Absher’s Jobsite Contact Information (For safety reasons, arrangements must be made with Absher prior to entering construction zones) Absher Job Trailer 1825 K Street SE Auburn, WA 98002 Telephone: (253) 845-9544 Olympic Middle School Progress is produced by Absher Construction Company, general contractor/construction manager for the project, to help convey project plans, upcoming events, construction activities and other information to the Olympic Middle School community and project participants. Community input is welcome! Please contact Rachel Knudson at [email protected] for more information. Olympic Middle School Construction Overview Serving the Olympic Middle School community during construcon Project Team Owner: Auburn School District GC/CM: Absher Construction Company Architect: BLRB Architects Engineers: PCS Structural Solutions Hargis Engineers AHBL Weisman Design Group Stantec Halliday Associates The Olympic Middle School Reconstruction Project is a three-phase project to replace the current Olympic Middle School. It will be a two-story structure, approximately 105,000 square feet, and will accommodate 800 students. The first two phases will include construction of a new middle school at the south end of the current school site and minor modernization of the existing school buildings. Once the school year for 2018/2019 ends, the existing building will undergo minor improvements to allow it to function as an interim elementary school. The interim elementary will house students from other schools for a period of four years, while the district builds five new elementary schools. Absher Construction Company • www.AbsherCo.com Olympic Middle School Construction Update Progress Now that weather is improving, Absher and our subcontractors are underway with much of the exterior work. New sidewalks are being added, beginning from H St., going east on 21 st St., heading north on K St. and ending at the old school. We are also setting the bases for the light poles, and the site is being graded so that landscaping can begin. The brick exterior is 80% complete—by the end of the month we will begin removing the scaffolding and washing the brick. We also recently began installing windows and glass. On the interior of the building, we are currently finishing the drywall, painting the walls, and beginning to install the flooring. Throughout the classrooms, we are installing cabinetry and the ceiling grid. In the restrooms, the tiles for walls and floors are underway. Soon we will be receiving deliveries of the specialty items: stage equipment, gymnasium equipment, operable partitions,and kitchen items. We are working tirelessly to get the new Olympic Middle School opened up by August! OLYMPIC MIDDLE SCHOOL P R O J E C T U P D A T E M A Y 2 0 1 9 Neighborhood Impacts New sidewalks, street lighting and partial asphalt replacement on H St., 21 st St. and K St. are underway. Please watch for occasional road closures, flaggers and truck traffic. In July 2019, two buildings part of the original Olympic Middle School will be demolished. There will be fencing and precautionary measures in place. Project Contacts Assistant Superintendent: Max Cannon [email protected] 253.446.3141 Project Engineer: Rachel Knudson [email protected] 253.446.3141 Take a Sneak Peek Inside! PT12 PT12 PT8 1' - 4" 5' - 10" 1' - 4" 9' - 1 1/2" ALIGN ALIGN EQ EQ LETTERTYPE: CENTURY GOTHIC Administration area and front entrance Main corridor/hallway Main gymnasium This rendering from the architect shows the future design of the main gymnasium wall. Administration area

Upload: others

Post on 15-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Absher’s Jobsite Contact Information

(For safety reasons, arrangements must be made with Absher prior to

entering construction zones)

Absher Job Trailer 1825 K Street SE

Auburn, WA 98002

Telephone: (253) 845-9544

Olympic Middle School Progress is produced by Absher Construction Company, general contractor/construction manager for the project, to help convey project plans, upcoming events, construction activities and other information to the Olympic Middle School community and project participants. Community input is welcome! Please contact Rachel Knudson at [email protected] for more information.

Olympic Middle School Construction Overview

Serving the Olympic Middle

School community during

construction

Project TeamOwner: Auburn School District

GC/CM: Absher Construction Company

Architect: BLRB Architects

Engineers: PCS Structural Solutions Hargis Engineers AHBL Weisman Design Group Stantec Halliday Associates

The Olympic Middle School Reconstruction Project is a three-phase project to replace the current Olympic Middle School. It will be a two-story structure, approximately 105,000 square feet, and will accommodate 800 students.

The first two phases will include construction of a new middle school at the south end of the current school site and minor modernization of the existing school buildings.

Once the school year for 2018/2019 ends, the existing building will undergo minor improvements to allow it to function as an interim elementary school. The interim elementary will house students from other schools for a period of four years, while the district builds five new elementary schools.

Absher Construction Company • www.AbsherCo.com

Olympic Middle School Construction Update

ProgressNow that weather is improving, Absher and our subcontractors are underway with much of the exterior work. New sidewalks are being added, beginning from H St., going east on 21st St., heading north on K St. and ending at the old school. We are also setting the bases for the light poles, and the site is being graded so that landscaping can begin. The brick exterior is 80% complete—by the end of the month we will begin removing the scaffolding and washing the brick. We also recently began installing windows and glass.

On the interior of the building, we are currently finishing the drywall, painting the walls, and beginning to install the flooring. Throughout the classrooms, we are installing cabinetry and the ceiling grid. In the restrooms, the tiles for walls and floors are underway. Soon we will be receiving deliveries of the specialty items: stage equipment, gymnasium equipment, operable partitions,and kitchen items. We are working tirelessly to get the new Olympic Middle School opened up by August!

OLYMPIC M I D D L E S C H O O L

P R O J E C T U P D A T E M A Y 2 0 1 9

Neighborhood Impacts• New sidewalks, street lighting and

partial asphalt replacement on H St., 21st St. and K St. are underway. Please watch for occasional road closures, flaggers and truck traffic.

• In July 2019, two buildings part of the original Olympic Middle School will be demolished. There will be fencing and precautionary measures in place.

Project ContactsAssistant Superintendent: Max Cannon [email protected] 253.446.3141

Project Engineer: Rachel Knudson [email protected] 253.446.3141

Take a Sneak Peek Inside!

PT1

AWP3

PT1

PT8

PT1

RWB1

3' -

0"

7' - 0"7' - 0"

(96"x48")101100.MB

115200.EPS

116623.BBD

104413.FXC

098400.AWP

099123.PT

099123.PT

096466.RWB

099123.PT

116623.SPF SPF1

STRUCUTRAL DECK, JOISTS, STEEL, HVAC AND MECH EQUIPMENT TO BE PAINTED PT1 GLOSSY

8' -

6"1'

- 10

"3'

- 6"

14' -

0"

STRUCUTRAL DECK, JOISTS, STEEL, HVAC AND MECH EQUIPMENT TO BE PAINTED PT1 GLOSSY

099123.PT

098400.AWP

099123.PT

096466.RWB

4' -

2"2'

- 8"

3' -

6"1'

- 10

"8'

- 6"

7' -

2"

PT1

AWP3

PT1

PT8

PT12PT12

PT1

RWB1

PT8

1' -

4"5'

- 10

"1'

- 4"

9' - 1 1/2"

116623.BBD

099123.PT

ALIGNALIGN

EQ EQ

LETTERTYPE: CENTURY GOTHIC

GENERAL INT. ELEVATION NOTES1. FOR ROLLER SHADE LOCATIONS, SEE SHEETS A7.1A, A7.1B, AND A7.2A.

ROLLER SHADES WITH AN '(E)' DESIGNATION ARE MOTOR-OPERATED; '(M)' DESIGNATION ARE MANUALLY OPERATED. SHEETS A7.1A/B TAKE PRECEDENCE OVER A5-SERIES SHEETS. (12 21 13.RVS)

2. SEE SPECIFICATIONS FOR LEEVEL OF WALL FINISH FOR GYPSUM BOARD. 09 29 00

3. COORDINATE ALL WALL FINISHES WITH ROOM FINISH SCHEDULE. INTERIOR ELEVATION TO SUPERSEDE ROOM FINISH SCHEDULE WHEN IN CONFLICT.

4. ALL FINISH COLORS TO BE FIELD COLOR AS OUTLINED IN THE ROOM FINISH SCHEDULE UNLESS OTHERWISE NOTED.

5. ALL EXPOSED MECAHNICAL EQUIPMENT, STRUCTURAL DECK AND STRUCTURE STEEL TO BE PAINTED AS INDICATED. SEE REFLECTED CEILING PLAN AND ELEVATIONS FOR COLOR.

6. ALL MECHANICAL GRILLS TO BE PAINTED TO MATCH SURROUNDING WALL COLOR.

7. ALL MECHANICAL EQUIPMENT AND PANELS LOCATED WITHIN WAINSCOT OR SIMILAR PANEL FINISH SHOULD BE TRIMMED IN.

8. SEE DETAILS IN THE A8 SERIES FOR FLOORING TRANSITIONS.9. ARCHITECT/OWNER TO LOCATE CABINET GROMMETS DURING REVIEW OF

CASEWORK SHOP DRAWINGS.

2 3 4 5 6 7 8 9

A

B

C

D

E

F

G

H

J

K

Drawing Title:

Date : Drawn By :

Revised : Project No.

Stamp Sheet No.

of

BLRB ARCHITECTS, P.S.

1

4/3/

2018

10:

31:0

3 PM

INTERIOR ELEVATOINS -LEVEL1 AREA1

04/02/2018 JE,DL

1634

A5.11B

OLYMPIC MIDDLESCHOOL

RECONSTRUCTION

100% CONSTRUCTIONDOCUMENTS

AUBURN SCHOOL DISTRICT No. 408

1/4" = 1'-0" @ FULL SIZEE1 310 - MAIN GYMNASIUM - NORTH

1/4" = 1'-0" @ FULL SIZEK1 310 - MAIN GYMNASIUM - EAST

MATERIALS KEY096466.RWB RESILIENT WALL BASE (VENTED)098400.AWP ACOUSTICAL WALL PANEL099123.PT PAINT SYSTEM101100.MB MARKERBOARD104413.FXC FIRE EXTINGUISHER CABINET115200.EPS116623.BBD BACKBOARD ELECTRIC OPERATION

(ELEC./MANUAL)116623.SPF SAAFETY PAD (FIXED)

DRAWING REVISIONS

REV.DELTA

REV.DATE

REV. DESCRIPTION

Administration area and front entrance

Main corridor/hallway Main gymnasium

This rendering from the architect shows the future design of the main gymnasium wall.

Administration area