progressive mine closure plan of kathara kothar...
TRANSCRIPT
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Prepared by :Balram Singh Associates Pvt. Ltd.
RQP/JBP/105/2003/BValid upto - 14.09.2013
Chopra Colony, P.O.- MaiharDistt.- Satna (M.P.) Pin : 485771
Phone No. : (07674) 232473, Mob - 09425185701e-mail : [email protected]
SCHEME OF MINING &PROGRESSIVE MINE CLOSURE PLAN OF
KATHARA KOTHAR LATERITE & BAUXITE MINE
M. L. Area - 0.97 Hects.M. L. Area in Forest - Nil
Total M. L. Area - 0.97 Hects.
In Village - Kathara KotharTehsil - Raghuraj Nagar, District- Satna
State - Madhya Pradesh
For the Mineral - Laterite and Bauxite Proposal Period - 2010-11 to 2014-15
Category of Mine - Very Small ‘B’ Category
Submited toIndian Bureau of Mines
Under Rule 12(3) of M.C.D.R., 1988 andUnder Rule 23 B of M.C.D.R., 1988
LesseeShri Rajendra Kumar Agrawal
P.O. - JaitwaraDistt.- Satna (M.P.)
Satna (M.P.)Pin Code - 485221
(1)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
CERTIFICATE
(I) CERTIFIED THAT THE PROVISIONS OF MINES ACT. RULES & REGULATIONS MADE
THERE UNDER HAVE BEEN OBSERVED IN THE SCHEME OF MINING AND
WHEREVER SPECIFIC PERMISSIONS ARE REQUIRED, THE APPLICANT WILL
APPROACH THE DIRECTOR GENERAL OF MINES SAFETY.
(II) THIS IS TO CERTIFY THAT THE PROVISIONS OF MINERAL CONSERVATION AND
DEVELOPMENT RULES - 1988 HAVE BEEN OBSERVED IN THE SCHEME OF MINING
OF KATHARA KOTHAR LATERITE & BAUXITE MINE FOR AN AREA OF 0.97 HECTS.
IN VILL- KATHARA KOTHAR, TEHSIL -RAGHURAJ NAGAR, DISTT. -SATNA, STATE -
M.P. APPLIED BY SHRI RAJENDRA KUMAR AGRAWAL, AND WHEREEVER
SPECIFIC PERMISSIONS ARE REQUIRED THE APPLICANT WILL APPROACH THE
CONCERNED AUTHORITIES OF INDIAN BUREAU OF MINES FOR GRANTING THE
PERMISSION.
(III) IT IS ALSO CERTIFIED THAT THE INFORMATIONS FURNISHED IN THE ABOVE
SCHEME OF MINING ARE TRUE & CORRECT TO THE BEST OF MY KNOWLEDGE.
SIGNATURE OF RQP
for : Balram Singh Associates Pvt. Ltd.Regd. No. - RQP/JBP/105/2003/B
Sanjay k. SinghAuthorised signatory
Key person :-
R.C. Bansal(Min.Engg.)
Place : Maihar
Date : 12.03.2011
(2)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
CONSENT LETTER FROM APPLICANT
This Scheme of Mining in respect of KATHARA KOTHAR LATERITE &
BAUXITE MINE , Area - 0.97 Hects., Mineral - Laterite and Bauxite, Village -Kathara
Kothar, Tehsil -Raghuraj Nagar, Distt.: Satna (M.P.) regarding Mining lease under
Rule - 12 of M.C.D.R. 1988 has been prepared by M/s. Balram Singh
Associates Pvt. Ltd. Regd. No.- RQP/JBP/105/03/B. I request Deputy
Controller of Mines, I.B.M. Jabalpur to make further correspondence regarding
modification of the Scheme of Mining with the said recognised person on their
following address :
Balram Singh Associates Pvt. Ltd.Regd. No. : RQP/JBP/105/2003/B
Chopra Colony, P.O.- MaiharDistt. : Satna (M.P.) Pin : 485771
Phone : (07674) [email protected]
I hereby under take that all the modifications so made in
the Scheme of Mining by the recognised person may be deemed to have been
made with my knowledge & consent & shall be acceptable to me and binding on
me in all respects. I have understood the contents of the Scheme of Mining and
agree to implement the same.
SIGNATURE OF THE APPLICANT
Rajendra Kumar AgrawalLessee
PLACE : SATNA
DATE : 30.12.2010
(3)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
CERTIFICATE
The provisions of Mines Act, Rules and Regulations made
thereunder have been observed in the Scheme of Mining of
KATHARA KOTHAR LATERITE & BAUXITE MINE of Shri
Rajendra Kumar Agrawal, Satna and where specific permissions are
required, the applicant will approach the D.G.M.S. Further, standards
prescribed by DGMS in respect of Miners health will be strictly
implemented.
Signature of Applicant
Rajendra Kumar AgrawalLessee
PLACE : SATNA
DATE : 30.12.2010
(4)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
CERTIFICATE
This is to certify that said Closure Plan complies all Statutory Rules,
Regulations and orders made by the Central or State Government, Statutory
organizations, Courts etc. have been taken into considerations and wherever any
specific permission is required the lessee will approach the concerned authorities.
UNDERTAKING
All the measures proposed in this Closure Plan will be implemented in a
time bound manner as proposed.
Boundary Pillars Undertaking
Lease boundary points as indicated on the surface plan are marked in the field
and the precise lease area forms the basis for preparation of this Scheme of Mining
The boundary pillars erected on these points shall be maintained in good shape
and condition through out the subsistence of lease as per provisions under rule 33 of MCR,
1960 and item No. 2 part-VII of form K of MCR, 1960.
Signature of the Owner
Rajendra Kumar AgrawalLessee
(5)
PLACE : SATNA
DATE 30.12.2010
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Review of Mining plan
Exploration & Reserve
Mining
Disposal of mine waste and seperate stacking of sub-grade
Minerals
Use of Minerals
Employment potential
Environment Management Plan
Conceptual Plan
Any other relevant information
Progressive Mine Closure Plan
List of Annexures
Supplementary Agreement
Chemical Analysis report
RQP Certificate
Photographs
Photo ID and Address Proof
Undertaking
Bank Guarantee
CONTENTS
SUBJECTCHAPTERNO. PAGE NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1.
2.
3.
4.
5.
6.
7.
9
17
22
25
28
28
29
33
37
37
55
62
63
64
65
66
67
(6)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(7)
LIST OF PLAN AND SECTION
(1) KEY PLAN - PLATE - 1
(2) LEASE MAP - PLATE - 2
(3) LOCATION PLAN - PLATE - 3
(4) SURFACE PLAN - PLATE - 4(i & ii)
(5) SURFACE GEOLOGICAL PLAN - PLATE - 5
(6) SURFACE GEOLOGICAL SECTION - PLATE - 6
(7) 5 YEAR DEVELOPMENT/PRODUCTION - PLATE - 7
PLAN
(8) ENVIRONMENT PLAN - PLATE - 8
(9) CONCEPTUAL PLAN & SECTION - PLATE - 9
(10) PROGRESSIVE MINE CLOSURE PLAN - PLATE - 10
(11) ENVIRONMENT MANAGEMENT PLAN - PLATE - 11
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
SCHEME OF MININGOF
KATHARA KOTHAR LATERITE & BAUXITE MINELessee :- Shri Rajendra Kumar Agrawal
INTRODUCTORY NOTE :-
This Scheme of Mining has been prepared under Rule - 12(3) of
M.C.D.R 1988. The guide lines applicable for Very small ‘B’ category mine has been
followed. This will be manual mine without drilling and blasting and average daily labour
employment less than 25. The other details regarding the ML is as under -
1. Lease Period - 29.04.2000 to 28.04.2020
2. Original Lease granted to - Shri Shabbir Ahmed Siddqui of Jaitwara vide
M.R.D.State Govt. of M.P. letter No.-F-3-42/96/12/2, Dated-18.09.2002
3. Transferred to - Shri Rajendra Kr. Agarwal. Form “O” was executed
on 23.07.2004. Mineral Bauxite was added in the mining lease vide State
Govt. letter No.-F3-42/96/12/2, Dated-11.12.2003. The supplementry
agrement was signed on 03.08.2004 (Annexure-1).
4. Date of 1st Opening - 21.11.2000
5. 1st Mining Plan approved on - 22.09.98
6. Last approved document - Scheme of Mining on 07.10.2005.
7. Proposal period of last document 2005-06 to 2009-10
8. Lapsed period - Nil
9. Present SOM period - 2010-11 to 2014-15
10 BG validity period - 31.03.2015
11 Coordinate of boundary pillar -
Pllar No. Latitude Longitude
A 24053’8.0” 80058’56.5”
B 24053’6.2” 80059’0.2”
C 24053’4.3” 80058’57.2”
D 24053’5.5” 80058’53.5”
There is no other mining lease sanctioned in the name of lessee.
(8)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
1.0 REVIEW OF MINING PLAN
1.1 (a) Name of the Mine : Kathara Kothar Laterite & Bauxite Mine
(b) Address : Village - Kathara Kothar
Tehsil - Raghuraj Nagar
Distt - Satna
(c) Area : 0.97 Hects.
(d) Lessee : Shri Rajendra Kumar Agrawal
Distt.- Satna (M.P.)
Satna (M.P.)
Pin Code - 485221
(e) Date of expiry of lease : 28.04.2020.
(f) Name and address of the RQP : Balram Singh associates Pvt. Ltd.
preparing Scheme of Mining Regd No.-RQP/JBP/105/2003/B
Valid up to - 14.09.2013
Chopra Colony
P.O.- Maihar, Pin-485771,
Distt.:Satna (M.P.)
Phone:(07674) 232473
e-mail - [email protected]
1.2 Particulars of approval of Mining plan :-
The Mining plan was earlier approved on 22.09.98 vide letter no.-
M.P./Satna/Lat./MPLN/G-13/98-99/3295 under Rule-22 of M.C.R. 1960 for grant of
Mining lease over an area of 0.97 Hects. The Scheme of Mining was approved on MP/Satna/
Lat/M.Scheme-21/2005-06 dated 07.10.2005 for period upto 31.03.2010.
1.3 Date of commencement of mining operations :-
The date of commencement of mining operations is 21.11.2000.
(9)
CHAPTER - I
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(10)
1.4 (a) Deficiencies, if any that existed in the approved Scheme of Mining to be taken
note of and rectified by incorporating suitable proposals for implementation in
the Scheme of Mining :-
There are minor deviations existing from the approved Scheme of Mining ,
which has been take careof. The deficiencies found from place to place has been
taken note of and rectified by incorporating suitable proposals for implementation in
this Scheme of Mining.
(b) A review of compliance position of salient feature of the Mining plan on
chapterwise basis bringing out marked deviations, if any, and justifications/
reasons thereof. Items to be covered may include exploration, mine
development, exploration, afforestation programme, reclamation &
rehabilitation, control of dust, noise and ground vibration and if any other
significant features :-
Justification : No deviation.
PROPOSAL AS PER APPROVEDM.PLAN/SOM
TYPE OFEXPLORATION
ACHIVEMENT*
QUANTUMSIZE/NOS.
LOCATIONType QUANTUM
SIZE/NOS.
No exploratonwas proposed.
NA NA No exploratonwas carried out.
NA
1.4.1 (i) Exploration -
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
1.4.(ii) Mine Development :-
At the begining of proposal period there were three quarries. It was proposed to
laterally extend the quarry -1 towards north and work in depth upto full thickness of
mineralisation. Proposed dimensions of pits at the end of proposal period (ref previous 5th
year Development plan) and their actual position as on date(Surface plan) is given in
following table. Besides this quarry no. 2 & 3 were also merged and extended towards north.
Actual Achieved during proposal period -
(11)
Quarry No. -1
BENCHES
BROKEN AREA (Ha.) PIT BOTTOM RL
BEGINING ADDITIONALPROPOSED
AT THE END PREVIOUS PROPOSED
Soil
OB/Waste
MINERAL
Laterite
(Bauxite)
R O A DMAKING Nil
1(B-1) of 0.45 0.06 0.51 377 3770.5 x (1.5-3)No Bench.As interburden
1 (B-2 )2.5m x 3m1 (B-3 )2.5m x 3m
No & SIZE-M(HXW)
PROPOSAL (Cum. proposal as per last 5th yr SOM) -
Quarry No. -1
BENCHES
BROKEN AREA (Ha.) PIT BOTTOM RL
BEGININGOF YEAR
ACTUALADDITIONAL
PRESENT
Soil
OB/Waste
MINERAL
Laterite/
Bauxite
R O A DMAKING Nil
1(B-1) of 0.40 0.13 0.53 376 - 380 m1m x 3mNo Bench.As interburden
2 (B-2 & 3)2.5m x 3m
No & SIZE-M(HXW)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
JUSTIFICATION - The development of area ,over burden removal and production was onmuch higher side. This was due to better demand of ore leading to moredevelopment as well as production. The production of bauxite was less dueto poor recvery of bauxite and better recovery of laterite than thatenvisaged.
Quarry No. -2
BENCHES
BROKEN AREA (Ha.) PIT BOTTOM RL
BEGININGOF YEAR
ACTUALADDITIONAL
PRESENT
Soil
OB/Waste
MINERAL
Laterite/
Bauxite
R O A DMAKING Nil
1(B-1) of 0.05 0.12 0.17 377 - 381m1m x 3mNo Bench.As interburden
2 (B-2 & 3)2.5m x 3m
No & SIZE-M(HXW)
(12)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Just
ifica
tion
:Th
e ex
ploi
tatio
n of
ove
r bur
den
rem
oval
and
pro
duct
ion
was
on
muc
h hi
gher
side
. Thi
s w
as d
ue to
bet
ter d
eman
d of
ore
lead
ing
to m
ore d
evel
opm
ent a
s wel
l as p
rodu
ctio
n. T
he p
rodu
ctio
n of
bau
xite
was
less
due
to p
oor r
ecve
ry o
f bau
xite
and
bette
r re
cove
ry o
f lat
erite
than
that
env
isage
d.
1.4
(iii)
EXPL
OIT
ATIO
N -
Year
wise
pro
posa
l and
achi
evem
ent f
rom
the m
ine i
s giv
en in
tabl
e bel
ow -
Prop
osal
mad
e in
Sche
me o
f Min
ing
Stat
us o
f im
plem
enta
tion
/ dev
iatio
n fr
omSc
hem
e of M
inin
g o
bser
ved
The
follo
win
g pr
oduc
tion
was
pla
nned
in th
e
appr
oved
Sch
eme o
f Min
ing
.
The
follo
win
g pr
oduc
tion
was
ach
eive
d du
ring
appr
oved
Sch
eme o
f Min
ing
perio
d.
Year
2005
-06
162
507
669
951
843
1:0.
88-
4040
Nil
228
1:0.
17
2006
-07
9548
958
411
1060
01:
0.79
-20
2044
Nil
1:0.
45
2007
-08
-37
537
512
65N
il1:
0.67
300
700
1000
880
2912
1:0.
26
2008
-09
-56
656
611
8081
01:
0.67
700
1000
1700
Nil
4810
1:0.
35
2009
-10
-49
649
611
1052
51:
0.65
500
740
1240
Nil
4070
1:0.
30
Prop
osal
Perio
d
of S
OM
Min
eral
(t)
Soil
OB/
was
teSr
ippi
ng
ratio
Tota
lB
auxi
teLa
teri
te
Min
eral
(t)
Soil
OB/
was
teSr
ippi
ng
ratio
Tota
lB
auxi
teLa
teri
te
(13)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(14)
1.4 (iv) Afforestation Programme - At the begining of proposal period no surviving plant existed.
Yearwise proposal and achievement from the mine is given in table below.
Proposal -
Achievement -
Justificaton - Due to non availibility of matured area for backfilling, plantation could not be
started. No plantation survived due to stony nature of the applied area and
scarcity of water in boundary.
Backfilling Area
Nos
Waste Dump
Nos
Green Belt
Nos
Bench/BFSlope
Nos
Other Areas
NosYear
05-06 - - - - - - - - - - -
06-07 - - - - - - - - - - -
07-08 - - - - - - - - - - -
08-09 - - - - - - - - - - -
09-10 - - - - 10 0.01 - - - - -
SurvivalRate
Area(ha.) Area(ha.) Area(ha.) Area(ha.) Area(ha.)
AFFORESTATION DONE ON
Backfilling Area
Area(ha.) Nos
Waste Dump
Nos
Green Belt
Nos
Bench/BFSlope
Nos
Other Areas
NosYear
05-06 - - - - 10 0.01 - - - - 80%
06-07 - - - - 10 0.01 - - - - 80%
07-08 10 0.01 - - - - 80%
08-09 52 0.052 - - 10 0.01 - - - - 80%
09-10 22 0.022 - - 10 0.01 - - - - 80%
SurvivalRate
Area(ha.) Area(ha.) Area(ha.) Area(ha.)
AFFORESTATION PROGRAMME ON
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(15)
1.4 (v) Waste management -OB MANAGEMENT - There was no external dump as well as in pit dump in the ML area.During proposal period soil to be generated was proposed to be backfilled in the excavated
area. Proposed and actual soil management during proposal period is given in table below -
SOIL - 5 Year Proposal 5 Year Achievement
Genrationm3
Disposal - m3For
AfforestationTo be Stored
Disposal - m3For
Afforestation Stored
Genration
257 257 Nil 1500 Nil 250 cum andrest used for
mainteinance ofapproach road.
Proposal 5 Year Achievement 5 Year
WASTE - There was no waste dump at the begining of the proposal period. During proposal periodwaste generated was proposed to be backfilled.Proposed and actual wastemanagement during proposal period is given in table below -
Genrationm3
Disposal
Backfiling- m3
ExternalDumping m3
Others m3Genration
m3
Disposal
Backfiling ExternalDumping
Others
2433 2433 Nil Nil 2500 Nil Nil Used formainteinance ofapproach road
and as in pitdump.
Justification : There is deviation in the proposal as no area was matured for reclamation in view of
ore body continuing in depth.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
1.4(vii) Control of dust, noise and vibration and any other significant features :-
There is no significant generation of dust and noise pollution and vibration and as such no
deviation from the approved Scheme of Mining . There is no other significant features.
Sprinkling of water was done on haul roads.
1.4 (viii) Any other significant feature :- Nil
1.4 (vi) Reclamation of mined out area - At the begining of proposal period there was no mine out
area or matured dump. Proposal and achievement during proposal period is given in table
below-
SOMPeriod
Rehabilitation in M2 Rehabilitation ofmatured Dumpby Compaction& Afforestation
Of BFArea
Of Bench/Slope by
Plantation
WaterHarvesting
Proposal 1073 735 Nil Nil Nil Nil
Achievement Nil Nil Nil Nil Nil GD
ProtectiveMeasures for
Dump (GD/RW/ST)*
Reclama-tion by
Backfillingin M2
Justification : No reclamation was carrid out as no area was matured for reclamation in view of orebody continuing in depth.
(16)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
2.0 EXPLORATION AND RESERVES :-2.1 Reserves extimated in the approved Scheme of Mining with grade :-
Geological Reserve as calculated in the approved Scheme of Mining.
Proved Geological reserve of Laterite = 43,415 t.
Proved Geological reserve of Bauxite = 32,235 t.
Grade :-
The Laterite is of cement grade while Bauxite is of metal grade.
2.2 Depletion of reserves during the period of the approved Scheme of Mining:-
The depletion of the reserve during the period of approved Scheme of Mining Plan is given
below :-
Year Production (t.)
Laterite Bauxite
2005-06 228 Nil
2006-07 Nil 44
2007-08 2912 880
2008-09 4810 Nil
2009-10 4070 Nil
Total 12,020 924
2.3 Additional reserve established category wise with basis and parameters considered
during the period of Scheme of Mining :-
No additional reserve has been calculated.The updated reserves are
hereunder in view of UNF classification implemented.
(17)
CHAPTER - II
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
2.4 Updated reserves with grade(Indicate end use grade with analysis) as well as
marginal grades,based on above :-Method of estimation of mineral reserves :-
The total mineral resource has been calculated by surface area method. Inthis method the surface mineralised area has been multiplied by the average thickness of theore body to find out the volume. This is turn has been multiplied by the bulk density to find outthe tonnage. The mineral reserve there after has been calculated by depleting remainingresource from total mineral resource.Categorisation of total mineral resources and mineral reserve :-
The total mineral resource has been put under 331 category while the mineralreserve has been put under 121 category as per the UNF classification. The mineralisationhas been proved by extensive pitting in the ML area.1) Economic Axis :-
E-1 - (i) General exploration laterally as well as in depth by way of pitting.(ii) Mining report/Mining Plan prepared under Rule 24 of MCR 1960 & SOMunder 12(3) of MCDR 1988.(iii) Specific end use grade of reserve established. The reserves of Lateritein the lease area is of cement and metal grade.(iv) Specific knowledge of non forest and other land use data available. Thelease area is non forest land with mostly barren waste land.
2) Feasible Axis :- Pre feasibility study carried outF-2 - 1. Geology : Local geology, Mineralogy and Geometry of the Laterite and
Bauxite deposit in the lease area established during mining operations. Theidentification of the ore body carried out and only Laterite and Bauxite wasfound to occur in the lease area.2. Mining : The mine will be worked by manual method. Pre production &development plan prepared and appended. The estimate of man power hasbeen carried out.3. Environment : Base line data on environment and land use data etc. hasbeen generated.
(18)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
4. Processing : No processing is proposed.5. Infrastructure : Infrastructure & services - Site services such as rest shelter, firstaid room, drinking water facilities etc. will be provided in compliance of Mines Act1952 and Mines Ruls 1955.6. Costing : Capital cost and operating cost has been evaluated based on comparablemining operations.7. Marketing : The Laterite and Bauxite of the lease area is proposed for supply tocement and aluminium plants respectively.8. Economic Viability : The mine is economically viable.9. Other factors : Statutury provisions relating to land has been complied while labour,mining and taxation etc. during the course of mining.
3) Geological Axis :-G-1 - 1. (i) Geological survey : Mapping on a scale of 1:1000 with triangulationpoints & bench marks carried out and shown in surface geological plan. Extensivepitting has been done and the nature of deposition of Laterite and Bauxite has beenshown on geological plan & section.(ii) Linking of map with topogrid carried out and latitude and longitude of the cornerpoints taken.(iii) Assessment of lithology carried out based on the exposures in the pit of Lateriteand Bauxite, structure and surface mineralisation studied and mapped during the courseof mining and given in the Scheme of Mining.(iv) The mining lease was granted in year 2000. It is being worked since then.2. Geochemical survey : Detailed sampling of the pit.3. Geophysical survey : Geophysical survey carried out on the basis of exposuresand out crops. Based on the exploration and exposures in pit, the mineralised zonedelineated.4. Technological : Extensive pitting carried out through the applied area . The depthis upto 8m. The deposit is regular. Surface and sub surface lithology and co-relation ofmineralised zones carried out by above mentioned pitting and sampling carried out ofpit faces. Almost complete area is broken and hence has been taken for G1 category.
(19)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Mineral Resources :-(i) Measured Mineral Resource (331)Resource = Surface mineralised area x Av. Thickness of orebody x B.D. x RecoverySurface Mineralised area = 9700 sqmAv. Thickness = 2.5 mBulk density , Bauxite = 2.3
Laterite = 2.7Recovery, Overall = 70%
Bauxite = 20%Laterite = 80%
Hence, Measured Mineral Resource (331) of Laterite= 97,00sqm x 2.5 m x 2.7 x 0.7 x 0.8 = 36666 t.
Measured Mineral Resource (331) of Bauxite= 97,00sqm x 2.5 m x 2.3 x 0.7 x 0.2 = 7809 t.
Mineral reserve and Remaining Resources:-
Mineral reserve = Total mineral resource - Remaining resources
Remaining Resources (Pre Feasibility Mineral Resource - 221) of Laterite
The following are the Pre Feasibility Mineral Resource under UNF classification 221
(1) Deduction due to 7.5 m barrier as per M.M.R. 1961
= Length x width x Av.Thickness x B.D. x Recovery
= 255m x 7.5m x 2.5m x 2.7 x x 0.7 x 0.80 = 7229 t.
(2) Deduction due to slope stability
= 225m x 2.5m x 2.5m x 2.7 x x 0.7 x 0.80 = 2126 t.
Total deduction = 7229 t. + 2126 t. = 9355 t.
Probable Mineral reserve (121) of Bauxite :-
Probable Mineral reserve (121) = [Total mineral resource (331)- Remaining resources (221)]
= 36666 t. - 9355 t. = 27,311 t.
Remaining Resources (Pre Feasibility Mineral Resource - 221) of Bauxite
The following are the Pre Feasibility Mineral Resource under UNF classification 221
(1) Deduction due to 7.5 m barrier as per M.M.R. 1961
= 255m x 7.5m x 2.5m x 2.3 x x 0.7 x 0.20 = 1540 t.
(2) Deduction due to slope stability
= 225m x 2.5m x 2.5m x 2.3 x x 0.7 x 0.20 = 453 t.
Total deduction = 1540 t. + 453 t. = 1993 t.
(20)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(21)
Category wise Updated Mineral Reserve as per UNFC classification :-
United NationsFrame-work
Classification(UNFC)
UNFCcode
Proved Mineral 111 - -Reserve
Probable Mineral 121 27311 t. 5816Reserve
Feasibility mineral 211 - -Resource
Pre-Feasibility 221 9355 t. 1993Mineral Resource
Measured Mineral 331 - -Resource
Indicated Mineral 332 - -Resource
Inferred Mineral 333 - -Resource
Reconnaissance 334 - -Mineral Resource
Laterite Grade
The Laterite of the leasearea is of cement gradewhile Bauxite is of metalgrade.
Probable Mineral reserve (121)of Bauxite :-
Probable Mineral reserve (121) = [Total mineral resource (331)- Remaining resources (221)]
= 7809 t. - 1993 t. = 5816 t.
Bauxite
2.5 Yearwise exploration proposed to be carried out during the ensuing 5 years period.
Location of trial pits / and or bore holes to be depicted on the geological plan :-
Sufficient exploration has been carried out and the occurence of
mineral has been proved through out the lease area. No exploration has been proposed during
the next five year. This is in view of sufficient exploration already carried out for working till
mine life end.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(22)
3.0 MINING
3.1 Yearwise development for the ensuing five years period :-
Opencast manual method of mining has been adopted in the lease
area using hand tools like crobars, sledge hammers, chiesels & spades. Loading of OB and ore
into the tippers will be done manually. Haul road has been extended to the top of the quarry.
No blasting has been done nor is required.
Year 10-11 :- As carried in past, opencast manual method of mining will be adopted using
hand tools like crobars, sledge hammers, chiesels & spades. It is proposed to work in depth
and mine out the left out ore from quarry depth. No development is needed as working has
been proposed in depth. Production will be carried out from one lowest bench. The height of
the bench will be 2.5m and the width of the bench will follow the quarry floor. The RL of the
bench will be 374m. The face length is 25m and face advance is 25m. The haul road has been
extended to the floor of the pit. This being a opencast manual mine, no labour camp will be
required. The transport of men is not applicable and they come from nearby villages on their
own foot. They take the equipment/tools/material with them. No tubs, haulage rope, conveyor
or locomotive will be used. The OB and ore will be loaded manually on dumpers or trucks.
Year 11-12 :- It is proposed to work in depth and mine out the left out ore from quarry
depth. No development is needed as working has been proposed in depth. Production will be
carried out from one lowest bench.The height of the bench will be 2.5m and the width of the
bench will follow the quarry floor. The RL of the bench will be 374m. The face length is 62m
and face advance is 15m. The haul road has been extended to the floor of the pit.
Year 12-13 :- It is proposed to develop the quarry towards east and work in depth and mine
out the left out ore from quarry depth. Development will be carried out in one bench. The height
of the bench will be 0.75m and width will vary from 1.5m towards UPL to 3m towards
working face.The face length will be 7m and face advance 3m. Production will be carried out
from 2 benches. The height of the benches will be 2.5m and the width of the 2nd bench will be
3m while that of 3rd will follow the quarry floor. The face lengths will be 90m and 85m while
face advance will be 1.5m and 9m resp.
Year 13-14 :- It is proposed to develop the quarry towards east and work in depth and mine
out the left out ore from quarry depth. Development will be carried out in one bench. The height
CHAPTER - III
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
of the bench will be 0.75m and width will vary from 1.5m towards UPL to 3m towards
working face.The face length will be 58m and face advance 3m. Production will be carried
out from 2 benches. The height of the benches will be 2.5m and the width of the 2nd bench will
be 3m while that of 3rd will follow the quarry floor. The face lengths will be 54m and 98m
while face advance will be 3m and 7m resp.
Year 14-15 :- It is proposed to develop the quarry towards east and work in depth and mine
out the left out ore from quarry depth. Development will be carried out in one bench. The height
of the bench will be 0.75m and width will vary from 1.5m towards UPL to 3m towards
working face.The face length will be 65m and face advance 7.5m. Production will be carried
out from 2 benches. The height of the benches will be 2.5m and the width of the 2nd bench will
be 3m while that of 3rd will follow the quarry floor. The face lengths will be 62m and 101m
while face advance will be 7.5m and 7m resp.
3.2 Yearwise production for the ensuing five years period :-
Production will be carried out by manual means using hand tools. No blasting
has been done nor is required. It is proposed to extend eastern face of quarry 1 towards
further east. The orientation of the working will be north - south and east- west.
The cut off grade of Bauxite is 35% Alumina and 5% Silica while of Laterite is Fe2O3. +42%
& SiO2 -3%. How ever to the possible extent, suitable blending will be done in the best
interest of mineral conservation. The Laterite is of cement grade while Bauxite of metal grade.
(i) Year 2010-11:-Production will be carried out from 1 bench in orebody Laterite/
Bauxite named bench 3. The height of bench will be 2.5m. The width will followquarry floor.
(ii) Year 2011-12:-Production will be carried out from 1 bench in orebody Laterite/
Bauxite named bench 3. The height of bench will be 2.5m. The width will followquarry floor.
(iii) Year 2012-13:-Production will be carried out from 2 benches in orebody Laterite/
Bauxite named bench 2 & 3. The height of benches will be 2.5m. and the width of the 2nd
bench will be 3m while that of 3rd will follow the quarry floor.
(iv) Year 2013-14:-Production will be carried out from 2 benches in orebody Laterite/
Bauxite named bench 2 & 3. The height of benches will be 2.5m. and the width of the 2nd
bench will be 3m while that of 3rd will follow the quarry floor.
(iii) Year 2014-15:-Production will be carried out from 2 benches in orebody Laterite/
Bauxite named bench 2 & 3. The height of benches will be 2.5m. and the width of the 2nd
bench will be 3m while that of 3rd will follow the quarry floor.
The details of production has been given in table next page.
(23)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(24)
NB. (1) B.D. , Laterite = 2.7, Bauxite = 2.3, (2) Recovery from B-2 = 80% and from B-3 = 60%.Ratio of Laterite : Bauxite = 4 : 1
Design parameters of developing/working the deposit :-
Yr BenchB-1Soil
Soil(m3)
OB/Waste(m3)
Production (t.) StrippingRatio
Av.Face Length (m) 25Av.Face Advance (m) 25Av.Face Height (m) 1.5
10 Volume (cum) - - 938 - 375 1216 259 1:0.25-11 Production (t.) 1475
Soil (m3) -O.B./Waste (m3) 1394Reduced level(m) 374Av.Face Length (m) 62Av.Face Advance (m) 12Av.Face Height (m) 1.5
11 Volume (cum) - - 1116 - 446 1446 308 1:0.25-12 Production (t.) 1754
Soil (m3) -O.B./Waste (m3) 446Reduced level(m) 375Av.Face Length (m) 7 90 85Av.Face Advance (m) 3 1.5 9Av.Face Height (m) 0.75 1.5 1.5
12 Volume (cum) 16 203 1148 16 499 1839 392 1:0.23-13 Production (t.) - 426 1805
Soil (m3) 16 - -O.B./Waste (m3) - 40 459Reduced level(m) 380.75 378.25 375.75Av.Face Length (m) 58 54 98Av.Face Advance (m) 3 3 7Av.Face Height (m) 0.75 2.5 1.5
13 Volume (cum) 131 405 1029 131 493 2034 433 1:0.25-14 Production (t.) - 849 1618
Soil (m3) 131 - -O.B./Waste (m3) - 81 1420Reduced level(m) 381.50 379.0 376.50Av.Face Length (m) 65 62 101Av.Face Advance (m) 7.5 7.5 7Av.Face Height (m) 0.75 2.5 1.5
14 Volume (cum) 366 1163 1061 366 889 3385 721 1:0.30-15 Production (t.) - 2438 1668
Soil (m3) 366 - -O.B./Waste (m3) - 465 424Reduced level(m) 382.25 379.75 377.25Total 513 2702 9920 2113 1:0.267
B-2Lat/
Bauxt
B-3Lat/
Bauxt Laterite Bauxite
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(25)
3.3 Any change in the proposed method of Mining, Drilling, Blasting & development
of machinary if so, give details :-
(a) Method of mining :- Opencast manual method of mining was proposed in the
approved Scheme of Mining and the same method has been adopted during past and
will be continued in future also. The O.B. and the mineral being soft has been
excavated manually with hand tools like sledge, hammers, chisels, spades and
crowbars. The haul road has has been extended upto the top of the quarry. Loading
and unloading is done manually.
(b) Drilling :-No drilling has been proposed nor has been done and as such
there is no change in the proposed method of mining.
(c) Blasting :- Since no blasting has been proposed nor has been done, there is
no change in this system also.
(d) Broad blasting parameters :- Not applicable.
3.4 Precautions to be observed during drilling & blasting :-
Since no drilling and blasting is done, no precautions are required
to be observed.
4.0 DISPOSAL OF MINE WASTE & SEPARATE STACKING OF SUBGRADE MINERALS :-
4.1 Nature of waste & its rate of yearly generation :-
The details of present waste dumps are as under -
CHAPTER - IV
Dump No.Type/quality in
pit/ externalQuantity
(m3)Base area xAv. Height
Location Remark
Soil Dump 1 Inactive/External 250 250sqm x 1.25m South East Terrace 1
Scattered Inactive/In Pit Dump 400 500 sqm x 1m Quarry 1 Terrace 1
dump 2 No.
20-35m x 10-
15m x 1m
Total 650
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
The mine waste is in the form of :-
(a) Soil :- There is no top soil. The soil is lateritic in the form of loose material.
(b) Mine waste :-The mine waste will be in the form of lateritic soil and mixed with
unaltered sandstone.
YEARWISE WASTE GENERATION
4.2 Selection of dumping site :- No external dumping will be done. Simultaneous backfilling willbe done in the excavated portion of the lease area. The yearwise backfilling programmeindicating area and depth of filling has been given under para 7.2 as shown on plate -10 & 11.
4.3 Method of dumping & maximum height and spread of dumps :-No external dumping will be done as mentioned above.
(26)
Year Soil O.B./ Sub Grade Reject(m3) waste (m3)
10-11 - 375 Nil Nil11-12 - 446 Nil Nil12-13 16 499 Nil Nil13-14 131 493 Nil Nil14-15 366 889 Nil Nil
Waste disposal (waste, reject, soil, sub grade)
Year Wastegeneration
Old wastedump
handling
Totalwaste
handling
EffectiveVolume
Quantity Disposed of on
DumpNo.1
DumpNo.2
Backfillingarea (sqm)
10-11 375 200 575 644 - - 225
11-12 446 200 646 724 - - 504
12-13 515 - 515 577 - - 640
13-14 624 - 624 699 - - 480
14-15 1255 - 1255 1405 - - 651
M 3 M 3 M 3 M 3
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Dump No./ Backfill area location -
4.4 Precautions for confinemenet of dumps to prevent pollution of surface waterbodies / courses :- Garland drain will be prepared towards western sloping side ofdimension 1m x 0.5m.
4.5 Arrangement for seperate stacking of sub-grade minerals :-No sub-grade mineral will be generated.
Year Size of backfill portion at thebegining of the year
EffiectiveQuantitydumped
Size of backfill portion at the end ofthe year
Bottomarea M2
Top areaM 2
Avg. height’thickness
Bottomarea M2
Top areaM 2
Avg. height’thickness
M 3
10-11 - - - 225 225 81 2
11-12 225 81 2 504 729 484 1.5
12-13 729 484 1.5 640 1369 1024 1.5
13-14 1369 1024 1.5 480 1849 1444 1.5
14-15 1849 1444 1.5 651 2500 1764 2.5
(27)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
5.0 USE OF MINERAL5.1 Changes proposed in the specifications of mineral being sold including anticipated
changes & new industries using the minerals :-
No changes are anticipated in specification and new idustries using
minerals. The lessee is producing limited amount of minerals and selling in above mentioned
industries only. Laterite is proposed to be sold to cement plants.
Bauxite is proposed to be sold to Aluminum plants and various
refractory plants. In view of quantity being less and area small, the same will be sold through
local traders.
5.2 Eforts made for utilisation of the sub-grade minerals including fines :-
No sub-grade mineral is expected to be generated.
CHAPTER - V
(28)
6.0 EMPLOYMENT POTENTIAL6.1 Management & supervisory personal :-
1. Mining Engineer / Mines Manager - 1
2. Supervisor - 1
6.2 Labour skilled, semi-skilled & un-skilled :-
1. Skilled (Gangman) - 1
2. Semi-skilled (Face workers) - 14
3. Un-skilled (Loader & other) - 5
4. No. of working days - 250
5. Targetted production per year - 4,000 t./year
The statutory requirment in respect of miners health will be implemented as per rules.
CHAPTER - VI
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(29)
CH
AP
TE
R -
VII
7.0
EN
VIR
ON
ME
NT
M
AN
AG
EM
EN
T
PLA
N
S. No.
Item
Prop
osal
s as p
er ap
prov
ed S
chem
e of M
inin
gPo
sitio
n at
the e
nd o
f 5 y
ear
of S
chem
e of M
inin
g 1
.To
p soi
lsto
rage
,pr
eser
vatio
nan
dutil
isatio
n.
2.
Land
recla
mat
ion
Prop
osal
for t
he n
ext 5
yea
r of S
chem
e of M
inin
g p
erio
d
No
top
soil
was
prop
osed
to b
ege
nera
ted.
Sim
ulta
neou
s bac
kfill
ing
ofm
ined
out
are
aw
asp
rop
ose
d.
Abo
ut10
73 s
qm a
rea
was
prop
osed
to b
eba
ckfil
led in
pit
upt
o 3.
5m he
ight.
No
top
soil
was
gen
erat
ed.
No
recl
amat
ion w
as ca
rrie
dou
t as n
o ar
ea w
as m
atur
edfo
r rec
lamat
ion i
n view
of
ore b
ody c
ontin
uing
in d
epth
.
No t
op so
il is e
xpec
ted t
o be g
ener
ated a
s it i
s abs
ent
at th
epr
opos
ed de
velop
men
t site
dur
ing
SO
M p
erio
d.
Sim
ulta
neou
s bac
kfill
ing h
as be
enpr
opos
ed fr
om 1
st y
ear a
s det
aile
dun
der w
hile
reha
bilit
atio
n of b
ackf
illed
area
from
3rd
year
onw
ards
-Ye
ar E
ffec
tive
A
rea
at th
e
Av.
Are
a R
/R
Are
a R
/R C
um. A
rea
R/R
Qty
.
en
d of
the y
ear H
eigh
t at
beg
in.
du
ring
at t
he en
d of
of th
e yea
r th
e yea
r th
e yea
r
To
p
Bot
tom
(
sqm
) (
sqm
)
(sqm
)
10-1
142
0
9 x
915
x 1
5 2
m
N
il
N
il
N
il11
-12
500
22
x22
27 x
27
1.5
m
Nil
Nil
Nil
12-1
357
7 3
2 x
3237
x 3
7 1
.5 m
Nil
225
225
13-1
469
9 3
8 x
3843
x 4
3 1
.5 m
2
25
50
4
7
0914
-15
1406
42
x42
50 x
50
2.5
m
7
09
64
0
13
49Re
clam
atio
n and
reha
bilit
atio
n will
inclu
de ba
ckfil
ling f
ollo
wed
byaf
fore
statio
n.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(30)
S.N
o.It
emPr
opos
als a
s per
app
rove
dSc
hem
e of M
inin
gPo
sitio
n at
the e
nd o
f 5 y
ear
of S
chem
e of M
inin
gPr
opos
al fo
r the
nex
t 5 y
ear
of S
chem
e of M
inin
g p
erio
d
3.W
aste
dum
pm
anag
emen
t
4.A
ffore
statio
npr
ogra
mm
e with
prec
autio
n for
surv
ival
and
prot
ectio
n of
plan
tatio
n
The s
oil a
nd w
aste
was
pro
pose
d
to b
e ba
ckfil
led
in th
e ex
cava
ted
area
.
The
soil
has
been
sta
cked
whi
le m
ine w
aste
was
mos
tly
been
use
d for
main
tain
ance
of
appr
oach
road
and
rest
in p
it
botto
m. N
o ba
ckfil
ling
was
carri
ed o
ut.
The s
oil a
nd w
aste
will
be
sim
ulta
neou
s bac
kfill
ed fr
om 1
st
year
as d
etai
led
in p
ara 7
.0(2
).
Year
No.
of
tree
sA
rea
(Hec
t)Su
r.R
ate
Year
wise
affo
resta
tion a
s per
the
appr
oved
Sch
eme o
f Min
ing
is gi
ven
belo
w :-
Abo
ut 1
0 tre
ss w
as p
lant
ed in
the b
ound
ary s
ide.
Non
e of t
his
has s
urvi
ved.
Year
No.
of
tree
sA
rea
(sqm
)
Plan
tati
on w
ill
be d
one
in t
heba
ckfil
led
area
as p
er th
e pr
ogra
mm
egi
ven
belo
w.
The s
peci
es o
f Bab
ool,
Sub-
babo
ol a
ndM
ango
tres
s will
be p
lant
ed ev
ery y
ear.
Barb
ed w
ire f
enci
ng w
ill b
e do
ne t
opr
otec
t the
pla
nts,
wat
erin
g ar
rang
emen
tw
ill al
so be
don
e dur
ing
sum
mer
seas
onas
far a
s pra
ctia
ble.
Sur.
Rat
e
05-0
610
100
80%
06-0
710
100
80%
07-0
810
100
80%
08-0
910
100
80%
09-1
010
100
80%
12-1
323
225
80%
13-1
350
504
80%
14-1
557
567
80%
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(31)
S.N
o.It
emPr
opos
als a
s per
app
rove
dSc
hem
e of M
inin
gPo
sitio
n at
the e
nd o
f 5 y
ear
of S
chem
e of M
inin
g
5.Q
ualit
y of A
ir
6.Q
ualit
y &m
ake o
f wat
erinc
ludin
gsu
rface
&gr
ound
wat
er
The q
ualit
y of a
ir w
as p
resu
med
to be
with
in pe
rmiss
ible
limit
as no
signi
fican
t pol
lutio
n is
expe
cted
due t
o sm
all s
cale
of m
inin
g.
The q
ualit
y of
air w
as w
ithin
per
miss
ible
limit.
Prop
osal
for
the
nex
t 5
year
of S
chem
e of
Min
ing
per
iod
In o
rder
to su
ppre
ss ai
r bor
nedu
st, sp
rinkl
ing
of w
ater
will
bedo
ne. D
ust m
asks
will
be
prov
ided
to p
erso
ns w
orki
ngne
ar lo
adin
g op
erat
ions
. Plan
-ta
tion
will
be
carr
ied
out.A
irqu
ality
mon
itorin
g w
ill b
edo
ne o
nce
in
a ye
ar e
xcep
tm
onso
on se
ason
.
Ther
e is n
o to
xic c
onta
min
atio
n in
the o
ver b
urde
n or o
re. T
he m
ine
wat
er g
ets
suffi
cien
t tim
e fo
rse
ttilin
g and
as su
ch is
clea
r. The
reis
nosu
rface
wat
er c
ours
e in
the v
iccin
ity o
f the
leas
e are
a and
as su
ch no
inte
rfere
nce w
asex
pect
ed. D
ue to
small
and s
impl
eex
tent
of m
inin
g., n
o ad
vers
eim
pact
and c
onta
min
atio
n was
expe
cted
.
No
adve
rse i
mpa
ct w
as n
otic
ed. N
opu
mpi
ng o
f wat
er w
as re
quire
d an
d do
ne.
The m
ine w
ater
will
get
suffi
cient
time f
or se
ttilin
g and
assu
ch w
ill b
e cl
ear.
Ther
e is
nosu
rfac
e w
ater
cou
rse
in t
hevi
ccin
ity o
f the
leas
e ar
ea a
ndas
such
no in
terfe
renc
e is
expe
cted
. Wat
er q
ualit
ym
onito
ring
will
be do
ne o
nce i
na y
ear e
xcep
t mon
soon
seas
on.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(32)
S.N
o.It
emPr
opos
als a
s per
app
rove
dSc
hem
e of M
inin
gPo
sitio
n at
the e
nd o
f 5 y
ear
of S
chem
e of M
inin
gPr
opos
al fo
r the
nex
t 5 y
ear o
fSc
hem
e of M
inin
g p
erio
d
7.N
oise
leve
l and
vibr
atio
n.
8.
Tre
atm
ent o
f min
e
wat
er a
nd af
fluen
t
/ to
xic
subs
tanc
es
be
fore
disc
harg
e
9.Re
circu
latio
n of
treat
ed w
ater
The n
oise
leve
l was
expe
cted
to
be b
elow
thr
esho
ld v
alue
. No
blas
ting
prop
osal
was
giv
en.
No
men
tion
was
mad
e in
the
appr
oved
Sch
eme o
f Min
ing
rega
rdin
g thi
s.
Not
men
tione
d in
app
rove
d
SOM
.
The
nois
e le
vel
was
bel
ow
thre
shol
d va
lue.
No
chan
ge.
No
treat
men
t of w
ater
was
carr
ied o
ut an
d he
nce n
ot
appl
icabl
e.
The s
ourc
es o
f noi
se ar
e veh
icles
. The
pre
dict
ed
noise
leve
l will
be b
elow
thre
shol
d v
alue.
Ther
e is n
o to
xic s
ubsta
nce i
n the
ove
r bur
den o
r
ore.
The
min
e wat
er g
ets s
uffic
ients
time f
or
settl
ing
and
as su
ch is
clea
r. N
o m
iner
al
proc
essin
g or
trea
tmen
t is p
ropo
sed
and
henc
e
is en
visa
ged
to b
e cle
ar.
Not
appl
icab
le
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
8.0 CONCEPTUAL MINING PLAN8.1 Time frame of completion of mineral exploration programme in lease hold area :-
The prospecting has been done in the lease area by way of exploration
and the evidence of deposit has been proved in view of extensive mining being done in the lease
area. Hence no exploration has been proposed during the conceptual stage.
8.2 Whether ultimate pit limit has been determined and demarcated on surface and
geological plans :-
Ultimate pit limit has been determined and demarcated on the surface
and geological plan. At present there are two quarries and the total broken area is about 0.70hects.The quarry depth varies from 5m to 6m. There are 1 to 2 benches. Individual benchesrange in height from 0.5m to 4m while the berm width varies from 1.5m to 6m.
During the proposal period - The quarry 1 will be developed towards east in additional0.07 hect. area. The plan period size will be 90m in length, 80m to 85m in width and 5m to 6min depth. The over all pit slope will be 45 degree. The stripping ratio will be 1:0.23 to 0.30during 5 yr period. The pit depth will be confirming to 374 mRL to 377.25 mRL whereassurface level varies from 380 mRL to 384mRL. There will be 3 benches of height 0.75m to2.5m each. The berm width will vary from 1.5m to 3m. For quantity of OB and ore during 1st5 years refer table para 3.2(b).Conceptual Mine Development -
The development and the ultimate pit limit has been designed keeping in view 7.5mbarrier as per Rule 111 of MMR 1961 and mineralsed area. The Conceptual minedevelopment will be carried out in 0.82 hect. area. The dimension of the conceptual pit will be
as follows -
Size at surface Size at floor
Length 90m to 100m 85m to 95m
Width 80m to 90m 75m to 85m
Depth 6m from top R.L. of surface.
The ultimate slope will be 450. The stripping ratio will be 1:0.28. Thepit depth will be confirming to 374 mRL to 378 mRL whereas surface level varies from 380mRL to 385mRL. There will be 3 benches of height 0.75m to 2.5m each.
CHAPTER - VIII
(33)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
It is proposed to mine 5,000 t. of Laterite and Bauxite per annum beyond the 1st 5
years period till the conceptual period. Hence 21094 t. of Laterite and Bauxite will be
produced beyond the 1st 5 years period till the conceptual period which is 5 years beyond
SOM period.
Life of the Mine :- Production during 1st 5 years = 12033 t.
Life of the mine = 5 Years + [33127 t. - 12033] = 10 years. 5,000 t.
8.3 Whether the site (s) for disposal of waste rock & unsaleable ores (has/have been
examined for adequacy of land & suitability of long terms use in the event of
continuation of mining activity.)There is only one external dump in the lease area. The detail of the dump is as under -
Dump Size of Dump Average Quantity Location Nature No. Bottom Top height1 25m x 10m 15m x 5m 2m 250 cum S-E OB
Number of terrace = 1 & slope = 300 . Besides waste is spread in 250 sqm area at surface of
0.10m height. The site for disposal of waste rock has been examined for adequacy of land and
suitability of long terms use in the event of continuation of mining activity. No external dumping
will be done. Simultaneous backfilling has been proposed.
Quantum of waste dumping at the end of 5 year plan period - During the ensuing
Scheme of Mining period 513 cum of soil and 2702 cum of OB/waste will be generated. This
will correspond to 3600 cum after 12% of ultimate swelling. This will be backfilled.
Builtup of dump at the conceptual stage - No dumping has been proposed during theconceptual stage. Simultaneous backfilling will be carried out during the conceptual period. No
dump will remain at end.
Quantum of waste dumping at the conceptual stage - 1487 cum of OB soil and 2293 cum
of OB/mine waste will be produced beyond the 1st 5 years period till the conceptual period.This will correspond to 1665 cum of soil and 2568 cum of OB/waste after 12% of ultimateswelling. The total OB/waste generated will be simultaneously backfilled in excavated area
during conceptual period. No dumping has been proposed.
Conceptual dump design - Not applicable as no dumping has been proposed and nodump will remain at conceptual stage.
(34)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(35)
8.4 Whether backfilling of pits after recovery of ore / mineral upto techno-economical
feasible depth envisaged, if so, describe the broad features of the proposal :-
Backfilling has been proposed during the ensuing mining scheme
period as per programme given under para 7.0 (2). This is in view of mining done upto full
depth of mineralisation.
Conceptual reclamation and rehabilitation -(i) Present land use -
1. Pits and quarries - 0.70 Hect2. Dumps - 0.05 Hect3. Road / infrastructure - 0.05 Hect4. Waste / barren land - 0.17 hect.
(ii) Area under use during the plan period -1. Pits and quarries - 700 sqm area will be degraded in original waste/ barren
land.2. Dumps - No dumping has been proposed.3. Road - No further road construction will be needed.4. Site services - Rest shelters will be made in 0.005 hect. area in original waste/
barren land.5. Proposed reclamation & rehabilitation - Reclamation will be carried out
simultaneously from 1st year on wards. 2450 sqm area will be backfilled upto2.0m depth. The backfilled area will be rehabilitated during 3rd to 5th year byway of plantation in 0.13 hect.
(iii) Area under use at conceptual stage -1. Pits and quarries - 0.05 Hect area will be degraded. The original land use
of this area is waste/ barren land .Thus total degradation will be 0.82 hect.2. Plantation - Green belt will be prepared in 0.15 hects. area which is presently
barren land while plantation in reclaimed area will be done in 0.69 hects. area.This is presently excavated .
3. Proposed reclamation & rehabilitation - Reclamation will be carried outsimultaneously. About 1400 sqm area will be reclaimed per year.Rehabilitation by way of afforestation will be carried out in 1500 sqm area peryear. The quantity of OB and waste to be utilised per year will be about 1,000cum.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
8.5 Post mining land use envisaged -
Conceptual land use -
1. Green belt - 0.15 Hects.
2. Reclaimed and rehabilitated to Plantation - 0.82 Hects.
3. Details of sapplings - The recommended species are Neem, Gulmohar, Mango,
Sagwan, Shisham, Kachnar, Bauhinia, Gamhar, Jamun, Agaves, etc. The spacing
between the trees will vary from 1.0m to 3.0m. However minimum tree density of 1000
trees per hect. will be maintained at end. The expected survival rate will be 80%.
Before final closure of mine it is proposed to develop plantation in 0.85 hects with
atleast 80% survival rate and height of 2m. During final closure of mine 0.12 hect. will
be afforested and all efforts will be made for better survival of the sapplings and their
healthy growth like watering, fencing, keeping watch and ward. Summary of Land use at different stage will be as follows :
Existing 5th year Mine Life end end
1) Total area excavated (broken) 0.70 0.77 0.822) Area fully mined out (out of 1) Nil 0.40 0.823) Area fully reclaimed (Backfilled out of 2) Nil 0.245 0.824) Area rehabilitated out of 3 by afforestation NA 0.13 0.825) Area reclaimed by water harvesting Nil Nil Nil6) Total area under dumps 0.05 Nil Nil7) Area under active dumps Nil Nil Nil8) Area under mineral stack Nil Nil Nil9) Area under Road 0.05 0.05 Nil10) Area under Green belt Nil Nil 0.15
(i.e. plantation on area other than dump and backfilled area)11) Area under infrastructure Nil 0.005 Nil12) Undisturbed area 0.17 0.0145 Nil
(36)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(37)
9.0 ANY OTHER INFORMATIONNil
S.No. Item
1 A Lease area - - - 0.97 - 0.972 B. Mining & allied
activities(i) Pits - - - 0.70 - 0.70(ii) Dumps - - - 0.05 - 0.05(iii) Roads - - - 0.05 - 0.05(iv) Site Services - - - - - -(v) Green belt - - - - - -(v) Undisturbed Area - - - 0.17 - 0.17Total - - - 0.97 - 0.97
Type of land (In Hects.)
Fore
st L
and
Agr
icultu
rela
nd
Gra
zing L
and
Barr
en L
and
Any
othe
rty
pe
Tota
l
PROGRESSIVE MINE CLOSURE PLAN10.1. INTRODUCTION :-
(a) Name of the lessee : Shri Rajendra Kumar Agrawal(b) Location & extent of lease area :
Location : Village - Kathara KotharTehsil - Raghuraj NagarDistt. - Satna (M.P.)
Extent of lease area : 0.97 Hects.
(c) Type of lease area & the present land use pattern :
Type of lease area : Waste land
Existing land use pattern :-
CHAPTER - IX
CHAPTER - X
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(d) Method of mining and mineral processing operations :-
Opencast manual method of mining will be adopted. Refer Chapter 3
for details. No processing of mineral is required.
10.1.1 REASONS FOR CLOSURE :-
The mine under reference is a working mine. No part of the area is
closed or proposed to be closed during the ensuing PMCP period.
10.1.2 STATUTORY OBLIGATION :-
No special condition was imposed while execution of the mining
lease deed, which the lessee is bound to implement. This PMCP is being prepared in order to
comply Rule-23 (B) of MCDR 1988.
10.1.3 CLOSURE PLAN PREPARATION :-
(a) Name and address of the applicant : Shri Rajendra Kumar Agrawal
P.O. - Jaitwara
Distt.- Satna (M.P.)
Satna (M.P.)
Pin Code - 485221
(b) Name and address of the RQP : Balram Singh associates Pvt. Ltd.
preparing Mine Closure Plan Regd No.-RQP/JBP/105/2003/B
Chopra Colony
P.O.:Maihar, Pin-485771,
Distt.:Satna (M.P.)
(c) Name of the executing agency : Shri Rajendra Kumar Agrawal
10.2.0 MINE DESCRIPTION :-
10.2.1 GEOLOGY :-
(a) TOPOGRAPHY :-
The lease area is small mound having slope in all directions. The
maximum height of mound is 385 m above MSL towards north-west while the lowest
elevation is 379 m above MSL towards south-west direction. The topography of the area
is undulating.
(38)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(b) General Geology :-
The applied area is situated in Satna-Rewa plateau. The plateau
slopes down gently towards south and merges with the plains of Ganurgarh shale. A
series of topographic highs in the form of detached mounds and ridges dot the plateau of
Rewa quartzite, as also the plains of Ganurgarh shales. Bauxite/Laterite deposit of the
applied area belong to Upper Rewa Sandstone in Rewa group of Vindhyan super group.
The General succession of rocks is summerised as under :-
(39)
TABLE - 1
(GENERALIZED LITHOSTRATIGRAPHY OF THE VINDHYAN SUPER GROUP)
GROUP FORMATION
BHANDER UPPER BHANDER SANDSTONE
SIRBOO SHALE
NAGOD LIMESTONE
GANURGARH SHALE
REWA GOVINDGARH SANDSTONE
JHIRI SHALE
LOWER REWA SANDSTONE
PANNA SHALE
KAIMUR DHANDRAUL SANDSTONE
MANGESAR FORMATION
BIJAYGARH SHALE
GHAGHAR SANDSTONE
SUSNAI BRECCIA
SASARAM SANDSTONE
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Sandstone, clay & ochre beds overlying both the Rewa quartzite
and Ganurgarh shale are capped at several places with 1 m to 10 m thick lateritic duricrusts.
Bauxite deposit occurs in this lateritic duricrusts. The Jhiri shale is brown, green and
laminated with thin interbeds of fine grained sandstone.
Local Geology :-
Laterite occurs as pebble, boulders and granules within the
lateritic matrix upto maximum thickness of about 1.5m. This is underlined by lateritic
soil of thickness varying between 0.25m to 0.5 m. Laterite and Bauxite is found in pockets. The
summarised account of succession of rocks is furnished below :-
Lateritic soil 0.25 to 0.5 m
Vindhyan Super Laterite /
Group Bauxite upto 5m
Lithomargic clay upto 1m.
Massive poorly felspathic sandstone - continued
(40)
GROUP FORMATION
SEMRI BHAGWAR SHALE
ROHTASGARH LIMESTOME
RAMPUR FORMATION
SALKHAN LIMESTONE
KOLDAHA SHALE
DEONAR FORMATION
KAJRAHAT LIMESTONE
ARANGI LIMESTONE
DEOLAND SANDSTONE
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.2.2 RESERVES :- For details refer chapter-2.3 of the Scheme of Mining.
10.2.3 MINING METHOD :-
(a) Existing and proposed method of mining :- Refer Chapter 3 , of the SOM.
(b) Extent of mechanization :- No mechanisation is proposed.
10.2.4 MINERAL BENEFICIATION :-
No beneficiation of ore is required to be done. Only sizing of ore is
done as per consumer specification.
10.3.0 REVIEW OF IMPLEMENTATION OF MINING PLAN/SCHEME OF MINING
INCLUDING FIVE YEARS PROGRESSIVE MINE CLOSURE PLAN UPTO THE
FINAL CLOSURE OF MINE :-
Review of the PMCP has been given in the Scheme of Mining in
chapter 1 & 2. A brief is stated as under.
(A) Method of mining :- Manual method of mining was proposed and adopted.
(B) Water quality management :- There is no river, nalla or any surface water source
in the lease area. Due to small scale of opencast mining, erosion, sedimentation,
siltation didn’t occurred and water treatment was not needed. There is no toxic
contamination in the ore and overburden. Hence no contamination of any nature was
reported. The working was carried out above ground water table.
(C) Air quality management :- The only source of air pollution was generation of dust
and emmision of gases due to plying of vehicles. This was nullified by sprinkling of
water on approach road and proper maintenance of vehicles.
(D) Waste management :- The OB/ waste was proposed to be stacked for 1 year and
then simultaneous backfilling was proposed. In view of small area and mineral not
mined out upto full depth of mineralisation, backfilled could not be started. The waste
has been stacked in pit bottom on unsystematic note.
(E) Top Soil management :- No top soil was generated in the lease area and hence
was not applicable. The soil is lateritic in nature.
(F) Safety and security :- The mine was suitably guarded and any approach to mine was
restricted and prohibited.
(G) Disaster management and risk assessment :-
No accident, untoward incident and disaster happened in the mine.
(H) Plantation :- No tree was planted during PMCP period in view of area being very
small..
(41)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.4.0 CLOSURE PLAN :-
10.4.1 Mined out land :-
(a) Proposal and manner of reclamation and rehabilitation of mined out land :-
Mining effect environment in various ways including depletion of land cover,
vegetation, removal of soil, change of land scape & deposition of the solid waste product thus
causing imbalance in the land scape and increasing air, water and soil pollution. Land use in
mining areas consists of mainly forestry, pasture and agriculture.The mined out land which will
be fully exhausted by virtue of excavation upto full depth of mineralisation will be
simultaneously/progressively reclaimed by backfilling of OB & waste generated during the
course of mining. The level of backfilling will be near parallel to the original topography. The
reclaimed area will be rehabilitated by way of afforestation.
The total waste that will be generated during mining will be 7000 cum
which after ultimate 12% swelling and compaction will be 7840 cum. The depth of mining will
be 8m with RL of pit floor varying from 378m towards east to 374m towards west.
The depth of filling will be 2.0m on average. The RL of reclaimed area will vary from 376m
to 380m with 300 sloping side towards ultimate pit limit. Hence the surface level will go
down by 4m on average. How ever the level of backfilling will be in such a way that a profile
parallel to the original topography will be maintained at end with proper slopes at corners. The
reclaimed area will be rehabilitated by way of afforestation.
(42)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
Rehabilitation Details -
Year BalanceUn
rehabili-tatedmined
out areaat the
beginingof year
Minedout areaduring
the year
Total unrehabili-
tatedmined
out area
Rehabilitation during the yearby
Totalrehabilita-
tion
Balanceun reha-bilitated
mined outarea at
the end ofyear
a b c D=b+c e f g
10-11 Nil 625 625 Nil Nil Nil Nil 62511-12 625 744 1369 Nil Nil Nil Nil 136912-13 1369 765 2134 225 Nil Nil 225 190913-14 1909 686 2595 504 Nil Nil 504 209114-15 2091 707 2798 640 Nil Nil 640 2158
Plantation waterreservoir
Bench’slope
plantation
Area in sqm.
Reclamation Details -
Year Brokenarea at
thebeginingof year
Cumbrokenarea atthe endof year
Minedout area
at thebeginingof year
Cummined out
area atthe end of
year
Area reclaimed bybackfilling at the
begining of year outof G
Areareclaimedby back-
fillingduring the
year
Cum areareclaimedby back-filling by
the end ofyear
a b D=b+c e G=e+f h i j
10-11 7000 7000 Nil 625 Nil 225 225
11-12 7000 7000 625 1369 225 504 729
12-13 7000 7021 1369 2134 729 640 1369
13-14 7021 7195 2134 2820 1369 480 1849
14-15 7195 7683 2820 3527 1849 651 2500
Area in sqm.
(43)
Progressive Reclamation/Rehabilitation of mined out area during proposal period inworking pits:
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.4.2 Water quality management :-
(a) Surface and ground water body :-
There is no river, nalla, any surface or ground water source in
the lease area or in the nearby buffer zone. Hand pumps and dug wells exist in the buffer zone.
Garland drain will be made towards sloping western side to prevent erosion,sedimentation,
siltation.Water treatment is not expected. Since there is no river or any perennial water course
in the M.L. area, diversion will not be required. There is no toxic element in and around the
M.L. area or in OB or ore. Hence contimination of any nature is not expected for surface or
any ground water source. Simultaneous backfilling of OB and waste has been proposed and
no dump will remain at the end of PMCP period. Hence contamination due to wash off from
dumps or leachete is not expected.
Mining operations are not envisaged to adversely affect the water table
of the area as the working is proposed above ground water table. The rain water accumulation
and water harvesting in the pit will recharge the ground water table .
(b) Hydrological study :-
The ground water table in the lease area varies from 365m
RL to 367m RL. Mining will be done 7m above ground water table. Hence ground water table
will not be affected. The water seeps into the ground through different water channels. The
behaviour of ground water table has been noticed to be uniform.Main source of water supply
in the different villages of study area is well, small pond and tube wells.
(c) Acid mine drainage :-
There is no sulphide in the country rock, hence problems of
acid mine drainage is irrelevant in this mine.
(44)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.4.3 Air quality management :- The air quality in the applied area as well as in the nearby
buffer zone is well below the permissible limits.Mitigative measures suggested for air pollution
control are based on the ambient air quality data. Following measures will be taken for air
quality management for abetting in anticipated danger to air quality at mine life end.
S.No Dust Source Control measure1 Haul Road Regular water spraying.2 Truck Movement No overloading of trucks.
Trucks to be covered while transporting ore.Enforcing speed limit.Regular monitoring of the exhaustProper maintenance of trucks
3 Waste dumps Simultaneous backfilling of worked out portionswill be done at end.
4 Mine workings Regular water spraying in working areas.Green belt surrounding MLPersonal protective equipments like dust mask,goggles, boots and helmets etc.will be providedto the employees.
Controlling of SO2 & NOx Levels
The source of SO2 & NOX would be due to vehicular emissions. This can
be controlled by proper maintenance and servicing of vehicles. There is no anticipated
danger to air quality at the mine life end in view of very small mine with no hazardous or
toxic contamination.Ambient air quality monitoring will be carried out as per CPCB norms
once in a year except monsoon season.
(45)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.4.4 Waste management :-
The OB/mine waste will be inform of soil and unaltered sandstone etc.During the ensuing PMCP period 513 cum of soil and 2701 cum of OB/waste will begenerated. This will correspond to 3600 cum after 40% of swelling and 20% ofcompaction. This will be simultaneously backfilled in the excavated and exhausted area. No
dump will remain at end.
In order for abetting any anticipated danger at mine life end Garland bund
and drain will be prepared towards the sloping western boundary area. No toxic and
hazardous element is present in the OB as well as in the ore body.
10.4.5 TOP SOIL MANAGEMENT :-
The top soil is sandy in nature. The quantity to be generated during PMCP
period will be 513 cum. All the generated soil will be used for topping of the backfilled area
to do afforestation No dump will remain at end of mine life. Hence no action will be taken for
utilisation and proper stacking of soil to be left at end.
10.4.6 TAILING DAM MANAGEMENT :-
No tailing dam will be created in the applied area in future. No processing of
mineral is required. No toxic contamination is there in the water body.
10.4.7 INFRASTRUCTURE :-
(a) Existence and utilisation :-
No infrastructural facility such as aerial rope way, conveyor belt, Railway,
Building & structures, water treatment plant, transport and water supply source is present
in the lease area. No action is proposed during the SOM/PMCP period for the disposal of
the infrastructure created for the mining operation during the life of the mine.
10.4.8 DISPOSAL OF MINING MACHINERY :-
No static machinery will be deployed in the mine.No disposal/shifting will be
needed in the PMCP period.
(46)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.4.9 SAFETY AND SECURITY :-
In order to avert any danger to the mine site at the end
of life of mine following measures will be taken during the PMCP period.
(i) The non-active sides of the working quarry will be suitably fenced.
(ii) The mine will be suitably guarded and any approach to mine will be restricted and
prohibited.
(iii) Protective safety boots, goggles, hand glove and helmets will be provided to the
person working in the opencast works.
(iv) Employee will be adequately trained and educated for involvement and commitment in
to the implementation of health and safety guidelines.
(v) Provision of all necessary resources for safety and health of employees and contractors
engaged in mining.
(vi) For minimizing the adverse impact of dust, the mine workers working in the dust area
will be provided dust masks for their occupational safety.
10.4.10 DISASTER MANAGEMENT AND RISK ASSESSMENT :-
Preliminary Risk assessment is based on the philosophy that “Prevention is
better then cure”. Mining operations may be carried to the utmost safety but there is always
some element of danger or risk in it. No disaster is envisaged. Only minor accidents may take
place. The applied area has gentle slope towards west. No perennial source of surface
water is present. Blasting has not been proposed. The mining operations will be carried out
under supervision of statutory personnels as per provisions of MCR 1960, MCDR 1988,
Mines Rules 1955, Mines Act 1952 & strictly following safety aspects as per MMR 1961
monitored by Directorate General of Mines safety.
The applied area does not come under active seismic zone. Land slide,
subsidence is not expected in view of opencast mining and almost plain topography. No river is
near the applied area and hence flood is not expected. Since opencast mining has been
proposed, problems related with underground mines is not applicable. In case of eventuality,
(47)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
first aid will be given by the competent authority initially to the injured person. The competent
person / Mines manager or Mining engg. will give notice of accident as per Rule-23 of Mines
Act-1952. The persons / competent authorities named above will be responsible for
co-ordinations between management and Distt.authorities / DGMS etc. Regarding general
safety as per Rule-181 of MMR 1961, “No person shall negligently or will fully do anything
likely to endanger life or limb in the mine, or negligently or will fully omit to do anything
necessary for the safety of the mine or of the persons employed there in”. The workers will be
provided with protective foot wear and safety helmets. Following precautions will be taken
during PMCP period in order to avert any danger to mine at end.
1. In OB/ore the sides will be benched and height of any bench will not exceed
3 m. and the breadth thereof shall not be less than the height.
DISASTER MANAGEMENT CELL:-
In order to avert any danger to the mine site at the end of life of mine a disaster
management cell headed by local authority Distt.Magistrate. will be constituted. Police deptt.,
Fire fighting deptt. and health authorities, including doctor, surgeons, hospitals, ambulances
and so on will have a vital part to play following a disaster along with the mine management,
and they will be an integral part of the disaster management plan.
10.4.11CARE & MAINTENANCE DURING TEMPORARY DISCONTINUANCE:-
If the mine will be discontinued temporarily for more than 120 days, notice will
be given 30 days before the date of such discontinuance to the concerned authorities. During
discontinuance period safety arrangement and fencing will be provided to avoid the entry of
unauthorized persons and accessibility to the mine from the surface The mine will be properly
guarded by employing security guards.
(48)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(49)
10.5.0 ECOMOMIC REPERCUSSIONS OF CLOSURE OF MINE AND MAN POWER
RETRENCHMENTS :-
Manpower retrenchment, compensation to be given, socioeconomic repercussions
and remedial measures consequent to the closure of mines should be described,
specifically stating the following.
1. Number of local residents employed in the mine, status of the continuation
family occupation and scope of joining the occupation back.
About 20 persons will get direct employment and 25 persons will be
getting indirect employment from this mine. The family occupation is mine labour
besides agriculture. The mine workers will continue with their occupation of mine labour
in view of opportunity of employment throughout the year.
2. Compensation given or to be given to the employees connecting with
sustenance of himself and their family members.
No manpower retrenchment is expected in progressive mine closure
plan period or in near future. On the other hand employment will be given to local
peopole.After final closure of mine compensation will be given as per labour laws.
3. Satellite occupations connected to the mining industry number of persons
engaged therein - continuance of such business after mine closes.
Small shops of mechanics, tools, equipments , tyre shop, tea and daily
needs etc are the other satellite occupation connected to the mining industry. About 20
local residents will be engaged there in. In case of closure of mine they will continue
with such business as there are many other mines located in the near viccinity.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
4. Continued engagement of employees in the rehabilitated status of mining lease
area and any other remnant activities.
No closure of mine as mentioned above is expected during PMCP
period. No rehabilitation has been proposed. The employees may be employed there
after as security guard for safety & security purpose and mine labour etc.
5. Envisaged repercussions on the expectation of the society around due to
closure of mine.
No man power retrenchment will be done during the ensuing
Progressive mine closure plan period. No adverse socio-economic repercussions are
envisaged during the PMCP period. The lessee under his CSR will help the society
inform of community development by providing funds for repairing schools, stationary
and dress materials for students below poverty line, medicines in nearby PHC,
approach roads and drinking water facilities etc. as such. On the other hand due to
employment given to local residents, socio-econmic awareness & upliftment will take
place. Also the poverty will reduce. No closure of mine is expected during the PMCP
period.
In order to avoid any strike, lockout or dissatisfaction amongst
workers upto the end of life of mine, following measures will be taken during the PMCP
period.
(i) Priority during employment will be given to local person.
(ii) Corporate Social responsibility will be borne.
(iii) Adequate fund will be provided for community development.
(iv) The local people and panchayat will be taken in confidence.
(v) Mining will be done with the vision of leaving a positive impact on
socio-economics of people living in the nearby villages.
(vi) A first-aid centre to meet the basic medical needs of employees will be provided.
(50)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.6.0 Time scheduling for Reclamation & Rehabilitation :-
No abandonment of any activity is expected upto the PMCP period end.
Reclamation will be carried out simultaneously from 1st year onwards. About 0.245 hect.area will be reclaimed during the PMCP period. Rehabilitation is proposed in 0.128 hects areaby way of afforestation. The quantity of OB and waste to be utilised will be about 3600 cum.
10.7.0 Reclamation & Rehabilitation Cost :-
The cost envisaged based on the activities required for implementing the
protective and rehabilitation measures including their maintenance and monitoring is given in
table next page.The total cost of reclamation will be Rs. 75,000 /- during PMCP period
while about Rs. 2,00,000/- till FMCP period.
(51)
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(52)
225
504
567
553
601
401
500
577
699
1406
0.10
0.10
0.15
0.15
0.25
SW --
--22
550
456
7--
--23
5057
----
0.05
0.10
0.10
--
----
----
----
----
----
----
-- --
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
-- --
--W
estern
Boun
dary
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
--
----
----
----
----
----
----
----
-- --
----
----
----
----
----
----
----
-- --
----
----
----
----
--0.2
50.2
50.2
50.2
50.2
5C
ore z
one
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
0.25
0.25
0.25
0.25
0.25
--0.4
00.36
50.9
321.0
45--
----
----
--0.6
00.6
00.7
00.7
50.8
5--
ITEM
(A)
REC
LAM
ATIO
N&
REH
ABI
LITA
TIO
NO
F M
INE
D
OU
TLA
ND
(B)
STA
BILA
ZATI
ON
&RE
HA
BILI
TATI
ON
OF
DU
MPS
(C)
REH
AB
ILIT
ATIO
NO
F B
AR
RE
N
AR
EA
WIT
HIN
LEA
SE(D
)EN
VIR
ON
MEN
TAL
MO
NIT
ORI
NG
(Cor
ezo
ne &
Buf
fer
Zone
sepa
rate
ly)
(i) B
ackf
illin
g(ii
) Affo
resta
tion
on t
he b
ackf
illed
area
(iii)
Oth
er (p
leas
e spe
cify
)
Agr
icul
ture
land
(iv) P
iscic
ultu
re(v
) Cov
erin
g in
to w
ater
rese
rvoi
r.(v
i) Pi
cnic
Spo
t(i)
Ter
raci
ng(ii
) Pitc
hing
(iii)
Con
stru
ctio
n of
Par
apet
Wal
ls/R
etai
ning
Wal
l at t
oe o
f dum
ps.
(iv) C
onst
ruct
ion
of C
heck
Dam
s alo
ng sl
ope
of v
allie
s etc
.(v
) Con
stru
ctio
n of
Set
tling
Pon
ds (G
arla
nddr
ain
etc.
)(v
i) D
esilt
ing
of S
ettli
ng p
onds
, cha
nnel
s(v
ii) A
ffore
stat
ion
on d
umps
(viii
) Oth
er (V
eget
atio
n G
row
th)
(i) A
ffore
stat
ion
(Gre
en b
elt b
uild
ing)
(ii) O
ther
(Ple
ase s
peci
fy)
(i) A
mbi
ent A
ir Q
ualit
y(ii
) Wat
er Q
ualit
y(ii
i) N
oise
Lev
el S
urve
y(iv
) Gro
und
Vibr
atio
n(v
) Oth
er (O
ccup
atio
nal H
ealth
& C
SR)
AR
EA (s
qm)
PRO
POSE
DQ
UANT
ITY
(cum
)PR
OPO
SED
EXPE
NDIT
URE
(In La
c Rs.)
PRO
POSE
D
10.6
.0 a
nd 1
0.7.
0 - Y
ear -
wise
pro
posa
l for
Tim
e sch
edul
ing
of R
ecla
mat
ion
& R
ehab
ilita
tion
Cos
t :-
DETA
ILS
Ye
ar
1
st
2nd
3rd
4th
5
th
1st
2nd
3
rd
4
th
5th
1st
2nd
3rd
4th
5th
REM
ARK
S
(
Loca
tion)
TO
TAL
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
(53)
S.No.
1 Area 0.70 0.07 0.77 - 0.77excavated
2 Storage for 0.05 - 0.05 - 0.05top soil
3 Overburden - - - - -dumps
4 Mineral storage - - - - -
5 InfrastructureI Workshop - - - - -II ANFO - - - - -Mixing shedIII. Crusher - - - - -
6 Roads 0.05 - 0.05 - 0.05
7 Railways - - - - -
8 Green belts - - - - -
9 Tailing ponds - - - - -
10 Effluent - - - - -Treatementplant
11 Mineral - - - - -seperation plant
12 Township area - - - - -
13 Others (specify)I. Site services - 0.005 0.005 - 0.005
Total 0.80 0.075 0.875 - 0.875
Head
Area put touse at startof mining
plan /MiningScheme
(A)
Additional arearequirementduring plan /
schemeperiod
(B)
Total
A+B
Areareclaimed &rehabilitated
(C)
Net area forfinancial
assurance
(A+B-C)
10.8.0 Financial Assurance :- This is a “B” category mine and hence Rs. 15000 /- is required onper Hects basis as per Rule 23 F of MCDR 1988. However in this case the minimum amountof Rs. 1.0 Lac is applicable. The Financial assurance has been submitted in form of BankGuarantee for period concurrent with SOM i.e. 31.03.2015.
Prepared by : M/s. Balram Singh Associates Pvt. Ltd., Maihar (M.P.)Regd No. _ RQP/JBP/ 105/2003/B
Scheme of Mining of KATHARA KOTHAR LATERITE & BAUXITE MINE ofShri Rajendra Kumar Agrawal, Satna (M.P.)
10.9.0 Certificate :-
A certificate and undertaking regarding Mine Closure Plan
has been appended herewith.
10.10.0 Plans, Sections etc. :-
Plan and Sections in support of Chapter-1,2,3 and 4 has
been appended.
For : Balram Singh Associates Pvt. Ltd.Regd. No. - RQP/JBP/105/2003/B
Sanjay k. Singh(Auth. signatory)
Key person
R.C. Bansal(Min.Engg.)
(54)