Page 1: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Program Safeguard Systems Assessment

Project Number: 50193-003 September 2019

India: Maharashtra Rural High Voltage Distribution System Expansion Program

Page 2: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher
Page 3: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

ABBREVIATIONS

ADB - Asian Development Bank CEA CHS

- -

Central Electricity Authority construction health and safety

DT - distribution transformer EC - environmental clearance EAC - Expert Appraisal Committee ESARF environmental and social assessment and review framework EHS - environmental health and safety EIA - environmental impact assessment EMP - environmental management plan ESMS - environmental and social management system GRM - grievance redress mechanism HVDS - high voltage distribution system HT - high tension IEE - initial environmental examination MERC - Maharashtra Electricity Regulation Commission MoEFCC - Ministry of Environment, Forest, and Climate Change MSEDCL - Maharashtra State Electricity Distribution Co. Ltd. NGO - non-government organization OHE - occupational health and environment OHS - occupational health and safety PSSA - program safeguard system assessment RBL - results-based lending REA - rapid environmental assessment SEIAA - State Environment Impact Assessment Authority SHE - safety, health, and environment SPCB - State Pollution Control Board SSMR - semiannual safeguards monitoring report

Page 4: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

TABLE OF CONTENTS

Page

I. INTRODUCTION.................................................................................................................................. 1

A. Program Background and Rational .............................................................................................. 1

II. ADB’s SAFEGUARD POLICY PRINCIPLES TRIGGERED .......................................................................... 5

III. ENVIRONMENTAL AND SOCIAL IMPACTS AND RISKS ...................................................................... 12

A. Environmental Impacts .............................................................................................................. 12

B. Social Impacts ............................................................................................................................. 13

IV. DIAGNOSTIC ASSESSMENT .............................................................................................................. 15

A. Assessment Methodology and Resources ................................................................................. 15

B. Policy Equivalence Assessment .................................................................................................. 19

V. Institutional Arrangement Assessment ........................................................................................... 32

A. Internal Grievances Redressal Cell (IGRC) .................................................................................. 34

B. Consumer Grievances Redressal Forum (CGRF) ......................................................................... 35

C. Electricity Ombudsman .............................................................................................................. 35

VI. PROGRAMME ACTION PLAN............................................................................................................ 35

VII. CONCLUSION ................................................................................................................................... 42

A. Procedural Guideline............................................................................................................. 132

B. Community Meeting and Consultation with Affected Persons ........................................ 133

C. Support to vulnerable APs ................................................................................................... 133

D. Land Transfer of Title ............................................................................................................ 134

APPENDIXES 1. Circular for Land Purchase-MSEDCL------------------------------------------------------------------43 2. Records of Detail Consultations-------------------------------------------------------------------------51 3. Safeguards Screening Checklists Due Diligence---------------------------------------------------98 4. Generic EMP for Bid Document------------------------------------------------------------------------110 5. Safeguards Monitoring Template----------------------------------------------------------------------120 6. Consultations, Formats, Social and Environment-------------------------------------------------124 7. Guidelines Voluntary Donation and Direct Purchase through Negotiated

Settlement---------------------------------------------------------------------------------------------------132

Page 5: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

I. INTRODUCTION

A. Program Background and Rational 1. The Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) is the largest distribution company in India (24.6 million customers) and is a distribution licensee in the state of Maharashtra in both rural and urban areas. About 17% of consumers (4.1 million) are agriculture consumers. Sales to the agriculture category (30,643 million kWh) comprise 30% of MSEDCL’s total sales while the agriculture category provides 15% (9,060 crores) of MSEDCL’s total revenues in fiscal year (FY) 2018. Only about 65% of agriculture consumers are metered. MSEDCL’s financial performance is affected by the difference between the average revenue collection (including government support) for agriculture and the cost of supply. The state and MSEDCL intend to undertake phased investments for feeder segregation and adoption of high voltage distribution systems (HVDS) through (i) continuing feeder separation of rural domestic and rural agriculture feeders; (ii) release of all new agriculture connections on HVDS; and (iii) eventual replacement of low voltage rural agriculture feeders with high voltage feeders covering all agriculture consumers. 2. The state government of Maharashtra has requested Asian Development Bank (ADB) funding to support HVDS in rural areas for agriculture supply. Adoption of HVDS is an alternative approach that extends the distribution system at higher distribution voltages (11 kV) to the consumer doorstep coupled with lower capacity distribution transformers that can be used for 1-2 connections.

3. The Maharashtra Rural HVDS Program is proposed to finance a portion of distribution planning development for Maharashtra using the results-based lending (RBL) modality of ADB. ADB received a financing request for $346 million from Department of Economic Affairs (DEA) to support HVDS related investments in rural areas of the state of Maharashtra for supply to agriculture consumers. The executing agencies of the program will be the Energy Department, Maharashtra; and MSEDCL. The outcome will be access to reliable, efficient and sustainable power supply for agriculture usage in rural Maharashtra improved. The Program aims to connect about 156,000 new agriculture consumers on HVDS between 2019-2021 and requires about (i) 132,600 new distribution transformers; (ii) 46,800 km. of HT connections to distribution transformers; and (iii) establishment of 121 new 33/11 kV distribution sub-stations and related 11 kV feeders for upstream strengthening. These interventions would be across the state in the regions of Vidharbha, Marathwada, Konkan, western Maharashtra and northern Maharashtra.

4. The program will extend power supply to the agriculture consumers. All connections are voluntary as investment cost (approximately U$3,800/household) is born by MSEDCL without any contribution from farmers, and electricity bill is also subsidized (approximately Rs. 4/kWh) by the government. Also, the system is not provided to each household in the region but only households who have the need for better reliable electricity connection for irrigation voluntarily apply for the program. The program will bring following benefits to the farmers.

(i) dedicated distribution transformer facility to the consumer; (ii) reliable and stable power with proper voltage; (iii) sense of ownership to take responsibility of distribution transformer (DT) among

consumers; and (iv) reduction in failure of farmer’s electrical pumps.

5. These benefits will increase the agricultural yield, at the same time lower the maintenance, which will result in financial benefits to farmers. Additionally, the consumers will lead to increase

Page 6: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

2

cross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher subsidy for Maharashtra. 6. The program safeguard system assessment (PSSA) aims to (i) examine the safeguard systems of the Government of India, Maharashtra, and MSEDCL, as well as related implementation practices and capacities; and (ii) suggested safeguard program actions where gaps and weaknesses are found. The PSSA, which ADB undertook in partnership with MSEDCL, builds on the existing knowledge and practices of MSEDCL and the discussions with MSEDCL on ADBs’ Safeguard Policy System (2009) requirements, as well as on a specific analysis carried out during program preparation. The PSSA is based on document reviews, meetings and extensive discussions with MSEDCL, field investigations, and interviews with relevant stakeholders. Based on the PSSA, the program triggers environment and involuntary resettlement (IR) safeguard principles under ADB’s Safeguard Policy Statement (2009). Thus, the project is categorized as B for environment and IR, and C for IP.

1. Program Activities

1.1 Technical Components and Design Standards

7. The program activities include construction and installation of new 33/11kV substations, 11kV distribution lines, distribution transformers and connections. The developing water resource and installing pump are outside of the program scope, which are usually existing and managed by farmers already. 8. A typical 33/11kV substation will require about 40mx40m (1,600 sq.) land area. The substations will be mostly on government or public land but in some cases may also require private land. The 33/11kV substations will be installed with modern equipment and technology. The new substations will be constructed with completely new equipment including steel structures, substation gantries, power transformers and foundations with concrete, firefighting arrangements, control room with staff utilities and fencing. 9. The 11kV distribution lines under the program will consist of pole mounted single circuit (3-phase) conductors. The poles will consist of round pre-stressed concrete poles with height of 9 meters and spaced approximately 50 meters apart. The distribution transformers will be mounted on poles (cross arms and insulators) at designated locations to support 3-phase conductors. Overhead ground wires will be installed for lightning protection. Table 1 presents the technical details of the 11kV distribution Line.

Table 1: Technical Details of the Distribution Line Line Design Features 11 kV Feeder Line Voltage 11kV Type Poles: Pole structures with concrete foundations

Cable: 34 sq.mm aluminum AAAC Conductor Transformer 10 Kva, 16Kva, 25Kva 11/0.4Kv & 22/0.4 Kv Average span between poles

60 meters (average)

Pole height 9 meters (1/6th length burial depth) Pole land area < 0.3m2 pole; 1.0 m2 foundations per pole Right-of-way (Row) meters 2 meters

Page 7: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

3

10. All insulators and fittings to be utilized by the program shall conform to the international standard of the International Electrotechnical Commission (IEC). Design standards for all new 11kV distribution lines will be in accordance with all relevant international technical and environmental health and safety norms.

1.2 Proposed Works and Activities 11. The 33/11kV substations will be installed on a 40mx40m land area. The substations will be mostly on government or public land but in some cases may also require private land. The construction activities will involve civil work for foundation, control room, and installation of transformers and equipment etc. All 11kV distribution lines will be installed along with existing roads or un-used lands bet un-used lands between agricultural plots. The construction activities will involve transporting of the poles on the roadside, augering of ground for pole foundation up to depth of 1.5 meters, erection of poles, stringing of conductors, and erection of pole-mounted transformers. These construction activities are primarily done using a small team of workers with minimal use of mechanical equipment. Based on MSEDCL experience, approximately 10 poles can be erected per day. 12. Transformers will be transported and installed on 11 kV distribution line poles. There will not be any additional land requirement for the installation of transformers. The transformers will be located between two poles with above surface. All excavated soil will be utilized for refilling and banking up of the pole foundations. 13. The pole installation activities generally occupy a land area of 1-meter radius whereas line stringing generally temporarily disturbs a 2-meter strip of land below the conductor. 14. In some cases, trimming or cutting of roadside trees may be required to ensure appropriate safety clearances for the power lines. Normally trees are only trimmed for installation of lines and poles, but in case where tree cutting is required than the department forestry intervenes for communication and compensation regardless whether trees are in public or private land. A minimum vertical clearance of 3 meters from existing structures and trees will be maintained as required for safety. The lines will be sited to avoid houses or structures to the maximum extent possible. 15. During the operational phase, regular activities that will be implemented include the routine monitoring and inspection to check if the required clearances of trees and structures below the line are maintained. Maintenance activities include the trimming of trees and vegetation and checking of nuts and bolts to ensure structural stability of the line. The clearing of vegetation shall be done manually, without the use of heavy equipment and herbicides. Following photographs shows the typical distribution system (33/11 kV substation, 11kV feeders, distribution transformer) of MSEDCL. 16. Following pictures depicts the typical HVDS program activities.

Page 8: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

4

Photo 1: Typical 11kV feeder line to Agriculture

consumer from HVDS line Photo 2: Base of HVDS Pole system

Photo 3: Typical 11 kV HVDS Line pole Photo 4: Proposed site for 33/11kV substation at

Belora, Amrawati

Photo 5: Proposed site for 33/11kV substation at

Tisgaon, Nashik

Photo 6: Agriculture Well to be connected by HVDS Connection

Page 9: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

5

Photo 7: Typical HVDS meter installed on the

Pole Photo 8: Typical Pole Mounted DTR for HVDS

II. ADB’S SAFEGUARD POLICY PRINCIPLES TRIGGERED 17. The program will trigger all 11 environmental policy principles listed in ADB’s Safeguard Policy Statement (2009) A brief analysis of environment policy principles for the Program is provided in Table 2.

Table 2. Applicability of Environment Safeguard Policy Principles # IR Policy Principle Triggered/Not

Triggered/Partially Triggered

Remarks

1 Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type of environmental assessment so that appropriate studies are undertaken commensurate with the significance of potential impacts and risks.

Triggered Screening and due diligence needs to be undertaken for program activities to determine the scale of impacts and assessment required. (Impacts are anticipated to be minor and temporary from RBL activities).

2 Conduct an environmental assessment for each proposed project to identify potential direct, indirect, cumulative, and induced impacts and risks to physical, biological, socioeconomic (including impacts on livelihood through environmental media, health and safety, vulnerable groups, and gender issues), and physical cultural resources in the context of the project’s area of influence. Assess potential transboundary and global impacts,

Triggered Each program activities will be assessed using simplified safeguards screening and assessment template developed for the program activities.

Page 10: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

6

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

including climate change. Use strategic environmental assessment where appropriate.

3 Examine alternatives to the project’s location, design, technology, and components and their potential environmental and social impacts and document the rationale for selecting the alternative proposed. Also consider the no project alternative.

Triggered Alternatives are considered as part of site /location selection for substations and distribution lines.

4 Avoid, and where avoidance is not possible, minimize, mitigate, and/or offset adverse impacts and enhance positive impacts by means of environmental planning and management. Prepare an environmental management plan (EMP) that includes the proposed mitigation measures, environmental monitoring and reporting requirements, related institutional or organizational arrangements, capacity development and training measures, implementation schedule, cost estimates, and performance indicators. Key considerations for EMP preparation include mitigation of potential adverse impacts to the level of no significant harm to third parties, and the polluter pays principle.

Triggered Environmental management plan will be prepared for each program activities. Mitigation measures, cost and implementation arrangement has been proposed in the EMP. Also preliminary estimation has been undertaken. .

5 Carry out meaningful consultation with affected people and facilitate their informed participation. Ensure women’s participation in consultation. Involve stakeholders, including affected people and concerned nongovernment organizations, early in the project preparation process and ensure that their views and concerns are made known to and understood by decision makers and considered. Continue consultations with stakeholders throughout project implementation as necessary to address issues related to environmental assessment. Establish a grievance redress mechanism (GRM) to receive and facilitate resolution of the affected people’s concerns and grievances regarding the project’s environmental performance.

Triggered Consultations will be carried out among the stakeholders especially forestry officials, agricultural farmers, the concerned government line agencies and community elected leaders. The consultation is mostly focused group discussion with the beneficiaries and with individuals due to the nature of the program activities.

6 Disclose a draft environmental assessment (including the EMP) in a timely manner, before project appraisal, in an accessible place and in a form and language(s) understandable to affected

Triggered Program safeguards documents including PSSA and monitoring reports will be disclosed.

Page 11: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

7

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

people and other stakeholders. Disclose the final environmental assessment, and its updates if any, to affected people and other stakeholders.

Affected communities will be informed through consultations about project activities.

7 Implement the EMP and monitor its effectiveness. Document monitoring results, including the development and implementation of corrective actions, and disclose monitoring reports.

Triggered EMP will be implemented and monitored by MSEDCL with ADB TA support. Monitoring results will be disclosed.

8 Do not implement project activities in areas of critical habitats, unless (i) there are no measurable adverse impacts on the critical habitat that could impair its ability to function, (ii) there is no reduction in the population of any recognized endangered or critically endangered species, and (iii) any lesser impacts are mitigated. If a project is located within a legally protected area, implement additional programs to promote and enhance the conservation aims of the protected area. In an area of natural habitats, there must be no significant conversion or degradation, unless (i) alternatives are not available, (ii) the overall benefits from the project substantially outweigh the environmental costs, and (iii) any conversion or degradation is appropriately mitigated. Use a precautionary approach to the use, development, and management of renewable natural resources.

Triggered All sensitive areas will be avoided. Selection criteria included only Environment Cat B projects will be included in the program.

9 Apply pollution prevention and control technologies and practices consistent with international good practices as reflected in internationally recognized standards such as the World Bank Group’s Environmental, Health and Safety Guidelines. Adopt cleaner production processes and good energy efficiency practices. Avoid pollution, or, when avoidance is not possible, minimize or control the intensity or load of pollutant emissions and discharges, including direct and indirect greenhouse gases emissions, waste generation, and release of hazardous materials from their production, transportation, handling, and storage. Avoid the use of hazardous materials subject to international bans or phaseouts. Purchase, use, and manage pesticides based on integrated pest management approaches and reduce reliance on synthetic chemical pesticides.

Triggered International best practices including World Bank Group’s (IFC) EHS Guidelines will be implemented to control pollution from the project activities.

Page 12: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

8

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

10 Provide workers with safe and healthy working conditions and prevent accidents, injuries, and disease. Establish preventive and emergency preparedness and response measures to avoid, and where avoidance is not possible, to minimize, adverse impacts and risks to the health and safety of local communities.

Triggered Occupational EHS provisions will be made in the contract documents. MSEDCL’s operational practices has provisions for workers health and safety.

11 Conserve physical cultural resources and avoid destroying or damaging them by using field-based surveys that employ qualified and experienced experts during environmental assessment. Provide for the use of “chance find” procedures that include a pre-approved management and conservation approach for materials that may be discovered during project implementation.

Triggered Program activities will not encroach in any cultural resources.

18. Five of the Safeguard Policy Statement’s 12 IR principles will be triggered fully whereas 1 will be partially triggered; and 6 will not. The program’s negative impact is minimal. The program is demand driven and there will be no deterioration of affected persons’ livelihoods or physical relocation. The program will have mostly temporary impacts such as loss of crops and trees during installations of distribution lines but it is also marginal as the distribution line will follow roads and for the private property, be installed only when the owners wish to be connected upon receiving consent from them. A brief analysis on IR policy principles for the program is provided below in Table 3.

Table 3: Applicability of IR Safeguard Policy Principles # IR Policy Principle Triggered/Not

Triggered/Partially Triggered

Remarks

1 Screen the project early on to identify past, present, and future IR impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks.

Triggered MSEDCL, as per current practice, goes for government land and negotiated acquisition for the selection of substation site to avoid any IR and significant impact. However, this has not been recorded through a screening exercise. Therefore, screening procedure is needed to choose the substation site with proper recording.

2 Carry out meaningful consultations with affected persons, host communities, and concerned nongovernment organizations. Inform all displaced persons of their

Triggered Consultations have been undertaken, but not recorded by MSEDCL as per current practice.

Page 13: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

9

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and IP, and those without legal title to land, and ensure their participation in consultations. Establish a redress mechanism to receive and facilitate resolution of the affected persons’ concerns. Support the social and cultural institutions of displaced persons and their host population. Where IR impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by a social preparation phase.

These are mostly informal in nature during project planning, site selection and project implementation. Therefore, meaningful consultations need to be carried out with the affected persons and recorded during site selection, land negotiation and project implementation.

3 Improve, or at least restore, the livelihoods of all displaced persons through (i) land-based resettlement strategies when affected livelihoods are land based where possible or cash compensation at replacement value for land when the loss of land does not undermine livelihoods, (ii) prompt replacement of assets with access to assets of equal or higher value, (iii) prompt compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through benefit sharing schemes where possible.

Not Triggered There will be no loss of livelihood under the program as there is no involuntary acquisition of land or IR. Requirement of land per substation is approximately 40-meter X 40 meter. Compensation will be paid as per the negotiation.

4 Provide physically and economically displaced persons with needed assistance, including the following: (i) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of resettled persons economically and socially into their host communities, and extension of project benefits to host communities; (ii) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (iii) civic infrastructure and community services, as required.

Not Triggered No physical displacement is foreseen under the program. The size of land required for substations is small and to be on government owned land or will be through voluntary donation or direct purchase.

5 Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural

Not Triggered There will be no physical displacement and no IR under the program activities because of the

Page 14: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

10

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

areas provide them with legal and affordable access to land and resources, and in urban areas provide them with appropriate income sources and legal and affordable access to adequate housing.

small scale of the envisaged interventions. As far as vulnerability is concerned, MSEDCL usually does not purchasing land from vulnerable people, but there are measures to provide support to household who may be vulnerable.

6 Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status.

Triggered As per MSEDCL’s policy, any private land for 33/11kV substations must be obtained through negotiated settlement with the landowner. However, due to lack of proper recording, this principle is triggered.

7 Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of nonland assets.

Not Triggered In the current program, non-titled holders are not expected to be affected as the connections will be given only to those who has requested to MSEDCL for connection and who has land in their possession. The program covers farmers having titled land.

8 Prepare a resettlement plan elaborating on displaced persons’ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule.

Not Triggered Preparation of a typical Resettlement Plan is not necessary considering that the land, in case of privately owned, will be acquired through negotiated settlement. Land intake and the impact is minimal. Therefore, Due-Diligence containing the impacts, mitigation measures, cost etc. will be required to record the negotiated settlement and payment of compensation if any. Failure of negotiation will not lead to compulsory land acquisition and MSEDCL will find alternate site.

Page 15: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

11

# IR Policy Principle Triggered/Not Triggered/Partially

Triggered

Remarks

9 Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders.

Not Triggered Since there is no IR, therefore, preparation of resettlement plan is not required, hence, full disclosure is not needed.

10 Conceive and execute IR as part of a development project or program. Include the full costs of resettlement in the presentation of project’s costs and benefits. For a project with significant IR impacts, consider implementing the IR component of the project as a stand-alone operation.

Partially triggered Cost for land for substations, and PSSA implementation will be part of the overall program cost.

11 Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation.

Triggered MSEDCL has to pay compensation for direct purchase and/or loss of the other assets. Since payment of compensation is involved therefore, this is triggered.

12 Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by considering the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

Triggered There is no monitoring requirement for MSEDCL according to their current practice. Therefore, it is required under the program.

IP = indigenous people, IR = involuntary resettlement, kV = kilovolt, MSEDCL = Maharashtra State Electricity Distribution Company Limited. 19. The program area may cover some of the notified tribal areas (which will be known during the detailed assessment) for which adequate consultations and assessment will be undertaken. The program will not have any adverse impacts on indigenous peoples, their cultural identity, survival, cultural resources or livelihood systems. If there are any adverse impacts, these will be avoided through screening and consultation. Also, the IPs are not targeted beneficiary though the program will not exclude the IPs. Lastly, the villages are mostly electrified, and the benefit is improvement of supply to agricultural feeders rather than new connection, thus changes on culture or lifestyle of the IPs are not expected. However, as the screening of IP has not been done under the national regulations and MSEDCL’s practices, the Appendix 3 guides the client to screen the IP impacts of the program.

Page 16: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

12

III. ENVIRONMENTAL AND SOCIAL IMPACTS AND RISKS

A. Environmental Impacts 20. The program activities include construction and installation of new 33/11kV substations, 11kV distribution lines, distribution transformers and connections to agriculture customers. The unit of the activity under the Program is constructing substation, and providing line, transformer and connection. The developing water resource and installing pump are outside of the project scope, which are usually existing and managed by farmers already. The program activities will be implemented in rural areas of Maharashtra state. Activities that would be classified as category A under ADB’s Safeguard Policy Statement (2009)1 will not qualify for RBL support,2 and on the basis a safeguard screening guidance will be issued before first disbursement and applied by MSEDCL (zonal and divisional offices), the program is categorized B for environment. Activities located in or directly adjacent to key biodiversity area or national protected areas-including wildlife sanctuaries or reserves, forests, and cultural heritage sites, will be excluded from the program scope through the application of the safeguard screening guidance. Any excluded activities may remain included in the broader MSEDCL program.3 Therefore, the Program does not affect any environmentally/biologically sensitive areas. No forest clearance will be required in this Program as the expansion of the distribution network will occupy limited areas and will generally take place along existing roads and in agricultural fields with minimum disturbance to crops. 21. The program activities will not cause significant, irreversible, diverse, or unprecedented adverse environmental impacts. Potential construction-related impacts from pole and line installation include waste generation; soil erosion from site preparation activities; fugitive dust and other emissions (e.g., from vehicle traffic, land clearing activities, and materials stockpiles); noise and vibration from construction equipment and truck traffic; oil or fuel spills associated with construction equipment operation and fueling activities affecting soils and water bodies; and occupational and community health and safety hazards, including working at height and electrocution. Potential impacts during operation include waste generation (trimmed trees and replaced equipment), and oil spills or leaks from transformers. Potential risks to occupational and community health and safety include working at height and electrocution. Polychlorinated biphenyls (PCBs) are non-biodegradable with carcinogenic tendency, so its use in electrical equipment as insulating media has been banned all over the world long back. However, it has been reported in some studies that chances of contamination of oil with PCB in existing transformers is possible. All utilities in India (including MSEDCL) are taking all possible steps in association with regional testing laboratories for testing of existing oil for PCB traces. Results of tests suggests that PCB contamination is not an issue. 22. Additional stress on the ground water availability is anticipated as the program will provide connections to the agriculture consumers, which in will lead to additional agriculture pumps installed though the developing water resource and installing pump are outside of the Program scope. In the region. MSEDCL will select the activity sites with abundant groundwater supply and coordinate with irrigation department on this issue. If required, support will be provided under the program to ongoing/new programs of irrigation department to recharge ground water. 1 An activity would be classified as category A if it is likely to have significant adverse environmental impacts that are

irreversible, diverse, or unprecedented. ADB. 2009. Safeguard Policy Statement. 2 ADB. 2013. Piloting Results-Based Lending for Programs. Manila. RBL for programs will exclude activities that would

be classified as category A under the Safeguard Policy Statement (2009). 3 ADB. 2013. Piloting Results-Based Lending for Programs. Manila. Activities excluded from the RBL program may

remain included in the broader government program.

Page 17: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

13

B. Social Impacts 23. There will be no involuntary land acquisition and IR in the program activities. The impacts are envisaged to be temporary and is considered is not significant under the program, hence, the Program is categorized as “B” for the IR, as per ADBs Safeguard Policy Statement, (2009). The program is need-based and customer driven activity on their own initiative. The MSEDCL will provide connections only to the agriculture customers who wish to have an improved supply of electricity. All investment cost (approximately U$3,800/household) is born by MSEDCL without any contribution from farmers, and electricity bill is also subsidized (approximately Rs. 4/kWh) by the government. Due to this nature, the system is not provided to each household in the region but only households who have need for better reliable electricity connection for irrigation voluntarily apply for the program. The proposed HVDS will include small scale physical interventions by expanding the distribution network to agricultural farmers through the 33/11 kV distribution system which includes activities such as constructing 33/11 kV substations and installation of 11kV lines and distribution transformers. 24. Each 33/11 kV new substation will require approximately 0.16 (40 meters X 40 meters) hectares of land amounting to a total of approximately 19.36 hectares4 of land. The land is mostly proposed on government barren land which is usually procured through inter-departmental transfer. In case of private land, the land is procured through either (i) donation; or (ii) direct purchase through negotiated settlement. In the event the seller is not interested in donating or selling, or if the negotiation fails, then alternative land will be found by MSEDCL. In any of the case, there will be no compulsory land acquisition under this program. MSEDCL has its own policy for land purchase which was publicly announced as of July 2015. MSEDCL explores public land first and then private land second and tries to avoid schedule tribe area. For public land, MSEDCL proposes land transfer plan to district collector (DC) and receives no objection certification (NOC) from relevant government authorities. For private land, MSEDCL advertises land purchase need to local newspapers, and receives requests from owners. After reviewing ownership documents, conducting joint measurement surveys, and getting confirmation from neighboring owners, MSEDCL negotiates rate with the owners. MSEDCL has never forced owners to sell land or expropriate the land, there will be no compulsory land acquisition using the eminent domain. This is a principle applicable for program activities and in the general operation of MSEDCL for distribution projects. Maharashtra government adopted a direct purchase method through negotiation and MSEDCL practices do not imply expropriation based on eminent domain. Also, a copy MSEDCL’s land purchased policy related to negotiated settlement is provided in Appendix-1. 25. As far as the lines are concerned, the DTs are placed on poles and the lines are pole-based which does not require any land acquisition. The distribution line will be carefully designed to follow existing right of way of roads or public property. Impacts related to distribution lines are foreseen in terms of temporary loss of small-scale crops and some high rising trees. These impacts are usually avoided by keeping the construction activities during the off-crop season and placing the poles along the parcel boundary and not through the middle of any land parcel. In the case of marginal unavoidable trees or crops loss, the sub-project will not proceed without the consent of the owner. Base on practices, people usually voluntarily provide their land or allow for construction of the lines as they receive direct benefits. The program will provide last mile connection which traverses very short length from the current feeders. In addition, the 11-kV pole 4 A total of 121 proposed new 33/11 kV substations at 40mx40m of land equivalent to 1,600 square meters of land per

substation.

Page 18: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

14

requires only 20 * 30cm or less land for erection. Thus, the program will not traverse through middle of other farmer’s land, and there will be no hindrances to other farmers who are not beneficiaries. 26. The program is categorized as “C” for IP. The program’s activities may cover some notified tribal areas5 considering the vast program area across Maharashtra state. However, the program will be a customer driven activity which is voluntary, and donation based. MSEDCL will provide HVDS connections for the agricultural feeders only to households who wish to have the connections. The customer could be from some notified tribal areas considering the vast program location across the state of Maharashtra. Thus, the program is individual household demand driven and not targeted to the communities. Within a village community some farmers may demand while some others would not. The Constitution of India identifies scheduled areas, which are predominately inhabited by such people. However, only sub-projects will be undertaken which are requested by the owners and communities willingly. It is also pertinent here that, being agriculture feeders, the customers including the IP customers possess land and they are not vulnerable. In addition, there will be no large-scale construction activities involved under the program and there will be no involuntary land acquisition and physical displacement in the Program. The program will not have any adverse impacts on IP, their cultural identity, survival, cultural resources or livelihood systems. It is anticipated that there would not be targeted or tailored positive impacts on IPs in those areas. Thus, the Program is categorized as “C” for IP. 27. The scope and nature of the program is limited to agriculture connections through HVDS. The overall objective of the program is to improve electricity distribution network via a dedicated HVDS system to agricultural farmers which will have positive impacts on the overall socio-economic development of the area. The program will target people in general and will not specifically target IP. No scheduled tribes or minorities or indigenous communities are anticipated to be impacted negatively due to the program. The sub-projects which can be either A or B will be ruled out. 28. Details on impacts related to IR under the program activities are described in the table below.

Table 4: Social Safeguards Impact in Program Activities Program Activities Land Acquisition and IR

Impacts

Establishing 121 number of new 33/11 kV distribution substations

Total land requirement is 19.36 hectares for 121 number of 33/kV substations. No compulsory land acquisition by eminent domain will be applied. Government owned land will be transferred to MSEDCL as per departmental transfer mechanism and the privately-owned land will be availed either through voluntary donation or through direct purchase by negotiated settlement.

5 Palghar, Nasik, Dhule, Nandubar, Jalgaon, Nanded, Yavatmal, Amaravati, Gadchiroli and Chandrapur

Page 19: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

15

Program Activities Land Acquisition and IR Impacts

11 kV distribution lines No land acquisition is required for the poles. Lines are proposed along the roads and edge of agricultural plots. In case of any crop damage, the losses will be compensated. Hence, there is no impact on land acquisition and IR.

Installation of 132,600 HVDS distribution transformers

DTs will be installed in two poles which does not require land acquisition.

DT = distribution transformers, IR = involuntary resettlement, kV = kilovolt, MSEDCL = Maharashtra State Electricity Distribution Company Limited.

IV. DIAGNOSTIC ASSESSMENT A. Assessment Methodology and Resources 29. The assessment incorporated a review of government laws and regulations pertaining to safeguards, MSEDCL guidelines/circulars and guidance related to activities under the program scope and safeguards, and other MSEDCL documents, such as manuals, standards bidding documents and technical specifications, monitoring reports related to the program scope. 30. Meetings and extensive discussions were held with key MSEDCL staff at headquarters in Mumbai, and with MSEDCL regional (circle, division and section) offices in Baramati (Pune district), Nasik (Nasik district), Latur (Latur district) and Amravati (Amravati district). Field investigations of existing 11kV distribution lines and 33/11kV substations were conducted in Malegaon (Pune district), Chandwad (Nasik district), Astha (Latur district), Madhan (Amravati district), in the month of January 2019. Besides existing facilities, assessment of sites/locations of the 11kV distribution lines and 33/11kV substations proposed under RBL program has also been undertaken as part of program preparation due diligence for four substation locations and lines under the program activities, one each from four regional offices of MSEDCL in the month of January 2019. The sites visited included Karahawgaj (Pune district), Tisgaon (Nasik district), Gharini (Latur district), and Belora (Amravati district. Each sample location includes one existing system and one proposed system which becomes eight samples in total for the four locations. Interviews were held with (i) state and district level environment agencies i.e. Maharashtra State Pollution Control Board, District Forest Departments etc. to validate the environmental assessment and monitoring and reporting procedures related to the program scope; and (ii) community stakeholders, landowners, IP, district and village offices to gather information on their perspectives about MSEDCL’s safeguard implementation practices for distribution system. Consultation meetings were held with the MSEDCL officials in Mumbai headquarters in the months of October 2018, January 2019, and February 2019, to obtain their views, suggestions, and recommendations on the draft PSSA. 31. Additionally, site visit was made by the ADB team to undertake due diligence for existing operation. The team visited Belgaon Dhaga village under Nasik Tehsil district and met with beneficiaries to see how the activity is implemented on the field. The Belgaon Dhaga 33/11kV substation is 40 × 40m and maintained in a good condition without any spills and wastes left over the site. The lines are following the common village roads or un-used lands between agricultural plots, and transformers are located between poles located edge of the plots. Each pole is

Page 20: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

16

occupying only 20 × 30 cm of land. 32. Special attention was given to conduct public consultations in program areas on a sample basis which included local people and beneficiaries. Additional consultations were also carried out among the women in the sampled locations. The objective of the consultations was to discuss the safeguard’s requirements and specially to gather information on people’s acceptability and support for the Program. Consultations were held at various program intervention villages at 8 locations having a total of 70 participants (45 male and 25 female) such as (i) Astha having 12 participants; (ii) Gharni having 12 participants; (iii) Malegaon Khurd having 5 participants; (iv) Karhawagaj having 11 participants; (v) Ganoor having 6 participants; (vi) Tisgaon having 11 participants; (vii) Madhan having 3 participants; and (viii) Beloda having 11 participants. Additionally, consultations among women have been carried out at 4 locations having a total of 25 female participants. Feedback about the Program was welcoming, with participants expressing their support. Summary details of the consultations are provided in Table 5 below and detailed record of consultations is provided separately in Appendix 2.

Table 5: Summary Findings of Public Consultations Issues Discussed People’s Views and Perception

Information about the project Most of the villagers during the consultation reported that they have some information regarding the proposed project. They are aware that separate transformers will be provided to the farmers.

Opinion about this project Almost all of them agreed that the project is beneficial for the farmers, as pumps can be operated without any disturbance. Issues such as low voltage, overloading problem will be minimised after the proposed project. Better electricity supply will help the income of the farmers with more crops and production.

Support to this project All the participants expressed their full support to this project. Average landholding size The average landholding size is 4 to 5 acres (1.82-2.02 ha).

Status of electrification Almost all the villages are fully electrified.

Status on separate agriculture connections in the village

In all the villages agriculture connections are available However, 40 to 50% of the households have a separate connection.

Out of the total agricultural pumps how many are electrified?

In almost all the villages it was found that all the agricultural pumps are electrified.

What is the average horsepower of the pumps? Average horsepower of the pumps is 5HP.

How many farmers depend on one pump and how do they manage? Who is responsible for getting the pump installed and maintenance including the payment of electricity bills?

On average one farmer depends on one pump. The farmer is responsible for getting the pump installed and maintenance including the payment of electricity bill.

How many hours of electricity is available and what is the average electricity bill?

On average in the daytime electricity is available for 8 Hours, while at night times it is available for 10 hours. Average quarterly bill for a 5HP pump is Rs 3000.

How much land can be irrigated with an average size of a horsepower pump?

With a 5HP pump a 3 acre to 4-acre (1.21 – 1.81 ha) plot can be irrigated.

How much expenditure does it take for a diesel-based pump to run for one hour?

On average for a 5HP diesel-based pump to run for one hour the expenditure is Rs 3000 quarterly.

Page 21: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

17

Issues Discussed People’s Views and Perception How electrified pump will be beneficial? Electrified pump is beneficial for the farmers than diesel pump

as it is cheaper and easy to manage. What are the major crops? The major crops are Jewar, Wheat, Sugarcane, Gram,

Soyabean, and Tuar Dal Problem regarding current electric supply as far as home connection and agriculture connections are concerned

The common problems faced by the farmers are low voltage, overloading caused regular fault, and damaged distribution transformer center (DTC). Repairing of transformer is not easy and tripping is regular.

Do you think that the project is necessary?

Almost all the villagers opined that the proposed project is necessary for the farmers.

Main concerns/issues about the project Timing of repairing and maintenance is a big issue for farmers. Farmers suggested that the repair work should be carried out during no crop season. Also, people do not like to work during night time specifically for the electrical work.

Can you suggest how best to address your concerns/issues?

Better management system required for maintenance. Regular visit by the line men and agency will address the problems.

View on loss of crops and trees during construction.

All the villagers mentioned that they did not anticipate loss of crops/ land/ trees etc. during construction.

Would you volunteer to donate or sell the land for the project?

Private land provided by the local farmers is already one of the practices for land acquisition.

Do you expect any kind of compensation if there is loss to land or crops or trees?

Most of the villagers reported that they do not want any compensation as the project is in their interest. Some others informed that cash compensation is already discussed by the MSEDCL.

Positive impacts and/or benefits from the project

Several positive impacts foreseen by the project. By the separate DTC regular high voltage power/ current will be available and production will be increased. Ultimately income of the farmers will increase.

Safety of the distribution feeder The distribution feeder is 100% safe. Any suggestion for project design, construction and operation stage

All the villagers opined that fencing in and around the DTC is required.

Any IP/ tribal people or ethnic minority living in this area In 50% of the villages there are no tribal population

(Scheduled Tribe). In the remaining villages around 5% HHs belong to the ST category.

Environment Protected areas (national park, protected forest, religiously sensitive sites, and historical or archaeological sites)

All the villagers reported that there is no protected land near the villages.

Access to the forest land and the use of the forest land (if any)

In all the villages except one, there is no forest land. In one village the villagers reported that 3-acre (1,21 ha) forest land is available but not use by the department of forest.

Current environmental conditions in the area

Almost all the villagers mentioned that environmental condition is clean, and no such pollution is there.

Will the project sitting adversely impact the water or soil resource in the locality?

The project sitting will not adversely impact the water or soil resource in the locality.

Type of trees in the area Neem and Babool Wild, endemic, endangered animals in the area. Wild pig, Deer and Peacock

Page 22: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

18

Issues Discussed People’s Views and Perception Shortage of water for human consumption and irrigation

No rain from the last 6 years, so during summer season shortage of water is noticed. There is shortage of water for the irrigation during summer period.

What is the general ground water level in this area and negative impact of agriculture pumps on ground water?

Most of the villagers opined that the ground water available at about 150 feet. The pumps will not impact the ground water level and the pumps are installed at about 250-300 ft.

Main source of drinking water Bore well at deep groundwater, and piped water supplied by Gram panchayat.

Any conflicts on water use rights and social impacts No conflicts on water use rights and social impacts.

Health status and availability of hospitals

In majority of the villages there are no such common health problems. In a few villages there are cases of blood pressure and sugar. Sub centre facility is available in the village. In case of any emergency people use to visit civil hospital or government hospital.

Is the consultation useful? All the villagers opined that the consultation is very useful for them.

Support and participation during the implementation of Project

All the villagers extended their full support and held that they would like to participate during the implementation of the project.

Any other Suggestions Installation of DTs should be completed within 6 months. Ensure maintenance of facility with very short period in the case of fault. Management committee required to run the facilities smoothly.

DTC = distribution transformer center, DTs = distribution transformers, HHs = households, HP = horsepower, MSEDCL = Maharashtra State Electricity Distribution Company Limited, ST = scheduled tribe

Page 23: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

19

B. Policy Equivalence Assessment

1. Environmental Policies Assessment 33. The Safeguards Diagnostic Assessment summarizes the result of the diagnostic assessment of the government’s current system (policy and legal frameworks) and MSEDCL practices, as well as the gap between them and the ADB’s Safeguard Policy Statement (2009) regarding the environment safeguards. 34. Policy and legal frameworks. India has a well-defined institutional and legislative framework for environment safeguards. The legislation covers all components of environment such as air, water, soil, terrestrial and aquatic flora and fauna, natural resources, and sensitive habitats. The environmental legislations in India are framed to protect the valued environmental components and comply with its commitment to international community under various conventions and protocols as well. 35. The legal framework of the country consists of several acts, notifications, rules, and regulations to protect environment and wildlife. The umbrella act in India is Environment (Protection) Act, 1986 and key instrument for environmental assessment is the Environmental Impact Assessment (EIA) Notification, 2006 (amended till date. Other acts and regulations are the Forest (Conservation) Act 1980 (Amended 1988) and Rules 1981 (Amended 2003): the Wildlife (Protection) Act, 1972 (Amended 1993); the Biodiversity Act, 2002; the Water (Prevention and Control of Pollution) Act 1972 (Amended 1988) and Rules 1974;the Air (Prevention and Control of Pollution) Act, 1981(Amended 1987) and Rules 1982;the Noise Pollution (Regulation and Control) Rules, 2000 (Amended 2002) and Hazardous Waste (Management, Handling and Trans-boundary Movement) Rules 2008 (Amended 2009 and 2016); Batteries (Management and Handling) Rules, 2001, and Region Depleting Substances (Regulation and Control) Rules, 2000. 36. The Environment (Protection) Act, 1986 has been enacted to provide for the protection and improvement of environment by preparation of manuals, codes or guides relating to prevention, control and abatement of environment pollution. This Act is an umbrella legislation that provides a single focus for the protection of the environment and seeks to plug the loopholes of earlier legislation relating to the environment. 37. The EIA Notification, 2006 and its amendments provide for conducting EIA studies and obtaining environmental clearance from Ministry of Environment, Forest and Climate Change (MoEFCC) or State Environment Impact Assessment Authority (SEIAA). The schedule of the notification provides criteria for categorizing projects into A and B categories based on the magnitude and scale of the impacts associated with the project and provides for incorporating environmental safeguards in the project planning phase. The category A and B projects require environmental clearance from MoEFCC and State Environment Impact Assessment Authorities. As per this notification, power distribution projects were not listed as environmental sensitive projects and hence environmental clearance is required for the project. However, forest clearance from Maharashtra State Forest Department will be required only in cases where program activity is constructed on forest areas or requires cutting of trees in forest areas. 38. India is also a party and signatory to several international and regional environmental treaties, agreements and conventions, to which the MoEFCC is the national focal point. Key international agreements that India is signatory to and relevant for the project are provided below:

Page 24: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

20

• Convention Relative to the conservation of Flora and Fauna in their Natural State (1933)

• International Plan Protection Convention (1951) • Convention on Wetlands of International Importance, Especially as Waterfowl

Habitat (Ramsar, 1971) • Convention concerning the Protection of the World Cultural and Natural Heritage

(Paris, 1972) • Convention in International Trade in Endangered Species of Wild Fauna and Flora

(Washington, 1973) • Convention on Migratory Species of Wild Animals (Bonn, 1979) • Convention on the Prior Informed Procedure for Certain Hazardous Chemicals and

Pesticides in International Trade (PIC or Rotterdam, 1990) • United Nations Framework Convention on Climate Change (Rio De Janeiro, 1992) • Convention on Biological Diversity (Rio De Janeiro, 1992) • Protocol to the United Nations Convention on Climate Change (Kyoto, 1997)

39. MSEDCL Practices. Environmental, health and safety mitigation measures as specified in the government’s Electricity Act, 2003 as associated laws and rules including (i) Central Electricity Authority (CEA) (Measures relating to Safety and Electric Supply) Regulations, 2010 and amendment Regulation 2015 (as amended time to time); (ii) CEA (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) Regulation, 2011; and (iii) Maharashtra Electricity Regulation Commission (Electricity Supply Code and other conditions of Supply), Regulations, 2005, are being followed by MSEDCL in its planning, design and operations. 40. As a rule, and common practice for the selection of sites for the substations and optimal routing of the distribution lines, MSEDCL avoid forest areas and other environmentally sensitive areas such as national parks, wildlife sanctuaries and other ecological sensitive as well as settlement. Following points are taken into consideration while selecting route/sites. • The route of the proposed lines does not involve any human displacement/rehabilitation. • Any monument of cultural or historical importance is not affected by the route of the line. • The proposed route of line does not create any threat to the survival of any community with

special reference to Tribal Community. • The proposed route of line does not affect any public utility services like playgrounds, schools,

other establishments etc. • The line route does not pass through any forests, national parks, wildlife sanctuaries etc. • The line route does not infringe with area of natural resources.

41. Distribution lines are generally routed along the existing roads within the road right of way or through agriculture fields (in case of connections to the customers) and distribution substations are generally located on the outskirt of the villages mostly on the land belongs to gram panchayats (village land owned by government). During the due diligence site visits for the proposed RBL program, it was confirmed that all the visited sites for distribution lines are routed along the road and substation sites are located on government owned. The existing substations are generally located away from the habitation areas and mostly surrounded by agricultural or open land. The land ownership belongs to the MSEDCL. There are no protected areas or forests within 2 km

Page 25: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

21

radius of the substations. The substation premises are properly fenced with barbed wires and well secured. The substation areas are generally clean and clear of any waste/garbage. Adequate water supply and proper drainage system is provided in each substation. In some sub-division substations, there are facilities to collect and store transformer oil from failed transformers and storage in drums. In the substations where these facilities are not available at sub-division level then the transformer oil is transported to the regional facilities. 42. MSEDCL restricts the use of herbicides during tree trimming and clearing. In case cutting of trees required, necessary permits are obtained by MSEDCL from forest department and local district administration. 43. MSEDCL conduct consultations with local communities and landowners as part of selection of locations of distribution system particularly while selecting location of substations. Local land administration and forest department are also consulted prior to finalization of the sites. Records of these consultations are documented as part of planning documents. 44. As part of design MSEDCL also specifies that transformers should not contain PCBs, and that electrical equipment including power circuit breakers containing sulfur hexafluoride must comply with the international standards such as American National Standards Institute and International Electrotechnical Commission. MSEDCL technical specifications also specify that the transformers, capacitors, and other electrical equipment will not contain any PCBs. 45. There are two main environmental issues involved with the operation of the substations: (i) management of transformer oil from failed/damaged transformers including spills/leaks; and (ii) handling and disposal of phased out transformers and other electrical equipment. The services for the maintenance and repairs of out of order transformers are being provided by MSEDCL. If found during inspection or on receipt of online/mobile complaint from consumer, MSEDCL lineman staff coordinating to bring transformer at division office. In general, an agency is hired by MSEDCL to repair the failed transformer. The staff from approved (by MOEFCC to handling of hazardous waste) contracted third party will take transformer from sub-division/division. Before, handing the transformer to hired agency, oil is drained out in drums for filtration and reclamation. For filtration and reclamation of used transformer oil another approved vendor is also outsourced to provide oil filtration and reclamation. The outsourced vendors must be licensed by State Pollution Control Board to carry out oil reclamation activities at their facility and proper disposal of sledge/waste as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. The vendors collect oil in drums and supply reclaimed oil back to MSEDCL sub-division/division. At division/sub-division the oil is filled in repaired transformers. The other waste generated from existing feeder line and sub-station include used conductor, damaged insulators and poles. These wastes generally recycled through auction by MSEDCL. 46. To address potential risks to workers’ health and safety, MSEDCL established an occupational health and safety management system (which also includes a Safety Manual), which has been strictly implemented with penalties imposed on contractors for noncompliance. Each MSEDCL divisional office submits occupational health and safety and environmental performance reports to Zonal Office and Zonal office then submits it to MSEDCL headquarters on a quarterly basis. MSEDCL also established a robust system6 to manage workers/staff as well as community health and safety aspects during construction and operation of its facilities. It has formulated safety guidelines and manual, which are communicated to communities by the Department of

6 MSEDCL has dedicated department (Department of Training and Safety) within its organization structure responsible

for managing health and safety aspects during construction and maintenance phases on the its facilities.

Page 26: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

22

Training and Safety of MSEDCL. The local communities also confirmed it during consultations carried out as part of due diligence site visits. 47. MSEDCL has established an effective complaints management system as provided under MERC (Consumer Grievance Redressal Forum & Electricity Ombudsman) Regulations, 2006. Consumer Grievance Redressal Forums are established at all Zonal level offices of MSEDCL and these forums follows the principles of natural justice, inter-alia which states that (i) it shall protect the interest of consumers; and (ii) it shall facilitate and expedite the redressal of grievances. This system is available to all customers of MSEDCL throughout the state and accessible through the call center which can be accessed by anyone anywhere through the (i) MSEDCL website, email, telephone, or social media; (ii) online by using consumer grievance system available at MSEDCL website; and (iii) through customer services. The existing mechanism has three three-tier system at different levels as (i) internal grievances redressal cell (IGRC); (ii) consumer grievances redressal forum (CGRF); and (iii) electricity ombudsman. The system addressed complaints regarding distribution networks, including those related to construction impacts, the environment, community health and safety, and resettlement issues. It also deals with grievances of workers and staff as per national regulatory requirements. 48. Gaps identified. Some regional offices do not prepare environmental documents for distribution lines as it is not a mandatory requirement for them, including those in or directly adjacent to protected areas. Regional offices in these areas lack information on the location of the protected areas and there is no proper demarcation that could be used for screening. Some contractors do not dispose trimmed tree branches properly but leave them on private land without the landowners’ permission. Field investigations also noted that, in some areas, safety clearances of distribution lines with neighboring houses and trees were not in accordance with the prescribed clearance standards due to structures that were built and trees that grew or were planted after the installation of the distribution lines.

49. There are also general flaws in waste management. Replaced equipment generated by distribution line maintenance—such as poles, cables, transformers, and meters—accumulate at substation premises, warehouse sites, and most are stored in open areas without soil protection. The current assets and waste disposal system requires several verification and administrative procedures, which have resulted in disposal delays and storage at warehouse sites for long period up to six months. Field investigators also noted oil spills from replaced transformers at the substations and warehouse sites and areas where oil-draining activities were being done. 50. Although MSEDCL zonal and divisional offices submit quarterly environmental performance reports to headquarters, these focus on the environmental impacts of substations and do not cover distribution lines. 51. Based on the assessments undertaken, the environment safeguard system currently in place through the government’s environmental laws and regulations is in general complying with the ADB’s Safeguard Policy Statement (2009) principles that are triggered for the proposed activities. However, MSEDCL must improve current practices by ensuring compliance with the government’s environmental requirements, ADB Safeguard Policy Statement (2009) environmental assessment requirements, as well as International Finance Corporation Environmental, Health and Safety (IFC EHS) General Guidelines (2007) and IFC EHS Guidelines for Electric Power Transmission and Distribution (2007). MSEDCL must screen all activities included in the program and must obtain the necessary information regarding protected and key biodiversity areas (including protected and reserved forest areas) to enable the screening and exclusion of activities in or directly adjacent to protected areas and key biodiversity areas from

Page 27: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

23

the program scope. Environmental management can also be improved by preparing and implementing environmental documents and associated management procedures as required by the government’s laws and regulations. The management of wastes can be improved by: (i) cleaning up existing oil spills and ensuring spills/leaks on impermeable bunded to 110% surfaces to avoid the contamination of soils; (ii) equipping substations and warehouse sites with oil containment and protection/emergency measures; (iii) improving the administrative process of assets and waste disposal; (iv) securing the appropriate permits for the storage and disposal of hazardous waste; (v) properly recording the waste storage and disposal; and (vi) reviewing Occupational Health and Safety (OHS) records in terms of incidents, any improvements needed to reduce number of minor, lost time, and fatal incidents. Community safety can be further enhanced by building proper awareness program about possible accidents and regularly trimming trees around existing distribution lines. 52. Table 6presents a comparison of the environmental requirements of ADB and the government, and recommendations to meet the identified gaps.

Table 6: Comparison of Environmental Requirements of ADB and GOI Project Stage ADB GoI MSEDCL Gaps for RBL and

Recommendations Screening and Categorization

• Uses sector-specific rapid environmental assessment checklist for screening

• Assigns categories based on potential impacts: A - EIA

required (irreversible, diverse or unprecedented adverse environmental impacts)

B - IEE required

C - no environmental assessment required but a review of environmental implications is required

FI - ESMS required

• EIA Notification (2006; as amended in 2009) set screening criteria to classify new and expansion projects based on potential environmental impacts as follows: category A, B1 and/or B2.

• The category determines the level of environmental assessment.

• Categorization as per GoI EIA Notification.

• As per the Indian regulations, the EIA is mandatory for eight types of project activities including mining, power generation, primary processing, materials production and processing, specific manufacturing and services sectors, infrastructure and construction. Under each category, the threshold limits are specified when it is mandatory to conduct an EIA.

• Power Distribution projects are not listed as environmental sensitive projects.

• Each project activity will be screened and categorized using ADB REA Checklist.

• MSEDCL will assess each

Page 28: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

24

Project Stage ADB GoI MSEDCL Gaps for RBL and Recommendations

category B activity for environmental impacts using due diligence template developed as part of ESMS (Appendix 3). An EMP will also be developed for each activity (using generic EMP).

• Category A projects are not eligible for RBL in ADB.

Environmental Assessment

• Identify potential impacts on physical, biological, physical cultural resources, and socioeconomic aspects in the context of project's area of influence (i.e., primary project site and facilities, and associated facilities)

• Category A. Require Prior EC from Central Government in the MoEFCC through recommendation of EAC.

• Category B. Category B 1 projects require prior Environmental Clearance from SEIAA through recommendations of State Expert Appraisal Committee (SEAC).

• Category B2. Does not require EIA, goes directly to Appraisal stage based on initial assessment.

• As per GoI EIA Notification.

• Power Distribution projects are not listed as environmental sensitive projects

• Projects under RBL will be screened and environmental due diligence will be carried out.

Analysis of Alternatives

• Examine alternatives to the project's location, design, and technology

• Document rationale for selecting the project location, design, and technology

• Consider "no project" alternative

• Compares feasible alternatives to the proposed projects site, technology, design and operation including the -without project‖ situation in terms of their potential environmental impacts, the feasibility of mitigating these impacts, their capital and

• Compares feasible alternatives to the proposed projects site, technology, design and operation.

• Under the National Law, Distribution projects have the right of way

• In such cases, however, to comply with the SPS (2009), analysis of alternatives needs to be carried out.

Page 29: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

25

Project Stage ADB GoI MSEDCL Gaps for RBL and Recommendations

recurrent costs, their suitability under local conditions and abatement.

Meaningful Consultation

• Starts early and continues during implementation

• Undertaken in an atmosphere free of intimidation

• Gender inclusive and responsive

• Tailored to the needs of vulnerable groups

• Allows for the incorporation of all relevant views of stakeholders

• Public consultation required to be undertaken through public notice prior to the approval by the MoEFCC only for Category B1 and A projects.

• Starts at a later stage in the project cycle

• Consultations are carried out at planning stage as part of site selection for a project and continues during construction stage.

• No specific requirements for gender balance and vulnerable groups. There are no major gaps

• The public consultation will start at an early stage in the project cycle and it will also focus on gender balance and vulnerable groups.

Information Disclosure

ADB will post in its website the following: • A draft full EIA

(including the draft EMP) at least 120 days prior to ADB Board consideration, and/or environmental assessment and review frameworks before project appraisal, where applicable;

• The final EIA/IEE; • A new or updated

EIA/IEE and corrective action plan prepared during project implementation, if any; and

• The environmental monitoring reports.

• Information disclosure required to be undertaken through public hearing prior to the approval by the MoEFCC only for Category B1 and A projects.

• Information disclosure through MSEDCL website as well as through circle offices

• No major gaps • PSSA and other

program related safeguards documents will be disclosed on MSEDCL website.

Grievance Redress Mechanism

• Establish a grievance redress mechanism to receive and facilitate resolution of grievances or complaints

• Grievance Redress Mechanism is not mentioned in the regulations

• Well established grievance redress mechanism is available to deal with complaints.

• No gap of proposed RBL implementation.

Use of Environmental Standards

• Refers to IFC EHS • If national

regulations differ,

• The Environment (Protection) Rules, 1986

• The Environment

• The limiting value of some pollutants specified in the

Page 30: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

26

Project Stage ADB GoI MSEDCL Gaps for RBL and Recommendations

more stringent one will be followed

• If less stringent levels are appropriate in view of specific project circumstances, provide full and detailed justification

• Various legislations addressing aspects such as air and water pollution, hazardous substance management, etc.

• Occupational health and safety standards included in the Factories Act (India) and various India specific Labor Laws

• National Ambient Air Quality Standards as per (MoEFCC notification G.S.R 826(E), dated 16.11.2009) and in compliance with the Air (Prevention and Control of Pollution) Act, 1981(Amended 1987) and Rules 1982.

• Noise Standards as per the Noise Pollution (Control and Regulation) Rules, 2000 (Amended 2002).

• Water quality standards as per MoEFCC notification No. GSR 742(E), Dt: 25.09.2000) and in compliance with the Water (Prevention and Control of Pollution) Act 1972 (Amended 1988) and Rules 1974.

(Protection) Rules, 1986

• Various legislations addressing aspects such as air and water pollution, hazardous substance management, etc.

• Occupational health and safety standards included in the Factories Act (India) and various India specific Labor Laws

Indian regulatory standards maybe different than those specified in EHS guidelines and hence some gaps in certain situations.

• The more stringent one will be followed for ADB projects including WB EHS Guidelines.

Monitoring and Reporting

• Prepare monitoring reports on the progress of EMP implementation

• Retain qualified and experienced external experts or

• Post (EC) monitoring is stipulated by the regulations, with semi-annual compliance reports to be made

• Monitoring system is in place for MSEDCL activities.

• No major gaps. Additional monitoring measures are proposed for RBL.

Page 31: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

27

Project Stage ADB GoI MSEDCL Gaps for RBL and Recommendations

NGOs to verify monitoring information for category A projects

• Prepare and implement corrective action plan if non-compliance is identified

• Requires regular monitoring reports to ADB for review and disclosure.

available as public documents.

• Latest report displayed on website of regulatory authority

EAC = expert appraisal committee, EC = environmental clearance, EHS = environmental health and safety, EIA = environmental impact assessment, EMP = environmental management plan, IEE = initial environmental examination, MOEFCC = Ministry of Environment, Forest and Climate Change, MSEDCL = Maharashtra State Electricity Distribution Company Limited, NGO = non-government organization, RBL = results-based lending.

2. Social Policies Assessment

53. Policy and legal frameworks of India: The Government of India has adopted the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR-2013). Its scope includes tribal areas, scheduled areas, "non-cadastral" lands in scheduled tribal areas. The Act has consolidated various laws, regulations, guidelines, and international best practices pertaining to IR and IP. The aims and objectives of the Act include: (i) to ensure, in consultation with institutions of local self-government and Gram Sabhas established under the constitution of India, a humane, participative, informed and transparent process for land acquisition for industrialization, development of essential infrastructural facilities and urbanization with the least disturbance to the owners of the land and other affected families; (ii) provide just and fair compensation to the affected families whose land has been acquired or proposed to be acquired or are affected by such acquisition; (iii) make adequate provisions for such affected persons for their rehabilitation and resettlement; and (iv) ensure that the cumulative outcome of compulsory acquisition should be that affected persons become partners in development leading to an improvement in their post-acquisition social and economic status and for matters connected therewith or incidental thereto. However, Maharashtra government decided to take a direct negotiated purchase for land acquisition of public projects. the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR-2013) is not going to be applied for the program. 54. The Electricity Act (2003) as amended in 2007 has also been taken into consideration. Section 67 and 68 of Part-VIII and Section 164 of part-XVII are relevant. The Electricity Act makes provision for payment of compensation for acquiring land and refers that land will be acquired as per LAA, 19847. This is primarily relevant to the substations. The Electricity Act has the provision for issuing notification to all the concerned villages and people prior to any construction activities. As far as the trees or crops or structure near the overhead line is concerned, it does not say directly about payment of compensation, however, if the competent authority thinks deem fit, then compensation may be paid. 7 This still refers to LAA, 1894 because the the LARR 2013 came later than the Electricity Act 2003, the Electricity Act

2003 still mentions LAA 1894 though it is now null and void.

Page 32: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

28

55. Indian Telegraph Act (1885) has also been taken into consideration for its relevant applicability. Part-III of the Act8 is applicable for transmission and distribution projects. The Indian Telegraph Act does not have any provision for permanent land acquisition except for payment of compensation for construction of lines and towers as temporary impacts. The Indian Telegraph Act, 1885 is usually followed, which does not have any provision of land acquisition for construction of transmission pillars and lines. The act exercises the power to remove any trees interrupting the transmission lines, however, subsection of section 18 of the Act provides the opportunity for compensation for cutting the trees if the tree is in existence before the telegraph line was placed. The telegraph authority may, from time to time, place and maintain a telegraphic line under, over, along or across, and post in or upon, any immovable property provided that the telegraph authority shall not exercise the powers conferred by this section except for the purpose of a telegraph established or maintained by the central government, or to be so established or maintained. If any tree standing or lying near a telegraph line interrupts, or is likely to interrupt, telegraphic communication, a magistrate of the first or second class may, on the application of the telegraph authority, cause the tree to be removed or dealt with in such other way as he deems fit. When disposing of an application under sub-section (1), the magistrate shall, in the case of any tree in existence before the telegraph line was placed, award to the persons interested in the tree such compensation as he thinks reasonable, and they shall be final. 56. State Level: The Government of Maharashtra has adopted its policy on R&R called the "The Maharashtra Project Affected Persons Rehabilitation Act, 1999" as modified up to 2006. The applicability of the policy includes to (i) all irrigation projects of which the area of the affected zone exceeds 50 hectares, or the area of the benefited zone exceeds 200 hectares or a Gaothan is affected, and (ii) all projects, other than irrigation projects such as industry including industrial estate, atomic park, sanctuary, mines, etc. However, the entire responsibility to execute them and to rehabilitate the project affected persons shall rest with the concerned department of the government of Maharashtra by entering into an agreement with the concerned project authority or body. It shall not apply to projects falling under the jurisdiction of inter-state projects; and the rehabilitation work financed by the external agencies and countries. This policy will not apply to the proposed program. 57. For land acquisition, the Maharashtra government took decision to acquire private land directly through negotiation for public projects 9 . The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 is resulting to delay in the acquisition of land and subsequently delay on the start of project work. Considering this and as per directive of the chief minister, a special committee was constituted as of 24,12,2014 under presidentship of upper principal secretary (planning). The body of committee was partly modified vide Govt. Decision dated 12.2.2015 and the upper principal secretary (finance) designated as president of committee. After detailed deliberation in the committee meeting dated 24.3.2015, it has recommended to acquire private land for irrigation & other projects through negotiation by direct purchase method with some principle guidelines since it is not banned as per new land acquisition Act as per Govt. Decision No.SANKIRNA-03/2015/Para.Kra.34/A-2 by the Government of Maharashtra of Revenue & Forest Department as of 12. 5. 2015. 58. Detailed proposal showing land to be acquired in each village is prepared by executing agency and submit the same to District Collector Office. It is to be forwarded to sub divisional officer (SDO) who scrutinize the information, then to Deputy Superintendent of Land Record (Dy.

8 Power to place Telegraph Lines and Posts 9 https://www.business-standard.com/article/economy-policy/maharashtra-govt-decides-to-acquire-land-through-

negotiations-115051300027_1.html

Page 33: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

29

SLR) for joint measurement (JM) of land to be acquired. SDO office forward the copies of the JM sheet and statement to concerned agricultural officer, forest officer, public works department, Panchayat Samiti offices for the valuation of fruit bearing trees, other trees, structures and well/bore wells in the land to be acquired. In addition, SDO office collects details of sale deeds executed in land three years in the adjoining areas of land to be acquired from concerned Registrar’s office. All these details with JM sheets and detailed statements are shared with town planning officer of the district for recommending rates of the land to be paid for acquisition. For the rate fixation, district collector establishes district level committee composed of 7 members. Lastly, the amount of compensation is calculated by SDO office as per the provision of Article no. 26 to 30 of land acquisition act 2013 & Schedule I. Including other related features. Then 25% amount is added on the above calculated compensation for giving consent for direct purchase method, and direct purchase is discussed with owners of the land. The whole process needs approximately 18 months. There is no independent verification, however, the process itself requires different government officials’ involvement with several layers of scrutinization. 59. MSEDCL Practices: MSEDCL being a government of Maharashtra undertaking utility, have issued circulars regarding the land acquisition. (CEC/Corp. off. Mum/Tech/956 17-08-2013) and (CE(Dist)/D-III/Req. of Land/ 28792 dated 17-07-2015) which are attached in Appendix 1. Based on these, they have standard practice wherein they prefer government owned barren land for construction of 33/11kV substation through consultations with local villagers and the concerned government departments. In case of government owned land, MSEDCL approaches the appropriate government line department for mutual and departmental transfer of the land with a transaction value of INR 1 to the MSEDCL. In case of privately-owned land, it is always done through negotiated settlement where MSEDCL conducts direct purchase of land from the landowner through negotiated settlement. MSEDCL advertises land purchase need to local newspapers and receives requests from owners. After reviewing ownership documents, conducting joint measurement surveys, and getting confirmation from neighboring owners, MSEDCL negotiates rate with the owners. During the negotiation, the local revenue authority is also involved for determining the base rate upon which rates are negotiated. There is no involuntary land acquisition for the substation land. Regarding construction of distribution lines, there is no need for land acquisition for placing the poles or stringing the lines. Usually, MSEDCL does not have any stipulated guidelines to compensate any damage along the distribution lines, however, they deal with unforeseen impacts related to lines on a case-to-case to basis during the construction with the assistance from the contractor. 60. While releasing connection to Residential/Commercial/Industrial etc. complexes/township/establishments, the applicant for the electricity connection will be requested to make available the required suitable piece of land for the establishment of distribution network for providing the power supply. If the land required is for DTCs only, then concerned executive engineer (O & M) division along with sub-division in-charge shall visit the site for finalization of the location If the land required is for EHV sub-station then the concerned superintending engineer (O & M) circle along with concerned superintending engineer (civil) zone MSEDCL shall visit the site for finalization of the location. If the land required is for 33/11 or 22/11 kV sub-station along with DTCs, then the concerned superintending engineer (O & M) circle, the executive engineer (O & M) division along with sub-division in charge shall visit the site for finalization of the location. 61. Gaps Identified: The Maharashtra state government adopted decision to acquire private land directly through negotiation for public projects and MSEDCL circulars and practices adopted for the program’s impact do not imply expropriation based on eminent domain. MSEDCL always opts for negotiated settlement while procuring land for permanent impact such as

Page 34: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

30

substations and seeks alternatives if sellers are not willing to sell. Gaps are identified between MSEDCL’s practices and ADB’s principles on IR. As per the practice of MSEDCL, there is no mandatory requirement for screening the project, carrying out consultations and record of consultations, preparation of resettlement plans for temporary damages, special attention to vulnerable groups and no provision for the non-titled. For the distribution lines, no assessment is done regarding impacts and the compensation mechanism prior to start of construction. However, any damages to crops and trees during construction is compensated by the contractor. Distribution line poles are erected on land for which no standard compensation mechanism exists. There is no prior consultation regarding the project design and local people become aware when the contractor comes in to start the project. The process of compensation for the right of way is not documented and there is no provision for compensation for temporary damages. However, it may be noted that distribution line projects are unlikely to affect the income and livelihood status of the affected persons. Comparison of the IR requirements of ADB, the government, and MSEDCL practice is analyzed below in Table 7.

Table 7: Comparison of Involuntary Resettlement Requirements of ADB and GoI Project Stage

ADB GoI MSEDCL Gaps and Recommendations

Screening and categorization

Screen the project early on to identify past, present, and future IR impacts and risks. Assign categories based on potential impacts.

The electricity Act-2003 and the Indian Telegraph Act, 1885 do not refer to such policy principles.

MSEDCL Practice partially complies and hence no major gap found

• There are gaps between ADB, GoI and MSEDCL. Forms and template with guidelines to be prepared on undertaking screening and due diligence activities.

Meaningful Consultation

Carry out meaningful consultations with affected persons, host communities, and concerned NGOs.

The electricity Act-2003 and the Indian Telegraph Act, 1885 do not refer to such policy principles. Maharashtra state government act (No. SANKIRNA-03/2015/Para.Kra.34/A-2) requires meetings with owners.

• MSEDCL practice partially compiles because, MSEDCL does carry out informal consultation (though not recorded) while selecting the 33/1 kV substation.

• There are gaps between ADB, GoI and MSEDCL. Guidelines to be prepared on undertaking meaningful consultation.

Grievance redress Mechanism

Establish a grievance redress mechanism to receive and facilitate resolution of the affected

The electricity Act-2003 and the Indian Telegraph Act, 1885 do not refer to such policy principles.

MSEDCL has an overall grievance redress mechanism, that has multi- levels, hence no major gaps found.

• There are gaps between ADB, GoI and MSEDCL.

• MSDECL has a concrete GRM and the GRM will be applied for the program.

Page 35: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

31

Project Stage

ADB GoI MSEDCL Gaps and Recommendations

persons’ concerns.

Negotiated Settlement

The borrower will engage an independent external party to document the negotiation and settlement processes. The borrower will agree with ADB on consultation processes, applicable policies, and laws; third-party validation; mechanisms for calculating the replacement costs of land and other assets affected; and record-keeping requirements.

The electricity Act-2003 and the Indian Telegraph Act, 1885 do not refer to such policy principles. Maharashtra state government act requires direct purchase for public projects.

MSEDCL practice fully encourages negotiated settlement for the 33/11 kV substations’ land. However, there is no third party, independent verification or record keeping.

• There are gaps between ADB, GOI and MSEDCL, however, the state act has provision for direct purchase with transparent verification procedure.

• A format to be developed to keep records for negotiated settlement and third-party acknowledgement.

Voluntary donation

Due diligence is needed to: (i) verify that the donation is in fact voluntary and did not result from coercion, using verbal and written records and confirmation through an independent third party; and (ii) ensure that voluntary donations do not severely affect the living standards of affected

The electricity Act-2003 and the Indian Telegraph Act, 1885 do not refer to such policy principles.

MSEDCL does encourage voluntary donation of land for the Program by the people, however, there is no record keeping.

• There are gaps between ADB, GOI and MSEDCL

• A format to be developed to keep records for voluntary donation which to ensure a transparency without any coercion for donation of land.

• Third party acknowledgement to be included in the form.

Page 36: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

32

Project Stage

ADB GoI MSEDCL Gaps and Recommendations

persons and benefit them directly.

ADB = Asian Development Bank, GOI = Government of India, GRM = grievance redress mechanism, kV= kilo volt, MSEDCL = Maharashtra State Electricity Distribution Company Limited, NGO = non-government organization, RBL = results-based lending. 62. For IP, the program is not anticipated to cause any negative impacts or any targeted positive impacts on IPs. Screening and meaningful consultation requirement is addressed along with social due diligence and management for IR.

V. INSTITUTIONAL ARRANGEMENT ASSESSMENT 63. Institutional Arrangement, Staff, Budget, Environmental Health Service related Procedures and Grievance Redress Mechanism (GRM). MSEDCL has multi layered institutional arrangements with a huge network of operation all over Maharashtra. The MSEDCL organizational structure has 4 regional divisions, 16 zonal offices, 44 circles, 140 divisions, 663 sub-divisions, and 3228 section offices. Overall planning and execution of projects is being done by the corporate office in Mumbai and at regional level, it is undertaken by the regional director offices. The zonal offices are responsible for the construction and operation of substations and distribution lines. Each zonal office contains circle offices that oversee constructing distribution lines and operating substations, and distribution lines. Each circle contains divisions and subdivisions that oversee customer services, including the maintenance of distribution lines within districts. Section offices oversee maintenance of distribution lines at village levels. The overall institutional set of MSEDCL is depicted in the figure below.

Page 37: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

33

64. As a decentralized operation, MSEDCL has two staff at its headquarters (HQ) and two staff in its division offices dedicated with added safeguards (environment and land acquisition) responsibilities. At HQ, the civil department oversees the resettlement and the training and safety department oversees the environment in MSEDCL. Staffs of civil department (headed by the chief engineer) at HQ are responsible for policy matters, while divisional office staffs are responsible for implementation. At MSEDCL HQ, the training and safety department (headed by chief general manager and supported other full-time staff) handle environmental, health and safety issues all over the state. Each division office has two staff members who oversee the implementation of health, safety, and environmental policies and can handle the safeguards screening and activity selection in terms of safeguards. Some divisions have one to three safety officers who monitor health and safety aspects. The HQ staff are qualified engineers with environmental, health and safety trainings. Additional capacity building in terms of human resources are provided in the PSSA. At program level, MSEDCL will include one representative from civil department for resettlement and one representative from training and safety department for environment in PMU. MSEDCL will also assigned one engineer in each division level for implementation of the PSSA. For monitoring PSSA, PMU will have internal monitoring and independently monitoring will be done by consultants to be engaged under ADB’s TA. MSEDCL’s concerned staff related to safeguards will be provided with orientation training under the TA on safeguards screening, planning, implementation, consultations, grievance redress, monitoring and on voluntary donation and negotiation. . 65. Since 2005, MSEDCL has implemented many distribution line projects funded by

Page 38: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

34

multilateral agencies. While MSEDCL headquarters has accumulated knowledge of and experience in handling environmental and social safeguards issues, the implementation of environmental and social safeguards measures remains low at the circle level and division levels. To enhance capacity, MSEDCL staff attends training sessions (including training on safeguards) provided by the Training and Safety Department of the MSEDCL Corporate Office. The Training and Safety Department has also formulated safety guidelines and a manual for its operation. All staff are entitled to select and attend training sessions every year. In addition, several MSEDCL staff have been enhancing their understanding of social and environmental safeguards by participating in external training conducted by donor agencies. 66. Weakness in Implementation and Effectiveness of the Safeguard System. The assessment found that the weak application of environmental regulations and CEA regulations was an outcome of low staff awareness about the related regulatory framework and guidelines. Robust in-house refresher training is to be conducted regularly for MSEDCL staff to increase their awareness and ensure the proper implementation of safeguard requirements. Focal persons for environmental and social safeguards will be assigned at headquarters and in each unit (circle and division offices) to ensure compliance with the safeguard program actions. Necessary budgetary provisions have been made in the program towards capacity building. 67. Grievance Redress Mechanism. MSEDCL does not have any specific GRM for safeguards, however, they have an overall grievance redress system which is well functional, effective, transparent and accessible to the people. MSEDCL has large network and the layer of operation goes up to the ground level which is at village level. MSEDCL has both electronic and manual mode of accepting grievances. Officials at sections level are directly linked to the consumers and any complaints raised by the people are recorded and action taken as per the existing GRM. In the current scenario, all the consumers and beneficiaries are listed in the MSEDCL’ s data base from the section level up to the head quarter level and the beneficiaries are aware about their concerned dealing officer. Therefore, they have easy accessibility to the existing GRM. Necessary efforts will be given to make the beneficiaries aware about the current GRM. 68. As provided under MERC (Consumer Grievance Redressal Forum & Electricity Ombudsman) Regulations, 2006 MSEDCL has established Consumer Grievance Redressal Forums at all Zonal level. Such Forums shall follow the principles of natural justice, inter-alia which includes the following: (i) protect the interest of consumers and (ii) facilitate and expedite the redressal of grievances referring to OHS/CHS. Grievances falling within the purview of any of the following provisions of the Act are excluded from the jurisdiction of the Forums;

• Unauthorized use of electricity as provided under section 126 of the Act i.e. I.E. 2003. • Offences and penalties as provided under section 135 to 139 of the Act. • Accidents beyond the MSEDCL distribution network i.e. at electricity user end as

provided under section 161 of the Act • Recovery of arrears where the bill amount is not disputed.

69. With regards to procedural aspects, the set mechanism is having three-tier system, which is provided as follows: A. Internal Grievances Redressal Cell (IGRC) 70. The Applicant may approach to the appropriate office of the Distribution Licensee or IGRC and file the grievance as per the prescribed Format ‘Form X’ which is available on website &

Page 39: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

35

IGRC. Illiterate persons can directly approach to section offices of MSEDCL to register their complaints. The IGRC shall not admit any grievance unless it is filed within two (2) years from the date on which the cause of action has arisen. Where such grievance cannot be made in writing, the IGRC shall render all reasonable assistance to the person making the grievance orally to reduce the same in writing. The office of the IGRC shall issue acknowledgement of the receipt of the grievance to the consumer within five (5) working days from the date of receipt of a grievance. Where the grievance has been submitted in person, the acknowledgement shall be provided at the time of submission. The address & contact nos. of IGRC are available on following link of website; https://www.mahadiscom.in/wp-content/uploads/2018/06/IGRC-Adresses_-Annexure-A.xls B. Consumer Grievances Redressal Forum (CGRF) 71. Having redressed or not and even if consumer is not satisfied with the decision of IGRC, he can approach to CGRF under the prescribed format in schedule "A" of the MERC (CGRF & Electricity Ombudsman) Regulations, 2006 in duplicate along with all the particulars, documentary evidences within 60 days from date of decision of IGRC. Upon receipt of the prescribed format A, the CGRF provides the acknowledgement of receipt of grievance to the consumer within 5 working days from the date of receipt of grievance by post and if submitted in person the acknowledgement is to be provided at the time of submission. A copy of the grievance shall be forwarded forthwith by the CGRF to the nodal officer designated by the distribution licensee for redressal or to file its reply to the grievance. Within 15 days of intimation from the CGRF or within such other time as it may be directed, the distribution licensee shall furnish to CGRF with a copy to the consumer, its issue-wise comments/ reply on the grievance, failing which the forum shall proceed on the basis of the material record available. The CGRF shall notify the distribution licensee and the applicant who has submitted the grievance, the date of hearing of the grievance in writing, giving enough advance notice. The consumer is supposed to argue the case, or he may depute his representative other than an advocate to present the case and to do all or carry of the acts for the purposes. The distribution licensee may depute either nodal officer or such other executives to represent the case. Upon personal hearing, if required, CGRF may grant further such period for the submission or compliances. CGRF needs to decide the grievance within a period of 2 months from the date of receipt of the grievance. The address & contact nos. of CGRFs are available on following link of website; https://www.mahadiscom.in/wp-content/uploads/2018/02/CGRF_web-aboutus.pdf C. Electricity Ombudsman 72. Aggrieved by the order of CGRF, consumer can prefer appeal to the Electrical Ombudsman, Mumbai or Nagpur within a period of 60 days from the date of order.

VI. PROGRAMME ACTION PLAN 73. Considering the diagnostic assessment, and considering the scope and scale of the impacts, a Safeguards Program Action Plan (SPAP) is proposed with the indicators, targets, responsibilities, timeframes, and budget resources (listed in table 8 below). Table 10 presents the elaborated action plan along with budget for the identified gaps in policy and institutional capacity. MSEDCL will be responsible to implement these actions to be monitored by ADB during program implementation.

Table 8. Safeguard Program Action Plan (SPAP) for Identified Gaps

Page 40: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

36

Gap Proposed Action to fill the Gap

Targets/Indicators Responsibility

Timeframe

Budget Source

Environment Actions Lack of screening and categorization of environment impacts of the Program activities

Program activities will be screened according to the environmental impacts screening criteria and categorized accordingly (Appendix 3 screening and categorization criteria)

All program activities are screened and categorized for environmental impacts

MSEDCL The planning stage of each activity

In kind staff support

Lack of due diligence

For activities with impacts and risks, due diligence will be undertaken using the template in the PSSA (Appendix 3) and the results submitted to ADB.

Due diligence completed for all program activities.

MSEDCL Design and prior to start of civil works

In kind staff support

Alternatives are considered as part of site /location selection for substations and distribution lines.

The site will be selected base on the screening and selection criteria

All program activities are screened and selected

MSEDCL Design and prior to start of civil works

In kind staff support

Lack of environmental management implementation

An EMP included in the bidding document and contracts. Generic EMP is provided in (Appendix-4).

EMP developed and included in the bid document.

MSEDCL Bidding

In kind staff support and to be evaluated during implementation10

Lack of capacity of MSEDCL

Safeguard orientation trainings are provided to the MSEDCL’s program staff. An environmental specialist is engaged under ADB TA.

The trainings are conducted. The specialist is providing guidance and support for the implementation of the program

ADB & TA consultant

Ongoing

Budget included in TA

Lack of meaningful consultations

• Meaningful consultations carried out with the affected people and community ensuring participation of women and vulnerable groups. Consultation template is provided as Appendix-6

Consultation conducted and recorded

MSEDCL TA consultant

Ongoing

In kind staff support Counterpart

10 As the sites and impacts under the program have not been identified, thus the cost for EMP implementation has not

been fully evaluated. A preliminarily estimation has been done based on several assumptions. It would be approximately U$ 0.6 million which is tentative and going to be re-evaluated during the implementation.

Page 41: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

37

Gap Proposed Action to fill the Gap

Targets/Indicators Responsibility

Timeframe

Budget Source

• Consultation plan and consultations’ minutes documented at subdivision level.

financing11

Disclose safeguard document

• The PSSA is to be disclosed

• Affected communities will be informed through consultations about project activities.

Document disclosed and information disseminated

MSEDCL

Ongoing

In kind staff support

Lack of monitoring and reporting

Implementation of the ESMS and mitigation measures monitored and reported to ADB on semiannual basis. Safeguards monitoring template is provided in (Appendix-5).

Semiannual safeguards monitoring reports.

MSEDCL Ongoing

In kind staff support

Environmentally sensitive areas

The site will be selected base on the screening and selection criteria. Environmentally sensitive areas are avoided.

All program activities are screened and selected

MSEDCL Design and prior to start of civil works

In kind staff support

11 As the sites and impacts under the program have not been identified, thus the cost for consultation has not been fully

evaluated. A preliminarily estimation has been done based on several assumptions. It would be approximately U$ 0.02 million which is tentative and going to be re-evaluated during the implementation.

Page 42: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

38

Gap Proposed Action to fill the Gap

Targets/Indicators Responsibility

Timeframe

Budget Source

Lack of proper pollution control measures Lack of transformer oil management

• Drainage system development by providing impervious surface and drains which are also 110% bunded impermeable surfaces for catching spills/leaks wherever fuel, oil, chemicals, and liquid wastes involved.

• Dust management through sprinkling water on roads

• Noise management through limiting working hours in daytime Ecology protection through the vegetation recovering/ replanting plan

• Waste management by qualified collector

• Transformer oil management through disposal at appropriately licensed hazardous waste disposal facilities, with records of all transfer notes retained

Review and inspections including semiannual safeguards monitoring reports.

MSEDCL

Ongoing

O&M cost

Lack of proper management of occupational health and safety risks during construction and community

• Occupational health and safety training plan and records documented at division level.

• Awareness enhancement conducted for communities to prevent tall vegetation along the HT lines and public contact with potentially dangerous electrical

Review and inspections including semiannual safeguards monitoring reports.

MSEDCL Ongoing

O&M cost

Page 43: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

39

Gap Proposed Action to fill the Gap

Targets/Indicators Responsibility

Timeframe

Budget Source

health and safety risks during operation

equipment, with records documented at subdivision level.

• Safety notice posted on newly installed DTs and on boundary of substations

• Daily monitoring on health and safety during installation, construction and operation

Physical cultural resources

• The site will be selected base on the screening and selection criteria

All program activities are screened and selected

MSEDCL Design and prior to start of civil works

In kind staff support

Social Actions Lack of screening and categorization of IR impacts of the Program activities

Program activities will be screened according to the IR Impacts Screening Criteria and categorized accordingly (Appendix 1 IR screening and categorization criteria)

All program activities are screened and categorized for IR impacts

MSEDCL The planning stage of each activity

In kind staff support

Domestic procedure does not meet the requirement of ‘meaningful consultation’

Consultation procedure will be aligned with the requirement of ‘meaningful consultation’ (Appendix 6)

Meaningful consultation is conducted and reported in semiannual safeguards monitoring reports.

MSEDCL Ongoing

In kind staff support counterpart financing12

Procedure for voluntary donation and direct purchase does not meet the requirement of proper recording and vulnerability

Guideline for voluntary donation and direct purchase through negotiated settlement will be followed up (Appendix 8)

The procedure is conducted with proper recording and consideration of vulnerability

MSEDCL Ongoing

Being calculated13

12 As the sites and impacts under the program have not been identified, thus the cost for consultation has not been fully

evaluated. A preliminarily estimation has been done based on several assumptions. It would be approximately U$ 0.02 million which is tentative and going to be re-evaluated during the implementation.

13 As the sites and impacts under the program have not been identified, thus the cost for land acquisition and compensation have not been evaluated fully evaluated. A preliminarily estimation has been undertaken based on several assumptions. It would be approximately U$2.48 million which is tentative and going to be re-evaluated during the implementation.

Page 44: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

40

Gap Proposed Action to fill the Gap

Targets/Indicators Responsibility

Timeframe

Budget Source

The capacity of MSEDCL needs to be strengthened

Safeguard orientation trainings are provided to the MSEDCL’s program staff. A social specialist will be engaged under ADB’s TA

The trainings are conducted. The specialist is providing guidance and support for the implementation of the program

ADB & TA consultant

Ongoing

Budget included in TA

The monitoring process needs to meet ADB’s requirement

The monitoring will be undertaken using the tables and tools in Appendix 5.

MSEDCL is undertaking monitoring and report it to ADB through semiannual monitoring report. The social specialist is undertaking monitoring for PSSA implementation and report it to ADB through TA materials.

MSEDCL TA consultant

Ongoing

Budget included in TA

Table 9. Summary of Safeguard Program Action Plan (SPAP)

Item Proposed Actions Indicators Environmental Actions

1. Ensure implementation of environmental and social management system (ESSMS) 14 with secured budget

1. Activities are screened and selected in accordance with selection criteria specified in the PSSA (Appendix-3).

2. For activities with impacts and risks, due diligence undertaken using the template in the PSSA (Appendix 3) and the results submitted to ADB through semi-annual monitoring reports.

3. An environmental management plan included in the bidding document and contracts. Generic EMP is provided in (Appendix-4). EMP in bidding document and contract is adequate to mitigate relevant risks and implemented as planned.

4. Implementation of the ESMS and mitigation measures monitored and reported to ADB through the semi-annual safeguards monitoring report (SSMR). Safeguards monitoring report template is provided in (Appendix-5).

5. If noncompliance with the proposed mitigation measures is identified, corrective actions shall be proposed to ADB for review and implemented.

6. Adequate budget secured in the project cost. 2. Improve the environmental

management 1. Environmental management improvement plan

implemented 2. Drainage system development by providing impervious

surface and drains which are also 110% bunded

14 The screening checklist, due diligence template, generic EMP and monitoring template are developed as an

environmental management system for this RBL Program.

Page 45: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

41

Item Proposed Actions Indicators impermeable surfaces for catching spills/leaks wherever fuel, oil, chemicals, and liquid wastes involved.

3. Dust management through sprinkling water on roads 4. Noise management through limiting working hours in

daytime 5. Waste management by qualified collector 6. Transformer oil management through disposal at

appropriately licensed hazardous waste disposal facilities, with records of all transfer notes retained

7. Ecology protection through the vegetation recovering/replanting plan

2. Enhance the management

of occupational health and safety risks during construction and community health and safety risks during operation

1. Occupational health and safety training provided, and incidents are recorded and remedied.

1. Awareness enhancement campaign conducted to prevent electric shock due to tall vegetation and contact with lines and equipment and incidents are recorded and remedied.

2. Safety notice posted on newly installed DTs and on boundary of substations

3. Daily monitoring on health and safety during installation, construction and operation

Social Actions 1

Ensure implementation of environmental and social management system (ESMS) with secured budget

1. Program activities are screened and selected in accordance with selection criteria specified in the ESMS (Appendix-3) 2. For program activities with resettlement impacts, due diligence undertaken using checklist (Appendix-3) and the result submitted to ADB through semi-annual monitoring reports. 3. Implementation of ESMS and mitigation measures monitored and reported to ADB through the semi-annual safeguards monitoring report (SSMR). Safeguards monitoring report template is provided in (Appendix-5). 4. if noncompliance with the proposed mitigation measures is identified, corrective actions shall be proposed to ADB for review and implemented. 5. Adequate budget secured in the project cost

2

Procure land for substations and lines by voluntary donation and/or direct purchase through negotiated settlement

1. In case of lines, transformers and land donation, a written agreement obtained. The form for consent is provided in Appendix-7 which will be used by MSEDCL. 2. In case of voluntary donation and/or direct purchase through negotiated settlement, MSEDCL will follow the guidelines in appendix 8 3. Compensation on tree and crop losses due to installation of lines paid simultaneously during construction in a phased manner.

General Actions 1. Strengthen meaningful

consultation with affected peoples and communities

1. Meaningful consultations carried out with the affected people and community ensuring participation of women and vulnerable groups. Consultation template is provided as Appendix-6

2. Consultation plan and consultations’ minutes documented at subdivision level.

Page 46: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

42

Item Proposed Actions Indicators 2. Strengthen the capacity of

the MSEDCL’s program staff in terms of safeguards

1. Safeguard orientation trainings provided to the MSEDCL’s program staff.

2. A social specialist and an environmental specialist will be engaged under ADB’s TA.

3. Qualified and experienced safeguards focal persons joined the program management unit in HQ and engineers at division level assigned to implement ESSM and SPAP

3. Monitor and ensure the implementation of the safeguard program action plan

1. Implementation of the safeguard program action plan monitored, documented, and reported to ADB regularly through semiannual safeguards monitoring report.

4. Ensure effective implementation of grievance redress mechanism

1. Complains properly recorded and responded to the complainant in a timely manner.

VII. CONCLUSION 74. The overall assessment reveals that the Program intervention will not have any significant impact on environment, IR and IP. However, some impacts are anticipated which need to be mitigated through appropriate action plan. MSEDCL through its civil works contractor will be responsible for mitigating any adverse environment impact through assessment of impacts and risks, and implementation of an environment management plan. Similarly, MSEDCL needs to address the issues related to land purchase for substation through negotiation, and payment of compensation for temporary damages. It is proposed to have capacity building training enhancement program for the designated staff of MSEDCL who will be dealing with the safeguards’ issues. Overall, there are no sensitive issues foreseen under the program as far as safeguards are concerned.

Page 47: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 1 43

MSDECL CIRCULAR RELATED TO LAND ACQUISITION 1-1. Land Acquisition

Page 48: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

44 Appendix 1

Page 49: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 1 45

1-2. Land Identification

Page 50: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

46 Appendix 1

Page 51: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 1 47

Page 52: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

48 Appendix 1

Page 53: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 1 49

Page 54: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

50 Appendix 1

Page 55: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 51

RECORDS OF DETAILED CONSULTATIONS

CONSULTATION: 01 Particulars Responses

Village Astha Tehsil/Mandal Chakor District Latur Existing feeder or proposed feeder Existing feeder SS Type of Area Rural Have you heard about the project or Do you have any information about the project?

We have some information regarding the proposed project that separate transformer will be provided to the farmers free of cost

What is your opinion about this project? Project is beneficial for the farmers as pumps can be operated without any disturbance. Issues such as low voltage, overloading problem will be minimised after the proposed project.

Do you support this project? Full support Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-4029, Total Household-782, Total land-1600 hector, 95% farmer

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

100% are electrified under Saubhayya Yojna

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

No separate connection

How many agricultural pumps do you have in your village

389 pumps

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% electrified pumps

What is the average horsepower of the pumps 3HP-40% 5HP-60%

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

Single farmer on one pump

How many hours of electricity you get for your pump and how much you pay monthly?

In day time-8 Hours, Night time-10 Hours, 3HP- average-1000 Rs, 5HP-1500Rs

How much land can be irrigated with an average size of horsepower pump 2Hectors per Pump

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

3000 Rs quarterly for 5Hp 4000 Rs quarterly for 7.5Hp

Do you think electrified pump will be beneficial and if yes then please share how 100% beneficial

What are the major crops and how many crops you cultivate in a year

Jewar, Wheat, Sugarcane, Gram, Soyabean, Tuar Dal

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Low voltage, overloading caused regular fault, damaged DTC regularly, costly for repairing and time taking, and it affects crops

Do you think that the Project is necessary The proposed project is necessary for the farmers

Page 56: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

52 Appendix 2

Particulars Responses What are your main concerns/issues about the project In case of fault in DTC who will be responsible for

repairing Can you suggest how best to address your concerns/issues

Better management system required for maintenance

The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No loss of crops/ land/ trees etc.

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Private land provided by the local farmers already processed for land acquisition

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

Yes, cash compensation already negotiated by the MSEDCL

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

Cash

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Only positive impacts foreseen by the project. 50% income will be increased due to the project, and farmer condition will become better

What negative impacts do you think the project will have No negative impacts

How safe do you think or consider the distribution feeder? 100% safe in all aspects

Any criteria you would like to be considered for project design, construction and operation stage? Fencing in and around the DTC required

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

No such people living in this area

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

No protected land

Access to the forest land and the use of the forest land (if any)

No forest land

Current environmental conditions in the area – air, dust, noise conditions in the area.

Current environmental condition is clean, no pollution is foreseen

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. Wild pig Shortage of water for human consumption, irrigation, and how extensive are they?

No rain from last 6 year properly so during summer season shortage of water noticed

Page 57: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 53

Particulars Responses What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

300' 500' ground water level. The agriculture pumps will not impact the ground water

What is your prime source of drinking water? And what are the other sources of drinking water?

Bore well, piped water by Gram panchayat, Ganjur wadi- Reserve wire (pond)

Any conflicts on water use rights and social impacts? No conflicts on water use rights and social impacts

Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

Blood pressure and Sugar is very common these days. Sub centre facility available in the village. In case of any emergency people use to visit Latur civil hospital.

Is the consultation useful The consultation is very useful Would you support and participate during the implementation of Project The local people would like to support

Any other Suggestions if any Water available but due to low voltage pumps cannot operate for lifting water from the well Overloaded DP (20-25 pumps on one DTC) not functioning properly

LIST OF PARTICIPANTS = Total 12 (Male- 12 and Female=0)

# Name Age Sex Education Occupation 1 Mr Sawata Pundu Mali 50 M 10th Sarpanch 2 Mr Bhandan aming Rathod 45 M illiterate Farmer 3 Mr Vaijnath Hanmant Gaikwad 32 M 12th Farmer 4 Mr Tukaram Vishwanath Pawar 35 M 10th Farmer 5 Mr Maruti Gaikwad 50 M 10th Farmer 6 Vijay Pandurang Mali 50 M 10th Farmer 7 Manik Namdeo Mule 50 M 7th Farmer 8 Arun Hariba Kamale 45 M 10th Farmer 9 Dyaneshwar Hanmant Patil 40 M 12th Farmer 10 Mr Shabir Shaikh 48 M 10th Farmer 11 Mr Kamlakar Gaikwad 44 M 10th Farmer 12 Mr Sanjay Jadhav 46 M BSC VDO

Page 58: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

54 Appendix 2

PHOTOGRAPHS

Page 59: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 55

CONSULTATION: 02

Particulars Responses Village Gharni Tehsil/Mandal Chakur District Latur Existing feeder or proposed feeder Proposed Feeder Type of Area Rural Have you heard about the project or Do you have any information about the project?

Local people heard about the project, official shared information about the project land for SS already provided by the Gram panchayat newspaper

What is your opinion about this project? Proposed project is beneficial for the farmers, low voltages pump cannot run during season, overloaded cause transformer regularly failed,15-30 days repair

Do you support this project? 100% support Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-5500, Total Household-1500, Total farmer-1000, Labour-500, Average land holding total 7000 acre

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

100% Under Saubhayya Yojna

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

250 Separate agriculture connection

How many agricultural pumps do you have in your village 250 pumps

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% agriculture pumps are electrified only no diesel pump sets in the operation

What is the average horsepower of the pumps 5HP-80% 7.5HP-20%

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

1pump/ Farmers

How many hours of electricity you get for your pump and how much you pay monthly?

In day time-8 Hours, Night time-10 Hours, Average monthly 1000 Rs/HP

How much land can be irrigated with an average size of horsepower pump 5HP-5Acre, 7.5 HP-7 Acre

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

3000 Rs quarterly for -5Hp 4000 Rs quarterly for 7.5Hp

Do you think electrified pump will be beneficial and if yes then please share how

Electrified pump is beneficial for the farmers then diesel pump it is cheaper and easy to manage

What are the major crops and how many crops you cultivate in a year

Soybean, Tuar, Wheat, Red Gram, Jawar, Sugarcane

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Day and night supply, not regular and time table not proper, repairing of transformer is not easy, tripping is regular, 12-15 farmers depend on DTC

Do you think that the Project is necessary Very Necessary What are your main concerns/issues about the project No issue about the project

Page 60: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

56 Appendix 2

Particulars Responses Can you suggest how best to address your concerns/issues N/A The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No loss of crops/ land/ trees etc.

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Private land provided for the sub-station land acquisition about to complete

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

Compensation demanded and given by the Electricity Board

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition Negotiated with land owner

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Income will be increased, multiple crops possible and production may increase due to better irrigation

What negative impacts do you think the project will have No negative impacts How safe do you think or consider the distribution feeder? Safe 100% in all aspects Any criteria you would like to be considered for project design, construction and operation stage? N/A

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

No such people living in this area

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any No protected land

Access to the forest land and the use of the forest land (if any)

No forest land

Current environmental conditions in the area – air, dust, noise conditions in the area.

Current environmental condition is clean, no kind of pollution foreseen

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. No Shortage of water for human consumption, irrigation, and how extensive are they?

Not in the village water availability is sufficient and quality of water is good

What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

200'-300' Water level for the bore well

What is your prime source of drinking water? And what are the other sources of drinking water?

Piped water supply, gram panchayat, filter water supply, bore well water

Page 61: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 57

Particulars Responses Any conflicts on water use rights and social impacts? No conflicts on water use rights and social

impacts Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

No health problem, sub centre available in the village, PHC available at Chakur and Civil hospital is available at Latur

Is the consultation useful The consultation is very useful Would you support and participate during the implementation of Project

The local people would like to support and participate as per requirement

Any other Suggestions if any Feeder Demanded for Drinking water supply

LIST OF PARTICIPANTS = Total 12 (Male- 12 and Female=0)

# Name Age Sex Education Occupation 1 Sudhakrsopan 47 M 9th Sarpanch 2 Balasaheb Bhagwanrao Shinde 62 M Illiterate Farmer 3 Ashok Gangaram Chinte 65 M 12th Business 4 Ramdas Sakharam Chawad 48 M MA Farmer 5 Vyakatrao Vasantrao Pahi 55 M 12th Farmer 6 Prakash Dnyanoba Pore 35 M Illiterate Farmer 7 Rajender Hanmant Kamble 40 M 10th Farmer 8 Gopal Shinde 70 M Illiterate Farmer 9 Navnath Driyanoba Khatuke 30 M 11th Farmer 10 Balchander Tanajirao Pahi 52 M BCOM Farmer 11 Sanjay Raghunath Shingril 25 M 12th Farmer 12 Anand Govindrao Shinde 66 M BSC Farmer

PHOTOGRAPHS

Page 62: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

58 Appendix 2

CONSULTATION-3 Particulars Responses

Village Malegaon Khurd Tehsil/Mandal Baramati District Pune Existing feeder or proposed feeder Existing feeder Type of Area Rural Have you heard about the project or Do you have any information about the project?

Local people heard about the project, official visit regularly in the village

What is your opinion about this project? Work is under progress very good for the farmers, enough and better electricity will affect positively will help the income of the farmers with more crops and production

Do you support this project? 100% support Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Average 2 acre- 5-acre land holding size

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

100% houses electrified, 24 hours single phase

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

470 AG Connection

How many agricultural pumps do you have in your village

475 Agriculture pumps available

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% agriculture pumps are electrified only no diesel pump sets in the operation

What is the average horsepower of the pumps Average 3HP-5HP

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

At present one farmer depends on one pump, farmer is responsible for getting the pump installed and maintenance including the payment of electricity bill

How many hours of electricity you get for your pump and how much you pay monthly?

Average 8-10 hours, Average monthly bill 3-5Hp is 3000 quarterly

How much land can be irrigated with an average size of horsepower pump Average 3-5 Acre/ pump

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

Do you think electrified pump will be beneficial and if yes then please share how

Yes, the electrified pump will be beneficial to increase the income of the farmers

What are the major crops and how many crops you cultivate in a year Wheat, Maize, onion, Sugarcane, Vegetable

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Agriculture connection voltage problem regular fault, DTC burnt a major problem today

Do you think that the Project is necessary Yes, useful for better cultivation What are your main concerns/issues about the project

Local objection for Right of way 10-15% only depend on personal relation specially for small farmers, theft problem, problem of the service provider

Page 63: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 59

Particulars Responses Can you suggest how best to address your concerns/issues Want local level committee formation

The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

10*10 and pump house required but no loss of any crops, trees due to the project

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Government land (E class), Non usable land (GP) proposed by the local gram panchayat for the existing sub-station

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

Already settled

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

By the separate DTC regular enough with high voltage power/ current available cropping patterns may change and production will increase up to 50% ultimately income of the farmers will increase

What negative impacts do you think the project will have No negative impacts

How safe do you think or consider the distribution feeder? Safe 100% in all aspects

Any criteria you would like to be considered for project design, construction and operation stage?

Fencing in and around the DTC required

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

No such people living in this area

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

Kohina Dam-170km no protected area near the village

Access to the forest land and the use of the forest land (if any)

No forest land

Current environmental conditions in the area – air, dust, noise conditions in the area.

Dust, air pollution by sugar factory, but not panic situation

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. No Shortage of water for human consumption, irrigation, and how extensive are they?

No shortage of water for human consumption but for the irrigation possible

Page 64: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

60 Appendix 2

Particulars Responses What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

200' for irrigation 30'-50' for well

What is your prime source of drinking water? And what are the other sources of drinking water? Piped water supplies available through the bore well

Any conflicts on water use rights and social impacts? No conflicts on water use rights and social impacts Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

Blood pressure and Sugar is very common these days. Government hospital available in Baramuti 7 km

Is the consultation useful Useful come to know in detail about the project Would you support and participate during the implementation of Project

The local people would like to support and participate as per requirement

Any other Suggestions if any Training time to time regarding the use of new HVDS project Management committee required to run smoothly

LIST OF PARTICIPANTS = Total 5 (Male- 5 and Female=0)

# Name Age Sex Education Occupation 1 Nand Kumar Eknath Kal 61 M 10th Farmer 2 Nikhil Suresh Raskar 29 M MSC Service 3 Kale Suraj Suresh 30 M Diploma Farmer 4 Popat rajaram Bharani 62 M Primary Farmer 5 Mr Baborajaram bharani 70 M 7th Farmer

PHOTOGRAPHS

Page 65: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 61

CONSULTATION-4

Particulars Responses Village Karhawagaj Tehsil/Mandal Baramati District Pune Existing feeder or proposed feeder Proposed Feeder Type of Area Rural Have you heard about the project or Do you have any information about the project?

Heard about the proposed project but not in details

What is your opinion about this project? Current electric supply 8 hours but not full voltage supply always problem

Do you support this project? Full support gram sabha passed Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-3368, Total Household-1000, 80% farmer,2 acre to 5-acre average land holding

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

8% house electrified; 24 hours of electricity available

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

500 connection

How many agricultural pumps do you have in your village

500 agriculture purpose

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

All pump run by electricity only

What is the average horsepower of the pumps 3HP-70% 5HP-30%

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

One farmer depends on one pump

How many hours of electricity you get for your pump and how much you pay monthly? 8 hours in day time, 10 hours in night

How much land can be irrigated with an average size of horsepower pump 2-5 acre/ pump

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

Do you think electrified pump will be beneficial and if yes then please share how 100% electrified

What are the major crops and how many crops you cultivate in a year Wheat, jwari, maize, onion, sugarcane

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Low voltage, breakdown, fault and burnt of DTS a major problem

Do you think that the Project is necessary Very necessary for the farmers for their improvement

What are your main concerns/issues about the project No issue about the project Can you suggest how best to address your concerns/issues N/A

Page 66: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

62 Appendix 2

Particulars Responses The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No loss of crops/ land/ trees etc.

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Government land for the sub-station proposed and passed by the gram panchayat

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

N/A

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Only positive impacts foreseen in this project for the farmers and farming it will help to increase income of the farmers

What negative impacts do you think the project will have No negative impacts How safe do you think or consider the distribution feeder? The distribution feeder is 100% safe

Any criteria you would like to be considered for project design, construction and operation stage?

N/A

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

No such people living in this area

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

No protected land

Access to the forest land and the use of the forest land (if any)

2km (Karhawagaj) 30-40-acre land belong to the forest department

Current environmental conditions in the area – air, dust, noise conditions in the area. No pollution, no issue regarding the environment

Will the project sitting adversely impact the water or soil resource in the locality

The project will not sitting adversely impact the water or soil resource iin the locality

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. No Shortage of water for human consumption, irrigation, and how extensive are they?

March-May, water scarcity noticed. Very hard to manage, commercial water supplies available during that time

What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

300' bore well 50' well Ground water is good

What is your prime source of drinking water? And what are the other sources of drinking water?

Piped water, well lift water (individual)

Page 67: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 63

Particulars Responses Any conflicts on water use rights and social impacts? No conflicts on water use rights and social

impacts Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

Good health condition no chronic disease prevalent in this area civil hospital available at Baramati 8 km

Is the consultation useful People got aware in details after this consultation Would you support and participate during the implementation of Project

Full support and would like to participate during the implementation of the project

Any other Suggestions if any Installation of DTS should be completed within 6 months

LIST OF PARTICIPANTS = Total 11 (Male- 11 and Female=0)

# Name Age Sex Education Occupation 1 Sadashiv B Nale 55 M 7th Farmer 2 Popatrao S Gawade 48 M BA Farmer 3 Nitin A Mulmule 38 M 12th Farmer 4 Appasaheb S Bangale 52 M BA Farmer 5 Tejmal A Gujamani 51 M 12th Farmer 6 Shashikant Shrirang 50 M 10th Farmer 7 Mahesh D Nale 31 M 10th Farmer 8 Nitin P Gawade 31 M MA Farmer 9 Pramod D Gawade 25 M BA Farmer 10 Tushar G Nale 19 M 12th Farmer 11 Kiran K Nale 23 M B Com Farmer

PHOTOGRAPHS

Page 68: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

64 Appendix 2

CONSULTATION-5 Particulars Responses

Village Ganoor Tehsil/Mandal Chanwad District Nasik Existing feeder or proposed feeder Existing feeder Type of Area Rural Have you heard about the project or Do you have any information about the project?

Fully aware, information about the project shared with the local people

What is your opinion about this project? New project, regular problem, low voltage, breakdown, power cut disturbed the farming specially during agriculture peek time

Do you support this project? Demand from the farmers at large scale full support

Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-3500, Total Household-800, 10-15% landless 3to 5-acre average land holding

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

100% household electrified 20 hours with power cut

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

450 connection

How many agricultural pumps do you have in your village 450 agriculture pumps

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% electrified pumps only

What is the average horsepower of the pumps

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

One farmer depends on one pump

How many hours of electricity you get for your pump and how much you pay monthly?

8 hours in day time, 10 hours in night, average quarterly 1000-2000 Rs for 3HP- 3000 Rs for 5 HP

How much land can be irrigated with an average size of horsepower pump

2acre/ pumps due to less water available

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

Do you think electrified pump will be beneficial and if yes then please share how Yes

What are the major crops and how many crops you cultivate in a year Onion, tomato, maize

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Power cut 2-3 hours, low voltage, load shedding due to overloading in case of fault take more time to repair

Do you think that the Project is necessary Necessary it will benefit the farmer low cost and improve irrigation

What are your main concerns/issues about the project pump run during rainy season, over loading problem

Page 69: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 65

Particulars Responses Can you suggest how best to address your concerns/issues Pump used only for 6 months but billing

12 months HP tariff, minimum fix charge or unit by charge demanded, fixed charge 1HP-150 Rs

The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No loss of crops/ land/ trees etc.

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Land belong to gram panchyat and gram panchayat already passed for the project

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

No compensation demanded

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Separate DTC will be helpful to run the pumps properly with proper voltage without any fault

What negative impacts do you think the project will have No negative impacts How safe do you think or consider the distribution feeder? The distribution feeder is 100% safe Any criteria you would like to be considered for project design, construction and operation stage?

N/A

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

Bheel-50HH, Muslim 40HH

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

Forest land at Ganoor at 2km but no plantation, barren, desert land

Access to the forest land and the use of the forest land (if any)

Under forest department

Current environmental conditions in the area – air, dust, noise conditions in the area. No issue of environment

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. Deer in forest land Kalvit , Sanbher Shortage of water for human consumption, irrigation, and how extensive are they?

500' water supply by gram panchayat / jeevan pradhikaran

What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

Bore well by PWD Water is not suitable for drinking. Yes, after installation of pump under new project ground water may go down

What is your prime source of drinking water? And what are the other sources of drinking water? Piped water weekly supplied

Page 70: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

66 Appendix 2

Particulars Responses Any conflicts on water use rights and social impacts? No conflicts on water use rights and

social impacts Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

No health facility, Civil hospital, private clinic available at Chanwad 4 km, Sugar and blood pressure

Is the consultation useful Very useful in terms of awareness Would you support and participate during the implementation of Project

The local people would like to support and participate as per requirement

Any other Suggestions if any Due bills should not be left, as this increase the discrimination among the farmers and no development possible

LIST OF PARTICIPANTS = Total 6 (Male- 6 and Female=0)

# Name Age Sex Education Occupation 1 Vilash Thakare 52 M MA Bed Govt Service 2 Akil Patel 56 M BSC Bed Farmer 3 Popat Watpade 35 M SSC Farmer 4 Sambhaji Thakare 58 M Illiterate Farmer 5 Kalash Thakare 48 M SSC Farmer 6 Ragendra Thakare 50 M SSC Farmer

PHOTOGRAPHS

Page 71: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 67

CONSULTATION-6 Particulars Responses

Village Tisgaon Tehsil/Mandal Chanwad District Nasik Existing feeder or proposed feeder Proposed under HVDS Type of Area Rural Have you heard about the project or Do you have any information about the project?

The local people are aware about the proposed project, time to time local official came and shared the information regarding the project

What is your opinion about this project? 100% beneficial for the local farmers, overloaded transformer always create problem

Do you support this project? Land already selected and proposal of land already passed by the gram panchayat at present land acquisition at final stage

Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-1352, Total Household-300, Total farmer-300 minimum 2acre-5acre average land holding

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

10% household not electrified under process, 20-21 hours

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

Total DTC 14 Existing-15-20 Farmers at one DTC

How many agricultural pumps do you have in your village

275 total pumps mostly 3-5 HP

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

Only 2 pumps run by diesel

What is the average horsepower of the pumps 3-5HP

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

Separate farmer at 1 pump

How many hours of electricity you get for your pump and how much you pay monthly?

Day times 8 hours with low voltage, trip regular, night -10 hours, 15-20 days repairing time

How much land can be irrigated with an average size of horse power pump 2 acre/ pump (3HP)

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

3HP quarterly-2000/month 5HP quarterly-3000/month

Do you think electrified pump will be beneficial and if yes then please share how

50% more production possible by the proposed project, more crops possible at present only single crops

What are the major crops and how many crops you cultivate in a year Maize, Onion, Wheat, Red Gram

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Low voltage, regular fault, overloading is the major problem

Do you think that the Project is necessary 100% necessary it should be completed priority basis without delay

Page 72: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

68 Appendix 2

Particulars Responses What are your main concerns/issues about the project Maintenance time if any fault occurs and

response by the agency/ electricity board Can you suggest how best to address your concerns/issues

Regular visit by the line men and agency will decrease the problems

The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No such loss observed for DTC no land required manageable

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Government land proposed for the project and gram panchayat already proposed and passed

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

No demand of compensation by the gram panchyat due to public interest project

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Without any disturbance farmers can run the pumps, new crops possible after this project, production will increase rate may increase

What negative impacts do you think the project will have No negative impacts

How safe do you think or consider the distribution feeder?

The distribution feeder is 100% safe but need to cover fencing around the DTC properly

Any criteria you would like to be considered for project design, construction and operation stage?

N/A

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

Bheel-70(ST), living in the village

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

No protected land

Access to the forest land and the use of the forest land (if any)

No forest land

Current environmental conditions in the area – air, dust, noise conditions in the area. No issue of environment

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. Deer, Peacock Shortage of water for human consumption, irrigation, and how extensive are they?

Only during the summer water availability very less from last 6 years no proper rain in the area

Page 73: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 69

Particulars Responses What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

500' water level, ground water is good for drinking

What is your prime source of drinking water? And what are the other sources of drinking water? Piped water by Jeevan Pradhikaran weekly

Any conflicts on water use rights and social impacts? No conflicts on water use rights and social impacts

Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

Chandwad 8 Km only health facility available

Is the consultation useful Useful Would you support and participate during the implementation of Project

Full support and would like to participate during the implementation of the project

Any other Suggestions if any Want the proposed project in less time

LIST OF PARTICIPANTS = Total 11 (Male- 11 and Female=0)

# Name Age Sex Education Occupation 1 Daulod Madi 35 M 12th Sarpanch 2 Shankarn v Gangurde 55 M 12th Sarpanch 3 Shivaji Nikam 62 M 12th Farmer 4 Bhikaji kedu Gangurde 71 M 8th Farmer 5 Ganesh Vinayak Gangurde 32 M 12th Farmer 6 Ashok Rajnath Gangurde 45 M 10th Farmer 7 Vijay Vasant Gangurde 35 M 10th Farmer 8 Maruti Namdev Gangurde 60 M 5th Farmer 9 Khandu Kisan Mali 34 M 10th Farmer 10 Vinayak waman Gangurde 70 M 5th Farmer 11 Jayram Baburao Sonawme 41 M 12th Farmer

Page 74: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

70 Appendix 2

PHOTOGRAPHS

Page 75: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 71

CONSULTATION-7 Particulars Responses

Village Madhan Tehsil/Mandal Chandur- Bazar District Amarawati Existing feeder or proposed feeder Existing Feeder Type of Area Rural Have you heard about the project or Do you have any information about the project?

Heard by official

What is your opinion about this project? Very good project, through separate at present in case of fault all pumps stopped automatically

Do you support this project? 100% Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-1800, Total Household-300, Total farmer, average land holding less than 5 acres

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

10% new settled household not having connection, power supply 24 hours

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

Total 250, separate agriculture connection already provided

How many agricultural pumps do you have in your village 250 pumps

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% electrified pumps only

What is the average horsepower of the pumps 5HP-80% 7.5HP-20%

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

Two pumps/ farmer, single farmer only

How many hours of electricity you get for your pump and how much you pay monthly? Day time 8 hours, night 10 hours

How much land can be irrigated with an average size of horsepower pump 5acre/ pump by 5 HP

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

Quarterly 3500 Rs

Do you think electrified pump will be beneficial and if yes then please share how Yes, very beneficial

What are the major crops and how many crops you cultivate in a year

Orange, Cotton, Wheat, Red gram, Soybean, Water Melon, Banana

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Everything is fine now but in the night time no timing low voltage fault problem

Do you think that the Project is necessary Necessary What are your main concerns/issues about the project Labour problem during night, not

available, create problem Can you suggest how best to address your concerns/issues More power supply in day time only

Page 76: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

72 Appendix 2

Particulars Responses The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

no kind of loss

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

Government land for Substation no issue gram panchayat already proposed

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

No expecting any kind of compensation

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Income will increase through the proper irrigation, fault can be reduced, more useful

What negative impacts do you think the project will have Repairing, maintenance by the single framer a major issue

How safe do you think or consider the distribution feeder? No problem regarding the safety Any criteria you would like to be considered for project design, construction and operation stage?

N/A

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

ST -10 household, Gond, Takonkar, Thakur

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any No protected land

Access to the forest land and the use of the forest land (if any)

No forest land

Current environmental conditions in the area – air, dust, noise conditions in the area.

No pollution, no issue regarding the environment

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. After 10 km state started wild pig, deer available

Shortage of water for human consumption, irrigation, and how extensive are they?

During rainy season shortage of water observed but not extensive

What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

150' ground water available, no negative impact on ground water

What is your prime source of drinking water? And what are the other sources of drinking water?

Bore well water, Dam water not functioning due to no payment

Page 77: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 73

Particulars Responses Any conflicts on water use rights and social impacts? Yes, but not at large scale in case of any

major fault water not available, at substation water available but not allowed to take water

Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

No issue of health

Is the consultation useful useful Would you support and participate during the implementation of Project 100% support

Any other Suggestions if any Overloading DP should be separated Want immediate connection who have already applied for 2 years back

LIST OF PARTICIPANTS = Total 3 (Male- 3 and Female=0)

# Name Age Sex Education Occupation 1 Arun Gangurde 35 M 5th Farmer 2 Sachin Vishnu Pise 39 M BA Farmer 3 Bhushan Dilip Rao Ghuikhedkar 31 M BA Farmer

PHOTOGRAPHS

Page 78: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

74 Appendix 2

CONSULTATION-8 Particulars Responses

Village Beloda Tehsil/Mandal Chandur- Bazar District Amarawati Existing feeder or proposed feeder Proposed Type of Area Rural Have you heard about the project or Do you have any information about the project?

Not heard before

What is your opinion about this project? Very good project for the farmers it will positively affect, and farmers can get power supply without any problem now due to overload not useful during the peak agriculture season

Do you support this project? 100% Total households in the village and how many approximately have agriculture land and what is the average landholding size?

Total population-5200, Total Household-1180, Total farmer-950, average land holding 2- 5 acres

Are all houses electrified and if yes then what is average hours of electricity per day for domestic consumption

100% electrified, 24 hours current available for the domestic use

Are there separate agriculture connections in the village and if yes then what is the percentage of farmers who have existing agriculture connections

AG consumer 500+, Average DTC -100KV-10-12, 63KV-7-8, total AG DTC-30

How many agricultural pumps do you have in your village

500+ legal, new pending connection -100

Out of the total agricultural pumps how many are electrified and how many are run on diesel?

100% electrified pumps only

What is the average horsepower of the pumps 5HP-10% 7.5HP-90%

How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

Single farmer on one pump

How many hours of electricity you get for your pump and how much you pay monthly? Day time 8 hours, night 10 hours

How much land can be irrigated with an average size of horsepower pump 4acre land can be irrigated with 5 HP pump

How much expenditure does it take for a diesel-based pump to run for one hour and how many hours on an average, it is run

Quarterly 3000 Rs- 5HP, 4000 Rs 7.5HP

Do you think electrified pump will be beneficial and if yes then please share how

Yes, problem regarding the pump can be solved and more hours of pump can be run for irrigation

What are the major crops and how many crops you cultivate in a year

Cotton, Soybean, Tuar, Red gram, Wheat, Onion

Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

Breakdown, Low voltage, LT line pole- not maintained

Do you think that the Project is necessary DP Box- not maintain properly very necessary

What are your main concerns/issues about the project Timing of repairing and maintenance big issue for separate farmer

Page 79: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 75

Particulars Responses Can you suggest how best to address your concerns/issues Time table for current supply regularity

The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

No

Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

No issue

Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this since the project will be for your development?

No need of compensation due to land belongs to government

If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

N/A

Specifically, what concerns/issues do you have on the implementation of the project? No

What positive impacts and/or benefits do you think the project will have

Agriculture pump can be run with no problem, more useful for cultivation, new crops can be harvested

What negative impacts do you think the project will have No negative impacts How safe do you think or consider the distribution feeder? 100% safe

Any criteria you would like to be considered for project design, construction and operation stage?

Need fencing properly around the DTS and Pumps only

How long have you been living in this area By Birth Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

ST-40-50HH (Takonkar, Gond)

Environment Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

At 150 Kw

Access to the forest land and the use of the forest land (if any)

3.74-acre forest land available in the village but not in use by the department of forest

Current environmental conditions in the area – air, dust, noise conditions in the area. No issue of environment

Will the project sitting adversely impact the water or soil resource in the locality No

Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc. Neem, Babool

Wild, endemic, endangered animals in the area. Wild pig, Blue Bull, Deer found in this area Shortage of water for human consumption, irrigation, and how extensive are they?

Dam water supply for drinking, Bore well, well-20+

What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

Water level-200' salty water, no negative impact on ground water

Page 80: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

76 Appendix 2

Particulars Responses What is your prime source of drinking water? And what are the other sources of drinking water?

Dam water supply for drinking purpose for other sources of water is bore well

Any conflicts on water use rights and social impacts? Not any type of conflicts on water Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

Good health, not any health issue

Is the consultation useful Very useful, came to know about the project in details

Would you support and participate during the implementation of Project Full support without any condition

Any other Suggestions if any Want good services in case of any fault.

LIST OF PARTICIPANTS = Total 11 (Male- 6 and Female=5) # Name Age Sex Education Occupation 1 Arun Gondekar 43 M BA Farmer 2 Sucheta M Raut 32 F 12th Farmer 3 Sarda P Khawak 40 F 12th Farmer 4 Savita M Wanare 32 F 10th Farmer 5 Dipali A Gondekar 33 F Graduate Farmer 6 Savitu M Gharade 42 F Graduate Farmer 7 Swapnil 35 M 10th Farmer 8 Sachin N Pawade 37 M 12th Farmer 9 Mangesh D Raut 41 M 10th Farmer 10 Gaurav P Zugade 32 M 12th Farmer 11 Marotrao P Nimkar 51 M BA Farmer

Page 81: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 77

PHOTOGRAPHS

Page 82: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

78 Appendix 2

GENDER CONSULTATION-1 Particulars Responses

Village Gharni Open the discussion with an ‘ice-breaker’, a question which is easy to answer and begins to put people at ease. Ask each person: “Where do you live and how long have you lived there?”

From 30-35 years living in this village

Ask a further question to warm up: “What do you like most about living in this area?”

All facilities available like electricity, drinking water, health facilities, transport and education facilities

Initiate the discussion by asking the group on their primary occupation?

Household activities, agriculture work, a few women run small shop in the village

Please tell us as to how you spend your time (daily routine)? (Try to probe whether they get leisure time and what are the activities they usually do during the leisure hours.

No leisure time, restless life for the rural women, especially during the crop season

Opinion on the importance of education for the people and specifically of the girls and women in your area.

For development and better livelihood, education is must for all, education change the lifestyle especially to the girl/women

Educational level of community people in your locality/area.

Secondary average education level, economic status, social status is good

Types of education facilities (formal and non-formal education, its distance) available in the village / neighborhood and parent’s perception on quality of education (pre-school, primary, elementary and secondary/higher secondary). Try to know access and services to the girls.

Primary school/Middle school/ High school available in the village, Secondary and collage at Chakur-8Km

Reasons for non-enrolment and dropout amongst children & youth. (Male & Female)

Today non enrolment and dropout case not foreseen all facilities available almost free of cost, due to government scheme for the student it is possible

Perceived importance of girl’s education reasons for sending/not sending girls to school

Earlier no school and conservative lifestyle and fully depend on agriculture are the reasons for not sending girls to school, but now a day situation changed facilities of school and opportunity of employment motivating the girls for education

Type of engagement of children in household activities (try to know about the girls) for the (type) and extent to which they directly contribute to the earning of the household (type of occupations engaged in).

After 8th-10th passed, water fetching, cleaning, washing started as per choice not forcefully, no child labor in the practice in the community, priority of getting education for boys and girls equally

Page 83: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 79

Particulars Responses Existing skills and traditional skills amongst the adolescent girls and women that must be revived /encouraged. (Try to probe the skills those are economically productive for the women).

Embroidery work specially for curtain, papad making, parlor, Tailoring, skill available and helping the local women in the income generation

What are the barriers in terms of resources, availability, transport, locations of trainings if any, for pursuing vocational courses by women of your community? Also probe for the barriers from the family side, (like lack of time, etc)

Lack of facility provider vocational training and opportunity of job afterwards a major barrier

Is there any organization, government, private or NGO running any vocational courses for the adolescents and women in area? (Probe for the agencies, nature of vocational trades providing, women’s participation and livelihood opportunities).

Total-20SHG-10years, Dairy, Business, Finance, Cultivation started by the SHG but not at large scale

Do the women of the households in the community have ownerships of the property in the community, like houses, land, etc. probe for the reasons for having or not having ownership rights.

Equal ownership of the property in the community no type of partiality foreseen

Please tell us what are the nature of jobs mainly performed by the women of your community? (Try to probe for besides household work their engagement in government / private sectors, small scale business, agriculture, animal husbandry).

Agriculture/Small enterprises, job in the government, private sector mainly performed by the women

Referring to the group ask if there is any form of inequality in the receipt of wages, payments, rewards, etc for the work that the women perform. (Try to understand the nature of inequalities prevailing). What are the underlying factors for this prevalence of inequalities?

100 Rs less paid

Is the woman who are working and earning have the ultimate decision on the use of their money? (Try to probe the pattern of using the money earned, part saved, used for them, etc.)

Yes, the women who are working and earning have the ultimate decision on the use of their money as per requirement and choice, but practically any decision taken after discussion with each other

Page 84: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

80 Appendix 2

Particulars Responses What role do the women of the household have in the decision-making process of the household? Do you feel you have equal share along with the male counterpart any household decisions? Does it vary among the earning and non-earning women? (How).

Equal and very important role the women playing in the decision-making process of the household

Is there any form of inequality or the cases of male dominating the women in the decision-making process at the household level? Please try to probe for the different household decisions and the role of the women (Decisions may be financial matters, education & health care of the child, purchase of assets, day to day activities, on social functions and marriages).

No case of male domination observed and not in the practice generally any decision taken with mutual understanding

Is there any community-based organization (like NGO’s, SHGs, etc) for the women of your community? If yes, probe what are the activities those organizations are performing, what is the role of the women, is there any positions that they possess, like president, secretary, etc).

No NGO, SHG working in the village

Do the women of your community are members of any political bodies, like Pradeshiya Sabhas, Provincial Councils etc. what role played by them in terms of their involvement and participation. Also probe what prevent women from engaging in political process.

Total 13 ward, 7 wards fixed for female, all parties have the gram panchyat/ taluka level wing for the women the women participation is at high level

General health facilities available and the perceived satisfaction on the quality of services (government and private) & affordability

No specific health facility available in the village, all facilities are available at civil hospital Chakur-8km

Types of commonly prevalent diseases among the community, is there any specific ailments affecting the women of your community? Probe for the problems and the facilities available for the treatment.

No commonly prevalent disease among the community

Is there any provision of special health care services available near to your village/ neighborhood? Probe for the nearest maternity and child health care facilities available, problems faced and the perception on the quality of care.

108, PHC with all kind of health care services available nearest maternity and child health care facilities available with good quality of service

Page 85: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 81

Particulars Responses Do the women feel safe in going outside in the neighborhood during daytime? Also probe for the situation during the nighttime. What are the problems or fears they perceived for their movements?

100% safe, no fear perceiving for their movement day or night

Do the women in the community face any kind of domestic violence at their home? If yes probe for the reasons.

Among the uneducated families 5% of the total women are facing any kind of domestic violence

Is the system of dowry being prevalent among your community? Do the women of your community feel insecure for getting their girls married due to the reasons of dowry? What are the problems and challenges they perceive for this system?

Ratio of boys and girls reduced today so dowry is not prevalent among the community

Do you participate in the agriculture activities?

The women participate equally in the agriculture activities

Do you think that electrification of agricultural pump will be beneficial

100% beneficial urgent need, no need of loan after this project

How will it be beneficial to the women engaged in agricultural activities

After the proposed project agriculture activities increase due to better irrigation facilities

General Remarks if any Very urgently required for the farmers, it will increase the income of the farmers

LIST OF PARTICIPANTS

Village Gharni Name Relation wigh HH Occupation 1 Mrs Sangita Dnyanoba Waghmare Daughter in law Housewife 2 Rajabai Parlhad Kambale Daughter in law Housewife 3 Sangita Shivmutri Swami Daughter in law Housewife 4 Shital Vinayak Waghmare Daughter in law Housewife

Page 86: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

82 Appendix 2

PHOTOGRAPHS

Page 87: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 83

GENDER CONSULTATION-2 Particulars Responses

Village Karhawagaj Open the discussion with an ‘ice-breaker’, a question which is easy to answer and begins to put people at ease. Ask each person: “Where do you live and how long have you lived there?”

Living in this area after marriage at least 25-30 years

Ask a further question to warm up: “What do you like most about living in this area?”

On side road, near the district headquarter, all basic facilities available, school, hospital available near the village

Initiate the discussion by asking the group on their primary occupation?

Primary occupation of the local women are household activities and agricultural activities during the crop season

Please tell us as to how you spend your time (daily routine)? (Try to probe whether they get leisure time and what are the activities they usually do during the leisure hours.

Most of the time spend on household activities, they hardly get leisure time always busy in the household activities

Opinion on the importance of education for the people and specifically of the girls and women in your area.

Education is very important without education one cannot live better

Educational level of community people in your locality/area.

10th-12th average education level in the village

Types of education facilities (formal and non-formal education, its distance) available in the village / neighborhood and parent’s perception on quality of education (pre-school, primary, elementary and secondary/higher secondary). Try to know access and services to the girls.

Primary school-4, middle/high school- Anjangaon-2km

Reasons for non-enrolment and dropout amongst children & youth. (Male & Female)

No case of non-enrolment and dropout today parents are now taking interest for sending their children. The schools have many schemes which are motivating the parents to sending to school

Perceived importance of girl’s education reasons for sending/not sending girls to school

Everybody understands the importance of girl’s education as they become more educated and independent.

Type of engagement of children in household activities (try to know about the girls) for the (type) and extent to which they directly contribute to the earning of the household (type of occupations engaged in).

after 10-14 age/years to learn household like cleaning, washing its started but not forcefully no child labor practice in the community

Page 88: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

84 Appendix 2

Particulars Responses Existing skills and traditional skills amongst the adolescent girls and women that must be revived /encouraged. (Try to probe the skills those are economically productive for the women).

No special skills

What are the barriers in terms of resources, availability, transport, locations of trainings if any, for pursuing vocational courses by women of your community? Also probe for the barriers from the family side, (like lack of time, etc)

Baramati- Tailoring, Beauty Parlor Courses available, no free of cost training available

Is there any organization, government, private or NGO running any vocational courses for the adolescents and women in area? (Probe for the agencies, nature of vocational trades providing, women’s participation and livelihood opportunities).

No Ngo

Do the women of the households in the community have ownerships of the property in the community, like houses, land, etc. probe for the reasons for having or not having ownership rights.

Equal ownership of the property in the community no type of partiality foreseen

Please tell us what are the nature of jobs mainly performed by the women of your community? (Try to probe for besides household work their engagement in government / private sectors, small scale business, agriculture, animal husbandry).

Agriculture work, caring and helping in dairy/ allied activities performed by the women the women running small business and working private and government offices

Referring to the group ask if there is any form of inequality in the receipt of wages, payments, rewards, etc for the work that the women perform. (Try to understand the nature of inequalities prevailing). What are the underlying factors for this prevalence of inequalities?

Yes, inequality seen male paid at least 100rs more wages then the women

Is the woman who are working and earning have the ultimate decision on the use of their money? (Try to probe the pattern of using the money earned, part saved, used for them, etc.)

Yes, the women who are working and earning have the ultimate decision on the use of their money

Page 89: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 85

Particulars Responses What role do the women of the household have in the decision-making process of the household? Do you feel you have equal share along with the male counterpart any household decisions? Does it vary among the earning and non-earning women? (How).

The women play very important role in the decision-making process of the household with the help of male counterpart but vary among earning and non-earning women

Is there any form of inequality or the cases of male dominating the women in the decision-making process at the household level? Please try to probe for the different household decisions and the role of the women (Decisions may be financial matters, education & health care of the child, purchase of assets, day to day activities, on social functions and marriages).

No male domination in the community all type of decision taken after mutual understanding

Is there any community-based organization (like NGO’s, SHGs, etc) for the women of your community? If yes, probe what are the activities those organizations are performing, what is the role of the women, is there any positions that they possess, like president, secretary, etc).

No Ngo working in this area, SHG formed 10 years before total 15 groups actively working 85 propose at large scale, loan and training provided by the group

Do the women of your community are members of any political bodies, like Pradeshiya Sabhas, Provincial Councils etc. what role played by them in terms of their involvement and participation. Also probe what prevent women from engaging in political process.

Yes, gram panchayat reserve seats for the women the women are the members of the political party and participation observed

General health facilities available and the perceived satisfaction on the quality of services (government and private) & affordability

Asha worker working well, civil hospital Baramati, providing all facilities, the service is satisfactory

Types of commonly prevalent diseases among the community, is there any specific ailments affecting the women of your community? Probe for the problems and the facilities available for the treatment.

No commonly prevalent disease among the community

Is there any provision of special health care services available near to your village/ neighborhood? Probe for the nearest maternity and child health care facilities available, problems faced and the perception on the quality of care.

No special health care service available in the village all service available only at Baramati civil hospital

Page 90: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

86 Appendix 2

Particulars Responses Do the women feel safe in going outside in the neighborhood during daytime? Also probe for the situation during the nighttime. What are the problems or fears they perceived for their movements?

100% safe, no fear perceiving for their movement day or night

Do the women in the community face any kind of domestic violence at their home? If yes probe for the reasons.

No domestic violence at their home living peacefully with happiness

Is the system of dowry being prevalent among your community? Do the women of your community feel insecure for getting their girls married due to the reasons of dowry? What are the problems and challenges they perceive for this system?

Cash and gold given by the girl’s parents as dowry but not panic or insecure situation

Do you participate in the agriculture activities?

Yes, all are involved in the agriculture activities as per their requirement

Do you think that electrification of agricultural pump will be beneficial

Through the proposed project at large level benefit possible to improve agriculture activities

How will it be beneficial to the women engaged in agricultural activities

it will generate more employment for the local agriculture labor specially for women

General Remarks if any The proposed project is very helpful for the farmers it will helpful to increase farmers income permanently

LIST OF PARTICIPANTS

Village Karhawagaj # Name Relation with HH Occupation 1 Mrs Priyanka N Nale Wife Farmer 2 Mrs Rukmini S Nale Mother Farmer 3 Mrs Rekha L Nale Wife Farmer 4 Sangita D Nale Wife Farmer 5 Mrs Yashoda G Nale Mother Farmer 6 Warsha K Nale Wife Farmer 7 Anusaya H Nale Sister Farmer 8 Kalawati S Nale Mother Farmer 9 Kavita S Nale Wife Farmer

10 Tai S Nale Wife Farmer 11 Anjana N Nale Mother Farmer

Page 91: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 87

PHOTOGRAPH

Page 92: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

88 Appendix 2

GENDER CONSULTATION-3 Particulars Responses

Village Tisgaon Open the discussion with an ‘ice-breaker’, a question which is easy to answer and begins to put people at ease. Ask each person: “Where do you live and how long have you lived there?”

Living in this village by birth or after marriage at least from 35-40years

Ask a further question to warm up: “What do you like most about living in this area?”

This village is very old and known as Ahilya Bai Devi Holker village, all basic facilities are available in this village, no water problem in the village

Initiate the discussion by asking the group on their primary occupation?

Primary occupation of the women in this village are agriculture and household activities

Please tell us as to how you spend your time (daily routine)? (Try to probe whether they get leisure time and what are the activities they usually do during the leisure hours.

Most of the time spent on farming activities, specially during crop season then household activities, they hardly get leisure time

Opinion on the importance of education for the people and specifically of the girls and women in your area.

Education is very important specially for the women/girls without education life is not easy today, every walk of life education matter.

Educational level of community people in your locality/area.

Minimum 10th -12th both girl and boys, the facilities easily available in and around the village

Types of education facilities (formal and non-formal education, its distance) available in the village / neighborhood and parent’s perception on quality of education (pre-school, primary, elementary and secondary/higher secondary). Try to know access and services to the girls.

Primary school and anganwadi centre available in the village, High school is alos available for secondary and college visit Chanwad

Reasons for non-enrolment and dropout amongst children & youth. (Male & Female)

Today non enrolment and dropout amongst children not observed, state government providing everything without partiality

Perceived importance of girl’s education reasons for sending/not sending girls to school

Today people are sending girls to school without partiality for better life and future education changed the condition of the women today equally sharing and helping with all aspects

Type of engagement of children in household activities (try to know about the girls) for the (type) and extent to which they directly contribute to the earning of the household (type of occupations engaged in).

After 10-15 years childcare, cleaning working, farming started to learn, no child labor observed

Page 93: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 89

Particulars Responses Existing skills and traditional skills amongst the adolescent girls and women that must be revived /encouraged. (Try to probe the skills those are economically productive for the women).

No special skills

What are the barriers in terms of resources, availability, transport, locations of trainings if any, for pursuing vocational courses by women of your community? Also probe for the barriers from the family side, (like lack of time, etc)

Main barriers are not available of the institution for vocational training, no opportunity of vocational training in terms of getting job

Is there any organization, government, private or NGO running any vocational courses for the adolescents and women in area? (Probe for the agencies, nature of vocational trades providing, women’s participation and livelihood opportunities).

No NGO running any vocational courses

Do the women of the households in the community have ownerships of the property in the community, like houses, land, etc. probe for the reasons for having or not having ownership rights.

Some ownership without partiality, the women having equal ownership of the property in the community

Please tell us what are the nature of jobs mainly performed by the women of your community? (Try to probe for besides household work their engagement in government / private sectors, small scale business, agriculture, animal husbandry).

Generally, the women of this village performed cultivation, agriculture labor, government and private service, running small enterprises and allied activities like dairy, goattary

Referring to the group ask if there is any form of inequality in the receipt of wages, payments, rewards, etc for the work that the women perform. (Try to understand the nature of inequalities prevailing). What are the underlying factors for this prevalence of inequalities?

Rs 200/day for agriculture Rs 300/day-350 Rs for female for construction work Rs 300/day for agriculture and 400 Rs for construction for male

Is the woman who are working and earning have the ultimate decision on the use of their money? (Try to probe the pattern of using the money earned, part saved, used for them, etc.)

Yes, women who are working and earning have the ultimate decision on the use of their money

Page 94: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

90 Appendix 2

Particulars Responses What role do the women of the household have in the decision-making process of the household? Do you feel you have equal share along with the male counterpart any household decisions? Does it vary among the earning and non-earning women? (How).

Playing very vital role in the decision-making process of the household, having equal sharing along with the male counterpart, little bit very among the earning and non-earning women

Is there any form of inequality or the cases of male dominating the women in the decision-making process at the household level? Please try to probe for the different household decisions and the role of the women (Decisions may be financial matters, education & health care of the child, purchase of assets, day to day activities, on social functions and marriages).

All decision taken after consultation or discussion with each other

Is there any community-based organization (like NGO’s, SHGs, etc) for the women of your community? If yes, probe what are the activities those organizations are performing, what is the role of the women, is there any positions that they possess, like president, secretary, etc).

No NGO working, SHG-5 -loan and training provided by the local bank, groups are working but not in large scale, due to lack of training

Do the women of your community are members of any political bodies, like Pradeshiya Sabhas, Provincial Councils etc. what role played by them in terms of their involvement and participation. Also probe what prevent women from engaging in political process.

Mrs Usha Kailash khaire member of BTP actively working in the GP 50% seats are reserved for the women

General health facilities available and the perceived satisfaction on the quality of services (government and private) & affordability

No kind of health facilities available in the village in case of emergency people used to visit chanwad-8Km

Types of commonly prevalent diseases among the community, is there any specific ailments affecting the women of your community? Probe for the problems and the facilities available for the treatment.

No commonly prevalent disease among the community

Is there any provision of special health care services available near to your village/ neighborhood? Probe for the nearest maternity and child health care facilities available, problems faced and the perception on the quality of care.

Camp organized time to time and ambulance facility of 108 available in the case of emergency maternity and child health care facilities available at Chanwad government and civil hospital

Page 95: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 91

Particulars Responses Do the women feel safe in going outside in the neighborhood during daytime? Also probe for the situation during the nighttime. What are the problems or fears they perceived for their movements?

100% safe, no fear perceiving for their movement day or night

Do the women in the community face any kind of domestic violence at their home? If yes probe for the reasons.

No domestic violence noticed or in practice in the community

Is the system of dowry being prevalent among your community? Do the women of your community feel insecure for getting their girls married due to the reasons of dowry? What are the problems and challenges they perceive for this system?

No

Do you participate in the agriculture activities?

Yes

Do you think that electrification of agricultural pump will be beneficial

Yes

How will it be beneficial to the women engaged in agricultural activities

Better productivity

General Remarks if any We welcome the project.

LIST OF PARTICIPANTS

Village Tisgaon # Name Relation with HH Occupation 1 Shobha Bhagwan Ganguder Wife Farmer 2 Usha Kailash Khaire Wife Member GP 3 Baban Bai Bhakhaji Ganguder Wife Farmer

Page 96: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

92 Appendix 2

PHOTOGRAPHS

Page 97: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 93

GENDER CONSULTATION-4 Particulars Responses

Village Beloda Open the discussion with an ‘ice-breaker’, a question which is easy to answer and begins to put people at ease. Ask each person: “Where do you live and how long have you lived there?”

Living in this village after marriage or by birth

Ask a further question to warm up: “What do you like most about living in this area?”

Village is Aadarsh gram 2016-2017 awarded by prayavararn santulit smiridh gaon, all basic facility especially available local market anaj mandi available near the village

Initiate the discussion by asking the group on their primary occupation?

Household Agriculture Other activities like -Tailoring, Beauty parlor, Small shop, Charkha especially 12 BPL

Please tell us as to how you spend your time (daily routine)? (Try to probe whether they get leisure time and what are the activities they usually do during the leisure hours.

5-6 Hours agriculture 5-6 Hours household activities Watching television if gets leisure time

Opinion on the importance of education for the people and specifically of the girls and women in your area.

Very important for better life specially for the girls, people demanding educated girls as Bahu today girls can get opportunity of employment if educated

Educational level of community people in your locality/area.

Old generation up to 10th and new generation graduation and at least 12th pass today no kind of barrier for education for girls or boys

Types of education facilities (formal and non-formal education, its distance) available in the village / neighborhood and parent’s perception on quality of education (pre-school, primary, elementary and secondary/higher secondary). Try to know access and services to the girls.

Primary-1, Middle-1, High School-1, Collage- Chandur Bazar

Reasons for non-enrolment and dropout amongst children & youth. (Male & Female)

No case of non-enrolment and dropout amongst children male or female

Perceived importance of girl’s education reasons for sending/not sending girls to school

Today everyone trying to send girl to school without any partiality both given equal opportunity by the parents and government too

Type of engagement of children in household activities (try to know about the girls) for the (type) and extent to which they directly contribute to the earning of the household (type of occupations engaged in).

No forcefully involvement of children in household activities no child labor noticed

Page 98: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

94 Appendix 2

Particulars Responses Existing skills and traditional skills amongst the adolescent girls and women that must be revived /encouraged. (Try to probe the skills those are economically productive for the women).

Charkha, Tailoring, Parlor, sports- National players kabbadi is very common skill amongst the adolescent girl and women that is economically productive for the women

What are the barriers in terms of resources, availability, transport, locations of trainings if any, for pursuing vocational courses by women of your community? Also probe for the barriers from the family side, (like lack of time, etc)

Only barriers in terms of training and support by the Ngo or government side

Is there any organization, government, private or NGO running any vocational courses for the adolescents and women in area? (Probe for the agencies, nature of vocational trades providing, women’s participation and livelihood opportunities).

Jiga Mata Mahila Mandal an NGO working actively in this village for the women providing training and supporting as strengthen economically

Do the women of the households in the community have ownerships of the property in the community, like houses, land, etc. probe for the reasons for having or not having ownership rights.

Yes, equal ownership of the property in the community

Please tell us what are the nature of jobs mainly performed by the women of your community? (Try to probe for besides household work their engagement in government / private sectors, small scale business, agriculture, animal husbandry).

100 female doing job private and government sector 20-25 small business 40- Tailoring 20- Parlor

Referring to the group ask if there is any form of inequality in the receipt of wages, payments, rewards, etc for the work that the women perform. (Try to understand the nature of inequalities prevailing). What are the underlying factors for this prevalence of inequalities?

Agriculture-150-200 female 200-250 Male Construction work -300 Male -500 Rajmistri Underlying factors is hard and soft work

Is the woman who are working and earning have the ultimate decision on the use of their money? (Try to probe the pattern of using the money earned, part saved, used for them, etc.)

Yes, working and earning women have the ultimate decision on the use of their money

Page 99: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 95

Particulars Responses What role do the women of the household have in the decision-making process of the household? Do you feel you have equal share along with the male counterpart any household decisions? Does it vary among the earning and non-earning women? (How).

The women are playing very important role in the decision-making process of the household women have equal share along with the male counterpart, somewhat very among the earning and non-earning

Is there any form of inequality or the cases of male dominating the women in the decision-making process at the household level? Please try to probe for the different household decisions and the role of the women (Decisions may be financial matters, education & health care of the child, purchase of assets, day to day activities, on social functions and marriages).

Practically women dominate in the decision-making process at the household level

Is there any community-based organization (like NGO’s, SHGs, etc) for the women of your community? If yes, probe what are the activities those organizations are performing, what is the role of the women, is there any positions that they possess, like president, secretary, etc).

Total SHG-4, active loan and training provided by SBI for goattary

Do the women of your community are members of any political bodies, like Pradeshiya Sabhas, Provincial Councils etc. what role played by them in terms of their involvement and participation. Also probe what prevent women from engaging in political process.

50% seats reserved in the local body GP for the women all party have women sell at the GP level, no barriers in the participation in the political process

General health facilities available and the perceived satisfaction on the quality of services (government and private) & affordability

No ambulance facility available in the emergency medical facility is very poor, need Improvement

Types of commonly prevalent diseases among the community, is there any specific ailments affecting the women of your community? Probe for the problems and the facilities available for the treatment.

No specific disease except normal ailments

Is there any provision of special health care services available near to your village/ neighborhood? Probe for the nearest maternity and child health care facilities available, problems faced and the perception on the quality of care.

Government providing special health care specially for the women maternity and child health care facilities available in the nearest government hospital but quality of care needs improvement

Page 100: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

96 Appendix 2

Particulars Responses Do the women feel safe in going outside in the neighborhood during daytime? Also probe for the situation during the nighttime. What are the problems or fears they perceived for their movements?

100% safe, no fear perceiving for their movement day or night

Do the women in the community face any kind of domestic violence at their home? If yes probe for the reasons.

No king of domestic violence at their home noticed

Is the system of dowry prevalent among your community? Do the women of your community feel insecure for getting their girls married due to the reasons of dowry? What are the problems and challenges they perceive for this system?

No female so no demand of dowry, male and female ration is not proper it all depends on capacity and choice

Do you participate in the agriculture activities?

Yes, women who having agriculture land involve in the agriculture activities without any hesitation

Do you think that electrification of agricultural pump will be beneficial

Yes, the proposed project is beneficial for the farmers it will help to increase income

How will it be beneficial to the women engaged in agricultural activities

Through more agriculture activities and crops

General Remarks if any At present power supply for the agriculture pumps is not enough and proper, low voltage, regular training and regular fault are the major problem through the proposed project, farmers can able to get proper current supply without any problem

LIST OF PARTICPANTS

Village Beloda # Name Relation with HH Occupation

19 Supriya Girish Rao Utklede Wife Member GP 20 Priyank Srikant Raut Wife Member GP 21 Suchita M Raut Wife Member GP 22 Sharda P Khawale Wife Member GP 23 Savita M Wanare Wife Member GP 24 Dipali A Gandekar Wife Member GP 25 Savita M Gharade Wife Member GP

Page 101: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 2 97

PHOTOGRAPH

Page 102: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

98 Appendix 3

SAFEGUARDS SCREENING AND DUE DILIGENCE I. SAFEGAURD SCREENING A. GENERAL INFORMATION

Subproject Name: Block Name: District Name: Division/Subdivision: Total Length of the line: km Total Area of substation: ha

Construction time: B. SELECTION CRITERIAL (FUNDAMENTAL)

• All subprojects included in the ADB Prohibited Investment Activities List (List provided in Appendix 1) should be excluded from the Project;

• The environmental criteria shown in ADB’s Safeguard Policy Statement (2009) will be followed in the selection and development of new subprojects;

• Subprojects located within national parks, wildlife sanctuaries and nature reserves, or wetlands will not be selected;

• Clearing of any existing forest resources will be avoided; • All equipment procured under the investment program shall be free from polychlorinated

biphenyl (PCBs); • Monuments of cultural or historical importance will be avoided; • All environmental category A subprojects should be excluded from the RBL; • An environmental management plan (EMP) with adequate budget will be developed and

included in the bidding documents for subproject; and • Potential environmental impacts will be minimized by routing and siting to avoid sensitive

areas. • All IR category A subprojects should be excluded from the RBL; • All IP category A and B subprojects shall be excluded from the RBL; • No compulsory land acquisition will be adopted for any proposed new substations and the

land shall be on government land free from informal settlers or shall be on private land to be purchased through negotiated settlement or shall be donated by the beneficiaries.

C. SCREENING CHECKLIST

C-1. Describe Concisely the Potential Impacts and Proposed Mitigation Measures by Referring to the measures listed in the EMP Matrix

Potential Environmental Impacts Will the Project cause…

Yes No If yes, what is the proposed mitigation measures and indicate which EMS will be implemented

encroachment on historical/cultural areas, disfiguration of landscape and increased waste generation?

encroachment on precious ecosystem (e.g. sensitive or protected areas)?

Page 103: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 99

alteration of surface water

hydrology of waterways crossed by roads and resulting in increased sediment in streams affected by increased soil erosion at the construction site?

damage to sensitive coastal/marine habitats by construction of submarine cables?

deterioration of surface water quality due to silt runoff, sanitary wastes from worker-based camps and chemicals used in construction?

increased local air pollution due to rock crushing, cutting and filling?

risks and vulnerabilities related to occupational health and safety due to physical, chemical, biological, and radiological hazards during project construction and operation?

chemical pollution resulting from chemical clearing of vegetation for construction site?

noise and vibration due to civil works?

dislocation or involuntary resettlement of people?

disproportionate impacts on the poor, women and children, Indigenous Peoples or other vulnerable groups?

social conflicts relating to inconveniences in living conditions where construction interferes with pre-existing roads?

hazardous driving conditions where construction interferes with pre-existing roads?

creation of temporary breeding habitats for vectors of disease such as mosquitoes and rodents?

Page 104: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

100 Appendix 3

dislocation and compulsory

resettlement of people living in right-of-way of the power transmission lines?

environmental disturbances associated with the maintenance of lines (e.g. routine control of vegetative height under the lines)?

facilitation of access to protected areas in case corridors traverse protected area?

disturbances (e.g. noise and chemical pollutants) if herbicides are used to control vegetative height?

large population influx during project construction and operation that cause increased burden on social infrastructure and services (such as water supply and sanitation systems)?

social conflicts if workers from other regions or countries are hired?

poor sanitation and solid waste disposal in construction camps and work sites, and possible transmission of communicable diseases from workers to local populations?

risks to community safety associated with maintenance of lines and related facilities?

community health hazards due to electromagnetic fields, land subsidence, lowered groundwater table, and salinization?

risks to community health and safety due to the transport, storage, and use and/or disposal of materials such as explosives, fuel and other chemicals during construction and operation?

Page 105: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 101

community safety risks due to both accidental and natural hazards, especially where the structural elements or components of the project (e.g., high voltage wires, and transmission towers and lines ) are accessible to members of the affected community or where their failure could result in injury to the community throughout project construction, operation and decommissioning?

Evidence/report of existing or previous natural hazards such as floods, landslides, severe wind damage, storm surges, coastal erosion, earthquakes, tsunamis, sea level rise, and Other (specify):______________

(If Yes, indicate when and magnitude.)

C-2 Screening of Subprojects for IR

Probable IR Effects Yes No Not

Known Remarks Involuntary Acquisition of Land 1. Will there be land acquisition? 2. Is the site for land acquisition known? 3. Is the ownership status and current usage of land to be acquired known?

4. Will easement be utilized within an existing Right of Way (ROW)?

5. Will there be loss of shelter and residential land due to land acquisition?

6. Will there be loss of agricultural and other productive assets due to land acquisition?

7. Will there be losses of crops, trees, and fixed assets due to land acquisition?

8. Will there be loss of businesses or enterprises due to land acquisition?

9. Will there be loss of income sources and means of livelihoods due to land acquisition?

Involuntary restrictions on land use or on access to legally designated parks and protected areas 10. Will people lose access to natural resources, communal facilities and services?

11. If land use is changed, will it have an adverse impact on social and economic activities?

12. Will access to land and resources owned communally or by the state be restricted?

Information on Displaced Persons: Any estimate of the likely number of persons that will be displaced by the Project? [ ] No [ ] Yes If yes, approximately how many? NIL (NOT APPLICABLE) Are any of them poor, female-heads of households, or vulnerable to poverty risks? [ ] No [ ]

Page 106: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

102 Appendix 3

Are any displaced persons from indigenous or ethnic minority groups? [ ] No [ ] C-3. Screening of Subprojects for IP

KEY CONCERNS

(Please provide elaborations on the Remarks column)

YES NO NOT KNOWN Remarks

A. Indigenous Peoples Identification

1. Are there socio-cultural groups present in or use the project area who may be considered as "tribes" (hill tribes, schedules tribes, tribal peoples), "minorities" (ethnic or national minorities), or "indigenous communities" in the project area?

2. Are there national or local laws or policies as well as anthropological researches/studies that consider these groups present in or using the project area as belonging to "ethnic minorities", scheduled tribes, tribal peoples, national minorities, or cultural communities?

3. Do such groups self-identify as being part of a distinct social and cultural group?

4. Do such groups maintain collective attachments to distinct habitats or ancestral territories and/or to the natural resources in these habitats and territories?

5. Do such groups maintain cultural, economic, social, and political institutions distinct from the dominant society and culture?

6. Do such groups speak a distinct language or dialect?

7. Has such groups been historically, socially and economically marginalized, disempowered, excluded, and/or discriminated against?

8. Are such groups represented as "Indigenous Peoples" or as "ethnic minorities" or "scheduled tribes" or "tribal populations" in any formal decision-making bodies at the national or local levels?

B. Identification of Potential Impacts 9. Will the project directly or indirectly benefit or target Indigenous Peoples?

10. Will the project directly or indirectly affect Indigenous Peoples' traditional socio-cultural and belief practices? (e.g. child-rearing, health, education, arts, and governance)

11. Will the project affect the livelihood systems of Indigenous Peoples? (e.g., food production system, natural resource management, crafts and trade, employment status)

12. Will the project be in an area (land or territory) occupied, owned, or used by Indigenous Peoples, and/or claimed as ancestral domain?

C. Identification of Special Requirements Will the project activities include:

Page 107: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 103

KEY CONCERNS

(Please provide elaborations on the Remarks column)

YES NO NOT KNOWN Remarks

13. Commercial development of the cultural resources and knowledge of Indigenous Peoples?

14. Physical displacement from traditional or customary lands? 15. Commercial development of natural resources (such as minerals, hydrocarbons, forests, water, hunting or fishing grounds) within customary lands under use that would impact the livelihoods or the cultural, ceremonial, spiritual uses that define the identity and community of Indigenous Peoples?

16. Establishing legal recognition of rights to lands and territories that are traditionally owned or customarily used, occupied or claimed by indigenous peoples?

17. Acquisition of lands that are traditionally owned or customarily used, occupied or claimed by indigenous peoples?

Anticipated project impacts on IP

Project component/ activity/ output Anticipated positive effect Anticipated negative effect

Electric Power Generation

No specific impact is identified to IP .

No specific impact is identified to IP

D. DUE DILIGENCE FORMAT FOR INITIAL ENVIRONMENTAL EXAMINATION(Only if

impacts and risks identified)

D-1. Climatic Conditions

Temperature High: Low: Humidity High: Low: Rainfall _________ mm/year

Rainy seasons from (month) to (month) D-2. Location of the Subproject (Also provide details on google map).

Type of ecosystem Yes15 No Explanation

Coastal area Distance from coastal line: ___km Mangrove along the distribution line: 1. (___) Yes (___) more than 50% (___) less than 20% 2. (___) No

15 In case answer to any question is yes, such subprojects are avoided if it triggers category A for environment and

justification should be given.

Page 108: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

104 Appendix 3

Type of ecosystem Yes15 No Explanation

Hilly/Mountainous area Altitude: _____m [Explain how many km of the line located in the hilly area, and explain the topography of the area]

Forest area [Explain whether the alignment passes through forest areas or located along the forest areas. If it passes through forest areas, the length of the alignment that passes through the forest area and if it passes along the forest areas, explain how many km of the alignment is located along the forest area and the distance from the centerline of the line to the forest area] Density/vegetation coverage: Type of vegetation: Legal status of the forest area:

Waterbody [Explain the distance of the centerline of the line from the edge of the waterbody] Size of the waterbody: Status of the waterbody:

Inhabited area

Agricultural land

Barren land

Flat area

D.2.1 Along the alignment and within 500 m of the line or within a 500 m radius of the substation, is

there any area with critical habitat16? (___) Yes

(___) No secondary information available and local community is not aware of this matter. D.2.2 Along the alignment and within 500 m of the line or within a 500 m radius of the substation, is

there any species of flora and fauna that is classified as endangered species?

16 As described in SPS 2009, Critical habitat is a subset of both natural and modified habitat that deserves attention. Critical habitat includes areas with high biodiversity value, including habitat required for the survival of critically endangered or endangered species; areas having special significance for endemic or restricted-range species; sites that are critical for the survival of migratory species; areas supporting globally significant concentrations or numbers of individuals of congregator species; areas with unique assemblages of species or that are associated with key evolutionary processes or provide key ecosystem services; and areas having biodiversity of significant social, economic, or cultural importance to local communities. Critical habitats include those areas either legally protected or officially proposed for protection, such as areas that meet the criteria of the World Conservation Union classification, the Ramsar List of Wetlands of International Importance, and the United Nations Educational, Scientific, and Cultural Organization’s world natural heritage sites.

Page 109: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 105

(___) Yes (___) No secondary information available and local community is not aware of this matter

D.2.3 Along the alignment and within 500 m of the line or within a 500 m radius of the substation, is there any breeding ground?

(___) Yes (___) No secondary information available and local community is not aware of this matter

D.2.4 Along the alignment and within 500 m of the line or within a 500 m radius of the substation, is

there any bird migration area? (___) Yes (___) No secondary information available and local community is not aware of this matter

D.2.5 Along the alignment and within 500 m of the line or within a 500 m radius of the substation, is there any physical cultural resource?

(___) Yes (___) No D.2.6 Is the area along the project alignment prone to landslide problems?

(___) Yes (___) No D.2.7 Is the area along the project alignment prone to flooding problems? (___) Yes (___) No D-3. List of the Permit/Clearance Required Prior to Commencing the Civil Work

Type of permits Yes No Explanations on the recommended time to apply for the permits

SPCB–Non objection Certificate Forest Department MOEFCC For water extraction For Quarry For Disposing Spoil Materials Other, please describe in the last columns

Page 110: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

106 Appendix 3

E. DUE DILIGENCE for SOCIAL (Only if impacts and risks identified) E-1. Due Diligence for Proposed New 33/11kV Substations

# Particulars Description/Details/Status 1 Whether the land has been identified? And if identified

then whether finalized?

2 Name of Villages 3 Name of Circle/Block 4 Name of District 5 Is it a Tribal Area 6 Approximate Distance of proposed new substation site

from the village

7 Total Area (Acre/Hectare/Bigha) 8 Ownership of land (private/ Government) 9 If Government, then which department and are there

any informal settlers in the government land

10 Land Use Pattern (Cultivation/Barren) 11 If Private, how many owners? 12 Are the Owners Tribal 13 Are there any houses or building in the proposed land 14 Are there any religious or cultural structures the

proposed land

15 is there any crop or trees present and if yes what type of crop and what type of trees with approximate Number of Trees to be cut

16 In case of Private land, what would be the modality of land procurement (Negotiation or Compulsory Acquisition)

17 In case of Private land, has MSEDCL started the consultation with the Owners

18 Have the Owners given consent and willingness to sell the land

19 Are the local people supporting the proposed substation

20 Observation/Remarks

E-2. Due Diligence for Existing 33/11kV Substations or Substations Land already purchased

# Particulars Description/Details/Status 1 How long since the substation has been built 2 What is the approximate area of the

substations

3 What was land ownership prior to construction of substation

4 If private land, has the land been forcefully acquired or mutually purchased or voluntarily donated?

Page 111: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 107

# Particulars Description/Details/Status 5 Was there support of local people while

finalizing the substation site?

6. In case of land acquisition Were you aware about the project and land acquisition prior to the land acquisition done?

7. Were you consulted by the project people during the land acquisition process?

8. Who decided the compensation rate project authority or together?

9. Are you satisfied with the compensation offered to you?

10. If not satisfied, explain why? 11. How long did it take to complete the entire

land acquisition process?

12 Did you find any difficulties while receiving the compensation?

13 What was the mode of compensation (cheque or cash)

14 Were you also paid for other assets associated with your land, such as trees, crops, wells etc.

15 Was there any displacement due to the land acquisition

16. If yes, were you relocated or paid cash compensation only?

17 Do you have any grievances; if you had any grievances was it address satisfactory manner?

1. Did you get anything extra in addition to land compensation?

19. Are you satisfied with the whole process?

20. Remarks

E-3. Due Diligence for Construction of Feeders (33/11kV Lines)

# Particulars Description/Details/Status 1 from Km________To Km___________ 2 Name of Villages 3 Name of Circle/Block 4 Name of District 5 Is it a Tribal Area 6 Approximate Distance of Feeder line

from nearby habitation (Left Side and Right Side of Line from the central line)

7 Type of Area (Agricultural/Crop Area/ Plantation/Settlement or Residential Area/Along the Road/Commercial Area/Defence Area etc in the corridor

Page 112: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

108 Appendix 3

8 Ownership of land (private/ Government)

9 General Land Use Pattern along the Corridor

10 Is the feeder passing over houses or buildings

11 If yes How many buildings approximately

12 what type of building (Residential/Shops/Others)

13 Is the feeder passing over Religious or Cultural Properties

14 Approximate Number of Trees to be cut 15 Types and Names of Trees along the

Corridor

16 Types of Crops along the corridor 17 Remarks (Whether Compensation is to

be paid or avoided or farmers are willing to cooperate without any compensation

F. PUBLIC CONSULTATIONS along with Due Diligence

Consultation Activities Yes No Issues Raised by the community

Consultations with community was conducted before finalizing the alignment

Any suggestion received in finalizing the alignment

If suggestions received, are they incorporated into design

Are there any special consultations conducted in the tribal area and are there any informal consent received from the tribal people (in case subprojects passing through tribal area)

Submitted by: (MSEDCL or its consultant) Name and signature: Position: Date:

Reviewed by: (MSEDCL HQ) Name and signature: Position: Date:

Page 113: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 3 109

Note from the Reviewer, if any:

Page 114: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

110 Appendix 4

SAMPLE OF THE SUMMARY ENVIRONMENTAL MANAGEMENT PLAN TO BE ATTACHED IN THE CONSTRUCTION CONTRACT DOCUMENT

Environmental

Impact Mitigating Measures Implementation Schedule

Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

A. DESIGN AND PRE-CONSTRUCTION PHASE

Release of toxic pollutants, chemicals and gases in receptors (air, water, land) from transformers and equipment

• PCBs will not be used in transformers and other project facilities or equipment.

• Processes, equipment and systems not to use chlorofluorocarbons (CFCs), including halon, and their use, if any, in exiting processes and systems should be phased out and to be disposed of in a manner consistent with the requirements of Government of India.

Design Stage - Part of tender specifications for the equipment

Project Costs

Tender preparation

Check contract document to ensure compliance

Detailed design to comply with specifications

Interference with other utilities and traffic due to design and layout of equipment

• Obtain necessary clearances from other utilities that could be affected by the project

Survey and design stage

Project Costs

Confirm with relevant agencies

Check compliance

Comply with requirements

Land acquisition and resettlement/Loss of agricultural productivity

• Alignment designed to be within road reserves, and as much as possible will avoid the need to remove trees

• Loss of fruit-bearing trees that have economic values shall be compensated in accordance with national requirements

Survey and design stage

Project costs -LA budget

Confirm with relevant agencies

Check compliance

Comply with requirements

Loss of agricultural land, temporary disruption of farming activities, damage to crops, bunds, canals and drains.

• Carefully select the line route to minimize impacts on property and to avoid structures such as bunds, canals and drainage.

• Schedule the installation of the poles during the dry season.

Survey and design stage

Project costs

Confirm with relevant agencies

Check compliance

Comply with requirements

Cutting of trees and other vegetation

• Consult with the owner of the affected trees and vegetation.

• Provide a justified compensation rate for

Survey and design

Project costs

Confirm with relevant agencies

Check compliance

Comply with requirements

Page 115: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 4 111

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

affected trees and vegetation with economic value according to national norms.

Encroachment into ecologically sensitive areas

• Power lines will be routed primarily along existing road reserves and as much as possible avoid the need to remove trees.

• Consult with relevant stakeholders and authorities responsible for managing the areas and implement any special design requirements imposed by those responsible authorities

Survey and design Project costs

Confirm with relevant agencies

Check compliance

Comply with requirements

Impact on aesthetics / Loss of original landscape beauty

• Poles to be sited to minimize visual impacts wherever possible.

• Siting of poles near areas of high cultural and historical significance requires consultation with responsible authorities.

Survey and design

Poles to be sited to minimize visual impact

Confirm with relevant agencies

Check compliance

Comply with requirements

B. CONSTRUCTION PHASE

Planning for construction EMP not effectively implemented

• Prior to mobilization the Contractor required to prepare and submit a construction environmental management plan (CEMP) to MSEDCL for approval.

• CEMP to provide details on how contractor plan to implement the construction mitigation measures specified in this EMP.

Prior to mobilization of contractor to site

Project costs / EMP Budget

Approve CEMP

Train / support PIU & contractor in preparing CEMP including requirements for approval

Prepare CEMP

Impacts on valuable property including land and structures. loss of agricultural land that cause temporary disruption of farming activities, damage to crops, bunds, canals and

• Consult and inform APs prior to starting any construction works.

• Immediately cover and stabilize excavation and disturbed ground after pole erection

• If paddy bunds and drain or canal embankments are affected, the contractor will be required to rehabilitate the area/structures. This shall form part of the contract documents.

Construction stage

Base project costs RP budget

Check with contractor regarding need for pole replacement on private land and initiate engagement with

Audit implementa tion of procedure

Advise PIU and PMC of need for pole replacement on private land

Page 116: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

112 Appendix 4

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

drains. • Where road reserves are being informally used for agriculture, compensation shall be paid for lost productivity in accordance with the RP.

• Implement careful construction practices to avoid damage to existing structures.

landowner

Location of contractor facilities and materials storage areas could adversely affect residential areas and sensitive receptors (schools, hospitals/clinics)

• Local communities and local official officials shall be consulted when selecting sites for project facilities including construction camps, if any, and materials storage sites.

Construction stage

Project costs

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Cutting or trimming of trees

• Position the concrete poles within the road reserve and avoid to the maximum extent possible areas with high concentration of trees.

• Where cutting or trimming of trees is necessary, the activity will be done in accordance with safety clearance requirements.

• Identify offset option with local authorities for loss of indigenous tree species, if any.

Construction stage Project costs

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Interference with traffic and accessways

• Properly plan and execute a traffic management plan that is supported by good site supervision.

• Stockpiling of concrete poles, spoils and cable reels shall only be done in designated areas where no access will be blocked

• Install highly visible guides, signage and/or marker to direct vehicular traffic, and

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Page 117: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 4 113

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

warning signs to inform the public of temporary blockage of one lane of the road during poles installation works.

• Closely coordinate with the local communities.

Soil erosion during auguring/ excavation of pole foundation.

• Auguring will limit the area to be disturbed for pole foundation.

• Contractor will be required to rehabilitate any disturbed areas to its original conditions.

• Schedule the construction activities during the dry season to minimize exposed area subject to erosion.

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Risks of soil erosion, damages to sub-surface utilities and chance find of objects of cultural and historical value during construction of underground cable.

• Excavation will be limited within road reserve

• Contractor will be required to check with local authority whether there are pipe or telecommunication, or other utilities lines exist underground prior to excavation

• Contractor will be required to restore disturbed areas to its original conditions.

• A chance find procedure will be put in place if cultural or historical objects are found during excavation works. MSEDCL who will make sure the Contractor strictly follows the following Procedure:

• If physical cultural objects are encountered during excavation, all works at the find site should be immediately halted.

• The find should be assessed by a competent local District Office of Culture and Fine Arts official, and procedures to avoid, minimize or mitigate impacts to such

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Page 118: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

114 Appendix 4

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

physical cultural objects should be developed.

• Work should not begin until the procedures to avoid, minimize or mitigate impacts to the physical cultural objects have been implemented.

• Where avoidance is not feasible, no alternatives to removal exist, and the Project benefits outweigh the anticipated cultural heritage loss from removal, the physical cultural objects should be removed and preserved according to the best available technique.

• Any removal should be conducted in accordance with relevant provisions of national heritage protection decrees and laws.

• Records should be maintained of all finds, including chain of custody instructions for movable finds.

• All Project workers and staff should be made aware of the chance-find procedure.

Dust and noise

• Implement good construction practices such as water sprinkling of areas prone to dust generation.

• Limit the construction and installation works only at daytime to avoid noise nuisance.

• Impose speed limits on construction vehicles to minimize dust emission along areas where sensitive receptors are located (houses, schools, hospitals, temples, etc.)

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Air pollution and • Limit engine idling to maximum 5 minutes Construction Part of Check Review PIU Implement

Page 119: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 4 115

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

dust emission from movement and operation of construction vehicles and equipment

• Dry and windy conditions, watering shall be done at least twice a day on dusty and exposed areas at project areas, where necessary.

• Impose speed limits on construction vehicles.

• Burning of wastes generated by project-related activities shall be strictly prohibited.

• Position any stationary emission sources (e.g. diesel generators, compressors, etc.) as far as practical from sensitive receptors (houses, schools, clinics, temples)

• Regular use of water spray systems will be introduced at the construction site to minimize dust.

• All sand piles will always be covered. All trucks carrying sediments will also be covered (additional sand will most certainly be required from the sand yard across the highway from the current sub-station).

• Exhaust emissions from vehicles, machinery equipment will comply with GOI and IFC air quality emission standards.

stage construction cost

implementation using checklist

inspection records

mitigation measures

Noise from construction activities

• Noisy construction-related activities will be minimized during religious or cultural events near the sites

• Truck drivers and equipment operators shall avoid as much as possible the use of horns in areas with sensitive receptors such as schools, pagodas, and clinics.

• Avoid noisy construction activities in the vicinity of sensitive receptors during nighttime or other sensitive periods such as during school hours and prayer time.

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Page 120: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

116 Appendix 4

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

Generation of wastes

• Segregate and regularly collect construction wastes.

• Prohibit disposal of solid wastes into canals, rivers, watercourses, and agricultural field. Solid wastes shall only be disposed to sites approved by commune/district authorities.

• Prohibit burning of construction and domestic wastes.

• Recover recyclable wastes that could be reused or sold to recyclers. Ensure that residual wastes are not haphazardly disposed in the environment.

• Sewage to be discharged only in accordance with the conditions of necessary consents.

• Waste management plan to be collated and implemented throughout the contract in accordance with all legal requirements and best practice.

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

OHS

• Installation contractor will be required to implement an OHS plan that includes provision of all appropriate personal protection equipment (PPEs) such as hard hats and safety gloves.

• Contractor will be required to provide readily available first-aid kit and medicines for workers.

• Arrange with nearest health centers and/or hospitals for emergency cares of workers

• Health/accident insurance for workers will be provided for the duration of their contracts.

• An accident reporting system will also be

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

Page 121: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 4 117

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

put in place. • Special consideration will be given to risks

associated with working at height and with electrical components (workers will be suitably trained for these tasks and fitted with safety equipment).

Community health and safety such as toppling of concrete poles, traffic and accidents, emergency spill of materials, and access of villagers to dangerous working areas.

• The whole project work site will be fenced off and signs regarding potential hazards posted in conspicuous locations.

• Contractor will be required to develop a community health and safety plan that incorporates best practices and recognized standards.

• Local communities will continue to be informed about project construction activities, schedules, and possible health and safety risks.

• Implement an emergency response and preparedness procedures with communication systems and protocols to report an emergency

• Coordinate with commune and provincial emergency and health authorities.

Construction stage

Part of construction cost

Check implementation using checklist

Review PIU inspection records

Implement mitigation measures

C. OPERATIONAL AND MAINTENANCE PHASE

Oil spill

• Licensed company to collect the transformers.

• All oil storage drums to be located on impermeable bases with an impervious bund capable of retaining at least 110% of drum volume.

• Tank couplings to be located within bund. • All drums to be stored safely in site

compounds and protected from vehicle impact.

Page 122: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

118 Appendix 4

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

• Adequate oil absorbent and containment materials to be held in areas on all parts of the site and staff briefed on how to use this effectively.

• Oil contaminated water from bunded areas and drip trays to be removed by means of a manually controlled positive lift pump, or other measures (such as oil-absorbent pads, for drip trays) to be agreed in advance with the relevant local authority.

• Contaminated water/materials to be disposed off site to appropriate disposal site with necessary paperwork in place in accordance with the Site Waste Management Plan.

• Mobile fuel and lubricant servicing units to have quality delivery hoses with trigger-type delivery nozzles.

• All staff to be aware of necessary emergency procedures in case of spill.

Impacts on occupational health and safety due to exposure to live power lines, working in heights, and risks of accidents (electrocution, lightning, fires and explosion)

• Allow only trained and qualified workers to have access to work on electrical equipment

• MSEDCL shall ensure adherence to electrical safety standards

• Ensure proper grounding and deactivation of live power distribution lines during maintenance work or if working near the lines

• Provide PPE for workers, safety guidelines and other precautions

• Require workers to observe the minimum approach distances for excavations, tools, vehicles, pruning, and other activities when

O&M stage MSEDCL O&M budget

MSEDCL to comply with requirements

NA NA

Page 123: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 4 119

Environmental Impact Mitigating Measures Implementation

Schedule Budget/ Source

Responsibilities MSEDCL

PIU PMC Contractor

working around power lines.

Worker accidents when working on heights.

• Require workers to test the structural integrity of the pole prior to proceeding with the work

• Use fall protection measures, i.e. all workers are required to wear body harness when working on poles.

O&M stage MSEDCL O&M budget

MSEDCL to comply with requirements

NA NA

Impacts to community health and safety such as electrocution and lightning strikes, explosion and fire, and exposure to magnetic field.

• MSEDCL and contractor to provide public information / awareness campaign on risks and hazards related to live electric lines

• Conduct regular inspections on the line to ensure that the minimum vertical clearance and protection is maintained, and that missing or corroded part are immediately identified and replaced

• Provide lightning arresters along the line • Ensure security of cable to avoid vandalism • Conduct training of workers on emergency

preparedness and response procedures including guidelines on safety and emergency

• Provide warning signages to the public about safety distances from the power lines.

O&M stage MSEDCL O&M budget

MSEDCL to comply with requirements

NA NA

Disturbance to local people due to trimming of trees during maintenance.

• Provide advance information to locals through the village heads about the schedule of maintenance works

• Avoid encroachment into rice or cropland of villagers during vegetation trimming or pruning activities

• MSEDCL will not allow the use of herbicides and pesticides to control vegetation growth, including burning.

O&M stage

MSEDCL O&M budget

MSEDCL to comply with requirements

NA NA

Page 124: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

120 Appendix 5

ENVIRONMENTAL AND SOCIAL SAFEGUARDS MONITORING TEMPLATE

(Note: This template will be used by MSEDCL as a tool to keep records of the environmental and social safeguards mitigations and issues during implementation of the project.)

1. Subproject Details

Subproject Name: Block Name: District Name: Division/Subdivision: Total Length of the line: km Total Area of substation: ha Construction time:

2. Proposed Format of Waste Management17 Monitoring Summary

Type of Subproject

Location of Subproject

Construction Waste Storage Location Disposed By

Type of Subproject

Location of Subproject

Number of Transformers

Failed Stored Sent to Repairing

Repaired/ Replaced

3. Proposed Format of Transformer Oil Management Monitoring Summary

Type of Subproject

Location of Subproject

Transformers Oil (kg)

Oil Collected and Stored

Oil sent to Testing Oil Reused Oil Disposed

4. Proposed Format of EHS Management Monitoring Summary

Type of Subproject

Location of Subproject

Occupational EHS Incidences

Trainings Taken

Nature of Incidence

Mitigation Taken

Residual Impacts Level of Loss

17 During construction phase, will be mainly the construction waste; during operation phase, will be mainly replaced equipment.

Page 125: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 5 121

Type of Subproject

Location of Subproject

Occupational EHS Incidences

Trainings Taken

Nature of Incidence

Mitigation Taken

Residual Impacts Level of Loss

Type of Subproject

Location of Subproject

Community EHS Incidences

Notice to Community

Nature of Incidence

Mitigation Taken

Residual Impacts Level of Loss

• Total Number of Issues for Project: • Number of Open Issues: • Number of Closed Issues: • Percentage Closed: • Non-conformance Level (major/minor):

5. Proposed Format of Substation Land Records

Land Records Attached YES/NO Land Ownership Deed: duly registered under applicable law in India for lands for the farmer.

OR Land lease agreement: registered with local land office, more than 10 years remaining. Lease agreement more than 10 years in case of government land

OR Direct purchase of new land by individual farmer on ―willing buyer-seller basis: prices, names and addresses of peoples witnessed the act of price negotiations and payment, and evidence of actual payment.

OR Land donation certificate by the individual (for private land) or by the community (for panchayat/community land)

OR In case land belongs to any Tribal or Indigenous Peoples Household, whether consent has been obtained through the district magistrate/commissioner

6. Proposed Format of Voluntary Donation and Direct Purchase for the Land

(as of end ……………..[month], ……………..[year]) District: Taluka: GP:

Name of Substation: Project stage

Task Completed (Date)

Outstanding tasks Time frame for completion

Site Selection

stage Selection of Site

P r D P Dissemination of Project Information

Page 126: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

122 Appendix 5

Sensitization of Community

Finalization of location Consultations with Community/APs

Survey for Profile of APs

Identification of Vulnerable APs

Dissemination of Process of Voluntary Land donation or direct purchase, Support/assistance options & Grievance procedures

Finalization of support/assistance to

vulnerabe households

Site

Pre

para

tion

Stag

e

Post

DPR

Sta

ge

Collection of MoU or consent

Advance Notice to Farmers with Standing

Crops

Relocation or compensation of Immovable

assets

Enrollment for Support/assistance

Provision of Support/assistance

Finish compensation and payment for all

assets

Physical Possession of Land by EA

Cons

truc

tion

stag

e

Redressal of Grievances

Unforeseen Impacts

Tree Plantation

Note: This form will be prepared monthly by the Taluka for each Union till issues related to voluntary donation of land are addressed.

7. Proposed Format of Feeders/Distribution Lines

Crops and Trees Attached YES/NO Any Potential Impact on loss of crops and Trees for the construction of Lines

Whether Impacts are avoided during construction If unavoidable impact on crops and trees, whether people volunteered to cooperate with the project construction without asking for compensation

In case of demand for compensation for loss of crops and trees, whether compensation has been paid and no objection has been obtained from the farmer

Page 127: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 5 123

8. Proposed Format of Public Consultations Monitoring Summary

Type of Subproject

Location of Subproject

Consultations

No. of Consultations

Issued discussed Actions Taken Record

maintained

9. Proposed Format of Grievances Monitoring Summary

Type of Subproject

Location of Subproject

Grievances

Type of Grievance

Action Taken and Timeline

Status of complaint

(Closed/Open) Record

maintained

Page 128: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

124 Appendix 6

FORMAT FOR PUBLIC /COMMUNITY/STAKEHOLDERS’ CONSULTATIONS (SOCIAL AND ENVIRONMENT)

Name of the Feeder: ------------------------OR…. Name of the Substation: ----------------------------------- Site/Location: ------------------------Village ------------------------Tehasil/Block--------------------------------- Districts------------------------ Region ------------------------ Existing Feeder or Proposed Feeder------------------------ Existing Substation or Proposed Substation ------------------------ Date of Consultation: ------------------------ Type of Area (Urban/Rural/Highly Congested Urban: ------------------------

# ISSUES PARTICIPANTS’ OPINION, COMMENTS AND SUGGESTIONS

SOCIAL AND GENERAL 1 Have you heard about the Project or Do you

have any information about the project

2 What is your opinion about this Project

3 Do you support this Project

4 Are there landless people in the village

5 Are all houses electrified and if yes then what is average hours of electricity do you get

6 Are there separate agriculture connections in the village

7 How many agricultural pumps do you have in your village

Page 129: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 6 125

# ISSUES PARTICIPANTS’ OPINION, COMMENTS AND SUGGESTIONS

8 Out of the total agricultural pumps how many are electrified and how many are run on diesel?

9 What is the average horsepower of the pumps?

10 How many farmers depend on one pump and how they manage. Who is responsible for getting the pump installed and maintenance including the payment of electricity bill

11 How much land can be irrigated with an average size of horsepower pump

12 Do you think electrified pump will be beneficial and if yes then please share how?

13 What are the major crops and how many crops you cultivate in a year?

14 Do you face any problem regarding current electric supply as far as home connection and agriculture connections are concerned?

15 Do you think that the Project is necessary

16 What are your main concerns/issues about the project

17 Can you suggest how best to address your concerns/issues

18 The Project is about new agricultural connection through new feeders and new substations. There might be loss of crops and trees during construction. Would you volunteer to cooperate with the MSEDCL during construction?

19 Also, the proposed new land which may be government or privately owned. Would you volunteer to donate or sell the land for the Project?

20 Do you expect any kind of compensation if there is loss to land or crops or trees (which is negligible) during construction? MSEDCL wants your cooperation in this regard for no compensation. What is your thought on this

Page 130: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

126 Appendix 6

# ISSUES PARTICIPANTS’ OPINION, COMMENTS AND SUGGESTIONS

since the project will be for your development?

21 If you need compensation, what kind of compensation will you be expecting (cash or kind) in case of land acquisition

22 Specifically, what concerns/issues do you have on the implementation of the project with respect to the following:

• Community health and safety • Land • Agricultural production • Cultural heritage • Displacement • Loss of income and business • Others (Specify)

23 What positive impacts and/or benefits do you think the project will have

24 What negative impacts do you think the project will have

25 How safe do you think or consider the distribution feeder?

26 Any criteria you would like to be considered for project design, construction and operation stage?

27 How long have you been living in this area

28 Are there any indigenous people/ tribal people or ethnic minority living in this area? If yes, how far and what is the name of tribe group and what is their number of households etc.

ENVIRONMENT

29 Protected areas (national park, protected forest, religiously sensitive sites, historical or archaeological sites), if any

Page 131: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 6 127

# ISSUES PARTICIPANTS’ OPINION, COMMENTS AND SUGGESTIONS

30 Access to the forest land and the use of the forest land (if any)

31 Current environmental conditions in the area – air, dust, noise conditions in the area.

32 Will the project siting adversely impact the water or soil resource in the locality

33 Type of trees in the area: Fruit/non fruit/forest/ rare/endangered species etc.

34 Wild, endemic, endangered animals in the area.

35 Shortage of water for human consumption, irrigation, and how extensive are they?

36 What is the general ground water level in this area and does the ground water used for drinking water purpose? Do you think agriculture pumps will have negative impact on ground water being used for drinking water?

37 What is your prime source of drinking water? And what are the other sources of drinking water?

38 Any conflicts on water use rights and social impacts?

39 Health status, Availability of Hospitals and over all environmental condition. Is there any chronic disease prevalent in this area and are you aware about HIV/AIDS and STP?

40 Is the consultation useful

41 Would you support and participate during the implementation of Project

42 Any other Suggestions if any

Page 132: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

128 Appendix 6

# ISSUES PARTICIPANTS’ OPINION, COMMENTS AND SUGGESTIONS

LIST OF PARTICIPANTS

S.No. Name Age Sex (M/F)

Education Occupation Project Affected (yes/No)

Signature

Page 133: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 6 129

PHOTOGRAPHS

Page 134: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

132 Appendix 7

Guideline for Voluntary Donation and Direct Purchase through Negotiated Settlement

A. Procedural Guideline 1. For the program, affected landowner(s) will have the option to voluntarily donate or sell land

where private land. Voluntary land donation or direct purchase involves landowners contributing private land for the project. This contribution is deemed by the landowner to be their own interest and the interest of the community by improving the local infrastructure. The basic principles are the following:

(i) The donation will be limited to only land and minor assets (houses and major assets will be excluded from donation);

(ii) No physical displacement will take place; and (iii) To ensure that no one donating land is severely affected, the donation will be

limited to maximum 9% of the productive assets of the private doner. (iv) In case negotiations for voluntary land donation does not work then direct

purchase through negotiated settlement will be used. In any case, eminent domain or other powers of the country will not be used;

2. Voluntary land donation or direct purchase though negotiated settlement is not within the

scope of the Safeguard Policy Statement (2009)18. However, to ensure that land donation or direct purchase will be carried out on a voluntary basis and that persons donating or selling are not adversely impacted, proper due diligence and meaningful consultation will be conducted. The due diligence and consultation will (i) verify that the donation or selling is in fact voluntary and did not result from coercion, using verbal and written records and confirmation through an independent third party or legal authority; and (ii) ensure that voluntary donations or selling do not severely affect the living standards of affected persons and benefit them directly.

3. The process of voluntary land donation or selling must ensure that landowners can exercise “power of choice” based on full information. Voluntary land donation or selling cannot involve any element of coercion. Individual verification is mandatory to ensure that people are volunteering land of their own volition.

4. The steps for voluntary land donation or selling are as follows: (i) Disseminate information to all stakeholders on project information and land

donation concept, including affected parties and government agencies; (ii) Identification and verification of land to be donated or selling through screening

and survey with cadastral map; (iii) Awareness raising, information sharing and meaningful consultation with affected

landowner(s); (iv) Obtaining signed agreement for land donation or selling in presence of

independent third-party witness; (v) Transfer of title for donated or sold portion of land; and (vi) Verification and monitoring by the social specialist under the ADB TA.19

5. To ensure transparency, written confirmation of voluntary donation or selling will be submitted

by the owners of land/asset affected by the project. The confirmation will be in the written form) with an individual or a group, which will be done between the landowner(s) and the

18 ADB. 2009. Safeguard Policy Statement, 2009. Manila. 19 Monitoring templates are included as Appendix 8.

Page 135: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 7 133

MSEDCL executing the project and will be verified by an independent third party or legal authority.

6. Consultations should be carried out in a meaningful manner to obtain the fullest support of the communities. Consultation methods used are formal and informal, individual and grouped. It is equally important to record each discussion and report any suggestions, complaints made by the community to relevant staff of district office MSEDCL, consultant or contractor in order to take decisions for the betterment of the project.

7. For monitoring land donation, a social specialist under ADB’s TA will be engaged to ensure

that land donation or selling is conducted in a transparent manner and without coercion. For portions of land that have been donated or sold, land title will be modified and transferred to the acquiring agency.

B. Community Meeting and Consultation with Affected Persons 8. Continued consultations with affected persons will be conducted to ensure that affected

peoples understand and support the project and actively participate in the implementation. Information sharing and meaningful consultation is important to avoid harm and reduce local conflict and project delays.

9. The program will specifically target more vulnerable groups for information sharing and meaningful consultation. Seniors, non-titled persons, female-headed households’ children and other stakeholders shall be consulted through focus group discussions, meetings and individual interviews. Stakeholder opinions and their perceptions shall be documented during these consultations.

10. The key stakeholders to be consulted during project preparation and implementation include: (i) Affected persons and beneficiaries; (ii) Gram Panchayat, elected representatives, community leaders, and

representatives of community-based organizations; and (iii) Relevant government agencies/ their representatives’ viz. land revenue, forest etc.

11. Consultations will be recorded and cover the following aspects and refer Appendix 6 in the

PSSA for format on documentation of consultation meetings and consultation with affected persons.

(i) Land requirement; (ii) Willing needs to donate or sell land; (iii) Procedure to be adopted for accretion of land assets; (iv) Environmental issues in the project and how the issues will be resolved; (v) Schedule of census survey, method and criteria for identifying vulnerable

affected persons; (vi) Options for support/assistance to affected persons identified as vulnerable; (vii) Mechanisms for grievance redressal; and (viii) Anticipated construction schedule.

C. Support to vulnerable APs

12. The owner of the land are all titled holding farmers who are unlikely to belong to the vulnerable category stipulated below. MSEDCL also will avoid accepting land donation if the owners are identified as vulnerable groups. The vulnerable households are (i) below poverty line (BPL)

Page 136: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

134 Appendix 7

as per the state poverty line; (ii) immovable assets affected; (iii) female or minor (under 18 years) or elder (above 60 year) or differently abled persons headed; (iv) scheduled caste or tribe; and (v) squatters without any other land are regarded vulnerable household and special attentions will be given to them.

Table 1: Support to Vulnerable APs Impact

Category Mitigation Measures Responsibility

Loss of productive land • Willing transfer of land by means of land donation or direct purchase.

• Advance notice to harvest standing crops. • Assistance/support by means of alternate land sites

provided by Gram Panchayat (GP). • For land involving traditional and tenurial rights, the

legal provisions applicable of the central and state governments pertaining to transfer of land will be followed. Existing customary rights of the tribal communities on various categories of land shall be taken into account during the process of land transfer.

Gram Panchayat (GP), MSEDCL and land revenue department

Loss of assets other land • Willing transfer of the assets along with land • Immovable assets required to be relocated or

compensated for replacement.

MSEDCL, GP and land revenue department

Other impacts not identified

• Unforeseen impacts will be documented and mitigated based on the principles in this guideline.

AP= Affected Peoples, GP= Gram Panchayat, MOU= Memorandum of Understanding, PIU- project implementation unit D. Land Transfer of Title 19. Proper transfer of title to MSEDCL for the portion of donated or sold land must be undertaken and monitored. Once the group and/or individual consent is obtained, MSEDCL through the GP will initiate the process for land ownership transfer in order to avoid the titleholder paying relevant duties and taxes on the donated or sold portion of the land in the future. In coordination with revenue officials, the actual extent of land lost will be identified and on mutual convenient date both the representative of the GP /MSEDCL and land owner(s) will visit Land Revenue Office and complete the process. The revenue officer will check the record of land transfer as a third party. 20. MSEDCL will maintain the record of land owners properly by help of consultants. MSEDCL will be responsible to record the process of land transfer, problem faced, lesson learnt and so on which will be reflected in the periodic reports of the project. 21. Land ownership transfer will start before the beginning of the construction and will continue until the transfer is completed for all affected families/parcels, completing the entire deed transfer process. The land transfer process involves the following stages:

Page 137: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 7 135

(i) Obtaining collective and/or individual consent letters in writing from each affected family or person;

(ii) Distribution of assistance/support for vulnerable APs; (iii) Legal transfer of land ownership.

22. The landowners will be exempted from the tax of the government and other costs incurred during land ownership transfer.

Page 138: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

136 Appendix 7

Annex 1

FORMAT OF SURVEY QUESTIONNAIRE 1. Household Identification Number:………………………………………………………. 2. Plot No.: ………...…………………………………………………………………………… 3. Name of the Head of the Household:…….…………………………………………….. 4. Vulnerability: Tick here if belong to any of the following:

i) below poverty line (BPL) as per the state poverty line; ii) immovable asset affected iii) female or minor (under 18 years) or elder (above 60 year) or diffently abled

persons (persons with disability (PWD) headed; iv) scheduled caste or tribe; v) squatters without any other land; vi) Any other (Specify)

6. Household Size: ……………………………………………………………………. 7. No. of Adult earning members: …….………………………………………………. 8. No. of Dependents: ………………………………………………….……………… 9. Annual Income in Rs. (prior to donation):………………………………. 10. Nature of Impact:

Loss of productive land loss of productive assets other than land Any Other (Specify) …………………………………….

11. Land Status: 1. Irrigated; 2. Commercial; 3. Barren and 4. Any other (Specify) 12. Category of AP: 1. Titleholder; 2. Squatter; 3. Encroacher; 4. Tenant;

5. Non-titled person; 6. Children; and 7. Others’ (specify) 13. Extent of impact (% of total land holding including any other land parcels owned elsewhere by the APs). Specify extent of loss in the following:

Less than 5%

More than 5% - less than 10%

More than 10% - less than 15%

More than 15% - less than 20%

More than 20% - less than 25%

More than 25%..........

14 Size of the residual holding (in acres/m2): …………………………………… 15. Asset Loss: 16. Inventory assets lost (Secondary structures, trees, wells, common property resource [CPRs] etc.): ……………………

Page 139: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 7 137

Annex 2

MEMORANDUM OF UNDERSTANDING FOR LAND DONATION

This memorandum of understanding is made on _____________day of _____ 2019 between the persons listed below on the one part (hereinafter collectively referred to as “the First Party”), and the Governor of (State) through Sri/Srimati ________________ (designation) _______________________ (hereinafter referred to as “the Second Party”).

THESE PRESENTS WITNESS AS FOLLOW:

1. That the First Party is the landowners with transferable right of the respective acres (OR OTHER UNITS AS APPLICABLE) of land bearing details as listed below in village __________________________, Block _______________, Tehsil/Circle________________________, District _________________. 2. That the First Party has taken part in the location survey conducted under the requirements of the _____________ substation and has been made to understand the benefits of obtaining HVDS facilities.

3. That the First Party hereby grants to the Second Party, out of their free will, above said land as detailed in the list below for the construction and development of substation for HVDS in the village ___________ under _____ Panchayat, for the benefit of the villagers and the public at large.

4. That the First Party would not claim any compensation against the above said grant of land.

5. That the the First Party would not claim any compensation agaist the assets of the above said land. Only in case they are immovable properties like structure and tree which needs relocation, then the affected assets shall be relocated or cash compneastion for relocation shall be paid by the Second Party to the eligible First Party/owner/occupier of the properties.

6. That the Second Party shall construct and develop the HVDS projects and take all possible precautions to avoid any damage to land adjacent to the substation.

7. That the First Party also assures the Second Party that the first party will not indulge in any willful act of damaging the new facilities or obstructing the operation.

8. That both the Parties hereto agree that the substations constructed/developed shall be considered as public premises after donation. 9. That the provisions of the MEMORANDUM OF UNDERSTANDING will come into force and effect from the date of signing of this deed.

Page 140: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

138 Appendix 7

S. No. Name Description of land owned Description of land granted for _______________ HVDS

IN WITNESS WHEREOF the Parties hereto have signed this deed on the day and the year first above written. Signatures of the First Party Signature for and on behalf of the Second Party

1.________________________ ________________________

2.________________________

3.________________________

(all the signatures of the First Party should be obtained)

Witnesses: Witnesses:

1. _______________________ 1. _______________________

2.________________________ 2. _______________________

(Signature, name and address) (Signature, name and address)

Note: The witnesses will include the panchayat head/village chief and the Engineer of MSEDCL conducting the location survey. More witnesses can be added – including NGOs, village elders etc.

Page 141: Program Safeguard Systems Assessmentcross subsidy and power purchase cost, however, the cost will be booked as annual revenue requirement. Also increase consumers will result in higher

Appendix 7 139

Annex 3

CONSENT LETTER FOR DIRECT PURCHASE

Date: Name of the Substation: Name of the Village: Name of the Block/Tehasil: Name of the District: MSEDCL is proposing to construct a new 33/11kV substation and associated lines in your locality for which approximately 40 meters X 40 meters of land will be required from you. MSEDCL,Ttherefore, kindly seek your advance consent to express your free will to sell the land through negotiation settlement for the development. All the protocol related to land negotiation and transfer will be held as per the stipulated laws and regulations applicable to MSEDCL. The cost of the land will be mutually agreed between you as an owner and MSEDCL with the help from local revenue officials. Details of the land are attached. MSEDCL kindly request you to provide, advance consent to provide the land for the construction of the new substation as per the agreed negotiation to be followed between MSEDCL and you (landowner).

S. No. Name Description of land owned Description of land to be sold for _______________ HVDS

Name and Signature of the Land Owner

Name and Signature of concerned MSEDCL official