8/26/2021 MPR Report :: Jul_2021 1/26 Bihar Rajya Pul Nirman Nigam Ltd, Patna Progress Report of Ongoing Schemes for Projects Date:Jul_2021 Printed on: 26/08/2021 Approved by SPE Achievement for the month / till month Physical Financial 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 220.00 M 0.00/ 100.00 0.00/ 100.00 20.00/ 30.00 0.00/ 0.00 33.44/ 148.21 2 200.00 M 0.00/ 100.00 0.00/ 100.00 0.00/ 100.00 0.00/ 97.00 0.00/ 613.40 3 250.00 M 0.00/ 100.00 0.00/ 100.00 0.00/ 100.00 0.00/ 90.00 0.00/ 322.82 Sl.No Division Name Of Work Head / Sub Head Distirct Administrative Approval Type/Length Of Bridge(M) Agreement Amount Length of Approach (in M) Date of Commen cement Date Of Scheduled completion Revised Date of completion Likely date of completion Remarks Foundation (in %) Sub-Structure (in %) Super-Structure (in %) Approach (in %) Cumulative (In Lakh Only.) 3 19 Ara Construction of H.L. RCC Bridge Span (3x18.75) located over Dudhinalla between Nauhatta-Siyaidah-Bhagwanpur Road Nauhatta Block in Rohtas District. Nabard RWD Rohtas 288.080000 / 8647 / 13 Oct 2019 RCC/57.96 24857000.00 25 Nov 2020 24 Nov 2021 Work in progress. Ara Construction of High Level RCC Bridge 5x18.75 M in Goraipur Village over River Durgawati in Bhabhua Block in Kaimur (Bhabhua) District.(BASANT VANIJYA LTD.) Nabard RWD Kaimur(Bhabua) 697.710000 / 5620 / 07 Dec 2018 RCC/96.60 64741460.00 01 Mar 2019 31 May 2020 31 Aug 2020 Work almost completed. Rs 3,23,705.00 withheld vide letter no-475, Dated- 15.07.2020 Ara CONSTRUCTION OF PROPOSED H.L RCC BRIDGE ON KARMANASA RIVER, AT CHAINPURA VILLAGE ( ADHAURA), IN KAIMUR DISTRICT(ALOK KUMAR) Nabard RWD Kaimur(Bhabua) 399.030000 / 9216 / 01 Dec 2017 RCC/50.72 45585577.00 04 Jun 2019 03 Jun 2020 03 Sep 2020 Work almost completed. Rs. 4,35,850.00 withheld vide letter no-473, Dated-13.07.2020

Upload: others

Post on 12-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

8/26/2021 MPR Report :: Jul_2021

1/26

Bihar Rajya Pul Nirman Nigam Ltd, PatnaProgress Report of Ongoing Schemes for Projects Date:Jul_2021

Printed on: 26/08/2021 Approved by SPEAchievement for the month / till month

Physical Financial

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 220.00 M 0.00/100.00

0.00/100.00

20.00/30.00

0.00/0.00

33.44/148.21

2 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/97.00

0.00/613.40

3 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/322.82

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

3 19

Ara

Construction of H.L. RCC Bridge Span(3x18.75) located over Dudhinalla between

Nauhatta-Siyaidah-Bhagwanpur Road NauhattaBlock in Rohtas District. N

abar

d RW

D

Roh

tas

288.

0800

00 /

8647

/ 13

Oct

201

9

RC

C/5

7.96

2485

7000

.00

25 N

ov 2

020

24 N

ov 2

021

Work in progress.

Ara

Construction of High Level RCC Bridge5x18.75 M in Goraipur Village over RiverDurgawati in Bhabhua Block in Kaimur

(Bhabhua) District.(BASANT VANIJYA LTD.) Nab

ard

RWD

Kai

mur

(Bha

bua)

697.

7100

00 /

5620

/ 07

Dec

201

8

RC

C/9

6.60

6474

1460

.00

01 M

ar 2

019

31 M

ay 2

020

31 A

ug 2

020 Work almost completed. Rs 3,23,705.00

withheld vide letter no-475, Dated-15.07.2020

Ara

CONSTRUCTION OF PROPOSED H.L RCCBRIDGE ON KARMANASA RIVER, AT

CHAINPURA VILLAGE ( ADHAURA), INKAIMUR DISTRICT(ALOK KUMAR) N

abar

d RW

D

Kai

mur

(Bha

bua)

399.

0300

00 /

9216

/ 01

Dec

201

7

RC

C/5

0.72

4558

5577

.00

04 Ju

n 20

19

03 Ju

n 20

20

03 S

ep 2

020 Work almost completed. Rs.

4,35,850.00 withheld vide letter no-473,Dated-13.07.2020

8/26/2021 MPR Report :: Jul_2021

2/26

Achievement for the month / till month

Physical Financial

4 440.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

5 360.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/35.00

0.00/1005.90

6 0.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/41.83

7 280.00 M 0.00/100.00

10.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Ara

Construction of High Level RCC Bridge(4x18.0)m in 40th K.M. of Bhabhua AdhauraRoad (At Tala Village) across Suara River in

Kaimur (Bhabhua) District.Jai Mata Dee & Maasita construction

Plan

Kai

mur

(Bha

bua)

560.

0000

00 /

9156

(S) /

03

Dec

201

8

RC

C/7

2.00

5412

9785

.00

17 Ja

n 20

20

16 A

pr 2

021

16 Ju

l 202

1

30 A

pr 2

022 Issue- Redesign, NOC from forest

Department on the basis of re-designhas been obtained. Work likely to start

very soon.

Ara

Construction of H.L.RCC Bridge at 19th K.M.of Mohania-Ramgarh road (2x18+4x26)m

across Durgawati River in Kaimur District. JaiMata Dee Maa Sita Construction. Mob-

9934462616

Plan

Kai

mur

(Bha

bua)

1751

.040

000

/ 902

6(s)

/ 13

Oct

201

7

RC

C/1

40.0

0

1227

3009

8.00

21 A

ug 2

018

20 A

ug 2

020

20 N

ov 2

020

31 O

ct 2

021 No work in Progress due to rise in water

level of Durgawati river. Rs.6,13,650.00 withheld vide letter no-504,

Dt-05.08.2020.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of Boundry Wall of Karpuri hostelunder Kishanganj District.Ganesh Contruction

Araria Non

-Pla

n

Kis

hang

anj

66.3

8000

0 / 2

591

/ 26

Dec

201

7

Oth

ers/

1.00

41.4

3

25 S

ep 2

018

24 Ja

n 20

19

Work Completed On 31.08.2020

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 4x16.00m HL R.C.C Bridgeincluding Approach road, Protection Work,

Land Acquisition work and Miscellaneous workin 21st km of Bahadurganj-Terhagachh Road in

the District of Kishanganj.Raj Kishor Singh

Plan

Kis

hang

anj

986.

0000

00 /

7321

(s) /

08

Aug

201

9

RC

C/6

6.40

696.

75

19 S

ep 2

020

18 D

ec 2

021

1.Work is in progress Pile- 42/42, PileCap-5/5 & Pier Shaft-5/5 & Pier Cap-4/5. 2.LA Proposal returned by DLAO

for want of Khatiyan of 5 Plots.3.Direction has been sought from higher

Authorities.

8/26/2021 MPR Report :: Jul_2021

3/26

Achievement for the month / till month

Physical Financial

8 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/100.00

0.00/298.15

9 185.00 M 0.00/100.00

0.00/100.00

0.00/100.00

30.00/115.00

0.00/247.56

10 525.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/1775.27

11 210.00 M 0.00/99.00

0.00/85.00

0.00/60.00

0.00/22.00

0.00/879.33

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Repair of Pre Stress Girder Bridge (10 Span)over river Mahananda in 8th km of Kishanganj -

Bahadurganj road near Mastan Chowk in theDistrict of Kishanganj. [Rebuild Struct

Associates, Mumbai]

Plan

Kis

hang

anj

262.

6900

00 /

347(

s) /

09 Ja

n 20

19

Oth

ers/

425.

00

269.

00

09 M

ar 2

019

08 M

ar 2

020

Work Completed On 14.08.2020

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x16.50m R.C.C. Bridge overKathliya Kochpara Dhar in Kishanganj Block inthe District of Kishanganj. [Star Construction] M

MSN

Y

Kis

hang

anj

261.

5300

00 /

6868

(s) /

23

Jul 2

014

RC

C/3

3.00

244.

23

03 O

ct 2

014

02 O

ct 2

015

01 Ja

n 19

00

Work Completed On 22.06.2021

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 6X24.00M H.L.R.C.C Bridgein 11th km. of Muraligach-Thakurganj Road

over Chenga river at Chenga Ghat inKishanganj District. [Shiv Kishore

Construction]

Plan

Kis

hang

anj

2085

.000

000

/ 129

2(s)

/ 18

Feb

201

7

RC

C/1

47.7

8

1682

.17

11 Ja

n 20

18

10 Ja

n 20

20

28 M

ay 2

020

30 O

ct 2

020

Work Completed On 31.10.2020

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 5X16.00M H.L.R.C.C Bridgeover Kankai river under Kochadhaman Block in

15th km. of Mastan Chowk-Bagalbari-Rahmatpara-Alta-Barbatta road in the District

of Kishanganj [Navin Chandra Sarkar, Katihar]

Plan

Kis

hang

anj

1648

.000

000

/ 120

71(s

) / 2

7 D

ec 2

017

RC

C/8

3.05

1009

.22

06 O

ct 2

018

05 A

pr 2

020

1. DLAO, Kishanganj returned the LAProposal stating to eliminate the

perpetual lease proposal and publish thesame in News Paper. After thatPermanent LA Proposal will be

considered.

8/26/2021 MPR Report :: Jul_2021

4/26

Achievement for the month / till month

Physical Financial

12 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/326.32

13 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/433.64

14 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/801.75

15 180.00 M 0.00/56.00

0.00/45.00

0.00/0.00

0.00/0.00

0.00/18.20

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of HL RCC bridge (2x16.00m)including approach road, diversion and

protection work in place of damaged road byflood in 2017 in the 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road inthe district of Kishanganj. [Tirupati Balajee

Earth Work Pvt. Ltd.]FD

R

Kis

hang

anj

442.

7300

00 /

1196

8(s)

/ 21

Dec

201

7

33.2

2

304.

12

24 M

ar 2

018

23 Ju

n 20

19

Work Completed On 10.06.2020

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. bridge (3x16.00m)including approach road, diversion and

protection work in place of damaged road in 9thkm of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of Kishanganj.

[Bidyanand Gupta]

FDR

Kis

hang

anj

570.

9100

00 /

1207

2(s)

/ 27

Dec

201

7

49.8

3

397.

06

24 M

ar 2

018

23 Ju

n 20

19

Work Completed On 31.12.2020

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of of H.L. RCC bridge (5X16.00m) in 6th km. of Kishanganj-Bahadurganj road

under FDR in the District of Kishanganj.[Balram Singh]

FDR

Kis

hang

anj

791.

4400

00 /

47 (S

) / 0

2 Ja

n 20

18

83.0

5

585.

10

28 M

ar 2

018

27 S

ep 2

019

31 D

ec 2

020

Work Completed On 15.02.2021

Sara

n W

orks Construction of HL RCC Bridge with Utility

Shifting and Protection work in the main Roadnear parisadan Siwan in left out portion of N.H-

85 in Siwan District.

Plan

Siw

an

774.

0000

00 /

2490

(S) /

28

Apr

202

0

HL/

62.2

2 Pile completed 12/20, Pile capcompleted 2/4 and substructure of one

abt & one Pier complete.

8/26/2021 MPR Report :: Jul_2021

5/26

Achievement for the month / till month

Physical Financial

16 400.00 M 0.00/93.00

0.00/66.00

0.00/44.00

0.00/5.00

0.00/392.95

17 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/453.95

18 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/528.77

19 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/300.31

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Sara

n W

orks Construction of 4x18.75m H.L. R.C.C Bridge

including Approach Road, rotection Work &Miscellaneous work over Bashi river crossing

1st KM of Tamkuhi-chhitauni road Damaged in2017 Flood under Gopalganj Distric.

FDR

Gop

alga

nj

808.

7400

00 /

687(

s) /

19 Ja

n 20

18

RC

C/7

5.00

524.

42

03 O

ct 2

018

02 A

pr 2

020

31 D

ec 2

021

Two Span deck slab complete. Noticeissued vide letter No. 400 Dt

10.07.2020 for 4th mile stone failure.EOT Upto 20.2.21 granted by DCEvide

LtNo 1396 Dt. 1.9.20. ContractorDebarred vide M.D, BRPNNL Lt. No.

1619 Dt. 05.04.2021.Rest work inprogress.

Sara

n W

orks Construction of 4x16.00 m H.L. R.C.C Bridge

over Saran Main Canal crossing Bagauch-Kotnarahwan road Damaged in 2017 Flood

under Gopalganj District. Agency- M/s TirupatiBala ji Earth Work Pvt. Ltd. mob.-9431011120

FDR

Gop

alga

nj

852.

1800

00 /

685(

S) /

19 Ja

n 20

18

RC

C/6

4.00

564.

55

03 O

ct 2

018

02 A

pr 2

020

31 M

ar 2

021

30 Ju

n 20

21

Bridge work complete E.O.T upto31.3.21 granted by D.C.E vide LetterNo. 101 Dt. 16.01.21 without LD andPrice escalation. Approach work in

progress.

Sara

n W

orks Construction of 4x14.00 m HL R.C.C Bridge

over Saran Main Canal crossing Gopalganj-Barhariya road Damaged in 2017 Flood under

Gopalganj District. Agency- Sona Engicon Pvt.Ltd. Mob.-9431407389

FDR

Gop

alga

nj

790.

3000

00 /

686(

S) /

19 Ja

n 20

18

RC

C/5

6.00

535.

09

03 O

ct 2

018

02 A

pr 2

020

30 N

ov 2

020

30 N

ov 2

020

Work completed.

Sara

n W

orks Construction of 2x16.00 m H.L. R.C.C Bridge

over Hathua Branch Canal crossing Mirganj-Bhagipatti-Samaur road Damaged in 2017

Flood under Gopalganj District. Agency- M.KEnterprises Mob.-9431212686

FDR

Gop

alga

nj

549.

0700

00 /

895(

S) /

30 Ja

n 20

18

RC

C/3

2.00

306.

65

03 O

ct 2

018

02 Ja

n 20

20

02 M

ar 2

020

02 M

ar 2

020

Work completed.

8/26/2021 MPR Report :: Jul_2021

6/26

Achievement for the month / till month

Physical Financial

20 400.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/537.51

21 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/902.87

22 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/6.61

23 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1564.07

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Sara

n W

orks Construction of 5X18.75m H.L. R.C.C Bridge

over Dabra river in between AhimanpattiKanakpur to Shitalpur Station in Dighwara

block in Saran District Nab

ard

RWD

Sara

n

765.

1500

00 /

1360

/ 26

Apr

201

8

RC

C/7

3.75

553.

73

29 O

ct 2

018

28 A

pr 2

020

31 D

ec 2

020

Work completed.

Sara

n W

orks

Construction & Resetting of new PontoonBridge and Maintenace of Pontoon Bridge form

Year 2016-17 to 2020-21 and Dismentling ofPontoon Bridge form the Alignment and storing

the Pontoon sets at safe place on the side ofriver embankment at Pahleza Ghat inbetweenGaddipatti to Ramsapur during rainy season.

Agency- Shrishti Developers Pvt. Ltd.Mob.-9431014606

Plan

Sara

n

1076

.720

000

/ 29

(s) /

06

Jan

2016

293.

00

1061

.37

22 A

pr 2

016

21 A

pr 2

022

21 A

pr 2

022

Pontoon bridge opened on 20.06.2021

Gay

a

Construction of RCC Drain along with roadover Amwa Nala at Barista Café along with

Tayiban Monestry to Kalchakra Maidan GateNo.-04 in Bodhgaya Nagar Panchyat in the

District of Gaya. (Waris Buildcon (I) Pvt. Ltd.,Gaya Mob. No.-9308991151)

Oth

ers

Gay

a

681.

0000

00 /

96 /

06 M

ar 2

019

Oth

ers/

600.

00

After rescind the agency new quotationinvited for balance work. Two bidders

have participated & their preparedcomperative statement sent H.Q. videT.O.L. No.-532 (WE) dt. 29-06-2021

for necessary action.

Gay

a

Strengthing of Barun-Navinagar Road fromChainage 0.00 K.M. to 35.10 K.M. (Total

length-35.10 K.M.) including earth work, roadcrust work, cross drainage work, R.C.C. drainwork and misc. work in Aurangabad District.

(M/s. Jai Mata Dee and Maa Sita Construction,Rohtas-9934462616)

Plan

Aur

anga

bad

4999

.370

000

/ 997

4 (S

) / 1

9 N

ov 2

019

Oth

ers/

3510

.00

3938

.21

30 S

ep 2

021

Work is in Progress. E/W-30.00 (Partial)GSB-12.00, WMM-7.90, DGBM-18.30,

BC-12.00, Mastic-0.60, DLC.-3.00,PQC-2.90, DRAIN-2.50 & CD-11.00

Nos.

8/26/2021 MPR Report :: Jul_2021

7/26

Achievement for the month / till month

Physical Financial

24 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

65.71/95.07

25 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

232.19/326.37

26 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

154.02/248.06

27 200.00 M 0.00/100.00

0.00/100.00

0.00/15.00

0.00/0.00

0.00/216.42

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Gay

a

Construction of (1) Boundary Wall (2) RoadDevelopment (3) Drainage (4) Electric Light-High Mask/Road light (5) Entrance Gate &

Guard Room (6) Toilet Block of Krishi BazarSamiti in the District of Jehanabad.

Plan

Jeha

naba

d

996.

8300

00 /

290

/ 08

Mar

201

9

1.00

986.

86

31 D

ec 2

021

Boundry Wall - 18% & Drain - 30%

Gay

a

Construction of (1) Boundary Wall (2) RoadDevelopment (3) Drainage (4) Electric Light-

High Mask/Road light (5) Repair ofAdministrative Building if any (6) Toilet Blockof Krishi Bazar Samiti in the District of Gaya.

Plan

Gay

a

1049

.640

000

/ 263

/ 28

Feb

201

9

1.00

1049

.64

26 D

ec 2

021 Boundry Wall - 75%, Toilet Block -

55%, Main Gate - 15%, Drain Work-60%, Road Work-5% & G.S.B. work is

in Progress.

Gay

a

Construction of (1) Boundary Wall (2) RoadDevelopment (3) Drainage (4) Electric Light-

High Mask/Road light (5) Repair ofAdministrative Building if any (6) Toilet Blockof Krishi Bazar Samiti Daudnagar in the district

of Aurangabad.

Plan

Aur

anga

bad

1183

.390

000

/ 265

/ 28

Feb

201

9

1.00

1171

.56

31 D

ec 2

021 Boundry Wall -70%, Toilet Block-50%,

Road Work-15%, Drain Work-30% &Repair of Administrative Building-10%

Gay

a

Construction of H.L. R.C.C. bridge withapproach road over Morhar River in Pai Bigha -

Ghejan Road in Jehanabad District. (M/s.Shailendra Singh, Gaya-7739131191)

Plan

Jeha

naba

d

620.

0000

00 /

1081

2(S)

/ 23

Dec

201

9

RC

C/7

4.40

401.

97

20 S

ep 2

020

19 D

ec 2

021

19 D

ec 2

021

Work stopped due to water increased inriver.

8/26/2021 MPR Report :: Jul_2021

8/26

Achievement for the month / till month

Physical Financial

28 100.00 M 0.00/100.00

0.00/95.00

5.00/45.00

0.00/0.00

0.00/374.60

29 240.00 M 0.00/100.00

0.00/100.00

20.00/95.00

5.00/20.00

0.00/1326.49

30 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/402.32

31 1300.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/928.38

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Gay

a

Construction of H.L. R.C.C. bridge over RiverDardha between Hospital More and Horilganjon N.H.-83 inplace of old bridge in the Districtof Jehanabad.(Satyendra Kumar Yadav, Gaya-

9801850421)

Plan

Jeha

naba

d

1055

.000

000

/ 577

0 (S

) / 2

0 Ju

n 20

19

RC

C/1

11.6

0

687.

11

07 Ja

n 20

20

06 Ju

l 202

1

31 D

ec 2

021 4th span girder work is in Progress.

Withheld amount to Rs. 06,87,106.00due to failure of 2nd mile stone has

been imposed.

Gay

a

Construction of H.L.R.C.C. 19 x 18.00 mBridge inplace of damaged bridge Over Falgu

River at Ratan Bigha Village includingapproach road, Protection work, Diversion

Work and Miscellaneous work in 16th K.M. ofGhoshi-Islampur-Giriyak Road in Jehanabad

District.(R.A.S ENTERPRISESPVT.LTD,PATNA,099346616231)

Plan

Jeha

naba

d

2331

.040

000

/ 560

1 (S

) / 2

1 Ju

l 201

8

RC

C/3

53.4

0

2007

.07

21 F

eb 2

019

20 F

eb 2

021

31 A

ug 2

021

Bridge work is in progress. Wearingcoat work is in Progress.

Gay

a

Construction of H.L.R.C.C. 5x18.75m Bridgeincluding approach road and protection workover Punpun River between Bhagwatipur -

Kusre village in Arwal District under NABARDScheme. (R.A.S. Enterprises, 9199245601)

Nab

ard

Arw

al

569.

2900

00 /

7135

(s) /

05

Sep

2013

RC

C/9

7.00

492.

67

10 D

ec 2

013

10 Ju

n 20

15 L.A. Issues :- After getting the LPC ofraiyats & required papers registration of

land will be done by this month.

Gay

a

Construction of H.L.R.C.C. 7 x 18.75 m Bridgeover river Punpun with approach road,

Protection work and Miscellaneous work inbetween Khudwa - Kalen village in AurangabadDistrict Under MMADY Scheme. (JAI MATA

DI ROAD CONSTRUCTION PVT. LTD.,PATNA,09431427109)

MM

AD

Y

Aur

anga

bad

1318

.000

000

/ 111

0 / 3

0 A

pr 2

018

RC

C/1

35.5

6

1110

.00

25 D

ec 2

018

24 Ju

n 20

20

Bridge work Completed. Approach roadcompleted 2000 m in Khudwa side &90 m in Kalen side upto top level. In

Kalen side 560 m work completed uptoGSB level. W.M.M., B.T. work notcompleted due LA issues. L.A. on

perpetual lease is in Progress.

8/26/2021 MPR Report :: Jul_2021

9/26

Achievement for the month / till month

Physical Financial

32 200.00 M 0.00/100.00

0.00/95.00

10.00/20.00

0.00/0.00

0.00/346.10

33 540.00 M 0.00/100.00

0.00/50.00

0.00/0.00

0.00/0.00

0.00/224.40

34 200.00 M 0.00/16.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/60.56

35 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/726.89

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Gay

a

Construction of H.L. R.C.C. bridge withapproach road in 7th K.M. of Tetariya More to

Koiridih Road in Aurangabad District. (M/sK.Andi & Associates, Gaya-7004501271)

Plan

Aur

anga

bad

861.

0000

00 /

7531

(S) /

19

Aug

201

9

RC

C/8

3.00

672.

54

27 F

eb 2

020

26 A

ug 2

021

26 A

ug 2

021

Super structure (2nd Span) work is inProgress.

Gay

a

Construction of H.L. R.C.C. bridge withapproach road in Mamka More to Jakhim

Railway Station Road in Rafiganj Block ofAurangabad District. (M/s. Sanjay Construction

Co., Patna-9835049094)

Plan

Aur

anga

bad

870.

0000

00 /

7370

(S) /

09

Aug

201

9

RC

C/9

3.00

671.

15

27 A

pr 2

020

26 O

ct 2

021

26 O

ct 2

021

Sub Structure (Pier Cap) work is inprogress.

Gay

a

Construction of H.L.R.C.C. Bridge includingapproach road, Protection work and

Miscellaneous work over Dhadhar River ofGaya-Fatehpur-Gopi More-Murli Road (Gaya-Rajauli Road SH-70) in Gaya District Under

Plan Scheme. (Baban Kumar Singh,Gaya,9431224261)

Plan

Gay

a

700.

0000

00 /

960

(S) /

01

Feb

2018

RC

C/1

25.0

0

898.

18

07 M

ar 2

019

06 S

ep 2

020

31 D

ec 2

021

24/92 No's pile completed. Due to re-design of foundation pile work startedin the month of October, 2020. Workhas been stopped by Agency due to

Non-Availability of fund & increasedwater level in river.

Gay

a

Construction of H.L.R.C.C. 9x21.00m Bridgeincluding approach road and protection workover Morhar River Between Chitabkala and

Gendabag village in Sherghati Block in GayaDistrict.(RAMIYA CONSTRUCTION

LTD.,GAYA,09431226444)

Plan

Gay

a

1610

.870

000

/ 353

(s) /

01

Feb

2018

RC

C/1

94.4

0

928.

98

10 M

ay 2

018

09 F

eb 2

020

Bridge & Approach road workcompleted.

8/26/2021 MPR Report :: Jul_2021

10/26

Achievement for the month / till month

Physical Financial

36 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/274.25

37 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/155.55

38 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/270.65

39 2713.13M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/72.00

0.00/1027.40

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Gay

a

Construction of H.L.R.C.C. 3x21.00m Bridgeincluding approach road and protection work in

Bhalua to Paharpur Road (K.M. 0 to K.M.26.325) in Chainage 600 M in Gaya Districtunder PLAN Scheme. (Ramiya Construction

Pvt. Ltd., Gaya,09431226444)

Plan

Gay

a

556.

2800

00 /

1146

6(s)

/ 28

Nov

201

1

RC

C/6

4.84

315.

23

10 M

ay 2

018

09 N

ov 2

019

Bridge & Approach road workcompleted.

Gay

a

Construction of H.L.R.C.C. 3x14.00m Bridgeincluding approach road and protection work inDhangai Bazar to B.B. Pesra-Sobh to G.T. Road(K.M. 0 to K.M. 14.10) in Chainage 13970 Min Gaya District under PLAN Scheme. (M/s.

JAY SHANKAR RAY, Muzaffarpur)

Plan

Gay

a

429.

7300

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/5

5.84

227.

03

26 D

ec 2

016

25 M

ar 2

018

30 A

pr 2

019

Bridge & Approach road workcompleted.

Gay

a

Construction of H.L.R.C.C. 3x14.00m Bridgeincluding approach road and protection work inDhangai Bazar to B.B. Pesra-Sobh to G.T. Road(K.M. 0 to K.M. 14.10) in Chainage 4545 M in

Gaya District under PLAN Scheme. (ShreeTirupati Balaji Enterprises, 9470664329)

Plan

Gay

a

450.

6200

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/4

3.84

280.

78

18 F

eb 2

016

17 M

ay 2

017

31 M

ar 2

019

Bridge & Approach road workcompleted.

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdige overTrimuhan river in Dhankutawa village (SikataBlock)-Shivpur (Lauria or Chanpatia Block)

Road. Well foundation. Chankya constructionPvt. Ltd.

Nab

ard

Pach

im C

ham

parn

1998

.200

000

/ 221

1(s)

/ 27

Feb

201

7

RC

C/1

27.0

0

24 Ja

n 20

13

23 Ju

l 201

4

30 O

ct 2

021 Bridge Work Completed Payment

started to Raiyat and Approach Roadwork is in Progress.

8/26/2021 MPR Report :: Jul_2021

11/26

Achievement for the month / till month

Physical Financial

40 2340.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/67.00

0.00/1355.00

41 20.00 M 0.00/100.00

0.00/100.00

15.00/90.00

0.00/5.00

0.00/271.55

42 40.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/15.00

0.00/514.50

43 1700.00M

13.00/50.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/734.66

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdige overSikarhana river in Maheshara village (SikataBlock) - Sarisawa bazar (Majhaulia Block)

Road. Well foundation Barhonia Engicon Pvt.Ltd.

Nab

ard

Pach

im C

ham

parn

1927

.090

000

/ 237

0(s)

/ 12

Mar

201

2

RC

C/1

27.0

0

13 S

ep 2

012

12 S

ep 2

014

30 O

ct 2

021

Bridge Completed and Sarisawa bazarside approach road completed and

Maheshara side approach uncompleted.due to L.A. but traffic movement

through Kachchi road. Payment will bestarted soon to Raiyat

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. 2x30.00 mtr. In thedistrict of West Champaran under Indo-Nepal

Border Ch. 5.819 km. Near Inerwa Bazar. Nab

ard

Pach

im C

ham

parn

990.

9700

00 /

5590

(s) /

27

May

201

7

RC

C/4

0.00

05 Ju

l 201

8

04 A

ug 2

019

31 A

ug 2

021 Work in Progress and Agency debarred.

Milestone withheld notice vide Lt. No.1062 dated 22.09.2019 as Rs. 5.21 lakh

will be deducted

Cha

mpa

ran(

Mot

ihar

i)

Construction of 7x25M size Bridge inMadanpur-Bhangha Road in Chainage 43.400Km Pakage No. 03.C.K.Infra structure(Indo-

Nepal)

Nab

ard

Pach

im C

ham

parn

1402

.910

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/1

75.0

0

30 N

ov 2

016

30 Ju

l 201

8

31 D

ec 2

021

Work in Progress and Agency debarredand Notice sent to Agency for Rescind.Milestone withheld notice vide Lt. No.

1061 dated 22.09.2019 as Rs. 10.29lakh will be deducted

Cha

mpa

ran(

Mot

ihar

i) Construction of HL RCC Bridge (Sizes12x24.5M) over River Sikarahana with

approach road at Semara Ghat in Block Mehasiin Dist.- East Champaran under NABARD.Type of Foundation - Well, Bridge Length -304.32M. M/S AMBER INFRA PROJECT

PVT. LTD.

Nab

ard

RWD

East

Cha

mpa

ran(

Mot

ihar

i)

4596

.000

000

/ 36

/ 03

Jan

2019

RC

C/3

04.3

2

05 M

ar 2

019

04 S

ep 2

021

04 S

ep 2

021 Work in Progress and Milestone

withheld notice vide Lt. No. 1058 dated22.09.2019 as Rs. 1.50 lacs only

8/26/2021 MPR Report :: Jul_2021

12/26

Achievement for the month / till month

Physical Financial

44 0.00 M 0.00/75.00

0.00/0.00

0.00/0.00

0.00/0.00

91.50/344.23

45 310.00 M 1.10/33.60

0.00/0.00

0.00/0.00

0.00/0.00

0.00/899.02

46 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/99.00

0.00/783.52

47 250.00 M 0.00/100.00

0.00/100.00

0.00/98.00

0.00/60.00

0.00/1694.93

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Kha

garia

Construction of Marketing yard in the district ofBegusarai with boundary wall, Road work,

Drain work, Guard Room, High Mast Light &Toilet Work . M/S Classicon Construction (l)

Ptd., 9431018303

Plan

Beg

usar

ai

1236

.450

000

/ 289

/ 08

Mar

201

9

1.00

08 A

ug 2

020

22 F

eb 2

021

01 Ja

n 19

00

Boundary Wall - 50.00%, Road work -30.00% Drain work - 70.00% GuardRoom - 70.00% High Mast Light -40.00% Toilet Work - 72.00% Theproposal for extension of time for

completion of work till November 2021is submitted to the Nigam HQ.

Kha

garia

Construction of HL RCC Bridge over BagmatiRiver at Nawada Ghat in Chautham Block ofKhagaria district.M/S Ganesh Ram Dokaniya,

Banka Bihar 9931130066 Nab

ard

RWD

Kha

garia

5614

.000

000

/ 885

/ 01

Mar

201

9

RC

C/5

07.2

0

5013

.54

27 A

ug 2

019

26 F

eb 2

022

12 A

pr 2

022

Proposal for land acquisition submittedto DLAO, Khagaria vide letter no. 1038(Anu), dt - 16.08.2019. Demanded SIA

amount Rs. 2,44,835.00 is madeavailable to DLAO Khagaria on

19.04.2021

Remarks for LA: Milestone deductedvide our letter no. 1356 (Anu) dt

30.07.2020

Kha

garia

Construction of H.L. RCC Bridge over ChanhaRiver at Chhanch Ghat in 3rd km. of Bishanpur-

Sumbha Road of Khagaria District.SriBRAJKISHOR

RAY,SAMASTIPUR,9430800861

Plan

Kha

garia

1817

.490

000

/ 300

(S) /

10

Jan

2018

RC

C/1

08.0

4

1038

3277

9.00

23 O

ct 2

018

22 A

pr 2

020

31 O

ct 2

020

Proposal for land acquisition submittedto DLAO, Khagaria vide letter no. 103,dt - 13.02.2019 Demanded SIA amount

Rs. 2,09,990.00 is made available toDLAO Khagaria on 15.07.2020

Remarks for LA: A.N.Sinha institutehas done site survey for SIA. Public

hearing is done & report awaited. Worksubstantially completed on 25.04.2021

and EOT is awaited.

Saha

rsa Construction of High Level RCC (10x24.75)

Bridge at Dakra Dhar of Mahishi Block on theEna to Kanadiya Road (NABARD) Shankar

Sharma 9934756142 Nab

ard

RWD

Saha

rsa

1810

.680

000

/ 129

3 / 1

6 A

pr 2

018

RC

C/6

34.0

0

1418

.23

11 M

ar 2

019

10 M

ar 2

021

31 M

ay 2

021

Approach road has been constructedonly in A1 Side because Revised A/Aproposal to increase bridge span from10 to 25 has been submitted to RWDoffice Patna. Sanctioned Project has

been completed.

8/26/2021 MPR Report :: Jul_2021

13/26

Achievement for the month / till month

Physical Financial

48 200.00 M 0.00/100.00

0.00/95.00

5.00/95.00

0.00/55.00

0.00/588.30

49 650.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/3086.48

50 600.00 M 0.00/65.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/908.42

51 132.00 M 0.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1397.80

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Saha

rsa

Construction of High Level RCC Bridge(5x21.00M Well Foundation) including

Approach Road & Protection Work at 8.00 KMof Thalha to N.H. - 57 Road via Deepnagar,

Fulkahi, Ramvishnupur in the District ofSuapul. Contractor - Bipin Kumar Singh, Mob.

No.- 9431228914Pl

an

Supa

ul

3245

.960

000

/ 122

46 (S

) / 1

7 D

ec 2

014

RC

C/1

05.0

0

1032

.19

10 S

ep 2

020

09 S

ep 2

022 Agg No - 01/2020-21 Dated -

12.12.2020 Amount - 10,32,19,729.00Work in is Progress.

Dar

bhan

ga Construction of HLRCC bridge at kakar ghat inrosra morwara road in kareh river(16x24.75 m)

Shiv Kishore Construction Pvt.Ltd.,9431858543

Nab

ard

Sam

astip

ur

3009

.420

000

/ 780

2(s)

/ 13

Jul 2

012

RC

C/4

05.8

0

2199

2700

5.00

30 D

ec 2

012

30 M

ar 2

015

31 M

ar 2

021

Remarks for LA: Section-37(2) is in

progress. Payment being made toRaiyat.

Dar

bhan

ga Construction of H.L.R.C.C. Bridge(10x24.75M) over Budhi Gandank at PatparaGhat in the district of Samastipur,(Mukesh &

Anand,07979087453) Nab

ard

RWD

Sam

astip

ur

2453

.000

000

/ 845

/ 28

Feb

201

9

HL/

253.

60

1858

5929

6.00

31 O

ct 2

019

29 O

ct 2

021

31 Ja

n 20

22

Work Stopped due to flood

Dar

bhan

ga Construction of H.L.R.C.C. Bridge(19x24.00M) over river Kareh at Phuhiya Ghat

in the district of Samastipur.(B.K.BuildersP.V.T.Ltd,09955056922) N

abar

d RW

D

Sam

astip

ur

5809

.000

000

/ 615

/ 13

Feb

201

9

HL/

467.

44

3962

6260

1.00

26 O

ct 2

019

25 O

ct 2

022

31 Ja

n 20

23

Work Stopped due to flood

8/26/2021 MPR Report :: Jul_2021

14/26

Achievement for the month / till month

Physical Financial

52 1620.00M

0.00/85.00

10.00/75.00

0.00/78.00

0.00/15.00

0.00/3002.95

53 330.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/429.77

54 650.00 M 0.00/24.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/374.50

55 400.00 M 0.00/18.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Dar

bhan

ga

Construction of HLRCC bridge with Landacquisition ,approach road and protection worknear jhanjharpur at old NH-57 in kamala balanriver in madhubani distrcit(9x24.00 m)Tushar

Construction Company, Gaziabad., RCD

Plan

Mad

huba

ni

4197

.050

000

/ 622

0(S)

/ 09

Jul 2

015

RC

C/2

21.4

4

2772

8170

7.00

27 A

pr 2

016

27 D

ec 2

018

30 Ju

n 20

21

Work Stopped due to flood

Remarks for LA: Section-37(2) is inprogress. Payment being made to

Raiyat.

Dar

bhan

ga costruction of HLRCC bridge at damla ghat inbisfi block (3x21.75 m) Sri Krishna Kant

Thakur,9430897941 MM

SNY

Mad

huba

ni

470.

4700

00 /

8291

(s) /

01

Sep

2014

RC

C/6

7.12

3747

6383

.00

01 O

ct 2

014

01 Ja

n 20

16

30 A

pr 2

021

Remarks for LA: Section-37(2) is in

progress. Payment being made toRaiyat.

Dar

bhan

ga Construction of H.L. R.C.C. Bridge (19X24.750m) over River Bagmati in Sirniya to Bilaspur

Road in Hayaghat Block in the district ofDarbhanga N

abar

d RW

D

Dar

bhan

ga

6917

.000

000

/ 120

4 / 1

5 A

pr 2

020

HL/

481.

84

Work Stopped due to flood

Dar

bhan

ga Construction of H.L RCC Bridge (4 X18.75 M)across River Kamla at Rasiyari Ghat in the Shiv

Nagar Ghat to Ghanshyampur -Rasiyari GhatRoad in the District of Darbhanga

Plan

Dar

bhan

ga

1739

.000

000

/ 105

50(S

) / 1

0 D

ec 2

019

HL/

77.4

8

Work Stopped due to flood

8/26/2021 MPR Report :: Jul_2021

15/26

Achievement for the month / till month

Physical Financial

56 1110.00M

0.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1916.92

57 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/916.70

58 240.00 M 0.00/100.00

0.00/100.00

0.00/81.00

0.00/20.00

0.00/358.23

59 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/908.62

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Dar

bhan

ga Construction of H.L.R.C.C. Bridge in Ch.- 4.4,5.5 & 9th KM at Kuseshwarasthan to Phultora

road in the district of Darbhanga.(LalConstruction Company,09810112481)

Plan

Dar

bhan

ga

1046

5.00

0000

/ 70

25(S

) / 1

1 Se

p 20

18

HL/

684.

00

7763

4413

4.00

02 M

ar 2

019

01 M

ar 2

022

31 M

ay 2

022

Work Stopped due to flood

Dar

bhan

ga Construction of H.L.R.C.C. Bridge (5x21.00M)at Ch.- 18th Kusheshwarasthan to Phultora in

the district of Darbhanga.(B.K.BuildersPvt.Ltd,09955056922)

Plan

Dar

bhan

ga

1928

.000

000

/ 541

5(S)

/ 17

Jul 2

018

HL/

108.

00

1245

3583

8.00

02 M

ar 2

019

01 M

ar 2

021

Work Stopped due to flood

Dar

bhan

ga Construction of H.L.R.C.C. Bridge (3x21.00M)at Ch.- 19.8 Kuseshwarasthan to Phultora in the

district of Darbhanga.(BalramSingh,09431082277)

Plan

Dar

bhan

ga

974.

5000

00 /

5416

(S) /

17

Jul 2

018

HL/

64.8

0

7828

4294

.00

02 M

ar 2

019

01 S

ep 2

020

30 Ju

n 20

21

Work Stopped due to flood

Dar

bhan

ga Construction of High Level R.C.C. Bridge in3.8th k.m. (3x21.00m) of Kusheshwarsthan to

Phultora road in the District of Darbhanga.(BrajKishore Rai,09430800861)

Plan

Dar

bhan

ga

1512

.000

000

/ 542

8(S)

/ 17

Jul 2

018

RC

C/6

4.80

1051

2833

5.00

02 M

ar 2

019

01 M

ar 2

021

Work Stopped due to flood

8/26/2021 MPR Report :: Jul_2021

16/26

Achievement for the month / till month

Physical Financial

60 410.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/1257.25

61 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/438.06

62 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/254.20

63 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/1222.69

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Dar

bhan

ga

Construction of HLRCC bridge with Landacquisition ,approach road and protection work

near naiyam gram at pachphutiya ghat inBagmati river (7x24.75 m) Hari Construction &

Associate Pvt. Ltd., Begusarai

BD

F

Dar

bhan

ga

2319

.190

000

/ 181

6(s)

/ 28

Feb

201

4

RC

C/1

77.5

6

1295

9003

1.00

03 M

ar 2

014

02 M

ar 2

016

30 Ju

n 20

21

Work stopped due to flood

Kat

ihar

"Construction of RCC HL bridge (3X24.75 m)including approach road, diversion and

protection work in place of damaged by flood in2017 in the 1st Km of Belgachi PWD Road ViaNitendra-Macharhatta-goria road in the district

of Purnea. M/S SHIV SHAKTI CONST.PURNEA"

FDR

Purn

ia

1185

.000

000

/ 138

4(S)

/ 21

Feb

201

8

76.0

8

571.

44

10 O

ct 2

018

17 A

pr 2

020

31 O

ct 2

021

Bridge work completed. 4 Milestonewithheld vide Lt.no-2097 dt-23-12-18,Rs-2,85,721 vide Lt. no-571 dt-25-05-2019 Rs.=2,85,721, vide Lt no-525 dt-20- 06-20 Rs. 5,71,440. Approach road

work B.T. remaining. Traffic openthrough Bridge.

Kat

ihar

"Construction of 4x16.50m span H.L. R.C.C.Bridge over on BakhriKola Dhar in Bakhrikolto Vishhariya in the District of Purnea. Baba

Construction."

Nab

ard

Purn

ia

421.

1400

00 /

1807

(s) /

06

Mar

201

3

RC

C/6

8.44

309.

52

30 Ju

n 20

13

30 S

ep 2

014

31 D

ec 2

021 Bridge work completed. Approach road

L.A under Process. L.A. is under leaseprocess.

Kat

ihar

Construction of RCC HL bridge (6x21.00m) at28th KM of Belauri-Shivganj-Sonaili-SalmariBazar road in this district of Katihar. ARJUN

PRASAD,

FDR

Kat

ihar

1471

.000

000

/ 254

1(s)

/ 28

Mar

201

8

129.

60

1180

.60

10 O

ct 2

018

17 O

ct 2

020

31 O

ct 2

021

B.T. remaining. Traffic open throughbridge. Two Milestone withheld to

contractor for Rs.5,90,304 for delay ofwork vide Lt.No-238 Dt-22.2.19 &

Rs.5,90,304 vide Lt. No-491dt.-03.05.2019.

8/26/2021 MPR Report :: Jul_2021

17/26

Achievement for the month / till month

Physical Financial

64 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/162.40

65 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/90.00

0.00/194.07

66 260.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.13

67 320.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/216.51

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Kat

ihar

Construction of 2x12.50m span R.C.C. Bridgeover hara dhar in between Gogra-Lalganj ofKatihar District. (Balance Work) Baijnath

Sharma MM

SNY

Kat

ihar

251.

6400

00 /

1026

5(s)

/ 13

Sep

201

2

RC

C/3

0.00

155.

56

01 Ju

l 202

1

31 D

ec 2

021

31 D

ec 2

021 Bridge work completed. Approach road

L.A Under Process. L.A. under processof permanent L.A.

Kat

ihar

Construction of of H.L. RCC bridge (2X16.00m) in Place of Damaged by flood in 2017 in the

9th Km of Bairagachi-Banglacol road in theDistrict of Araria. MS SONACONSTRUCTION, SUPAUL

FDR

Ara

ria

547.

0800

00 /

287(

s) /

10 Ja

n 20

18

33.2

2

395.

50

19 A

ug 2

018

18 N

ov 2

019

31 O

ct 2

021

Bridge work completed. B.T. workremaining. 1% Milestone withheld Rs

3,95,708/- vide Lt. No-831 Dated-30.07.2019. 2nd 1% Milestone withheld

Rs 3,95,708/- vide Lt no- 1096 dt-28-09-2019. Traffic open through Bridge.

Kat

ihar

Construction of of H.L. RCC bridge (2X16.00m) in Place of Damaged by flood in 2017 in the

12th Km of Bairagachi-Banglacol road in theDistrict of Araria. ARZU CONST. LTD,

PATNA

FDR

Ara

ria

557.

0700

00 /

286(

s) /

01 Ja

n 20

18

33.2

2

386.

42

11 Ja

n 20

21

11 A

pr 2

022

Bridge at km 12 shifted to km 17approved. The contractor started

diversion & site Construction work.Work stopped due to heavy flood in

River.

Kat

ihar

Construction of 3x21.75m span R.C.C. Bridgeover Dhiwha (Chakka) dhar in front of Yogipurin farhi to kanholi Road of Narpatganj block inthe District of Araria District. (Balance Work)

Bipin Kr. Singh

MM

SNY

Ara

ria

331.

9400

00 /

9346

(s) /

24

Aug

201

2

RC

C/6

5.00

338.

76

01 Ju

l 202

1

31 D

ec 2

021

31 D

ec 2

021

Work stopped due to heavy flood inRiver.

8/26/2021 MPR Report :: Jul_2021

18/26

Achievement for the month / till month

Physical Financial

68 250.00 M 0.00/100.00

30.00/90.00

0.00/0.00

0.00/0.00

0.00/267.44

69 4693.00M

0.00/85.00

0.00/50.00

0.00/15.00

0.00/0.00

0.00/2026.26

70 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

10.80/294.04

71 300.00 M 0.00/100.00

0.00/100.00

15.00/75.00

0.00/35.00

0.00/1008.22

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Bha

galp

ur

Construction of (5x16.50) H.L R.C.C Bridge in1st KM of Tapua link road of Shivnarayanpur –Khawashpur Via Budhuchak in the District ofBhagalpur. Bhabesh Mishra Construction Pvt.

Ltd. Ishaqchak bhagalpur.

Plan

Bha

galp

ur

828.

4000

00 /

8083

(s) /

05

Sep

2019

HL/

85.5

5

4883

3056

.00

12 N

ov 2

020

11 F

eb 2

022 (i) Foundation- completed. (ii) Sub-

structure work is in progress. (iii) NoL.A issue.

Bha

galp

ur

Construction of ( 18x24.75 ) HL RCC BridgeOver Meandering branch of River Koshi in

between Vijay Ghat and Lokmanpur Panchayatin Bhagalpur District. RAJBIR

CONSTRUCTION PVT.LTD., 614 , HARIOMTOWER COMMERCIAL COMPLEX,

CIRCULAR ROAD,LALPUR , RANCHIJHARKHAND.

Nab

ard

RWD

Bha

galp

ur

5114

.000

000

/ 657

/ 15

Feb

201

9

HL/

456.

52

4755

8514

9.00

01 S

ep 2

020

28 F

eb 2

023 (i) Work is in progress. (ii) No work in

last month due to rise in water level.(iii) L.A proposal submitted vide T.Oletter no. 194(we) dated 09.04.2021

Bha

galp

ur

Re-setting, Repairing and maintainence work of28 sets module of Pontoon bridge on Koshiriver at Vijay Ghat between Naugachhia &

Dholbajja for the Year 2017-22 M/s ShaileshKumar, Gopal Goshala, Nogachia, Bhagalpur.

Mob No. 9431871130

Plan

Bha

galp

ur

430.

1200

00 /

1179

4(s)

/ 19

Dec

201

7

28.0

0

3753

8000

.00

18 F

eb 2

018

17 F

eb 2

023 Due to rainy season pipa bridge has

been dismantled and kept safely by theContractor.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C. Bridge withits approach road in 9th K.m of Sour-Patarghatroad in the district of Saharsa.(PKG-29 ) (M/s

Jai Mata Di Construction, Shri Krishnapuri(South), Begusarai (Bihar)-851101) W

BP

Phas

e-2

Saha

rsa

1265

.510

000

/ 404

/ 28

May

201

4

HL/

99.0

0

9546

3313

.00

08 M

ar 2

019

07 M

ar 2

021

31 A

ug 2

021 1. A2-P2 & P2-P1 Deck slab completed.

2. P1-A1 Deck slab shuttering work inProgress. 3. Earth work for approach

road in Progress.

8/26/2021 MPR Report :: Jul_2021

19/26

Achievement for the month / till month

Physical Financial

72 300.00 M 0.00/100.00

0.00/100.00

0.00/95.00

5.00/70.00

0.00/1101.55

73 100.00 M 0.00/100.00

15.00/100.00

0.00/30.00

0.00/20.00

0.00/719.19

74 350.00 M 0.00/85.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/860.08

75 350.00 M 0.00/80.00

0.00/15.00

0.00/10.00

0.00/0.00

0.00/860.08

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C Bridge withits approach road in 3rd Km of Baluwahat

Kosibandh via Aghori-Sakra-Paharpur-Baghwaroad in the district of Saharsa.(PKG-13 ) (M/s

Jai Mata Di Construction, Shri Krishnapuri(South), Begusarai (Bihar)-851101) W

BP

Phas

e-2

Saha

rsa

1031

.430

000

/ 404

/ 28

May

201

4

HL/

112.

00

1280

3685

8.00

08 M

ar 2

019

07 M

ar 2

021

31 A

ug 2

021 1. Deck slab completed, Crash barrier &

wearing coat work in progress. 2. GSBwork in A1 side Progress & A2 side is

Completed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(3X25) withits approach road in along Kakurwa Dhar in24th Km of Chandradei-Bangama-paktola-

Matiary-Mongra road in the district of Araria.{Nirman Engicons Pvt. Ltd., At + P.O.-

Mohanpur, District-Begusarai (Bihar)-851131}(PKG41)

WB

P Ph

ase-

2

Ara

ria

757.

7600

00 /

404

/ 28

May

201

4

75.0

0

7433

2455

.00

27 F

eb 2

016

26 A

ug 2

017

31 M

ar 2

021

31 D

ec 2

021

1. A2-P2 Deck Slab completed. 2. A1-Abutment Shaft completed & HammerHead completed. 3. P1- Hammer Headcompleted. 4. Amount Rs.6,86,398/-withheld is imposed due to delay inwork. 5. Contractor is debarred. 6.

Notice served to contractor why not ag

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L., R.C.C. Bridge(3X25)with its approach road over Tilyuga river in

Theho village-Sonapur road in DagmaraPanchyat of Nirmali block in the District of

Supaul.(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-852201)

(PKG-38 B)

WB

P Ph

ase-

2

Supa

ul

867.

7700

00 /

770

/ 25

Sep

2014

HL/

75.0

0

15 F

eb 2

017

14 F

eb 2

019

31 D

ec 2

021

1. Abutment A1-P2 Well Capcompleted. 2. P1 Sinking work

completed. 3. A2 plugging completed.4. Amount Rs.8,33,379/- withheld dueto delay in work. 5. Recomendation for

Debar.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L., R.C.C. Bridge(4X25)withits approach road over Tilyuga river besides

screw pile bridge in Kewtapatti-Nirmali Bazarroad in Nirmali Block in the district of Supaul.

(Devraha Construction Pvt. Ltd., GoutamNagar, Ward No.-12, Saharsa-852201)(PKG-38

A)

WB

P Ph

ase-

2

Supa

ul

1172

.780

000

/ 770

/ 25

Sep

201

4

HL/

100.

00

1514

4542

5.00

15 F

eb 2

017

14 F

eb 2

019

31 D

ec 2

021

1. Pier P1 in plugging stage. 2. P2-Piershaft in progress. 3. A2-P3 Deck Slab

completed. 4. L.A. requisition submittedto DM, Supaul, vide Letter No.-530(WE) Date-07.04.2021. 5. Amount

Rs.8,33,379/- withheld due to delay inwork. 6. Recomendation f

8/26/2021 MPR Report :: Jul_2021

20/26

Achievement for the month / till month

Physical Financial

76 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/90.00

28.52/414.22

77 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/1778.75

78 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

30.00/90.00

0.00/1830.58

79 495.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

21.02/565.92

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X28)withits approach road in 14th K.M. of Chaudhara-

Amha-Lokha-Saharsa road in Place of damagedOld R.C.C Bridge in the district of Saharsa.

(Sincon Infrastructure Pvt. Ltd., S.K Puri, LG-1& 2, Majestic Plaza, West Boring Canal Road,

Patna-800001)(PKG-32)W

BP

Phas

e-2

Saha

rsa

870.

0000

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

6059

2396

.00

27 F

eb 2

016

26 A

ug 2

017

31 D

ec 2

020

31 A

ug 2

021 1. Bridge work completed. 2. BT work

completed, Road furniture & protectionwork remaining. 3. Amount

Rs.2,60,577/- withheld due to delay inwork. 4. Contractor Debared.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(4X33) withits approach road in 15th K.M. of Ranginiya-Sonbarsa Road in Palce of Old S.P. Bridge inthe district of Saharsa. (Lall Construction Co.,

AA-105, Shalimar Bagh, Delhi-110088) (PKG-24) W

BP

Phas

e-2

Saha

rsa

1549

.360

000

/ 404

/ 28

May

201

4

HL/

132.

00

1549

3600

0.00

29 Ju

n 20

17

28 Ju

n 20

19

30 Ju

n 20

21

30 Ju

n 20

21

Completed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X25) in4th K.M. of Perserma-Chikni road in Palce ofdamaged Old S.P. Bridge (on Khardaha Dhar)

in the district of Supaul. (Lall Construction Co.,AA-105, Shalimar Bagh, Delhi-110088)(PKG-

16B) WB

P Ph

ase-

2

Supa

ul

550.

6600

00 /

404

/ 28

May

201

4

HL/

50.0

0

1990

4733

7.00

12 A

ug 2

017

11 A

ug 2

019

31 M

ar 2

020

31 A

ug 2

021 1. Bridge work completed.

2.Bituminous & protection workcompleted. 3. Road furniture work

remaining. 4. Amount Rs.13,26,489/-withheld due to delay in work.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(5X21) withits approach road in 11th K.m of Chandradei-

Bangama-Matiyari-Mogra road in the district ofAraria.(PKG-10) {Nirman Engicons Pvt. Ltd.,

At + P.O.- Mohanpur, District-Begusarai(Bihar)-851131}(PKG-10) W

BP

Phas

e-2

Ara

ria

857.

6100

00 /

404

/ 28

May

201

4

HL/

105.

00

6799

1774

.00

27 F

eb 2

016

26 A

ug 2

017

31 D

ec 2

020

30 Ju

n 20

21

Completed.

8/26/2021 MPR Report :: Jul_2021

21/26

Achievement for the month / till month

Physical Financial

80 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/889.82

81 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

15.00/95.00

0.00/889.83

82 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/81.48

83 115.00 M 2.00/72.00

0.00/35.00

0.00/0.00

0.00/0.00

0.00/923.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X21) withits approach road in 5th K.m of Alamnagar-

Budhma- Mali road in the district ofMadhepura. (Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)(PKG-7B) W

BP

Phas

e-2

Mad

hepu

ra

595.

8000

00 /

404

/ 28

May

201

4

HL/

42.0

0

1119

9173

6.00

07 D

ec 2

016

06 D

ec 2

018

31 D

ec 2

020

31 A

ug 2

021 1. Amount Rs.5,81,867/- withheld due

to delay in work. 2. Debared fromDivision. 3. BT work & Protection work

Completed. 4. Road furniture workremaining.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(4x25) withits approach road in 10th K.m in Khurhan-

Parel-Ratwara-Kapasia road in the district ofMadhepura (Extended part of RCD road 0 to 15k.m.) (Haque Construction Co., Sarai Syed Ali,

Muzaffarpur-842001 (PKG.7A) WB

P Ph

ase-

2

Mad

hepu

ra

851.

6700

00 /

404

/ 28

May

201

4

HL/

100.

00

1119

9173

6.00

07 D

ec 2

016

06 D

ec 2

018

31 D

ec 2

020

31 O

ct 2

021

1. Amount Rs.5,81,867/- withheld dueto delay in work. 2. Debared from

Division. 3. BT work & Protection workcompleted. 4. Road furniture work

remaining.

Patn

a-1

Construction of Renovation work NH Divisionoffice of RCD, Rajbanshi Nagar, Patna

Non

-Pla

n

Patn

a

215.

0000

00 /

6023

(S) /

01

Jul 2

019

44.8

8

22 A

pr 2

020

21 Ja

n 20

21

31 A

ug 2

021

Finishing work is in Progress.

Patn

a-1 Construction of Cable Suspension Bridge

(Laxman Jhula) across Punpun River at Punpunghat at the east side of Railway bridge in district

Patna(APICON-BCPL (JV),INDORE MP)

Plan

Patn

a

4677

.290

000

/ 116

6(S)

/ 31

Jan

2019

Oth

ers/

320.

00

5051

.00

31 A

ug 2

019

02 M

ar 2

021

31 M

ar 2

022

31 M

ar 2

022

Work in Progress.

8/26/2021 MPR Report :: Jul_2021

22/26

Achievement for the month / till month

Physical Financial

84 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/180.45

85 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/356.78

86 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/1506.67

87 580.00 M 0.00/100.00

0.00/100.00

10.00/90.00

0.00/0.00

0.00/479.52

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Patn

a-1 (b) Construction of Jan Nayak Karpuri

Chhatrawas Chahar Diwari (Hostel) in districtPatna.(RAMESH KUMAR,PATNA)

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

0.00

25 M

ar 2

019

24 D

ec 2

020

Completed.

Patn

a-1 (a) Construction of Jan Nayak Karpuri

Chhatrawas (Hostel) in district Patna.(RAMESH KUMAR,PATNA)

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

362.

31

25 M

ar 2

019

24 D

ec 2

020

31 M

ar 2

021

Finishing work is about to Complete.

Patn

a-1 Construction of Incubation Centre I.I.T. Patna

(Bihta)(KALSHI BUILDCONPVT.LTD.,HINOO,RANCHI,JHARKHAND) O

ther

s

Patn

a

1640

.700

000

/ / 1

7 N

ov 2

016

Oth

ers/

0.00

1489

.38

06 O

ct 2

018

05 A

pr 2

020

31 A

ug 2

020

Incubation Centre has been Inauguratedon 19.09.2020

Patn

a-1

Construction of H.L. R.C.C. Bridge (6x18.00m)over river Punpun between Nashopur

(Naubatpur Block) Poaawan Ghat (MasaudhiBlock) in Kahaguri-Khaurat Road in the district

of Patna.(PRABHAT KUMAR,PATNA)

Plan

Patn

a

1369

.000

000

/ 229

6(S)

/ 05

Mar

201

9

RC

C/1

11.6

0

816.

46

14 A

ug 2

019

13 F

eb 2

021

13 F

eb 2

021

31 D

ec 2

021

Work in Progress.

8/26/2021 MPR Report :: Jul_2021

23/26

Achievement for the month / till month

Physical Financial

88 100.00 M 0.00/100.00

0.00/95.00

0.00/40.00

0.00/30.00

0.00/502.22

89 290.00 M 0.00/100.00

0.00/100.00

1.00/31.00

0.00/0.00

0.00/476.90

90 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/684.16

91 585.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/471.64

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Patn

a-1

Construction of H.L. R.C.C. Bridge (6x18.00m)in place of damaged bridge in 12th Km of Pali-Ullar-Masaudhi Road under Pali Block in the

district of Patna.(SATYENDRAKR.YADAV,RAMPUR,GAYA)

Plan

Patn

a

1346

.310

000

/ 746

1(S)

/ 26

Sep

201

8

RC

C/1

08.0

0

900.

84

06 M

ar 2

019

05 M

ar 2

021

05 M

ar 2

021

15 M

ay 2

022

The work has been interrupted due toflood in the river.

Patn

a-1

Construction of H.L. R.C,.C. bridge Musnaperto Masaurhi-Noubatpur via duct NH-83 Potahi

& Patna Gaya Railway line cross 20 km inbetween Shahwajpur, Block-Punpu and

Chakkan Bigha, Block-Noubatpur Approachroad, Protection work with LA (6x18m)on thepunpun river.(RAKESH CONSTRUCTIONPVT.LTD.JAMSHEDPUR,JHARKHAND)

Plan

Patn

a

1427

.170

000

/ 446

4(s)

/ 14

Jun

2018

RC

C/1

11.6

0

748.

01

05 M

ar 2

019

04 M

ar 2

021

04 M

ar 2

021

31 M

ar 2

022

Work in Progress.

Patn

a-1

Construction of left turning ramp 9 Extra Arm)connecting Newly constructed Mithapur-

Chiraiyatand via Railway Station Flyover (P30-P31) with Chiraiyatand Exhibition Road

Flyover in Patna.(S.P.SINGLACONSTRUCTION

PVT.LTD.,PANCHKULA,HARYANA)

Plan

Patn

a

818.

0000

00 /

8573

(S) /

15

Nov

201

8

RC

C/2

10.0

0

859.

69

09 M

ar 2

019

08 D

ec 2

019

21 O

ct 2

020

Completed.

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Kachidargah to Rustampur (Raghopur)

(including setting, Resetting for 5 Years) ofRaghopur Block in district Vaishali.(RAJNISH

KUMAR,SHAHPUR,DANAPUR,PATNA)

Non

-Pla

n

Patn

a

751.

5700

00 /

1180

4(s)

/ 19

Dec

201

7

Pont

oon

Brid

ge/0

.00

625.

72

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pipa Sets has been removed and asideon dated-15.06.2021 on arrival of

Monsoon.

8/26/2021 MPR Report :: Jul_2021

24/26

Achievement for the month / till month

Physical Financial

92 400.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/224.77

93 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/946.79

94 60.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.56

95 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/576.04

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Gyaspur to Kaladiyara Diyara

(including opening & Resetting for 5 Years) ofBakhtiyarpur Block in district Patna.(RUBIINDUSTRIAL FASTNERS,PATLIPUTRA

COLONY,PATNA)

Non

-Pla

n

Patn

a

582.

2300

00 /

1196

4(s)

/ 21

Dec

201

7

Pont

oon

Brid

ge/0

.00

472.

72

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pipa Sets has been removed and asideon dated-15.06.2021 on arrival of

Monsoon.

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Danapur to Panapur Diyara (including

opening & Resetting for 5 Years) in districtPatna.(SHIBU CONSTRUCTION

PVT.LTD,DANAPUR,PATNA)

Non

-Pla

n

Patn

a

1114

.990

000

/ 119

65(s

) / 2

1 D

ec 2

017

Pont

oon

Brid

ge/0

.00

873.

73

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pipa Sets has been removed and asideon dated-15.06.2021 on arrival of

Monsoon.

Patn

a-1

(b) Construction of Balance work of one spanout of three span H.L.R.C.C. Bridge

(1x16.50M) across Dhaba River in 4th Km. ofKhusrupur-Nagarnausa Road at Nirmali chak

Middle Vidayalay in Patna Dist. IncludingApproach in both side and Bituminous work

thereof.(NARAYAN INFO VENTUREPVT.LTD.,PATNA)

Nab

ard

Patn

a

418.

9800

00 /

1871

(s) /

03

Mar

201

4

RC

C/1

6.50

0.00

The Ryot has been received the amountof compensation.

Muz

affa

rpur Construction of Pontoon Bridge in river Ganga

between Chakosanghat to Jamindari Ghat(including opening & Resetting for 5 Years) of

Bidupur in district Vaishali.

Plan

Vais

hali

3013

.650

000

/ 233

8(S)

/ 31

Mar

201

6

Pont

oon

Brid

ge/5

97.0

0

7660

8900

.00

06 F

eb 2

018

05 F

eb 2

023

Dismantling of Pipa Pul have been donedated 15.06.2021 due to high discharge

of river water and closed for traffic.Installation of Pipa pul will be done

after rainy season.

8/26/2021 MPR Report :: Jul_2021

25/26

Achievement for the month / till month

Physical Financial

96 60.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

803.33/994.04

97 1100.00M

0.00/100.00

0.00/100.00

6.00/80.00

0.00/0.00

0.00/4258.83

98 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

80.00/80.00

0.00/823.65

99 2030.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/66.00

0.00/3775.30

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Muz

affa

rpur

Construction of 2x10.37M size Bridge overCanal to Siman chakjamal Siman Road in ward

No. 33 of Vaishali District MM

SNY

Vais

hali

169.

0400

00 /

6066

(S) /

08

Jul 2

014

RC

C/2

2.00

1297

4000

.00

21 N

ov 2

014

20 N

ov 2

015 Work Completed.

Remarks for LA: Total No of LPC-02Nos. Registered LPC- 01 Nos. LPC

(Under Legal objection)- 01

Muz

affa

rpur

Construction of R.C.C H.L Bridge ChandauliGhat in Bagmati River District of Sitamarhi. Pl

an

Sita

mar

hi

7089

.380

000

/ 739

4(S)

/ 10

Aug

201

6

RC

C/4

32.0

0

4443

6794

3.00

10 F

eb 2

016

09 A

pr 2

019

30 Ju

n 20

20

31 M

ar 2

022

Work of main bridge is in progress.Publication of Preliminary notificationunder Section 11 of L.A. Act has been

under done by DLAO, Sitamarhi.

Remarks for LA: Land owners not agreeto start work in approach road matter

has been brought to notice ofD.M.,Sitamarhi on 09.04.2021 meetingof land owners with D.M.Sitamarhi was

held on 12.04.2021 but issue notresolved.

Muz

affa

rpur

Construction of R.C.C H.L Bridge Belsand-chhitauni-Tariyani Road in 2nd Km. 4x21.00M

District of Sitamarhi. Nab

ard

Sita

mar

hi

851.

4600

00 /

1012

5 / 1

0 Se

p 20

12

RC

C/8

4.00

7562

9157

.00

30 D

ec 2

012

30 Ju

n 20

14

30 Ju

n 20

20

31 M

ar 2

022

Bridge work has been completed &Agreement closed. Tender of

remananing work of the bridge(Approach road, Proctetion work &Miscellaneous work) has been done.

Remarks for LA: Registry of six plots0.520 acres under perpetual lease is in

Progress.

Muz

affa

rpur "Construction of 12x24.00 m H.L.R.C.C.

Bridge in Athar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district of

Muzaffapur. (Plan) Ganesh Ram Dokania, Mob-9471637819"

Plan

Muz

affa

rpur

3554

.810

000

/ 181

7(S)

/ 28

Feb

201

4

RC

C/2

97.0

0

2815

5918

6.00

22 N

ov 2

014

21 N

ov 2

016

31 M

ar 2

020

31 D

ec 2

021

Main Bridge of project has beencompleted & work in approach road is

in progress.

Remarks for LA: Nos of 55 nos LPCdocuments has been registred against 75

no LPC documents and rest is underprocess.

8/26/2021 MPR Report :: Jul_2021

26/26

Achievement for the month / till month

Physical Financial

100 1306.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/2590.38

101 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/446.52

102 240.00 M 15.00/100.00

10.00/60.00

0.00/0.00

0.00/0.00

0.00/516.59

103 240.00 M 0.00/100.00

0.00/100.00

25.00/90.00

0.00/30.00

0.00/711.74

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

(In

Lak

h O

nly.

)

Muz

affa

rpur

"Construction of 12x24.00 m H.L.R.C.C.Bridge in Dr Jagarnath Mishra College inbetween Soda Godaun to Ahiyapur with

approach road in the district of Muzaffarpur.(Nabard). Ganesh Ram Dokania, Mob-

9471637819"

Nab

ard

Muz

affa

rpur

4329

.610

000

/ 788

9(S)

/ 03

Jan

2013

RC

C/3

00.0

0

3107

1017

1.00

19 F

eb 2

014

18 F

eb 2

016

30 Ju

n 20

20

31 D

ec 2

021

Main Bridge of the Project almostcompleted. Work of approach road

started on dated 31.12.2020 but stoppedby Land onwer on issue of valuation of

land and deadline of payment ofcompensation amount.

Remarks for LA: Section 19 (1) of L.A.

act is under process.

Nal

anda

Construction of (1) Boundary wall (2) RoadDevelopment(3) Drainage(4) Electric Light-High Mast/Road/Street light (5) Repair of

Existing Building if any (6) Entrance Gate &Guard Room (7) Toilet Block of Bazar krishi

samiti, Biharsharif, Phase-I

Plan

Nal

anda

1453

.000

000

/ 284

/ 07

Mar

201

9

1.00

1438

.00

24 F

eb 2

020

23 A

ug 2

020

31 M

ar 2

021

1.) Boundary Wall up to Plinth Level900m/938m. 2.) Boundary wall (BrickMasonary work) up to full Height-750

m/938m 3.) RCC Drain -860m/957m 4.)GSB in Road -595m/ 630m 5.) ToiletBlock No-01- Brick Masonary up to

Terrict Level Complete

Nal

anda

Construction of High Level RCC Bridge(16x18.00m) Size in 14th km of Manjhay-

Govindpur Road in Distritct of Nawada. M/s K.ANDI & ASS0CIATES Mob. - 7004501271

Plan

Naw

ada

1616

.000

000

/ 106

19(S

) / 1

2 D

ec 2

019

HL/

300.

00

30 A

pr 2

022 1.) 114/114 Pile Completed. 2.) Pile

Cap-17/17 Nos Completed. 3.) 15/17Piear Shaft up to 2nd left Completed. 3.

Rest work is in Progress.

Nal

anda

Construction of H.L. R.C.C. Bridge 8 x 18mtr.In place of Old Screw pile bridge connecting

Rajauli Bazar to NH 31 across river DhanarjayUnder Block - Rajauli in Dist. Nawada. M/s K.

ANDI & ASS0CIATES Mob. - 7004501271

Plan

Naw

ada

1143

.000

000

/ 718

2(s)

/ 05

Aug

201

9

RC

C/1

48.8

0

850.

00

30 O

ct 2

019

29 A

pr 2

021

29 A

pr 2

021

1.) Pile-80/80Nos Completed. 2.) PileCap-9/9 Nos Completed. 3). Pier Shaft-

9/9 Completed. 4.) Deck Slab8/8Completed 5.) Earth Work is in

Progress. 6.) Rest work is in Progress.