project controls cv (mohamed kamal)

4
NAME NAME EMPLOYER CONTACT INFO Moha PLANNING 12. 2007 Till Now Wo pr Wo fro Sc ga Jo 12. 2006 12. 2007 W pr pr Jo amed G & PROJE 7 PGES w PLAN (CAIRO orking as pro oject from Ap orking as sen om December cope of work: as turbines, tw ob description Prepare an Prepare an engineerin Prepare th schedules meeting Cost evalu the pre-aw Prepare an meeting Review the Prepare th Prepare an schedule. Prepare, c Evaluate th Evaluate a 6 WO 7 Plan (CAI Working as pla rojects Scope rojects. ob descriptio Prepare a contractua Prepare th Evaluate a Attend the Prepare, c Assist the Kama ECT CONT SCo POWE NING & P O-EGYPT) oject controls pril, 2010 till n nior project c r 2007 to Apri : engineering, wo heat recov n: nd update the nd update on w ng progress pe he bid schedule and negotiate uation for bidde ward meeting nd update the e monthly and he monthly and nd coordinate coordinate and he schedule a and coordinate RLYPAR nning En RO-EGYP anning engin e of work: civ on: and update the al scope he monthly an and prepare th e daily and we coordinate and e office team in al Hus TROL SUPE ER GENERA PROJEC s supervisor f now. ontrols for Nu il, 2010. , procuremen very steam ge overall plan fo weekly basis t erformance rep es for contract e the contract s ers’ scope adj construction in d weekly progre d weekly progr with project te d attend the ex nd cost adjust e with project t RSONS (R ngineer T) neer for Kuraim vil works for K e detailed plan nd weekly prog he schedule a eekly coordina d attend the sc n preparing the ssein ERVISOR ATION & EN CT CONTR for Banha pow ubaria III pow nt, constructio enerator and or engineering the detailed en ports on month t packages an schedule with ustment and n ntegrated sch ess reports for ress reports an eam the worka xecutive projec tment for the is eam the claim RESOUR mat II & III po Kuraimat II & n for engineerin gress reports a djustment for tion meetings chedule meeti e tender docum m_ GINEERING ROLS SU wer plant 750 wer plant 750M on and placin one steam tu g, procurement ngineering sch hly basis nd purchase or successful bid negotiate it wit edule and run r contractors a nd alert for an around plans to ct review meet ssued change ms/arbitration s 00 RCES & E ower plants 75 III power plan ng, procureme and alert for an the issued cha with consultan ings with subc ments for new _kamal_hus G SERVICE C UPERVIS 0MW combine MW combined ng into opera urbine. t and construc hedule and pre rders, evaluate dder during th th successful b n the weekly sc and suppliers ny project delay o mitigate dela tings with Own e notices submitted by c 02-0100022 ENERGY) 50MW combin nts 750MW co ent and constr ny project dela ange notices nt and owner contractors w projects ssien@yaho COMPANYSOR ed cycle d cycle projec tion of two ction phases epare the e bidders’ e pre-award bidder during chedule ys. ays in project ner ontractors 24420 ) ned cycle ombined cyc ruction for the ays oo.com ct le

Upload: mohamed-kamal

Post on 15-Aug-2015

51 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Project Controls CV (Mohamed Kamal)

N

AM

E

N

AM

E

EM

PL

OY

ER

CO

NT

AC

T IN

FO

MohaPLANNING

12. 2007Till Now

Wopr

WofroScgaJo

12. 200612. 2007

WprprJo

amed G & PROJE

7 PGESw PLAN

(CAIRO

Working as proroject from Ap

Working as senom Decembercope of work:as turbines, twob description Prepare an Prepare an

engineerin Prepare th

schedules meeting

Cost evaluthe pre-aw

Prepare anmeeting

Review the Prepare th Prepare an

schedule. Prepare, c Evaluate th Evaluate a

6 WO7 Plan

(CAI

Working as plarojects Scoperojects. ob descriptio Prepare a

contractua Prepare th Evaluate a Attend the Prepare, c Assist the

KamaECT CONT

SCo “POWE

NING & PO-EGYPT)

oject controlspril, 2010 till nnior project cr 2007 to Apri: engineering,wo heat recovn: nd update the nd update on w

ng progress pehe bid schedule and negotiate

uation for biddeward meeting nd update the

e monthly andhe monthly andnd coordinate

coordinate andhe schedule a

and coordinate

RLYPARnning EnRO-EGYP

anning engine of work: civ

on: and update theal scope he monthly anand prepare the daily and wecoordinate and

e office team in

al HusTROL SUPE

ER GENERA

PROJEC

s supervisor fnow. ontrols for Nu

ril, 2010. , procuremenvery steam ge

overall plan foweekly basis t

erformance repes for contracte the contract s

ers’ scope adj

construction in

d weekly progred weekly progr with project te

d attend the exnd cost adjust

e with project t

RSONS (Rngineer

T)

neer for Kuraimvil works for K

e detailed plan

nd weekly proghe schedule a

eekly coordinad attend the scn preparing the

sseinERVISOR

ATION & EN

CT CONTR

for Banha pow

ubaria III pow

nt, constructioenerator and

or engineeringthe detailed enports on montht packages anschedule with

justment and n

integrated sch

ess reports forress reports aneam the worka

xecutive projectment for the isteam the claim

RESOUR

mat II & III poKuraimat II &

n for engineerin

gress reports adjustment for tion meetings chedule meetie tender docum

m_

GINEERING

ROLS SU

wer plant 750

wer plant 750M

on and placin one steam tu

g, procurementngineering schhly basis nd purchase or successful bid

negotiate it wit

edule and run

r contractors and alert for an

around plans to

ct review meetssued change

ms/arbitration s

00

RCES & E

ower plants 75 III power plan

ng, procureme

and alert for an the issued cha with consultanings with subcments for new

_kamal_hus

G SERVICE C

UPERVIS

0MW combine

MW combined

ng into operaurbine.

t and construchedule and pre

rders, evaluatedder during th

th successful b

n the weekly sc

and suppliers ny project delayo mitigate dela

tings with Owne notices submitted by c

02-0100022

ENERGY)

50MW combinnts 750MW co

ent and constr

ny project delaange notices nt and owner contractors w projects

ssien@yaho

COMPANY”SOR

ed cycle

d cycle projec

tion of two

ction phases epare the

e bidders’ e pre-award

bidder during

chedule

ys. ays in project

ner

contractors

24420

)

ned cycle ombined cyc

ruction for the

ays

oo.com

ct

le

Page 2: Project Controls CV (Mohamed Kamal)

06. 20010. 200

ASJ

J

f

JSwJ

10. 20012. 200

WJ

WpSoJ

01 HID04 Civ

(CA

Working as cAugust 2004 Scope of worJob descripti Managin Estimatin Close fo Coordina Prepare

Working as cJob descripti Estimatin Study th Review & Prepare

Working as cfrom July 200Working as cJanuary 2002Scope of worworks Job descripti Managin Estimatin Close fo Coordina Prepare Cost and

04 EPS06 Civ

(CA

Working as cJob descripti Prepare Attend m

new projWorking as cproject from OScope of woroutdoor 220kJob descripti Perform Prepare Prepare, Prepare

DELECOvil EngineAIRO-EGYP

civil engineer to October 20rk: constructiion: ng the resourcng the require

ollow up duringate with client invoices and g

civil engineer ion: ng civil prices

he contract con& approve the detailed sche

civil engineer 02 to April 20civil engineer 2 to June 2002rk: constructi

ion: ng the resourcng the require

ollow up duringate with client invoices and gd material con

S “Electrvil EngineAIRO-EGYP

civil engineer ion: civil tender do

meetings with Ojects

civil engineer October, 2004rk: engineerinkV switchyardion: all civil inspec the monthly a, coordinate an punch list and

“High Daeer PT)

for Fayoum W004. ion works inc

es & monitorined material andg construction to perform theget client appr for Technica

for tenders & nditions & alarme budget for awedule for award and acting si03. and acting si2. ion works inc

es & monitorined material andg construction to perform theget client appr

ntrol

rical Poweer PT)

for substatio

ocuments for nOwner and inc

and acting si4 to June, 200ng, procuremd and indoor 1

ctions on daily and weekly prond attend the wd support clien

m for Indu

West (Electric cluding surve

ng the progresd coordinate w to ensure the e required insproval.

al Affairs Depa

offers. rm for unusual warded projectded projects. ite manager f

ite manager f

cluding surve

ng the progresd coordinate w to ensure the e required insproval.

wer Syste

ons departmen

new projects acorporate their

ite manager f06. ent, construc11kV switchg

y basis ogress reports weekly progre

nt for contract c

ustrial & E

cal Overhead

ey, civil and er

ss of work. with project ma quality of perfpections.

artment from

l conditions. ts.

for Police Aca

for King Fase

ey, civil and el

ss of work. with project ma quality of perfpections.

em"

nt from June

and coordinater comments fo

for Sidi Salem

ction and placgear.

ess meetings wclose out

Electrical P

d Lines 220kV

rection works

anagement to pformed work.

April 2003 to

ademy Subst

el Substation

lectro-mecha

anagement to pformed work.

2006 to Dece

e it with other dor civil tender d

m substation 2

cing into oper

with contracto

Projects"

V & 66kV) from

s,

procure it.

o August 2004

tation 66/11 k

66/11 kV from

anical erection

procure it.

ember, 2006.

disciplines. documents for

220/66/11 kV

ration of

or

m

4

kV

m

n

r

Page 3: Project Controls CV (Mohamed Kamal)

PE

RSO

NN

AL

O

THER

S

PE

RSO

NN

AL

O

THER

S

INF

O

LA

NG

UA

GE

S

E

DU

CA

TIO

N

S

KIL

LS

A

A

A

A

A

A

F

U

M

S

U

M

A

E

D

N

M

JSeJ

Attended & C

Attended & C

Attended & C

Attended & C

Attended & C

Attended & C

First Univers

University :-

Major :-

Second Univ

University :-

Major :-

Arabic Nativ

Excellent Co

Date of Birth

Nationality:-

Marital Statu

Working as cJanuary, 2002Scope of worerection workJob descripti Managin Estimatin Close fo Coordina

Completed P

Completed R

Completed C

Completed S

Completed P

Completed A

sity Degree

-

versity Degr

-

ve Language

ommand of E

h:- 1

- E

us:- M

civil engineer 2. rk: constructiks ion: ng the resourceng the requirellow up duringate with client

Project Mana

Risk Manage

Cost Manage

Safety & Hea

Primavera co

AutoCAD & S

:-

ree :-

e.

English Lang

18/10/1978

Egyptian

Married

for Marsa Ala

ion works inc

es & monitorind material and

g construction to perform the

agement Pro

ement Profe

ement Profe

alth Training

ourses P3 &

SAP course

B.Sc. Engin

Higher tech

Civil Engin

Projects M

Ain Shams

Projects M

guage Spok

am Diesel Po

cluding surve

ng the progresd coordinate w to ensure the e required insp

ofessional (P

ssional (RM

essional (CM

g course in C

& P6

s

neering (20

hnological in

neering

Management

s University

Management

ken and Writt

wer Station fr

ey, civil and el

ss of work. with project ma quality of perfpections.

PMP) course

MP) course

MP) course

Construction

001)

nstitute with

Diploma (20

ten.

from June 200

lectro-mecha

anagement to pformed work.

e

n

h 10th of Ram

008)

01 to

anical

procure it.

madan

Page 4: Project Controls CV (Mohamed Kamal)