programa de fabricación
DESCRIPTION
819TRANSCRIPT
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
1 STEAM DRUM SCHEDULE OP 819 69 % 73% 149.5 das vie 11/04/14 mi 05/11/14
2 Enginerig 100 % 100% 50 das vie 11/04/14 mi 18/06/14
8 Purchasing 100 % 75% 18 das lun 02/06/14 mi 25/06/14
11 Materils reception 100 % 60% 30 das jue 05/06/14 mi 16/07/14
14 Material Verification 100 % 40% 18 das jue 26/06/14 lun 21/07/14
17 Fabrication 50 % 66% 92 das lun 30/06/14 mi 05/11/14
18 Forming heads 100 % 100% 12.7 das lun 30/06/14 jue 17/07/14
19 Cut plates 100 % 100% 1 da lun 30/06/14 mar 01/07/14
20 Forming heads 100 % 100% 2 das mi 02/07/14 vie 04/07/14
21 Cut final higth 100 % 100% 1 da mar 15/07/14 mi 16/07/14
22 Inspeccion y liberacion 100 % 100% 0.5 das mi 16/07/14 jue 17/07/14
23 Shell fabrication 72 % 45% 63.4 das mar 01/07/14 vie 26/09/14
24 Cut plates shell 100 % 100% 2 das mar 01/07/14 jue 03/07/14
25 Rolled shell 100 % 100% 2 das jue 03/07/14 lun 07/07/14
26 Stroke suppotrs 100 % 100% 1 da jue 03/07/14 vie 04/07/14
27 Cut Supports 100 % 100% 1 da vie 04/07/14 lun 07/07/14
28 Fitting Suports 100 % 100% 1 da lun 07/07/14 mar 08/07/14
29 Welding supports 100 % 100% 1.5 das mar 08/07/14 jue 10/07/14
30 Welding shell long 100 % 100% 1 da lun 07/07/14 mar 08/07/14
73%
100%
75%
60%
40%
66%
100%
100%
100%
100%
100%
45%
100%
100%
100%
100%
100%
100%
100%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 1Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
31 Reroled shell 100 % 100% 1 da mar 08/07/14 mi 09/07/14
32 Fitting shell 100 % 100% 1 da mi 09/07/14 jue 10/07/14
33 ASME Point 100 % 100% 0.5 das jue 10/07/14 vie 11/07/14
34 Welding shell circ. 100 % 75% 3 das vie 11/07/14 mi 16/07/14
35 Beveling. Heads 0 % 0% 1 da mi 03/09/14 mi 03/09/14
36 Fitting head 1 0 % 0% 2 das jue 04/09/14 vie 05/09/14
37 Welding head 0 % 0% 6 das lun 08/09/14 lun 15/09/14
38 Fitting head 2 0 % 0% 6 das mar 16/09/14 mar 23/09/14
39 Welding head 2 0 % 0% 2 das mi 24/09/14 jue 25/09/14
40 "X" Ray long and circ. 0 % 0% 1 da vie 26/09/14 vie 26/09/14
41 Stroke principal axes 100 % 100% 0.3 das lun 11/08/14 lun 11/08/14
42 Layout for Drilling 100 % 100% 0.5 das lun 11/08/14 lun 11/08/14
43 Drilling steam drum 100 % 100% 2 das mar 12/08/14 mi 13/08/14
44 Cleaning and detail 100 % 100% 1 da jue 14/08/14 jue 14/08/14
45 Nozzle and manway stroke 100 % 100% 2 das vie 15/08/14 lun 18/08/14
46 Drilling tubeholes 100 % 100% 1 da mar 19/08/14 mar 19/08/14
47 Fitting Nozzles 100 % 0% 3 das mi 20/08/14 vie 22/08/14
48 Welding nozzles 100 % 0% 5 das lun 25/08/14 vie 29/08/14
49 Internal stroke 44 % 100% 2 das lun 01/09/14 mar 02/09/14
100%
100%
100%
75%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
0%
0%
100%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 2Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
50 Drilling risers out holes 0 % 100% 2 das mi 03/09/14 jue 04/09/14
51 Drilling risers holes 0 % 100% 3 das vie 05/09/14 mar 09/09/14
52 Preparation for hydro test 0 % 0% 3 das mi 10/09/14 vie 12/09/14
53 Hydro test 0 % 0% 2 das lun 15/09/14 mar 16/09/14
54 Cleaning stream drum 0 % 0% 2 das mi 17/09/14 jue 18/09/14
55 Internals fabrication 53 % 87% 57.5 das mar 22/07/14 jue 09/10/14
56 Chevrones Fabrication (18 Pcies) 94 % 94% 33 das mar 22/07/14 jue 04/09/14
57 Cut plates MK. 1 100 % 100% 2 das mar 22/07/14 mi 23/07/14
58 Cleaning plates 100 % 100% 2 das jue 24/07/14 vie 25/07/14
59 Bending plates 100 % 100% 2 das lun 28/07/14 mar 29/07/14
60 Cut plates MK. 2 100 % 100% 2 das jue 24/07/14 vie 25/07/14
61 Cleaning plates 100 % 100% 2 das lun 28/07/14 mar 29/07/14
62 Bending plates 100 % 100% 2 das mi 30/07/14 jue 31/07/14
63 Cut plates MK. 3 100 % 100% 2 das lun 28/07/14 mar 29/07/14
64 Cleaning plates 100 % 100% 1 da mi 30/07/14 mi 30/07/14
65 Bending plates 100 % 100% 2 das jue 31/07/14 vie 01/08/14
66 Cut Plates MK. 4 100 % 100% 1 da mi 30/07/14 mi 30/07/14
67 Cleaning plates 100 % 100% 1 da jue 31/07/14 jue 31/07/14
68 Bending plates 100 % 100% 2 das vie 01/08/14 lun 04/08/14
100%
100%
0%
0%
0%
87%
94%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 3Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
69 Cut plates MK. 5 100 % 100% 2 das jue 31/07/14 vie 01/08/14
70 Cleaning plates 100 % 100% 1 da jue 31/07/14 jue 31/07/14
71 Bending plates 100 % 100% 3 das lun 04/08/14 mi 06/08/14
72 Cut plates MK. 6 100 % 100% 2 das lun 04/08/14 mar 05/08/14
73 Cleaning plates 100 % 100% 1 da mi 06/08/14 mi 06/08/14
74 Bending plates 100 % 100% 2 das jue 07/08/14 vie 08/08/14
75 Cut plates MK. 7 100 % 100% 2 das mi 06/08/14 jue 07/08/14
76 Cleaning plates 100 % 100% 1 da vie 08/08/14 vie 08/08/14
77 Bending plates 100 % 100% 2 das lun 11/08/14 mar 12/08/14
78 Cut plates MK. 8 W 100 % 100% 2 das lun 11/08/14 mar 12/08/14
79 Cleaning plates 100 % 100% 1 da mi 13/08/14 mi 13/08/14
80 Bending plates 100 % 100% 2 das jue 14/08/14 vie 15/08/14
81 Fitting caising 100 % 100% 2 das lun 18/08/14 mar 19/08/14
82 Weldin Internal caising 100 % 100% 4 das mi 20/08/14 lun 25/08/14
83 Assembly MK. 8 100 % 100% 4 das mi 20/08/14 lun 25/08/14
84 Fititn for close caising 100 % 85% 5 das mar 26/08/14 lun 01/09/14
85 Welding caising 100 % 100% 5 das mar 26/08/14 lun 01/09/14
86 Welding Details 0 % 100% 3 das mar 02/09/14 jue 04/09/14
87 Inspecction 0 % 0% 3 das mar 02/09/14 jue 04/09/14
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
85%
100%
100%
0%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 4Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
88 SEPARATOR INTERNAL FABRICATION (24) 79 % 100% 39 das mar 22/07/14 vie 12/09/14
89 Cut plates MK. 2743 y 2744 100 % 100% 1.5 das mar 22/07/14 mi 23/07/14
90 Cleaning plates 100 % 100% 1.5 das mi 23/07/14 jue 24/07/14
91 Cut plates MK. 2742 100 % 100% 1.5 das vie 25/07/14 lun 28/07/14
92 Cleaning plates 100 % 100% 1.5 das lun 28/07/14 mar 29/07/14
93 Roled plates 100 % 100% 1.5 das mi 30/07/14 jue 31/07/14
94 Cut plates MK. 2745 100 % 100% 1.5 das jue 31/07/14 vie 01/08/14
95 Cleaning plates 100 % 100% 1.5 das lun 04/08/14 mar 05/08/14
96 Roled plates 100 % 100% 1.5 das mar 05/08/14 mi 06/08/14
97 Cut plates MK. 2749 100 % 100% 1.5 das jue 07/08/14 vie 08/08/14
98 Cleaning plates 100 % 100% 1.5 das vie 08/08/14 lun 11/08/14
99 Rolled plates 100 % 100% 1.5 das mar 12/08/14 mi 13/08/14
100 Cut plates MK. 2741 100 % 100% 1.5 das mi 13/08/14 jue 14/08/14
101 Cleaning plates 100 % 100% 1.5 das vie 15/08/14 lun 18/08/14
102 Cut plates MK. 2751 100 % 100% 1.5 das lun 18/08/14 mar 19/08/14
103 Cleaning plates 100 % 100% 1.5 das mi 20/08/14 jue 21/08/14
104 Bvending and roled plates 100 % 100% 1.5 das jue 21/08/14 vie 22/08/14
105 Cut plates MK. 2746 100 % 100% 1.5 das lun 25/08/14 mar 26/08/14
106 Cleaning plates 100 % 100% 1.5 das mar 26/08/14 mi 27/08/14
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 5Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
107 Bending and roled plates 100 % 100% 1.5 das jue 28/08/14 vie 29/08/14
108 Cut plates MK. 2747 100 % 100% 1.5 das vie 29/08/14 lun 01/09/14
109 Bending plates 0 % 100% 1.5 das mar 02/09/14 mi 03/09/14
110 Cut plates MK. 2748 0 % 100% 1.5 das mi 03/09/14 jue 04/09/14
111 Cleaning plates 0 % 100% 1.5 das vie 05/09/14 lun 08/09/14
112 Bending plates 0 % 100% 1.5 das lun 08/09/14 mar 09/09/14
113 Cut plates MK. 2752 0 % 100% 1.5 das mi 10/09/14 jue 11/09/14
114 Cleaning plates 0 % 100% 1.5 das jue 11/09/14 vie 12/09/14
115 Dry box fabrication 0 % 56% 13 das lun 15/09/14 mi 01/10/14
116 Cut materials 0 % 100% 3 das lun 15/09/14 mi 17/09/14
117 Cleaning plates 0 % 80% 2 das jue 18/09/14 vie 19/09/14
118 Fitting dry box 0 % 75% 3 das lun 22/09/14 mi 24/09/14
119 Welding dry box 0 % 15% 3 das jue 25/09/14 lun 29/09/14
120 Die check 0 % 0% 2 das mar 30/09/14 mi 01/10/14
121 Horizontal separator fabrication 0 % 63% 10 das lun 22/09/14 vie 03/10/14
122 Cut plates 0 % 100% 3 das lun 22/09/14 mi 24/09/14
123 Fit ting plates 0 % 50% 2 das jue 25/09/14 vie 26/09/14
124 Welding plates 0 % 75% 3 das lun 29/09/14 mi 01/10/14
125 Assembly separators 0 % 0% 2 das jue 02/10/14 vie 03/10/14
100%
100%
100%
100%
100%
100%
100%
100%
56%
100%
80%
75%
15%
0%
63%
100%
50%
75%
0%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 6Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS
-
Id Nombre de tarea % PROGR.
% REAL Duracin Comienzo Fin
126 Accesories, pipes , and supports fabrication 0 % 55% 10.5 das jue 25/09/14 jue 09/10/14
127 Cut materials 0 % 80% 2 das jue 25/09/14 vie 26/09/14
128 Fitting materials 0 % 50% 1.5 das lun 29/09/14 mar 30/09/14
129 Welding materiales 0 % 50% 2 das mar 30/09/14 jue 02/10/14
130 Fitting base plates supports 0 % 50% 1 da jue 02/10/14 vie 03/10/14
131 Welding base plates supports 0 % 50% 3 das jue 02/10/14 mar 07/10/14
132 Detallado de soldadura en silletas 0 % 50% 2 das mar 07/10/14 jue 09/10/14
133 Erection internals supports 0 % 0% 12 das jue 02/10/14 lun 20/10/14
134 Ceaning an painting 0 % 0% 1 da lun 20/10/14 mar 21/10/14
135 Detail paint 0 % 0% 2 das mar 21/10/14 jue 23/10/14
136 Final Inspection ASME 0 % 0% 1 da jue 23/10/14 vie 24/10/14
137 Prepatation for SHIPPING 0 % 0% 3 das vie 24/10/14 mi 29/10/14
138 Final Document Package 0 % 0% 5 das vie 24/10/14 vie 31/10/14
139 Liberacin final 0 % 0% 1 da vie 31/10/14 lun 03/11/14
140 SHIPPING 0 % 0% 2 das lun 03/11/14 mi 05/11/14
55%
80%
50%
50%
50%
50%
50%
0%
0%
0%
24/10
0%
0%
0%
0%
mar abr may jun jul ago sep oct nov dic enetri 1, 2014 tri 2, 2014 tri 3, 2014 tri 4, 2014 tri 1, 2015
Tareas crticas
Divisin crtica
Progreso de tarea crtica
Tarea
Divisin
Progreso de tarea
Lnea de base
Divisin de la lnea de base
Hito de lnea de base
Hito
Progreso del resumen
Resumen
Resumen del proyecto
Tareas externas
Hito externo
Tarea inactiva
Hito inactivo
Resumen inactivo
Tarea manual
Slo duracin
Informe de resumen manual
Resumen manual
Slo el comienzo
Slo fin
Fecha lmite
AXIS INDUSTRIAL S.A. DE C.V.JOB SCHEDULE STEAM DRUMCliente:FWNAC
Pgina 7Rev. 1
Elab. F. Bernabe.Rev. M. Pacheco
Aprobo. D. Mcintosh
PROGRAMA DE TERMINACION DE TFecha: mi 03/09/14ELABORO: IFBS