1 Project Alluvion – City of West Des Moines Project Alluvion Updates Better Concrete Conference November 10, 2016

Upload: others

Post on 13-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Alluvion Updates - Iowa State University

1

Project Alluvion – City of West Des Moines

Project Alluvion Updates

Better Concrete ConferenceNovember 10, 2016

Page 2: Project Alluvion Updates - Iowa State University

2

Project Alluvion – City of West Des Moines

Project Alluvion UpdatesProject Background

Page 3: Project Alluvion Updates - Iowa State University

3

Project Alluvion – City of West Des Moines

Iowa State University Updates What Do We Know Now?

Page 4: Project Alluvion Updates - Iowa State University

4

Project Alluvion – City of West Des Moines

Air and DurabilitySuper Air MeterRapid Air Test

Image: Gudimettla

Page 5: Project Alluvion Updates - Iowa State University

5

Project Alluvion – City of West Des Moines

Air and DurabilityResults

• Air content—good• 5.6-8.2% in front of paver (conventional—higher)• All cores: 5.8% and up

• SAM/spacing factor

Page 6: Project Alluvion Updates - Iowa State University

6

Project Alluvion – City of West Des Moines

Air and Durability

• Freeze/thaw resistance (ASTM C666)• Durability factor – all above 75% indicating a good

F/T resistance• Correlate with air structure

Page 7: Project Alluvion Updates - Iowa State University

7

Project Alluvion – City of West Des Moines

Resistance to Chemical De-IcersSoak tests 56 day cure Soak in 4%

MgCl2 at 40ºF

High FA (MQMC) DOT (QMC)

Page 8: Project Alluvion Updates - Iowa State University

8

Project Alluvion – City of West Des Moines

Permeability

Resistivity TestResults

• 7 & 28 days• Similar results for M-QMC and reg. QMC

• 56 & 91 days• M-QMC showing continuous improvement, higher

resistivity than reg. QMC• Significant improvement over C4

Image: Proceq

Page 9: Project Alluvion Updates - Iowa State University

9

Project Alluvion – City of West Des Moines

Permeability

Resistivity of Core Samples:Higher resistivity =less permeable,greater durability

Page 10: Project Alluvion Updates - Iowa State University

10

Project Alluvion – City of West Des Moines

Alluvion Conclusions

Workability and finishing• Mix is paving and finishing nicely• Watch how curbs are standing up

Chemical resistance and permeability• Benefits of fly ash may become apparent in long-

term test resultsExpansion tests indicate improved resistance to salts

Page 11: Project Alluvion Updates - Iowa State University

11

Project Alluvion – City of West Des Moines

Concrete Mix Updates

What are We Going to Do Now Concrete Mix on Other Projects

Page 12: Project Alluvion Updates - Iowa State University

12

Project Alluvion – City of West Des Moines

Concrete Mix Updates What is Different Coarse Aggregate Fine Aggregate Intermediate Aggregate Fly Ash Type 400 lbs Cement Minimum Test Section

Page 13: Project Alluvion Updates - Iowa State University

13

Project Alluvion – City of West Des Moines

Concrete Mix Updates

Tarantula (2015) Tarantula (2016)

Page 14: Project Alluvion Updates - Iowa State University

14

Project Alluvion – City of West Des Moines

Concrete Mix Updates

Construction Adjustments made first day Actual workability Air loss Water W/C discussion

Page 15: Project Alluvion Updates - Iowa State University

15

Project Alluvion – City of West Des Moines

QUESTIONS FROM THE AUDIENCEAsk away…