PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL Project Client: Willmott Dixon Specified products: Deck Coatings: DeckProtect + Blueshield to the exposed levels DeckProtect + Rapidflex to all the internal levels Movement Joints: Floorbridge Project Duration: 35 Weeks Project Start: January 2020 Project Finish: September 2020 Area: 36,308 m2

Upload: others

Post on 27-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL

PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL

Project Client: Willmott Dixon

Specified products:

Deck Coatings: DeckProtect+ Blueshield to the exposed levels

DeckProtect+ Rapidflex to all the internal levels

Movement Joints: Floorbridge

Project Duration: 35 Weeks

Project Start: January 2020

Project Finish: September 2020

Area: 36,308 m2

Page 2: PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL

PROJECT OVERVIEW

StructureCare was appointed by main contractor, Willmott Dixon, to apply deck coatings to all levels, install movement joints throughout the structure and undertake stair core decoration works at the new nine-floor Kings Dock MSCP in Liverpool. All work was carried out during the COVID-19 pandemic. The nine-floor, £30m, Kings Dock MSCP provides 1,453 car park spaces and was built to replace the MSCP that was destroyed in a fire in 2017- https://www.bbc.co.uk/news/uk-england-merseyside-46290095 . It is one of a host of projects in Liverpool which has seen spending of over £90m in total. The multi-storey-car-park will serve visitors to the Arena, ACC Conference Centre and Liverpool’s historic waterfront, which is enjoying considerable regeneration fuelled by private and public investment. The structure is the biggest car park in Liverpool and StructureCare were delighted to work on such a significant project, for such a prestigious client.

Following considerable discussions between the main contractor, Willmott Dixon and their client, the DeckProtect+ range of deck coatings was selected. This technically advanced range of decking systems combines excellent durability, exceptional flexibility, cost effectiveness, along with a single point and robust 10-year warranty.

Page 3: PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL

PROJECT PHOTOS

Page 4: PROJECT CASE STUDY – KINGS DOCK MSCP, LIVERPOOL