By: The Dream Team

New network that will accommodate ACME Inc needs

Four campuses

Four, five floor buildings

Eight different locations

New IP addressing scheme Outfit building with new routers and switches

Map out a new network topology Subnet IP addresses for network Cost and efficiency Consolidate research and implement Allow for future expansion

Create a network that meets cisco industry standards.

Based off the Cisco Borderless Campus Design.

Create a stable and efficient network to decrease downtime and increase profit.

This network will be able to accommodate all of ACME’s needs now and for the future while keeping their wallet fat.

Business Needs: A whole new network spanning 8 locations.

An efficient network for ACME Inc.

Technical Needs: 64,000 host network distributed over 8 locations

32 Servers per location

Business Constrains: Keep costs low now and in the future.

Technical Constraints: Equipment cannot be purchased from e-bay or any seller who cannot

provide a warranty.

Goals for a Network

Effective

Redundant

Successful

Latest Technology

Equipment to Last

Scalability

IP Addressing

Reliable & Failsafe

2 Routers per location

2 Layer 3 Core Switches per location

Easy to Maintain & Implement

EIGRP

Using all Cisco Products allows use for EIGRP All new equipment Use of redundancy for fail safe Easy IP design

Hardware Amount Price/per unit Total Price Warranty Location Purchased

Switches

Cisco 2960 series

WS-C2960S-24PD-L

3200 $2,308.00 $7,385,600.00 1 year

standard

Router-switch.com

Cisco 4506 series

WS-C4506-S4-AP25

272 $16,500.00 $4,488,000.00 1 year

standard

Router-switch.com

Routers

Cisco 7201 series 16 $11,500.00 $184,000.00 1 year

standard

Router-switch.com

Servers

Cisco UCS 260 256 $23,000.00 $5,708,800 howardtechnologies.com

Consulting Services

Consultants 8 $170,000.00 $1,360,000.00 Cisco IBSG

Grand Total $19,126,400.00

About a year long project

Per Location

▪ 1.5 Months

5 days per campus

14 days of troubleshooting

8 Locations