Proiect - Qua rterlv Progress Report Promote/s Name Casa Grande Civil En gineering Private Limited Project Name Casagrand Bellissimo Project Registration No TN/01/Buildin sloo28l2ot7 Quarter Ending September 23,zOLg B. Construction S.No Description Nos. Total Area - (sq.m) Plots/Flats Booked size wise (As given in Carpet Area Statement while registering) 2!9.2493 7 501.311 3952.069 96s 1.802 2 Parking Lots 339 UDS Registered in Sq.m. 35 t89L.17 S.No Description Block/Tower No. Status Door Shutter fixing, Painting & Cp san fixing work is in resS B Door Shutter fixing, Pajnting & Cp san fixing work is in pr ogress ary C Final Coat painting is in progress, Han over is in P rogress tng D False ceiling, Door Shutter fixing, pain CP sanitary fixing & Terrace tile laying is in progress ng, ork E False ceiling, Door Shutter fixing, paint CP sanitary fixing work is in progress ng& L Stage of construcUon of each Block/Tower, Floor wise F Tile laying, Window fixing & painting is in progress rk ./.. / t'i I I I 5 A. Sales 4 2367 6.7 2BHK 64 1) 3BH K 156 4BH K 43 L. 4068 3.

Upload: others

Post on 28-Oct-2019

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

Proiect - Qua rterlv Progress Report

Promote/s Name Casa Grande Civil Engineering Private LimitedProject Name Casagrand BellissimoProject Registration No TN/01/Buildin sloo28l2ot7Quarter Ending September 23,zOLg

B. Construction

S.No Description Nos. Total Area

- (sq.m)

Plots/Flats Booked size wise(As given in Carpet AreaStatement while registering)

2!9.24937 501.311

3952.069

96s 1.802

2 Parking Lots

339

UDS Registered in Sq.m.

35 t89L.17

S.No Description Block/Tower No. Status

Door Shutter fixing, Painting & Cp sanfixing work is in resS

B Door Shutter fixing, Pajnting & Cp sanfixing work is in progress

ary

C Final Coat painting is in progress, Hanover is in Progress

tng

DFalse ceiling, Door Shutter fixing, pain

CP sanitary fixing & Terrace tile layingis in progress

ng,

ork

EFalse ceiling, Door Shutter fixing, paintCP sanitary fixing work is in progress

ng&

L Stage of construcUon ofeach Block/Tower, Floorwise

FTile laying, Window fixing & paintingis in progress

rk

./../ t'i

II

I5

A. Sales

4

2367 6.7

2BHK 641)

3BH K 156

4BH K 43

L.

40683.

Page 2: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

ress

1g isj

Marble & Tile laying, Window fixing &Painting work is in progress

lnternal Plumbing, WaterproofingCompleted & Tile laying work is in p

Block work, lnternal Plastering, plumbiin Progress, Water proofing Complete

2 Status of commonAmenities for eachBlock/Tower, ltem wise Club House Stilt floor roofslab is in

C. Details of Clearances

1-. Completion Certificate No. NA2. Annual Audit Report of Special Account in Form 7 Enclosed

D. Latest Photo with Date (Atleast from 2 angles) - Enclosed in CD

For CASA G CIVIL

U

PVI LTD

d tories

G

J

Page 3: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – A   PAINTING WORK, FALSE CEILING, SWITCH PLATE, KITCHEN COUNTER, FINISHING WORK  IN PROGRESS.

Page 4: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – A 

Page 5: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – B FINISHING WORK IN PROGRESS

Page 6: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – B

Page 7: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – C FINISHING AND QC SNAG WORK  IN PROGRESS

Page 8: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – C

Page 9: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – D 3RD FLOORPAINTING   AND KITCHEN GRANITE LAYING, DOOR SHUTTER, COUNTER TOP WASH BASIN, WIRING, SWITCH PLATE GRANITE WORK 

IN PROGRESS

Page 10: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – D

Page 11: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – E  INTERNAL PAINTING,SWITCH PLAT WORK,KITCHEN PLATFORM, IN PROGRESS

Page 12: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – E

Page 13: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – F  4TH FLOOR TILE, WALL PUTTY, EXTERNAL PAINTING, UPVC WINDOW WORK IN PROGRESS, WATER PROOFING, WINDOW GRILL

Page 14: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – F

Page 15: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – G PLUMBING WORK , WATER PROOFING, WALL&FLOOR TILES, MARBLE FLOORING, EXTERNAL PAINTING WORK, GRILL FIXING 

IN PROGRESS

Page 16: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – G

Page 17: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – H PLUMBING WORK,WATERPROOFING,WALL PUTTY         TILING,EXTERNAL PAINTING IN PROGRESS 

Page 18: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – H

Page 19: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

BLOCK – J  4th FLOOR BLOCK WORK,2ND  FLOOR PLASTERING WORK, EXTERNAL PLASTERING,1ST FLOOR WALL PUTTY WORK 

IN PROGRESS

Page 20: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

CLUB HOUSE ROOF SHUTTERING &BARBENDING CONCRETE WORK

Page 21: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private

DRAIN & ELECTRICAL TRENCH WORK,CHAMBER ,STILT FLOOR PCC WORK IN, PLUMBING CHAMBER, STILT CEILING GVP WORK, LIFT ELECTRICAL, PROGRESS

TRENCH A to D

EXTERNAL WORK