY REQUEST TO OTHER - - - - -
Air Transport - 9.000.000 - - - - - - - - - In land Travel - 350.000 - - - - - - - - - Hotel Accommodation - 350.000 - - - - - - - - - OSA - 300.000 - - - - - - - - -
151.658.000 141.613.323 - 141.613.323 10.044.677 TOTAL DUTY TRAVEL PROVINCE KALIMANTAN UTARA
Vol Rate Amount Vol Amount Vol Amount Vol Amount Vol Amount
6.1 OFFICE RUNNING COST 1.241.451.500 1.199.877.577 26.166.600 1.226.044.177 15.407.323
6.1.1 OC Office 603.027.000 584.992.755 12.500.000 597.492.755 5.534.245
a Propinsi DKI Jakarta (Jakarta) including PD 59,5 5.000.000 293.000.000 58,5 287.571.665 1,0 5.000.000 59,5 292.571.665 0,0 428.335
b Propinsi Banten (Serang) 59,5 2.500.000 141.750.000 58,5 138.787.909 1,0 2.500.000 59,5 141.287.909 0,0 462.091
c 59,5 2.500.000 133.277.000 58,5 130.776.905 1,0 2.500.000 59,5 133.276.905 0,0 95
d Propinsi Kalimantan Timur (Januari-Juni 2017) 14,0 2.500.000 35.000.000 12,0 27.856.276 1,0 2.500.000 13,0 30.356.276 1,0 4.643.724
6.1.2 City Coordinator Office 455.064.500 442.246.038 8.696.100 450.942.138 4.122.362
a Propinsi DKI Jakarta 154.587.500 151.508.186 1.500.000 153.008.186 1.579.314
(4 Kota/Kab) 217,5 750.000 154.587.500 214,0 151.508.186 2,0 1.500.000 216,0 153.008.186 1,4 1.579.314
b Propinsi Banten 190.625.000 184.723.278 3.750.000 188.473.278 2.151.722
(4 Kota/Kab) 241,0 750.000 160.250.000 234,0 155.347.284 5,0 3.750.000 239,0 159.097.284 2,0 1.152.716
Additional 1 Kota/Kab 40,5 750.000 30.375.000 40,0 29.375.994 - - 40,0 29.375.994 0,5 999.006
c Propinsi Kalimantan Barat 90.602.000 88.009.174 2.201.500 90.210.674 391.326
(5 Kota/Kab) 192,8 750.000 90.602.000 188,8 88.009.174 3,0 2.201.500 191,8 90.210.674 1,0 391.326
d Propinsi Kalimantan Utara 19.250.000 18.005.400 1.244.600 19.250.000 -
(1 Kota/Kab) 27,0 750.000 19.250.000 25,0 18.005.400 2,0 1.244.600 27,0 19.250.000 0,0 -
6.1.3 Assitant CD City Coordinator Office 183.360.000 172.638.784 4.970.500 177.609.284 5.750.716
a Propinsi DKI Jakarta 68.500.000 66.233.109 2.000.000 68.233.109 266.891
(2 Kota/Kab) 141,0 500.000 68.500.000 137,0 66.233.109 4,0 2.000.000 141,0 68.233.109 0,0 266.891
b Propinsi Banten 59.060.000 58.051.210 1.000.000 59.051.210 8.790
(3 Kota/Kab) 136,8 500.000 59.060.000 126,6 58.051.210 2,0 1.000.000 128,6 59.051.210 8,2 8.790
c Propinsi Kalimantan Barat 40.300.000 35.329.465 970.500 36.299.965 4.000.035
(1 Kota/Kab) 59,5 500.000 17.550.000 48,3 15.858.557 1,0 500.000 49,3 16.358.557 10,2 1.191.443
Additional 1 Kota/Kab 59,5 500.000 22.750.000 48,0 19.470.908 1,0 470.500 49 19.941.408 10,5 2.808.592
d Propinsi Kalimantan Utara 15.500.000 13.025.000 1.000.000 14.025.000 1.475.000
Askot CD Nunukan 3,0 500.000 1.500.000 3,0 1.500.000 - - 3,0 1.500.000 0,0 -
Askot CD Bulungan 14,0 500.000 7.000.000 13,0 6.425.000 1,0 500.000 14,0 6.925.000 0,0 75.000
Askot CD Malinau 14,0 500.000 7.000.000 12,0 5.100.000 1,0 500.000 13,0 5.600.000 1,0 1.400.000
6.2 OFFICE SUPPLY & CONSUMABLE 1.536.320.000 1.503.083.951 31.449.500 1.534.533.451 1.786.549
6.2.1 OC Office 737.400.000 721.712.971 15.000.000 736.712.971 687.029
a Propinsi DKI Jakarta (Jakarta) including PD 59,5 6.000.000 359.900.000 58,5 353.863.400 1,0 6.000.000 59,5 359.863.400 0,0 36.600
b Propinsi Banten (Serang) 59,5 3.000.000 174.500.000 58,5 171.397.725 1,0 3.000.000 59,5 174.397.725 0,0 102.275
c Propinsi Kalimantan Barat (Pontianak) 59,5 3.000.000 164.000.000 58,5 160.627.346 1,0 3.000.000 59,5 163.627.346 0,0 372.654
d Propinsi Kalimantan Timur (Januari-Juni 2017) 14,0 3.000.000 39.000.000 13,0 35.824.500 1,0 3.000.000 14,0 38.824.500 0,0 175.500
6.2.2 City Coordinator Office 607.880.000 595.399.180 11.449.500 606.848.680 1.031.320
a Propinsi DKI Jakarta 204.740.000 202.739.650 2.000.000 204.739.650 350
(4 Kota/Kab) 218,0 1.000.000 204.740.000 216,0 202.739.650 2,0 2.000.000 218,0 204.739.650 0,0 350
b Propinsi Banten 258.730.000 253.728.245 4.940.100 258.668.345 61.655
(4 Kota/Kab) 230,0 1.000.000 202.650.000 225,0 197.707.245 5,0 4.940.100 230,0 202.647.345 0,0 2.655
Additional 1 Kota/Kab 56,5 1.000.000 56.080.000 56,5 56.021.000 - - 56,5 56.021.000 0,0 59.000
c Propinsi Kalimantan Barat 121.130.000 117.657.285 2.509.400 120.166.685 963.315
(5 Kota/Kab) 178,5 1.000.000 121.130.000 154,8 117.657.285 3,0 2.509.400 157,8 120.166.685 20,7 963.315
d Propinsi Kalimantan Utara 23.280.000 21.274.000 2.000.000 23.274.000 6.000
(1 Kota/Kab) 25,0 1.000.000 23.280.000 22,0 21.274.000 2,0 2.000.000 24,0 23.274.000 1,0 6.000
6.2.3 Assitant CD City Coordinator Office 191.040.000 185.971.800 5.000.000 190.971.800 68.200
a Propinsi DKI Jakarta 63.800.000 61.787.250 2.000.000 63.787.250 12.750
(2 Kota/Kab) 150,0 500.000 63.800.000 127,0 61.787.250 4,0 2.000.000 131,0 63.787.250 19,0 12.750
II. DIRECT REEIMBURSABLE COST
NO.
Propinsi Kalimantan Barat (Pontianak)
INVOICE LALU
2.6. OFFICE OPERATIONAL EXPENSES
URAIAN SISA KONTRAKINVOICE SAAT INI INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21
Vol Rate Amount Vol Amount Vol Amount Vol Amount Vol Amount
II. DIRECT REEIMBURSABLE COST
NO. INVOICE LALU
2.6. OFFICE OPERATIONAL EXPENSES
URAIAN SISA KONTRAKINVOICE SAAT INI INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21
b Propinsi Banten 61.750.000 60.740.000 1.000.000 61.740.000 10.000
(3 Kota/Kab) 133,5 500.000 61.750.000 120,5 60.740.000 2,0 1.000.000 122,5 61.740.000 11,0 10.000
c Propinsi Kalimantan Barat 49.990.000 48.944.550 1.000.000 49.944.550 45.450
(1 Kota/Kab) 59,0 500.000 25.600.000 57,5 25.086.550 1,0 500.000 58,5 25.586.550 0,5 13.450
Additional 1 Kota/Kab 59,0 500.000 24.390.000 48,5 23.858.000 1,0 500.000 50 24.358.000 9,5 32.000
d Propinsi Kalimantan Utara 15.500.000 14.500.000 1.000.000 15.500.000 -
Askot CD Nunukan 3,0 500.000 1.500.000 3,0 1.500.000 - - 3,0 1.500.000 0,0 -
Askot CD Bulungan 14,0 500.000 7.000.000 13,0 6.500.000 1,0 500.000 14,0 7.000.000 0,0 -
Askot CD Malinau 14,0 500.000 7.000.000 13,0 6.500.000 1,0 500.000 14,0 7.000.000 0,0 -
6.3 COMMUNICATION COST 724.500.000 642.008.865 10.825.593 652.834.458 71.665.542
6.3.1 OC Office 328.600.000 295.905.094 3.648.343 299.553.437 29.046.563
a Propinsi DKI Jakarta (Jakarta) including PD 59,5 4.000.000 167.300.000 57,5 154.443.616 1,0 1.550.327 58,5 155.993.943 1,0 11.306.057
b Propinsi Banten (Serang) 59,5 2.000.000 66.500.000 56,5 60.155.920 1,0 856.781 57,5 61.012.701 2,0 5.487.299
c Propinsi Kalimantan Barat (Pontianak) 59,5 2.000.000 80.100.000 56,5 73.538.622 1,0 694.417 57,5 74.233.039 2,0 5.866.961
d Propinsi Kalimantan Timur (Januari-Juni 2017) 14,0 2.000.000 14.700.000 11,0 7.766.936 1,0 546.818 12,0 8.313.754 2,0 6.386.246
6.3.2 City Coordinator Office 300.600.000 264.658.985 5.927.950 270.586.935 30.013.065
a Propinsi DKI Jakarta 85.900.000 80.572.662 876.000 81.448.662 4.451.338
(4 Kota/Kab) 204,2 1.000.000 85.900.000 182,4 80.572.662 2,0 876.000 184,4 81.448.662 19,8 4.451.338
b Propinsi Banten 123.900.000 107.937.661 2.322.950 110.260.611 13.639.389
(4 Kota/Kab) 192,4 1.000.000 98.900.000 186,4 95.680.259 4,0 2.322.950 190,4 98.003.209 2,0 896.791
Additional 1 Kota/Kab 25,0 1.000.000 25.000.000 18,0 12.257.402 - - 18 12.257.402 7,0 12.742.598
c Propinsi Kalimantan Barat 75.000.000 64.425.017 729.000 65.154.017 9.845.983
(5 Kota/Kab) 123,8 1.000.000 75.000.000 110,8 64.425.017 2,0 729.000 112,8 65.154.017 11,0 9.845.983
d Propinsi Kalimantan Utara 15.800.000 11.723.645 2.000.000 13.723.645 2.076.355
(1 Kota/Kab) 25,0 1.000.000 15.800.000 12,0 11.723.645 2,0 2.000.000 14,0 13.723.645 11,0 2.076.355
6.3.3 Assitant CD City Coordinator Office 95.300.000 81.444.786 1.249.300 82.694.086 12.605.914
a Propinsi DKI Jakarta 19.700.000 13.611.174 - 13.611.174 6.088.826
(2 Kota/Kab) 46 500.000 19.700.000 28,0 13.611.174 - - 28 13.611.174 18,0 6.088.826
b Propinsi Banten 37.150.000 34.959.780 - 34.959.780 2.190.220
(3 Kota/Kab) 79,5 500.000 37.150.000 73,0 34.959.780 - - 73,0 34.959.780 6,5 2.190.220
c Propinsi Kalimantan Barat 31.550.000 29.059.832 749.300 29.809.132 1.740.868
(1 Kota/Kab) 53,5 500.000 19.800.000 49,0 18.499.476 1,0 440.800 50,0 18.940.276 3,5 859.724
Additional 1 Kota/Kab 32,5 500.000 11.750.000 27,0 10.560.356 1,0 308.500 28,0 10.868.856 4,5 881.144
d Propinsi Kalimantan Utara 6.900.000 3.814.000 500.000 4.314.000 2.586.000
Askot CD Nunukan 3,0 500.000 500.000 1,0 500.000 - - 1,0 500.000 2,0 -
Askot CD Bulungan 14,0 500.000 2.900.000 6,0 1.314.000 1,0 250.000 7,0 1.564.000 7,0 1.336.000
Askot CD Malinau 14,0 500.000 3.500.000 8,0 2.000.000 1,0 250.000 9,0 2.250.000 5,0 1.250.000
6.4. INTERNET - - - - -
6.4.1 OC Office - - - - -
a Propinsi DKI Jakarta (Jakarta) including PD - 1.000.000 - - - - - - - 0,0 -
b Propinsi Banten (Serang) - 1.000.000 - - - - - - - 0,0 -
c Propinsi Kalimantan Barat (Pontianak) - 1.000.000 - - - - - - - 0,0 -
6.5. OPERASIONAL TIM PERCEPATAN (Oktober 2016 - Desember 2016) 18.000.000 18.000.000 - 18.000.000 -
6.5.1 OFFICE OPERASIONAL 18.000.000 18.000.000 - 18.000.000 -
a. Kabupaten Tangerang 3,0 3.000.000 9.000.000 3,0 9.000.000 - - 3,0 9.000.000 0,0 -
b. Kota Pontianak 3,0 3.000.000 9.000.000 3,0 9.000.000 - - 3,0 9.000.000 0,0 -
3.440.271.500 3.362.970.393 68.441.693 3.431.412.086 8.859.414 TOTAL OF OFFICE OPERATIONAL EXPENSES
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
7.1 OSP OFFICE 584.623.500 556.260.000 8.500.000 564.760.000 19.863.500
7.1.1 Propinsi DKI Jakarta (Jakarta) 169.000.000 162.350.000 - 162.350.000 6.650.000
a Desktop Computer (Purchase) 6 6.500.000 39.000.000 6 39.000.000 - - 6 39.000.000 - -
b Laptop/Notebook (Purchase) 11 8.000.000 88.000.000 11 88.000.000 - - 11 88.000.000 - -
c Printer Laser Jet (Purchase) 2 3.000.000 6.000.000 2 6.000.000 - - 2 6.000.000 - -
d Printer Color A3 (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
e Digital Camera (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
f GPS tools (Purchase) 1 3.500.000 3.500.000 1 3.500.000 - - 1 3.500.000 - -
g LCD Projector (Purchase) 1 10.000.000 10.000.000 1 10.000.000 - - 1 10.000.000 - -
h Scanner (Purchase) 2 1.000.000 2.000.000 2 2.000.000 - - 2 2.000.000 - -
i Equipment Maintenance (Include existing equipment) 1 16.000.000 12.500.000 0 5.850.000 - - - 5.850.000 1 6.650.000
7.1.2 Propinsi Banten (Serang) 153.500.000 144.770.000 - 144.770.000 8.730.000
a Desktop Computer (Purchase) 5 6.500.000 32.500.000 5 32.500.000 - - 5 32.500.000 - -
b Laptop/Notebook (Purchase) 10 8.000.000 80.000.000 10 80.000.000 - - 10 80.000.000 - -
c Printer Laser Jet (Purchase) 2 3.000.000 6.000.000 2 6.000.000 - - 2 6.000.000 - -
d Printer Color A3 (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
e Digital Camera (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
f GPS tools (Purchase) 1 3.500.000 3.500.000 1 3.500.000 - - 1 3.500.000 - -
g LCD Projector (Purchase) 1 10.000.000 10.000.000 1 10.000.000 - - 1 10.000.000 - -
h Scanner (Purchase) 1 1.000.000 1.000.000 1 1.000.000 - - 1 1.000.000 - -
i Equipment Maintenance (Include existing equipment) 1 16.000.000 12.500.000 0 3.770.000 - - - 3.770.000 1 8.730.000
7.1.3 Propinsi Kalimantan Barat (Pontianak) 131.198.500 127.390.000 - 127.390.000 3.808.500
a Desktop Computer (Purchase) 4 6.500.000 26.000.000 4 26.000.000 - - 4 26.000.000 - -
b Laptop/Notebook (Purchase) 9 8.000.000 72.000.000 9 72.000.000 - - 9 72.000.000 - -
c Printer Laser Jet (Purchase) 2 3.000.000 6.000.000 2 6.000.000 - - 2 6.000.000 - -
d Printer Color A3 (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
e Digital Camera (Purchase) 1 4.000.000 4.000.000 1 4.000.000 - - 1 4.000.000 - -
f GPS tools (Purchase) 1 3.500.000 3.500.000 1 3.500.000 - - 1 3.500.000 - -
g LCD Projector (Purchase) 1 10.000.000 10.000.000 1 10.000.000 - - 1 10.000.000 - -
h Scanner (Purchase) 1 1.000.000 1.000.000 1 1.000.000 - - 1 1.000.000 - -
i Equipment Maintenance (Include existing equipment) 1 16.000.000 4.698.500 0 890.000 - - - 890.000 1 3.808.500
7.1.4 Propinsi Kalimantan Utara (Januari 2017 - Juni 2017) 130.925.000 121.750.000 8.500.000 130.250.000 675.000
a Desktop Computer (Rental) 42 1.000.000 42.000.000 39 39.000.000 3 3.000.000 42 42.000.000 - -
b Laptop/Notebook (Rental) 106 750.000 74.925.000 93 69.750.000 6 4.500.000 99 74.250.000 7 675.000
c Printer Laser Jet (rental) 28 500.000 14.000.000 26 13.000.000 2 1.000.000 28 14.000.000 - -
7.2 CITY COORDINATOR OFFICE 285.500.000 281.900.000 3.600.000 285.500.000 -
7.2.1 Propinsi DKI Jakarta (4 Korkot) 74.000.000 74.000.000 - 74.000.000 -
a Laptop/Notebook (Purchase) 4 8.000.000 32.000.000 4 32.000.000 - - 4 32.000.000 - -
b Desktop Computer (Purchase) 4 6.500.000 26.000.000 4 26.000.000 - - 4 26.000.000 - -
c Printer Laser Jet (Purchase) 4 3.000.000 12.000.000 4 12.000.000 - - 4 12.000.000 - -
d Scanner (Purchase) 4 1.000.000 4.000.000 4 4.000.000 - - 4 4.000.000 - -
7.2.2 Propinsi Banten (4 Korkot) 74.000.000 74.000.000 - 74.000.000 -
a Laptop/Notebook (Purchase) 4 8.000.000 32.000.000 4 32.000.000 - - 4 32.000.000 - -
Laptop/Notebook (Rental) - 750.000 - 0 - - - - - - -
NO INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2.7. OFFICE EQUIPMENT EXPENSES
URAIAB CONTRAC AMENDEMENT - 21
II. DIRECT REEIMBURSABLE COST
SISA KONTRAK
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NO
INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI URAIAB
CONTRAC AMENDEMENT - 21 SISA KONTRAK
b Desktop Computer (Purchase) 4 6.500.000 26.000.000 4 26.000.000 - - 4 26.000.000 - -
Desktop Computer (Rental) - 600.000 - 0 - - - - - -
c Printer Laser Jet (Purchase) 4 3.000.000 12.000.000 4 12.000.000 - - 4 12.000.000 - -
Printer Laser Jet (Rental) - 300.000 - 0 - - - - - -
d Scanner (Purchase) 4 1.000.000 4.000.000 4 4.000.000 - - 4 4.000.000 - -
Scanner (Rental) - 150.000 - 0 - - - - - -
7.2.3 Propinsi Kalimantan Barat (5 Korkot) 92.500.000 92.500.000 - 92.500.000 -
a Laptop/Notebook (Purchase) 5 8.000.000 40.000.000 5 40.000.000 - - 5 40.000.000 - -
b Desktop Computer (Purchase) 5 6.500.000 32.500.000 5 32.500.000 - - 5 32.500.000 - -
c Printer Laser Jet (Purchase) 5 3.000.000 15.000.000 5 15.000.000 - - 5 15.000.000 - -
d Scanner (Purchase) 5 1.000.000 5.000.000 5 5.000.000 - - 5 5.000.000 - -
PROVINSI KALIMANTAN UTARA ( 1 KORKOT/KOTA TARAKAN) 45.000.000 41.400.000 3.600.000 45.000.000 -
a Laptop/Notebook (Rental) 25 750.000 18.750.000 23 17.250.000 2 1.500.000 25 18.750.000 - -
b Desktop Computer (Rental) 25 600.000 15.000.000 23 13.800.000 2 1.200.000 25 15.000.000 - -
c Printer Laser Jet (Rental) 25 300.000 7.500.000 23 6.900.000 2 600.000 25 7.500.000 - -
d Scanner (Rental) 25 150.000 3.750.000 23 3.450.000 2 300.000 25 3.750.000 - -
7.3 ASSISTAN CD MANDIRI OFFICE 84.900.000 83.100.000 1.800.000 84.900.000 -
7.3.1 Propinsi DKI Jakarta (2 AsKorkot CD MAndiri) 19.000.000 19.000.000 - 19.000.000 -
a Desktop Computer (Purchase) 2 6.500.000 13.000.000 2 13.000.000 - - 2 13.000.000 - -
b Printer InkJet (Purchase) 2 3.000.000 6.000.000 2 6.000.000 - - 2 6.000.000 - -
7.3.2 Propinsi Banten (3 AsKorkot CD MAndiri) 28.500.000 28.500.000 - 28.500.000 -
a Desktop Computer (Purchase) 3 6.500.000 19.500.000 3 19.500.000 - - 3 19.500.000 - -
b Printer InkJet (Purchase) 3 3.000.000 9.000.000 3 9.000.000 - - 3 9.000.000 - -
7.3.3 Propinsi Kalimantan Barat (1 AsKorkot CD MAndiri) 9.500.000 9.500.000 - 9.500.000 -
a Desktop Computer (Purchase) 1 6.500.000 6.500.000 1 6.500.000 - - 1 6.500.000 - -
b Printer InkJet (Purchase) 1 3.000.000 3.000.000 1 3.000.000 - - 1 3.000.000 - -
Propinsi Kalimantan Utara (3 AsKorkot CD MAndiri) 27.900.000 26.100.000 1.800.000 27.900.000 -
a Desktop Computer (Purchase) 31 600.000 18.600.000 29 17.400.000 2 1.200.000 31 18.600.000 - -
b Printer InkJet (Purchase) 31 300.000 9.300.000 29 8.700.000 2 600.000 31 9.300.000 - -
7.3.3 PENGADAAN EQUIPMENT TIM PERCEPATAN (Oktober 2016 - Desember 2016) 247.360.000 247.360.000 - 247.360.000 -
a Peta Citra Statelit (scala 1 : 5000) 2 Kota x 1 unit 2 100.000.000 169.360.000 2 169.360.000 - - 2 169.360.000 - -
b Laptop Rental (2 Kota x 4 unit x 3 bln) 24 1.000.000 24.000.000 24 24.000.000 - - 24 24.000.000 - -
c PC Rental (2 kota x 5 unit x 3 bln) 28 750.000 21.000.000 28 21.000.000 - - 28 21.000.000 - -
d Printer A3 Rental (2 kota x 2 unit x 3 bln) 12 500.000 6.000.000 12 6.000.000 - - 12 6.000.000 - -
e. Pengadaan Alat Ukur (Roll Meter, Perlengkapan Survey, Theodolite TS) 1 27.000.000 27.000.000 1 27.000.000 - - 1 27.000.000 - -
1.202.383.500 1.168.620.000 13.900.000 1.182.520.000 19.863.500 TOTAL OF OFFICE EQUIPMENT EXPENSES
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
2.7.1 OSP OFFICE SPACE (including furniture, AC etc) 3.303.267.500 3.207.730.084 60.034.375 3.267.764.459 35.503.041
space/m2 mth
2.7.1.1 DKI Jakarta (Jakarta) 223 16 m2/mth 13.717,5 75.000 994.990.000 12.893 967.102.500 222 16.668.750 13.115 983.771.250 602 11.218.750
2.7.1.2 Banten (Serang) 201 16 m2/mth 13.257,1 75.000 910.420.500 11.804 885.270.000 200 15.000.000 12.004 900.270.000 1.254 10.150.500
2.7.1.3 Kalimantan Barat (Pontianak) 151 16 m2/mth 9.057,9 75.000 602.076.500 7.744 582.457.584 121 9.065.625 7.865 591.523.209 1.193 10.553.291
Kalimantan Utara (Januari 2017 - Nopember 2017) 2.112,6 75.000 151.680.500 1.878 139.800.000 151 10.800.000 2.029 150.600.000 84 1.080.500
2.7.1.4 For City Coordinator (19) 19 16 m2/mth 1.122 500.000 546.000.000 1.100 535.000.000 17 8.500.000 1.117 543.500.000 5 2.500.000
Additional for City Coordinator (1) - 500.000 - - - - - - - - -
FOR CITY COORDINATOR (4) 24 500.000 12.000.000 24 12.000.000 - - 24 12.000.000 - -
Office / studio TIM PERCEPATAN (OKtober 2016 - Desember 2016) 468 75.000 35.100.000 468 35.100.000 - - 468 35.100.000 - -
Vechicle Rental R4 (2 unit x 3 bln) TIM PERCEPATAN (Oktober 2016 - Desember 2016) 6 8.500.000 51.000.000 6 51.000.000 - - 6 51.000.000 - -
2.7.2 VEHICLES (Minimun Y 2010 - Included driver, O &
M, Insurance etc) for OSP Office 3.711.950.000 3.621.000.000 68.000.000 3.689.000.000 22.950.000
unit mth
2.7.2.1 DKI Jakarta (Jakarta) 3 16 unit/mth 180,5 8.500.000 1.535.950.000 177 1.504.500.000 3 25.500.000 180 1.530.000.000 1 5.950.000
2.7.2.2 Banten (Serang) 2 16 unit/mth 120 8.500.000 1.020.000.000 118 1.003.000.000 2 17.000.000 120 1.020.000.000 - -
2.7.2.3 Kalimantan Barat (Pontianak) 2 16 unit/mth 122 8.500.000 1.037.000.000 118 1.003.000.000 2 17.000.000 120 1.020.000.000 2 17.000.000
Kalimantan Utara (Januari 2017 - Juni 2017) 14 8.500.000 119.000.000 13 110.500.000 1 8.500.000 14 119.000.000 - -
2.7.3 VEHICLES (Minimun Y 2010 - Included driver, O &
M, Insurance etc) for City Coordinator Office 6.154.000.000 6.052.000.000 102.000.000 6.154.000.000 -
2.7.3.1 DKI Jakarta unit mth 17.000.000
(4 Kota/Kab) 4 16 unit/mth 224 8.500.000 1.904.000.000 222 1.887.000.000 2 17.000.000 224 1.904.000.000 - -
2.7.3.2 Banten 42.500.000
(4 Kota/Kab) 4 16 unit/mth 260,5 8.500.000 2.214.250.000 255,5 2.171.750.000 5 42.500.000 260,5 2.214.250.000 - -
additional Vehicles 33,5 8.500.000 284.750.000 33,5 284.750.000 - - 33,5 284.750.000 - -
2.7.3.3 Kalimantan Barat 25.500.000
(5 Kota/Kab) 5 16 unit/mth 181,0 8.500.000 1.538.500.000 178 1.513.000.000 3 25.500.000 181 1.538.500.000 - -
KALIMANTAN UTARA 17.000.000
KORKOT TARAKAN 25,0 8.500.000 212.500.000 23 195.500.000 2 17.000.000 25 212.500.000 - -
MOTORCYCLE (Minimun Y 2010 - Included O & M, Insurance etc)
For Assistant CD Mnandiri of City Coordinators
2.7.4.1 DKI Jakarta unit mth 2.000.000
(2 Kota/Kab) 2 16 unit/mth 142 500.000 71.000.000 138 69.000.000 4 2.000.000 142 71.000.000 - -
2.7.4.2 Banten 1.000.000
(3 Kota/Kab) 3 16 unit/mth 136,0 500.000 68.000.000 134 67.000.000 2 1.000.000 136 68.000.000 - -
2.7.4.3 Kalimantan Barat 1.000.000
(1 Kota/Kab) 1 16 unit/mth 60,0 500.000 30.000.000 59 29.500.000 1 500.000 60 30.000.000 - -
Additional (1 Kota/Kab) 59,0 500.000 29.500.000 58 29.000.000 1 500.000 59 29.500.000 - -
KALIMANTAN UTARA
ADDITIONAL (3 KOTA/KAB) 31,0 500.000 15.500.000 29 14.500.000 2 1.000.000 31 15.500.000 - -
13.326.217.500 13.089.730.084 235.034.375 13.324.764.459 1.453.041
- 2.7.4 214.000.000
II. DIRECT REEIMBURSABLE COST
2.8. RENTAL EXPENSES
INVOICE S/D SAAT INIINVOICE SAAT INI NO. Unit URAIAN
INVOICE LALU SISA KONTRAK
209.000.000 5.000.000
CONTRAC AMENDEMENT - 21
214.000.000
TOTAL OF RENTAL EXPENSES
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
2.5.1 REGULAR REPORT 50.162.500 38.705.000 - 38.705.000 11.457.500
a Inception Report 30 50.000 1.500.000 15 750.000 - - 15 750.000 15 750.000
b Monthly Report 688,5 25.000 17.212.500 615 15.355.000 - - 615 15.355.000 74 1.857.500
c Quarterly Report 330 40.000 13.200.000 240 9.600.000 - - 240 9.600.000 90 3.600.000
d Annual Report 30 75.000 2.250.000 - - - - - 30 2.250.000
e Draft Final Report 40 75.000 3.000.000 - - 0 - - - 40 3.000.000
f Final Report (Indonesia & English) 88 100.000 8.800.000 88 8.800.000 - - 88 8.800.000 - -
g Executive Summary (Indonesia & English) 84 50.000 4.200.000 84 4.200.000 - - 84 4.200.000 - -
2.5.2 SPECIAL REPORT 7.645.000 - - - 7.645.000
a Performance Evaluation of OSP 90 50.000 4.500.000 - - - - - 90 4.500.000
b Complaint Resolution Follow-up Report 120 20.000 2.395.000 - - - - - 120 2.395.000
c Workshop Findings and Results 30 25.000 750.000 - - - - 30 750.000
57.807.500 38.705.000 - 38.705.000 19.102.500
II. DIRECT REEIMBURSABLE COST
2.9. REPORTING EXPENSES
TOTAL REPORTING EXPENSES
INVOICE S/D SAAT INI NO URAIAN
INVOICE SAAT INI SISA KONTRAKINVOICE LALUCONTRAC AMENDEMENT - 21
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
3.1. IN REGIONAL LEVELS 33.200.000 33.200.000 - 33.200.000 -
a Rakor OSP 120 250.000 30.000.000 120 30.000.000 - - 120 30.000.000 - -
- Kits 64 50.000 3.200.000 64 3.200.000 - - 64 3.200.000 - -
- Speaker honorarium - 500.000 - - - - - - - - -
3.2. IN PROVINCIAL LEVELS 386.184.250 386.184.250 - 386.184.250 -
a OC Consolidation DKI Jakarta
OC Consolidation DKI Jakarta 144 100.000 14.307.250 144 14.307.250 - - 144 14.307.250 - -
OC Consolidation Banten 135 100.000 13.452.000 135 13.452.000 - - 135 13.452.000 - -
OC Consolidation Kalimantan Barat 45 100.000 4.500.000 45 4.500.000 - - 45 4.500.000 - -
b Pelatihan Penguatan PLPBK - -
Propinsi DKI Jakarta 160 75.000 12.000.000 160 12.000.000 - - 160 12.000.000 - -
Propinsi Banten 135 75.000 10.125.000 135 10.125.000 - - 135 10.125.000 - -
Propinsi Kalimantan Barat - 75.000 - - - - - - - - -
c Advance Training/Couching PLPBK for City Coordinator Assistant UP 96 175.000 16.800.000 96 16.800.000 - - 96 16.800.000 - -
dTraining for City Coordinators Assistants (Infrastructure, Economic, Community Dev,
MIS, Urban Planner)180 175.000 31.500.000 180 31.500.000 - - 180 31.500.000 - -
e Special Training for Kelurahan Facilitators (Technic) 531 175.000 92.925.000 531 92.925.000 - - 531 92.925.000 - -
f Special Training for Kelurahan Facilitators (Economic) 381 175.000 66.675.000 381 66.675.000 - - 381 66.675.000 - -
g Special Training for Kelurahan Facilitators (Social) 372 175.000 65.100.000 372 65.100.000 - - 372 65.100.000 - -
h Special Training for Senior Facilitators 336 175.000 58.800.000 336 58.800.000 - - 336 58.800.000 - -
i Pelatihan Dasar Pemda - 175.000 - - - - - - - - -
- 600.000 - - - - - - - - -
j Training of AKP & Planning for Local Goverment - 175.000 - - - - - - - - -
- 600.000 - - - - - - - - -
k Training of Poverty Budgeting for Local Government - 175.000 - - - - - - - - -
- 600.000 - - - - - - - - -
l Special Training for Technical Team of PLPBK - 175.000 - - - - - - - - -
m Speaker honorarium - 500.000 - - - - - - - - -
3.3. In City/Regency Levels 30.058.000 30.056.595 - 30.056.595 1.405
a Diskusi/refleksi tematik KBP 147 75.000 11.000.000 147 10.999.375 - - 147 10.999.375 0 625
b Konsolidasi Faskel, askot, korkot 764 25.000 19.058.000 764 19.057.220 - - 764 19.057.220 - 780
449.442.250 449.440.845 - 449.440.845 1.405
3.2. TRAINING ACTIVITY JULI 2014 - April 2015
3.2.1. IN REGIONAL LEVELS 6.600.000 6.600.000 - 6.600.000 -
Rakor OSP 24 250.000 6.000.000 24 6.000.000 - - 24 6.000.000 - -
- Kits 12 50.000 600.000 12 600.000 - - 12 600.000 - -
- Speaker honorarium - 500.000 - - - - - - - - -
NEW (Additional) - - - - -
Rakor OC - 250.000 - - - - - - - - -
- Kits - 50.000 - - - - - - - - -
- Speaker Honrarium - 500.000 - - - - - - - - -
3.1.2. IN PROVINCIAL LEVELS 508.170.000 508.170.000 - 508.170.000 -
a OC Consolidation :
OC Consolidation DKI Jakarta 40 100.000 4.000.000 40 4.000.000 - - 40 4.000.000 - -
OC Consolidation Banten 40 100.000 3.945.000 40 3.945.000 - - 40 3.945.000 - -
OC Consolidation Kalimantan Barat 27 100.000 2.700.000 27 2.700.000 - - 27 2.700.000 - -
b Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder - 600.000 - - - - - - - - -
c Pelatihan Penguatan Pemda dan Stakeholder - 600.000 - - - - - - - - -
d Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator - 175.000 - - - - - - - - -
e Pelatihan Penguatan Askot dan Fasilitator - 175.000 - - - - - - - - -
f Konsolidasi Pemandu Pelatihan PLPBK - 175.000 - - - - - - - - -
g Pelatihan Dasar PLPBK - 75.000 - - - - - - - - -
h Pelatihan Penguatan PLPBK : - -
a
b
INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21 INVOICE SAAT INI SISA KONTRAK
3.1. BREAKDOWN OF TRAINING ACTIVITY
URAIANINVOICE LALU
TOTAL OF TRAINING ACTIVITY
NO.
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21 INVOICE SAAT INI SISA KONTRAKURAIAN
INVOICE LALUNO.
Propinsi DKI Jakarta - 75.000 - - - - - - - - -
Propinsi Banten - 75.000 - - - - - - - - -
Propinsi Kalimantan Barat - 75.000 - - - - - - - - -
i Pelatihan Tim Teknis PLPBK 83 175.000 14.525.000 83 14.525.000 - - 83 14.525.000 - -
j Orientation and Planning Training for Lielihood/PPMK (New Location FY 2014) 908 175.000 158.900.000 908 158.900.000 - - 908 158.900.000 - -
168 175.000 29.400.000 168 29.400.000 - - 168 29.400.000 - -
814 175.000 142.450.000 814 142.450.000 - - 814 142.450.000 - -
870 175.000 152.250.000 870 152.250.000 - - 870 152.250.000 - -
NEW (Additional) 458.475.000 458.475.000 - 458.475.000 -
a OC Consolidation 40 100.000 4.000.000 40 4.000.000 - - 40 4.000.000 - -
b Konsolidasi Pemandu Pelatihan Pemerintah Daerah - 600.000 - - - - - - - - -
c Pelatihan Pemerintah Daerah - 600.000 - - - - - - - - -
d Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan - 175.000 - - - - - - - - -
e Pelatihan Penguatan Program Lanjutan 2.550 175.000 446.250.000 2.550 446.250.000 - - 2.550 446.250.000 - -
f Pelatihan Penguatan PLPBK - 175.000 - - - - - - - - -
g Pelatihan Tim Teknis PLPBK (Banten) - 600.000 - - - - - - - - -
h Pelatihan Penguatan PPMK - 175.000 - - - - - - - - -
i Pelatihan SIM 47 175.000 8.225.000 47 8.225.000 - - 47 8.225.000 - -
j Pelatihan Khusus Askot MK dan Faskel Ekonomi - 175.000 - - - - - - - - -
k Pelatihan Aplikasi Pembukuan UPK (Computerize System) - 175.000 - - - - - - - - -
3.1.3. In City/Regency Levels 6.825.000 6.825.000 - 6.825.000 -
a Pelatihan Aplikasi Pembukuan UPK (Computerize system) - 175.000 - - - - - - - - -
b Thematic Discussion/Reflection of KBP 33 75.000 2.475.000 33 2.475.000 - - 33 2.475.000 - -
cConsolidation of Kelurahan Facilitator,City Coordinator ,Assistentc & City
Coordinators174,0 25.000 4.350.000 174 4.350.000 - - 174 4.350.000 - -
d Pelatihan Pengembangan Federasi UPK - 175.000 - - - - - - - - -
e Pelatihan Pengolahan BDC - 300.000 - - - - - - - - -
NEW (Additional) - - - - -
a Thematic Discussion / Reflection of KBP, City Changer, Forum BKM - 75.000 - - - - - - - - -
bConsolidation of Kelurahan Facilitator, City Coordinator, Assistentc & City
Coordinators- 25.000 - - - - - - - - -
c Pelatihan Aplikasi Pembukuan UPK (Computerize system) - 175.000 - - - - - - - - -
d Pelatihan Pengembangan Federasi UPK - 175.000 - - - - - - - - -
e Pelatihan Pengolahan BDC (2 Kab/Kota) - 175.000 - - - - - - - - -
Speaker honorarium - 500.000 - - - - - - - - -
3.3.1. IN REGIONAL LEVELS - - - - -
Konsolidasi OC/OSP - 350.000 - - - - - - - - -
- Kits - 50.000 - - - - - - - - -
Konsolidasi OC/OSP (Januari 2017 - Juni 2017) - 350.000 - - - - - - - - -
- Kits - 50.000 - - - - - - - - -
3.3.2. IN PROVINCIAL LEVELS 1.895.270.000 1.820.070.000 - 1.820.070.000 75.200.000
a OC Consolidation :
OC Consolidation DKI Jakarta - 100.000 - - - - - - - - -
OC Consolidation Banten - 100.000 - - - - - - - - -
OC Consolidation Kalimantan Barat - 100.000 - - - - - - - - -
Konsolidasi /KBIK Provinsi (September 2016 - Juni 2017)
OC Consolidation DKI Jakarta 128 100.000 12.400.000 124 12.400.000 - - 124 12.400.000 - -
OC Consolidation Banten 86 100.000 8.600.000 86 8.600.000 - - 86 8.600.000 - -
OC Consolidation Kalimantan Barat 66 100.000 6.600.000 66 6.600.000 - - 66 6.600.000 - -
OC Consolidation Kalimantan Utara 30 100.000 3.000.000 30 3.000.000 - - 30 3.000.000 - -
b Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator 72 175.000 12.600.000 72 12.600.000 - - 72 12.600.000 - -
c Pelatihan Fasilitator - -
a. In Class training 4.152 175.000 726.600.000 4.152 726.600.000 - - 4.152 726.600.000 - -
III.3 TRAINING ACTIVITY Januari 2016 - September 2016
k Advance Training for Livelihood/PPMK (Location FY 2012 and location 2014)
a
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21 INVOICE SAAT INI SISA KONTRAKURAIAN
INVOICE LALUNO.
b. On the job training (praktek lapang) 1.042 100.000 104.200.000 1.042 104.200.000 - - 1.042 104.200.000 - -
Pelatihan Penguatan Fasilitator (September 2016 - Juni 2017)
a. In Class training - 350.000 - - - - - - - - -
Material Kits - 50.000 - - - - - - - - -
Pelatihan SIM Kotaku (September 2016 - Juni 2017)
a. In Class training - 350.000 - - - - - - - - -
Material Kits - 50.000 - - - - - - - - -
d Konsolidasi Pemandu Pelatihan khusus untuk Fasilitator - 175.000 - - - - - - - - -
Konsolidasi Pelatihan fasilitator 64 175.000 4.550.000 64 4.550.000 - - 64 4.550.000 - -
e Pelatihan khusus untuk fasilitator - -
a. In Class training - 175.000 - - - - - - - - -
b. On the job training (praktek lapang) - 100.000 - - - - - - - - -
Pelatihan Askot dan Fasilitator (50 kota Prioritas) Wil-1
a. In Class training 900 175.000 157.500.000 900 157.500.000 - - 900 157.500.000 - -
In Class training 514 175.000 72.450.000 514 72.450.000 - - 514 72.450.000 - -
b. On the job training (praktek lapang) 300 100.000 30.000.000 300 30.000.000 - - 300 30.000.000 - -
On the job training (praktek lapang) 138 100.000 13.800.000 138 13.800.000 - - 138 13.800.000 - -
Asesment Korkot dan Askot
a. ATK dan Akomodasi 150 350.000 44.100.000 150 44.100.000 - - 150 44.100.000 - -
Asesment Askot
a. ATK dan Akomodasi 182 350.000 63.700.000 182 63.700.000 - - 182 63.700.000 - -
f Pelatihan Pembukuan UPK (Computerization) *)
a. In Class training - 300.000 - - - - - - - - -
b. Kits - 50.000 - - - - - - - - -
c. Inlad Transport DKI - 200.000 - - - - - - - - -
d. Inlad Transport Banten - 200.000 - - - - - - - - -
e. Inlad Transport Kalbar - 200.000 - - - - - - - - -
f. Inlad Transport Kalbar - Ketapang - 1.000.000 - - - - - - - - -
Pelatihan Pembukuan UPK (Computerization) *)
a. In Class training 418 300.000 125.250.000 418 125.250.000 - - 418 125.250.000 - -
b. Kits 146 50.000 6.870.000 146 6.870.000 - - 146 6.870.000 - -
Pelatihan perencanaan bagi TAPP (Khusus 2 Kota) 209 350.000 73.150.000 209 73.150.000 - - 209 73.150.000 - -
Material Kits 92 50.000 4.600.000 92 4.600.000 - - 92 4.600.000 - -
Pelatihan Perhitungan luasan Kumuh untuk Fasilitator (lokasi Penanganan kumuh
53 Kel/Desa)120 350.000 42.000.000 120 42.000.000 - - 120 42.000.000 - -
Material Kits 60 50.000 3.000.000 60 3.000.000 - - 60 3.000.000 - -
Kegiatan Baru April 2017 - Juni 2017
H Pelatihan PPMK (833) Kelurahan (peserta Askot Ekonomi dan Faskel Ekonomi) 260 350.000 91.000.000 260 91.000.000 - - 260 91.000.000 - -
Material Kits 59 50.000 2.700.000 59 2.700.000 - - 59 2.700.000 - -
KEGIATAN OKTOBER 2017
1 Konsolidasi Pemandu Pelatihan Khusus Fasilitator 18 350.000 5.600.000 18 5.600.000 - - 18 5.600.000 - -
2 TOT dan Pelatihan Khusus Tim Fasilitator Lokasi Direktif Menteri
1. Kab. Tangerang
- Peserta 330 350.000 115.500.000 330 115.500.000 - - 330 115.500.000 - -
- Material Kit 59 50.000 2.950.000 59 2.950.000 - - 59 2.950.000 - -
2. Kota Pontianak
- Peserta 160 350.000 56.000.000 160 56.000.000 - - 160 56.000.000 - -
- Material Kit 25 50.000 1.000.000 25 1.000.000 - - 25 1.000.000 - -
3. Kota Tarakan
- Peserta 95 350.000 29.750.000 95 29.750.000 - - 95 29.750.000 - -
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
INVOICE S/D SAAT INICONTRAC AMENDEMENT - 21 INVOICE SAAT INI SISA KONTRAKURAIAN
INVOICE LALUNO.
- Material Kit 12 50.000 600.000 12 600.000 - - 12 600.000 - -
3 Coaching Penyiapan Kegiatan Infrastruktur
1. Jakarta Pusat
- Peserta 72 250.000 18.000.000 - - - - - - 72 18.000.000
- Material Kit 24 50.000 1.200.000 - - - - - - 24 1.200.000
2. Kab. Tangerang
- Peserta 87 250.000 21.750.000 - - - - - - 87 21.750.000
- Material Kit 29 50.000 1.450.000 - - - - - - 29 1.450.000
3. Kota Pontianak
- Peserta 72 250.000 18.000.000 - - - - - - 72 18.000.000
- Material Kit 24 50.000 1.200.000 - - - - - - 24 1.200.000
4. Kota Tarakan
- Peserta 51 250.000 12.750.000 - - - - - - 51 12.750.000
- Material Kit 17 50.000 850.000 - - - - - - 17 850.000
3.3.3. In City/Regency Levels 1.600.341.000 1.269.341.000 - 1.269.341.000 331.000.000
a Pelatihan BDC *) 160 300.000 46.456.000 160 46.456.000 - - 160 46.456.000 - -
b Pelatihan Pengembangan Federasi UPK - 175.000 - - - - - - - - -
c Konsolidasi /KBIK Kabupaten - 25.000 - - - - - - - - -
d Diskusi tematik di Kota/Kabupaten - 75.000 - - - - - - - - -
September 2016 - Juni 2017
Konsolidasi /KBIK Kabupaten 674 25.000 16.680.000 674 16.680.000 - - 674 16.680.000 - -
Diskusi tematik di Kota/Kabupaten 439 75.000 12.500.000 439 12.500.000 - - 439 12.500.000 - -
e Pelatihan Pembukuan UPK (Computerization) *)
a. In Class training - 175.000 - - - - - - - - -
b. Kits - 50.000 - - - - - - - - -
c. Transport - 100.000 - - - - - - - - -
Pelatihan Pembukuan UPK (Computerization) *)
a. In Class training 2.811 175.000 479.730.000 2.811 479.730.000 - - 2.811 479.730.000 - -
1.464 175.000 185.175.000 1.464 185.175.000 - - 1.464 185.175.000 - -
b. Kits 736 50.000 35.500.000 736 35.500.000 - - 736 35.500.000 - -
620 50.000 22.300.000 620 22.300.000 - - 620 22.300.000 - -
c. Transport 896 100.000 89.200.000 896 89.200.000 - - 896 89.200.000 - -
505 100.000 33.300.000 505 33.300.000 - - 505 33.300.000 - -
Asesment SF (Senior Faskel)
a. ATK dan Akomodasi 127 250.000 31.750.000 127 31.750.000 - - 127 31.750.000 - -
Asesment Fasilitator
a. ATK dan Akomodasi 483 250.000 120.750.000 483 120.750.000 - - 483 120.750.000 - -
Kegiatan Baru April 2017 - Juni 2017
fCoaching clinic 5 kali di 50 Kota Prioritas Wil-1 (Korkot, Askot SF dan
Narasumber)450 250.000 120.750.000 450 120.750.000 - - 450 120.750.000 - -
Material Kits 510 50.000 27.750.000 510 27.750.000 - - 510 27.750.000 - -
Narasumber 105 500.000 47.500.000 105 47.500.000 - - 105 47.500.000 - -
g Coaching clinic 2 kali
Peserta 1.116 250.000 279.000.000 - - - - - - 1.116 279.000.000
Material Kits 1.040 50.000 52.000.000 - - - - - - 1.040 52.000.000
3.3.3.1 KOTA CB UNTUK FASKEL TIM PERCEPATAN (Oktober 2016 - Desember 2016) - - - - -
Pelatihan Pokja PKP - 350.000 - - -
Material Kits - 50.000 - - -
TOTAL OF TRAINING ACTIVITY 4.475.681.000 4.069.481.000 - 4.069.481.000 406.200.000
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)
4.1. 30.100.000 30.059.000 - - 30.059.000 - 41.000
4.1.1. Lokakarya Review Propinsi/midterm - - - - -
a Kegiatan Lokakarya
- Propinsi DKI Jakarta - 250.000 - - - - - - -
- Propinsi Banten - 250.000 - - - - - - -
- Propinsi Kalimantan Barat - 250.000 - - - - - - -
b Press Conference - 200.000 - - - - - - -
c Nara Sumber Provinsi - 500.000 - - - - - - - - -
d Kits Lokakarya - 50.000 - - - - - - -
4.1.2 Workshop Media 24.600.000 24.559.000 - 24.559.000 41.000
a Kegiatan Workshop 84 250.000 21.000.000 84 21.000.000 - - 84 21.000.000 - -
b Narasumber Workshop 2 500.000 1.000.000 2 1.000.000 - - 2 1.000.000 - -
c Kits Workshop 52 50.000 2.600.000 52 2.559.000 - - 52 2.559.000 - 41.000
4.1.3 Penulisan Artikel / Berita 5 500.000 2.500.000 5 2.500.000 - - 5 2.500.000 - -
4.1.4. TV Talkshow 3 1.000.000 3.000.000 3 3.000.000 - - 3 3.000.000 - -
4.1.5. Work Shop Midtrem Program KOTAKU (September 2016 - Juni 2017) - - - - -
a Accomodation - 300.000 - - - - - - - - -
b Resources Person - 500.000 - - - - - - - - -
c Press Conference - 200.000 - - - - - - - - -
d Panitia - 200.000 - - - - - - - - -
e Kits - 50.000 - - - - - - - - -
4.1.6. TV Talkshow - 10.000.000 - - - - - - - - -
4.2. CITY/REGENCY LEVELS 312.309.000 312.150.000 - 312.150.000 159.000
4.2.1 Lokakarya Review /midterm 90.950.000 90.950.000 - 90.950.000 -
- Kegiatan Lokakarya 844 100.000 84.350.000 844 84.350.000 - - 844 84.350.000 - -
- Press Conference 66 100.000 6.600.000 66 6.600.000 - - 66 6.600.000 - -
- Nara Sumber Provinsi - 300.000 - - - - - - - - -
4.2.2 Radio Talkshow 35 500.000 17.200.000 35 17.200.000 - - 35 17.200.000 - -
4.2.3 Media Field Visit 36 500.000 18.000.000 36 18.000.000 - - 36 18.000.000 - -
4.2.4 Penulisan Artikel / Berita 29 500.000 14.500.000 29 14.500.000 - - 29 14.500.000 - -
4.2.5 Exhibition 10 5.000.000 50.000.000 10 50.000.000 - - 10 50.000.000 - -
4.2.1. Lokakarya Midtrem Program KOTAKU (September 2016 - Juni 2017) - - - - -
a Accomodation - 250.000 - - - - - - - - -
b Resources Person - 500.000 - - - - - - - - -
c Press Conference - 200.000 - - - - - - - - -
d Panitia - 200.000 - - - - - - - - -
e Kits - 50.000 - - - - - - - - -
4.2.3 Pengembangan Newsletter - 500.000 - - - - - - - - -
4.2.5 Exhibition - 5.000.000 - - - - - - - - -
URAIANCONTRAC AMENDEMENT - 21
IV. SOCIALIZATION ACTIVITY EXPENSES [ FIXED ]
INVOICE LALU INVOICE SAAT INI SISA KONTRAKINVOICE S/D SAAT INI
PROVINCIAL LEVELS (Prov. DKI Jakarta, Banten & Kalimantan Barat)
NO.
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)URAIAN
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI SISA KONTRAKINVOICE S/D SAAT ININO.
4.2.6. Workshop (forum Konsultan) (TIM PERCEPATAN) September 2016 -
Desember 2016 322 350.000 112.659.000 322 112.500.000 - - 322 112.500.000 - 159.000
Material Kit 180 50.000 9.000.000 180 9.000.000 - - 180 9.000.000 - -
342.409.000 342.209.000 - 342.209.000 200.000
4.3.PROVINCIAL LEVELS (Prov. DKI Jakarta, Banten & Kalimantan Barat)
Juli 2014 - April 2015 1.500.000 1.500.000 - 1.500.000 -
4.3.1. Lokakarya Review Propinsi/midterm - - - - -
a Kegiatan Lokakarya
- Propinsi DKI Jakarta - 250.000 - - - - - - - - -
- Propinsi Banten - 250.000 - - - - - - - - -
- Propinsi Kalimantan Barat - 250.000 - - - - - - - - -
4.3.2. Penulisan Artikel Koran Provinsi 3 500.000 1.500.000 3 1.500.000 - - 3 1.500.000 - -
4.3.3. TV Talkshow - 1.000.000 - - - - - - - - -
4.3.4. Workshop Media
a Kegiatan Workshop - 250.000 - - - - - - - - -
b Narasumber Workshop - 500.000 - - - - - - - - -
c Kits Workshop - 50.000 - - - - - - - - -
4.4. CITY/REGENCY LEVELS 117.200.000 117.200.000 - 117.200.000 -
4.4.1 Lokakarya Review /midterm 36.700.000 36.700.000 - 36.700.000 -
- Kegiatan Lokakarya 356 100.000 35.600.000 356 35.600.000 - - 356 35.600.000 - -
- Press Conference 5 100.000 500.000 5 500.000 - - 5 500.000 - -
- Nara Sumber Provinsi 2 300.000 600.000 2 600.000 - - 2 600.000 - -
4.4.2 Workshop "BDC" di 15 Kab/Kota (60 peserta per Kab/Kota) - 250.000 - - - - - - - - -
Workshop Federasi UPK di 3 Kab/Kota (OC 3) - 250.000 - - - - - - - - -
4.4.3 Radio Talkshow 33 500.000 16.500.000 33 16.500.000 - - 33 16.500.000 - -
4.4.4 Media Field Visit 22 500.000 11.000.000 22 11.000.000 - - 22 11.000.000 - -
4.4.5 Penulisan Artikel / Berita Koran Kab. Kota 26 500.000 13.000.000 26 13.000.000 - - 26 13.000.000 - -
4.4.6 Exhibition 8 5.000.000 40.000.000 8 40.000.000 - - 8 40.000.000 - -
PROVINCIAL LEVELS (Prov. DKI Jakarta, Banten & Kalimantan Barat)
Juli - Desember 2015187.000.000 187.000.000 - 187.000.000 -
1 Lokakarya Sosialisasi Kumuh
a Kegiatan Lokakarya 600 250.000 124.000.000 600 124.000.000 - - 600 124.000.000 - -
b Press Conference 15 200.000 3.000.000 15 3.000.000 - - 15 3.000.000 - -
c Nara Sumber Provinsi 9 500.000 4.500.000 9 4.500.000 - - 9 4.500.000 - -
d Kits Lokakarya 375 50.000 18.750.000 375 18.750.000 - - 375 18.750.000 - -
2 Workshop Media
a Kegiatan Workshop 120 250.000 30.000.000 120 30.000.000 - - 120 30.000.000 - -
b Narasumber Workshop 6 500.000 3.000.000 6 3.000.000 - - 6 3.000.000 - -
c Kits Workshop 75 50.000 3.750.000 75 3.750.000 - - 75 3.750.000 - -
3 Penulisan Artikel / Berita - 1.000.000 - - - - - - - - -
4 TV Talkshow - 7.500.000 - - - - - - - - -
CITY/REGENCY LEVELS (Additional) 517.486.750 517.486.750 - 517.486.750 -
1 Lokakarya Sosialisasi Kumuh
- Kegiatan Lokakarya 2.160 250.000 472.486.750 2.160 472.486.750 - - 2.160 472.486.750 - -
- Press Conference 180 100.000 18.000.000 180 18.000.000 - - 180 18.000.000 - -
- Nara Sumber Provinsi 90 300.000 27.000.000 90 27.000.000 - - 90 27.000.000 - -
TOTAL OF SOCIAL ACTIVITY (4.1 + 4.2)
Vol Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR)URAIAN
CONTRAC AMENDEMENT - 21 INVOICE LALU INVOICE SAAT INI SISA KONTRAKINVOICE S/D SAAT ININO.
2 Workshop "BDC" di 15 Kab/Kota (OC1=3, OC2=5, OC3=2, OC4=5) 0 250.000 0 - - - - - - - -
Workshop Federasi UPK di 3 Kab/Kota (OC-1; OC-3 dan OC-4) - 250.000 - - - - - - - - -
3 Lokakarya PLPBK - 250.000 - - - - - - - - -
4 Radio Talkshow 0 500.000 0 - - - - - - - -
5 Media Field Visit 0 500.000 0 - - - - - - - -
6 Penulisan Berita 0 500.000 0 - - - - - - - -
7 Exhibition 0 5.000.000 0 - - - - - - - -
PROVINCIAL LEVELS (Prov. DKI Jakarta, Banten & Kalimantan Barat)
Januari - September 2016 77.500.000 77.500.000 - 77.500.000 -
1 Lokakarya Provinsi (3 Provinsi)
a Kegiatan Lokakarya 260 250.000 65.000.000 260 65.000.000 - - 260 65.000.000 - -
c Nara Sumber Provinsi 12 500.000 6.000.000 12 6.000.000 - - 12 6.000.000 - -
d Kits Lokakarya 130 50.000 6.500.000 130 6.500.000 - - 130 6.500.000 - -
CITY/REGENCY LEVELS (Additional) 458.000.000 457.950.000 - 457.950.000 50.000
1 Lokakarya Kabupaten (18 Kabupaten/Kota)
- Kegiatan Lokakarya 920 250.000 203.850.000 920 203.850.000 - - 920 203.850.000 - -
- Nara Sumber Provinsi 80 300.000 24.000.000 80 24.000.000 - - 80 24.000.000 - -
- Kits Lokakarya 915 50.000 45.750.000 915 45.750.000 - - 915 45.750.000 - -
2 Lokakarya Khusus Kabupaten (3 Kabupaten/Kota)
- Kegiatan Lokakarya 120 250.000 30.000.000 120 30.000.000 - - 120 30.000.000 - -
- Press Conference 20 100.000 2.000.000 20 2.000.000 - - 20 2.000.000 - -
- Nara Sumber Provinsi 10 300.000 3.000.000 10 3.000.000 - - 10 3.000.000 - -
- Kits Lokakarya 140 50.000 7.000.000 140 7.000.000 - - 140 7.000.000 - -
3 Penayangan di TV Berita daerah 4 10.000.000 40.000.000 4 40.000.000 - - 4 40.000.000 - -
4 Pengembangan Newsletter 4.400 1.500 6.600.000 4.400 6.600.000 - - 4.400 6.600.000 - -
5 Exhibition 5 5.000.000 25.000.000 5 25.000.000 - - 5 25.000.000 - -
Kegiatan Juli 2017 - Agustus 2017
Pengembangan Newsletter - 15.000 - - - - - - - - -
Pengembangan Newsletter - 15.000 - - - - - - - - -
Workshop BDC (Full day Meeting) -
a. Accomodation 240 250.000 60.000.000 240 60.000.000 - - 240 60.000.000 - -
b. Resources Person 12 100.000 1.200.000 12 1.200.000 - - 12 1.200.000 - -
c. Press Conference 20 300.000 6.000.000 20 6.000.000 - - 20 6.000.000 - -
d. Kits 120 50.000 3.600.000 120 3.550.000 - - 120 3.550.000 - 50.000
Exhibition - 5.000.000 - - - - - - - - -
45 FIX COST TIM PERCEPATAN September 2016 - Desember 2016 1.291.500.000 1.291.500.000 - 1.291.500.000 -
4.5.1 Biaya Penyusunan Dokumen RPLP/RTPLP
Tenaga Ahli Pendamping Masyarakat 36 5.000.000 180.000.000 36 180.000.000 - - 36 180.000.000 - -
Sosialisasi Tingkat Kelurahan 30 5.000.000 150.000.000 30 150.000.000 - - 30 150.000.000 - -
Forum Konsultasi dan uji publik 30 5.000.000 150.000.000 30 150.000.000 - - 30 150.000.000 - -
Peralatan Survey, dukungan FGD/rembug dan 30 15.000.000 450.000.000 30 450.000.000 - - 30 450.000.000 - -
Penguatan Masyarakat/TIPP atau DED (Opsional) 30 10.000.000 300.000.000 30 300.000.000 - - 30 300.000.000 - -
Biaya Penyusunan (5%) 61.500.000 61.500.000 - 61.500.000 -
TOTAL OF SOCIAL ACTIVITY (4.3 + 4.4) 2.650.186.750 2.650.136.750 - 2.650.136.750 50.000
TOTAL OF SOCIAL ACTIVITY (4.1 + 4.2 + 4.3 + 4.4) 2.992.595.750 2.992.345.750 - 2.992.345.750 250.000