Olympic Middle School Progress is produced by Absher Construction Company, general contractor/construction manager for the project, to help convey project plans, upcoming events, construction activities and other information to the Olympic Middle School community and project participants. Community input is welcome! Please contact Rachel Knudson at [email protected] for more information.
Olympic Middle School Construction Overview
Serving the Olympic Middle
School community during
construction
Project TeamOwner: Auburn School District
GC/CM: Absher Construction Company
Architect: BLRB Architects
Engineers: PCS Structural Solutions Hargis Engineers AHBL Weisman Design Group Stantec Halliday Associates
The Olympic Middle School Reconstruction Project is a three-phase project to replace the current Olympic Middle School. It will be a two-story structure, approximately 105,000 square feet, and will accommodate 800 students.
The first two phases will include construction of a new middle school at the south end of the current school site and minor modernization of the existing school buildings.
Once the school year for 2018/2019 ends, the existing building will undergo minor improvements to allow it to function as an interim elementary school. The interim elementary will house students from other schools for a period of four years, while the district builds five new elementary schools.
Absher Construction Company • www.AbsherCo.com
Olympic Middle School Construction Update
ProgressNow that weather is improving, Absher and our subcontractors are underway with much of the exterior work. New sidewalks are being added, beginning from H St., going east on 21st St., heading north on K St. and ending at the old school. We are also setting the bases for the light poles, and the site is being graded so that landscaping can begin. The brick exterior is 80% complete—by the end of the month we will begin removing the scaffolding and washing the brick. We also recently began installing windows and glass.
On the interior of the building, we are currently finishing the drywall, painting the walls, and beginning to install the flooring. Throughout the classrooms, we are installing cabinetry and the ceiling grid. In the restrooms, the tiles for walls and floors are underway. Soon we will be receiving deliveries of the specialty items: stage equipment, gymnasium equipment, operable partitions,and kitchen items. We are working tirelessly to get the new Olympic Middle School opened up by August!
OLYMPIC M I D D L E S C H O O L
P R O J E C T U P D A T E M A Y 2 0 1 9
Neighborhood Impacts• New sidewalks, street lighting and
partial asphalt replacement on H St., 21st St. and K St. are underway. Please watch for occasional road closures, flaggers and truck traffic.
• In July 2019, two buildings part of the original Olympic Middle School will be demolished. There will be fencing and precautionary measures in place.
Project ContactsAssistant Superintendent: Max Cannon [email protected] 253.446.3141
Project Engineer: Rachel Knudson [email protected] 253.446.3141
Take a Sneak Peek Inside!
PT1
AWP3
PT1
PT8
PT1
RWB1
3' -
0"
7' - 0"7' - 0"
(96"x48")101100.MB
115200.EPS
116623.BBD
104413.FXC
098400.AWP
099123.PT
099123.PT
096466.RWB
099123.PT
116623.SPF SPF1
STRUCUTRAL DECK, JOISTS, STEEL, HVAC AND MECH EQUIPMENT TO BE PAINTED PT1 GLOSSY
8' -
6"1'
- 10
"3'
- 6"
14' -
0"
STRUCUTRAL DECK, JOISTS, STEEL, HVAC AND MECH EQUIPMENT TO BE PAINTED PT1 GLOSSY
099123.PT
098400.AWP
099123.PT
096466.RWB
4' -
2"2'
- 8"
3' -
6"1'
- 10
"8'
- 6"
7' -
2"
PT1
AWP3
PT1
PT8
PT12PT12
PT1
RWB1
PT8
1' -
4"5'
- 10
"1'
- 4"
9' - 1 1/2"
116623.BBD
099123.PT
ALIGNALIGN
EQ EQ
LETTERTYPE: CENTURY GOTHIC
GENERAL INT. ELEVATION NOTES1. FOR ROLLER SHADE LOCATIONS, SEE SHEETS A7.1A, A7.1B, AND A7.2A.
ROLLER SHADES WITH AN '(E)' DESIGNATION ARE MOTOR-OPERATED; '(M)' DESIGNATION ARE MANUALLY OPERATED. SHEETS A7.1A/B TAKE PRECEDENCE OVER A5-SERIES SHEETS. (12 21 13.RVS)
2. SEE SPECIFICATIONS FOR LEEVEL OF WALL FINISH FOR GYPSUM BOARD. 09 29 00
3. COORDINATE ALL WALL FINISHES WITH ROOM FINISH SCHEDULE. INTERIOR ELEVATION TO SUPERSEDE ROOM FINISH SCHEDULE WHEN IN CONFLICT.
4. ALL FINISH COLORS TO BE FIELD COLOR AS OUTLINED IN THE ROOM FINISH SCHEDULE UNLESS OTHERWISE NOTED.
5. ALL EXPOSED MECAHNICAL EQUIPMENT, STRUCTURAL DECK AND STRUCTURE STEEL TO BE PAINTED AS INDICATED. SEE REFLECTED CEILING PLAN AND ELEVATIONS FOR COLOR.
6. ALL MECHANICAL GRILLS TO BE PAINTED TO MATCH SURROUNDING WALL COLOR.
7. ALL MECHANICAL EQUIPMENT AND PANELS LOCATED WITHIN WAINSCOT OR SIMILAR PANEL FINISH SHOULD BE TRIMMED IN.
8. SEE DETAILS IN THE A8 SERIES FOR FLOORING TRANSITIONS.9. ARCHITECT/OWNER TO LOCATE CABINET GROMMETS DURING REVIEW OF
CASEWORK SHOP DRAWINGS.
2 3 4 5 6 7 8 9
A
B
C
D
E
F
G
H
J
K
Drawing Title:
Date : Drawn By :
Revised : Project No.
Stamp Sheet No.
of
BLRB ARCHITECTS, P.S.
1
4/3/
2018
10:
31:0
3 PM
INTERIOR ELEVATOINS -LEVEL1 AREA1
04/02/2018 JE,DL
1634
A5.11B
OLYMPIC MIDDLESCHOOL
RECONSTRUCTION
100% CONSTRUCTIONDOCUMENTS
AUBURN SCHOOL DISTRICT No. 408
1/4" = 1'-0" @ FULL SIZEE1 310 - MAIN GYMNASIUM - NORTH
1/4" = 1'-0" @ FULL SIZEK1 310 - MAIN GYMNASIUM - EAST
MATERIALS KEY096466.RWB RESILIENT WALL BASE (VENTED)098400.AWP ACOUSTICAL WALL PANEL099123.PT PAINT SYSTEM101100.MB MARKERBOARD104413.FXC FIRE EXTINGUISHER CABINET115200.EPS116623.BBD BACKBOARD ELECTRIC OPERATION
(ELEC./MANUAL)116623.SPF SAAFETY PAD (FIXED)
DRAWING REVISIONS
REV.DELTA
REV.DATE
REV. DESCRIPTION
Administration area and front entrance
Main corridor/hallway Main gymnasium
This rendering from the architect shows the future design of the main gymnasium wall.
Administration area