ASSIGNMENT 5PROGRESS FINAL PROJECT
Application Arduino
1540900832 1540901715
1540901723 1540902044
.452
2 2556
-
ASSIGNMENT 5PROPOSAL FINAL PROJECT
HOUSE DOG TO FEED FOOD WITH ARDUINO AND ANDROID APPLICATION
SUBMITTED BYPANATDA KONGWET 1540900832SUREERAT SADMAK 1540901715
NARUDOL MONGKOLRAT 1540901723SUTTIPONG KULLAWATTANA 1540902044
PRESENTTODSAPON BANKLONGSI
MI452 INFORMATION SYSTEM ANALYSIS AND DESIGNDEPARTMENT OF MULTIMEDIA AND INTERNET SYSTEM ENGINEERING
SCHOOL OF ENGINEERINGBANGKOK UNIVERSITYSEMESTER 2 YEAR 2013
-
Lean CanvasInspiration & Product
Wireframe Design
Application & Agile
SoftwareDevelopment
APPLICATION DEVELOPMENT TEAM
-
INSPIRATION TO IDEA
-
GOODINSPIRATION
-
INSPIRATIONTO HELP
-
PROTOTYPE
-
APPLICATION WIREFRAME
-
LEAN CANVAS
-
LEAN CANVAS
1. 2. 3.
1. 2. Application3. Database4. 5.
1. 2. Application
1. Pet Shop2.
1. 2.
1. Facebook2. Youtube3. Twitter4. Instagram
1. 2.
A: ApplicationA: R: R: R:
1. 2. Application3.
1. 3 2. 6
-
AGILE SOFTWARE DEVELOPMENT
-
ID Requirements User Stories
1 Login : Application
: Update, Delete, Insert
:
2 :
:
:
3 :
: ,
, Application
:
4 :
:
:
1 Product Backlog
-
ID Requirements User Stories
5 :
:
:
6 :
:
:
7
:
:
:
8 :
:
:
-
ID Priority Story Point
REQ1 5 5
REQ2 5 4
REQ3 4 8
REQ4 4 9
REQ5 3 10
REQ6 3 5
REQ7 3 5
REQ8 3 7
Average 6.625 6
Sum of Point 53
2 Sprint Planning
-
Agile Requirement
Requirement 8 6.625 point = 53 Point (Point ) Sprint 1
4 8 1 Sprint 4 x 6.625 point = 26.5 Point
26.5 Point
Release Sprint 1 = 26.5 point / 4 = 6
Sprint 2 Requirement 4 Sprint 2 4 x 6.625 point = 26.5 Point
0 Point
Release Sprint 2 = 26.5 point / 4 = 6
12
-
Sprint n ID Task To Do
( )
1 1 Login 8 2557
2 15 2557
3 22 2557
4 1 2557
2 5 8 2557
6 15 2557
7
22 2557
8 29 2557
3 Sprint Backlog
-
YESTERDAY- Application - - UI Application Requirement - Application
TODAY Application 2
PROBLEMS
4 Daily Scrum
-
Application Application Requirement Application Social Media
5 Sprint Review and Retrospective
-
Sum Story Point ()
6 Estimation Sum story point = Ideal story point= 53 Ideal story point
-
12 UML DIAGRAM DESIGN
-
Data Flow Diagram (DFD)
1
-
Entity Relationship
Diagram (ERD)
2
-
Use Case Diagram
3
-
ClassDiagram
4
-
ObjectDiagram
5
-
Sequence Diagram
6
-
Collaboration Diagram
7
-
State Diagram
8
-
Activity Diagram
9
-
Component Diagram
10
-
Deployment Diagram
11
-
Workflow Diagram
12
-
User Experience (UX)
-
7 User Experience (UX) LAWS
1.) 2.) 3.) 4.) Sex 5.) 6.) 7.)