Project Value: Confidential Project Overview: ACS provided design and construction phase services to fit-out a new appliance and electronics R & D laboratory. Key Performance Features: The facility includes fit-out of 5,000 square meter floor for R & D laboratories and offices. ACS led architectural and engineering programming/preliminary design resulting in completion of a Preliminary Design Report. This report was used as the basis to solicit proposals from local Hong Kong, PRC A/E firms to complete final construction documents. Jones, Lang, LaSalle led contractor pre- qualification short listing, bidding and construction phase management with ACS’ input to ensure conformance with the design requirements. PROJECT CAMEO SHENZHEN TECHNICAL CENTER (STC) / WHIRLPOOL / SHENZHEN, CHINA ACS Services: Owner’s Representative for Leadership of Design and Construction Phase Management Project Duration: 10 months Completion Date: February 2006 Headquarters: ACS 3330 University Ave. Suite 200 / Madison, WI / 53705 P 608.663.1590 [email protected] www.acscm.com

Upload: trinhnhi

Post on 31-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT CAMEO SHENZHEN TECHNICAL CENTER (STC) WHIRLPOOL ... · completion of a Preliminary Design Report. ... PROJECT CAMEO SHENZHEN TECHNICAL CENTER (STC) WHIRLPOOL / / SHENZHEN,

Project Value: Confidential

Project Overview:

ACS provided design and construction phase

services to fit-out a new appliance and electronics

R & D laboratory.

Key Performance Features:

• The facility includes fit-out of 5,000 square

meter floor for R & D laboratories and offices.

• ACS led architectural and engineering

programming/preliminary design resulting in

completion of a Preliminary Design Report.

This report was used as the basis to solicit

proposals from local Hong Kong, PRC A/E firms

to complete final construction documents.

• Jones, Lang, LaSalle led contractor pre-

qualification short listing, bidding and

construction phase management with ACS’

input to ensure conformance with the design

requirements.

P R O J E C T C A M E O

S H E N Z H E N T E C H N I C A L C E N T E R ( S T C ) / W H I R L P O O L / S H E N Z H E N , C H I N A

ACS Services: Owner’s Representative for

Leadership of Design and Construction Phase

Management

Project Duration: 10 months

Completion Date: February 2006

Headquar ters : ACS3330Univers i ty Ave. Suite 200 / Madison, WI / 53705 • P 608.663.1590 • [email protected] • www.acscm.com