project costs(in thousands)

155
Title: State Route: 2025 - 2028 $0 $0 $0 Title: State Route: 2025 - 2028 $0 $0 $0 Title: State Route: 2025 - 2028 $0 $0 $0 Title: $0 Total FFY 2021-2032 Cost $14,671 PennDOT Project Id: 27144 Project Administrator: City of Pittsburgh 28th Street Bridge Period Totals: $10,371 $4,300 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 Federal: $10371 $4300 $0 $0 $0 Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2029 - 2032 Actual Construction Bid Date: Estimated Construction Bid Date: 5/6/21 Location: SR 2040, Lebanon Church Road, from Buttermilk Road to Ceco Drive in West Mifflin Boroughs Allegheny County Project Description: Left turn lane, mill overlay on SR 2040, Lebanon Church Road, from Buttermilk Road to Ceco Drive in West Mifflin Borough, Allegheny County Improvement Type: Restoration 2040 Municipality: West Mifflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis $0 Total FFY 2021-2032 Cost $6,011 PennDOT Project Id: 26623 Project Administrator: PENNDOT SR 2040/Buttermilk Hollow Rd - Ceco Dr Period Totals: $2,011 $2,000 $2,000 $0 $0 Local/Other: $0 $0 $0 $0 $0 State: $402 $400 $400 $0 $0 Federal: $1609 $1600 $1600 $0 $0 Project Description: Bridge restoration/replacement on SR 3039 Nike Site Road over Robinson Run, Panhandle Trail, and Old Noblestown Road in Collier Township, Allegheny County Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2029 - 2032 Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21 Location: SR 3039 Nike Site Road over Robinson Run, Panhandle Trail, and Old Noblestown Road in Collier Township, Allegheny County. Improvement Type: Bridge Rehabilitation 3039 Municipality: Collier (TWP) Air Quality Status: Exempt from Regional Conformity Analysis $0 Total FFY 2021-2032 Cost $820 PennDOT Project Id: 26546 Project Administrator: PennDOT Nike Site Road Bridge Rehabilitation Period Totals: $820 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 State: $164 $0 $0 $0 $0 2024 2029 - 2032 Federal: $656 $0 $0 $0 $0 Location: SR 19, Washington Road from Cochran Road to Village Drive in Bethel Park Borough, Upper St. Clair and Mt. Lebanon Townships, Allegheny County Project Description: Traffic adaptive signal system on US Route 19, Washington Road from Cochran Road to Village Drive in Bethel Park Borough, Upper St. Clair and Mt. Lebanon Townships, Allegheny County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 Municipality: Upper St Clair (TWP) Air Quality Status: Significant: Included in regional conformity analysis Actual Construction Bid Date: 3/4/21 Estimated Construction Bid Date: 3/4/21 Project Administrator: PENNDOT US 19/Washington Rd (South Hills) Adaptive Signal Improvement Type: Existing Signal Improvement 19 Date: 3/30/21 10:25AM Southwestern Pennsylvania Commission MPO TIP - Highway & Bridge Projects Page 1 of 167 Allegheny PennDOT Project Id: 26454

Upload: others

Post on 11-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $14,671

PennDOT Project

Id:

27144

Project Administrator: City of Pittsburgh 28th Street Bridge

Period Totals: $10,371 $4,300 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $10371 $4300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/6/21

Location: SR 2040, Lebanon Church Road, from Buttermilk Road to Ceco Drive in West Mifflin Boroughs Allegheny County

Project Description: Left turn lane, mill overlay on SR 2040, Lebanon Church Road, from Buttermilk Road to Ceco Drive in West Mifflin Borough, Allegheny County

Improvement Type: Restoration 2040

Municipality: West Mifflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,011

PennDOT Project

Id:

26623

Project Administrator: PENNDOT SR 2040/Buttermilk Hollow Rd - Ceco Dr

Period Totals: $2,011 $2,000 $2,000 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $402 $400 $400 $0 $0

Federal: $1609 $1600 $1600 $0 $0

Project Description: Bridge restoration/replacement on SR 3039 Nike Site Road over Robinson Run, Panhandle Trail, and Old Noblestown Road in Collier Township, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: SR 3039 Nike Site Road over Robinson Run, Panhandle Trail, and Old Noblestown Road in Collier Township, Allegheny County.

Improvement Type: Bridge Rehabilitation 3039

Municipality: Collier (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $820

PennDOT Project

Id:

26546

Project Administrator: PennDOT Nike Site Road Bridge Rehabilitation

Period Totals: $820 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $164 $0 $0 $0 $0

2024 2029 - 2032

Federal: $656 $0 $0 $0 $0

Location: SR 19, Washington Road from Cochran Road to Village Drive in Bethel Park Borough, Upper St. Clair and Mt. Lebanon Townships, Allegheny County

Project Description: Traffic adaptive signal system on US Route 19, Washington Road from Cochran Road to Village Drive in Bethel Park Borough, Upper St. Clair and Mt. Lebanon Townships, Allegheny

County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Upper St Clair (TWP) Air Quality Status: Significant: Included in regional conformity analysis

Actual Construction Bid Date: 3/4/21 Estimated Construction Bid Date: 3/4/21

Project Administrator: PENNDOT US 19/Washington Rd (South Hills) Adaptive Signal

Improvement Type: Existing Signal Improvement 19

Date: 3/30/21 10:25AM Southwestern Pennsylvania Commission MPO TIP - Highway & Bridge Projects Page 1 of 167

Allegheny

PennDOT Project

Id:

26454

Page 2: Project Costs(In Thousands)

State Route:

2025 - 2028

$4200

$788

$263

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Description: Widening to provide four standard lanes, median barrier; grade separation at the 31st Steet Bridge and 40th Street Bridge intersection.

Located on 31st Street Bridge to Millvale Int. in the City of Pittsburgh, Allegheny County.

Actual Construction Bid Date: 6/10/10 Estimated Construction Bid Date: 6/10/10

Location: 31st Street Bridge to Millvale Int. in the City of Pittsburgh, Allegheny County

Improvement Type: Widen 28

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $55

PennDOT Project

Id:

27180

Project Administrator: PennDOT PA 28 Widen/31st St-Millv

Period Totals: $55 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $11 $0 $0 $0 $0

Federal: $44 $0 $0 $0 $0

Project Description: Widening to provide four standard lanes, median barrier; grade separation at the 31st Steet Bridge intersection.

Troy Hill Road to 31st Street Bridge in the City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/14/11 Estimated Construction Bid Date: 6/14/11

Location: Troy Hill Road through the 31st Street Bridge to the City limits in the City of Pittsburgh, Allegheny County

Improvement Type: Widen 28

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

27179

Project Administrator: PENNDOT PA 28 Widen/Troy-31st St

Period Totals: $1,500 $0 $0 $0 $0

Local/Other: $300 $0 $0 $0 $0

State: $1200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/30/21

Location: Carries Vilsack Road over the South Branch of Pine Creek in Shaler Township, Allegheny County

Project Description: (Sponsor = Allegheny County) Bridge replacement on PS06 (Pine Creek #6) on Vilsack Road over the South Branch of Pine Creek in Shaler Township, Allegheny County.

Improvement Type: Bridge Replacement 7118

Municipality: Shaler (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $13,270

PennDOT Project

Id:

27159

Project Administrator: Allegheny County Pine Creek Br. #6 (PS06)

Period Totals: $751 $518 $3,375 $3,375 $5,251

Local/Other: $38 $26 $169 $169 $0

State: $113 $78 $506 $506 $0

Federal: $600 $414 $2700 $2700 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Location: Carries 28th Street over Conrail RR and East Busway, in the City of Pittsburgh, Allegheny County.

Project Description: (Sponor = City of Pittsburgh) Rehabilitation of the bridge that carries 28th Street over Conrail Railroad and the East Busway in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Page 3: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$9409

$0

$2352

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Description: (Sponsor = City of Pittsburgh) Widen roadway and bridge rehabilitation (West Ohio Street RR Bridge) and demolition (Ridge Ave Bridge), both over Norfolk Southern Railroad in the

North Shore of the City of Pittsburgh, Allegheny County

Project Costs(In Thousands)

Actual Construction Bid Date: 10/10/19 Estimated Construction Bid Date: 10/10/19

Location: Located on West Ohio Street from Merchant Ave to Ridge Ave, including the Ridge Ave Bridge over the Norfolk Southern Railroad, all on the North Shore of the City of Pittsburgh,

Allegheny County.

Improvement Type: Bridge Rehabilitation 4084

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $126

PennDOT Project

Id:

27300

Project Administrator: City of Pittsburgh West Ohio St/Ridge Ave Br's.

Period Totals: $63 $63 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $63 $63 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Location: Located on SR 2048 (Business 22) from Interstate 376 in Churchill to SR 48, Churchill and Monroeville Borough and Wilkins Township, Allegheny County.

Project Description: Mill and overlay, curb gutter repair, mountable curb, guide rail, drainage on SR 2048 (Business 22) from Interstate 376 in Churchill to SR 48, Churchill and Monroeville Borough and

Wilkins Township, Allegheny County.

Improvement Type: Restoration 2048

Municipality: Churchill (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $26,600

PennDOT Project

Id:

27225

Project Administrator: PennDOT 2048 Wm Penn Hwy/I-376 Ramp to PA 48

Period Totals: $3,100 $3,438 $6,250 $2,051 $11,761

Local/Other: $620 $688 $1250 $410 $0

State: $0 $0 $0 $0 $0

Federal: $2480 $2750 $5000 $1641 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: Located on Campbell's Run Road from McMichael Road to Keiner's Lane in Robinson and Collier Townships, Allegheny County, FC=16, Urban Minor Arterial

Project Description: (Sponsor = Allegheny County) Highway reconstruction on Campbell's Run Road from McMichael Road to Keiner's Lane in Robinson and Collier Townships, Allegheny County. Widen

roadway to 24 feet, and upgrade intersection.

Improvement Type: Reconstruct 3041

Municipality: Robinson (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $11

PennDOT Project

Id:

27219

Project Administrator: Allegheny County Campbell's Run Road

Period Totals: $11 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2 $0 $0 $0 $0

Federal: $9 $0 $0 $0 $0

Project Description: Widening to provide four standard lanes, median barrier; grade separation at the 31st Steet Bridge and 40th Street Bridge intersection.

Located on 31st Street Bridge to Millvale Int. in the City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 4: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$5734Federal: $0 $0 $0 $0 $17000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/15/27

Location: Located on SR 22, Steubenville Pike Bridge over Parkway West in Robinson Township, Allegheny County.

Project Description: Bridge restoration/replacement on US Route 22, Steubenville Pike Bridge over Parkway West in Robinson Township, Allegheny County.

Improvement Type: Bridge Replacement 22

Municipality: Robinson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,690

PennDOT Project

Id:

27445

Project Administrator: PennDOT 22/30 over the Parkway West

Period Totals: $490 $1,200 $0 $0 $0

Local/Other: $98 $240 $0 $0 $0

State: $392 $960 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/2/22

Location: Carries Bailey Run Road over Days Run in East Deer Township, Allegheny County

Project Description: (Sponsor = Allegheny County) Bridge replacement with wall repair on Carries Bailey Run Road over Days Run in East Deer Township, Allegheny County

Improvement Type: Bridge Replacement 7104

Municipality: East Deer (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,933

PennDOT Project

Id:

27322

Project Administrator: Allegheny County Days Run Bridge No. 3 (DY03)

Period Totals: $209 $1,350 $1,249 $1,125 $0

Local/Other: $10 $68 $62 $56 $0

State: $39 $202 $187 $169 $0

Federal: $160 $1080 $1000 $900 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/2/23

Location: 6 structures in Allegheny County. AB03 in Monroeville Boro, AB04 in Monroeville Boro, SQ01 in Ohara Twp, PU02 in Penn Hills, PA02 in Upper St. Clair Township and WB01 in Shaler

Twp.Project Description: (Sponsor = Allegheny County) Bridge preservation on 6 structures in Penn Hills Township, Monroeville Borough, Ohara Township, Upper St. Clair Township and Shaler Township,

Allegheny County. Abers Creek Road over Abers Creek in Monroeville Borough,

Cavitt Rd over Abers Creek, in Monroeville Borough, Old Freeport Road over Squaw Run, in Ohara Township, Universal Road over Plum Creek Upper Branch, in Penn Hills Township,

Improvement Type: Bridge Preservation Activities 7113

Municipality: Penn Hills (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,414

PennDOT Project

Id:

27316

Project Administrator: Allegheny County AL Local BPRS Group 2

Period Totals: $1,414 $0 $0 $0 $0

Local/Other: $71 $0 $0 $0 $0

State: $212 $0 $0 $0 $0

Federal: $1131 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 5: Project Costs(In Thousands)

$1434

$0

Title:

State Route:

2025 - 2028

$3200

$0

$800

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $8,940

Period Totals: $1,100 $5,395 $2,445 $0 $0

Local/Other: $220 $1061 $489 $0 $0

State: $0 $0 $0 $0 $0

Federal: $880 $4334 $1956 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/8/22

Location: Located from Fort Pitt Boulevard to Sixth Avenue in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Highway reconstruction on Smithfield Street from Fort Pitt Boulevard to Sixth Avenue in the City of Pittsburgh, Allegheny County.

Improvement Type: Reconstruct 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

27493

Project Administrator: City of Pittsburgh Smithfield St Reconstruct, Ph 1

Period Totals: $500 $0 $0 $0 $0

Local/Other: $100 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $400 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/50

Location: Located on Painters Run Road, from Bower Hill Road to Cedar Boulevard, in Scott Township and Upper St. Clair and Mount Lebanon Boroughs, Allegheny County

Project Description: Highway restoration on Painters Run Road, from Bower Hill Road to Cedar Boulevard in Scott Township and Upper St. Clair and Mount Lebanon Boroughs, Allegheny County.

Improvement Type: Reconstruct 0

Municipality: Upper St Clair (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $7,050

PennDOT Project

Id:

27492

Project Administrator: Allegheny County Painters Run- Bower Hill to Cedar Blvd

Period Totals: $700 $850 $0 $1,500 $4,000

Local/Other: $140 $170 $0 $300 $0

State: $0 $0 $0 $0 $0

Federal: $560 $680 $0 $1200 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/11/24

Location: Located on Beck's Run Road between East Carson Street and Brownsville Road in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = Allegheny County) Highway reconstruction on Beck's Run Road between East Carson Street and Brownsville Road in the City of Pittsburgh, Allegheny County.

Improvement Type: Reconstruct 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$21,250

Total FFY 2021-2032 Cost $31,018

PennDOT Project

Id:

27491

Project Administrator: Allegheny County Beck's Run Road

Period Totals: $500 $1,100 $200 $800 $7,168

Local/Other: $0 $0 $0 $0 $0

State: $500 $1100 $200 $800 $4250

Page 6: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$5138

$963

$321

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Improvement Type: Bridge Replacement 7103

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $14,100

PennDOT Project

Id:

27770

Project Administrator: Allegheny County SN02 Spring Run NO2

Period Totals: $775 $1,325 $2,453 $3,125 $6,422

Local/Other: $39 $66 $123 $156 $0

State: $116 $199 $368 $469 $0

Federal: $620 $1060 $1962 $2500 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/15/23

Location: Frazier Street, Swinburne Bridge, City of Pittsburgh, Allegheny County

Project Description: (Sponsor = City of Pittsburgh) Bridge rehabilitation on Swinburne Bridge, which carries Frazier Street over CSX RR and Saline Street in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,800

PennDOT Project

Id:

27747

Project Administrator: City of Pittsburgh Swinburne Bridge

Period Totals: $1,000 $800 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1000 $800 $0 $0 $0

Project Description: (Sponsor = Swissvale/Norfolk Southern) Replacing Kenmawr Bridge, located on S. Braddock Avenue over Norfolk Southern RR in Swissvale and Rankin Boroughs, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 11/15/19 Estimated Construction Bid Date: 11/15/19

Location: Located on S. Braddock Avenue over Norfolk Southern RR in Swissvale and Rankin Boroughs, Allegheny County.

Improvement Type: Bridge Replacement 7463

Municipality: Swissvale (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,100

PennDOT Project

Id:

27543

Project Administrator: Allegheny/Swissvale/Norfolk Southern Kenmawr Bridge over NS RR

Period Totals: $300 $800 $0 $0 $0

Local/Other: $60 $160 $0 $0 $0

State: $240 $640 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Located on Thompson Run Road over Thompson Run, 500' north of Evergreen Rd in Ross Twp.

Project Description: Bridge replacement of structure located on Thompson Run Road over Thompson Run, 500' north of Evergreen Rd in Ross Township

Improvement Type: Bridge Replacement 7116

Municipality: Ross (TWP) Air Quality Status: AQ Conformity Does Not Apply

PennDOT Project

Id:

27513

Project Administrator: Allegheny County Thompson Rn Rd Br TN02

Page 7: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Located on SR 2040 (Lebanon Church) from Ceco Drive to Brownsville Road in Baldwin, West Mifflin, Pleasant Hills Borough in Allegheny County. Also include SR 885, from Clairton

Road to Lebanon Road.Project Description: Mill & overlay with widening on SR 2040 (Lebanon Church) from Ceco Drive to Brownsville Road in Baldwin, West Mifflin, Pleasant Hills Borough in Allegheny County. Also includes

SR 885, from Clairton Road to Lebanon Road.

Improvement Type: Resurface 2040

Municipality: Pleasant Hills (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,300

PennDOT Project

Id:

28025

Project Administrator: PennDOT 2040/Ceco Dr to Brownsville Rd

Period Totals: $600 $0 $2,440 $2,260 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $500 $2000 $0

Federal: $600 $0 $1940 $260 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 50 (Washington Pike) from Thoms Run Road to Mayer Street in Collier Township, Allegheny County.,

Project Description: Lane widening and signal upgrades on SR 50 (Washington Pike) from Thoms Run Road to Mayer Street in Collier Township, Allegheny County.

Improvement Type: Widen 50

Municipality: Collier (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $7,250

PennDOT Project

Id:

28010

Project Administrator: PennDOT PA 50 -I79-Vanadium

Period Totals: $300 $3,250 $2,350 $1,350 $0

Local/Other: $0 $0 $0 $0 $0

State: $300 $3250 $2350 $1350 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/3/22

Location: SR 837, Glenwood Interchange in West Homestead Borough and the City of Pittsburgh, Allegheny County,

Project Description: Construct a new pedestrian bridge on SR 837 at Glenwood Interchange in West Homestead Borough and the City of Pittsburgh, Allegheny County.

Improvement Type: Pedestrian Facilities 837

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,080

PennDOT Project

Id:

27991

Project Administrator: PENNDOT PA 837 Pedestrian Bridge

Period Totals: $1,080 $0 $0 $0 $0

Local/Other: $216 $0 $0 $0 $0

State: $864 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: Spring Run Road over Spring Run in Crescent Township Allegheny County

Project Description: Bridge replacement on Spring Run Road over Spring Run in Crescent Township Allegheny County

Page 8: Project Costs(In Thousands)

2025 - 2028

$0

$3128

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $0 $0 $600 $600 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Pittsburgh Metropolitan area, Allegheny County

Project Description: Transportation Demand Management forecast in Pittsburgh Metropolitan area, Allegheny County

Improvement Type: Planning 0

Municipality: Robinson (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $150

PennDOT Project

Id:

28172

Project Administrator: TMA's TDM Line Item - FFY 2023/24

Period Totals: $150 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $30 $0 $0 $0 $0

Federal: $120 $0 $0 $0 $0

Project Description: Bridge replacement on SR 2152 (Ramp to Rodi Road) over Chalfont Run in Wilkins Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 8/8/19 Estimated Construction Bid Date: 8/8/19

Location: Located on SR 2152 (Ramp to Rodi Road) over Chalfont Run in Wilkins Township, Allegheny County.

Improvement Type: Bridge Replacement 2152

Municipality: Wilkins (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,000

PennDOT Project

Id:

28159

Project Administrator: PENNDOT Ramp - Rodi Rd/Chalfont R

Period Totals: $3,700 $1,300 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3700 $1300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: SR 30 at Falls Run in Forest Hills Borough, Allegheny County.

Project Description: Design build structure replacement on SR 30 over Falls Run in Forest Hills Borough, Allegheny County. 1000ft south east of Braddock Rd.

Improvement Type: Bridge Replacement 30

Municipality: Forest Hills (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $21,328

PennDOT Project

Id:

28155

Project Administrator: PennDOT Ardmore Blvrd Br over Falls Run

Period Totals: $50 $2,950 $7,000 $8,200 $3,128

Local/Other: $0 $0 $0 $0 $0

State: $50 $2950 $7000 $8200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 9: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$4000

$5000

$0

$10,000

Total FFY 2021-2032 Cost $24,200

Period Totals: $0 $400 $800 $4,000 $9,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $400 $800 $4000 $2000

Federal: $0 $0 $0 $0 $8000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: SR 3104 over the Ohio River in the City of Pittsburgh, Stowe Township and McKees Rocks Borough, Allegheny County. McKees Rocks Bridge is between SR 51 and SR 65.

Project Description: Bridge Preservation, sidewalk repair, structural steel retrofits, strip seal rehab, and minor deck spall repair on the McKees Rocks Bridge in the City of Pittsburgh, Stowe Township and

McKees Rocks Borough, Allegheny County.

Improvement Type: Bridge Preservation Activities 3104

Municipality: Mckees Rocks (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $663

PennDOT Project

Id:

28344

Project Administrator: PENNDOT McKees Rocks Bridge Phase 2

Period Totals: $663 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $663 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Lane widening on I-79, from Washington County (Cecil Township) just north of the Southpointe Interchange at Segment/Offset 0474/1093 and extends north approximately 3.0 miles to

0504/1486 in South Fayette Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 12/19/18 Estimated Construction Bid Date: 12/19/18

Location: Located on I-79, from Washington County (Cecil Township) just north of the Southpointe Interchange at Segment/Offset 0474/1093 and extends north approximately 3.0 miles to

0504/1486 in South Fayette Township, Allegheny County.

Improvement Type: Widen 79

Municipality: South Fayette (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $464

PennDOT Project

Id:

28281

Project Administrator: PENNDOT Southern Beltway Connector

Period Totals: $464 $0 $0 $0 $0

Local/Other: $93 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $371 $0 $0 $0 $0

Project Description: (Sponsor = City of Pittsburgh) CBD Signal improvement at Central Business District, City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 8/23/18 Estimated Construction Bid Date: 8/23/18

Location: Central Business District, City of Pittsburgh, Allegheny County

Improvement Type: Existing Signal Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

28180

Project Administrator: City of Pittsburgh CBD Signal Phase 3 Construction

Period Totals: $0 $0 $750 $750 $0

Local/Other: $0 $0 $150 $150 $0

Page 10: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$2000

$375

$125

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $3,500

PennDOT Project

Id:

28525

Project Administrator: PENNDOT Smithfield Street Bridge

Period Totals: $2,000 $1,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2000 $1500 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge replacement, signal improvement and turning lane widening on State Route 3005 (Mayview Road Bridge) and SR 3006 (Boyce Road) over branch of Chartiers Creek, near Boyce

Road in South Fayette Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: Mayview Road Bridge over branch of Chartiers Creek, at intersection with Boyce Road, in South Fayette Township Allegheny County. Also included is SR 3006 and SR 3005.

Improvement Type: Bridge Replacement 3005

Municipality: South Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $7,253

PennDOT Project

Id:

28520

Project Administrator: PENNDOT Mayview Road Bridge

Period Totals: $800 $313 $2,389 $1,251 $2,500

Local/Other: $40 $16 $120 $63 $0

State: $120 $47 $359 $188 $0

Federal: $640 $250 $1910 $1000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/16/23

Location: Coraopolis Bridge (OB02) in Coraopolis Borough, Allegheny County; Lincoln Road over Shades Run (SD03) in Penn Hill Township; Saunders Station Road (TL19) in Monroeville and

Sutersville (YR01) in Elizabeth TownshipProject Description: (Sponsor = Allegheny County) Bridge preservation on Coraopolis - Neville Island Bridge in Coraopolis Borough, Lincoln Road Bridge in Penn Hills, Saunders Station Road in Monroeville

and Sutersville Road Bridge in Elizabeth Township, Allegheny County.

Improvement Type: Bridge Preservation Activities 7420

Municipality: Coraopolis (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,500

PennDOT Project

Id:

28426

Project Administrator: Allegheny County AL Local BPRS Group 5

Period Totals: $2,500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $500 $0 $0 $0 $0

Federal: $2000 $0 $0 $0 $0

Project Description: Full paint, structural steel repairs, deck replacement, sidewalk and barrier replacement, expansion dame replacement, concrete substructure repairs, bearing repairs, approach work on SR

2094 (Jerome Street Bridge) over SR 2027, from SR 2021 and SR 2094 to Jerome Street and SR 2094 in the City of McKeesport, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/30/20 Estimated Construction Bid Date: 4/30/20

Location: SR 2094 over Youghiogheny River in the City of McKeesport, Allegheny County.

Improvement Type: Bridge Rehabilitation 2094

Municipality: Mckeesport (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

28345

Project Administrator: PENNDOT Jerome Street Bridge

Page 11: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Improvement Type: Bridge Preservation Activities 366

Municipality: Tarentum (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $75

PennDOT Project

Id:

63306

Project Administrator: PennDOT Tarentum Bridge Ramp 'A'

Period Totals: $75 $0 $0 $0 $0

Local/Other: $4 $0 $0 $0 $0

State: $11 $0 $0 $0 $0

Federal: $60 $0 $0 $0 $0

Project Description: Wenzell Avenue, from the intersection with Tole Street to the intersection with Banksville Road (US Route 19), and along Carnahan Road, from the intersection with Banksville Road (US

Route 19)to the intersection with Banksville Avenue. Reconstruction of roadways, curbs, sidewalks and culvert rehabilitation/replacement on Carnahan Road, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/11/19 Estimated Construction Bid Date: 4/11/19

Location: Wenzell Avenue, from the intersection with Tole Street to the intersection with Banksville Road (S.R. 0019), and along Carnahan Road, from the intersection with Banksville Road (S.R.

0019) to the intersection with Banksville Avenue., ,

Improvement Type: Reconstruct 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,400

PennDOT Project

Id:

58561

Project Administrator: City of Pittsburgh Wenzell Av/Carnahan Rd Br

Period Totals: $3,300 $3,100 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3300 $3100 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: Located on US 30 over Falls Run 100 feet northwest of Newport Road in Forest Hills Borough, Allegheny County.

Project Description: Bridge replacement of structure on US Route 30 over Falls Run 100 feet northwest of Newport Road in Forest Hills Borough, Allegheny County.

Improvement Type: Bridge Replacement 30

Municipality: Forest Hills (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,138

PennDOT Project

Id:

28593

Project Administrator: PennDOT US 30 over Falls Run

Period Totals: $2,738 $2,000 $400 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2658 $2000 $400 $0 $0

Federal: $80 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: Smithfield Street Bridge in City of Pittsburgh, Allegheny County

Project Description: Bridge preservation on Smithfield Street Bridge which carries Smithfield Street over the Monongahela River in City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 3027

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Page 12: Project Costs(In Thousands)

2025 - 2028

$2000

$500

$0

Title:

State Route:

2025 - 2028

$1480

$370

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: Located on SR 1038 over Allegheny River in East Deer Township, Allegheny County.

Project Description: Bridge preservation on SR 1038 over Allegheny River in East Deer Township, Allegheny County.

Improvement Type: Bridge Preservation Activities 1038

Municipality: East Deer (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,230

PennDOT Project

Id:

63515

Project Administrator: PennDOT New Kensington Bridge

Period Totals: $3,130 $3,100 $0 $0 $0

Local/Other: $626 $620 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2504 $2480 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Primary intersection locations: Boulevard of the Allies and Commonwealth Place; Boulevard of the Allies and Stanwix Street; Boulevard of the Allies and Market Street; and Boulevard of

the Allies and Cherry Way.Project Description: (Sponsor = City of Pittsburgh) Replacement of outdated traffic signal hardware with new, state-of-the art equipment at various intersections within the City Business District (CBD) along

with connections to Northside, Southside and South Hills in the City of Pittsburgh, Allegheny County.

Improvement Type: Existing Signal Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,370

PennDOT Project

Id:

63378

Project Administrator: City of Pittsburgh CBD Signalization Upgrade- Ph 4

Period Totals: $0 $0 $520 $0 $1,850

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $104 $0 $0

Federal: $0 $0 $416 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/27

Location: Located on Bateman Road Bridge over North Branch Robinson Run in North Fayette Township, Allegheny County.

Project Description: Rehabilitation/Replacement of the Bateman Road Bridge over North Branch Robinson Run in North Fayette Township, Allegheny County.

Improvement Type: Bridge Replacement 978

Municipality: North Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,871

PennDOT Project

Id:

63330

Project Administrator: PennDOT Bateman Road Bridge

Period Totals: $2,491 $1,880 $0 $0 $2,500

Local/Other: $0 $0 $0 $0 $0

State: $2211 $1600 $0 $0 $0

Federal: $280 $280 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: Tarentum Boro. Tarentum Ramp "A" over SR 8088

Project Description: Bridge preservation on Ramp A of the Tarentum Bridge over the Conrail Railroad, 4th Avenue and SR 8088 (Ramp D) in Tarentum Borough, Allegheny County.

Page 13: Project Costs(In Thousands)

2025 - 2028

$0

$7000

$0

Title:

State Route:

2025 - 2028

$550

$138

$0

Title:

State Route:

2025 - 2028

$0

$10367

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $375 $0 $0 $0

Federal: $80 $1410 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: City of Pittsburgh owned structures.

Project Description: (Sponsor = City of Pittsburgh) Bridge preservation line item for City of Pittsburgh owned structures in Allegheny County.

Improvement Type: Bridge Preservation Activities 0

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $23,367

PennDOT Project

Id:

68252

Project Administrator: City of Pittsburgh Pittsburgh City BPRSF Line Item

Period Totals: $0 $3,000 $5,000 $5,000 $10,367

Local/Other: $0 $0 $0 $0 $0

State: $0 $3000 $5000 $5000 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/27/22

Location: Located on SR 2114 (McKeesport-Duquesne Bridge) over the Monongahela River and railroad in the City of Duquesne and McKeesport, Allegheny County.

Project Description: Bridge preservation on SR 2114 (McKeesport-Duquesne Bridge) over the Monongahela River and railroad in the City of Duquesne and McKeesport, Allegheny County.

Improvement Type: Bridge Preservation Activities 2114

Municipality: Duquesne (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,501

PennDOT Project

Id:

63583

Project Administrator: PennDOT McKeesport Duquesne Bridge

Period Totals: $500 $0 $625 $688 $688

Local/Other: $0 $0 $0 $0 $0

State: $100 $0 $125 $138 $0

Federal: $400 $0 $500 $550 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Located on SR 3004, McLaughlin Run Rd over McLaughlin Run in Bridgeville Borough, Allegheny County.

Project Description: Bridge restoration/replacement on SR 3004, McLaughlin Run Road over McLaughlin Run in Bridgeville Borough, Allegheny County.

Improvement Type: Bridge Replacement 3004

Municipality: Bridgeville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $17,000

PennDOT Project

Id:

63558

Project Administrator: PennDOT McLaughlin Run Rd #2

Period Totals: $0 $3,750 $2,500 $3,750 $7,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $750 $500 $750 $0

Federal: $0 $3000 $2000 $3000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 14: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,700

PennDOT Project

Id:

73055

Period Totals: $1,700 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1700 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Located on SR 3035, Weyman Road Bridge over Saw Mill Run in Whitehall Borough, Allegheny County.

Project Description: Bridge replacement on SR 3035, Weyman Road Bridge over Saw Mill Run in Whitehall Borough, Allegheny County.

Improvement Type: Bridge Replacement 3035

Municipality: Whitehall (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,787

PennDOT Project

Id:

73051

Project Administrator: PennDOT SR 3035/Weyman Br ov Saw Mill Rn

Period Totals: $997 $2,430 $3,090 $3,270 $0

Local/Other: $199 $480 $600 $600 $0

State: $798 $1950 $2490 $2670 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located at various sites in Allegheny County.

Project Description: (Sponsor = Allegheny County) Bridge Reserve Line Item for Allegheny County owned bridges. For rehabilitation/replacement of small bridges using state and local funding for various

sites (TBD) in Allegheny County.

Improvement Type: Bridge Replacement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

69839

Project Administrator: Allegheny County Alleg. Co Local Br. (S/L)

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1000 $0 $0 $0 $0

Project Description: Bridge preservation on SR 4025, Sewickley Bridge, over the Ohio River in Sewickley Borough and Moon Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/13/20 Estimated Construction Bid Date: 2/13/20

Location: Located on SR 4025, Sewickley Bridge, over the Ohio River in Sewickley Borough and Moon Township, Allegheny County.

Improvement Type: Bridge Preservation Activities 4025

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,865

PennDOT Project

Id:

69076

Project Administrator: PennDOT Sewickley Bridge Preservation

Period Totals: $80 $1,785 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 15: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$1350

$0

Title:

State Route:

2025 - 2028

$4359

$8454

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various municipalities within Allegheny, Beaver, and Lawrence Counties,

Improvement Type: Slides Correction 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$1,361

Total FFY 2021-2032 Cost $25,118

PennDOT Project

Id:

75669

Project Administrator: PennDOT Slide Line Item

Period Totals: $2,338 $2,807 $1,136 $4,663 $12,813

Local/Other: $0 $0 $0 $0 $0

State: $0 $150 $541 $3349 $233

Federal: $2338 $2657 $595 $1314 $1128

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Allegheny County, Various Municipalities

Project Description: Betterment Reserve Line Item. - Design & construction within Allegheny County. Mill and resurface roadway. Minor upgrades to drainage and guide rail. Potential 2017 betterment projects

are SR 837 (2nd St to Rankin Br in West Mifflin), SR 2040 (Curry Hollow Center to Keenan Road, in Pleasant Hills), SR 885 (Clairton Rd to Lebanon Road in West Mifflin), SR 28 (Gen

Robinson to East Ohio St in City of Pittsburgh) and 2017 ADA curb ramp in various routes, in Allegheny County.

Improvement Type: Restoration 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,950

PennDOT Project

Id:

75341

Project Administrator: PennDOT Betterment Reserve Allegheny

Period Totals: $250 $0 $350 $0 $1,350

Local/Other: $0 $0 $0 $0 $0

State: $250 $0 $350 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/27

Location: Located on PA 28 over Yutes Run in Springdale Township, Allegheny County

Project Description: Bridge Replacement on PA 28 over Yutes Run in Springdale Township, Allegheny County

Improvement Type: Bridge Deck Replacement 28

Municipality: Springdale (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $35

PennDOT Project

Id:

74255

Project Administrator: PennDOT PA 28 over Yutes Run

Period Totals: $35 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $35 $0 $0 $0 $0

Project Description: Bridge replacement on SR 4017 (Wetzel Road bridge) over Little Pine Creek in Shaler Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/11/19 Estimated Construction Bid Date: 4/11/19

Location: Located on SR 4017 (Wetzel Road) over Little Pine Creek in Shaler Township

Improvement Type: Bridge Replacement 4017

Municipality: Shaler (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Project Administrator: PennDOT 4017 ov Little Pine Creek

Page 16: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: SPC 10 County Region - Includes District 10, 11 and 12

Project Description: SPC regional Safety Reserve Line Item- Funds are to be used on a highway safety improvement project . A highway safety improvement project is any strategy, activity or project on a

public road that is consistent with the data-driven State Strategic Highway Safety Plan (SHSP) and corrects or improves a hazardous road location or feature or addresses a highway safety

problem.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,451

PennDOT Project

Id:

76430

Project Administrator: PennDOT SPC Reg. Safety Line Item

Period Totals: $4,551 $900 $0 $0 $0

Local/Other: $228 $125 $0 $0 $0

State: $683 $375 $0 $0 $0

Federal: $3640 $400 $0 $0 $0

Project Description: (Sponsor = Allegheny County) Bridge full replacement on truss bridge carrying Bell Avenue over O'Connell Boulevard including approach pavement, drainage, street lighting

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/16/20 Estimated Construction Bid Date: 4/16/20

Location: (Dookers Hollow Bridge) carrying Bell Avenue over O'Connell Boulevard including approach pavement, drainage, street lighting

Improvement Type: Bridge Replacement 7449

Municipality: North Braddock (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $24,602

PennDOT Project

Id:

76393

Project Administrator: Allegheny County Dooker's Hollow Br (DK01)

Period Totals: $5,351 $6,251 $7,500 $5,500 $0

Local/Other: $268 $313 $375 $275 $0

State: $803 $938 $1125 $825 $0

Federal: $4280 $5000 $6000 $4400 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/16/21

Location: Bridge carrying 6th Street over the Allegheny River and 10th Street bypass. The bridge intersects with Fort Duquesne Boulevard, in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = Allegheny County) Repair deteriorated steel and concrete, sandblast clean and spot paint the rusted areas of the substructure and interior surfaces of the stiffening girders on the

structure carrying 6th Street over the Allegheny River and the 10th Street Bypass in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

76388

Project Administrator: Allegheny County 6th Street Bridge Rehab

Period Totals: $0 $400 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $400 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Slide reserve for land slide remediation Districtwide at various municipalities in Allegheny, Beaver, and Lawrence Counties.

Page 17: Project Costs(In Thousands)

$41344

$0

$0

Title:

State Route:

2025 - 2028

$4800

$1200

$0

Title:

State Route:

2025 - 2028

$24689

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $175

Period Totals: $175 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $175 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge Replacement on SR 0051, Island Avenue over filled in spandrel arch in Stowe Township, Allegheny County. 200 feet west of Fleming Park Bridge.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 11/7/19 Estimated Construction Bid Date: 11/7/19

Location: Located on SR 0051, Island Avenue over filled in spandrel arch in Stowe Township, Allegheny County. 200 feet west of Fleming Park Bridge.

Improvement Type: Bridge Removal 51

Municipality: Stowe (TWP) Air Quality Status: Non-Significant: Not included in regional conformity analysis

$24,689

Total FFY 2021-2032 Cost $74,066

PennDOT Project

Id:

78176

Project Administrator: PennDOT Island Avenue Bridge

Period Totals: $6,172 $6,172 $6,172 $6,172 $24,689

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $6172 $6172 $6172 $6172 $24689

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Port Authority of Allegheny County

Project Description: (Sponsor = PAAC) Replace buses from within existing fleet that have reached their useful life, no expansion to fleet. Procure approximately 19 40' Low Floor Clean Diesel buses per year,

or 11 60' Articulated Clean Diesel buses per year. The type of bus to be procured each year is based upon fleet replacement schedule.

Improvement Type: Miscellaneous 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $16,714

PennDOT Project

Id:

77273

Project Administrator: Port Authority of Allegheny County PAAC Bus Procurement

Period Totals: $4,348 $595 $2,246 $3,525 $6,000

Local/Other: $0 $0 $0 $0 $0

State: $2596 $323 $872 $641 $0

Federal: $1752 $272 $1374 $2884 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Allegheny County

Project Description: Bridge Reserve - Improve structurally deficient bridges - scoping, design, repair, and painting. Within various municipalities, Allegheny County Bridges.

Improvement Type: Bridge Rehabilitation 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$41,346

Total FFY 2021-2032 Cost $118,509

PennDOT Project

Id:

76458

Project Administrator: PennDOT Bridge - Allegheny County

Period Totals: $4,811 $10,336 $10,336 $10,336 $41,344

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $4811 $10336 $10336 $10336 $41346

Page 18: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$1000

$0

Title:

State Route:

2025 - 2028

$3000

$9000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 837

$0

Total FFY 2021-2032 Cost $7,000

PennDOT Project

Id:

78441

Project Administrator: PennDOT Eighth Ave ov Homestead Run

Period Totals: $1,000 $1,000 $2,500 $2,500 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $1000 $2500 $2500 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/3/22

Location: SR 4070, Wildwood Road over Buffalo Pittsburgh Railroad in Hampton Township, Allegheny County., 1.5 miles west of SR 8.

Project Description: Superstructure replacement on SR 4070, Wildwood Road over Buffalo Pittsburgh Railroad in Hampton Township, Allegheny County.

Improvement Type: Bridge Rehabilitation 4070

Municipality: Hampton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$8,000

Total FFY 2021-2032 Cost $20,650

PennDOT Project

Id:

78427

Project Administrator: PennDOT Wildwood Rd over BP RR

Period Totals: $0 $0 $650 $0 $12,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $650 $0 $0

Federal: $0 $0 $0 $0 $8000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/25

Location: Located on SR 2112, Electric Avenue over Falls Run in East Pittsburgh and Turtle Creek Boroughs, Allegheny County

Project Description: Bridge restoration/replacement on SR 2112, Electric Avenue over Falls Run in East Pittsburgh and Turtle Creek Boroughs, Allegheny County.

Improvement Type: Bridge Replacement 2112

Municipality: North Braddock (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

78232

Project Administrator: PennDOT Electric Ave ov Falls Run

Period Totals: $0 $250 $0 $350 $1,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $250 $0 $350 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/15/26

Location: Located on SR 2070, Indiana Drive over Small Stream in , Penn Hills Township, Allegheny County,

Project Description: Bridge replacement on SR 2070, Indiana Drive over Small Stream in Penn Hills Township, Allegheny County

Improvement Type: Bridge Replacement 2070

Municipality: Penn Hills (TWP) Air Quality Status: AQ Conformity Does Not Apply

Total FFY 2021-2032 Cost $175

PennDOT Project

Id:

78231

Project Administrator: PennDOT Indiana Drive Culvert

Page 19: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: Carries Stotler Road over Little Plum Creek in Plum Borough, Allegheny County

Project Description: Bridge replacement on Stotler Road over Little Plum Creek in Plum Borough, Allegheny County

Improvement Type: Bridge Replacement 7466

Municipality: Plum (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,800

PennDOT Project

Id:

81710

Project Administrator: Allegheny County PM06 Plum Creek #6

Period Totals: $1,800 $0 $0 $0 $0

Local/Other: $360 $0 $0 $0 $0

State: $1440 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge Replacement on McClelland Road over Deer Creek in Indiana Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 5/23/19 Estimated Construction Bid Date: 5/23/19

Location: Carries McClelland Road over Deer Creek in Indiana Township, Allegheny County

Improvement Type: Bridge Replacement 7209

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,100

PennDOT Project

Id:

79895

Project Administrator: Allegheny County DE09 Deer Creek Br #9

Period Totals: $1,100 $0 $0 $0 $0

Local/Other: $220 $0 $0 $0 $0

State: $880 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/3/22

Location: Carries McClaren Road (formerly Cliff Mine Road) over McClarens Run in Findlay Township, Allegheny County

Project Description: Bridge replacement on McClaren Road (formerly Cliff Mine Road) over McClarens Run in Findlay Township, Allegheny County.

Improvement Type: Bridge Replacement 7203

Municipality: Findlay (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,000

PennDOT Project

Id:

79894

Project Administrator: Allegheny County MC07 McClarens Run #7

Period Totals: $0 $0 $1,000 $2,000 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $1000 $2000 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 7/14/22

Location: Located on SR 0837, Eighth Avenue over Homestead Run in, Munhall Borough, Allegheny County.

Project Description: Bridge replacement/restoration on SR 0837 (Eighth Avenue) over Homestead Run in Munhall Borough, Allegheny County.

Municipality: Munhall (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Page 20: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$7252

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $870 $3100 $2800 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/16/21

Location: Located on Penn Avenue from Evaline Street toward East Liberty in City of Pittsburgh, Allegheny County

Project Description: (Sponsor = City of Pittsburgh) Penn Avenue reconstruction, Phase 2 extends from Evaline Street (the eastern end of Phase 1) to Graham Street (eastern limits for Phase 2) in City of

Pittsburgh, Allegheny County. Approximately four blocks.

Improvement Type: Reconstruct 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$7,251

Total FFY 2021-2032 Cost $19,807

PennDOT Project

Id:

83136

Project Administrator: City of Pittsburgh Penn Ave Reconstruction, Ph 2

Period Totals: $637 $1,041 $1,813 $1,813 $7,252

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $637 $1041 $1813 $1813 $7251

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: All of SPC

Project Description: SPC Regional Transportation Alternatives Program (TAP) Line Item Reserve to provide for a variety of alternative transportation projects, including many that were previously eligible

activities under separately funded programs. The Transportation Alternatives Program (TAP) replaces the funding from pre-MAP-21 programs including Transportation Enhancements,

Recreational Trails, Safe Routes to School, and several other discretionary programs, wrapping them into a single funding source.

Improvement Type: Transportation Enhancement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $536

PennDOT Project

Id:

82754

Project Administrator: PennDOT SPC Region TAU Line Item

Period Totals: $536 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $536 $0 $0 $0 $0

Project Description: 1.5 ' - 4.0" Mill and overlay, Binder on US Route 19, Washington Road from Washington County Line to McMurray Road in Upper St Clair, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/28/19 Estimated Construction Bid Date: 2/28/19

Location: Located on SR 19, Washington Road from Washington County Line to McMurray Rd in Upper St Clair, Allegheny County.

Improvement Type: Reconstruct 19

Municipality: Upper St Clair (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $750

PennDOT Project

Id:

81856

Project Administrator: PennDOT US 19, Washington Road

Period Totals: $750 $0 $0 $0 $0

Local/Other: $150 $0 $0 $0 $0

State: $600 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 21: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$28958

$0

$0

$89,359

Total FFY 2021-2032 Cost $118,367

Period Totals: $0 $0 $50 $0 $28,958

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $50 $0 $89359

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: SPC region

Project Description: This is a reserve CMAQ funding line item for cost increases and flexibility in programming (not intended for new projects).

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Non-Significant: Not included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $260

PennDOT Project

Id:

84078

Project Administrator: PennDOT SPC CMAQ Line Item

Period Totals: $260 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $52 $0 $0 $0 $0

Federal: $208 $0 $0 $0 $0

Project Description: Bridge rehabilitation/replacement (4 structures) on SR 885 from intesection with SR 2045 to 1 mile south of the Glenwood Bridge in t City of Pittsburgh, Allegheny County. All four

structures carry SR 885 (Lebanon Rd) over a branch of Streets Run at different locations.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 7/17/14 Estimated Construction Bid Date: 7/17/14

Location: SR 885 from intersection with SR 2045 to 1 mile south of the Glenwood Bridge in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Replacement 885

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,251

PennDOT Project

Id:

84018

Project Administrator: PennDOT Glenwood Interchange Ph 2

Period Totals: $5,251 $0 $0 $0 $0

Local/Other: $263 $0 $0 $0 $0

State: $788 $0 $0 $0 $0

Federal: $4200 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/15/22

Location: Carrying South Negley Avenue over Norfolk Southern Railroad tracks and Port Authority of Allegheny County East Busway, City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Bridge rehabilitation on structure carrying South Negley Avenue over Norfolk Southern Railroad tracks and Port Authority of Allegheny County East Busway

in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $8,456

PennDOT Project

Id:

83137

Project Administrator: City of Pittsburgh South Negley Ave. Bridge

Period Totals: $1,081 $3,875 $3,500 $0 $0

Local/Other: $211 $775 $700 $0 $0

Page 22: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 2058

$0

Total FFY 2021-2032 Cost $1,160

PennDOT Project

Id:

89077

Project Administrator: PennDOT Verona Road Bridge

Period Totals: $560 $600 $0 $0 $0

Local/Other: $112 $120 $0 $0 $0

State: $448 $480 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: The bridge carries Campbells Run Road over Campbells Run and is located. .7 miles west of the underpass to I-79 in Robinson Township, Allegheny County

Project Description: Sponsor = Allegheny County. Superstructure Replacement on the bridge carries Campbells Run Road over Campbells Run and is located. .7 miles west of the underpass to I-79 in Robinson

Township, Allegheny County

Improvement Type: Bridge Rehabilitation 7115

Municipality: Robinson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,675

PennDOT Project

Id:

88401

Project Administrator: Allegheny County CM06 Campbells Run

Period Totals: $1,220 $167 $613 $675 $0

Local/Other: $47 $8 $31 $94 $0

State: $133 $25 $92 $281 $0

Federal: $1040 $134 $490 $300 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Allegheny County

Project Description: (Sponsor = Allegheny County) Bridge preservation reserve line item for Allegheny County local bridges. To be used on structures eligible for federal funding. Bridges TBD.

Improvement Type: Bridge Preservation Activities 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $270

PennDOT Project

Id:

87777

Project Administrator: Allegheny County Allegheny Co Loc Br Pres.

Period Totals: $270 $0 $0 $0 $0

Local/Other: $110 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $160 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: (Sponsor = Allegheny County) Allegheny County Local Line Item for roadway betterment projects (mill and repave roadway, minor upgrades to drainage and guiderail.) Locations TBD.

Project Description: (Sponsor - Allegheny County) Allegheny County local line item for roadway betterment projects (mill and resurface roadway, minor upgrades to drainage and guiderail.) Locations TBD.

Improvement Type: Restoration 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

86487

Project Administrator: Allegheny County Allegheny Cty Local Rdwy

Page 23: Project Costs(In Thousands)

2025 - 2028

$0

$1950

$0

Title:

State Route:

2025 - 2028

$1000

$250

$0

Title:

State Route:

2025 - 2028

$0

$1000

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/10/21

Location: Located on Wexford Run Road over Raymond P Shafer Highway (I-79), Marshall Township Allegheny County.

Project Description: Bridge preservation on Wexford Run Road over Raymond P Shafer Highway in Marshall Township, Allegheny County.

Improvement Type: Bridge Preservation Activities 4053

Municipality: Marshall (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

91596

Project Administrator: PennDOT SR 4053/Wexford Run Road

Period Totals: $0 $250 $0 $350 $1,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $250 $0 $350 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/26

Location: Located on SR 4011, Rochester Road over Branch of Lowries Run in Ross Township, Allegheny County

Project Description: Bridge Replacement on SR 4011, Rochester Road over Branch of Lowries Run in Ross Township, Allegheny County

Improvement Type: Bridge Improvement 4011

Municipality: Ross (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,250

PennDOT Project

Id:

89155

Project Administrator: PennDOT Rochester Road Culvert

Period Totals: $0 $750 $0 $1,250 $1,250

Local/Other: $0 $0 $0 $0 $0

State: $0 $750 $0 $250 $0

Federal: $0 $0 $0 $1000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/14/24

Location: Bridge rehabilitation on State Route 2031, Lincoln Way, over Long Run, 237 feet east of State Route 48 in White Oak Borough

Project Description: Bridge Rehabilitation on SR 2031, Lincoln Way, over Long Run in White Oak Borough, Allegheny County

Improvement Type: Bridge Replacement 2031

Municipality: White Oak (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,450

PennDOT Project

Id:

89129

Project Administrator: PennDOT SR 2031 ov Long Run

Period Totals: $0 $0 $0 $500 $1,950

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $500 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/27

Location: Located on State Route 2058 (Verona Road) over Sandy Creek in Penn Hills Borough, Allegheny County, ,

Project Description: Bridge Replacement or restoration on State Route 2058 (Verona Road) over Sandy Creek in Penn Hills Borough, Allegheny County

Municipality: Penn Hills (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 24: Project Costs(In Thousands)

2025 - 2028

$0

$600

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$12000

$0

Title:

State Route:

Project Description: Interchange improvement including roadway reconstruction, bridge preservation, painting, walls, sound barriers on SR 28 (Allegheny Valley Expressway) at the Highland Park Bridge

Interchange (SR 8050) between Highland Park Bridge Road (SR 1005) and the Delafield Avenue Interchange (SR 8052), including Ramps in the City of Pittsburgh, Fox Chapel, Aspinwall

and Sharpsburg Boroughs and O'Hara Township, Allegheny County.

Project Costs(In Thousands)

Actual Construction Bid Date: 10/1/20 Estimated Construction Bid Date: 10/1/20

Location: Located on PA 28 at the Highland Park Bridge Interchange (S.R. 8050) between Highland Park Bridge Road (S.R. 1005) and the associated ramps (SR 8952 and 8082) in Aspinwall Fox,

Chapel, Sharpsburg and O'Hara and Pittsburgh in Allegheny County.

Improvement Type: Interchange Improvement 28

Municipality: Ohara (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$8,000

Total FFY 2021-2032 Cost $20,250

PennDOT Project

Id:

91845

Project Administrator: PennDOT PA 28/Highland Park Br Interchange

Period Totals: $250 $0 $0 $0 $12,000

Local/Other: $0 $0 $0 $0 $0

State: $250 $0 $0 $0 $8000

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/28

Location: Located on SR 2046 (Streets Run Road) from Prospect Road to Baldwin Road in Baldwin and West Mifflin Boroughs, Allegheny County.

Project Description: Mill & overlay on SR 2046 (Streets Run Road) from Prospect Road to Baldwin Road in Baldwin and West Mifflin Boroughs, Allegheny County.

Improvement Type: Restoration 2046

Municipality: Baldwin (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $4,210

PennDOT Project

Id:

91796

Project Administrator: PennDOT Streets Run Road

Period Totals: $2,710 $1,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2710 $1500 $0 $0 $0

Project Description: Mill and overlay and bridge preservation on US 30 (Lincoln Highway) from Lenox Ave to PA 48 in East Pittsburgh, East McKeesport, Forest Hills, North Braddock and Chalfant Boroughs

and North Versailles Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/16/20 Estimated Construction Bid Date: 1/16/20

Location: Located on US 30 (Lincoln Highway) from Lenox Ave to PA 48 in East Pittsburgh, East McKeesport, Forest Hills, North Braddock and Chalfant Boroughs and North Versailles Township,

Allegheny County.

Improvement Type: Restoration 30

Municipality: East Pittsburgh (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,728

PennDOT Project

Id:

91696

Project Administrator: PennDOT Lincoln Hwy/Lenox Ave - PA 48

Period Totals: $628 $1,250 $1,250 $0 $600

Local/Other: $0 $0 $0 $0 $0

State: $600 $1250 $1250 $0 $0

Federal: $28 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 25: Project Costs(In Thousands)

2025 - 2028

$15814

$0

$0

Title:

State Route:

2025 - 2028

$18398

$3404

$4575

Title:

State Route:

2025 - 2028

$1565

$0

$0

Title:

State Route:

2025 - 2028

$4000

$0

$0

$0Period Totals: $3,000 $3,080 $2,000 $2,000 $4,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3000 $3080 $2000 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/10/21

Location: SR 28 from Delafield Ave northbound ramps to on Harmar Township line in O'Hara Township, Aspinwall and Fox Chapel Borough and City of Pittsburgh, Allegheny County.

Project Description: Mill/resurface, bridge preservation, minor widening for lane reconfiguration, ITS upgrade, green storm water feature, guiderail and signing on SR 28 from Delafield Ave northbound ramps

to on Harmar Township line in O'Hara Township, Aspinwall and Fox Chapel Borough and City of Pittsburgh, Allegheny County.

Improvement Type: Resurface 28

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,694

PennDOT Project

Id:

92274

Project Administrator: PennDOT PA 28: Highland Park - RIDC

Period Totals: $1,509 $520 $100 $0 $1,565

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1509 $520 $100 $0 $0

Project Description: Mill and overlay and bridge preservation on SR 28 SB, from Etna Bypass to Highland Park Bridge in O'Hara Township and Sharpsburg Borough, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/2/20 Estimated Construction Bid Date: 4/2/20

Location: Located on SR 28 SB, from Etna Bypass to Highland Park Bridge in O'Hara Township & Sharpsburg Borough, Allegheny County.

Improvement Type: Restoration 28

Municipality: Sharpsburg (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $28,477

PennDOT Project

Id:

92273

Project Administrator: PennDOT PA 28/Etna Bypass - Highland Pk Br

Period Totals: $1,000 $1,100 $0 $0 $26,377

Local/Other: $50 $55 $0 $0 $0

State: $150 $165 $0 $0 $0

Federal: $800 $880 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/7/24

Location: Located on Boulevard of the Allies over Schenley Park, Bike Trail and CSX Railroad in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Bridge replacement/rehabilitation on Charles Anderson Bridge over Schenley Park, Bike Trail and CSX Railroad in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Replacement 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $57,276

PennDOT Project

Id:

91907

Project Administrator: City of Pittsburgh Charles Anderson Bridge

Period Totals: $11,766 $7,004 $8,895 $13,797 $15,814

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $11766 $7004 $8895 $13797 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 26: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$1878

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $6,777

PennDOT Project

Id:

93419

Project Administrator: Allegheny County MA08 - Glenwood Bridge

Period Totals: $675 $1,100 $3,351 $1,651 $0

Local/Other: $34 $55 $168 $83 $0

State: $101 $165 $503 $248 $0

Federal: $540 $880 $2680 $1320 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/30/23

Location: IV01 in the City of Pittsburgh, PT15 in Bethel Park, PD03 and PD04 in Ross Township, Allegheny County.

Project Description: (Sponsor = Allegheny County) Bridge preservation on Ivory Ave Bridge over I279 in the City of Pittsburgh, Hillcrest Bridge over PAAC LRT in Bethel Park Borough, Bellevue Road and

Jacks Run over I279 in Ross Township, Allegheny County.

Improvement Type: Bridge Preservation Activities 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $7,759

PennDOT Project

Id:

93394

Project Administrator: Allegheny County AL Local BPRS Group 4

Period Totals: $1,208 $500 $2,551 $3,500 $0

Local/Other: $60 $25 $128 $175 $0

State: $181 $75 $383 $525 $0

Federal: $967 $400 $2040 $2800 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/22/23

Location: Patton Street Bridge in Wilmerding Boro, Allegheny County

Project Description: (Sponsor = Allegheny County) Bridge rehabilitation on the Patton Street Bridge (TL13) over Norfolk Southern RR in Wilmerding Borough, Allegheny County. Patton Street Bridge

intersects East McKeesport Road.

Improvement Type: Bridge Rehabilitation 7479

Municipality: Wilmerding (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $24,235

PennDOT Project

Id:

93371

Project Administrator: Allegheny County Patton St Bridge (TL13)

Period Totals: $1,765 $10,038 $7,555 $2,999 $1,878

Local/Other: $0 $0 $0 $0 $0

State: $1650 $7013 $7555 $2999 $0

Federal: $115 $3025 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/13/22

Location: SR 28 - Harmarvillle to Russelton in East Deer, Frazer, Harmar and Springdale Townships, Allegheny County.

Project Description: Mill and overlay, guiderail and minor bridge work on SR 28 - Harmarvillle to Russelton in East Deer, Frazer, Harmar and Springdale Townships, Allegheny County.

Improvement Type: Restoration 28

Municipality: Ohara (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $14,080

PennDOT Project

Id:

92276

Project Administrator: PennDOT PA 28: Harmarville-Russelton

Period Totals: $3,000 $3,080 $2,000 $2,000 $4,000

Page 27: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$5600

$1050

$350

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: The Armstrong Tunnels are located at the intersection of S. 10th Street and 2nd Avenue in the City of Pittsburgh, Allegheny County.

Project Description: (Project Sponsor = Allegheny County) Tunnel restoration for the Armstrong Tunnel, located on South Tenth Street From Second Avenue to Forbes Avenue in the City of Pittsburgh,

Allegheny County.

Improvement Type: Bridge Improvement 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Non-Significant: Not included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $6,827

PennDOT Project

Id:

93922

Project Administrator: Allegheny County AR01 - Armstrong Tunnel

Period Totals: $2,057 $4,219 $551 $0 $0

Local/Other: $104 $211 $28 $0 $0

State: $309 $633 $83 $0 $0

Federal: $1644 $3375 $440 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: Kenmawr Ave Ramp Road over Fleet Street over RR in Rankin Borough, Allegheny County.

Project Description: (Sponsor = Allegheny County) Bridge rehabilitation on Kenmawr Ave Ramp Road over Fleet Street over RR in Rankin Borough, Allegheny County.

Improvement Type: Bridge Rehabilitation 7456

Municipality: Rankin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $8,500

PennDOT Project

Id:

93917

Project Administrator: Allegheny County Kenmawr Ave Ramp

Period Totals: $500 $0 $500 $500 $7,000

Local/Other: $25 $0 $25 $25 $0

State: $75 $0 $75 $75 $0

Federal: $400 $0 $400 $400 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Ramp located on Rankin Bridge to Talbot Ave, over Union RR, in Rankin Borough, Allegheny County.

Project Description: Bridge rehabilitation on Ramp located on Rankin Bridge to Talbot Ave, over Union RR, in Rankin Borough, Allegheny County.

Improvement Type: Bridge Rehabilitation 7456

Municipality: Rankin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,804

PennDOT Project

Id:

93915

Project Administrator: Allegheny County Talbot Ave Ramp Bridge

Period Totals: $1,302 $1,251 $1,251 $0 $0

Local/Other: $66 $63 $63 $0 $0

State: $196 $188 $188 $0 $0

Federal: $1040 $1000 $1000 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/7/21

Location: SR 885 over Monongahela River, Carson Street, NS and CSX rail lines in City of Pittsburgh, Allegheny County

Project Description: (Sponsor = Allegheny) Bridge preservation on Glenwood Bridge from the intersection of Glass Run Road at SR 885 over Monongahela River, Carson Street, NS and CSX rail lines in City

of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 885

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Page 28: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$4274

$0

$0

Title:

State Route:

2025 - 2028

$11680

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: County Wide

Project Description: TMA Assisitance Program, ACTA, OTMA, and PDP TMA, in Pittsburgh Metropolitan area, Allegheny County.

Improvement Type: Administration 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$12,000

Total FFY 2021-2032 Cost $33,944

PennDOT Project

Id:

94882

Project Administrator: TMA's TMA Funding 21-22

Period Totals: $1,264 $3,000 $3,000 $3,000 $11,680

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1264 $3000 $3000 $3000 $12000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: SPC Region

Project Description: (Sponsor = SPC) Reserve for SPC Smart Transportation Initiative. The program is designed to encourage sponsors to plan and implement strategies that link transportation improvements

with land use development strategies to create sustainable, livable communities consistent with policies of the region's adopted plan.

Improvement Type: Miscellaneous 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $14,500

PennDOT Project

Id:

94698

Project Administrator: SPC SPC Smart Tr. Initiative

Period Totals: $500 $1,000 $4,188 $4,538 $4,274

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $500 $1000 $4188 $4538 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/15/23

Location: The limits of the project are on I 376 between the Grant Street interchange (MP 70.5) and the eastern terminus of I-376 at the Pennsylvania Turnpike and US 22 (MP 84.5) in Allegheny

County ,Project Description: The Parkway East Active Traffic Management System (PE ATMS) is an intelligent transportation system (ITS) improvement intended to improve traffic safety and operations on portions of

I-376 in Allegheny County, Pennsylvania.Pennsylvania. The limits of the project are between the Grant Street interchange (MP 70.5) and the eastern terminus of I-376 at the Pennsylvania

Turnpike and US 22 (MP 84.5).

Improvement Type: Safety Improvement 376

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $14,500

PennDOT Project

Id:

94651

Project Administrator: PennDOT I-376/Parkway East A.T.M

Period Totals: $5,750 $5,000 $2,500 $1,250 $0

Local/Other: $1150 $1000 $500 $250 $0

State: $0 $0 $0 $0 $0

Federal: $4600 $4000 $2000 $1000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: (Project Sponsor = Allegheny County) Tunnel restoration for the Armstrong Tunnel, located on South Tenth Street From Second Avenue to Forbes Avenue in the City of Pittsburgh,

Allegheny County.

Page 29: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$46919

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $36 $0 $0 $0 $0

Project Description: (Sponsor = Sport and Exhibition) To construct a new structure (Cap) to span over I-579 for a non-vehicular, pedestrian/bicycle connection from the Lower Hill District to Downtown, in the

City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/28/19 Estimated Construction Bid Date: 3/28/19

Location: Located over I-579, Crosstown Boulevard bounded by Washington Place to the east, Centre Avenue to the south, Chatham Square to the west, and Webster Avenue to the north.

Improvement Type: New Bridge 579

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $57,274

PennDOT Project

Id:

97846

Project Administrator: Sports and Exhibition Authority I-579 "Cap" Project

Period Totals: $0 $4,035 $4,320 $2,000 $46,919

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $4035 $4320 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/12/23

Location: Located on I-376 from the Parkway Center Interchange (SR 8091) to the Fort Pitt Tunnel in the City of Pittsburgh, Allegheny County. Includes US 19 (Banksville Road), US 19/PA 51 at

Woodville ramps and Banksville Interchange Ramps (SR 8075).Project Description: Interchange improvement on I-376 from the Parkway Center Interchange (SR 8091) to the Fort Pitt Tunnel in the City of Pittsburgh, Allegheny County. Includes US 19 (Banksville Road),

PA 51 ramps and Banksville Interchange ramps (SR 8075).

Improvement Type: Interchange Improvement 376

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $6,980

PennDOT Project

Id:

97028

Project Administrator: PennDOT I-376/Banksville Interchange

Period Totals: $480 $3,200 $2,300 $1,000 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $480 $3200 $2300 $1000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: SR 837 from Homestead Bridge to Baldwin Road in West Homestead and Baldwin Boroughs, Allegheny County

Project Description: Concrete reconstruction on SR 837, from Neel Street 1.2 miles to the railroad overpass bridge in West Homestead and Baldwin Boroughs, Allegheny County.

Improvement Type: Concrete Rehabilitation 837

Municipality: West Homestead (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

96559

Project Administrator: PennDOT Seventh Ave/W. Eighth Ave.

Period Totals: $750 $750 $0 $0 $0

Local/Other: $150 $150 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $600 $600 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 30: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,563

Period Totals: $1,563 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1563 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Port Authority of Allegheny County

Project Description: (Sponsor = Port Authority of Allegheny County) Equipping buses with Transit Signal Priority (TSP) activation devices and upgrading traffic signals at 20 intersections and associated

software in the Downtown - Oakland segment of the BRT Corridor.

Improvement Type: Transit System Improvement 0

Municipality: Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

100316

Project Administrator: Port Authority of Allegheny County PAAC-TransitSignalBRT

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Reconstruction of 1,000 feet of roadway on SR 837 (East Carson Street) starting at Smithfield Street then mill and overlay on SR 837, East Carson and West Carson Street starting at

Smithfield Street to Saw Mill Run Boulevard in City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/14/19 Estimated Construction Bid Date: 3/14/19

Location: Located on SR 837, East Carson and West Carson Street starting at Smithfield St to Saw Mill Run Blvd in City of Pittsburgh, Allegheny County.

Improvement Type: Reconstruct 837

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,352

PennDOT Project

Id:

98105

Project Administrator: PennDOT PA 837, Carson Street

Period Totals: $2,500 $4,000 $2,852 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2500 $4000 $2852 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/8/21

Location: Located on PA 65 (Ohio River Blvd) from Emsworth to Sewickley Bridge in Glenfield, Haysville and Glen Osborne Boroughs, Allegheny County.

Project Description: Mill and overlay on SR 65 from Emsworth to Sewickley Bridge in Kilbuck Township, Glenfield, Haysville and Glen Osborne Boroughs, Allegheny County.

Improvement Type: Resurface 65

Municipality: Glenfield (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $36

PennDOT Project

Id:

97934

Project Administrator: PennDOT PA 65/Emsworth to Sewickley Br

Period Totals: $36 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 31: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 3/14/24

Improvement Type: Bridge Replacement 136

Municipality: Forward (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $14,780

PennDOT Project

Id:

100618

Project Administrator: PennDOT PA 136 Rainbow Run ov Beckets

Period Totals: $6,455 $5,579 $2,746 $0 $0

Local/Other: $2400 $0 $0 $0 $0

State: $2600 $3900 $2746 $0 $0

Federal: $1455 $1679 $0 $0 $0

Project Description: bridge rehabilitation, bituminous approach, concrete pavement reconstruction, drainage on SR 50 Millers Run Road and Washington Pike in South Fayette Township & Bridgeville Borough,

Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/18/21 Estimated Construction Bid Date: 3/18/21

Location: SR 0050-A28, Washington Ave, from the intersection of Millers Run Road and Washington Pike South Fayette Township & Bridgeville Borough, Allegheny County.

Improvement Type: Add Lane 50

Municipality: South Fayette (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,050

PennDOT Project

Id:

100607

Project Administrator: PennDOT PA 50/Chartiers Street

Period Totals: $400 $150 $750 $750 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $150 $150 $150 $0

Federal: $0 $0 $600 $600 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/16/23

Location: Located on Jacks Run Road over branch of Jacks Run in White Oak Borough

Project Description: Bridge replacement/restoration on Jacks Run Road over branch of Jacks Run in White Oak Borough, Allegheny County.

Improvement Type: Bridge Replacement 48

Municipality: White Oak (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,400

PennDOT Project

Id:

100606

Project Administrator: PennDOT Jacks Run Rd Br ov Jacks R

Period Totals: $1,340 $2,000 $60 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1340 $2000 $60 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: Located on US 30 over Falls Bridge at Falls Run in Forest Hills Borough, Allegheny County.

Project Description: Design build structure replacement on SR 30, Ardmore Boulevard over Branch of Falls Run in Forest Hills Borough, Allegheny County.

Improvement Type: Bridge Replacement 30

Municipality: Forest Hills (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

100604

Project Administrator: PennDOT Ardmore Blvrd Br ov Br. Falls Run

Page 32: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$14671

$9700

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 3/3/22

Location: Located on PA 910, Gibsonia Road over Rawlins Run, in Indiana Township

Project Description: Bridge rehabilitation on PA 910, Gibsonia Road over Rawlins Run, in Indiana Township, Allegheny County

Improvement Type: Bridge Replacement 910

Municipality: Indiana (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $425

PennDOT Project

Id:

100635

Project Administrator: PennDOT PA 910 over Rawlins Run

Period Totals: $425 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $425 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge preservation/restoration on PA 837, Kennywood Park Bridge over abandoned Union Railroad yard in West Mifflin Borough and City of Duquesne, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 9/17/20 Estimated Construction Bid Date: 9/17/20

Location: Bridge preservation on PA 837, Kennywood Park Bridge over abandoned Union Railroad yard in West Mifflin Borough and City of Duquesne, Allegheny County.

Improvement Type: Bridge Improvement 837

Municipality: Duquesne (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $35,821

PennDOT Project

Id:

100629

Project Administrator: PennDOT Kennywood Park Bridge

Period Totals: $1,500 $1,200 $2,500 $6,250 $24,371

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $1500 $1250 $0

Federal: $1500 $1200 $1000 $5000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 7/13/23

Location: Located on PA 366, Tarentum Bridge over Norfolk Southern Rail and Allegheny River, in Tarentum Borough, Allegheny County.

Project Description: Bridge restoration/replacement on PA 366, Tarentum Bridge over Norfolk Southern Rail and Allegheny River, in Tarentum Borough, Allegheny County.

Improvement Type: Bridge Rehabilitation 366

Municipality: Tarentum (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,950

PennDOT Project

Id:

100624

Project Administrator: PennDOT Tarentum Bridge ov NS RR

Period Totals: $250 $200 $0 $1,500 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $200 $0 $300 $0

Federal: $0 $0 $0 $1200 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: Located on PA 136, Monongahela Road over Beckets Run intersection with State Route 2013, in Forward Township, Allegheny County

Project Description: Bridge replacement on PA 136, Monongahela Road over Beckets Run, intersection with State Route 2013, in Forward Township, Allegheny County.

Page 33: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1600

$400

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0Period Totals: $320 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $320 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge preservation work includes structural steel repairs and superstructure painting on SR 3048 (Noblestown Road) over Robinson Run at the Interstate 79 Interchange and Noblestown

Road in Collier Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/7/18 Estimated Construction Bid Date: 6/7/18

Location: Located on State Route 3048 (Noblestown Road) over Robinson Run at the I79 Interchange and Noblestown Road in Collier Township, Allegheny County

Improvement Type: Bridge Painting 3048

Municipality: Collier (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,800

PennDOT Project

Id:

100690

Project Administrator: PennDOT SR 3048 ov Robinson Run

Period Totals: $0 $250 $550 $0 $2,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $250 $550 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/15/27

Location: PA 978, Clinton Road over North Branch Robinson Run, in North Fayette Township, Allegheny County

Project Description: Bridge replacement/rehabilitation on PA 978, Clinton Road over North Branch Robinson Run, in North Fayette Township, Allegheny County

Improvement Type: Bridge Replacement 978

Municipality: North Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,075

PennDOT Project

Id:

100637

Project Administrator: PennDOT Clinton Rd ov NB Robinson

Period Totals: $575 $1,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $575 $1500 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Bridge replacement on PA 978, Millers Run Road over Dolphin Run, near State Route 3026, in South Fayette Township

Project Description: Bridge replacement or rehabilitation on PA 978, Millers Run Road over Dolphin Run, near State Route 3026, in South Fayette Township, Allegheny County

Improvement Type: Bridge Replacement 978

Municipality: South Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,700

PennDOT Project

Id:

100636

Project Administrator: PennDOT Millers Run ov Dolphin Rn

Period Totals: $500 $1,200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $500 $1200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 34: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$15000

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $2,000

PennDOT Project

Id:

102961

Project Administrator: PennDOT PA 88 & SR 3004 Widening

Period Totals: $1,000 $1,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $1000 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Construction of a roundabout at the intersection of SR 3004, McLaughlin Run Road, and SR 3034, Lesnett/McMillian Road, located in Upper St. Clair Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/27/20 Estimated Construction Bid Date: 2/27/20

Location: Located at the intersection of SR 3004, McLaughlin Run Road, and SR 3034, Lesnett/McMillian Road, located in Upper St. Clair Township, Allegheny County.

Improvement Type: Add Lane 3004

Municipality: Upper St Clair (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $45

PennDOT Project

Id:

100963

Project Administrator: PennDOT McLaughlin Rn Rd@McMillia

Period Totals: $45 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $45 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slide Remediation on Harrison Hollow Road in Lincoln Borough, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 7/12/19 Estimated Construction Bid Date: 7/12/19

Location: Located on Harrison Hollow Road in Lincoln Borough, Allegheny County

Improvement Type: Slides Correction 2023

Municipality: Lincoln (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$10,000

Total FFY 2021-2032 Cost $33,490

PennDOT Project

Id:

100842

Project Administrator: PennDOT Harrison Hollow Road Slide

Period Totals: $490 $2,000 $3,000 $3,000 $15,000

Local/Other: $0 $0 $0 $0 $0

State: $430 $0 $0 $0 $0

Federal: $60 $2000 $3000 $3000 $10000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: Bridge preservation on several ramps on PA 885 & SR 8004 over I-376 in the City of Pittsburgh, Allegheny County

Project Description: Bridge preservation on several ramps on PA 885 & SR 8004 over I-376 in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 8004

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $320

PennDOT Project

Id:

100728

Project Administrator: PennDOT Boulevard of Allies Ramps

Period Totals: $320 $0 $0 $0 $0

Page 35: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$17000

$9000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 5/26/22

Location: Located on SR 3015 (Cochran Mills Road) over Lick Run Creek in Jefferson Hills Boro, Allegheny County.

Improvement Type: Bridge Replacement 3015

Municipality: South Park (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

105451

Project Administrator: PennDOT SR 3015 ov Lick Run Creek

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1000 $0 $0 $0 $0

Project Description: Mill and overlay and minor bridge preservation on US 22, William Penn Highway from PA 48 to the Westmoreland County line in the City of Monroeville, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/28/19 Estimated Construction Bid Date: 2/28/19

Location: US 22, William Penn Highway from PA 48 to the Westmoreland County Line in the City of Monroeville, Allegheny County.

Improvement Type: Restoration 22

Municipality: Monroeville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $33,800

PennDOT Project

Id:

105449

Project Administrator: PennDOT US 22 / PA 48 to Westmoreland Co Line

Period Totals: $1,500 $2,500 $0 $3,800 $26,000

Local/Other: $60 $0 $0 $0 $0

State: $240 $500 $0 $0 $0

Federal: $1200 $2000 $0 $3800 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/11/24

Location: I79 at SR 910 Interchange in Marshall Township, Allegheny County.

Project Description: Interchange widening on I-79 at PA 910 in Marshall Township, Allegheny County.

Improvement Type: Interchange Improvement 79

Municipality: Marshall (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $100

PennDOT Project

Id:

104328

Project Administrator: PennDOT I-79 at PA 910 Interchange

Period Totals: $100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $100 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Widening for turning lanes, including the replacement of two bridges, at the intersection of SR 0088 and SR 3004 in Bethel Park Borough, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 9/12/19 Estimated Construction Bid Date: 9/12/19

Location: SR 88 and SR 3004 Intersection in Bethel Park Boro, Allegheny County.

Improvement Type: Add Turning Lane 88

Municipality: Bethel Park (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Page 36: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

Project Description: Rehabilitation to two retaining walls along I-376 above 2nd Avenue and the Three Rivers Heritage Trail at segment 0711 and 0720 in the City of Pittsburgh, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 11/7/19 Estimated Construction Bid Date: 11/7/19

Location: Located along I-376 above 2nd Avenue and the Three Rivers Heritage Trail at segments 0711 and 0720 in the City of Pittsburgh, Allegheny County.

Improvement Type: Safety Improvement 376

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $75

PennDOT Project

Id:

105465

Project Administrator: PennDOT I-376 Above 2nd Ave Wall Replacement

Period Totals: $55 $20 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $55 $20 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slide remediation on SR 3066 (Steubenville Pike) in North Fayette Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/20/19 Estimated Construction Bid Date: 6/20/19

Location: Located on SR 3066, Steubenville Pike in North Fayette Township, Allegheny County.

Improvement Type: Slides Correction 3066

Municipality: North Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $350

PennDOT Project

Id:

105464

Project Administrator: PennDOT SR 3066, Steubenville Pike Slide Remediation

Period Totals: $350 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $350 $0 $0 $0 $0

Project Description: Slide remediation on SR 4011 (Rochester Road) in McCandless Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 7/9/20 Estimated Construction Bid Date: 7/9/20

Location: Located on SR 4011 Segs. 0150-0160, Rochester Road in McCandless Township, Allegheny County.

Improvement Type: Slides Correction 4011

Municipality: Mccandless (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,205

PennDOT Project

Id:

105461

Project Administrator: PennDOT SR 4011, Rochester Slide Remediation

Period Totals: $705 $1,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $281 $300 $0 $0 $0

Federal: $424 $1200 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Bridge rehabilitation/replacement on SR 3015 (Cochran Mills Road) over Lick Run Creek in Jefferson Hills Borough, Allegheny County.

Page 37: Project Costs(In Thousands)

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1117

$0

$0

Title:

State Route:

2025 - 2028

$3808

$714

$238

$5,000

Total FFY 2021-2032 Cost $12,240

Period Totals: $800 $1,100 $102 $478 $4,760

Local/Other: $40 $55 $6 $24 $250

State: $120 $165 $16 $72 $750

Federal: $640 $880 $80 $382 $4000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/24

Location: Larimer Avenue Bridge over Allegheny Valley Railroad in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Bridge restoration/replacement on Larimer Avenue Bridge over Allegheny Valley Railroad in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$1,200

Total FFY 2021-2032 Cost $3,167

PennDOT Project

Id:

106386

Project Administrator: City of Pittsburgh Larimer Avenue Bridge

Period Totals: $125 $125 $300 $300 $1,117

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Federal: $100 $100 $300 $300 $1200

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located on various routes and counties in Southwestern Pennsylvania Region.

Project Description: (Sponsor = SPC) Act as project manager to advance selected projects that improve multimodal connections and community livability enhancements.

Improvement Type: Transportation Enhancement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,620

PennDOT Project

Id:

106080

Project Administrator: SPC Smart Transportation/TAP Admin

Period Totals: $1,620 $0 $0 $0 $0

Local/Other: $324 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1296 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/16/21

Location: Located in the City of Pittsburgh's South Side along 18th Street.

Project Description: (Sponsor = Pittsburgh) The replacement of five existing signals (at Sarah Street, Jane Street, Mission Street, Arlington Avenue and Brownsville at Bauseman) and the installation of one new

signal at Josephine Street in the City of Pittsburgh's South Side neighborhood along South 18th Street, Allegheny County.

Improvement Type: Existing Signal Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,000

PennDOT Project

Id:

105603

Project Administrator: City of Pittsburgh PGH - South Side Signals

Period Totals: $2,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2000 $0 $0 $0 $0

Page 38: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1500

$0

$750

$0

Total FFY 2021-2032 Cost $5,376

PennDOT Project

Id:

106773

Period Totals: $0 $313 $938 $1,875 $2,250

Local/Other: $0 $63 $188 $375 $0

State: $0 $0 $0 $0 $0

Federal: $0 $250 $750 $1500 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/2/23

Location: Located at various locations in Allegheny, Beaver and Lawrence Counties.

Project Description: (Sponsor = SPC) Signal improvement at various locations in Allegheny, Beaver and Lawrence Counties.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,099

PennDOT Project

Id:

106593

Project Administrator: SPC SPC - Traffic Signal 5

Period Totals: $2,099 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2099 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/6/21

Location: State Route 2040 - Lebanon Church Road- from Bombardier Drive to Buttermilk Hollow Road in Pleasant Hills and West Mifflin Boroughs, Allegheny County.

Project Description: Design and construction of an Adaptive Traffic Signal System along State Route 2040 - Lebanon Church Road- from Bombardier Drive to Buttermilk Hollow Road in Pleasant Hills and

West Mifflin Boroughs, Allegheny County.

Improvement Type: Safety Improvement 2040

Municipality: West Mifflin (BORO) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

106507

Project Administrator: PennDOT Lebanon Church Rd - Adaptive Traffic Signal System

Period Totals: $1,500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1500 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 7/15/21

Location: SR 885, SR 2045, SR 3025, SR 3033, SR 3034, SR 4022 in West Mifflin Borough, City of Pittsburgh, Scott Township, Mt. Lebanon, Bridgeville, Allegheny County and SR 4021 in

Chippewa Township, Beaver County.Project Description: Construct ADA curb ramps on SR 885, SR 2045, SR 3025, SR 3033, SR 3034, SR 4022 in West Mifflin Borough, City of Pittsburgh, Scott Township, Mt. Lebanon, Bridgeville, Allegheny

County and SR 4021 in Chippewa Township, Beaver County.

Improvement Type: Safety Improvement 885

Municipality: West Mifflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Total FFY 2021-2032 Cost $12,240

PennDOT Project

Id:

106388

Project Administrator: PennDOT 2020 ADA Curb Ramp Project

Page 39: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 7/15/21

Location: Various locations

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $170

PennDOT Project

Id:

109353

Project Administrator: PennDOT 2021 ADA Curb Ramp Project

Period Totals: $170 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $170 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Bridge Street crosses the tracks of Norfolk Southern Railroad in Etna Borough and Sharpsburg Borough, Allegheny County (US DOT 510 967 F).

Project Description: Installation of railroad crossing safety improvements where Bridge Street crosses the tracks of Norfolk Southern Railroad in Etna Borough and Sharpsburg Borough, Allegheny County (US

DOT 510 967 F)

Improvement Type: RR Warning Devices 0

Municipality: Etna (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,730

PennDOT Project

Id:

108118

Project Administrator: Norfolk Southern Railroad Bridge Street RR Etna (NS)

Period Totals: $2,730 $0 $0 $0 $0

Local/Other: $630 $0 $0 $0 $0

State: $2100 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: 12,000 acres of Allegheny County owned parks

Project Description: (Sponsor = Allegheny County) Widening the shoulders, paving, signage installation and bike markings at 12,000 acres of Allegheny County owned parks

Improvement Type: Bicycle Facilities/Services 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $5,900

PennDOT Project

Id:

107789

Project Administrator: Allegheny County Parks MTF Pearce Mill Road Paving

Period Totals: $500 $5,400 $0 $0 $0

Local/Other: $50 $2520 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $450 $2880 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/31/22

Location: Liberty Ave from Grant Street to Herron Ave in the City of Pittsburgh, Allegheny County.

Project Description: (sponsor = City of Pittsburgh) new traffic signals, pedestrian accommodations and equipment, new signing and pavement markings on Liberty Avenue from Grant Street to Herron Avenue

in the City of Pittsburgh, Allegheny County. Total length of 1.9 miles.

Improvement Type: Safety Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

Project Administrator: City of Pittsburgh Liberty Ave

Page 40: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/3/22

Location: Located on SR 60, Steubenville Pike, 2 miles east of I-79 exit in Robinson Township/City of Pittsburgh, Allegheny County.

Project Description: Bridge Preservation with minimal roadway approach work on SR 60, Steubenville Pike, 2 miles east of I-79 exit in Robinson Township/City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 60

Municipality: Robinson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,974

PennDOT Project

Id:

109510

Project Administrator: PennDOT Thornburg Bridge

Period Totals: $6,174 $800 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $6174 $800 $0 $0 $0

Project Description: Milling and paving of bituminous surface, guide rail updates, drainage upgrades, inlet adjustments, base repairs as needed, mountable curb repairs as needed, ADA curb ramps, replacement

of the compression seal between backwalls and the approach slabs, spot painting of the bridge superstructure and minor repairs on SR 19, Washington Road from McMurray Road to

Connor Road in Upper St. Clair, Mount Lebanon and Bethel Park Townships, Allegheny County. Also include SR 3038 from Iroquois Park to Fresh Market.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/4/21 Estimated Construction Bid Date: 3/4/21

Location: Located on SR 19, Washington Road from McMurray Road to Connor Road in Upper St. Clair, Mount Lebanon and Bethel Park Townships, Allegheny County

Improvement Type: Resurface 19

Municipality: Upper St Clair (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,580

PennDOT Project

Id:

109388

Project Administrator: PennDOT Washington Road

Period Totals: $80 $0 $1,500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $80 $0 $1500 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/3/22

Location: Various locations

Project Description: Construct ADA curb ramps from the previous year District 11 group project locations.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,020

PennDOT Project

Id:

109357

Project Administrator: PennDOT 2022 ADA Curb Ramp Project

Period Totals: $66 $954 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $66 $954 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Construct ADA curb ramps from the previous year District 11 group project locations.

Page 41: Project Costs(In Thousands)

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $910

Period Totals: $710 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $710 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Located on SR 1032, Oak Manor Road, at segment 70 in Harrison Township, Allegheny County.

Project Description: Slide correction on SR 1032, Oak Manor Road, at segment 70 in Harrison Township, Allegheny County.

Improvement Type: Slides Correction 1032

Municipality: Harrison (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $300

PennDOT Project

Id:

109533

Project Administrator: PennDOT Oak Manor Road Slide

Period Totals: $0 $300 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/15/22

Location: Install all weather pavement markers in various locations district 11

Project Description: Install all weather pavement markers in various locations within District 11.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $300

PennDOT Project

Id:

109518

Project Administrator: PennDOT AWPM 2022

Period Totals: $300 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $300 $0 $0 $0 $0

Project Description: Install all weather pavement markers in various locations within District 11.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/18/21 Estimated Construction Bid Date: 3/18/21

Location: Install all weather pavement markers in various locations district 11

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $8,200

PennDOT Project

Id:

109517

Project Administrator: PennDOT AWPM 2021

Period Totals: $800 $2,200 $3,000 $2,200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $2000 $3000 $2200 $0

Federal: $800 $200 $0 $0 $0

Page 42: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$5200

$1300

$0

Title:

State Route:

2025 - 2028

$701

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 910

$0

Total FFY 2021-2032 Cost $2,050

PennDOT Project

Id:

109558

Project Administrator: PennDOT PA 910 over Deer Creek 2

Period Totals: $550 $750 $750 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $550 $750 $750 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/6/21

Location: Located on SR 910, Gibsonia Road over Deer Creek in West Deer Township

Project Description: Deck replacement on SR 910, Gibsonia Road over Deer Creek in West Deer Township, Allegheny County

Improvement Type: Bridge Deck Replacement 910

Municipality: West Deer (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $953

PennDOT Project

Id:

109557

Project Administrator: PennDOT PA 910 over Deer Creek 3

Period Totals: $252 $0 $0 $0 $701

Local/Other: $0 $0 $0 $0 $0

State: $141 $0 $0 $0 $0

Federal: $111 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/50

Location: Located on SR 19, Banksville Road from McMonagle Street to Crane Avenue in the City of Pittsburgh, Allegheny County.,

Project Description: Traffic adaptive signal system on US Route 19, Banksville Road from McMonagle Street to Crane Avenue in the City of Pittsburgh, Allegheny County.

Improvement Type: Existing Signal Improvement 19

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$28,500

Total FFY 2021-2032 Cost $35,700

PennDOT Project

Id:

109556

Project Administrator: PennDOT US 19/Banksville Rd Adaptive Signal

Period Totals: $0 $0 $700 $0 $6,500

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $140 $0 $0

Federal: $0 $0 $560 $0 $28500

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/27

Location: Located on SR 1005 (Highland Park) in Sharpsburg Borough, Allegheny County

Project Description: Bridge preservation on SR 1005 (Highland Park) over Allegheny River, Norfolk Southern Railway and AVR Railroad in Sharpsburg Borough, Allegheny County.

Improvement Type: Bridge Preservation Activities 1005

Municipality: Sharpsburg (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Total FFY 2021-2032 Cost $910

PennDOT Project

Id:

109549

Project Administrator: PennDOT Highland Park Bridge

Page 43: Project Costs(In Thousands)

2025 - 2028

$280

$70

$0

Title:

State Route:

2025 - 2028

$1360

$255

$85

Title:

State Route:

2025 - 2028

$10500

$2400

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 3/31/22

Location: Located at approximately 126 intersections along eight corridors within the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Signal improvement at approximately 126 intersections along eight corridors within the City of Pittsburgh, Allegheny County.

Improvement Type: Intersection Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $13,650

PennDOT Project

Id:

109691

Project Administrator: City of Pittsburgh Smart Spines (ATCMTD)

Period Totals: $150 $200 $200 $200 $12,900

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $150 $200 $200 $200 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/25/50

Location: PA 50, from Mayer Street to Great Southern Shopping Center and from I-79 to Thoms Run Road in Collier Township, Allegheny County.

Project Description: Roadway widening for additional lanes and intersection improvement of PA 50/I-79, from Mayer Street to Great Southern Shopping Center and from I-79 to Thoms Run Road in Collier

Township, Allegheny County.

Improvement Type: Intersection Improvement 50

Municipality: Collier (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,602

PennDOT Project

Id:

109640

Project Administrator: PennDOT PA 50: I-79 to Thoms Run

Period Totals: $300 $102 $0 $1,500 $1,700

Local/Other: $15 $6 $0 $75 $0

State: $45 $16 $0 $225 $0

Federal: $240 $80 $0 $1200 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/11/24

Location: Located on SR 4165 (Glenfield Viaduct Bridge) over the Norfolk Southern Railroad in Glenfield Boro, Allegheny County

Project Description: Bridge Preservation on SR 4165 (Glenfield Viaduct Bridge) over the Norfolk Southern Railroad in Glenfield Boro, Allegheny County.

Improvement Type: Bridge Preservation Activities 4165

Municipality: Glenfield (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,850

PennDOT Project

Id:

109570

Project Administrator: PennDOT Glenfield Viaduct Bridge

Period Totals: $500 $125 $625 $1,250 $350

Local/Other: $0 $0 $0 $0 $0

State: $100 $25 $125 $250 $0

Federal: $400 $100 $500 $1000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Location: Located on SR 910 over Deer Creek in West Deer Township, Allegheny County

Project Description: Bridge replacement on SR 910 over Deer Creek in West Deer Township, Allegheny County

Municipality: West Deer (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 44: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1430

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $63 $63 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/7/23

Location: Located on SR 4003, McKnight Road, from East Street to Babcock Boulevard in the City of Pittsburgh, Allegheny County

Project Description: Mill and overlay on SR 4003, McKnight Road, from East Street to Babcock Boulevard in the City of Pittsburgh, Allegheny County

Improvement Type: Resurface 4003

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $5,580

PennDOT Project

Id:

110353

Project Administrator: PennDOT SR 4003 - East Street to Babcock Blvd

Period Totals: $0 $150 $2,000 $2,000 $1,430

Local/Other: $0 $0 $0 $0 $0

State: $0 $150 $0 $0 $0

Federal: $0 $0 $2000 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: Located on PA 130, from Spring Street to Brown Ave in Turtle Creek, Pitcairn and Wilmerding Boro's, Allegheny County

Project Description: Resurfacing on PA 130, from Spring Street to Brown Ave in Turtle Creek, Pitcairn and Wilmerding Boro's, Allegheny County

Improvement Type: Resurface 130

Municipality: Turtle Creek (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $31

PennDOT Project

Id:

110061

Project Administrator: PennDOT PA 130, Tri Boro Expressway

Period Totals: $31 $0 $0 $0 $0

Local/Other: $6 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $25 $0 $0 $0 $0

Project Description: Regional Traffic Signal Program-Cycle 3 project in the City of Pittsburgh, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 12/12/19 Estimated Construction Bid Date: 12/12/19

Location: City of Pittsburgh

Improvement Type: Traffic System Management 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $14,088

PennDOT Project

Id:

109737

Project Administrator: SPC SINC - City of Pittsburgh

Period Totals: $14,088 $0 $0 $0 $0

Local/Other: $7088 $0 $0 $0 $0

State: $7000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 45: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,400

Period Totals: $0 $1,400 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $352 $0 $0 $0

Federal: $0 $1048 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located on SR 1001, Freeport Road, from 8th Street in Sharpsburg to Powers Run Road in O'Hara Township, Allegheny County.

Project Description: Design and Construction of a Traffic Adaptive Signal System along SR 1001 - Freeport Road from 8th Street in Sharpsburg to Powers Run Road in O'Hara Township, Allegheny County.

Improvement Type: Existing Signal Improvement 1001

Municipality: Sharpsburg (BORO) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,980

PennDOT Project

Id:

110372

Project Administrator: PennDOT SR 1001-Freeport Rd-Adaptive Traffic Signal System

Period Totals: $0 $1,980 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $396 $0 $0 $0

Federal: $0 $1584 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/23

Location: Located on SR 51, Clairton Blvd, from Peters Creek Road to Provost Road in the City of Pittsburgh, Baldwin, Brentwood, Jefferson, Pleasant Hills and Whitehall Boroughs, all within

Allegheny County.Project Description: Design and Construction of an Adaptive Traffic Signal System along SR 51, Clairton Boulevard, from Peters Creek Road to Provost Road in the City of Pittsburgh, Baldwin, Brentwood,

Jefferson, Pleasant Hills and Whitehall Boroughs, all within Allegheny County.

Improvement Type: Existing Signal Improvement 51

Municipality: Jefferson (BORO) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $80

PennDOT Project

Id:

110369

Project Administrator: PennDOT PA 51-Clairton Blvd-Adaptive Traffic Signal System

Period Totals: $0 $80 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $80 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/10/23

Location: Various locations

Project Description: Construct ADA curb ramps from the previous year District 11 group project locations.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $126

PennDOT Project

Id:

110357

Project Administrator: PennDOT 2023 ADA Curb Ramp Project

Period Totals: $63 $63 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 46: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Slides Correction 28

$0

Total FFY 2021-2032 Cost $351

PennDOT Project

Id:

110617

Project Administrator: PennDOT Noble Street Slide

Period Totals: $351 $0 $0 $0 $0

Local/Other: $71 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $280 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located in numerous areas including Moon, Findlay, Robinson and North Fayette Townships, all within Allegheny County

Project Description: Expansion of RideACTA Last Mile Service in numerous areas including Moon, Findlay, Robinson and North Fayette Townships, all within Allegheny County.

Improvement Type: Safety Improvement 0

Municipality: Robinson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $720

PennDOT Project

Id:

110381

Project Administrator: Airport Corridor Transportation Association Expansion of RideACTA Last Mile Service

Period Totals: $360 $360 $0 $0 $0

Local/Other: $60 $60 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $300 $300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located in numerous areas including Downtown Pittsburgh, Oakland, Lawrenceville, East Liberty and Hazelwood.

Project Description: Travel demand management (TDM) encompasses a diverse set of activities that focus on physical assets and services that provide real-time information on network performance and support

better decisionmaking for travelers choosing modes, times, routes, and locations. Public education, outreach, marketing, and promotion activities in numerous areas including Downtown

Pittsburgh, Oakland, Lawrenceville, East Liberty and Hazelwood.

Improvement Type: Planning 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,250

PennDOT Project

Id:

110378

Project Administrator: City of Pittsburgh TDM Coordinator and Outreach Program

Period Totals: $0 $1,250 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $250 $0 $0 $0

Federal: $0 $1000 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/7/22

Location: Located on SR 3069, Washington Road/West Liberty Avenue from Cochran Road to the Liberty Tunnel in Dormont, Mt. Lebanon and City of Pittsburgh, Allegheny County.

Project Description: Design and Construction of a Traffic Adaptive Signal System along SR 3069 - Washington Road/West Liberty Avenue from Cochran Road to the Liberty Tunnel in Dormont, Mt. Lebanon

and City of Pittsburgh, Allegheny County.

Improvement Type: Existing Signal Improvement 3069

Municipality: Mt Lebanon (TWP) Air Quality Status: Significant: Included in regional conformity analysis

PennDOT Project

Id:

110374

Project Administrator: PennDOT SR 3069 -Wash Rd/W. Liberty Ave Adaptive Traffic S

Page 47: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 5/26/22

Location: City of Pittsburgh

Project Description: (Sponsor = City of Pittsburgh) City of Pittsburgh hired contractor to review and assist with coordinating Safety Routes to School routes.

Improvement Type: Transportation Enhancement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Non-Significant: Not included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $980

PennDOT Project

Id:

111422

Project Administrator: City of Pittsburgh Pittsburgh SRTS Coordinator TAP

Period Totals: $0 $400 $580 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $400 $580 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: City of Pittsburgh, Allegheny County

Project Description: (Sponsor = City of Pittsburgh) enhance pedestrian safety and access by constructing sidewalks within critical gaps throughout the City of Pittsburgh, Allegheny County

Improvement Type: Transportation Enhancement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $830

PennDOT Project

Id:

111408

Project Administrator: City of Pittsburgh Critical Sidewalk Gap TAP

Period Totals: $400 $430 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $400 $430 $0 $0 $0

Project Description: (Sponsor = Allegheny County Department of Public Works) Transportation Enhancement on Spring Hill Road between Freeport Road and Karns Road in Harrision Township, Allegheny

County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: Located on Spring Hill Road between Freeport Road and Karns Road in Harrision Township, Allegheny County.

Improvement Type: Transportation Enhancement 0

Municipality: Harrison (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,785

PennDOT Project

Id:

110648

Project Administrator: Allegheny County Spring Hill Road Bike and Pedestrian TAP

Period Totals: $1,785 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1785 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slide remediation on SR 28 above Noble Street in in Sharpsburg Borough and O'Hara Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/2/20 Estimated Construction Bid Date: 4/2/20

Location: Located on SR 28 above Noble Street in Sharpsburg Borough and O'Hara Township, Allegheny County

Municipality: Ohara (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 48: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $63 $63 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/23

Location: Located on SR 51 (Clairton Boulevard) in Pleasant Hills Boro, Allegheny County

Project Description: Mill and overlay on SR 51 (Clairton Boulevard) in Pleasant Hills Boro, Allegheny County.

Improvement Type: Restoration 51

Municipality: Pleasant Hills (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $6,413

PennDOT Project

Id:

111571

Project Administrator: PennDOT SR 51, Clairton Boulevard

Period Totals: $808 $1,703 $3,902 $0 $0

Local/Other: $808 $1703 $3902 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/15/23

Location: SR 3109, University Blvd from Port Vue Drive to Rouser Road in Moon Township, Allegheny County

Project Description: (Sponsor = Moon Township) Upgrade existing .25-miles of Port Vue Drive and construct .3-miles missing segment of Port Vue Drive to complete connection between University Boulevard

and Rouser Road, in Moon Township, Allegheny County

Improvement Type: Restoration 3109

Municipality: Moon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $11,687

PennDOT Project

Id:

111517

Project Administrator: Moon Township MTA Rouser Road Connector

Period Totals: $1,191 $1,336 $9,160 $0 $0

Local/Other: $1191 $1336 $9160 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/23

Location: Stevenson Mill Road from Moon Clinton Road to Port Authority Drive at University Blvd, in Moon Township, Allegheny County

Project Description: (Sponsor = Moon Township) upgrade existing Stevenson Mill Road and construct 1.0 mile missing segment of Stevenson Mill Road to connect with University Blvd in Moon Township,

Allegheny County.

Improvement Type: Restoration 3109

Municipality: Moon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $464

PennDOT Project

Id:

111516

Project Administrator: Moon Township MTA Stevenson Mill Connector

Period Totals: $0 $464 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $464 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 49: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $850

PennDOT Project

Id:

112428

Period Totals: $850 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $0 $0 $0 $0

Federal: $600 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: Located on SR 2017, Blythedale Road at segment 90 in Elizabeth Township, Allegheny County

Project Description: Slides correction on SR 2017, Blythedale Road at segment 90 in Elizabeth Township, Allegheny County

Improvement Type: Slides Correction 2017

Municipality: Elizabeth (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $950

PennDOT Project

Id:

112417

Project Administrator: PennDOT SR 2017, Blythedale Road Slide

Period Totals: $400 $550 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $550 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Located on SR 2035, McKee Road in White Oak Boro, Allegheny County

Project Description: Slide correction on SR 2035, McKee Road in White Oak Boro, Allegheny County

Improvement Type: Slides Correction 2035

Municipality: White Oak (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

112404

Project Administrator: PennDOT SR 2035 McKee Road Slide

Period Totals: $0 $200 $300 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $300 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/13/22

Location: Located within the City of Pittsburgh, Allegheny County

Project Description: Stormwater management in the City of Pittsburgh, Allegheny County

Improvement Type: Drainage Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Non-Significant: Not included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $126

PennDOT Project

Id:

112115

Project Administrator: City of Pittsburgh MS-4 Storm Water Control

Period Totals: $63 $63 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 50: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 1/27/22

Location: SR 4003/4016, Ross Township, Allegheny County

Improvement Type: Intersection Improvement 4003

Municipality: Ross (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $483

PennDOT Project

Id:

112728

Project Administrator: Ross Township MTF Siebert Road & McKnight Road Improvement

Period Totals: $483 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $483 $0 $0 $0 $0

Project Description: Install 3 DMS signs on I-79, from I-376 to Washington County Line in City of Pittsburgh, Carnegie and Bridgeville Boroughs and Collier Township, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/18/20 Estimated Construction Bid Date: 6/18/20

Location: Located on I-79, from I-376 to Washington County Line in City of Pittsburgh, Carnegie and Bridgeville Boroughs and Collier Township, Allegheny County

Improvement Type: Variable Message Signs 79

Municipality: Bridgeville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

112621

Project Administrator: PennDOT I-79 South DMS Installation

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: Located on SR 3059, North Road at segment 30 in North Fayette Township, Allegheny County

Project Description: Slides correction on SR 3059, North Road at segment 30 in North Fayette Township, Allegheny County

Improvement Type: Slides Correction 3059

Municipality: North Fayette (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,629

PennDOT Project

Id:

112429

Project Administrator: PennDOT SR 3059 North Road Slide

Period Totals: $1,190 $439 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1190 $439 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slides correction on SR 4032, Little Sewickley Creek Road at segment 0010 - 0030 in Edgeworth Borough and Leet Township, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/4/21 Estimated Construction Bid Date: 3/4/21

Location: Located on SR 4032, Little Sewickley Creek Road at segment 0010 - 0030 in Edgeworth Borough and Leet Township, Allegheny County

Improvement Type: Slides Correction 4032

Municipality: Edgeworth (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Project Administrator: PennDOT SR 4032, Little Sewickley Creek Road Slide

Page 51: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: Located on SR 28 from the Junction of PA 28/I-579/I-279 near the Heinz Plant to the PA 910 Harmar Exit in City of Pittsburgh, Millvale, Shaler, Etna, Sharpsburg, Aspinwall, O'Hara,

Blawnox and Harmar Township, Allegheny CountyProject Description: Traffic system management on SR 28 from the Junction of PA 28/I-579/I-279 near the Heinz Plant to the PA 910 Harmar Exit in City of Pittsburgh, Millvale, Shaler, Etna, Sharpsburg,

Aspinwall, O'Hara, Blawnox and Harmar Township for removal of disabled or accident vehicles.

Improvement Type: Traffic System Management 28

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,800

PennDOT Project

Id:

113508

Project Administrator: PennDOT Freeway Service Patrol & Traffic Control

Period Totals: $3,325 $475 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3325 $475 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: SR 30 from Brinton Road in Wilkinsburg to Bevington Road in Forest Hills, Allegheny County.

Project Description: Milling and resurfacing on SR 30 (Ardmore Blvd) from Brinton Road in Wilkinsburg to Bevington Road in Forest Hills, Allegheny County.

Improvement Type: Restoration 30

Municipality: Wilkinsburg (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

113415

Project Administrator: PennDOT Ardmore Blvd/Brinton Road - Bevington Road

Period Totals: $1,600 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1600 $0 $0 $0 $0

Project Description: Bridge wash contract in district 11

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/25/21 Estimated Construction Bid Date: 3/25/21

Location: Bridge wash contract in district 11

Improvement Type: Bridge Washing 65

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,163

PennDOT Project

Id:

112937

Project Administrator: PennDOT Bridge Wash 2021

Period Totals: $3,163 $0 $0 $0 $0

Local/Other: $949 $0 $0 $0 $0

State: $2214 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Improving multi-modal facilities at the Siebert Rd & McKnight Rd intersection in Ross Township.

Page 52: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$1000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0Period Totals: $334 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $334 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slide correction on SR 2058, Verona Road from Segment 60 to Segment 70 in Penn Hills Township, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/30/20 Estimated Construction Bid Date: 1/30/20

Location: Located on SR 2058, Verona Road from Segment 60 to Segment 70 in Penn Hills Township, Allegheny County

Improvement Type: Slides Correction 2058

Municipality: Penn Hills (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,900

PennDOT Project

Id:

113741

Project Administrator: PennDOT SR 2058, Verona Road Slide

Period Totals: $400 $1,000 $500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $80 $200 $100 $0 $0

Federal: $320 $800 $400 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/27

Location: Located on SR 4068, Bakerstown Road over CSX Railroad in Richland Township, Allegheny County

Project Description: Bridge rehabilitation/replacement on SR 4068, Bakerstown Road over CSX Railroad in Richland Township, Allegheny County

Improvement Type: Bridge Improvement 4068

Municipality: Richland (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

113631

Project Administrator: PennDOT Bakerstown Road Bridge

Period Totals: $0 $0 $250 $350 $1,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $250 $350 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/27

Location: Located on SR 4031, Babcock Boulevard over Branch of Breakneck Creek in Pine Township, Allegheny County

Project Description: Bridge replacement on SR 4031, Babcock Boulevard over Branch of Breakneck Creek in Pine Township, Allegheny County

Improvement Type: Bridge Replacement 4031

Municipality: Pine (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $250

PennDOT Project

Id:

113629

Project Administrator: PennDOT Babcock Boulevard Culvert

Period Totals: $250 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $250 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 53: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$9142

$1714

$571

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

114194

Project Administrator: PennDOT SR 2010, Lovedale Road Wall Remediation

Period Totals: $400 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/15/23

Location: Located on PA 837, North State Street in West Mifflin Borough, Allegheny County

Project Description: Slide Remediation on PA 837, North State Street in West Mifflin Borough, Allegheny County.

Improvement Type: Slides Correction 837

Municipality: West Mifflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$32,573

Total FFY 2021-2032 Cost $47,501

PennDOT Project

Id:

114193

Project Administrator: PennDOT PA 837 Slide Remediation

Period Totals: $0 $751 $625 $2,125 $11,427

Local/Other: $0 $38 $31 $106 $1629

State: $0 $113 $94 $319 $4886

Federal: $0 $600 $500 $1700 $26058

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/1/24

Location: Located between Essen Street and N.Charles Street over I-279, HOV, Ramp G, and East Street in the City of Pittsburgh, Allegheny County.

Project Description: Swindell Bridge Rehabilitation located between Essen Street and N.Charles Street over I-279, HOV, Ramp G, and East Street in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $450

PennDOT Project

Id:

114150

Project Administrator: City of Pittsburgh Swindell Bridge

Period Totals: $450 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $450 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Slide correction on SR 2064, Lime Hollow Road from Segment 10 to Segment 30 in Penn Hills Township, Allegheny County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/30/20 Estimated Construction Bid Date: 1/30/20

Location: Located on SR 2064, Lime Hollow Road from Segment 10 to Segment 30 in Penn Hills Township, Allegheny County

Improvement Type: Slides Correction 2064

Municipality: Penn Hills (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $334

PennDOT Project

Id:

113742

Project Administrator: PennDOT SR 2064, Lime Hollow Road Slide

Period Totals: $334 $0 $0 $0 $0

Page 54: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: various routes in District 11

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $5,948

PennDOT Project

Id:

114242

Project Administrator: PennDOT Guiderail Upgrades

Period Totals: $0 $5,948 $0 $0 $0

Local/Other: $0 $5948 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/27

Location: From Stevenson Mill to Rouser Road in Moon Township, Allegheny County.

Project Description: (Sponsor = MTA) Road connection from Stevenson Mill to Rouser Road in Moon Township, Allegheny County.

Improvement Type: New Roadway 0

Municipality: Moon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,100

PennDOT Project

Id:

114214

Project Administrator: Moon Township MTA Stevenson Mill/Rouser Road Offsites

Period Totals: $250 $350 $0 $2,500 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $350 $0 $2500 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/15/24

Location: Located on SR 3034, Chartiers Street in Bridgeville Boro, Allegheny County

Project Description: Slide remediation on SR 3034, Chartiers Street in Bridgeville Boro, Allegheny County

Improvement Type: Slides Correction 3034

Municipality: Bridgeville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,500

PennDOT Project

Id:

114195

Project Administrator: PennDOT SR 3034, Chartiers St Slide Remediation

Period Totals: $250 $250 $0 $3,000 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $250 $0 $600 $0

Federal: $0 $0 $0 $2400 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/24

Location: Located on SR 2010, Lovedale Road in Elizabeth Township and Lincoln Boro, Allegheny County

Project Description: Replace failing walls on SR 2010, Lovedale Road in Elizabeth Township and Lincoln Boro, Allegheny County

Improvement Type: Safety Improvement 2010

Municipality: Elizabeth (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 55: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$6200

$0

$1550

Title:

State Route:

2025 - 2028

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/20/23

Location: Located from within the City of Pittsburgh including Downtown, Uptown, Oakland and the East End corridor, all within Allegheny County

Project Description: Establishment of Bus and Bike Lanes from within the City of Pittsburgh including Downtown, Uptown, Oakland and the East End corridor, all within Allegheny County

Improvement Type: Bicycle Facilities/Services 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $8,250

PennDOT Project

Id:

114280

Project Administrator: Port Authority of Allegheny County Pittsburgh BRT - Establish Bus & Bike Lanes

Period Totals: $0 $500 $0 $0 $7,750

Local/Other: $0 $25 $0 $0 $0

State: $0 $75 $0 $0 $0

Federal: $0 $400 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Located on West Carson Street (SR 7301) over Chartiers Creek in McKees Rocks Borough and City of Pittsburgh, Allegheny County

Project Description: Bridge rehab/replacement on West Carson Street (SR 7301) over Chartiers Creek in McKees Rocks Borough and City of Pittsburgh, Allegheny County

Improvement Type: Bridge Replacement 7301

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $975

PennDOT Project

Id:

114266

Project Administrator: City of Pittsburgh West Carson Street Bridge

Period Totals: $975 $0 $0 $0 $0

Local/Other: $49 $0 $0 $0 $0

State: $146 $0 $0 $0 $0

Federal: $780 $0 $0 $0 $0

Project Description: (Sponsor = Allegheny County) 5 years Maintenance contract for suspension bridge main cable dehumidification system of 10th Street over I-376 and CSX railroad from 2nd Ave and

Armstrong Tunnel to near Muriel St on the South Side, City

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/28/21 Estimated Construction Bid Date: 1/28/21

Location: 10th Street over I-376 and CSX railroad from 2nd Ave and Armstrong Tunnel to near Muriel St on the South Side, City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 7301

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,900

PennDOT Project

Id:

114243

Project Administrator: Allegheny County S 10th Street Bridge Dehumidification System

Period Totals: $900 $1,500 $1,500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $300 $300 $300 $0 $0

Federal: $600 $1200 $1200 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Guiderail upgrades in various routes in Allegheny, Beaver, Lawrence Counties.

Page 56: Project Costs(In Thousands)

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $5,540

Period Totals: $0 $0 $0 $5,540 $0

Local/Other: $0 $0 $0 $1108 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $4432 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: Located on Penn Avenue, from 17th Street to 31st Street in Pittsburgh's Strip District in the City of Pittsburgh, Allegheny County

Project Description: Signal improvement on Penn Avenue, from 17th Street to 31st Street in Pittsburgh's Strip District in the City of Pittsburgh, Allegheny County

Improvement Type: Existing Signal Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,400

PennDOT Project

Id:

114288

Project Administrator: City of Pittsburgh Penn Avenue Signal Improvements

Period Totals: $0 $0 $0 $1,400 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $280 $0

Federal: $0 $0 $0 $1120 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/24

Location: Located on SR 3003, Washington Pike between SR 3006 (Boyce Road) and Alpine Drive in South Fayette Township, Allegheny County.

Project Description: Safety improvement on SR 3003, Washington Pike between SR 3006 (Boyce Road) and Alpine Drive in South Fayette Township, Allegheny County.

Improvement Type: Intersection Improvement 3003

Municipality: South Fayette (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $10,705

PennDOT Project

Id:

114287

Project Administrator: PennDOT SR 3003 (Washington Pike) Improvements

Period Totals: $10,705 $0 $0 $0 $0

Local/Other: $138 $0 $0 $0 $0

State: $4144 $0 $0 $0 $0

Federal: $6423 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/23

Location: Located from within the City of Pittsburgh, Allegheny County

Project Description: Safety improvement from within the City of Pittsburgh, Allegheny County.

Improvement Type: Existing Signal Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,919

PennDOT Project

Id:

114283

Project Administrator: Port Authority of Allegheny County Pittsburgh BRT - Downtown Improvements

Period Totals: $2,919 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2919 $0 $0 $0 $0

Page 57: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 7459

$0

Total FFY 2021-2032 Cost $1,458

PennDOT Project

Id:

114945

Project Administrator: Allegheny County Little Sewickley Creek SB Bridge No. 1 (SS01)

Period Totals: $0 $0 $0 $1,458 $0

Local/Other: $0 $0 $0 $558 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $900 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/24

Location: Located from with the City of Pittsburgh, Allegheny County

Project Description: Bike/ped infrastructure and access located from with the City of Pittsburgh, Allegheny County

Improvement Type: Bicycle Facilities/Services 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,240

PennDOT Project

Id:

114296

Project Administrator: City of Pittsburgh Healthy Ride Electrified

Period Totals: $0 $0 $3,240 $0 $0

Local/Other: $0 $0 $2200 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $1040 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/24

Location: Located from within the City of Pittsburgh, Allegheny County

Project Description: Install Bus shelters/mobility hubs from within the City of Pittsburgh, Allegheny County

Improvement Type: Transit System Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,500

PennDOT Project

Id:

114294

Project Administrator: City of Pittsburgh City of Pittsburgh Bus Shelters/Mobility Hubs

Period Totals: $0 $0 $0 $3,500 $0

Local/Other: $0 $0 $0 $1500 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/15/24

Location: Located from Downtown Pittsburgh to Highland Park in the City of Pittsburgh, Allegheny County.

Project Description: Safety improvement from Downtown Pittsburgh to Highland Park in the City of Pittsburgh, Allegheny County.

Improvement Type: Safety Improvement 0

Municipality: Pittsburgh (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Total FFY 2021-2032 Cost $5,540

PennDOT Project

Id:

114290

Project Administrator: City of Pittsburgh Allegheny River Green Boulevard

Page 58: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/22

Location: (Sponsor = PAAC) Provide Park and Ride space information at 19 Port Authority owned park and ride lots in Allegheny County. Also, a new DMS sign at SR 19 near South Hills Village

GarageProject Description: (Sponsor = PAAC) Provide Park and Ride space information at 19 Port Authority owned park and ride lots in Allegheny County. Also, a new DMS sign at SR 19 near South Hills Village

Garage

Improvement Type: Park and Ride Lot 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $175

PennDOT Project

Id:

115279

Project Administrator: Port Authority of Allegheny County PAAC-PNR space availability System

Period Totals: $90 $85 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $90 $85 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: Western Regional Traffic Management Center, Bridgeville, Allegheny County.

Project Description: replaced and upgraded Western Regional Traffic Management Center, Bridgeville, Allegheny County.

Improvement Type: Traffic Control Center 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,480

PennDOT Project

Id:

115277

Project Administrator: PennDOT Western Regional TMC Upgrade 2021

Period Totals: $280 $0 $1,200 $0 $0

Local/Other: $280 $0 $1200 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/50

Location: Located at the intersection of Lovedale Road and Liberty Way in Lincoln Boro, Allegheny County

Project Description: Bridge replacement at the intersection of Lovedale Road and Liberty Way in Lincoln Boro, Allegheny County

Improvement Type: Bridge Replacement 7443

Municipality: Lincoln (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,480

PennDOT Project

Id:

114946

Project Administrator: Allegheny County Wylie's Run Bridge No. 8 (WY08)

Period Totals: $280 $0 $1,200 $0 $0

Local/Other: $280 $0 $1200 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/50

Location: Located at the intersection of Pink House Road and Fern Hollow Road in Sewickley Heights Boro, Allegheny County

Project Description: Bridge replacement at the intersection of Pink House Road and Fern Hollow Road in Sewickley Heights Boro, Allegheny County

Municipality: Sewickley Heights (BORO) Air Quality Status: AQ Conformity Does Not Apply

Page 59: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 4019, Mount Royal Boulevard in Hampton Township, Allegheny County

Project Description: Slide remediation on SR 4019, Mount Royal Boulevard in Hampton Township, Allegheny County

Improvement Type: Slides Correction 4019

Municipality: Hampton (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $50

PennDOT Project

Id:

115772

Project Administrator: PennDOT SR 4019, Mt. Royal Blvd Slide

Period Totals: $25 $25 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 3026, Millers Run Road in South Fayette Township, Allegheny County

Project Description: Slide remediation on SR 3026, Millers Run Road in South Fayette Township, Allegheny County

Improvement Type: Slides Correction 3026

Municipality: South Fayette (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $23,363

PennDOT Project

Id:

115771

Project Administrator: PennDOT SR 3026, Millers Run Road Slide

Period Totals: $23,363 $0 $0 $0 $0

Local/Other: $4673 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $18690 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/25

Location: Pittsburgh International Airport at Moon Township, Allegheny County.

Project Description: (Sponsor = ACAA) Expand and upgrade cargo facility at Pittsburgh International Airport at Moon Township, Allegheny County.

Improvement Type: Intermodal Facility 0

Municipality: Moon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $569

PennDOT Project

Id:

115765

Project Administrator: ACAA BUILD - PIT Cargo 4 Intermodal Freight Transfer

Period Totals: $279 $290 $0 $0 $0

Local/Other: $135 $140 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $144 $150 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 60: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,700

Period Totals: $1,700 $0 $0 $0 $0

Local/Other: $85 $0 $0 $0 $0

State: $255 $0 $0 $0 $0

Federal: $1360 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/16/21

Location: 30th Street Bridge from River Ave Viaduct to Herr's Island in the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = City of Pittsburgh) Bridge preservation on 30th Street from River Ave Viaduct to Herr's Island in the City of Pittsburgh, Allegheny County.

Improvement Type: Bridge Preservation Activities 7301

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $50

PennDOT Project

Id:

115822

Project Administrator: City of Pittsburgh 30th Street Bridge Preservation

Period Totals: $25 $25 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 2084, Milltown Road in Plum Boro, Allegheny County

Project Description: Slide remediation on SR 2084, Milltown Road in Plum Boro, Allegheny County

Improvement Type: Slides Correction 2084

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $50

PennDOT Project

Id:

115774

Project Administrator: PennDOT SR 2084, Milltown Road Slide

Period Totals: $25 $25 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 2075, Logans Ferry Road in Plum Boro, Allegheny County

Project Description: Slide remediation on SR 2075, Logans Ferry Road in Plum Boro, Allegheny County

Improvement Type: Slides Correction 2075

Municipality: Plum (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $50

PennDOT Project

Id:

115773

Project Administrator: PennDOT SR 2075, Logans Ferry Rd Slide

Period Totals: $25 $25 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Page 61: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Municipality: Parks (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Project Administrator: PENNDOT Upper Mateer Bridge #3

Improvement Type: Bridge Replacement 2036

$0

Total FFY 2021-2032 Cost $260

Armstrong

PennDOT Project

Id:

23934

Period Totals: $130 $130 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $130 $130 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/15/21

Location: Located on Grand Avenue (Pittsburgh & Ohio Central Railroad) in Neville Township, Allegheny County.

Project Description: Installation of railroad lights and gates on Grand Avenue (Pittsburgh & Ohio Central Railroad) in Neville Township, Allegheny County.

Improvement Type: RR Gates 0

Municipality: Neville (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

116006

Project Administrator: Pittsburgh & Ohio Central RR POHC Grand Avenue RR Crossing

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $200 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $800 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 7/15/21

Location: Located along Mellon Terrace between Mellon Street and North Negley Avenue in the Highland Park area of the City of Pittsburgh, Allegheny County.

Project Description: (Sponsor = Port Authority of Allegheny County) Multimodal Center along Mellon Terrace between Mellon Street and North Negley Avenue in the Highland Park area of the City of

Pittsburgh, Allegheny County..

Improvement Type: Intermodal Facility 0

Municipality: Pittsburgh (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $100

PennDOT Project

Id:

115893

Project Administrator: Port Authority of Allegheny County PAAC Mellon Terrace Multimodal Center

Period Totals: $0 $100 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $100 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/30

Location: Located on SR 837 in West Mifflin Boro, Allegheny County

Project Description: Rock fall study on SR 837, Duquesne Blvd in West Mifflin Boro, Allegheny County

Improvement Type: Slides Correction 837

Municipality: West Mifflin (BORO) Air Quality Status: AQ Conformity Does Not Apply

PennDOT Project

Id:

115836

Project Administrator: PennDOT Duquesne Blvd Rock Slide

Page 62: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1332

$7300

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 10/19/23

Location: Existing structure carrying SR 2005 (Cherry Run Road) over Cherry Run in Plumcreek Township.

Project Description: Bridge rehabilitation/replacement of the existing structure carrying SR 2005 (Cherry Run Road) over Cherry Run in Plumcreek Township, Armstrong County.

Improvement Type: Bridge Replacement 2005

Municipality: Plumcreek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,510

PennDOT Project

Id:

24136

Project Administrator: PENNDOT Brick Church Bridge #2

Period Totals: $288 $2,222 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $288 $2222 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: Existing structure carrying PA 28 over a branch of Cowanshannock Creek in Rayburn Township.

Project Description: Replacement of the existing structure carrying PA 28 over a branch of Cowanshannock Creek in Rayburn Township, Armstrong County.

Improvement Type: Bridge Replacement 28

Municipality: Rayburn (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,741

PennDOT Project

Id:

24056

Project Administrator: PENNDOT Poverty Hill Bridge

Period Totals: $0 $0 $546 $563 $8,632

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $113 $0

Federal: $0 $0 $546 $450 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/2/25

Location: Existing structure carrying US 422 over the Allegheny River in North Buffalo Township.

Project Description: Preservation of the existing structure carrying US 422 over the Allegheny River in North Buffalo Township, Armstrong County.

Improvement Type: Bridge Preservation Activities 422

Municipality: North Buffalo (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $0

PennDOT Project

Id:

23978

Project Administrator: PENNDOT Graff Bridge Preservation

Period Totals: $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

2024 2029 - 2032

Federal: $0 $0 $0 $0 $0

Location: Existing structure carrying SR 2036 (Upper Mateer Road) over Carnahan Run in Parks Township.

Project Description: Replacement of the existing structure carrying SR 2036 (Upper Mateer Road) over Carnahan Run in Parks Township, Armstrong County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Actual Construction Bid Date: 12/22/16 Estimated Construction Bid Date: 12/22/16

Page 63: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0Period Totals: $201 $0 $0 $0 $0

Local/Other: $10 $0 $0 $0 $0

State: $30 $0 $0 $0 $0

Federal: $161 $0 $0 $0 $0

Project Description: Bridge preservation, including bridge painting and other miscellaneous construction, of the existing structure carrying T-763 (Glade Drive) over US 422 in East Franklin Township,

Armstrong County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/24/19 Estimated Construction Bid Date: 10/24/19

Location: T-763 (Glade Drive) over US 422 in East Franklin Township.

Improvement Type: Bridge Preservation Activities 7207

Municipality: East Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9

PennDOT Project

Id:

24211

Project Administrator: PENNDOT T-763 West Hills Bridge

Period Totals: $9 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $9 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Bridge replacement (with a single-span composite steel plate girder bridge and other miscellaneous construction) of the existing structure carrying SR 4035 (Craigsville Road) over Buffalo

Creek in West Franklin Township, Armstrong County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 9/13/18 Estimated Construction Bid Date: 9/13/18

Location: Existing structure carrying SR 4035 (Craigsville Road) over Buffalo Creek in West Franklin Township.

Improvement Type: Bridge Replacement 4035

Municipality: West Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $661

PennDOT Project

Id:

24159

Project Administrator: PENNDOT Craigsville Bridge

Period Totals: $661 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $661 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Rehabilitation/replacement of the existing structure carrying SR 2036 (Upper Mateer Road) over Stitt Run in Parks Township, Armstrong County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/1/20 Estimated Construction Bid Date: 10/1/20

Location: Existing structure carrying SR 2036 (Upper Mateer Road) over Stitt Run in Parks Township.

Improvement Type: Bridge Improvement 2036

Municipality: Parks (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,510

PennDOT Project

Id:

24145

Project Administrator: PENNDOT Upper Mateer Bridge #2

Period Totals: $0 $388 $424 $1,698 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $78 $85 $0 $0

Federal: $0 $310 $339 $1698 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 64: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$1914

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$17142

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $42,717

PennDOT Project

Id:

83245

Project Administrator: PennDOT Rural Valley Bridge #4

Period Totals: $8,498 $8,554 $4,762 $3,761 $17,142

Local/Other: $0 $0 $0 $0 $0

State: $1021 $5635 $651 $2235 $0

Federal: $7477 $2919 $4111 $1526 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Armstrong, Butler and Indiana Counties in the SPC region.

Project Description: Reserve Highway/Bridge line item for the SPC region which includes Armstrong, Butler and Indiana Counties.

Improvement Type: Miscellaneous 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,791

PennDOT Project

Id:

79843

Project Administrator: PennDOT SPC D-10 Hwy/Bridge Line

Period Totals: $0 $1,791 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $358 $0 $0 $0

Federal: $0 $1433 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: Existing structure carrying SR 3005 (Pony Farm Road) over Glade Run in North Buffalo Township.

Project Description: Replacement of the existing structure carrying SR 3005 (Pony Farm Road) over Glade Run in North Buffalo Township, Armstrong County.

Improvement Type: Bridge Replacement 3005

Municipality: North Buffalo (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $20,656

PennDOT Project

Id:

74208

Project Administrator: PennDOT Pony Farm Road Bridge #2

Period Totals: $363 $5,071 $9,100 $4,208 $1,914

Local/Other: $0 $0 $0 $0 $0

State: $15 $5071 $9100 $2708 $0

Federal: $348 $0 $0 $1500 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/7/21

Location: Along PA 28 from 0.53 mile north of SR 1027 to 0.30 mile south of SR 1016 (Calhoun School Road) in Boggs and Wayne Townships.

Project Description: Safety improvement (roadway realignment, bridge replacements, continuation of a truck climbing lane, and left turn lanes) along PA 28 from 0.53 mile north of SR 1027 to 0.30 mile south

of SR 1016 (Calhoun School Road) in Boggs and Wayne Townships, Armstrong County.

Improvement Type: Safety Improvement 28

Municipality: Boggs (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $201

PennDOT Project

Id:

69141

Project Administrator: PennDOT Goheenville Dip

Period Totals: $201 $0 $0 $0 $0

Page 65: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$3190

$19571

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 10/5/23

Location: Existing structure carrying SR 2027 (Girty Road) over Fagley Run in South Bend Township.

Improvement Type: Bridge Replacement 2027

Municipality: South Bend (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,632

PennDOT Project

Id:

91794

Project Administrator: PennDOT Fagley Run Bridge #2

Period Totals: $144 $1,488 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $24 $0 $0 $0 $0

Federal: $120 $1488 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: Replace existing structure carrying SR 2063 (Evergreen Road) over Brady Run in Gilpin Township.

Project Description: Replacement of the existing structure carrying SR 2063 (Evergreen Road) over Brady Run in Gilpin Township, Armstrong County.

Improvement Type: Bridge Replacement 2063

Municipality: Leechburg (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $25,187

PennDOT Project

Id:

86017

Project Administrator: PennDOT Brady's Run Bridge #3

Period Totals: $426 $0 $0 $2,000 $22,761

Local/Other: $0 $0 $0 $0 $0

State: $85 $0 $0 $0 $0

Federal: $341 $0 $0 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/19/23

Location: At the existing at-grade intersection of US 422 and SR 2005 (Margaret Road) in Plumcreek Township.,

Project Description: Intersection improvements including realignment of the existing roadway and construction and expansion of turning lanes at the existing at-grade intersection of US Route 422 and SR 2005

(Margaret Road) in Plumcreek Township, Armstrong County.

Improvement Type: Intersection Improvement 422

Municipality: Plumcreek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,327

PennDOT Project

Id:

85574

Project Administrator: PennDOT Margaret Rd Intersection

Period Totals: $72 $0 $0 $1,255 $0

Local/Other: $0 $0 $0 $0 $0

State: $72 $0 $0 $1255 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/2/23

Location: Existing structure carrying SR 2001 (Water Street) over a tributary to Cowanshannock Creek in Rural Valley Township.

Project Description: Rehabilitation/replacement of the existing structure carrying SR 2001 (Water Street) over a tributary to Cowanshannock Creek in Rural Valley Township, Armstrong County.

Improvement Type: Bridge Replacement 2001

Municipality: Rural Valley (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Page 66: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Description: Replacement of the existing structure carrying SR 2003 over Huskins Run with a precast box culvert and other miscellaneous construction in Cowanshannock Township, Armstrong County.

Actual Construction Bid Date: 9/17/20 Estimated Construction Bid Date: 9/17/20

Location: Existing structure carrying SR 2003 over Huskins Run in Cowanshannock Township.

Improvement Type: Bridge Replacement 2003

Municipality: Cowanshannock (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,300

PennDOT Project

Id:

109614

Project Administrator: PennDOT South of Rural Valley Bridge #3

Period Totals: $6,300 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $6300 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Replacement of the existing structures carrying PA 56 over Sugar Hollow Run and northern and southern tributaries to the Kiskiminetas River in Apollo Borough and Kiskiminetas

Township, Armstrong County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/11/21 Estimated Construction Bid Date: 2/25/21

Location: Existing structures carrying PA 56 over Sugar Hollow Run in Apollo Borough, over the northern tributary to the Kiskiminetas River in Kiskiminetas Township and over the southern

tributary to the Kiskiminetas River in Kiskiminetas Township.

Improvement Type: Bridge Replacement 56

Municipality: Kiskiminetas (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,714

PennDOT Project

Id:

103146

Project Administrator: PennDOT PA 56 Apollo Group Bridges

Period Totals: $0 $0 $0 $3,714 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $3714 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/11/24

Location: Along PA 66 from a point .067 miles west of the SR 2063 (Evergreen Road) intersection to a point .08 miles east of the SR 2019 (Crooked Creek Dam Road) intersection in Gilpin, Bethel,

and Manor Townships.Project Description: Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades along

PA 66 from a point .067 miles west of the SR 2063 (Evergreen Road) intersection to a point .08 miles east of the SR 2019 (Crooked Creek Dam Road) intersection in Gilpin, Bethel, and

Manor Townships.

Improvement Type: Resurface 66

Municipality: Gilpin (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $590

PennDOT Project

Id:

99247

Project Administrator: PennDOT Forks Church Resurfacing

Period Totals: $40 $0 $0 $550 $0

Local/Other: $0 $0 $0 $0 $0

State: $40 $0 $0 $110 $0

Federal: $0 $0 $0 $440 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Replacement of the existing structure carrying SR 2027 (Girty Road) over Fagley Run in South Bend Township, Armstrong County.

Page 67: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$6000

$0

$0

Title:

State Route:

2025 - 2028

$1998

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various state-owned structures on various routes, in various townships, Armstrong County.

Project Description: Department force bridge maintenance of various state-owned structures on various routes, in various townships, Armstrong County.

Improvement Type: Bridge Rehabilitation 68

Municipality: Bradys Bend (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $15,001

PennDOT Project

Id:

111826

Project Administrator: PennDOT Armstrong Co. Department Force Bridge Maintenance

Period Totals: $0 $0 $8,165 $4,838 $1,998

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $8165 $4838 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/16/21

Location: Along PA 28 from Allegheny Valley Expressway Iron Bridge to US 422 in North and South Buffalo Townships.

Project Description: Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades along

PA 28 from Allegheny Valley Expressway Iron Bridge to US 422 in North and South Buffalo Townships, Armstrong County.

Improvement Type: Resurface 28

Municipality: South Buffalo (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $7,655

PennDOT Project

Id:

109624

Project Administrator: PennDOT PA 28 Allegheny Valley Expressway PM

Period Totals: $0 $0 $546 $1,109 $6,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $546 $1109 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/2/25

Location: Existing structure carrying SR 66 and the Graff Bridge Ramp over US 422, SR 2025, and Garretts Run in Manor Township.

Project Description: Bridge Rehabilitation of the existing structure carrying SR 66 and the Graff Bridge Ramp over US 422, SR 2025 (Garretts Run Road), and Garretts Run in Manor Township, Armstrong

County.

Improvement Type: Bridge Rehabilitation 66

Municipality: Manor (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $16

PennDOT Project

Id:

109622

Project Administrator: PennDOT 1/112th Infantry Bridge/Graff Ramp Rehabilitation

Period Totals: $16 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $16 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 68: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$106

$580

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $532

Period Totals: $432 $100 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $432 $100 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: Along SR 28 at various locations in North and South Buffalo Townships, Armstrong County and Buffalo Township, Butler County.

Project Description: Intelligent Transportation Systems along SR 28 at various locations in North and South Buffalo Townships, Armstrong County and Buffalo Township, Butler County.

Improvement Type: Variable Message Signs 28

Municipality: South Buffalo (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,783

PennDOT Project

Id:

114843

Project Administrator: PennDOT Route 28 AVE ITS Project - TSMO

Period Totals: $97 $1,000 $0 $0 $686

Local/Other: $0 $0 $0 $0 $0

State: $97 $1000 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/10/23

Location: Along SR 2029 (Logansport Road) in Bethel Township, Armstrong County.

Project Description: Slide repair along SR 2029 (Logansport Road) in Bethel Township, Armstrong County.

Improvement Type: Slides Correction 2029

Municipality: Bethel (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $13,100

PennDOT Project

Id:

114236

Project Administrator: PennDOT Logansport Slide Repair

Period Totals: $8,081 $3,820 $1,199 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2620 $0 $0 $0 $0

Federal: $5461 $3820 $1199 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/13/22

Location: Along US 422, PA 28 (A-15 north of US 422) and SR 8014 in Manor Township, Armstrong County. Project limits are the paving gap from Wray Plan Road project to the existing paving

notch on SR 1422 toward Indiana Hill.Project Description: Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades along

US 422, PA 28 and State Route 8014 in Manor Township, Armstrong County.

Improvement Type: Resurface 422

Municipality: Manor (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $647

PennDOT Project

Id:

113645

Project Administrator: PennDOT US 422 A-15 Concrete Preservation

Period Totals: $155 $159 $164 $169 $0

Local/Other: $0 $0 $0 $0 $0

State: $155 $159 $164 $169 $0

Page 69: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$3200

$800

$0

$0

Total FFY 2021-2032 Cost $10,113

Period Totals: $800 $1,875 $1,875 $1,563 $4,000

Local/Other: $0 $0 $0 $0 $0

State: $160 $375 $375 $313 $0

Federal: $640 $1500 $1500 $1250 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: PA 65, Mercer Road over Connoquenessing Creek in Franklin and North Sewickley Townships, Beaver County

Project Description: Bridge replacement/restoration on PA 65, Mercer Road over Connoquenessing Creek in Franklin and North Sewickley Townships, Beaver County

Improvement Type: Bridge Replacement 65

Municipality: North Sewickley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

35156

Project Administrator: PENNDOT PA 65, Country Club Bridge

Period Totals: $1,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Mill and overlay, and patch and overlay on SR 18, from SR 65 (5th St ) in New Brighton Borough to 20th Street in City of Beaver Falls in Beaver County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/14/19 Estimated Construction Bid Date: 2/14/19

Location: Located on SR 18, from SR 65 (5th St ) in New Brighton Borough to 20th Street in City of Beaver Falls in Beaver County.

Improvement Type: Restoration 18

Municipality: New Brighton (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,036

PennDOT Project

Id:

29094

Project Administrator: PennDOT PA 18 -7th Ave & 7th St. Bridge

Period Totals: $2,414 $622 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2414 $622 $0 $0 $0

2024 2029 - 2032

Federal: $0 $0 $0 $0 $0

Location: Located on SR 30 (Lincoln Highway), approximately 0.4 miles from the PA/WVA state line and proceeds to 1.0 mile west of SR 168 intersection all within Greene Township, Beaver

County.Project Description: Realignment and reconstruction on SR 30 (Lincoln Highway), approximately 0.4 miles from the PA/WVA state line and proceeds to 1.0 mile west of SR 168 intersection all within Greene

Township, Beaver County. This project is adding a left hand turn lane at Red Dog Road.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Greene (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: 8/20/20 Estimated Construction Bid Date: 8/20/20

Project Administrator: PENNDOT US 30 Upgrade

Improvement Type: Reconstruct 30

Total FFY 2021-2032 Cost $532

Beaver

PennDOT Project

Id:

29045

Page 70: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$1000

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 5/11/23

Improvement Type: Bridge Replacement 18

Municipality: Potter (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

101165

Project Administrator: PennDOT Frankfort Road Bridge

Period Totals: $250 $0 $350 $0 $1,000

Local/Other: $0 $0 $0 $0 $0

State: $250 $0 $350 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/25

Location: Located on SR 1021 over Pine Run in Marion Township, Beaver County

Project Description: Bridge replacement on SR 1021 over Pine Run in Marion Township, Beaver County.

Improvement Type: Bridge Replacement 1021

Municipality: Marion (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

93770

Project Administrator: PennDOT Pine Run Road Culvert

Period Totals: $400 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Resurfacing, Drainage improvements, Guiderail Replacement, Slope stabilization and slide repairs on SR 30 (Lincoln Highway), at the PA/WVA state line and proceeds to the SR 168

intersection, all within Greene Township, Beaver County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 8/20/20 Estimated Construction Bid Date: 8/20/20

Location: SR 30 (Lincoln Highway), at the PA/WVA state line and proceeds to the SR 168 intersection, all within Greene Township, Beaver County.

Improvement Type: Resurface 30

Municipality: Greene (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $30,000

PennDOT Project

Id:

81652

Project Administrator: PennDOT US 30/WV State Line to PA 168

Period Totals: $15,000 $15,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $15000 $15000 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Located on SR 2004 (Freedom Road) from SR 65 to SR 989 in New Sewickley Township and Conway Borough. Also including Crows Run Road in Conway Borough.

Project Description: Realignment and roadway reconstruction on SR 2004 (Freedom Road) from SR 65 to SR 989 in New Sewickley Township and Conway Borough. Also includes Crows Run Road in

Conway Borough, Beaver County.

Improvement Type: Relocation/Realignment 2004

Municipality: New Sewickley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

67016

Project Administrator: PennDOT Freedom Rd Upgrade - Ph C

Page 71: Project Costs(In Thousands)

2025 - 2028

$7603

$0

$0

Title:

State Route:

2025 - 2028

$0

$2000

$0

Title:

State Route:

2025 - 2028

$0

$11250

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: Located on PA 3007, Broadhead Road from Frankfort Road to Allegheny County line in City of Aliquippa, Hopewell and Center Townships, Beaver County.

Project Description: 2 inches mill and overlay on PA 3007, Broadhead Road from Frankfort Road to Allegheny County line in City of Aliquippa, Hopewell and Center Townships, Beaver County

Improvement Type: Restoration 3007

Municipality: Hopewell (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $14,625

PennDOT Project

Id:

105453

Project Administrator: PennDOT SR 3007/Frankfort Rd - Allegheny Co Line

Period Totals: $350 $400 $125 $2,500 $11,250

Local/Other: $0 $0 $0 $0 $0

State: $70 $80 $0 $2500 $0

Federal: $280 $320 $125 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/25/24

Location: Located on SR 18 over the Beaver River in Beaver Falls and New Brighton, Beaver County.

Project Description: Bridge preservation on SR 18 over the Beaver River in Beaver Falls and New Brighton, Beaver County.

Improvement Type: Bridge Preservation Activities 18

Municipality: New Brighton (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,585

PennDOT Project

Id:

105441

Project Administrator: PennDOT PA 18 Bridge ov Beaver River

Period Totals: $0 $450 $135 $0 $2,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $450 $135 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/15/26

Location: Located on PA 168 over Jordan Run in New Galilee Borough, Beaver County.

Project Description: Bridge rehabilitation/replacement on PA 168 over Jordan Run in New Galilee Borough, Beaver County.

Improvement Type: Bridge Replacement 168

Municipality: New Galilee (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $12,103

PennDOT Project

Id:

101173

Project Administrator: PennDOT PA 168 over Jordan Run

Period Totals: $400 $1,100 $1,000 $2,000 $7,603

Local/Other: $0 $0 $0 $0 $0

State: $0 $400 $0 $0 $0

Federal: $400 $700 $1000 $2000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: Located on Frankfort Road over Raccoon Creek in Potter Township, Beaver County.

Project Description: Bridge rehabilitation/replacement on Frankfort Road over Raccoon Creek in Potter Township, Beaver County.

Page 72: Project Costs(In Thousands)

2025 - 2028

$2630

$6495

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$500

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $75 $75 $0 $0 $0

Federal: $400 $400 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various local sponsored structures in Beaver County.

Project Description: (Sponsor = Beaver County) various local sponsored structures in Beaver County.

Improvement Type: Bridge Preservation Activities 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $600

PennDOT Project

Id:

106494

Project Administrator: Beaver County Beaver Local Bridge Line Item

Period Totals: $0 $0 $0 $100 $500

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $100 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Two NS RR Crossings. One in in Big Beaver, where NS tracks cross Aley Hill Rd, a township road, and in Darlington, where NS tracks cross McRoberts Rd, a township road, Beaver

County.Project Description: Railroad safety improvement at two NS RR Crossings. One in in Big Beaver, where NS tracks cross Aley Hill Rd, a township road, and in Darlington, where NS tracks cross McRoberts Rd,

a township road, Beaver County.

Improvement Type: RR Warning Devices 0

Municipality: New Galilee (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,092

PennDOT Project

Id:

106078

Project Administrator: PennDOT NS RR Crossings in Darlington and Big Beaver

Period Totals: $1,092 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1092 $0 $0 $0 $0

Project Description: Milling and resurfacing, signal updates and bridge preservation on PA 51 (Constitution Boulevard) from Central Square Drive to SR 4049 (Riverside Drive) in Fallston and Bridgewater

Boroughs, Patterson and Chippewa Townships, Beaver County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/30/20 Estimated Construction Bid Date: 4/30/20

Location: SR 51, Constitution Boulevard from Fallston and Bridgewater Boroughs, Patterson and Chippewa Townships, Beaver County.

Improvement Type: Restoration 51

Municipality: Fallston (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $13,650

PennDOT Project

Id:

105454

Project Administrator: PennDOT Constitution Boulevard - B51

Period Totals: $150 $1,250 $1,250 $1,875 $9,125

Local/Other: $0 $0 $0 $0 $0

State: $0 $250 $250 $375 $0

Federal: $150 $1000 $1000 $1500 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 73: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$9000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,800

Period Totals: $600 $600 $600 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $600 $600 $600 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: Located on SR 65, Mercer Road over Branch of Bennett Run in North Sewickley Township, Beaver County

Project Description: Bridge Replacement or restoration on SR 65, Mercer Road over Branch of Bennett Run in North Sewickley Township, Beaver County.

Improvement Type: Bridge Replacement 65

Municipality: North Sewickley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $11,530

PennDOT Project

Id:

109390

Project Administrator: PennDOT Mercer Road Bridge

Period Totals: $510 $20 $0 $2,000 $9,000

Local/Other: $0 $0 $0 $0 $0

State: $102 $4 $0 $2000 $0

Federal: $408 $16 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/2/23

Location: Located on SR 18, Rochester Monaca Bridge over Ohio River in Rochester and Monaca Boroughs, Beaver County.

Project Description: Bridge preservation on SR 18, Rochester Monaca Bridge over Ohio River in Rochester and Monaca Boroughs, Beaver County.

Improvement Type: Bridge Preservation Activities 18

Municipality: Monaca (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,000

PennDOT Project

Id:

109376

Project Administrator: PennDOT Rochester - Monaca Bridge

Period Totals: $3,000 $2,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3000 $2000 $0 $0 $0

Project Description: microsurface, guiderail and bridge preservations on SR 51, Constitution Boulevard from State Street to 17th Street in City of Aliquippa, South Heights and Monaca Boroughs, Center and

Hopewell Townships, Beaver County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/25/21 Estimated Construction Bid Date: 3/25/21

Location: Located on SR 51, Constitution Boulevard from State Street to 17th Street in City of Aliquippa, South Heights and Monaca Boroughs, Center and Hopewell Townships, Beaver County.

Improvement Type: Resurface 51

Municipality: South Heights (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,000

PennDOT Project

Id:

109352

Project Administrator: PennDOT Constitution Boulevard - B53

Period Totals: $500 $500 $0 $0 $0

Local/Other: $25 $25 $0 $0 $0

Page 74: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Slides Correction 4018

Municipality: Brighton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,050

PennDOT Project

Id:

112426

Project Administrator: PennDOT SR 4018, Park Road Slide

Period Totals: $50 $1,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $50 $200 $0 $0 $0

Federal: $0 $800 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/31/22

Location: Located on SR 2006, Lovi Road in New Sewickley Township, Beaver County

Project Description: Slide correction on SR 2006, Lovi Road in New Sewickley Township, Beaver County

Improvement Type: Slides Correction 2006

Municipality: New Sewickley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $126

PennDOT Project

Id:

112403

Project Administrator: PennDOT SR 2006, Lovi Road Slide

Period Totals: $63 $63 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $63 $63 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/15/23

Location: Located on SR 65, Ohio River Boulevard, from 8th Street to Mercer Road in Freedom Boro and North Sewickley Township, Beaver County

Project Description: Mill and overlay on SR 65, Ohio River Boulevard, from 8th Street to Mercer Road in Freedom Boro and North Sewickley Township, Beaver County

Improvement Type: Resurface 65

Municipality: Daugherty (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $750

PennDOT Project

Id:

110356

Project Administrator: PennDOT PA 65 - Eighth Street to Mercer Rd

Period Totals: $750 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $150 $0 $0 $0 $0

Federal: $600 $0 $0 $0 $0

Project Description: Slide correction on SR 151, Bocktown Road, segment 90 in Independence Township, Beaver County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/9/20 Estimated Construction Bid Date: 4/9/20

Location: SR 151, Bocktown Road, seg 90 in Independence Township, Beaver County

Improvement Type: Slides Correction 151

Municipality: Independence (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

109531

Project Administrator: PennDOT Bocktown Road Slide

Page 75: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 4/15/25

Location: Located on SR 3034, Century Farm Road over Branch of Little Traverse Creek in Hanover Township, Beaver County

Project Description: Bridge replacement on SR 3034, Century Farm Road over Branch of Little Traverse Creek in Hanover Township, Beaver County

Improvement Type: Bridge Replacement 3034

Municipality: Hanover (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $650

PennDOT Project

Id:

113630

Project Administrator: PennDOT Century Farm Road Culvert

Period Totals: $575 $75 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $575 $75 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: Located on I-376 in Beaver County from the Allegheny County Line to Toll 376 in Chippewa, Vanport and Hopewell Townships, Beaver County

Project Description: Intelligent Transportation Systems installed on I-376 in Beaver County from the Allegheny County Line to Toll 376 in Chippewa, Vanport and Hopewell Townships, Beaver County.

Improvement Type: Safety Improvement 376

Municipality: Chippewa (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,050

PennDOT Project

Id:

113607

Project Administrator: PennDOT I-376, ITS Installation - Beaver County

Period Totals: $550 $500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $550 $500 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: PA 588 Segment 0100, Bennett Run Road, North Sewickley Township, Beaver County

Project Description: Slide remediation on PA 588 Segment 0100, Bennett Run Road, North Sewickley Township, Beaver County

Improvement Type: Slides Correction 588

Municipality: North Sewickley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

112494

Project Administrator: PennDOT PA 588 - Bennett Run Rd Slide

Period Totals: $1,600 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1600 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Located on SR 4018, Park Road at segment 10 in Brighton Township, Beaver County

Project Description: Slides correction on SR 4018, Park Road at segment 10 in Brighton Township, Beaver County

Page 76: Project Costs(In Thousands)

2025 - 2028

$0

$1000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$1344

$0Local/Other: $0 $0 $0 $0 $0

State: $0 $318 $477 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/10/24

Location: Existing structure carrying PA 138 (Euclid Road) over a tributary to Muddy Creek in Clay Township, Butler County.

Project Description: Bridge rehabilitation/replacement of the existing structure carrying PA 138 (Euclid Road) over a tributary to Muddy Creek in Clay Township, Butler County.

Improvement Type: Bridge Improvement 138

Municipality: Clay (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,420

PennDOT Project

Id:

24682

Project Administrator: PENNDOT Southwest of Euclid Bridge

Period Totals: $420 $453 $1,547 $0 $0

Local/Other: $0 $0 $420 $0 $0

State: $0 $0 $0 $0 $0

2024 2029 - 2032

Federal: $420 $453 $1127 $0 $0

Location: Existing structure carrying T-372 (Taggart Road) over Slippery Rock Creek in Worth Township, Butler County.

Project Description: Replacement of the existing structure carrying T-372 (Taggart Road) over Slippery Rock Creek in Worth Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Worth (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Project Administrator: PENNDOT CO #24 Kelly Bridge

Improvement Type: Bridge Replacement 7232

$0

Total FFY 2021-2032 Cost $50

Butler

PennDOT Project

Id:

24471

Period Totals: $25 $25 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $25 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on SR 1019, Brush Creek Road in Marion Township, Beaver County

Project Description: Slide remediation on SR 1019, Brush Creek Road in Marion Township, Beaver County

Improvement Type: Slides Correction 1019

Municipality: Marion (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,600

PennDOT Project

Id:

115780

Project Administrator: PennDOT SR 1019, Brush Creek Road Slide

Period Totals: $250 $350 $0 $0 $1,000

Local/Other: $0 $0 $0 $0 $0

State: $250 $350 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 77: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $1,464

PennDOT Project

Id:

24759

Project Administrator: PENNDOT PA 356 over Tributary to Coal Run

Period Totals: $1,464 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $293 $0 $0 $0 $0

Federal: $1171 $0 $0 $0 $0

Project Description: Replacement with a precast box culvert and other miscellaneous construction of the existing structure carrying PA 8 over an unnamed tributary of Glade Run in Middlesex Township, Butler

County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: Existing structure carrying PA 8 over an unnamed tributary of Glade Run in Middlesex Township.

Improvement Type: Bridge Replacement 8

Municipality: Middlesex (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $722

PennDOT Project

Id:

24717

Project Administrator: PENNDOT South of Cooperstown Br #3

Period Totals: $722 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $144 $0 $0 $0 $0

Federal: $578 $0 $0 $0 $0

Project Description: Replacement with a precast box culvert and other miscellaneous construction of the existing structure carrying PA 8 over an unnamed tributary of Glade Run in Middlesex Township, Butler

County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: Existing structure carrying PA 8 over an unnamed tributary of Glade Run in Middlesex Township.

Improvement Type: Bridge Replacement 8

Municipality: Middlesex (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $834

PennDOT Project

Id:

24716

Project Administrator: PENNDOT South of Cooperstown Br #2

Period Totals: $834 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $167 $0 $0 $0 $0

Federal: $667 $0 $0 $0 $0

Project Description: Replacement with a precast box culvert and other miscellaneous construction of the existing structure carrying PA 8 over the south branch of Glade Run in Middlesex Township, Butler

County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: Existing structure carrying PA 8 over the south branch of Glade Run in Middlesex Township.

Improvement Type: Bridge Replacement 8

Municipality: Middlesex (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,139

PennDOT Project

Id:

24715

Project Administrator: PENNDOT South of Cooperstown Br #1

Period Totals: $0 $318 $477 $0 $1,344

Page 78: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: Existing structure carrying SR 2007 (Saxonburg Boulevard) over Rocky Run in Clinton Township.

Improvement Type: Bridge Replacement 2007

Municipality: Clinton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $141

PennDOT Project

Id:

78000

Project Administrator: PennDOT Saxonburg Boulevard Br #2

Period Totals: $141 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $141 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Improvements to the intersection of PA 108 (New Castle and Franklin Streets), PA 173 (South Main Street), and PA 258 (North Main Street) and the addition of a right-turn lane from PA

108 east (New Castle Street) onto PA 173 south (South Main Street) in Slippery Rock Borough, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/16/20 Estimated Construction Bid Date: 1/16/20

Location: Existing intersection of PA 108 (New Castle and Franklin Streets), PA 173 (South Main Street), and PA 258 (North Main Street) in Slippery Rock Borough.

Improvement Type: Intersection Improvement 108

Municipality: Slippery Rock (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,096

PennDOT Project

Id:

72378

Project Administrator: PennDOT PA 108/173/258 Slippery Rock Intersection

Period Totals: $400 $48 $1,234 $414 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $10 $247 $83 $0

Federal: $400 $38 $987 $331 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Existing structure carrying SR 1021 (Conerty Road) over Buffalo Run in Donegal Township.

Project Description: Replacement of the existing structure carrying SR 1021 (Conerty Road) over Buffalo Run in Donegal Township, Butler County.

Improvement Type: Bridge Replacement 1021

Municipality: Donegal (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,317

PennDOT Project

Id:

24819

Project Administrator: PENNDOT Rattigan Bridge #1

Period Totals: $113 $0 $0 $1,204 $0

Local/Other: $0 $0 $0 $0 $0

State: $18 $0 $0 $1204 $0

Federal: $95 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/5/23

Location: Existing structure carrying PA 356 (Freeport Road) over a tributary to Coal Run in Summit Township.

Project Description: Replacement of the existing structure carrying PA 356 (Freeport Road) over a tributary to Coal Run in Summit Township, Butler County.

Improvement Type: Bridge Replacement 356

Municipality: Summit (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 79: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/24/24

Location: Existing structure carrying PA 68 over the B&LE and B&P Railroads and Connoquenessing Creek in Butler and Summit Townships, Butler County.

Project Description: Replacement, including intersection improvements and replacement and/or extension of the twin-cell arch culvert, of the existing structure carrying PA 68 over the Bessemer and Lake Erie

and Buffalo and Pittsburgh Railroads and Connoquenessing Creek in Butler and Summit Townships, Butler County.

Improvement Type: Bridge Replacement 68

Municipality: Butler (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $87

PennDOT Project

Id:

86105

Project Administrator: PennDOT Karns Crossing Bridge

Period Totals: $87 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $87 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/1/22

Location: Existing structure carrying a tributary to Muddy Creek beneath US 422 in Muddy Creek Township.

Project Description: Replacement/repair of the existing culvert carrying a tributary to Muddy Creek beneath US Route 422 in Muddy Creek Township, Butler County.

Improvement Type: Drainage Improvement 422

Municipality: Muddy Creek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,713

PennDOT Project

Id:

83611

Project Administrator: PennDOT US 422 Shawood Pipe

Period Totals: $92 $465 $1,156 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $92 $0 $231 $0 $0

Federal: $0 $465 $925 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Existing structure carrying SR 3015 (Mars Evans City Road) over a tributary to Breakneck Creek in Callery Borough.

Project Description: Bridge rehabilitation/replacement of the existing structure carrying SR 3015 (Mars Evans City Road) over a tributary to Breakneck Creek in Callery Borough, Butler County.

Improvement Type: Bridge Replacement 3015

Municipality: Callery (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,351

PennDOT Project

Id:

83336

Project Administrator: PennDOT SR 3015 over Trib. to Breakneck Creek

Period Totals: $1,351 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1351 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Replacement of the existing structure carrying SR 2007 (Saxonburg Boulevard) over Rocky Run in Clinton Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 80: Project Costs(In Thousands)

$18109

$2429

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$11902

$8123State: $428 $0 $0 $0 $0

Federal: $2668 $13475 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: PA 228 (Mars Crider Road) from 500 feet east of its intersection with SR 3015 (Mars Valencia Road) to 1.0 mile east of its intersection with SR 3007 (Three Degree Road) in Adams

Township.Project Description: This safety improvement project includes adding through lanes along the length of the project, turn lanes at various intersections, side road improvements, the addition of service roads for

access control, drainage and guide rail upgrades, signal replacement, signage, and pavement markings along PA 228 (Mars Crider Road) from 500 feet east of the intersection with SR 3015

(Mars Valencia Road) to 1.0 mile east of the intersection with SR 3007 (Three Degree Road) as well as sidewalks, ADA ramps, bicycle consideration and the addition of a roundabout on

Three Degree Road in Adams Township, Butler County.

Improvement Type: Resurface 228

Municipality: Adams (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $180

PennDOT Project

Id:

91286

Project Administrator: PennDOT Three Degree Rd Intersection

Period Totals: $180 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $180 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Reconfiguration of existing PA 228 and State Route 2005 (Saxonburg Boulevard) intersection in Clinton Township, Butler County, to a roundabout as well as drainage, pavement markings,

highway lighting, and landscaping work.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 7/14/16 Estimated Construction Bid Date: 7/14/16

Location: Existing intersection of PA 228 and SR 2005 (Saxonburg Boulevard) in Clinton Township.

Improvement Type: Intersection Improvement 228

Municipality: Clinton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,115

PennDOT Project

Id:

90309

Project Administrator: PennDOT Cox's Corner Intersection

Period Totals: $123 $472 $1,520 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $424 $304 $0 $0

Federal: $98 $48 $1216 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Existing structure carrying SR 3014 (Kline Avenue) over Breakneck Creek in Callery Borough.

Project Description: Rehabilitation/replacement of the existing structure carrying SR 3014 (Kline Avenue) over Breakneck Creek in Callery Borough, Butler County.

Improvement Type: Bridge Replacement 3014

Municipality: Callery (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$22,689

Total FFY 2021-2032 Cost $44,122

PennDOT Project

Id:

89972

Project Administrator: PennDOT SR 3014 Callery Bridge

Period Totals: $895 $0 $0 $0 $20,538

Local/Other: $0 $0 $0 $0 $0

State: $179 $0 $0 $0 $4538

Federal: $716 $0 $0 $0 $18151

Page 81: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,238

Period Totals: $1,238 $0 $0 $0 $0

Local/Other: $62 $0 $0 $0 $0

State: $186 $0 $0 $0 $0

Federal: $990 $0 $0 $0 $0

Project Description: Replacement of the existing structure carrying T-554 (Brewer Road) over Rocky Run in Clinton Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 12/10/20

Location: Existing structure carrying T-554 (Brewer Road) over Rocky Run in Clinton Township.

Improvement Type: Bridge Replacement 7209

Municipality: Clinton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$26,125

Total FFY 2021-2032 Cost $26,225

PennDOT Project

Id:

95872

Project Administrator: PennDOT T-554 Brickyard Hill Bridge

Period Totals: $100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $100 $0 $0 $0 $2409

Federal: $0 $0 $0 $0 $23716

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/1/32

Location: Along PA 228 from SR 3019 (Pittsburgh Street) west to SR 3021 (Franklin Road) in Seven Fields Borough and Adams and Cranberry Townships, Butler County.

Project Description: Intersection improvements and widening of PA 228 to 4/5 lanes from SR 3019 (Pittsburgh Street) west to SR 3021 (Franklin Road) in Seven Fields Borough and Adams and Cranberry

Townships, Butler County.

Improvement Type: Widen 228

Municipality: Cranberry (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $23,266

PennDOT Project

Id:

92908

Project Administrator: PennDOT Mars RR Bridge West Expansion

Period Totals: $8,130 $5,408 $6,452 $3,276 $0

Local/Other: $0 $0 $0 $0 $0

State: $26 $1725 $1588 $1315 $0

Federal: $8104 $3683 $4864 $1961 $0

Project Description: Major realignment project involving the addition of a travel lane in each direction and a center turn lane (5-lane typical section), construction of four new structures and realigned local road

connections, and other miscellaneous construction along PA 228 (Mars Crider Road) from approximately 0.8 mile east of SR 3007 (Three Degree Road) to approximately PA 8 in

Middlesex Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/7/21 Estimated Construction Bid Date: 1/14/21

Location: Along PA 228 (Mars Crider Road) from approximately 0.8 mile east of SR 3007 (Three Degree Road) to approximately PA 8 in Middlesex Township.

Improvement Type: Relocation/Realignment 228

Municipality: Middlesex (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $40,596

PennDOT Project

Id:

91288

Project Administrator: PennDOT Balls Bend

Period Totals: $3,096 $13,475 $4,000 $0 $20,025

Local/Other: $0 $0 $4000 $0 $0

Page 82: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: 2/19/21 Estimated Construction Bid Date: 1/28/21

Improvement Type: Intersection Improvement 19

Municipality: Jackson (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $5,000

PennDOT Project

Id:

104233

Project Administrator: Jackson Towne Center Jackson Twp. Transp. Improvement TIIF

Period Totals: $5,000 $0 $0 $0 $0

Local/Other: $5000 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/22/24

Location: Along PA 228 from the I-79 northbound off ramp to Franklin Road (SR 3021) in Cranberry Township.

Project Description: Addition of a new mile-long eastbound lane along PA 228 from the I-79 northbound off ramp up to Franklin Road in Cranberry Township. This project complements another project that

involves an underpass which will carry traffic exiting the Interstate as well as from Cranberry Woods directly across to the north side of PA 228, to the new Lemieux UPMC-Penguins

training facility and other developments.

Improvement Type: Add Lane 228

Municipality: Cranberry (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $6,711

PennDOT Project

Id:

104231

Project Administrator: PennDOT PA 228/UPMC Enhancements

Period Totals: $561 $2,925 $3,225 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $185 $1045 $0 $0

Federal: $536 $2740 $2180 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/7/21

Location: Existing structure carrying PA 488 (East Portersville Road) over Interstate 79 northbound and southbound in Muddy Creek Township.

Project Description: Rehabilitation/replacement of the existing structure carrying PA 488 (East Portersville Road) over Interstate 79 northbound and southbound in Muddy Creek Township, Butler County.

Improvement Type: Bridge Improvement 488

Municipality: Muddy Creek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,238

PennDOT Project

Id:

98730

Project Administrator: PennDOT Portersville Bridge

Period Totals: $1,238 $0 $0 $0 $0

Local/Other: $62 $0 $0 $0 $0

State: $186 $0 $0 $0 $0

Federal: $990 $0 $0 $0 $0

Project Description: Replacement of the existing structures carrying T-573 (Wylie Road) and T-554 (Brewer Road) over Rocky Run in Clinton Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: Existing structures carrying T-573 (Wylie Road) and T-554 (Brewer Road) over Rocky Run in Clinton Township.

Improvement Type: Bridge Replacement 7209

Municipality: Clinton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

95875

Project Administrator: PennDOT T-573 Wylie & T-554 Brickyard Hill Bridges

Page 83: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 9/29/22

Location: Along PA 356 from PA 228 to PA 28 in Buffalo Township, Butler County.

Project Description: Upgrades/improvements to the flow of traffic with the addition of turning and through lanes, signal retiming and signal coordination along PA 356 from PA 228 to PA 28 in Buffalo

Township, Butler County.

Improvement Type: Transportation Enhancement 356

Municipality: Buffalo (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $11,423

PennDOT Project

Id:

106486

Project Administrator: PennDOT PA 356 Corridor Improvements

Period Totals: $3,128 $0 $3,811 $4,484 $0

Local/Other: $0 $0 $0 $0 $0

State: $91 $0 $0 $1659 $0

Federal: $3037 $0 $3811 $2825 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/16/23

Location: Along SR 228 from 0.47 miles northeast of T-554 (Brewer Road) to 300 feet north of T-557 (Sarver Road) in Clinton and Buffalo Townships.

Project Description: Resurfacing, restoration and rehabilitation along SR 228 from 0.19 miles northeast of T-554 (Brewer Road) to 300 feet north of T-557 (Sarver Road) in Clinton and Buffalo Townships,

Butler County.

Improvement Type: Resurface 228

Municipality: Clinton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,408

PennDOT Project

Id:

105900

Project Administrator: PennDOT Ekastown West 3R

Period Totals: $2,408 $0 $0 $0 $0

Local/Other: $908 $0 $0 $0 $0

State: $1500 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Complete road and intersection improvements on Little Creek Road, Mercer Road, Wise Road, and U.S. 19, including realignment and traffic signals to support a proposed

commercial/retail development in Jackson Township.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/19/21 Estimated Construction Bid Date: 9/3/20

Location: Along Little Creek Road, Mercer Road, Wise Road and US 119 in Jackson Township.

Improvement Type: Intersection Improvement 19

Municipality: Jackson (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

105121

Project Administrator: PennDOT Jackson Twp.Transp. Improvement MTF

Period Totals: $1,500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1500 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Intersection Improvements, roadway improvements and signal installation along US 19, Little Creek Road, Mercer Road, and Wise Road in Jackson Township.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: Along US 19, Little Creek Road, Mercer Road, and Wise Road in Jackson Township.

Page 84: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $2009 $366 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Resurfacing to include milling of the existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses, and minor drainage and guide rail upgrades

along PA 8 from the Allegheny County line to PA 228 in Middlesex Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: Along PA 8 from the Allegheny County line to PA 228 in Middlesex Township.

Improvement Type: Resurface 8

Municipality: Middlesex (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,641

PennDOT Project

Id:

109628

Project Administrator: PennDOT PA 8 Resurfacing - Allegheny to PA 228

Period Totals: $4,330 $4,476 $835 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1681 $400 $167 $0 $0

Federal: $2649 $4076 $668 $0 $0

Project Description: Resurfacing to include milling of the existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses, and minor drainage and guide rail upgrades

along US 19 from approximately 1.0 mile north of the intersection with Freedom Road to approximately 1.8 miles south of Middle Lancaster in Cranberry, Jackson, and Lancaster

Townships and Zelienople Borough, Butler County, and Marshall Township, Allegheny County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/19/21 Estimated Construction Bid Date: 1/28/21

Location: Along US 19 from approximately 1.0 mile north of the intersection with Freedom Road to approximately 1.8 miles south of Middle Lancaster in Cranberry, Jackson, and Lancaster Twps

and Zelienople Borough, Butler Co, and Marshall Twp, Allegheny Co.

Improvement Type: Resurface 19

Municipality: Cranberry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,094

PennDOT Project

Id:

109627

Project Administrator: PennDOT Cranberry North Resurfacing

Period Totals: $806 $3,288 $5,000 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $161 $1658 $0 $0 $0

Federal: $645 $1630 $5000 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/31/22

Location: Along PA 68 from just east of Stevenson Road (T-425) east to the intersection of Meridian Road/Benbrook Road (SR 3007) in Connoquenessing and Butler Townships.

Project Description: Signal replacement, installation of turn lanes, and corridor improvements to enhance safety and reduce congestion along PA 68 from T-425 (Stevenson Road) to SR 3007 (Meridian

Road/Benbrook Road) in Connoquenessing and Butler Townships, Butler County.

Improvement Type: Safety Improvement 68

Municipality: Connoquenessing (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $16,606

PennDOT Project

Id:

106568

Project Administrator: PennDOT PA 68 Corridor Improvements

Period Totals: $2,206 $11,500 $2,900 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1161 $2300 $580 $0 $0

Federal: $1045 $9200 $2320 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 85: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $250

Period Totals: $0 $50 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $50 $200 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/7/21

Location: Existing at grade crossing of the Buffalo & Pittsburgh Railroad on Maple Avenue (DOT Crossing # 145 753 H) in Evans City Borough.

Project Description: Upgrade of the existing railroad crossing crossbuck warning devices with the installation of LED lights and gates at the existing at-grade crossing of the Buffalo & Pittsburgh Railroad on

Maple Avenue (DOT Crossing # 145 753 H) in Evans City Borough, Butler County.

Improvement Type: RR Warning Devices 0

Municipality: Evans City (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,000

PennDOT Project

Id:

110766

Project Administrator: PennDOT Maple Avenue Crossing

Period Totals: $2,453 $547 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $600 $0 $0 $0 $0

Federal: $1853 $547 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: Along the Route 8 Corridor from Penn Street to Pittsburgh Street in Butler City, Butler County.

Project Description: Signal replacement/rehabilitation along the Route 8 Corridor from Penn Street to Pittsburgh Street in Butler City, Butler County.

Improvement Type: Existing Signal Improvement 8

Municipality: Butler (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $1,624

PennDOT Project

Id:

110464

Project Administrator: PennDOT PA 8 Main Street Signal Improvements

Period Totals: $1,624 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1624 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/26/21

Location: Along PA 356/68 from Campus Lane to Moraine Pointe Plaza in Butler Township.

Project Description: Signal upgrades along PA 356/68 from Campus Lane to Moraine Pointe Plaza in Butler Township, Butler County.

Improvement Type: Existing Signal Improvement 356

Municipality: Butler (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,375

PennDOT Project

Id:

110462

Project Administrator: PennDOT PA 356 Moraine Pointe to Campus Ln Signal Upgrade

Period Totals: $2,009 $366 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 86: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: New Roadway 3020

Municipality: Cranberry (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $647

PennDOT Project

Id:

112528

Project Administrator: PennDOT SR 3020 Haine School Road to Commonwealth Drive

Period Totals: $155 $159 $164 $169 $0

Local/Other: $0 $0 $0 $0 $0

State: $155 $159 $164 $169 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various state-owned structures on various routes, in various townships, Butler County.

Project Description: Department force bridge maintenance of various state-owned structures on various routes, in various townships, Butler County.

Improvement Type: Bridge Rehabilitation 8

Municipality: Butler (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,420

PennDOT Project

Id:

111827

Project Administrator: PennDOT Butler Co. Department Force Bridge Maintenance

Period Totals: $1,420 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1420 $0 $0 $0 $0

Project Description: Safety improvements including curve widening, sidewalk, curb replacement, and other miscellaneous construction along PA 68 from Green Lane to Main Street in Zelienople Borough,

Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/11/21 Estimated Construction Bid Date: 2/11/21

Location: Along PA 68 from Green Lane to Main Street in Zelienople Borough, Butler County.

Improvement Type: Safety Improvement 68

Municipality: Zelienople (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $8,890

PennDOT Project

Id:

110826

Project Administrator: PennDOT PA 68 Zelienople Curve

Period Totals: $2,390 $6,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $2390 $6500 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/17/22

Location: Along SR 3021 (Franklin Road) from SR 228 north to T-307 (Peters Road) in Cranberry Township, Butler County.

Project Description: Safety improvements, including shoulder widening, installation of edge-line rumble strips, and sight distance improvements along SR 3021 (Franklin Road) from SR 228 north to T-307

(Peters Road) in Cranberry Township, Butler County.

Improvement Type: Safety Improvement 3021

Municipality: Cranberry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

110783

Project Administrator: PennDOT 10-2 SR 3021 Corridor Improvements

Page 87: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 10/1/28

Location: Existing structure carrying State Route 8 over Connoquenessing Creek, Quarry Street and railroads in Butler City, Butler County.

Improvement Type: Bridge Preservation Activities 8

Municipality: Butler (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $21,664

PennDOT Project

Id:

113652

Project Administrator: PennDOT General Butler Bridge PM

Period Totals: $2,764 $13,525 $5,375 $0 $0

Local/Other: $1264 $0 $5375 $0 $0

State: $1500 $2000 $0 $0 $0

Federal: $0 $11525 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Intersection improvements and widening along PA 3020 (Freedom Road) from west of Powell Road to Haine School Road in Cranberry Township, Butler County. Former project name

was "Freedom Road Improvement (Lovi to Powell)"Project Description: Intersection improvements and widening along PA 3020 (Freedom Road) from west of Powell Road to Haine School Road in Cranberry Township, Butler County. Former project name

was "Freedom Road Improvement (Lovi to Powell)"

Improvement Type: Intersection Improvement 3020

Municipality: Cranberry (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $295

PennDOT Project

Id:

112933

Project Administrator: PennDOT Freedom Rd (Beaver Co. to Haine School Rd)

Period Totals: $295 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $295 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/24/22

Location: Various locations in Armstrong and Butler Counties.

Project Description: Traffic signal retiming/upgrades

42 Signals in Butler Co. - Local routes, PA 19 and 228

Cranberry, Marshall, Adams Twps and Seven Fields Borough

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $161

PennDOT Project

Id:

112713

Project Administrator: PennDOT D10 4c SINC-UP Project

Period Totals: $161 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $161 $0 $0 $0 $0

Project Description: New highway and turning lanes, service and access roads, highway realignment, safety improvements, and other miscellaneous construction along SR 3020 (Freedom Road) from

approximately T-302 Haine School Road to just east of T-725 Commonwealth Drive in Cranberry Township, Butler County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/7/21 Estimated Construction Bid Date: 1/14/21

Location: Along SR 3020 (Freedom Road) from approximately T-302 Haine School Road to just east of T-725 Commonwealth Drive in Cranberry Township.

Page 88: Project Costs(In Thousands)

2025 - 2028

$672

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Location: Hometown Streets project for streetscape improvements along several blocks in the downtown business district in the City of Uniontown, Fayette County.

Municipality: Uniontown (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: 11/7/19 Estimated Construction Bid Date: 12/12/19

Project Administrator: PennDOT HS Gen GC Marshall Plan 2

Improvement Type: Transportation Enhancement 51

$0

Total FFY 2021-2032 Cost $11,200

Fayette

PennDOT Project

Id:

73363

Period Totals: $3,900 $7,300 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $3900 $7300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: I-79 from .2 miles south of Exit 76 north to .3 miles north of Exit 88 in Cranberry and Jackson Twps, Butler Co and I-80 from .3 miles west of Exit 42 west to .2 miles west of Exit 105 in

Clarion and Jefferson CountiesProject Description: Guiderail Upgrade to Mash Compliance including new guiderail and end treatments along I-79 from .2 miles south of Exit 76 north to .3 miles north of Exit 88 in Cranberry and Jackson

Twps, Butler Co and I-80 from .3 miles west of Exit 42 west to .2 miles west of Exit 105 in Clarion and Jefferson Counties

Improvement Type: Guiderail Improvement 79

Municipality: Cranberry (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $7,076

PennDOT Project

Id:

115940

Project Administrator: PennDOT District 10 Interstate Guiderail Upgrade

Period Totals: $0 $0 $2,288 $4,788 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $2288 $4788 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: US 422 from the Duffy Rd (SR 3039) overpass to Whipporwill Rd (Old Route 422/ T-439) in Franklin, Connoquenessing, and Butler Townships, Butler County. Also included is

preventative maintenance paving of SR 8008 ramps between SR 356 and US 422.Project Description: Patch existing concrete four-lane roadway and overlay with bituminous binder and wearing courses, update drainage and guide rail, replace concrete median barrier, preservation work on

structure, and other miscellaneous construction along US 422 from west of its intersection with SR 3007 (Benbrook Road) to approximately west of SR 356 Interchange in Butler Township,

Butler County.

Improvement Type: Resurface 422

Municipality: Connoquenessing (TWP) Air Quality Status: AQ Conformity Does Not Apply

$5,000

Total FFY 2021-2032 Cost $6,235

PennDOT Project

Id:

114188

Project Administrator: PennDOT Butler Bypass Phase 2

Period Totals: $0 $0 $0 $563 $672

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $563 $5000

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: Preservation of the existing structure carrying State Route 8 over Connoquenessing Creek, Quarry Street and railroads in Butler City, Butler County.

Page 89: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$2268

$0

$0

Title:

State Route:

Project Description: This project is the intersection improvements to the US 40 (National Pike) / PA 381 (Farmington-Ohiopyle Road) Intersection in Wharton Township, Fayette County. The project is partially

funded with SAFETEA-LU Earmarks PA 351 and PA 597.

Project Costs(In Thousands)

Actual Construction Bid Date: 1/14/16 Estimated Construction Bid Date: 1/14/16

Location: Intersection Improvements to the US 40 (National Pike) / PA 381 (Farmington-Ohiopyle Road) Intesection

Improvement Type: Intersection Improvement 40

Municipality: Wharton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,140

PennDOT Project

Id:

75056

Project Administrator: PennDOT US 40/PA 381 Intersection

Period Totals: $0 $1,060 $3,924 $1,888 $2,268

Local/Other: $0 $0 $0 $0 $0

State: $0 $1060 $0 $0 $0

Federal: $0 $0 $3924 $1888 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/14/23

Location: SR 4003 (Market Street) over Dunlap Creek, Brownsville Borough, Fayette County, BMS# 26 4003 0090 0502

Project Description: This project is the rehabilitation of the Cast Iron Bridge (State Route 4003 Market Street) over Dunlap Creek in Brownsville Borough, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 4003

Municipality: Brownsville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,802

PennDOT Project

Id:

74344

Project Administrator: PennDOT Cast Iron Bridge

Period Totals: $1,200 $1,500 $3,551 $3,551 $0

Local/Other: $0 $0 $0 $0 $0

State: $1200 $1500 $710 $710 $0

Federal: $0 $0 $2841 $2841 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: PA 711 (Crawford Avenue) over Youghiogheny River, SR 1037 and CSX RR, City of Connellsville, Fayette County, 26-0711-0010-1863

Project Description: This project is the rehabilitation of the structure carrying PA 711 (Crawford Avenue) over the Youghiogheny River, State Route 1037 (South Water Street), and CSX Rail Road in the City

of Connellsville, Fayette County.

Improvement Type: Bridge Rehabilitation 711

Municipality: Connellsville (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $151

PennDOT Project

Id:

74342

Project Administrator: PennDOT PA 711 Crawford Ave Bridge

Period Totals: $151 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

2024 2029 - 2032

Federal: $151 $0 $0 $0 $0

Project Description: Hometown Streets project for streetscape improvements along several blocks in the downtown business district in the City of Uniontown, Fayette County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Page 90: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0Period Totals: $103 $1,591 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $103 $0 $0 $0 $0

Federal: $0 $1591 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/10/21

Location: SR 1037 (Arch Street) over Trump Run, City of Connellsville, Fayette County, BMS# 26 1037 0030 0000

Project Description: This project is the replacement of the structure carrying SR 1037 (Arch Street) over Trump Run in the City of Connellsville, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 1037

Municipality: Connellsville (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$224

Total FFY 2021-2032 Cost $424

PennDOT Project

Id:

76010

Project Administrator: PennDOT SR 1037 over Trump Run

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $224

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/3/27

Location: BMS: 26 0381 0210 0000, Segment/Offset: 0210/0000, PA 381 (Farmington-Ohiopyle Road), Wharton Township, Fayette County

Project Description: This project is the replacement/rehabilitation of the structure carrying PA 381 (Farmington-Ohiopyle Road) over a branch of Meadow Run in Wharton Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 381

Municipality: Wharton (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

76003

Project Administrator: PennDOT PA 381 ov Br Meadow Run - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/1/24

Location: BMS: 26 0166 0170 1296, Segment/Offset: 0170/1296, PA 166 (New Geneva Road), Nicholson Township, Fayette County

Project Description: This project is the replacement/rehabilitation of the structure carrying PA 166 (New Geneva Road) over Cats Creek in Nicholson Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 166

Municipality: Nicholson (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $20

PennDOT Project

Id:

75991

Project Administrator: PennDOT PA 166 over Cats Creek - DFB

Period Totals: $20 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $20 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 91: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$3331

$14357

$0

Title:

$25,969

Total FFY 2021-2032 Cost $53,498

PennDOT Project

Id:

79306

Project Administrator: PennDOT PA 21 over PA 166

Period Totals: $1,441 $6,333 $1,670 $397 $17,688

Local/Other: $0 $0 $0 $0 $0

State: $47 $2464 $1670 $70 $16499

Federal: $1394 $3869 $0 $327 $9470

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Fayette, Greene, Washington and Westmoreland Counties.

Project Description: District 12 Highway and Bridge Line Item.

Improvement Type: Reconstruct 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,167

PennDOT Project

Id:

76508

Project Administrator: PennDOT Dist12 Hwy/Brdg Line Item

Period Totals: $200 $0 $1,967 $0 $0

Local/Other: $0 $0 $393 $0 $0

State: $0 $0 $0 $0 $0

Federal: $200 $0 $1574 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: Moyer Road (T-7202) over Mounts Creek, Bullskin Township, Fayette County, BMS# 26 7202 0906 1115, 26 7202 0906 1072

Project Description: This project is the replacement of two locally owned structures carrying Moyer Road over Mounts Creek in Bullskin Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 7202

Municipality: Bullskin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

76137

Project Administrator: Fayette County Moyer Road Bridges

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: SR 4001 (Rush Run Road) over Rush Run, Luzerne Township, Fayette County, BMS: 26 4001 0050 0582

Project Description: This project is the replacement\rehabilitation of the structure carrying SR 4001 (Rush Run Road) over Rush Run in Luzerne Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4001

Municipality: Luzerne (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,694

PennDOT Project

Id:

76016

Project Administrator: PennDOT SR 4001 over Rush Run 0050-2 - DFB

Period Totals: $103 $1,591 $0 $0 $0

Page 92: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$30000

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/27

Location: BMS: 26 4003 0050 0000, Segment/Offset: 0050/0000, SR 4003 (Bull Run Road), Luzerne Township, Fayette County

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 4003 (Bull Run Road) over Cox Run in Luzerne Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 4003

Municipality: Luzerne (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

81801

Project Administrator: PennDOT SR 4003 over Cox Run - DFB

Period Totals: $400 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 8/24/17 Estimated Construction Bid Date:

Location: District Wide Bridge Preservation Line Item

Project Description: District Wide Bridge Preservation Line Item.

Improvement Type: Bridge Preservation Activities 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $35,168

PennDOT Project

Id:

81229

Project Administrator: PennDOT D12 Bridge Preservation Design

Period Totals: $1,200 $0 $2,968 $1,000 $30,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $2968 $1000 $0

Federal: $1200 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/19/25

Location: SR 4038 over Youghiogheny River / Trail, Perry Township, Fayette County

Project Description: This project is for the improvement of the Layton Bridge (SR 4038, Layton Street) over the Youghiogheny River and Great Allegheny Passage Trail in Perry Township, Fayette County.

*No new capacity will be added*

Improvement Type: Replace/Rehab 4038

Municipality: Perry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $7,581

PennDOT Project

Id:

81192

Project Administrator: PennDOT Layton Bridge

Period Totals: $300 $2,978 $4,303 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $300 $2978 $4303 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: PA 21 (Roy E. Furman Highway) over PA 166, German Township, Fayette County, BMS# 26 0021 0050 1810

Project Description: This project is the replacement of the structure carrying PA 21 (Roy E. Furman Highway) over PA 166 in German Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 21

Municipality: German (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 93: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: SR 4011 (Laureldale Road) over a Branch of Washwater Run Jefferson Township, Fayette County, Bridge Replacement\Rehabilitation, 26 4011 0030 0000

Project Description: This project is the replacement\rehabilitation of the structure carrying SR 4011 (Laureldale Road) over a Branch of Washwater Run in Jefferson Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4011

Municipality: Jefferson (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81994

Project Administrator: PennDOT SR 4011 over Washwater Run - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/1/22

Location: SR 1051 over Branch of Opposum Run, Dunbar Township, Fayette County, Bridge Replacement/Rehabilitation, BMS: 26 1051 0200 0000

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1051 (Crawford Avenue) over a Branch of Opposum Run in Dunbar Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1051

Municipality: Dunbar (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81956

Project Administrator: PennDOT SR 1051 ov Br Opossum Run - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: BMS: 26 2003 0080 2104, Segment/Offset: 0080/2104, SR 2003 (Wharton Furnace Road), Wharton Township, Fayette County

Project Description: This project is the replacement\rehabilitation of the structure carrying SR 2003 (Wharton Furnace Road) over Chaney Run in Wharton Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2003

Municipality: Wharton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81947

Project Administrator: PennDOT SR 2003 over Chaney Run-1 - DFB

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 4003 (Bull Run Road) over Cox Run in Luzerne Township, Fayette County.

*No new capacity will be added*

Page 94: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $200

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/2/23

Location: PA 281 (Bruceton Road) over Pinkham Run , Henry Clay Township, Fayette County, BMS# 26 0281 0030 1349

Project Description: This project is the replacement/rehabilitation of the structure carrying PA 281 (Bruceton Road) over Pinkham Run in Henry Clay Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 281

Municipality: Henry Clay (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

90750

Project Administrator: PennDOT PA 281 over Pinkham Run - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the replacement \rehabilitation of the structure carrying SR 1051 (Breakneck Road) over Butler Run in Bullskin Township, Fayette County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: SR 1051 over Butler Run, Bullskin Township, Fayette County, Bridge Replacement\Rehabilitation, 26 1051 0330 1040

Improvement Type: Bridge Replacement 1051

Municipality: Bullskin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

89078

Project Administrator: PennDOT SR 1051 over Butler Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/11/21

Location: SR 4001 (Rush Run Road) over Rush Run, Luzerne Township, Fayette County, BMS# 62 4001 0050 0000

Project Description: This project is the replacement \rehabilitationof the structure carrying SR 4001 (Rush Run Road) over Rush Run in Luzerne Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4001

Municipality: Luzerne (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

88878

Project Administrator: PennDOT SR 4001 over Rush Run 0050 - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Page 95: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 8/11/22

Improvement Type: Bridge Replacement 2040

Municipality: Uniontown (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

93507

Project Administrator: PennDOT SR 2040 over Redstone Ck

Period Totals: $400 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: D12 Right of Way Agreement

Project Description: D12 Right of Way Agreement

Improvement Type: Planning 0

Municipality: Air Quality Status: Non-Significant: Not included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

92321

Project Administrator: PennDOT D12 Right of Way Line Item

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: BMS: 26 2011 0070 0000, Segment/Offset: 0070/0000, SR 2011 (Dinner Bell Five Forks Road), Wharton Township, Fayette County

Project Description: This project is for the bridge rehabilitation\replacement of the structure carrying SR 2011 (Dinner Bell Five Forks Road) over Little Sandy Creek in Wharton Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 2011

Municipality: Wharton (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

91126

Project Administrator: PennDOT SR 2011 over Little Sandy Ck - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/12/24

Location: PA 281 (Bruceton Road) over a branch of Hall Run , Henry Clay Township, Fayette County, BMS# 26 0281 0040 0000

Project Description: This project is the replacement/rehabilitation of the structure carrying PA 281 (Bruceton Road) over a branch of Hall Run in Henry Clay Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 281

Municipality: Henry Clay (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

90754

Project Administrator: PennDOT PA 281 over Br Hall Run- DFB

Page 96: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,788

PennDOT Project

Id:

96661

Period Totals: $788 $978 $22 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $788 $978 $22 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/16/21

Location: Uniontown: PA 21/Main Street, , Washington Twp: PA 201 Fayette Ave/Vernon Ave, Brownsville: High Street/Brown Ave, High Street, Bridge Street, 2nd Street, Masontown: Main

Street/Cross Street, Main Street/Church StreetProject Description: This project is for signal enhancement and miscellaneous roadway work at various intersections in Fayette County; work to be performed includes signal replacements, modifications, and the

addition of ADA/pedestrian facilities at most locations. The individual intersections are as follows:

SR 21 and SR 2040 (Main St.), City of Uniontown: This signal is an old system with maintenance issues and poor controller placement. The intersection will receive all new signal

equipment including signal poles, mast arms, LED signal heads, new electronics, and ADA signals with pedestrian push buttons. The ADA ramps were recently replaced but will be checked

for ADA compliance during design and updated if necessary.

SR 201 and Fayette Ave., Washington Township: This signal is an old system with maintenance issues. The existing signal equipment, installed on strand wires, will be replaced with new

signal equipment including signal poles, mast arms, LED signal heads and new electronics. Pedestrians are not accommodated at this intersection.

SR 166 (Main St.) and Cross Street, Borough of Masontown: The existing signal equipment, installed on strand wires and poles, will be replaced with new signal equipment including signal

poles, mast arms, LED signal heads and new electronics, and ADA signals with pedestrian push buttons. The ADA ramps were recently replaced but will be checked for ADA compliance

during design and updated if necessary.

Improvement Type: Traffic System Management 21

Municipality: South Union (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $4,000

PennDOT Project

Id:

94953

Project Administrator: PennDOT FACO Signals - 1

Period Totals: $4,000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $4000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: SR 2040 (Main Street) over Redstone Creek, City of Uniontown, Fayette County, BMS# 26 2040 0041 1320

Project Description: This project is the replacement of the structure carrying SR 2040 (Main Street) over Redstone Creek in the City of Uniontown, Fayette County.

*No new capacity will be added*

Page 97: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$18009

$22554

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $1,141

PennDOT Project

Id:

104643

Project Administrator: Fayette County Fayette County #73

Period Totals: $80 $1,061 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $80 $1061 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/26/21

Location: City of Connellsville, York Avenue over Mount Creek, Bridge Rehabilitation

Project Description: This project is the rehabilitation of the structure carrying York Avenue over Mounts Creek, in the City of Connellsville, Fayette County.

Improvement Type: Bridge Rehabilitation 7301

Municipality: Connellsville (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

103208

Project Administrator: City of Connellsville York Avenue Bridge

Period Totals: $500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $500 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/6/19 Estimated Construction Bid Date:

Location: Fayette, Greene, Washington, Westmoreland

Project Description: This project is the design funds for District 12 in house pavement preservation projects.

Improvement Type: Restoration 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $46,248

PennDOT Project

Id:

101968

Project Administrator: PennDOT D12 Pvmt Presv Design

Period Totals: $0 $1,500 $2,000 $2,185 $40,563

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $1500 $2000 $2185 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/12/24

Location: New Interchange to be constructed over US 119 between, US 119/T-821 (McClure Rd.) and US 119/Kingview Road, Bullskin and Upper Tyrone Townships, Fayette County, Segments

0750/0304 to 0780/2481Project Description: This project is the review of the US Route 119 McClure Road intersection area in Upper Tyrone Township, Fayette County, to develop a proposal for projects that would update and

modernize US Route 119 in this area.

Improvement Type: Safety Improvement 119

Municipality: Upper Tyrone (TWP) Air Quality Status: Significant: Included in regional conformity analysis

Project Administrator: PennDOT McClure/Kingview Road Interchange

Page 98: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/23/24

Location: BMS: 26 1005 0012 0000, Segment/Offset: 0012/0000, SR 1005 (Back Creek Road) , Saltlick Township, Fayette County

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 1005 (Back Creek Road) over a branch of Back Creek in Saltlick Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 1005

Municipality: Saltlick (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105387

Project Administrator: PennDOT SR 1005 over Br Back Ck - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: SR 1034 (Tanyard Hollow Road) over Whites Run in Connellsville Township, Fayette County, 26 1034 0030 0036

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 1034 (Tanyard Hollow Road) over Whites Run in Connellsville Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 1034

Municipality: Connellsville (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $85

PennDOT Project

Id:

105323

Project Administrator: PennDOT SR 1034 over Whites Run - DFB

Period Totals: $85 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $17 $0 $0 $0 $0

Federal: $68 $0 $0 $0 $0

Project Description: This project is for bridge improvements on structure carrying SR 4010 (Laurel Hill Road) over Bute Run in Franklin Township, Fayette County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 12/6/18 Estimated Construction Bid Date: 12/6/18

Location: SR 4010 (Laurel Hill Road) over Bute Run , Franklin Township, Fayette County, BMS# 26 4010 0150 0109

Improvement Type: Bridge Improvement 4010

Municipality: Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,429

PennDOT Project

Id:

105309

Project Administrator: PennDOT SR 4010 over Bute Run

Period Totals: $1,399 $30 $0 $0 $0

Local/Other: $278 $6 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1121 $24 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: T-906 (Buttermore Road) over White's Run , Bullskin Township, Fayette County, Bridge Replacement, BMS# 26 7202 0906 1073 (local name: Meidel's Bridge)

Project Description: This project is the replacement of the structure carrying Buttermore Road (T-906) over White's Run in Bullskin Township, Fayette County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 7202

Municipality: Bullskin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 99: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $300 $350 $250 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/5/19

Location: Segment/Offset: 0010/2020, SR 1041 (River Road), Lower Tyrone Township, Fayette County

Project Description: This project is for rail grade crossing improvements on SR 1041 (River Road) in Lower Tyrone Township, Fayette County. Improvements will include upgrading of safety and warning

devices (by replacement or repair) where deemed necessary.

Improvement Type: Crossbuck Signs 1041

Municipality: Lower Tyrone (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $250

PennDOT Project

Id:

106060

Project Administrator: PennDOT Dawson Corridor

Period Totals: $250 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Fayette, Greene, Washington, Westmoreland, District Wide

Project Description: District 12 Department Force Bridge Line Item.

Improvement Type: Bridge Improvement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105858

Project Administrator: PennDOT Districtwide DFB Line Item

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is for replacement\rehabilitation of the structure carrying SR 1051 (Breakneck Road) over Spruce Run in Bullskin Township, Fayette County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/4/21 Estimated Construction Bid Date: 3/4/21

Location: SR 1051 (Breakneck Road) over Spruce Run, Bullskin Township, Fayette County, Bridge Replacement\Rehabilitation, 26 1051 0340 2194

Improvement Type: Bridge Replacement 1051

Municipality: Bullskin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105390

Project Administrator: PennDOT SR 1051 over Spruce Run - DFB

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 1005 (Back Creek Road) over a branch of Back Creek in Saltlick Township, Fayette County.

*No new capacity will be added*

Page 100: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,174

Period Totals: $724 $150 $300 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $724 $150 $300 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: US 119 Corridor, City of Connellsville, Fayette County

Project Description: The SR 0119, Section SE4 (US 119 Connellsville CMAQ) project is located in the City of Connellsville, Fayette County. The project consists of traffic signal upgrades at six intersections

that include US 119's intersections with: SR 1037 (Pittsburgh Street); McDonald's Driveway; York Avenue; Shopping Plaza Driveway; US 119 Southbound & SR 0711/SR 1051 (Crawford

Avenue)/SR 0201 (Vanderbilt Road); and US 119 Northbound & SR 0711 (Crawford Avenue). The project will upgrade traffic signal controllers and other equipment as well as include

hardware to support coordination of the intersections to improve traffic flow and reduce congestion and queueing. The project also includes upgrading existing ADA and pedestrian facilities

at the signalized intersections, and replacement of signing & pavement markings.

Improvement Type: New Traffic Signal 119

Municipality: Connellsville (CITY) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $125

PennDOT Project

Id:

110402

Project Administrator: PennDOT US 119 Connellsville CMAQ

Period Totals: $125 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $125 $0 $0 $0 $0

Project Description: 2019 High Friction Surface Contract

Various Locations District-wide

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 6/4/20 Estimated Construction Bid Date: 6/4/20

Location: Various Locations District-wide

Improvement Type: Safety Improvement 119

Municipality: Connellsville (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $700

PennDOT Project

Id:

109965

Project Administrator: PennDOT 2020 District 12 HFS Contract

Period Totals: $300 $400 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $300 $400 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: District 12

Project Description: Provide assistance to district 12 staff with the review of permit application submissions including all levels of Section 105 permits (including wetland mitigation and stream mitigation plans)

and NPDES permits and provide written comments on behalf of Department to department Project Manager or project consultant, as warranted.

Improvement Type: Miscellaneous 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $900

PennDOT Project

Id:

107869

Project Administrator: PennDOT Env Permit Coordination

Period Totals: $0 $300 $350 $250 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Page 101: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Safety Improvement 711

$0

Total FFY 2021-2032 Cost $4,000

PennDOT Project

Id:

113707

Project Administrator: PennDOT 12-21 RPM

Period Totals: $0 $2,000 $2,000 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $2000 $2000 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/10/22

Location: District wide Slide Repairs

Project Description: This project is for district wide slide repairs to be conducted in various locations and various municipalities in all 4 counties in District 12.

Improvement Type: Slides Correction 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $4,000

PennDOT Project

Id:

113705

Project Administrator: PennDOT 2022 Slide Repairs

Period Totals: $2,000 $2,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2000 $2000 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: 2021 Slide Repairs , District wide

Project Description: This project is to perform slide repairs on various state routes at various locations in various municipalities in Fayette, Greene, Washington and Westmoreland Counties.

Improvement Type: Slides Correction 201

Municipality: Washington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $438

PennDOT Project

Id:

112941

Project Administrator: PennDOT 2021 Slide Repairs

Period Totals: $0 $438 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $438 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Dunbar Business Park, SR 1028 and US 119

Project Description: This project is for transportation improvements to the Dunbar Business Park in Dunbar Township, Fayette County.

Improvement Type: Transportation Enhancement 1028

Municipality: Dunbar (TWP) Air Quality Status: Non-Significant: Not included in regional conformity analysis

Total FFY 2021-2032 Cost $1,174

PennDOT Project

Id:

112312

Project Administrator: FayPenn Dunbar Business Park Trans Impvmts

Page 102: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: D12 Design/Build Prep Line Item

Project Description: D12 Design/Build Prep Line Item

Improvement Type: Bridge Improvement 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $400

PennDOT Project

Id:

114213

Project Administrator: PennDOT D12 Design/Build Prep

Period Totals: $400 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $400 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: US-119 and US-40 Interchange, South Union Township, Fayette County

Project Description: This project is for the study of US-119/US-40 interchange in South Union Township, Fayette County.

Improvement Type: Interchange Improvement 40

Municipality: South Union (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $530

PennDOT Project

Id:

114042

Project Administrator: PennDOT US 40/US 119 Interchange Study

Period Totals: $0 $530 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $530 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/12/22

Location: Replacement/installation of reflective pavement markers throughout the district

Project Description: This project is for the replacement/installation of reflective pavement markers throughout the district.

Improvement Type: Safety Improvement 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $515

PennDOT Project

Id:

113708

Project Administrator: PennDOT 12-22 RPM

Period Totals: $515 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $515 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Replacement/installation of reflective pavement markers throughout the district

Project Description: This project is for the replacement/installation of reflective pavement markers throughout the district.

Municipality: Connellsville (CITY) Air Quality Status: AQ Conformity Does Not Apply

Page 103: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1737

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: BMS: 30 3007 0190 2358, Segment/Offset: 0190/2358, SR 3007 (Bristoria Road) , Rich Hill Township, Greene County,

Project Description: This project is for the rehabilitation/replacement of the structure carrying SR 3007 (Bristoria Road) over Branch of Wheeling Creek in Richhill Township, Greene County.

Improvement Type: Bridge Replacement 3007

Municipality: Richhill (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $4,593

PennDOT Project

Id:

30306

Project Administrator: PENNDOT SR 3007 over Br of Wheeling Crk - DFB

Period Totals: $618 $550 $0 $1,688 $1,737

Local/Other: $0 $0 $0 $0 $0

State: $0 $550 $0 $0 $0

2024 2029 - 2032

Federal: $618 $0 $0 $1688 $0

Location: SR 3001 (Day Road) over Wheeling Creek, Richhill Township, Greene County, BMS# 30 3001 0510 1771

Project Description: This project is for the replacement of the structure carrying SR 3001 (Day Road) over Wheeling Creek (Enlow Fork Bridge) in Richhill Township, Greene County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Richhill (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: Estimated Construction Bid Date: 8/22/24

Project Administrator: PENNDOT SR 3001 over Wheeling Ck

Improvement Type: Bridge Rehabilitation 3001

$0

Total FFY 2021-2032 Cost $4,000

Greene

PennDOT Project

Id:

30134

Period Totals: $0 $0 $4,000 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $4000 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: N/A

Project Description: This project is for the replacement of (11) diesel-fueled buses in the fleet of the Mid-Mon Valley Transit Authority with (11) CNG-fueled ones; fleet is based out of Charleroi Borough,

Washington County, but services Washington County, and portions of Westmoreland, Fayette, and Allegheny Counties.

Improvement Type: Administration 0

Municipality: Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,000

PennDOT Project

Id:

114630

Project Administrator: PennDOT Bus Replacement - MMVTA

Period Totals: $500 $500 $500 $500 $0

Local/Other: $0 $0 $0 $0 $0

State: $500 $500 $500 $500 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 104: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,291

Period Totals: $230 $1,061 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $230 $1061 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/7/21

Location: SR 19 (Mount Morris Road) over Branch of Dunkard Creek, Perry Township, Greene County, BMS: 30 0019 0020 0000, Segment/Offset: 0020/0000

Project Description: This project is the replacement of the structure carrying US Route 19 (Mount Morris Road) over a Branch of Dunkard Creek in Perry Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 19

Municipality: Perry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,032

PennDOT Project

Id:

76027

Project Administrator: PennDOT US 19 BR2 Dunkard Creek

Period Totals: $236 $796 $0 $0 $0

Local/Other: $47 $159 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $189 $637 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: T-634 (Mohr Road) over Muddy Creek, Cumberland Township, Greene County, BMS# 30 7203 0634 2015

Project Description: This project is the replacement of the structure carrying T-634 (Mohr Road) over Muddy Creek in Cumberland Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 7203

Municipality: Cumberland (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,403

PennDOT Project

Id:

51393

Project Administrator: Greene County Planning Commission Greene Co Bridge #15

Period Totals: $310 $0 $1,093 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $310 $0 $1093 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/27/22

Location: PA 21 (Roy E. Furman Highway) over Grinnage Run, Gray Township, Greene County, BMS# 30 0021 0180 0370

Project Description: This project is the replacement of the structure carrying PA 21 (Roy E. Furman Hwy) over Grinnage Run in Gray Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 21

Municipality: Gray (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

30315

Project Administrator: PENNDOT PA 21 over Grinnage Run

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 105: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Rehabilitation 4007

Municipality: Richhill (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81798

Project Administrator: PennDOT SR 4007 over Owens Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: BMS: 30 3018 0020 1794, Segment/Offset: 0020/1794, SR 3018 (Behm Road) over a branch of Blacks Creek , Aleppo Township, Greene County

Project Description: This project is the rehabilitation/replacement of the structure carrying SR 3018 (Behm Road) over a branch of Blacks Creek in Aleppo Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 3018

Municipality: Aleppo (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81796

Project Administrator: PennDOT SR 3018 over Br Blacks Ck - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: SR 3013 (Oak Forest Road) over a branch of Pursley Creek, Center Township, Greene County, BMS# 30 3013 0240 0000

Project Description: This project is the replacement /rehabilitation of the structure carrying SR 3013 (Oak Forest Road) over a branch of Pursley Creek in Center Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3013

Municipality: Center (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $201

PennDOT Project

Id:

79362

Project Administrator: PennDOT SR 3013 ov Br Pursley Ck-0240 - DFB

Period Totals: $201 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $201 $0 $0 $0 $0

Project Description: This project involves the full replacement of one structure and the replacement of the superstructure of a second structure carrying SR 1016 (Whiteley Road) over Little Whitely Creek in

Monongahela Township, Greene County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/18/18 Estimated Construction Bid Date: 10/18/18

Location: SR 1016 (Whiteley Road) over Little Whiteley Creek, Monongahela Township, Greene County, BMS# 30 1016 0010 0670, 30 1016 0010 1440

Improvement Type: Bridge Replacement 1016

Municipality: Monongahela (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

76039

Project Administrator: PennDOT SR 1016 ov Ltl Whiteley Ck-2

Page 106: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: BMS: 30 3022 0010 2261, Segment/Offset:0010/2261, SR 3022 (Bristoria Road), Richhill Township, Greene County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 3022 (Bristoria Road) over a branch of the North Fork of Wheeling Creek in Richhill Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3022

Municipality: Richhill (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,683

PennDOT Project

Id:

81985

Project Administrator: PennDOT SR 3022/N Fork Wheeling Ck - DFB

Period Totals: $463 $720 $500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $463 $720 $500 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/29/22

Location: SR 218 (Smith Creek Road) over Branch of Smith Creek, Franklin Township, Green County, BMS# 30 0218 0230 1397

Project Description: This project is the rehabilitation/replacement of the structure carrying PA 218 (Smith Creek Road) over a branch of Smith Creek in Franklin Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 218

Municipality: Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,573

PennDOT Project

Id:

81849

Project Administrator: PennDOT PA 218 ov Br Smith Ck

Period Totals: $541 $0 $587 $445 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $541 $0 $587 $445 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/27/22

Location: SR 1010 (River Road) over Pumpkin Run, Rices Landing Boro, Greene County, BMS# 30 1010 0030 0408

Project Description: This project is the rehabilitation/replacement of the structure carrying SR 1010 (River Road) over Pumpkin Run in Rices Landing Borough, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 1010

Municipality: Rices Landing (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

81842

Project Administrator: PennDOT SR 1010 over Pumpkin Run

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: BMS: 30 4007 0050 1643, Segment/Offset: 0050/1643, SR 4007 (Ackley Creek Road), Richhill Township, Greene County,

Project Description: This project is the rehabilitation/replacement of the structure carrying SR 4007 (Ackley Creek Road) over Owens Run in Richhill Township, Greene County.

*No new capacity will be added*

Page 107: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1210

$0

$0

Title:

State Route:

2025 - 2028

$0

$5000

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0Period Totals: $515 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $515 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/26/23

Location: PA 88 (Dilliner Point Marion Road) over Whiteley Creek , Monongahela Township, Greene County, BMS# 30 0088 0170 0000

Project Description: This project is the replacement of the structure carrying PA 88 (Dilliner Point Marion Road) over Whiteley Creek in Monongahela Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 88

Municipality: Monongahela (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $5,318

PennDOT Project

Id:

90646

Project Administrator: PennDOT PA 88 over Whiteley Creek

Period Totals: $0 $318 $0 $0 $5,000

Local/Other: $0 $0 $0 $0 $0

State: $0 $318 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/16/21

Location: SR 3001 (Wheeling Creek Road) over Crabapple Creek , Richhill Township, Greene County, Bridge Replacment, BMS# 30 3001 0410 3293

Project Description: This project is the replacement of the structure carrying SR 3001 (Wheeling Creek Road) over Crabapple Creek in Rich Hill Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3001

Municipality: Richhill (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,640

PennDOT Project

Id:

89086

Project Administrator: PennDOT SR 3001 ov Crabapple Ck

Period Totals: $0 $0 $430 $0 $1,210

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $430 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/28/24

Location: T-479 over Browns Creek, Morris Township, Greene County, Bridge Replacement

Project Description: This project is for the replacement of the structure carrying T-479 over Browns Creek in Morris Township, Greene County.

Improvement Type: Bridge Replacement 7214

Municipality: Morris (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

86225

Project Administrator: PennDOT Greene County #75

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 108: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105401

Project Administrator: PennDOT SR 1008 over Neel Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/2/22

Location: SR 4033 (Garner Run Road) over Garners Run , Washington Township, Greene County3, BMS# 30 4033 0030 1328

Project Description: This project is for the replacement/rehabilitation of the structure carrying SR 4033 (Garner Run Road) over Garners Run in Washington Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 4033

Municipality: Washington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105394

Project Administrator: PennDOT SR 4033 over Garners Run - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: BMS: 30 4025 0010 1488, Segment/Offset:0010/1488, SR 4025 (Iams Station Road), Morris Township, Greene County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4025 (Iams Station Road) over a Branch of Browns Creek in Morris Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4025

Municipality: Morris (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,436

PennDOT Project

Id:

105330

Project Administrator: PennDOT SR 4025 over Br Browns Ck - DFB

Period Totals: $310 $0 $0 $1,126 $0

Local/Other: $0 $0 $0 $0 $0

State: $310 $0 $0 $1126 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/24/22

Location: PA 21 (High Street) over Toll Gate Run , Waynesburg Borough, Greene County, BMS# 30 0021 0360 0400

Project Description: This project is for the replacement of the structure carrying PA 21 (High Street) over Toll Gate Run in Waynesburg Borough, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 21

Municipality: Waynesburg (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $515

PennDOT Project

Id:

105306

Project Administrator: PennDOT PA 21 over Toll Gate Run

Period Totals: $515 $0 $0 $0 $0

Page 109: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: BMS: 30 0018 0640 0991

Project Description: This project is the replacement\rehabilitation of the structure carrying PA 18 (Browns Creek Road) over a tributary of the Enlow Fork of Wheeling Creek in Morris Township, Greene

County.

Improvement Type: Bridge Replacement 18

Municipality: Morris (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105839

Project Administrator: PennDOT PA 18 ov Trib Enlow Fork Wheeling Ck- DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4006 (Maranda Run Road) over a branch of Maranda Run in Center Township, Greene County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 11/5/20 Estimated Construction Bid Date: 11/5/20

Location: BMS: 30 4006 0030 0000, Segment/Offset:0030/0000, SR 4006 (Maranda Run Road), Center Township, Greene County

Improvement Type: Bridge Replacement 4006

Municipality: Center (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105403

Project Administrator: PennDOT SR 4006 over Br Maranda Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: BMS: 30 3011 0070 1414, Segment/Offset: 0010/1414, SR 3011 (Hargus Creek Road) , Center Township, Greene County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 3011 (Hargus Creek Road) over a branch of Hargus Creek in Center Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3011

Municipality: Center (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105402

Project Administrator: PennDOT SR 3011 over Br of Hargus Ck - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: BMS: 30 1008 0060 0000, Segment/Offset: 0060/0000, SR 1008 (Carmichaels Street), Cumberland Township, Greene County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1008 (Carmichaels Street) over Neel Run in Cumberland Township, Greene County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1008

Municipality: Cumberland (TWP) Air Quality Status: AQ Conformity Does Not Apply

Page 110: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $0 $0 $0 $0

Project Description: Stormwater Management Line Item

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/19/21 Estimated Construction Bid Date: 1/14/21

Location: Stormwater Management Line Item

Improvement Type: Drainage Improvement 0

Municipality: Monongahela (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $8,000

PennDOT Project

Id:

114211

Project Administrator: PennDOT D12 Stormwater Management

Period Totals: $4,000 $4,000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $4000 $4000 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/1/22

Location: US 19 (Greene Street)/PA 21 (High Street), Segment/Offset: 0290/0000 - 0340/0000;, 0291/0000 - 0341/1305, City of Waynesburg, Greene County.

Project Description: This project is for betterment improvements to US 19 (Greene Street) and PA 21 (High Street) in the city of Waynesburg, Greene County. Project limits are from Roy E. Furman Highway to

Morris Street WB, and from High Street to Roy E. Furman Highway EB.

Improvement Type: Resurface 19

Municipality: Franklin (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $370

PennDOT Project

Id:

113683

Project Administrator: PennDOT Waynesburg Betterment

Period Totals: $0 $0 $0 $370 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $370 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/28/24

Location: Township Road 629 over Bates Fork (Local), Morris Township, Greene County, BMS ID: 30 7214 0629 2073

Project Description: This project is for the replacement of the structure carrying TR-629 over Bates Fork in Morris Township, Greene County.

Improvement Type: Bridge Replacement 7214

Municipality: Morris (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

112595

Project Administrator: PennDOT Greene County #73

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: This project is the replacement\rehabilitation of the structure carrying PA 18 (Browns Creek Road) over a tributary of the Enlow Fork of Wheeling Creek in Morris Township, Greene

County.

Page 111: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,135

Period Totals: $0 $1,135 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $1135 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: Existing structure carrying SR 4422 (West Pike Road) over a tributary of McCarthy Run in White Township.

Project Description: Replacement of the existing structure carrying SR 4422 (West Pike Road) over a tributary of McCarthy Run in White Township, Indiana County.

Improvement Type: Bridge Replacement 4422

Municipality: White (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,503

PennDOT Project

Id:

25752

Project Administrator: PENNDOT Claypoole Heights Bridge

Period Totals: $0 $382 $555 $1,566 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $76 $555 $313 $0

Federal: $0 $306 $0 $1253 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/5/23

Location: Existing structure carrying PA 286 over a tributary of Cherry Run in White Township.

Project Description: Replacement of the existing structure carrying PA 286 over a tributary of Cherry Run in White Township, Indiana County.

Improvement Type: Bridge Replacement 286

Municipality: White (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $350

PennDOT Project

Id:

25596

Project Administrator: PENNDOT PA 286 ovTrib to Cherry Rn

Period Totals: $350 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $70 $0 $0 $0 $0

2024 2029 - 2032

Federal: $280 $0 $0 $0 $0

Location: Existing two-span structure carrying SR 954 over Yellow Creek in Brush Valley, Center, and White Townships.

Project Description: Replacement of the existing two-span structure carrying SR 954 over Yellow Creek in Brush Valley, Center, and White Townships.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: White (TWP) Air Quality Status: AQ Conformity Does Not Apply

Actual Construction Bid Date: Estimated Construction Bid Date: 10/15/24

Project Administrator: PENNDOT Yellow Creek #2 Bridge

Improvement Type: Bridge Replacement 954

$0

Total FFY 2021-2032 Cost $1,420

Indiana

PennDOT Project

Id:

25411

Period Totals: $1,000 $420 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1000 $420 $0 $0 $0

Page 112: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 110

$0

Total FFY 2021-2032 Cost $7,183

PennDOT Project

Id:

83213

Project Administrator: PennDOT Creekside Bridge #1

Period Totals: $395 $3,285 $3,503 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $15 $3285 $3503 $0 $0

Federal: $380 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/13/22

Location: Existing structure carrying US 422 eastbound over SR 8016 in Cherryhill Township, Indiana County.

Project Description: Replacement of the existing structure carrying US 422 eastbound over SR 8016 in Cherryhill Township, Indiana County.

Improvement Type: Bridge Rehabilitation 422

Municipality: Cherryhill (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,091

PennDOT Project

Id:

78101

Project Administrator: PennDOT Mentch Bridge EB/WB

Period Totals: $299 $1,341 $451 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $299 $1341 $451 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/9/21

Location: Replace existing structure carrying SR 3016 (Jacksonville Road) over Two Lick Creek in Center Township and Homer City Borough, Indiana County.

Project Description: Rehabilitation/replacement of the existing structure carrying SR 3016 (Jacksonville Road) over Two Lick Creek in Center Township and Homer City Borough, Indiana County.

Improvement Type: Bridge Replacement 3016

Municipality: Center (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,381

PennDOT Project

Id:

25799

Project Administrator: PENNDOT SR 3016 over Two Lick Creek

Period Totals: $309 $160 $1,912 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $309 $160 $1912 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: Existing structure carrying SR 1046 (Canoe Ridge Rd) over Straight Run in Banks Township, Indiana County.

Project Description: Bridge Rehabilitation/Replacement of the existing structure carrying SR 1046 (Canoe Ridge Rd) over Straight Run in Banks Township, Indiana County. Project site is located .55 miles east

of the Banks/Canoe Township line and 1.3 miles west of SR 1033 (Glen Campbell Road).

Improvement Type: Bridge Improvement 1046

Municipality: Banks (TWP) Air Quality Status: AQ Conformity Does Not Apply

Total FFY 2021-2032 Cost $1,135

PennDOT Project

Id:

25791

Project Administrator: PENNDOT Straight Run Bridge #2

Page 113: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 1/14/29

Location: Existing structure carrying US 119 over Two Lick Creek in Center Township, Indiana County.

Project Description: Rehabilitation of the existing structure carrying US 119 over Two Lick Creek in Center Township, Indiana County.

Improvement Type: Bridge Rehabilitation 119

Municipality: Center (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,491

PennDOT Project

Id:

95852

Project Administrator: PennDOT US 119 over Two Lick Ck.

Period Totals: $0 $0 $0 $1,491 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $1491 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/14/23

Location: Existing structure carrying SR 3007 (Clarksburg Road) over Marshall Run in Conemaugh Township.

Project Description: Replacement of the existing structure carrying SR 3007 (Clarksburg Road) over Marshall Run in Conemaugh Township, Indiana County.

Improvement Type: Bridge Replacement 3007

Municipality: Conemaugh (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,722

PennDOT Project

Id:

83382

Project Administrator: PennDOT SR 3007 over Marshall Run #1

Period Totals: $172 $876 $674 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $34 $876 $674 $0 $0

Federal: $138 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: Existing structure carrying SR 1002 (East Pike) over Ramsey Run in White Township.

Project Description: Replacement of the existing structure carrying SR 1002 (East Pike) over Ramsey Run in White Township, Indiana County.

Improvement Type: Bridge Replacement 1002

Municipality: White (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $516

PennDOT Project

Id:

83364

Project Administrator: PennDOT Ramsey Run Bridge #1

Period Totals: $0 $0 $0 $516 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $516 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/15/26

Location: Existing structure carrying PA 110 over Crooked Creek in Creekside Borough.

Project Description: Replacement of the existing structure carrying PA 110 over Crooked Creek in Creekside Borough.

Municipality: Creekside (BORO) Air Quality Status: AQ Conformity Does Not Apply

Page 114: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $513 $5893

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/14/28

Location: Existing structure carrying US 119 over Stoney Run in Center Township, Indiana County.

Project Description: Replacement of the existing structure carrying US 119 over Stoney Run in Center Township, Indiana County.

Improvement Type: Bridge Replacement 119

Municipality: Center (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,479

PennDOT Project

Id:

101113

Project Administrator: PennDOT Stoney Run Bridge #1

Period Totals: $0 $0 $0 $3,479 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $3479 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/5/23

Location: Along SR 4005 (Indian Springs Road) from PA 954 to SR 4005 (Carter Ave) and from SR 286 (Philadelphia Street) to SR 110 in White Township and Indiana Borough.

Project Description: Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades along

SR 4005 (Indian Springs Road) from PA 954 to SR 4005 (Carter Ave) and from SR 286 (Philadelphia Street) to SR 110 in White Township and Indiana Borough.

Improvement Type: Resurface 4005

Municipality: White (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,837

PennDOT Project

Id:

100122

Project Administrator: PennDOT SR4005-PA954 to Oakland Ave

Period Totals: $2,837 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2837 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/6/21

Location: Along US 119 from T-659 (Marshall Road) to Jefferson County line in North Mahoning Township.

Project Description: Along US 119 from T-659 (Marshall Road) to Jefferson County line in North Mahoning Township.

Improvement Type: Resurface 119

Municipality: North Mahoning (TWP) Air Quality Status: AQ Conformity Does Not Apply

$2,000

Total FFY 2021-2032 Cost $2,513

PennDOT Project

Id:

100118

Project Administrator: PennDOT US119-MarshallRd.toJeffCo

Period Totals: $0 $0 $0 $513 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $513 $2000

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 115: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $882

Period Totals: $882 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $882 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Replacement of the existing structures carrying SR 4032 (Philadelphia Street) over Whites Run and PA 286 over Marsh Run in Indiana Borough, Indiana County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/24/19 Estimated Construction Bid Date: 10/24/19

Location: Existing structures carrying SR 4032 (Philadelphia Street) over Whites Run and PA 286 over Marsh Run in Indiana Borough.

Improvement Type: Bridge Replacement 286

Municipality: Indiana (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,213

PennDOT Project

Id:

106058

Project Administrator: PennDOT Philadelphia St Bridges Grp

Period Totals: $2,213 $0 $0 $0 $0

Local/Other: $511 $0 $0 $0 $0

State: $1702 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/27/22

Location: Along US 22 in Burrell Towship.

Project Description: Construct a multi-purpose pedestrian bridge over US 22 to connect Hoodlebug and Blairsville Riverfront Trails that will expand the multi-state trail network to provide a safe route to school

and reduce short-distance vehicular use in Burrell Township.

Improvement Type: New Bridge 22

Municipality: Burrell (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $410

PennDOT Project

Id:

105124

Project Administrator: PennDOT US 22 Ped/Bike Bridge MTF

Period Totals: $410 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $410 $0 $0 $0 $0

Project Description: Widening of the SR 286 (Oakland Avenue) corridor from two to four through lanes, the addition of five foot bike lanes and five foot sidewalks in both NB and SB direction from the US

Route 422 Interchange to Rustic Lodge Road as well as improvements (which will include traffic signal upgrades additional turning lanes, ADA curb ramps and cross walks at traffic signals)

at eight intersections on SR 286 in White Township, Indiana County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/10/19 Estimated Construction Bid Date: 10/10/19

Location: PA 286 (Oakland Avenue) from Rustic Lodge Road to the US 422 Interchange and SR 4422 (Indian Springs Road) from Birchwood Street to Treese Avenue in White Township.

Improvement Type: New Interchange 286

Municipality: White (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$5,893

Total FFY 2021-2032 Cost $6,406

PennDOT Project

Id:

104459

Project Administrator: PennDOT PA 286: US 422 Interchange East

Period Totals: $0 $0 $0 $513 $0

Local/Other: $0 $0 $0 $0 $0

Page 116: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Safety Improvement 3025

Municipality: Young (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,164

PennDOT Project

Id:

109693

Project Administrator: PennDOT Park Road Slide

Period Totals: $0 $1,164 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $1164 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: Existing structure carrying PA 954 (Cheese Plant Road) over a tributary to Little Mahoning Creek in West Mahoning Township.

Project Description: Rehabilitation/replacement of the existing structure carrying PA 954 (Cheese Plant Road) over a tributary to Little Mahoning Creek in West Mahoning Township, Indiana County.

Improvement Type: Bridge Improvement 954

Municipality: West Mahoning (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $10

PennDOT Project

Id:

109649

Project Administrator: PennDOT Windows Bridge

Period Totals: $10 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $2 $0 $0 $0 $0

Federal: $8 $0 $0 $0 $0

Project Description: Resurfacing to include milling, patching, bituminous overlay, minor drainage work, signal work, and other miscellaneous construction along PA 286 (Oakland Avenue) from approximately

100 feet east of T-813 (Rustic Lodge Road) to SR 4032 (Philadelphia Street) in White Township and Indiana Borough, Indiana County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/28/19 Estimated Construction Bid Date: 2/28/19

Location: PA 286 (Oakland Avenue) from approximately 100 feet east of T-813 (Rustic Lodge Road) to SR 4032 (Philadelphia Street) in White Township and Indiana Borough.

Improvement Type: Resurface 286

Municipality: White (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,647

PennDOT Project

Id:

109641

Project Administrator: PennDOT Oakland Ave Resurfacing-Rustic Lodge Rd to PhilaSt

Period Totals: $0 $0 $0 $1,647 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $1647 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/19/23

Location: Existing structure carrying PA 403 over a tributary to Pine Run in Marion Center Borough.

Project Description: Replacement of the existing structure carrying PA 403 over a tributary to Pine Run in Marion Center Borough, Indiana County.

Improvement Type: Bridge Replacement 403

Municipality: Marion Center (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

109638

Project Administrator: PennDOT Marion Center Bridge #1

Page 117: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various state-owned structures on various routes, in various townships, Indiana County.

Project Description: Department force bridge maintenance of various state-owned structures on various routes, in various townships, Indiana County.

Improvement Type: Bridge Rehabilitation 553

Municipality: Cherryhill (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,080

PennDOT Project

Id:

111829

Project Administrator: PennDOT Indiana Co. Department Force Bridge Maintenance

Period Totals: $450 $263 $1,367 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $250 $263 $1367 $0 $0

Federal: $200 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Existing at-grade intersection of State Route 4422 (Indian Springs Road) and State Route 3033 (Rustic Lodge Road) in White Township, Indiana County.

Project Description: Intersection improvements including left turn lanes, widening and a new traffic signal at the existing at-grade intersection of State Route 4422 (Indian Springs Road) and State Route 3033

(Rustic Lodge Road) in White Township, Indiana County.

Improvement Type: Intersection Improvement 4422

Municipality: White (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $356

PennDOT Project

Id:

111796

Project Administrator: PennDOT Indian Springs Road/Rustic Lodge Road Intersection

Period Totals: $0 $356 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $356 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: A two block area surrounding the Dwight D. Eisenhower Elementary School, in Indiana Borough, Indiana County.

Project Description: Installation of 2,500 feet of five foot wide sidewalks, 30 ADA accessible ramps and crosswalks, and appropriate signage, within a two block area surrounding the Dwight D. Eisenhower

Elementary School in Indiana Borough, Indiana County.

Improvement Type: Transportation Enhancement 0

Municipality: Indiana (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $80

PennDOT Project

Id:

110997

Project Administrator: PennDOT Eisenhower Safe Sidewalks

Period Totals: $80 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $80 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Along SR 3025 (Park Road) in Young Township.

Project Description: Roadway slide repair along SR 3025 (Park Road) in Young Township, Indiana County.

Page 118: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $284 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: Along SR 22 at various locations in East and West Wheatfield Townships, Indiana County.

Project Description: Intelligent Transportation Systems along SR 22 at various locations in East and West Wheatfield Townships, Indiana County.

Improvement Type: Variable Message Signs 22

Municipality: East Wheatfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $90

PennDOT Project

Id:

114842

Project Administrator: PennDOT SR 22 ITS Enhancement Project - TSMO

Period Totals: $90 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $90 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Along SR 3025 (Park Road) from 0.30 miles north of SR 286 to 0.22 miles south of SR 3027 (Blacklegs Road) in Young Township, Indiana County.

Project Description: Slides correction along SR 3025 (Park Road) from 0.30 miles north of SR 286 to 0.22 miles south of SR 3027 (Blacklegs Road) in Young Township, Indiana County.

Improvement Type: Slides Correction 3025

Municipality: Young (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $350

PennDOT Project

Id:

114754

Project Administrator: PennDOT SR 3025 Park Road South: Slides 1-4

Period Totals: $350 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $350 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: Along the southern end of the Hoodlebug Trail connector from a PennDOT installed pedestrian underpass (along Route 119) to the T-841 (Cornell Road) Intersection in Burrell Township,

Indiana County.Project Description: Bicycle and pedestrian facilities along the southern end of the Hoodlebug Trail connector from a PennDOT installed pedestrian underpass (along Route 119) to the Cornell Road Intersection

in Burrell Township, Indiana County

Improvement Type: Transportation Enhancement 0

Municipality: Burrell (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $431

PennDOT Project

Id:

114623

Project Administrator: PennDOT Hoodlebug Trail, Mile Hill Section

Period Totals: $103 $106 $109 $113 $0

Local/Other: $0 $0 $0 $0 $0

State: $103 $106 $109 $113 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 119: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $2,400

Period Totals: $650 $50 $1,000 $700 $0

Local/Other: $0 $0 $0 $0 $0

State: $650 $50 $1000 $700 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Location: Located on South Main Street over Branch of Hickory Run in Bessemer Borough, Lawrence County

Project Description: Bridge replacement/restoration on South Main Street over Branch of Hickory Run in Bessemer Borough, Lawrence County.

Improvement Type: Bridge Replacement 3001

Municipality: Bessemer (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,000

PennDOT Project

Id:

29394

Project Administrator: PENNDOT S. Main Street Bridge

Period Totals: $1,000 $1,000 $0 $0 $0

Local/Other: $50 $50 $0 $0 $0

State: $150 $150 $0 $0 $0

Federal: $800 $800 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/3/22

Location: On Township Road 356 (Wallace Road Bridge) over Little Beaver Creek in Little Beaver Township, Lawrence County

Project Description: (Sponsor = Lawrence County) Bridge Rehabilitation on Township Road 356, (Wallace Road Bridge) over Little Beaver Creek in Little Beaver Township, Lawrence County.

Improvement Type: Bridge Rehabilitation 7203

Municipality: Little Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $700

PennDOT Project

Id:

29327

Project Administrator: Lawrence County Wallace Road Bridge T356

Period Totals: $700 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $140 $0 $0 $0 $0

2024 2029 - 2032

Federal: $560 $0 $0 $0 $0

Location: Located on SR 288 over the B&O Railroad in Wayne Township, Lawrence County.

Project Description: Bridge replacement on SR 288 over the B&O Railroad in Wayne Township, Lawrence County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Wayne (TWP) Air Quality Status: AQ Conformity Does Not Apply

Actual Construction Bid Date: 6/7/18 Estimated Construction Bid Date: 6/7/18

Project Administrator: PENNDOT Wampum Ave Bridge Replace

Improvement Type: Bridge Rehabilitation 288

$0

Total FFY 2021-2032 Cost $284

Lawrence

PennDOT Project

Id:

29301

Period Totals: $284 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 120: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1200

$225

$75

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 7206

$0

Total FFY 2021-2032 Cost $1,955

PennDOT Project

Id:

57104

Project Administrator: North Beaver Township T-341 Burkey Road Bridge

Period Totals: $455 $1,500 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $215 $1500 $0 $0 $0

Federal: $240 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/10/21

Location: Located on SR 3002 (Beaver Dam Road) over Honey Creek in Little Beaver Township, Lawrence County

Project Description: Bridge Restoration including bridge painting on SR 3002 (Beaver Dam Road) over Honey Creek in Little Beaver Township, Lawrence County.

Improvement Type: Bridge Deck Replacement 3002

Municipality: Little Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,077

PennDOT Project

Id:

29541

Project Administrator: PENNDOT Beaver Dam Road

Period Totals: $351 $226 $0 $0 $1,500

Local/Other: $18 $12 $0 $0 $0

State: $53 $34 $0 $0 $0

Federal: $280 $180 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/15/25

Location: Located on Graceland Road (T-462) approximately 1.5 miles southwest of the intersection of Graceland Road (T-462) and State Route 1002 in Neshannock Township, Lawrence County.

Project Description: Bridge replacement on Graceland Road (T-462) approximately 1.5 miles southwest of the intersection of Graceland Road (T-462) and State Route 1002 in Neshannock Township, Lawrence

County.

Improvement Type: Bridge Replacement 7205

Municipality: Neshannock (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

29528

Project Administrator: Neshannock Township Graceland Rd Br T462

Period Totals: $800 $700 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $800 $700 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21

Location: Located on SR 2009, Tower Road over Funk Run in Perry Township, Lawrence County

Project Description: Bridge replacement located on SR 2009, Tower Road over Funk Run in Perry Township, Lawrence County.

Improvement Type: Bridge Replacement 2009

Municipality: Perry (TWP) Air Quality Status: AQ Conformity Does Not Apply

PennDOT Project

Id:

29474

Project Administrator: PENNDOT Tower Road Br/Funk Run

Page 121: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 3/3/22

Location: Located on SR 0551, Enon Road over Sugar Creek, in North Beaver Township, Lawrence County

Project Description: Bridge rehabilitation/replacement on SR 0551, Enon Road over Sugar Creek, in North Beaver Township, Lawrence County.

Improvement Type: Bridge Replacement 551

Municipality: North Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,426

PennDOT Project

Id:

78367

Project Administrator: PennDOT Enon Road over Sugar Creek

Period Totals: $226 $0 $600 $600 $0

Local/Other: $12 $0 $30 $30 $0

State: $34 $0 $90 $90 $0

Federal: $180 $0 $480 $480 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/13/23

Location: Located on Barkley Road over Camp Run in Perry Township, Lawrence County.

Project Description: (Sponsor = Perry Township) Bridge rehabilitation/replacement on Barkley Road over Camp Run in Perry Township, Lawrence County.

Improvement Type: Bridge Replacement 7207

Municipality: Perry (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,502

PennDOT Project

Id:

78357

Project Administrator: Perry Township Barkley Road Bridge #3

Period Totals: $751 $751 $0 $0 $0

Local/Other: $38 $38 $0 $0 $0

State: $113 $113 $0 $0 $0

Federal: $600 $600 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: Located over Jenkins Run in North Beaver Township, Lawrence County.

Project Description: Bridge replacement/restoration on Bartholomew Road (T-473) Bridge over Jenkins Run in North Beaver Township, Lawrence County.

Improvement Type: Bridge Replacement 7206

Municipality: North Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,502

PennDOT Project

Id:

57106

Project Administrator: North Beaver Township Bartholomew Road Bridge

Period Totals: $751 $751 $0 $0 $0

Local/Other: $38 $38 $0 $0 $0

State: $113 $113 $0 $0 $0

Federal: $600 $600 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/8/21

Location: Burkey Road Bridge (T341) is located on Burkey Road over Honey Creek in North Beaver Township, Lawrence County

Project Description: (Sponsor = North Beaver Township) Bridge restoration/replacement on Burkey Road over Honey Creek in North Beaver Township, Lawrence County

Municipality: North Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

Page 122: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$1200

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $79 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: (Sponsor = Pulaski Township) Bridge rehabilitation/ replacement on Coffee Run Road Bridge in Pulaski Township, Lawrence County. The structure is 25 feet of the intersection of Shady

Lane Road (T663) and Coffee Run Road (T-567)

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/27/20 Estimated Construction Bid Date: 2/27/20

Location: Coffee Run Road Bridge (T567) over Coffee Run, in Pulaski Township, Lawrence County. The structure is 25 feet of the intersection with Shady Lane Road (T663)

Improvement Type: Bridge Replacement 0

Municipality: Pulaski (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

88428

Project Administrator: Pulaski Township Coffee Run Road Br T-567

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/10/22

Location: Located on SR 0168 over Hottenbaugh Run in Hickory Township, Lawrence County.

Project Description: Bridge replacement on SR 0168 over Hottenbaugh Run in Hickory Township, Lawrence County.

Improvement Type: Bridge Rehabilitation 168

Municipality: Hickory (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,350

PennDOT Project

Id:

78397

Project Administrator: PennDOT Eastbrook Road Bridge

Period Totals: $0 $0 $150 $0 $1,200

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $150 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/15/27

Location: SR 0018 over Abandoned Plant Access Road South, Beaver Township, Lawrence County.,

Project Description: Bridge replacement on SR 0018 over Abandoned Plant Access Road South, Beaver Township, Lawrence County.

Improvement Type: Bridge Replacement 18

Municipality: North Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,275

PennDOT Project

Id:

78396

Project Administrator: PennDOT PA 18 ov Abandoned Plant Access Rd

Period Totals: $75 $600 $600 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $75 $600 $600 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 123: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $2,805

Period Totals: $419 $511 $0 $1,875 $0

Local/Other: $110 $102 $0 $375 $0

State: $0 $0 $0 $0 $0

Federal: $309 $409 $0 $1500 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/12/22

Location: (Sponsor = SPC) SPC's Regional Traffic Signal Program

Project Description: (Sponsor = SPC) SPC's Regional Traffic Signal Program proposes to continue its mission of improving the operation and safety of the region's key arterial corridors by funding and

implementing signal improvement projects that result in optimized and coordinated signal operations. Working with municipalities and PennDOT, this has been achieved with two types of

projects:

-SINC-UP projects: These projects include minor equipment upgrades in addition to signal retiming. The equipment upgrades are focused on areas required for signal coordination, energy

savings, and safety (communications, controllers, and indications). These projects may also include removal of traffic signals that are no longer warranted.

Improvement Type: Existing Signal Improvement 65

Municipality: Shenango (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $4,295

PennDOT Project

Id:

100382

Project Administrator: SPC SPC - Traffic Signal 4

Period Totals: $0 $400 $0 $3,895 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $779 $0

Federal: $0 $400 $0 $3116 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: Located on SR 65, East Washington Street in Shenango Township, Lawrence County.

Project Description: Mill and overlay on SR 65, East Washington Street in Shenango Township, Lawrence County

Improvement Type: Restoration 65

Municipality: Shenango (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,160

PennDOT Project

Id:

91768

Project Administrator: PennDOT PA 65/East Washington Street

Period Totals: $135 $25 $1,000 $0 $0

Local/Other: $27 $5 $200 $0 $0

State: $108 $20 $800 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/27/23

Location: Hickory View Drive over Hottenbaugh Run in North Beaver Township, Lawrence County.

Project Description: (Sponsor = North Beaver Township) Bridge rehabilitation / replacement on bridge on Hickory View Drive over Hottenbaugh Run in North Beaver Township, Lawrence County.

Improvement Type: Bridge Replacement 7206

Municipality: North Beaver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $255

PennDOT Project

Id:

88721

Project Administrator: North Beaver Township Hickory View Drive Bridge

Period Totals: $255 $0 $0 $0 $0

Local/Other: $176 $0 $0 $0 $0

Page 124: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Transportation Enhancement 0

Municipality: New Castle (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,836

PennDOT Project

Id:

107053

Project Administrator: City of New Castle New Castle Multimodal Regional Riverwalk

Period Totals: $175 $161 $1,500 $0 $0

Local/Other: $9 $9 $75 $0 $0

State: $26 $24 $225 $0 $0

Federal: $140 $128 $1200 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/16/23

Location: Located on McCartney Hollow Road over Tributary to Slippery Rock Creek in Perry Township, Lawrence County.

Project Description: (Sponsor = Perry Township) Bridge rehabilitation/replacement on McCartney Hollow Road over Tributary to Slippery Rock Creek in Perry Township, Lawrence County.

Improvement Type: Bridge Replacement 7207

Municipality: Perry (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $534

PennDOT Project

Id:

105601

Project Administrator: Perry Township McCartney Hollow Road Bridge T311

Period Totals: $534 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $534 $0 $0 $0 $0

Project Description: Highway restoration including a 1 1/2"" mill and overlay on US 224, Youngstown-Poland Road, from Carbon Micco Road to I-376 in Mahoning and Union Townships, Lawrence County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/30/20 Estimated Construction Bid Date: 4/30/20

Location: Located on SR 224, Youngstown-Poland Road , from Carbon Micco Road to Andrews Drive in Mahoning and Union Townships, Lawrence County.

Improvement Type: Restoration 224

Municipality: Mahoning (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $9,500

PennDOT Project

Id:

100920

Project Administrator: PennDOT US 224/Youngstown Poland Rd

Period Totals: $4,700 $3,400 $1,000 $400 $0

Local/Other: $0 $0 $0 $0 $0

State: $4700 $2100 $1000 $400 $0

Federal: $0 $1300 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: Located on East Washington Street (SR 2006) at TR 108 and SR 168 in the City of New Castle, Lawrence County.

Project Description: Bridge replacement/restoration on SR 2006, East Washington Street over Neshannock Creek in the City of New Castle in Lawrence County.

Improvement Type: Bridge Replacement 2006

Municipality: New Castle (CITY) Air Quality Status: AQ Conformity Does Not Apply

PennDOT Project

Id:

100743

Project Administrator: PennDOT East Washington Street Br

Page 125: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 12/25/50

Location: Located on Squaw Run Road (T-472) between Mt. Hope Road (T-715) and State Route 0065 in Wayne Township, Lawrence County

Project Description: Bridge replacement on Squaw Run Road (T-472) between Mt. Hope Road (T-715) and State Route 0065 in Wayne Township, Lawrence County

Improvement Type: Bridge Replacement 0

Municipality: Wayne (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $195

PennDOT Project

Id:

115814

Project Administrator: Wayne Township Squaw Run Rd Bridge No. 1

Period Totals: $10 $185 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $10 $185 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/30/21

Location: Located on SR 2032 (Cherry Street) crossing over RR tracks of New Castle Industrial Railroad (NCIR) in City of New Castle, Lawrence County

Project Description: Railroad safety improvement on SR 2032 (Cherry Street) crossing over RR tracks of New Castle Industrial Railroad (NCIR) in City of New Castle, Lawrence County

Improvement Type: RR Gates 2032

Municipality: New Castle (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $920

PennDOT Project

Id:

114621

Project Administrator: PennDOT NCIR at Cherry Street

Period Totals: $500 $420 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $500 $420 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: North Country Trail along Sankey Hill Road, Shenango Township, Lawrence County

Project Description: (Sponsor = Shenango Township) Construct a dedicated trail lane on North Country Trail along Sankey Hill Road, Shenango Township, Lawrence County

Improvement Type: Transportation Enhancement 0

Municipality: Shenango (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,734

PennDOT Project

Id:

111421

Project Administrator: Shenango Township North Country Trail Safety TAP

Period Totals: $536 $1,198 $0 $0 $0

Local/Other: $110 $856 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $426 $342 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: Located along N. Croton Avenue and North Street Bridge in the City of New Castle, Lawrence County.

Project Description: (Sponsor = City of New Castle) Pedestrian/bicycle friendly route enhancements along East Washington Street, South Mercer Street, South Croton Ave, South Mill Street and Market Street in

the City of New Castle, Lawrence County.

Page 126: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0Local/Other: $17 $0 $0 $0 $0

State: $48 $0 $0 $0 $0

Federal: $518 $492 $246 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/17/22

Location: OVER CHARTIERS CREEK : CANTON TWP : T-623 CO BR #53 :

Project Description: This local project is the replacement of the structure carrying SR 7204 (North Hewitt Avenue T-623) over Chartiers Creek in Canton Township, Washington County.

Improvement Type: Bridge Replacement 7204

Municipality: Canton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $783

PennDOT Project

Id:

30825

Project Administrator: PENNDOT Chartiers Creek #53

Period Totals: $680 $103 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $680 $103 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: This project is the improvements to the structure carrying SR 4012 (Lincoln Avenue) over Robb Run in McDonald Borough, Washington County.

Project Description: This project is the rehabilitation to the structure carrying SR 4012 (Lincoln Avenue) over Robb Run in McDonald Borough, Washington County.

Improvement Type: Bridge Rehabilitation 4012

Municipality: Mcdonald (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $25

PennDOT Project

Id:

30822

Project Administrator: PENNDOT SR 4012 over Robbs Run

Period Totals: $25 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $25 $0 $0 $0 $0

2024 2029 - 2032

Federal: $0 $0 $0 $0 $0

Location: SR 1009 (Pike Street) over Chartiers Creek , Houston Borough, Washington County, BMS# 62 1009 0120 1165

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1009 (Pike Street) over Chartiers Creek in Houston Borough, Washington County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: Houston (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: 4/30/20 Estimated Construction Bid Date: 3/26/20

Project Administrator: PENNDOT SR 1009 over Chartiers Ck

Improvement Type: Bridge Improvement 1009

$0

Total FFY 2021-2032 Cost $470

Washington

PennDOT Project

Id:

30687

Period Totals: $270 $200 $0 $0 $0

Local/Other: $270 $200 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 127: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $1,346

PennDOT Project

Id:

74230

Project Administrator: PennDOT SR 2026 over Trib Mon River - DFB

Period Totals: $286 $530 $530 $0 $0

Local/Other: $12 $0 $0 $0 $0

State: $60 $0 $0 $0 $0

Federal: $214 $530 $530 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: SR 7207 (Valley View Road) over Chartiers Creek , Cecil Township, Washington County, BMS# 62 7207 0672 4030

Project Description: This project is the replacement of SR 7207 (Valley View Road) over Chartiers Creek in Cecil Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 7207

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,246

PennDOT Project

Id:

65226

Project Administrator: PennDOT Chartiers Creek #30

Period Totals: $262 $0 $656 $328 $0

Local/Other: $0 $0 $0 $0 $0

State: $262 $0 $656 $328 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/28/23

Location: SR 1016 (Little Mingo Creek Road) over Branch of Mingo Creek Nottingham Township, Washington County, Bridge Replacement , BMS# 62 1016 0010 0473

Project Description: This project is the replacement of the structure carrying State Route 1016 (Little Mingo Creek Road) over a branch of Mingo Creek in Nottingham Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1016

Municipality: Nottingham (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,222

PennDOT Project

Id:

31152

Project Administrator: PENNDOT SR 1016 ov Br Mingo Ck

Period Totals: $51 $297 $437 $437 $0

Local/Other: $13 $0 $0 $0 $0

State: $38 $0 $0 $0 $0

Federal: $0 $297 $437 $437 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: West Wheeling Street over Trib to Chartiers Ck (Local), City of Washington, Washington County, BMS ID: 62 7302 9023 4058,

Project Description: This project is the replacement of the structure carrying SR 7302 over Catfish Creek (Tributary to Chartiers Creek) in the City of Washington, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 0

Municipality: Washington (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,321

PennDOT Project

Id:

30986

Project Administrator: PENNDOT Chartiers Bridge #58

Period Totals: $583 $492 $246 $0 $0

Page 128: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 9/19/24

Location: PA 18 (Park Avenue) over Chartiers Creek , South Franklin Township, Washington County, BMS# 62 0018 0280 0000

Project Description: This project is the replacement/rehabilitation of structure carrying PA 18 (Park Avenue) over Chartiers Creek in South Franklin Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 18

Municipality: South Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $300

PennDOT Project

Id:

79365

Project Administrator: PennDOT PA 18 over Chartiers Ck-1

Period Totals: $300 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $300 $0 $0 $0 $0

Project Description: This project is the rehabilitation/replacement of the structure carrying State Route 4007 (Bavington Road) over US Route 22 in Smith Township, Washington County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 12/13/18 Estimated Construction Bid Date: 12/13/18

Location: SR 4007 (Bavington Road) over US 22, Hanover and Smith Townships, Washington County, BMS# 62 4007 0080 0000

Improvement Type: Bridge Replacement 4007

Municipality: Smith (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,119

PennDOT Project

Id:

76073

Project Administrator: PennDOT SR 4007 over US 22

Period Totals: $619 $0 $0 $1,500 $0

Local/Other: $0 $0 $0 $0 $0

State: $310 $0 $0 $1500 $0

Federal: $309 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/22/22

Location: PA 88 (Pennsylvania Avenue) over a tributary to the Monongahela River, Speers Borough, Washington County, BMS# 62 0088 0480 2601

Project Description: This project is for the replacement of the structure carrying PA 88 (Pennsylvania Avenue) over a tributary to the Monongahela River in Speers Borough, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 88

Municipality: Speers (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

76050

Project Administrator: PennDOT PA 88 over Trib Mon River

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the replacement of the structure carrying SR 2026 (Main Street) over a tributary of the Monongahela River in Centerville Borough, Washington County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: SR 2026 (Main Street) over a tributary of the Monongahela River , Centerville Borough, Washington County, BMS# 62 2026 0020 2818

Improvement Type: Bridge Replacement 2026

Municipality: Centerville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Page 129: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $200 $0 $500 $2300 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/14/23

Location: SR 4057 (Reed Road) over Brush Run , Buffalo and Hopewell Townships, Washington County, BMS# 62 4057 0070 2297,

Project Description: This project is the rehabilitation/replacement of the structure carrying SR 4057 (Reed Road) over Brush Run in Buffalo and Hopewell Townships, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 4057

Municipality: Buffalo (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

89052

Project Administrator: PennDOT SR 4057 over Brush Run

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: SR 4012 (St. Johns Street) over Robinson Run , Midway Borough, Washington County, BMS# 62 4012 0140 0902

Project Description: This project is the replacement of the structure carrying SR 4012 (St Johns Street) over Robinson Run in Midway Borough, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4012

Municipality: Midway (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $830

PennDOT Project

Id:

81838

Project Administrator: PennDOT SR 4012 over Robinson Run-1

Period Totals: $830 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $830 $0 $0 $0 $0

Project Description: This project is the replacement of the structure carrying SR 3027 (Chapel Hill Road) over Buffalo Creek in East Finley Township, Washington County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: SR 3027 (Chapel Hill Road) over Buffalo Creek, East Finley Township, Washington County, BMS# 62 3027 0040 0000

Improvement Type: Bridge Replacement 3027

Municipality: East Finley (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,472

PennDOT Project

Id:

79387

Project Administrator: PennDOT SR 3027 over Buffalo Ck

Period Totals: $940 $0 $0 $2,532 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $2532 $0

Federal: $940 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Project Description: This project is the replacement/rehabilitation of structure carrying PA 18 (Park Avenue) over Chartiers Creek in South Franklin Township, Washington County.

*No new capacity will be added*

Page 130: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $200

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 2019 (Vanceville Road) over a branch of Pigeon Creek in Somerset Township, Washington County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/22/20 Estimated Construction Bid Date: 10/22/20

Location: 62 2019 0090 1703, SR 2019 (Vanceville Road) over a branch of Pigeon Creek in Somerset Township, Washington County

Improvement Type: Bridge Replacement 2019

Municipality: Somerset (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

90785

Project Administrator: PennDOT SR 2019 over Br Pigeon Creek - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/2/22

Location: BMS ID: 62 1061 0010 0052, Segment/Offset: 0010/0052, SR 1061 (Mingo Church Road), Union Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1061 (Mingo Church Road) over Froman Road in Union Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1061

Municipality: Union (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,910

PennDOT Project

Id:

90690

Project Administrator: PennDOT SR 1061 over Froman Run- DFB

Period Totals: $660 $0 $0 $2,250 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $2250 $0

Federal: $660 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/19/24

Location: PA 18 (Park Avenue) over Chartiers Creek , North Franklin Township, Washington County, BMS# 62 0018 0310 0532

Project Description: This project is the replacement of the structure carrying PA 18 (Park Avenue) over Chartiers Creek in North Franklin Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 18

Municipality: North Franklin (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $3,000

PennDOT Project

Id:

90685

Project Administrator: PennDOT PA 18 over Chartiers Creek-2

Period Totals: $200 $0 $500 $2,300 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Page 131: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 4031

$0

Total FFY 2021-2032 Cost $7,794

PennDOT Project

Id:

103058

Project Administrator: PennDOT SR 4031/Br So Fork Cross Creek - DFB

Period Totals: $703 $0 $0 $7,091 $0

Local/Other: $0 $0 $0 $0 $0

State: $703 $0 $0 $1418 $0

Federal: $0 $0 $0 $5673 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/6/22

Location: SR 2027 (Maple Drive) over Interstate 70 , Speers Borough, Washington County, BMS# 62 2027 0070 1005

Project Description: This project is the replacement of the structure carrying State Route 2027 (Maple Drive) over Interstate 70 in Speers Borough, Washington County.

Improvement Type: Bridge Replacement 2027

Municipality: Speers (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $10

PennDOT Project

Id:

98291

Project Administrator: PennDOT SR 2027 over I-70

Period Totals: $10 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $10 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: jsisul 7/22/2014 10:34:46

This project is the preservation of the structure carrying I-70 over PA 88, PA 906, 2 R/R, and the Mon River (Belle Vernon Bridge); concrete pavement patching on I-70 from the Speers

Interchange to the bridge that carries Ferncliff Drive over I-70; and rock fall remediation at the edge of the shoulders of the eastbound lanes(Seg/Off: 0404/1749 to 0410/1520) and

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 3/12/15 Estimated Construction Bid Date: 1/29/15

Location: 62-0070-0400-1415

Improvement Type: Bridge Preservation Activities 70

Municipality: Speers (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

94684

Project Administrator: PennDOT Belle Vernon Brdg Preserv

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/21/21

Location: 62 2047 0080 1729, SR 2047 (Little Creek Road) over Sowers Run in West Bethlehem Township

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 2047 (Little Creek Road) over Sowers Run in West Bethlehem Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2047

Municipality: West Bethlehem (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

90824

Project Administrator: PennDOT SR 2047 over Sowers Run - DFB

Page 132: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: BMS ID: 62 2013 0020 1807, Segment/Offset: 0020/1807, SR 2013 (Little Daniels Run Road), North Bethlehem Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 2013 (Little Daniels Run Road) over a branch of Little Daniels Run in North Bethlehem Township, Washington

County.

Improvement Type: Bridge Replacement 2013

Municipality: North Bethlehem (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105407

Project Administrator: PennDOT SR 2013/Br Little Daniels Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: BMS ID: 62 3021 0072 0000, Segment/Offset: 0072/0000, SR 3021 (McGuffey Road) , West Finley Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 3021 (McGuffey Road) over a branch of Middle Wheeling Creek in West Finley Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3021

Municipality: West Finley (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105406

Project Administrator: PennDOT SR 3021 ov Br Mid Wheel Creek - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/25

Location: BMS ID: 62 4015 0020 1018, Segment/Offset: 0020/1018, SR 4015 (Waterdam Road) , Mount Pleasant Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4015 (Waterdam Road) over a Branch of Raccoon Creek in Mount Pleasant Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4015

Municipality: Mount Pleasant (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

103142

Project Administrator: PennDOT SR 4015/ Br Raccoon Creek - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/3/21

Location: BMS ID: 62 4031 0040 1630, Segment/Offset: 0040/1630, SR 4031 (Atlasburg Road), Cross Creek Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4031 (Atlasburg Road) over a Branch of South Fork of Cross Creek in Cross Creek Township, Washington

County.

Municipality: Cross Creek (TWP) Air Quality Status: AQ Conformity Does Not Apply

Page 133: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $437 $2334 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/12/24

Location: SR 2001/18 (South Main Street) over a branch of Catfish Creek in the City of Washington, Washington County, BMS: 62 2001 0110 2160, BMS: 62 0018 0350 0612

Project Description: This project is the replacement of the structures carrying SR 2001/18 (South Main Street) over a branch of Catfish Creek in the City of Washington, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2001

Municipality: Washington (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $9,000

PennDOT Project

Id:

105888

Project Administrator: PennDOT SR 2001/PA 18 Bridges over Catfish Creek

Period Totals: $0 $0 $6,000 $3,000 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $6000 $3000 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/16/23

Location: PA 88 Segment/Offset: 0480/0000 to 0530/2603 , 0501/0000 to 0511/3442, Speers, Charleroi, and North Charleroi Boroughs, and Fallowfield Township, Washington

CountyProject Description: This project is for betterment improvements to PA 88 from I-70 to the Charleroi-Monessen Bridge in Speers, Charleroi, and North Charleroi Boroughs, and Fallowfield Township,

Washington County.

Improvement Type: Resurface 88

Municipality: Speers (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105426

Project Administrator: PennDOT Charleroi Betterment

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: 62 2022 0040 0000

Project Description: This project is the replacement/Rehabilitation of the structure carrying SR 2022 (Patterson Run Road) over a branch of Patterson Run in Marianna Borough, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2022

Municipality: Marianna (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105410

Project Administrator: PennDOT SR 2022/Br Patterson Run - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 134: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $2,868

Period Totals: $682 $0 $1,093 $1,093 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $1093 $1093 $0

Federal: $682 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: Intersection of Bebout Road and East McMurray Road in Peters Township, Washington County, Seg/Off: 0120/0000 to 0120/1971

Project Description: This project is the design and installation of turn lanes and a new traffic signal at the Bebout/East McMurray Road intersection in Peters Township, Washington County.

Improvement Type: Intersection Improvement 1002

Municipality: Peters (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

109025

Project Administrator: PennDOT Bebout Rd/ E McMurray Rd Intersection

Period Totals: $500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $500 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/6/23

Location: US 19, Segment/Offset: 0350/1547 to 0600/1265, 0351/1531 to 0601/1255, Various Municipalities, Washington County

Project Description: This project is to update the vehicle detection and signal equipment and institute an adaptive signal system through the US 19 corridor from the I-70/US 19 (DDI) Interchange to the

Allegheny County Line in various municipalities in Washington County.

Improvement Type: Existing Signal Improvement 19

Municipality: South Strabane (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

107432

Project Administrator: PennDOT US 19 Corridor Signal Upgrade

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/5/25

Location: BMS: 62 0231 0150 1182, Segment/Offset: 0150/1182, PA 231 (East Finley Drive), East Finley Township, Washington County

Project Description: This project is the replacement/rehabilitation of the structure carrying PA 231 (East Finley Drive) over a branch of Templeton Run in East Finley Township, Washington County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 231

Municipality: East Finley (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $4,178

PennDOT Project

Id:

105914

Project Administrator: PennDOT PA 231 over Br Templeton Run - DFB

Period Totals: $1,261 $2,917 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $824 $583 $0 $0 $0

Page 135: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Guiderail Improvement 70

$0

Total FFY 2021-2032 Cost $758

PennDOT Project

Id:

113755

Project Administrator: PennDOT Districtwide Cable Median Guiderail

Period Totals: $358 $400 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $358 $400 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Maple Glenn Road and PA 88 Grade Crossing, Centerville, East Bethlehem and Sutersville Boroughs, Washington County, Rail-Highway Crossing Safety upgrades, DOT 367 874 U (NS)

Project Description: This project is for rail-highway crossing safety upgrades to the Maple Glenn Road and PA 88 crossings in Centerville, East Bethlehem, and Sutersville Boroughs, Washington County.

Improvement Type: RR Warning Devices 88

Municipality: East Bethlehem (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $4,784

PennDOT Project

Id:

112651

Project Administrator: PennDOT Maple Glenn Road and PA 88 RRX

Period Totals: $0 $4,784 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $4784 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: PA 88, Fallowfield and McKean Avenue Signal Improvements, Charleroi Borough, Washington County

Project Description: This project is for the replacement and/or removal of 15 traffic signals at various intersections along PA 88 NB (McKean Avenue) and PA 88 SB (Fallowfield Ave), along with other

miscellaneous improvements, in Charleroi Borough, Washington County.

Improvement Type: New Traffic Signal 88

Municipality: Charleroi (BORO) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $2,657

PennDOT Project

Id:

110399

Project Administrator: PennDOT PA 88 Charleroi CMAQ

Period Totals: $680 $0 $1,093 $884 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $1093 $884 $0

Federal: $680 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22

Location: Valleybrook/Bebout Road Intersection, Peters Township, Washington County,

Project Description: This project is for the design and installation of a roundabout at the Valleybrook/Bebout Road Intersection in Peters Township, Washington County.

Improvement Type: Intersection Improvement 1010

Municipality: Peters (TWP) Air Quality Status: Significant: Included in regional conformity analysis

PennDOT Project

Id:

109242

Project Administrator: PennDOT Valleybrook/Bebout Rd Intersection

Page 136: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: I-70 from Exit 39-43

Project Description: This project is for the installation of five closed circuit cameras at six exits along I - 70, from the Speers exit to the Donora exit in various municipalities in Washington and Westmoreland

Counties.

Improvement Type: Traffic System Management 70

Municipality: Twilight (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $1,500

PennDOT Project

Id:

115214

Project Administrator: PennDOT D12 I-70 Cameras Exit 39-43

Period Totals: $0 $0 $1,500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $1500 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: PA 18, City of Washington, Washington County

Project Description: This project is for signal replacement/upgrades to five signal locations on PA 18, US 40, and PA 136 in the City of Washington, Washington County.

Improvement Type: Existing Signal Improvement 18

Municipality: Washington (CITY) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

114561

Project Administrator: PennDOT PA 18: Main Street to Third Sreet

Period Totals: $500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $500 $0 $0 $0 $0

Project Description: This project is for the installation of a flashing beacon at the PA 136/SR 1055 intersection in Somerset Township, Washington County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: SR 0136 Segment/Offset: 0180/1647, Intersection of PA 126 and 1055, Somerset Township, Washington County.

Improvement Type: Safety Improvement 136

Municipality: Somerset (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $620

PennDOT Project

Id:

113757

Project Administrator: PennDOT SR 136/SR 1055 Flashing Beacon

Period Totals: $620 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $620 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/16/21

Location: 62 - SR 0079/0414/2000 - 0480/0700 , 62 - SR 0070/0104/0189 - 0144/1032, 30 - SR 0079/0034/0498 - 0080/0115, 30 - SR 0079/0130/0993 - 0174/2495,

Project Description: This project is for the installation of median cable guiderail in various locations throughout District 12.

Municipality: Buffalo (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 137: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $3100 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/24/21

Location: BPN 1 (I-70 and I-79)

Project Description: This project is for the review and upgrade of guide rail on business plan network 1 (Interstates) to conform with MASH standards on the entirety I-70 and I-79 in various locations district-

wide.

Improvement Type: Guiderail Improvement 70

Municipality: Donegal (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $234

PennDOT Project

Id:

115800

Project Administrator: PennDOT BPN 1 Guide Rail Improvements

Period Totals: $124 $110 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $124 $110 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various Municipalities , Washington and Westmoreland Counties

Project Description: This project is for the installation of fiber optic cable along I-70 from segment 0390-0420 (approximately 3.2 miles) in various municipalities in Washington and Westmoreland Counties.

Improvement Type: Traffic System Management 70

Municipality: Twilight (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $234

PennDOT Project

Id:

115220

Project Administrator: PennDOT D12 I-70 Fiber Installation-2

Period Totals: $124 $110 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $124 $110 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various Municipalities , Washington County

Project Description: This project is for the installation of fiber optic cable along I-70 from segment 0360-0390 in various municipalities in Washington County.

Improvement Type: Traffic System Management 70

Municipality: Fallowfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $277

PennDOT Project

Id:

115218

Project Administrator: PennDOT D12 I-70 Fiber Installation-1

Period Totals: $147 $130 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $147 $130 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 138: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,295

Period Totals: $24 $0 $694 $577 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $694 $577 $0

Federal: $24 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: Fairwood Manor Drive over Tinkers Run (Local Name: Fairwood Manor Bridge) , Irwin Borough, Westmoreland County, BMS# 64 7411 9006 3100

Project Description: This project is the replacement of the structure carrying Fairwood Drive over Tinkers Run (Fairwood Manor Bridge) in Irwin Borough, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 0

Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

31669

Project Administrator: PENNDOT Fairwood Manor Bridge

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Location: SR 1015 (Hamill School Road) over Hypocrite Creek , Fairfield Township, Westmoreland County, BMS# 64 1015 0040 2753

Project Description: This project is the replacement of the structure carrying SR 1015 (Hamill School Road) over Hypocrite Creek in Fairfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 1015

Municipality: Fairfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,719

PennDOT Project

Id:

31634

Project Administrator: PENNDOT SR 1015 over Hypocrite Creek - DFB

Period Totals: $0 $0 $0 $2,719 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $318 $0

2024 2029 - 2032

Federal: $0 $0 $0 $2401 $0

Location: SR 7421 (Fourth Street) over Conrail Railroad , North Irwin Borough, Westmoreland County, BMS# 64 7421 0993 0003

Project Description: This project is the replacement of the structure carrying SR 7421 (Fourth Street) over Conrail Railroad in North Irwin Borough, Westmoreland County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023

Municipality: North Irwin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Actual Construction Bid Date: Estimated Construction Bid Date: 6/9/22

Project Administrator: PENNDOT Fourth Street Bridge

Improvement Type: Bridge Replacement 7421

$0

Total FFY 2021-2032 Cost $3,100

Westmoreland

PennDOT Project

Id:

31554

Period Totals: $3,100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

Page 139: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 1/19/23

Improvement Type: Bridge Improvement 906

Municipality: Rostraver (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

32084

Project Administrator: PENNDOT PA 906 ov Webster Hollow

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/1/23

Location: 64 0366 0262 1821, PA 366 (Greensburg Road) over a branch of Poke Run in Washington Township, Westmoreland County., Bridge Rehabilitation/Replacement

Project Description: This project is the rehabilitation/replacement of structure carrying PA 366 (Greensburg Road) over a branch of Poke Run in Washington Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 366

Municipality: Washington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $150

PennDOT Project

Id:

32059

Project Administrator: PENNDOT PA 366 over Br Poke Run - DFB

Period Totals: $150 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $150 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the rehabilitation/replacement of the structure carrying State Route 4075 (Schaffer Drive) over Pucketa Creek in Upper Burrell Township, Westmoreland County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/4/21

Location: SR 4075 (Schaffer Drive) over Pucketa Creek, Upper Burrell Township, Westmoreland County, BMS# 64 4075 0020 0090

Improvement Type: Bridge Improvement 4075

Municipality: Upper Burrell (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $345

PennDOT Project

Id:

31979

Project Administrator: PENNDOT SR 4075 over Pucketa Creek-DFB

Period Totals: $345 $0 $0 $0 $0

Local/Other: $17 $0 $0 $0 $0

State: $52 $0 $0 $0 $0

Federal: $276 $0 $0 $0 $0

Project Description: This project is the replacement of the structure carrying East Hillis Street over Jacks Run in Youngwood Borough, Westmoreland County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 4/2/20 Estimated Construction Bid Date: 3/12/20

Location: East Hillis Street over Jacks Run, Youngwood Borough, Westmoreland County, BMS# 64 7435 0555 3100

Improvement Type: Bridge Replacement 0

Municipality: Youngwood (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

PennDOT Project

Id:

31918

Project Administrator: PENNDOT East Hillis Street

Page 140: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Costs(In Thousands)

Actual Construction Bid Date: Estimated Construction Bid Date: 3/3/22

Location: SR 3007 (Fayette Street) over Interstate 70 , North Belle Vernon Borough, Westmoreland County, BMS# 64 3007 0032 0987

Project Description: This project is the replacement of the structure carrying State Route 3007 (Fayette Street) over Interstate 70 in North Belle Vernon Borough, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3007

Municipality: North Belle Vernon (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

75972

Project Administrator: PennDOT SR 3007 over I-70

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/1/22

Location: SR 4089 (Hulton Road) over a branch of Chartiers Run in Allegheny Township, Westmoreland County, 64 4089 0020 0000

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4089 (Hulton Road) over a branch of Chartiers Run in Allegheny Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 4089

Municipality: Allegheny (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

74265

Project Administrator: PennDOT SR 4089 over Br Chartiers Run - DFB

Period Totals: $0 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $200 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/1/22

Location: BMS ID: 64 3009 0040 0008, Segment/Offset: 0040/0008, SR 3009 (Lenity School Road), Rostraver Township, Westmoreland County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 3009 (Lenity School Road) over Speers Run in Rostraver Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3009

Municipality: Rostraver (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $361

PennDOT Project

Id:

32097

Project Administrator: PENNDOT SR 3009 over Speers Run - DFB

Period Totals: $361 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $361 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Location: PA 906 (Webster Road) over Webster Hollow Run , Rostraver Township, Westmoreland County, BMS# 64 0906 0150 1645

Project Description: This project is the rehabilitation/replacement of the structure carrying PA 906 (Webster Road) over Webster Hollow Run in Rostraver Township, Westmoreland County.

*No new capacity will be added*

Page 141: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$7879

$1970

$0

$0Period Totals: $1,775 $1,591 $0 $9,849 $9,849

Local/Other: $0 $0 $0 $0 $0

State: $1775 $1591 $0 $1970 $0

Federal: $0 $0 $0 $7879 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/22/23

Location: SR 1060 (Bridge Street) over the Kiskiminetas River and Norfolk Southern Railroad, Bell Township, Westmoreland County, BMS# 64 1060 0010 0000

Project Description: This project is for improvement to the structure (Salina Bridge) carrying State Route 1060 (Bridge Street) over the Kiskiminetas River and Norfolk Southern Railroad in Bell Township,

Westmoreland County.

Improvement Type: Bridge Improvement 1060

Municipality: Bell (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,422

PennDOT Project

Id:

81747

Project Administrator: PennDOT Salina Bridge

Period Totals: $300 $1,000 $1,122 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $300 $1000 $1122 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: SR 3103 (Carbon Road) over a branch of Jacks Run, Hempfield Township, Westmoreland County, BMS# 64 3103 0050 0000

Project Description: This project is the replacement of the structure carrying State Route 3103 (Carbon Road) over a branch of Jacks Run in Hempfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3103

Municipality: Hempfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,258

PennDOT Project

Id:

77872

Project Administrator: PennDOT SR 3103 over Jacks Run

Period Totals: $350 $160 $874 $874 $0

Local/Other: $0 $0 $0 $0 $0

State: $350 $160 $874 $874 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/15/22

Location: US 119 (Crabtree Road) over a branch of Crabtree Creek Hempfield Township, Westmoreland County, BMS# 64 0119 0410 1108

Project Description: This project is for the rehabilitation/replacement of the structure carrying US Route 119 (Crabtree Road) over a branch of Crabtree Creek in Hempfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Improvement 119

Municipality: Hempfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $6,201

PennDOT Project

Id:

76105

Project Administrator: PennDOT US 119 over Crabtree Creek 2

Period Totals: $175 $0 $2,026 $4,000 $0

Local/Other: $0 $0 $0 $0 $0

State: $175 $0 $2026 $4000 $0

Federal: $0 $0 $0 $0 $0

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 142: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$4900

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

$0

Total FFY 2021-2032 Cost $2,855

PennDOT Project

Id:

81991

Project Administrator: PennDOT SR 3016 over Br Sewickley Creek - DFB

Period Totals: $670 $0 $2,185 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $670 $0 $2185 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/16/23

Location: BMS: 64 4012 0010 0000, Segment/Offset: 0010/0000, SR 4012 (Brush Creek Road) , Manor Borough, Westmoreland County

Project Description: Improvements to the structure carrying SR 4012 (Brush Creek Road) over Brush Creek in Manor Borough, Westmoreland County

*No new capacity will be added*

Improvement Type: Bridge Replacement 4012

Municipality: Manor (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $150

PennDOT Project

Id:

81960

Project Administrator: PennDOT SR 4012 over Brush Creek

Period Totals: $150 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $150 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/3/21

Location: BMS: 64 0286 0230 1946

Project Description: This project is the replacement of the structure carrying PA 286 (Saltsburg Road) over Wolford Run in Bell Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 286

Municipality: Bell (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $8,734

PennDOT Project

Id:

81815

Project Administrator: PennDOT PA 286 over Wolford Run-DFB

Period Totals: $0 $1,195 $39 $2,600 $4,900

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $1195 $39 $2600 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 4/14/22

Location: PA 356 (SR 0356 SH) over Pine Run , Allegheny Township, Westmoreland County, BMS# 64 0356 0082 0360

Project Description: This project is the replacement of the structure carrying PA 356 (SR 0356 SH) over Pine Run in Allegheny Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 356

Municipality: Allegheny (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $23,064

PennDOT Project

Id:

81751

Project Administrator: PennDOT PA 356 over Pine Run

Period Totals: $1,775 $1,591 $0 $9,849 $9,849

Page 143: Project Costs(In Thousands)

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Project Description: This project is the reconstruction of US Route 119 from Burton Avenue to Stouts Carpet (where the 4 lane dived highway begins) located in Hempfield Township, Youngwood Borough,

and New Stanton Borough, Westmoreland County.

Actual Construction Bid Date: 4/2/20 Estimated Construction Bid Date: 4/2/20

Location: US 119 from Burton Avenue to Stouts Carpet (where the 4 lane dived highway begins) located in Hempfield Township, Youngwood Borough, Segments 0170/0950 to 0240/0570

Improvement Type: Reconstruct 119

Municipality: Youngwood (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,060

PennDOT Project

Id:

89191

Project Administrator: PennDOT US 119 Youngwood Recon

Period Totals: $0 $2,060 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $2060 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 1/27/22

Location: SR 4019 (Ardara Road) over Brush Creek, North Huntingdon Township, Westmoreland County, BMS# 64 4019 0070 0068,

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 4019 (Ardara Road) over Brush Creek in North Huntingdon Township, Westmoreland County.

Improvement Type: Bridge Improvement 4019

Municipality: North Huntingdon (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $300

PennDOT Project

Id:

89066

Project Administrator: PennDOT SR 4019 over Brush Creek

Period Totals: $300 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $300 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/3/22

Location: BMS: 64 2025 0110 0998

Project Description: This project is the replacement of the structure carrying SR 2025 (Ankney Hill Road) over Welty Run in Mt. Pleasant Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2025

Municipality: Mount Pleasant (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

89043

Project Administrator: PennDOT SR 2025 over Welty Run

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: BMS ID: 64 3016 0050 3666, Segment/Offset: 0050/3666, SR 3016 (Lowber Road) , Sewickley Township, Westmoreland County

Project Description: This project is the of replacement/rehabilitation of the structure carrying SR 3016 (Lowber Road) over a branch of Little Sewickley Creek in Sewickley Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3016

Municipality: Sewickley (TWP) Air Quality Status: AQ Conformity Does Not Apply

Page 144: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$2814

$0

Title:

State Route:

2025 - 2028

Project Description: The scope of work consists of the full replacement of ten (10) existing traffic signals, seven (7) existing traffic signal upgrades, seven (7) coordination/timing changes and the replacement of

two (2) flashing warning devices including sidewalk and ADA curb ramp replacement as well as updating the pavement marking and signs from State Route 3026 (Pittsburgh Street) at

Hamilton Avenue to PA 130 (Humphrey Road) and State Route 8064 (US Route 30 off ramp) in the City of Greensburg and Hempfield Township, Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/30/20 Estimated Construction Bid Date: 1/30/20

Location: PA 130/US 119/SR 3026/SR 3030, City of Greensburg, Westmoreland County,

Improvement Type: Existing Signal Improvement 3026

Municipality: Hempfield (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $6,708

PennDOT Project

Id:

94893

Project Administrator: PennDOT WECO Signal Upgrades-CMAQ

Period Totals: $550 $530 $0 $2,814 $2,814

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $2814 $0

Federal: $550 $530 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/21/23

Location: SR 3030 (St. Clair Way) over US 30 , Hempfield Township, Westmoreland County, BMS# 64 3030 0010 1070

Project Description: This project is the replacement of the structure carrying SR 3030 (St. Clair Way) over US Route 30 in Hempfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3030

Municipality: Hempfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

90834

Project Administrator: PennDOT SR 3030 over US 30

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: SR 3008 (Willowbrook Road) over a branch of Pollock Run in Rostraver Township, Westmoreland County, 64 3008 0050 0000

Project Description: This project is the replacement /rehabilitation of the structure carrying SR 3008 (Willowbrook Road) over a branch of Pollock Run in Rostraver Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 3008

Municipality: Rostraver (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $11,000

PennDOT Project

Id:

90807

Project Administrator: PennDOT SR 3008 over Br Pollock Run - DFB

Period Totals: $10,838 $162 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $10838 $162 $0 $0 $0

Project Description: This project is the reconstruction of US Route 119 from Burton Avenue to Stouts Carpet (where the 4 lane dived highway begins) located in Hempfield Township, Youngwood Borough,

and New Stanton Borough, Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 145: Project Costs(In Thousands)

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $1,603

Period Totals: $511 $0 $546 $546 $0

Local/Other: $0 $0 $0 $0 $0

State: $511 $0 $546 $546 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: PA 982 (New Derry Road) over a branch of Stony Run , Derry Township, Westmoreland County, BMS# 64 0982 0430 0000

Project Description: This project is the replacement of the structure carrying PA 982 (New Derry Road) over a branch of Stony Run in Derry Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 982

Municipality: Derry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $16,974

PennDOT Project

Id:

98860

Project Administrator: PennDOT PA 982 ov Br Stony Run

Period Totals: $4,708 $5,766 $6,500 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $4708 $5766 $6500 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is for safety improvements to various intersections along the PA 356 corridor from just north of White Cloud Road where we will tie into the PA 356 Climbing Lane Project and

south to Pleasant Hill Road, in Allegheny Township, Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: PA 356: Freeport Bridge to North of White Cloud Road, Allegheny Township, Westmoreland County, Safety Improvement

Improvement Type: Safety Improvement 356

Municipality: Allegheny (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $120

PennDOT Project

Id:

96654

Project Administrator: PennDOT PA 356 Safety Improvement

Period Totals: $120 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $120 $0 $0 $0 $0

Project Description: This project is the replacement of nine existing traffic signals and the upgrade of an additional traffic signal located

along PA 981 and Ligonier Streets in the City of Latrobe, Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 10/24/19 Estimated Construction Bid Date: 10/24/19

Location: PA 981 and Ligonier Street in the City of Latrobe and contained within eight city blocks.

Improvement Type: Traffic System Management 981

Municipality: Unity (TWP) Air Quality Status: Significant: Included in regional conformity analysis

$0

Total FFY 2021-2032 Cost $150

PennDOT Project

Id:

94952

Project Administrator: PennDOT PA 981 Signals - Latrobe

Period Totals: $150 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $150 $0 $0 $0 $0

Page 146: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$3205

$801

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Bridge Replacement 3017

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105332

Project Administrator: PennDOT SR 3017 over Br Cedar Creek - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: BMS ID: 64 0981 0040 0000, Segment/Offset: 0040/0000, PA 981 (Smithton Road) , South Huntingdon Township, Westmoreland County

Project Description: This project is for the rehabilitation/replacement of the structure carrying PA 981 (Smithton Road) over Barren Run in South Huntingdon Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 981

Municipality: South Huntingdon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105316

Project Administrator: PennDOT PA 981 over Barren Run - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/2/22

Location: PA 366 over branch of Pucketa Creek (64 0366 0242 2195), Washington Township, Westmoreland County

Project Description: This project is for bridge rehabilitation/replacement on structure carrying PA 366 (Greensburg Road) over Branch of Pucketa Creek in Washington Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 366

Municipality: Washington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $13,616

PennDOT Project

Id:

105315

Project Administrator: PennDOT PA 366 ov Br Pucketa Creek - DFB

Period Totals: $773 $1,303 $3,528 $4,006 $4,006

Local/Other: $0 $0 $0 $0 $0

State: $773 $1303 $3528 $801 $0

Federal: $0 $0 $0 $3205 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 3/7/24

Location: PA 136 (West Newton Bridge) over Youghiogheny River , West Newton Borough, Westmoreland County, BMS# 64 0136 0050 1938

Project Description: This project is the replacement of the structure carrying PA 136 (Main Street) over Youghiogheny River in West Newton Borough, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 136

Municipality: West Newton (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Total FFY 2021-2032 Cost $1,603

PennDOT Project

Id:

98869

Project Administrator: PennDOT West Newton Bridge

Page 147: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: SR 1071 (Hypocrite Creek Road) over a branch of Hypocrite Creek , Fairfield Township, Westmoreland County, Bridge Replacement/Rehabilitation , , 64 1071 0010 0000

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1071 (Hypocrite Creek Road) over a branch of Hypocrite Creek in Fairfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1071

Municipality: Fairfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105415

Project Administrator: PennDOT SR 1071 over Br Hypocrite Creek (Seg 10) - DFB

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: SR 1005 (Shannon Creek Road) over a branch of Shannon Run St. Clair Township, Westmoreland County, Bridge Replacement/Rehabilitation , 64 1005 0030 0000

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 1005 (Shannon Creek Road) over a branch of Shannon Run in St. Clair Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1005

Municipality: St Clair (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105414

Project Administrator: PennDOT SR 1005 over Br Shannon Run - DFB

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 11/4/21

Location: SR 2019 over branch of Sewickley Creek (64 2019 0030 2116), Unity Township, Westmoreland County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 2019 (Marguerite Road) over a branch of Sewickley Creek in Unity Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 2019

Municipality: Unity (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105413

Project Administrator: PennDOT SR 2019 over Br Sewickley Creek - DFB

Period Totals: $0 $0 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $200 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: BMS ID: 64 3017 0030 2615, Segment/Offset: 0030/2615, SR 3017 (Nicholls Hill Road), Rostraver Township, Westmoreland County,

Project Description: This project is for the replacement/rehabilitation of the structure carrying SR 3017 (Nicholls Hill Road) over a Branch of Cedar Creek in Rostraver Township, Westmoreland County

*No new capacity will be added*

Municipality: Rostraver (TWP) Air Quality Status: AQ Conformity Does Not Apply

Page 148: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0State: $0 $0 $0 $0 $0

Federal: $1760 $236 $0 $0 $0

Project Description: This project is rehabilitation of the locally owned structure that carries Ligonier Street over Loyalhanna Creek (County Bridge #29) in Latrobe Borough, Westmoreland County.

*No new capacity will be added*

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 1/14/21 Estimated Construction Bid Date: 1/14/21

Location: Ligonier Street over Loyalhanna Creek (Westmoreland County Bridge #29), Latrobe Borough, Westmoreland County , BMS# 64 7412 9012 5029

Improvement Type: Bridge Rehabilitation 7412

Municipality: Latrobe (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

106405

Project Administrator: PennDOT Westmoreland County #29

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: SR 1071 (Hypocrite Creek Road) over a branch of Hypocrite Creek , Fairfield Township, Westmoreland County, BMS# 64 1071 0030 0000

Project Description: This project is the replacement of the structure carrying SR 1071 (Hypocrite Creek Road) over a branch of Hypocrite Creek in Fairfield Township, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Replacement 1071

Municipality: Fairfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

106047

Project Administrator: PennDOT SR 1071 over Br Hypocrite Creek (Seg 30) - DFB

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/6/24

Location: BMS ID: 64 3010 0040 1826, Segment/Offset: 0040/1826, SR 3010 (Wyano Waltz Mill Road) , South Huntingdon Township, Westmoreland County

Project Description: This project is the replacement/rehabilitation of the structure carrying SR 3010 (Wyano Waltz Mill Road) over a branch of Sewickley Creek in South Huntingdon Township, Westmoreland

County.

Improvement Type: Bridge Replacement 3010

Municipality: South Huntingdon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

105416

Project Administrator: PennDOT SR 3010 over Br Sewickley Creek - DFB

Period Totals: $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $200 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 149: Project Costs(In Thousands)

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$35421

$13954

$0

$0Period Totals: $0 $0 $2,550 $5,364 $49,375

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $2550 $5364 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/30/25

Location: PA 981 from Norvelt to Pleasant Unity, Mount Pleasant Township, Westmoreland County

Project Description: SR 981, Section V20 is approximately 3.5 miles and begins north of the SR 981 and SR 2021 (Kecksburg Road)/Mt. Pleasant Road intersection (Norvelt intersection) in Mount Pleasant

Township. From just north of the Norvelt intersection, the project area extends generally along SR 2023 to the intersection with SR 130 in Unity Township. Section V20 primarily follows

existing SR 2023 with some offline shifts to improve the roadway.

Improvement Type: Relocation/Realignment 981

Municipality: Mount Pleasant (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $50,425

PennDOT Project

Id:

108010

Project Administrator: PennDOT LVTIP: Norvelt to Pleasant Unity

Period Totals: $12,070 $22,312 $16,043 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $4000 $0 $0 $0

Federal: $12070 $18312 $16043 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/10/21

Location: PA 819/PA 981 Intersection to Norvelt (981-Q20), Mount Pleasant and Unity Townships, Westmoreland County

Project Description: The LVTIP (Laurel Valley Transportation Improvement Project) project will upgrade the PA 981 corridor from the intersection with PA 819 in Mount Pleasant Township to the intersection

with US 30 in Unity Township, Westmoreland County.

Improvement Type: Corridor Safety Improvement 981

Municipality: Mount Pleasant (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $1,064

PennDOT Project

Id:

107957

Project Administrator: PennDOT LVTIP: PA 819 to Norvelt (PA 981-Q20)

Period Totals: $1,064 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $1064 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/20/22

Location: Various Local Structures over Loyalhanna Creek, Westmoreland County, BMS# 64 7204 0881 5025, 64 7210 0719 5026, 64 7204 0896 5027, 64 7204 0835 5032

Project Description: This project is for structure improvements to (4) locally owned structures over Loyalhanna Creek in Westmoreland County.

*No new capacity will be added*

The four structures to be worked on follows:

Improvement Type: Bridge Improvement 7204

Municipality: Derry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $2,495

PennDOT Project

Id:

106406

Project Administrator: PennDOT West Co Local Br Preservation

Period Totals: $2,200 $295 $0 $0 $0

Local/Other: $440 $59 $0 $0 $0

Page 150: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$16000

$8570

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$2854

$71972

$0

$12,406

Total FFY 2021-2032 Cost $93,362

Period Totals: $0 $700 $1,500 $3,930 $74,826

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $8998

Federal: $0 $700 $1500 $3930 $3408

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 6/8/23

Location: US 30 , Segment/Offsets (Allegheny County-North Versailles Township), - 0330/1200 to 0340/2437, - 0331/1050 to 0341/2448, Segment/Offsets (Westmoreland County-North

Huntingdon Township), - 0010/0000 to 0060/2931, - 0011/0000 to 0061/2935Project Description: This project is for safety improvements to the western section of the US 30 Corridor Safety Improvement Study Area from the intersection of US 30/PA 48 to Malts Lane in Allegheny and

Westmoreland Counties.

Improvement Type: Widen 30

Municipality: North Huntingdon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $345

PennDOT Project

Id:

110900

Project Administrator: PennDOT US 30 Corridor Impvmts - Western Section

Period Totals: $345 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $345 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 2/13/20

Location: Hillis Street, Youngwood Borough, Westmoreland County

Project Description: This project is for rail grade crossing improvements for the Hillis Street crossing in Youngwood Borough, Westmoreland County.

Improvement Type: RR Warning Devices 0

Municipality: Youngwood (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $26,821

PennDOT Project

Id:

110463

Project Administrator: PennDOT Hillis Street Grade Crossing

Period Totals: $0 $0 $0 $2,251 $24,570

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $2251 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 10/31/24

Location: PA 981 from Pleasant Unity to Airport, Mt Pleasant and Unity Townships, Westmoreland County.

Project Description: The LVTIP (Laurel Valley Transportation Improvement Project) project will upgrade 12 miles of the PA 981 corridor from the intersection with PA 819 in Mount Pleasant Township to the

Westmoreland County Airport in Unity Township.

The LVTIP will be constructed in three separate sections. Section Y10 is the northern most and will tie into the recently completed 981-V10 project near the airport. SR 981-Y10 is

approximately 2.5 miles in length and begins at the SR 2023 intersection with SR 130 in Unity Township.

Improvement Type: Relocation/Realignment 981

Municipality: Unity (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $57,289

PennDOT Project

Id:

108140

Project Administrator: PennDOT LVTIP: Pleasant Unity to Airport

Period Totals: $0 $0 $2,550 $5,364 $49,375

Page 151: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:Improvement Type: Environmental Mitigation 3023

$0

Total FFY 2021-2032 Cost $1,840

PennDOT Project

Id:

112623

Project Administrator: PennDOT MS4 PRP Stream Bank Stabilization

Period Totals: $450 $899 $491 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $180 $191 $0 $0

Federal: $450 $719 $300 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 9/29/22

Location: BMS# 64-4041-0110-0000, Segment/Offset: 0110/0000, SR 4041 (School Road), Municipality of Murrysville, Westmoreland County,

Project Description: This project is for improvements to the structure carrying SR 4041 (School Road) over Haymakers Run in the Municipality of Murrysville, Westmoreland County.

*No new capacity will be added*

Improvement Type: Bridge Rehabilitation 4041

Municipality: Penn (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $910

PennDOT Project

Id:

112554

Project Administrator: PennDOT SR 4041 over Haymakers Run

Period Totals: $910 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $910 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is for the reconstruction of PA 906 from the southern termini of the four lane section to Tenth Street in Rostraver Township and the city of Monessen, Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 12/12/19 Estimated Construction Bid Date: 12/12/19

Location: PA 906:, Seg/Off: From Seg 0020/1337 To , Seg 0070/3165 NB, Seg 0071/3145 SB

Improvement Type: Reconstruct 906

Municipality: Rostraver (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $999

PennDOT Project

Id:

111658

Project Administrator: PennDOT PA 906 Reconstruction

Period Totals: $261 $165 $573 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $261 $165 $573 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/20/21

Location: Derry Township

Project Description: This project is for the construction of segments 5 and 6 of the Loyalhanna Creek Trail in Derry Township, Westmoreland County.

Improvement Type: Bicycle Facilities/Services 0

Municipality: Derry (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Total FFY 2021-2032 Cost $93,362

PennDOT Project

Id:

111416

Project Administrator: Derry Township Municipal Authority Loyalhanna Creek Trail Segments 5 & 6

Page 152: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$1446

$0

$0

Title:

State Route:

Project Description: Various Structures

District Wide

Actual Construction Bid Date: 8/20/20 Estimated Construction Bid Date: 9/17/20

Location: Various Structures, District Wide, Bridge Preservation

Improvement Type: Bridge Improvement 30

Municipality: Hempfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,344

PennDOT Project

Id:

113594

Project Administrator: PennDOT West Co Bridge Preservation 2020

Period Totals: $0 $0 $244 $654 $1,446

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $244 $654 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: DOT Crossings: 510 936 G, 510 934 T, 510 933 L, 510 932 E, 510 931 X, 510 930 R, 510 908 D, 510 906 P, 510 898 A, 510 897 T, 510 895E, 510 890V, 510 889B, 504 620 H, 504

625 S, 504 626 Y, 504 627 F, 504 629 U, 507 636 P,, 507 637 W,Project Description: This project is the RRX Improvements including but not limited to Crossbuck signs, RR gates, and other warning devices on the New Kensington Corridor, at SR 4087 (Second Street), PA

56 (7th Street), and other municipal crossings in the city of New Kensington, Westmoreland County, and at various intersections along the line in District 11 (Only SR crossing is at SR 2082

Hulton Road) in Allegheny County.

Improvement Type: RR Warning Devices 4087

Municipality: New Kensington (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

$0

Total FFY 2021-2032 Cost $200

PennDOT Project

Id:

113267

Project Administrator: PennDOT New Kensington Cooridor

Period Totals: $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 12/12/24

Location: BMS ID: 64 3059 0070 2029, Segment/Offset: 0070/2029, SR 3059 (Turkey Town Road) , South Huntingdon Township, Westmoreland County,

Project Description: This project is the Department Force Bridge Replacement of the structure carrying SR 3059 (Turkey Town Road) over Hunters Run in South Huntingdon Township, Westmoreland County.

Improvement Type: Bridge Replacement 3059

Municipality: South Huntingdon (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

112980

Project Administrator: PennDOT SR 3059 over Hunters Run - DFB

Period Totals: $500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $500 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: Various Locations , District wide

Project Description: This project is for stream bank stabilization activities to be performed at various locations and in various municipalities district-wide.

Municipality: Rostraver (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Page 153: Project Costs(In Thousands)

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: US 30 Segment 370, Georges Station Road (SR 1053)

Project Description: This project is for improvements to the intersection of US 30 (Lincoln Highway) and State Route 1053 (Georges Station Road), located in Hempfield Township, Westmoreland County.

Improvement Type: Intersection Improvement 30

Municipality: Hempfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $3,000

PennDOT Project

Id:

114390

Project Administrator: PennDOT US 30 @ Georges Station Road

Period Totals: $1,300 $1,700 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $1300 $1700 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: US 22 from Allegheny Co Line to Indiana Co Line, Various Municipalities, Westmoreland County

Project Description: This project is for Concrete Pavement Restoration (CPR) repairs to US 22 from the Allegheny Co Line to the Indiana Co Line in various municipalities throughout Westmoreland County.

Improvement Type: Concrete Rehabilitation 22

Municipality: Murrysville (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $500

PennDOT Project

Id:

114224

Project Administrator: PennDOT US 22 Concrete Repair

Period Totals: $500 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $500 $0 $0 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 8/12/21

Location: US 22 and PA 819 Intersection, US 22, Segment/Offset: 0210/3542, Salem Township, Westmoreland County

Project Description: This project is for the safety improvements to the intersection of US 22 and PA 819 in Salem Township, Westmoreland County.

Improvement Type: Intersection Improvement 22

Municipality: Salem (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $750

PennDOT Project

Id:

113758

Project Administrator: PennDOT US 22/PA 819 Intersection Improvements

Period Totals: $0 $750 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $750 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: Various Structures

District Wide

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Page 154: Project Costs(In Thousands)

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $650

Period Totals: $650 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $650 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the preservation SR 1060 (Bridge Street) over the Kiskiminetas River and Norfolk Southern Railroad in Bell Township, Westmoreland County

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 8/20/20 Estimated Construction Bid Date: 8/20/20

Location: SR 1060 (Bridge Street) over the Kiskiminetas River and Norfolk Southern Railroad, Bridge Preservation, Bell Township, Westmoreland County, BMS# 64 1060 0010 0000

Improvement Type: Bridge Preservation Activities 1060

Municipality: Bell (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,750

PennDOT Project

Id:

115290

Project Administrator: PennDOT Salina Bridge Preservation - 2020

Period Totals: $0 $0 $0 $2,750 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $0 $2750 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date:

Location: US 30, Hempfield and Unity Townships, Westmoreland County

Project Description: Project includes upgrading 1 traffic signal and replacing 3 traffic signals, 2 in Hempfield Township and 1 in Unity Township, Westmoreland County along CMAQ Corridor 95. The

following intersections will require equipment upgrades to implement timing coordination: SR 30 and SR 1073 (Sheraton Dr / Old Route 30SR 30 and Nature Park Road / Eastgate

Shopping Center (complete signal replacement). SR 30 and SR 1053 (Georges Station Road) (complete signal replacement). SR 30 and Lewis Rd (T-669) (complete signal replacement).

The new traffic signals will include improved vehicle detection and controller capabilities, ADA

Improvement Type: Existing Signal Improvement 30

Municipality: Hempfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $2,250

PennDOT Project

Id:

114563

Project Administrator: PennDOT 30 Hempfield on Corridor 95

Period Totals: $0 $0 $2,250 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0

Federal: $0 $0 $2250 $0 $0

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: Estimated Construction Bid Date: 5/11/23

Location: Various Locations in Westmoreland County

Project Description: This project includes the replacement of 1 traffic signal and minor improvements to 7 traffic signals located on Congestion Management Corridor 88 in order to implement an efficient

traffic signal system and coordination timings in various locations in Westmoreland County.

Improvement Type: Existing Signal Improvement 119

Municipality: South Greensburg (BORO) Air Quality Status: AQ Conformity Does Not Apply

$0

Total FFY 2021-2032 Cost $600

PennDOT Project

Id:

114560

Project Administrator: PennDOT 119 SW Greensburg CMAQ

Period Totals: $400 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $400 $200 $0 $0 $0

Page 155: Project Costs(In Thousands)

Title:

State Route:

2025 - 2028

$0

$0

$0

$0

Total FFY 2021-2032 Cost $770

HBTIP

Period Totals: $350 $420 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0

State: $350 $420 $0 $0 $0

Federal: $0 $0 $0 $0 $0

Project Description: This project is the preservation (Epoxy Overlay) of various structures located within Westmoreland County.

Project Costs(In Thousands)

Phase Fund 2021 2022 2023 2024 2029 - 2032

Actual Construction Bid Date: 2/19/21 Estimated Construction Bid Date: 2/19/21

Location: Westmoreland County, Various Structures, Bridge Preservation

Improvement Type: Bridge Improvement 136

Municipality: Hempfield (TWP) Air Quality Status: AQ Conformity Does Not Apply

Total FFY 2021-2032 Cost $650

PennDOT Project

Id:

115568

Project Administrator: PennDOT Westmoreland County Epoxy Overlay- 2020