project directory project description partition type ... 50% progre… · 15/12/2015 · see door...
TRANSCRIPT
UP
UP
RAD PHYSICSCOUNTING
DOORS ATUPPER LEVEL
DOORS ATUPPER LEVEL CANOPY ABOVE
LOADING DOCKUPUP
DN
DOOR TO AREAUNDER LECTURE HALL
(SEE ABOVE)
TO AREA UNDERLECTURE HALL(SEE ABOVE)
DN
UP
UP
UP
DN
storage room under stairs
doors
LAV
MULTIPURPOSE LAB
DN
SOURCE STORAGE
LIFT
NEUTRONGENERATOR
CONTROLROOM
NEUTRON GEN.CONTROLLER
ELECTRON BEAM LAB
NEUTRON REF. LAB
NRFL/RPL EQUIPMENT
MATERIALCONTROL MATERIALS LAB
GAMMA CALIBRATION
ABBREVIATIONS
ALUM
CONT
CLR
C.J.
GHM
GL
HC
HM
MIN
MAX
O.H.
P.T.
SS
TYP
UNO.
VIF
WC
WD
EQ
C
P
PW
ALUMINUM
CONTINUOUS
CLEAR
CONTROL JOINT
GALVANIZED HOLLOW METAL
GLASS
HANDICAP
HOLLOW METAL
MINIMUM
MAXIMUM
OPPOSITE HAND
PRESSURE TREATED
STAINLESS STEEL
TYPICAL
UNLESS NOTED OTHERWISE
VERIFY IN FIELD
WATER CLOSET
WOOD
EQUAL
CENTERLINE
PROPERTY LINE
PLYWOOD
L
L
APPLICABLE CODES
INTERNATIONAL BUILDING CODE, 2012 EDITION,W/ GEORGIA STATE AMENDMENTS (2014) (2015).
INTERNATIONAL FIRE CODE, 2012 EDITION,WITH GEORGIA STATE AMENDMENTS (2014).
INTERNATIONAL PLUMBING CODE, 2012 EDITION,WITH GEORGIA STATE AMENDMENTS (2014) (2015).
INTERNATIONAL MECHANICAL CODE, 2012 EDITION,WITH GEORGIA STATE AMENDMENTS (2014) (2015).
INTERNATIONAL FUEL GAS CODE, 2012 EDITION,WITH GEORGIA STATE AMENDMENTS (2014) (2015).
NATIONAL ELECTRICAL CODE, 2014 EDITION(NO GEORGIA AMENDMENTS).
INTERNATIONAL ENERGY CONSERVATION CODE, 2009 EDITION,W/ GEORGIA STATE SUPPLEMENTS AND AMENDMENTS (2011) (2012).
2010 DEPARTMENT OF JUSTICE ADA STANDARDS FOR ACCESSIBLEDESIGN.
2012 NFPA 101 LIFE SAFETY CODE W/ GEORGIA AMENDMENTS (2013)
DRAWING CONVENTIONS
ROOM LABEL
ROOM NO.
A1011
SIM
101 DOOR NUMBER INDICATOR;SEE DOOR SCHEDULE
ALIGN ALIGN
EXISTING COLUMN INDICATOR
NORTH ARROW
DETAIL INDICATOR
SHEET NUMBER
DRAWING NUMBER
BUILDING / WALL SECTION
9'-0"A.F.F
ELEVATION DATUM
0
BREAKLINE
ELEVATION INDICATORA2.01
1
X-X1XX.1INTERIOR PARTITION INDICATOR
DIMENSION TO EDGEOR FACE OF FINISH
DIMENSION TOCENTERLINE
REVISION CLOUD AND NUMBER
PROJECT DESCRIPTION
REDESIGN AND IMPROVEMENTS TO BOGGS LECTURE HALLS ANDLOBBY INCLUDE NEW FURNISHINGS, NEW FINISHES, IMPROVED HVACDISTRIBUTION, NEW LIGHTING, AND UPDATED A/V EQUIPMENT.
PROJECT DIRECTORY
OWNERGEORGIA INSTITUTE OF TECHNOLOGY955 FOWLER STREET, NWATLANTA, GEORGIA 30332
OWNER REPRESENTATIVENICHOLAS PALFREY, AIA, LEED APOFFICE OF FACILITIES MANAGEMENT - DESIGN & CONSTRUCTION
PHONE: 404.894.6974EMAIL: [email protected]
ARCHITECT OF RECORDMake3 architecture/planning/design1075 BRADY AVENUE, NWATLANTA, GEORGIA 30318
PHONE: 404.876.5510WEB: www.make3arch.com
PRINCIPLE IN CHARGE:JIM WINER, AIA, LEED [email protected]
MECHANICAL ENGINEERJOHNSON, SPELLMAN & ASSOCIATES350 RESEARCH COURT, SUITE 130PEACHTREE CORNERS, GEORGIA 30092
PHONE: 770.447.4555WEB: jsace.com
ELECTRICAL ENGINEERBARNETT CONSULTING ENGINEERS655 ENGINEERING DRIVE, SUITE 150NORCROSS, GEORGIA 30092
PHONE: 404.382.9550WEB: bce-eng.com
ACOUSTICS CONSULTANTJ & A ENGINEERING CONSULTANTS4994 LOWER ROSWELL ROADMARIETTA, GEORGIA 30068
PHONE: 770.817.4220WEB: jaengineering.net
PROJECT MANAGER:JANICE [email protected]
MECHANICAL CONTACT:TIM [email protected]
CONTACT:LEAH BENINCASA, [email protected]
CONTACT:JORGE [email protected]
PLUMBING CONTACT:RICK [email protected]
SITE LOCATION MAP
BOGGS AUDITORIUM
PARTITION TYPE LEGEND
FIRE & SMOKE RATING:Not rated
1- One hour rated partition
BASIC MATERIAL:S Metal stud
BASIC SIZE:1 7/8" furring2 2 1/2" metal stud4 3-5/8" metal stud6 6" metal stud
APPLIED LAYERS:A 1 layer of 5/8" drywall;AA 1 layer 5/8" drywall each side;AB 1 layer 5/8" drywall one side, 1 layer 5/8" DensShield other side;BB 1 layer 5/8" DensShield each side
MODIFYING CONDITIONS:.1 Complete wall assembly is continuous to underside of structure above..2 Complete wall assembly extends 4" above finish ceiling; provide bracing as necessary.
PARTITION TYPE SYMBOL
BASIC MATERIAL
BASIC SIZE
APPLIED LAYERS CODE
MODIFYING CONDITIONS CODE
1-S6A.1
FIRE & SMOKE RATING CODE
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
STUDYB-1CB-1C
STORAGEB-12AB-12A
MECHANICALB-10AB-10AMECHANICAL
B-10B-10
HAZARDWASTE
B-12BB-12B
ELECB-4B-4
ELECB-4AB-4A
VESTIBULEB-2AB-2A
VESTIBULEB-2B-2
14
LECTUREHALL
B-6AB-6A
LECTUREHALL
B-6B-6
STOB-3AB-3ASTO
B-3B-3
LOBBYB-1B-1
3'-8
"
GROUND FLOOR KEY PLAN
AREA OF WORK
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A000
201511
COVER SHEET
JF Checker
DRAWING LIST
Sheet Number Sheet NameSHEETDATE
11/02/15 SDPRICING
SET12/15/15 50%
CD
01 ARCHITECTURALA000 COVER SHEET 12/15/15 □ ●A000.3D 3D VIEWS 12/15/15 ●A100.D DEMOLITION FLOOR PLAN & REFLECTED CEILING PLAN - LEVEL 0 12/15/15 □ ●A100 FLOOR PLAN & REFLECTED CEILING PLAN - LEVEL 0 12/15/15 □ ●A301 BUILDING SECTIONS 12/15/15 ●A401 WALL SECTIONS 12/15/15 ●A501 PLAN DETAILS 12/15/15 ●A502 SECTION DETAILS 12/15/15 ●A701 INTERIOR ELEVATIONS 12/15/15 □ ●A702 INTERIOR ELEVATIONS 12/15/15 □ ●A703 INTERIOR ELEVATIONS 12/15/15 □ ●A704 INTERIOR ELEVATIONS 12/15/15 □ ●A705 INTERIOR ELEVATIONS 12/15/15 □ ●A706 INTERIOR ELEVATIONS 12/15/15 □ ●A900 FINISH PLAN AND DOOR/FINISH SCHEDULE - LEVEL 0 12/15/15 □ ●
03 MECHANICALM001 HVAC LEGEND, SCHEDULE, DETAILS & GENERAL NOTES 12/15/15 ●M100.D HVAC DEMOLITION FLOOR PLANS 12/15/15 ●M100 HVAC NEW WORK FLOOR PLANS 12/15/15 ●
04 ELECTRICALE000 DRAWING INDES, GENERAL NOTES & LEGENDS 12/15/15 ●E020 DEMOLITION PLANS - POWER & FIRE ALARM 12/15/15 ●E021 DEMOLITION PLANS - LIGHTING 12/15/15 ●E201 POWER PLANS 12/15/15 ●E301 LIGHTING PLANS 12/15/15 ●E302 LIGHTING PLANS - STEP LIGHTING 12/15/15 ●E401 FIRE ALARM PLANS 12/15/15 ●E901 PANEL SCHEDULES 12/15/15 ●E931 SCHEDULES & DETAILS - LIGHTING 12/15/15 ●
1/8" = 1'-0"A0001 LIFE SAFETY FLOOR PLAN - LEVEL 0
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A000.3D
201511
3D VIEWS
Author Checker
A000.3D1 LECTURE HALL B-6 VIEW 1
A000.3D2 LECTURE HALL B-6 VIEW 2
A000.3D3 LECTURE HALL B-6 VIEW 3
A000.3D4 LECTURE HALL B-6A VIEW 1
A000.3D5 LOBBY VIEW
RAD PHYSICSCOUNTING
DOORS ATUPPER LEVEL
DOORS ATUPPER LEVEL CANOPY ABOVE
LOADING DOCKUPUP
DN
DOOR TO AREAUNDER LECTURE HALL
(SEE ABOVE)
TO AREA UNDERLECTURE HALL(SEE ABOVE)
DN
UP
UP
UP
DN
storage room under stairs
doors
LAV
MULTIPURPOSE LAB
DN
SOURCE STORAGE
LIFT
NEUTRONGENERATOR
CONTROLROOM
NEUTRON GEN.CONTROLLER
ELECTRON BEAM LAB
NEUTRON REF. LAB
NRFL/RPL EQUIPMENT
MATERIALCONTROL MATERIALS LAB
GAMMA CALIBRATION
UP
UP
UP
PLAN/RCP LEGEND
EXISTING TO REMAIN
NEW PARTITION
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL.
NO NEW WORK THIS AREA
GENERAL NOTES
VERIFY ALL DIMENSIONS IN FIELD.
PROVIDE COMPLETE DEMOLITION AS REQUIREDTO ACHIEVE DESIGN INTENT.
1.
2.
CONCRETE
WOOD STEP SEATING
2X2 ACOUSTICAL CEILING CLOUD
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
RECESSED LINEAR FIXTURE
SUSPENDED LINEAR FIXTURE
2X4 RECESSED DIRECT/INDIRECT
PENDANT FIXTURE
RECESSED SQUARE WALL WASHER
RECESSED SQUARE DOWNLIGHT
2X2 SUPPLY, RELOCATED, UNO.
SUSPENDED MINI-SPLIT, RELOCATED
CEILING MOUNTED LINEAR FIXTURE
TRACE PERIMETER WALL WASH
LINEAR COVE LIGHT
2X2 HEATERH
A CEILING MOUNTED ALARM
T
C
B
D
4" X 24' FRAMELESS SLOT DIFFUSER
CEILING MOUNTED EXIT SIGN
1' X 4' UTILITY LIGHTU
SD
RECESSED ASYMMETRIC LINEARA
GROUND FLOOR KEY PLAN
AREA OF WORK
2A301
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
STUDYB-1CB-1C
STORAGEB-12AB-12A
MECHANICALB-10AB-10AMECHANICAL
B-10B-10
HAZARDWASTE
B-12BB-12B
ELECB-4B-4
ELECB-4AB-4A
VESTIBULEB-2AB-2A
VESTIBULEB-2B-2
14 15 161
A301
STOB-3B-3
STOB-3AB-3A
AA
A
H H
A
D
D
D
D
T
C
T T T T T
C
C
C
AA
AA
A
A
A
A
A
A
A
AA
AA
B B B
BB B B
B B B
B
BBBBB
LOBBYB-1B-1
VENDINGB-1DB-1D
LECTUREHALL
B-6B-6LECTURE
HALLB-6AB-6A
ENTRYVESTIBULE
B-1AB-1A ENTRYVESTIBULE
B-1BB-1B
U U U U
SD
SD
SD
SD
SDT T T T T T
D
D
D
D
T
C
TTTTT
C
C
C
AA
AA
A
A
A
A
A
A
A
AA
A A
SD
SD
SD
SD
SD TTTTTT
3A301
OPEN TOSTRUCTURE
OPEN TOSTRUCTUREACT9' - 6"
2A401
2A301
A705
1
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
A701
A703
1
54
A702
3
4
A701
3
14 15 16
2
7
6
1 2
STUDYB-1CB-1C
STORAGEB-12AB-12A
MECHANICALB-10AB-10AMECHANICAL
B-10B-10
LECTUREHALL
B-6AB-6A
LECTUREHALL
B-6B-6
HAZARDWASTE
B-12BB-12B
ELECB-4B-4
ELECB-4AB-4A
VESTIBULEB-2AB-2A
VESTIBULEB-2B-2
B-1A.1 B-1B.1
B-12B
B-6A.3
B-6.3
B-14
B-10AB-10
1A301
1
2
A704 3
2
A7063
LOBBYB-1B-1
STOB-3AB-3A
STOB-3B-3
1
2
1
2
S2A.
2
S2A.2
S1A.2
S2A.
2
S4A.
1
S4A.1
S1A.
2
S4AA
.1
S4AA.1
S1A.
2S1
A.2
S4AA.1
S2A.
2
S4AA
.1
S1A.
2
S4AA.1S4
AA.1
S4AA.1
S1A.
2
S1A.
2
S1A.
2
S1A.2
S2A.2 S2A.
2
S2A.2
S2A.2
S1A.2
S4A.1
S1A.2
S2A.
2
S2A.
2
S2A.2
S2A.2 S2A.2
S2A.
2
S2A.
2
S2A.
2
S1A.
2
VESTIBULEB-3BB-3B
ENTRYVESTIBULE
B-1BB-1B
ENTRYVESTIBULE
B-1AB-1A
VENDINGB-1DB-1D B-15
B-12A
B-4AB-4
B-3.1 B-3A.1
B-1A.2 B-1B.2
B-6A.1B-6.1
B-2B-2A
B-3B
B-6A.2B-6.2
Q-S4A100.D
P-S4A100.D
2
3A301
A5012
A5013
A5011
2
2A401
A7041 A706 1
18'-8" 12'-8"
1'-1
0"1'-1
0"
3TYP.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A100
201511
FLOOR PLAN& REFLECTEDCEILING PLAN
- LEVEL 0
Author Checker
1/8" = 1'-0"A1003 RCP - LEVEL 0
1/8" = 1'-0"A1001 FLOOR PLAN - LEVEL 0
UP
UP
UP
RAD PHYSICSCOUNTING
DOORS ATUPPER LEVEL
DOORS ATUPPER LEVEL CANOPY ABOVE
LOADING DOCKUPUP
DN
DOOR TO AREAUNDER LECTURE HALL
(SEE ABOVE)
TO AREA UNDERLECTURE HALL(SEE ABOVE)
DN
UP
UP
UP
DN
storage room under stairs
doors
LAV
MULTIPURPOSE LAB
DN
SOURCE STORAGE
LIFT
NEUTRONGENERATOR
CONTROLROOM
NEUTRON GEN.CONTROLLER
ELECTRON BEAM LAB
NEUTRON REF. LAB
NRFL/RPL EQUIPMENT
MATERIALCONTROL MATERIALS LAB
GAMMA CALIBRATION
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
STUDYB-1CB-1C
STORAGEB-12AB-12A
MECHANICALB-10AB-10A
MECHANICALB-10B-10
HAZARDWASTE
B-12BB-12B
ELECB-4B-4
ELECB-4AB-4A VESTIBULE
B-2AB-2AVESTIBULE
B-2B-2
136 FIXED + 2 ADA =138 TOTAL
136 FIXED SEATS + 2 ADA= 138 TOTAL
14 15 16
2
2
2
2
33
4 4
5
5
5
5
8
8
8
8
8 8
6
10 10
11
Q-S4A100.D
P-S4A100.D
F F
8
11
11
11
11
3A301
2A401
DEMOLITION SHEET NOTES X
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
DEMOLISH EXISTING PLATFORM TO STRUCTURE.
DEMOLISH ALL EXISTING INTERMEDIATE STEPS TOSTRUCTURE.
CUT OUT POURED-IN-PLACE CONCRETE RISER ASREQUIRED FOR NEW CONSTRUCTION.
DEMOLISH ALL EXISTING SEATS AND TABLET ARMFURNITURE SYSTEMS.
DEMOLISH EXISTING ACOUSTICAL BLOCK WALLAND ACOUSTICAL PANELS TO CONCRETESTRUCTURE.
DEMOLISH EXISTING CONCRETE BLOCK WALL TOSTRUCTURE AS REQ'D FOR NEW CONSTRUCTION.
EXISTING CONCRETE BLOCK WALL TO REMAIN.
REMOVE EXISTING MILLWORK AND LECTURN.
REMOVE/PROTECT EXISTING A/V HARDWARE,EQUIPMENT, PROJECTOR SCREENS PER OWNERINSTRUCTION.
CUT NEW OPENING FOR NEW DOOR.
EXISTING RETURN AIR GRILL TO REMAIN.
SALVAGE AND STORE FOR REINSTALLATIONCARTRIDGE COOLING UNITS.
DEMOLITION LEGEND
NO WORK THIS AREA
EXISTING TO REMAIN
TO BE DEMOLISHED
DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
COORDINATE DEMOLITION WITH EXISTINGCONDITIONS, AVAILABLE EXISTING DRAWINGS, ANDALL BUILDING SYSTEMS INCLUDING BUT NOT LIMITEDTO MEP, FP, LOW VOLTAGE AND A/V.
REVIEW DEMOLITION WITH GT TO IDENTIFY ANYSALVAGE MATERIAL OR EQUIPMENT THAT GT WOULDLIKE TO RETAIN.
REVIEW, SALVAGE AND REUSE SCREENS, SPEAKERS,WIRELESS OR OTHER EQUIPMENT WITH GT.COORDINATE W/GT FOR STORAGE.
PROVIDE COMPLETE DEMOLITION AS REQUIRED TOACHIEVE DESIGN INTENT.
SEE ENGINEERING DRAWINGS FOR ADDITIONALDEMOLITION REQUIREMENTS.
GT TO PROVIDE ENVIRONMENTAL REPORT.DEMOLITION TO INCLUDE ABATEMENT, IF ANY, THATCONFORMS TO ALL REGULATORY REQUIREMENTS.
REMOVE ALL FINISH FLOORING AND ADHESIVES INAREAS OF WORK.
REMOVE ALL FINISH CEILINGS, LIGHT FIXTURES,GRILLS, EXIT SIGNAGE AND OTHER COMPONENTS INCEILING.
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14 15 16
10
10 10
10
1010
10
GROUND FLOOR KEY PLAN
AREA OF WORK
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A100.D
201511
DEMOLITIONFLOOR PLAN& REFLECTEDCEILING PLAN
- LEVEL 0
JF Checker
1/8" = 1'-0"A100.D1 DEMOLITION FLOOR PLAN - LEVEL 0
1/8" = 1'-0"A100.D2 DEMO RCP - LEVEL 0
LEVEL 10"
T.O. PARAPET19' - 8 1/2"
LEVEL 0-16' - 0"
B.O. STRUCTURE14' - 8 3/8"
1 2 3 4 5 6 7 8 9 10 11 12 13
PIPE TRENCH-24' - 0"
sightline
sightline
line of existing ceiling
1A301
5"
2A401
8'-3
"8'
-8"
A9002
LEVEL 10"
LEVEL 0-16' - 0"
2A301
B.O. STRUCTURE14' - 8 3/8"
TPMLJ U
3A301
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
LEVEL 10"
LEVEL 0-16' - 0"
3 4 5 6 7 8 9
1A301
A4011
3/16" = 1'-0"A3012 LONGITUDINAL SECTION - LECTURE HALLS
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A301
201511
BUILDINGSECTIONS
JF Checker
3/16" = 1'-0"A3011 TRANSVERSE BUILDING SECTION
3/16" = 1'-0"A3013 LONGITUDINAL SECTION - LOBBY
LEVEL 0-16' - 0"
LEVEL 0-16' - 0"
B.O. STRUCTURE14' - 8 3/8"
P
LEVEL 10"
LEVEL 0-16' - 0"
1A301
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A401
201511
WALLSECTIONS
Author Checker
3/4" = 1'-0"A4011 LONGITUDINAL SECTION - LOBBY - Callout 1
3/4" = 1'-0"A4012 Section 7
3/4" = 1'-0"A4013 Section 9
P
1A301
3A401
M
4
J
5
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A501
201511
PLAN DETAILS
Author Checker
1 1/2" = 1'-0"A5011 LECTURE HALL ENTRY VESTIBULE PLAN DETAIL
1 1/2" = 1'-0"A5012 FLOOR PLAN - LEVEL 0 - Callout 1
1 1/2" = 1'-0"A5013 FLOOR PLAN - LEVEL 0 - Callout 2
L
12
U
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A502
201511
SECTIONDETAILS
Author Checker
1 1/2" = 1'-0"A5022 CORRIDOR/ STUDY SOUTH - Callout 1
1 1/2" = 1'-0"A5021 LECTURE HALL B6 WEST - Callout 5
1 1/2" = 1'-0"A5023 LECTURE HALL B6 WEST - Callout 1
1 1/2" = 1'-0"A5024 LECTURE HALL B6 WEST - Callout 2
1 1/2" = 1'-0"A5025 LECTURE HALL B6 WEST - Callout 3
1 1/2" = 1'-0"A5026 LECTURE HALL B6 WEST - Callout 4
1 1/2" = 1'-0"A5027 LECTURE HALL B6 SOUTH UPPER LEVEL - Callout 1
1 1/2" = 1'-0"A5028 LECTURE HALL B6 SOUTH UPPER LEVEL - Callout 2
3
M L3
A301
P
ML 3A301
1'-0"
3A401
M L J
3A301
A5022
MLJ3
A301
5 6
1A301
561
A301
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A701
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7013 VENDING WEST
3/8" = 1'-0"A7011 ENTRY/VENDING SOUTH
3/8" = 1'-0"A7012 VENDING/CORRIDOR NORTH
3/8" = 1'-0"A7014 CORRIDOR/ STUDY SOUTH
3/8" = 1'-0"A7015 STUDY/CORRIDOR NORTH
3/8" = 1'-0"A7016 STUDY WEST
3/8" = 1'-0"A7017 STUDY EAST
4 5 6 7
1A301
4567
1A301
2A401
MLJ
3A301
M L3
A301MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A702
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7023 CORRIDOR WEST
3/8" = 1'-0"A7024 CORRIDOR EAST
3/8" = 1'-0"A7022 ENTRY NORTH
3/8" = 1'-0"A7021 CORRIDOR SOUTH
1 2 3 41
A301
A5023
A5024
A5025
A5026
2A401
A5021
1234
1A301
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A703
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7031 LECTURE HALL B6 WEST
3/8" = 1'-0"A7032 LECTURE HALL B6 EAST
2A301TP U
3A401
2A301 T PU
A5027
A5028
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
2A301
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A704
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7043 LECTURE HALL B6 NORTH
3/8" = 1'-0"A7041 LECTURE HALL B6 SOUTH UPPER LEVEL
3/8" = 1'-0"A7042 LECTURE HALL B6 SOUTH LOWER LEVEL
7 8 9 10 11 12
7891011
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A705
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7051 LECTURE HALL B6A WEST
3/8" = 1'-0"A7052 LECTURE HALL B6A EAST
2A301TP U
2A301 T PU
3A301
MATERIAL LEGEND
SHEET NOTES
1.
2.
3.
NEW CONCRETE RISER BUILD OUT, TYP.
NEW CONCRETE INTERMEDIATE STEP, TYP.
PAINTED STEEL RAIL. TYP.
CONCRETE
WOOD STEP SEATING
GYPSUM BOARD WALL/CEILING
ACOUSTICAL WOOD PLANK
CLARUS GLASSBOARD
2A301
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A706
201511
INTERIORELEVATIONS
JF Checker
3/8" = 1'-0"A7061 LECTURE HALL B6A NORTH UPPER LEVEL
3/8" = 1'-0"A7063 LECTURE HALL B6A SOUTH
3/8" = 1'-0"A7062 LECTURE HALL B6A NORTH LOWER LEVEL
UP
UP
UPUP
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
STUDYB-1CB-1C
STORAGEB-12AB-12A
MECHANICALB-10AB-10AMECHANICAL
B-10B-10
LECTUREHALL
B-6AB-6A
LECTUREHALL
B-6B-6
HAZARDWASTE
B-12BB-12B
ELECB-4B-4
ELECB-4AB-4A
VESTIBULEB-2AB-2AVESTIBULE
B-2B-2B-1A.1 B-1B.1
B-12B
B-6A.3
B-6.3
B-14
B-10AB-10
14 15 16
STOB-3B-3
STOB-3AB-3A
VESTIBULEB-3BB-3B
LOBBYB-1B-1
ENTRYVESTIBULE
B-1BB-1B
ENTRYVESTIBULE
B-1AB-1A
VENDINGB-1DB-1D
B-12A
B-4AB-4
B-3.1 B-3A.1
B-1A.2 B-1B.2
B-6A.1B-6.1
B-2B-2A
B-3B
B-6A.2B-6.2
B-15
FINISH ABBREVIATIONS
RB RUBBER BASE: JOHNSONITE 63 BURNT UMBER
SF STOREFRONT
WD ACOUSTIC WOOD PANEL MFD. BY DECOUSTICS. SOLO PLANK - BLACK CORE, MAPLE FINISH
CPT-1 CARPET:
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Bogg
s: L
ectu
re H
alls
B6,
B6A
and
Hal
l Lob
by R
edes
ign
& R
efre
sh
770
Stat
e St
reet
GEO
RG
IA IN
STIT
UTE
OF
TEC
HN
OLO
GY
12/15/15
A900
201511
FINISH PLANAND
DOOR/FINISHSCHEDULE -
LEVEL 0
JF Checker
1/8" = 1'-0"A9001 FINISH PLAN - LEVEL 0
ROOM FINISH SCHEDULE
NO. NAMEFLOOR
WALL FINISHCEILING
NOTESFINISH BASE MATERIAL
B-1 LOBBY ARDEX 4" RB GWB OPEN TO STRUCTURE, GWB/ACTCLOUDS
SEE ELEV FOR GLASS AND ACCENT PAINT LOCATIONS
B-1A ENTRYVESTIBULE
WALK-OFF CARPET -- SF GWB
B-1B ENTRYVESTIBULE
WALK-OFF CARPET -- SF GWB
B-1C STUDY CPT-1 4" RB GWB OPEN TO STRUCTURE, ACT CLOUDS SEE ELEV FOR GLASS AND ACCENT PAINT LOCATIONSB-1D VENDING ARDEX 4" RB EXIST'G CMU, GWB GWB, ACTB-2 VESTIBULE ARDEX 4" RB SF, GWB WDB-2A VESTIBULE ARDEX 4" RB SF, GWB WDB-3 STO ARDEX 4" RB GWB OPEN TO STRUCTUREB-3A STO ARDEX 4" RB GWB OPEN TO STRUCTUREB-6 LECTURE HALL ARDEX W/RUBBER
TREADS4" RB GWB, WD GWB, WD
B-6A LECTURE HALL ARDEX W/RUBBERTREADS
4" RB GWB, WD GWB, WD
DOOR SCHEDULE
IDENTIFICATION DOOR FRAME
FIRERATING
CARDREADER
HARDWARE SET COMMENTSMARK ROOM NAME
DIMENSIONS
TYPE MATERIAL FINISH TYPE MATERIAL FINISHWIDTH
HOVERALLB-1A.1 ENTRY VESTIBULE 6' - 2 1/4" 7' - 11 1/8" ALUM EXISTING STOREFRONT DOORS TO REMAINB-1A.2 ENTRY VESTIBULE 6' - 2 1/2" 7' - 11 1/8" ALUM NEW PAIR OF STOREFRONT DOORSB-1B.1 ENTRY VESTIBULE 6' - 2 1/4" 7' - 11 1/8" ALUM EXISTING STOREFRONT DOORS TO REMAINB-1B.2 ENTRY VESTIBULE 6' - 2 1/2" 7' - 11 1/8" ALUM NEW PAIR OF STOREFRONT DOORSB-2 VESTIBULE 2' - 11 3/8" 8' - 0 1/4" ALUM NEW STOREFRONT DOORB-2A VESTIBULE 3' - 0 1/8" 8' - 0 1/4" ALUM NEW STOREFRONT DOORB-3.1 STO 3' - 0" 7' - 0" WD NoB-3A.1 STO 3' - 0" 7' - 0" WD NoB-3B LOBBY 6' - 0" 7' - 0" SLIDING DOORB-6.1 LECTURE HALL 3' - 2 1/8" 8' - 0 1/4" ALUMB-6.2 3' - 0" 7' - 0" WD NoB-6.3 3' - 0" 7' - 0" WD NoB-6A.1 LECTURE HALL 3' - 2 1/8" 8' - 0 1/4" ALUMB-6A.2 3' - 0" 7' - 0" WD NoB-6A.3 3' - 0" 7' - 0" WD NoB-14 LOBBY 7' - 0" 7' - 0" No
3" = 1'-0"A9002 MODESTY PANEL DETAIL
HVAC LEGEND & ABBREVIATIONSSYMBOL DESCRIPTION
RECTANGULAR AIR DUCT - FIRST DIMENSION IS SIDE SHOWN00x00
DUCT TRANSITION, RECTANGULAR TO ROUND OR OVAL
ROUND DUCT (A"ø) OR FLAT OVAL (AxB)
FIRE DAMPERFD
AIR DUCT FLEXIBLE CONNECTOR
SUPPLY OR OUTSIDE AIR RECTANGULAR DUCT RISE OR DROP
RETURN AIR RECTANGULAR DUCT RISE OR DROPOR
OR
SINGLE BLADE DAMPERM.D.
DOUBLE ELBOW WITH SPLITTER DAMPER WITH CONTROL ROD
SMOKE DAMPERSDM
COMBINATION FIRE/SMOKE DAMPERF/SDM
SQUARE ELBOW WITH TURNING VANES
DUCT TRANSITION, RECTANGULAR TO RECTANGULAR
FLEX DUCT AT DIFFUSER
MANUAL VOLUME DAMPERMD
CONCENTRIC REDUCER
PIPE UNION
PIPE RISE
PIPE DROP
CAP ON END OF LINE
BUTTERFLY VALVE
LINED DUCTWORK, DIMENSIONS ARE OUTER METAL TO OUTER METAL
SMOKE DETECTORSDT
PIPE FLOW ARROW
GRADE ARROW-INDICATES RISE OR DROP IN DUCT OR PIPEUP DN
OR
CONDENSATE DRAINC
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
ABOVE FINISHED FLOORAFF
BOTTOM OF STRUCTUREBOS
MOTOR OPERATED DAMPERMOD
HUMIDITY SENSOR
OR EXHAUST AIR RECTANGULAR DUCT RISE OR DROP
CARBON DIOXIDE SENSOR
MOTOR OPERATED DAMPER SAME SIZE ASDUCT UNLESS OTHERWISE NOTED
PROGRAMMABLE THERMOSTAT
CARBON MONOXIDE SENSORCO
C
T
H
TEMPERATURE SENSOR. NON-ADJUSTABLE TYPE WITHOUT DISPLAY.T
DEMOLISHED DUCT00x00
SPIRAL DUCT
BRANCH DUCT
REMOTE-TYPE DAMPER. SEEFLOOR PLANS FOR CEILINGDEVICE LOCATION
ULLISTEDSTRIP
FLEX DUCT
DIFFUSER (HANGFROMSTRUCTURE)
CEILING
NOTE:1. SEE SPECIFICATIONS FOR MAXIMUM FLEX DUCT LENGTH.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductions arecopyrighted and the property of
Make3 architecture/planning/designand may not be used in any way
without their permission.© 2013
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Ren
ovat
ion
of B
oggs
Aud
itoriu
m
770
Sta
te S
tree
t
GE
OR
GIA
INS
TIT
UT
E O
F T
EC
HN
OLO
GY
12/15/15
M001
201511
HVACLEGEND,
SCHEDULE,DETAILS &GENERAL
NOTES
TFC TLN
50% CD 12/15/15
1. EXISTING EQUIPMENT, DUCTWORK AND PIPING TO REMAIN, UNLESS NOTED TO BEREMOVED.
2. VERIFY LOCATIONS OF EXISTING EQUIPMENT, DUCTWORK AND PIPING PRIOR TOBEGINNING WORK.
3. PROVIDE INSULATED FLEXIBLE DUCT TO DIFFUSER SAME SIZE AS DIFFUSER NECK SIZEWITH SPIN-IN, SCOOP AND SINGLE BLADE DAMPER AT DIFFUSER TAKE-OFF, UNLESSNOTED OTHERWISE.
4. ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING IS SHOWN SCREENED, NEWEQUIPMENT, DUCTWORK AND PIPING SHOWN SOLID.
5. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK, UNLESSOTHERWISE NOTED.
6. ROUTE DUCTWORK AS TIGHT TO STRUCTURE AS POSSIBLE, UNLESS OTHERWISENOTED,
7. MAXIMUM FLEXIBLE DUCT RUNOUT TO BE SEVEN FEET. USE GALVANIZED STEEL DUCTFOR INDIVIDUAL RUNOUTS OVER SEVEN FEET.
8. BALANCE AIR DISTRIBUTION SYSTEMS AS NOTED.
9. UNLESS OTHERWISE NOTED, WALL MOUNTED THERMOSTATS AND SENSORS SHALL BEMOUNTED AT 4'-0" AFF.
10. COORDINATE ALL LAY-IN CEILING DIFFUSERS WITH ARCHITECTURAL REFLECTEDCEILING PLAN.
11. PROTECT ALL MATERIALS AND EQUIPMENT FROM DAMAGE.
12. CONTRACTOR SHALL PAINT ALL DUCTWORK VISIBLE THROUGH SUPPLY AND RETURNAIR OPENINGS AND GRILLES FLAT BLACK.
HVAC GENERAL NOTES
SCALE: NO SCALEM0011 LINEAR DIFFUSER DIAGRAM
ELECTRIC BASEBOARD HEATER SCHEDULEMARK SERVES KW VOLTAGE DESIGN BASIS REMARKSEBH-1 VESTIBULE 1.5 120v/1ø QMARK SHA-06250 -EBH-2 VESTIBULE 1.5 120v/1ø QMARK SHA-06250 -EBH-3 VESTIBULE 1.5 120v/1ø QMARK SHA-06250 -EBH-4 VESTIBULE 1.5 120v/1ø QMARK SHA-06250 -
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14 15 16
36x30
48x16
F/SDM F/SDM
48x16
36x30AHU-S-7AHU-S-9
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14 15 16
48x1
6
48x1
6
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductions arecopyrighted and the property of
Make3 architecture/planning/designand may not be used in any way
without their permission.© 2013
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Ren
ovat
ion
of B
oggs
Aud
itoriu
m
770
Sta
te S
tree
t
GE
OR
GIA
INS
TIT
UT
E O
F T
EC
HN
OLO
GY
09/28/15
M100.D
201511
HVACDEMOLITION
FLOOR PLANS
TFC TLN
50% CD 12/15/15
0 4 8 16 FT
SCALE: 1/8" = 1'-0"M100.D1 HVAC DEMOLITION PLAN - LEVEL 0
0 4 8 16 FT
SCALE: 1/8" = 1'-0"M100.D2 HVAC DEMOLITION PLAN - LEVEL 1
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14 15 16
24x36
AHU-S-9
36x30
58x16
48x16
EBH-1 EBH-3
EBH-2 EBH-4
36x30
48x16
F/SDMF/SDM
AHU-S-7
24x36
46x24
60x6
5'-0"R-1225
TYP.246x24
60x6
5'-0"R-1225
TYP.2
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14 15 16
26x1422x1212x12 48x1
638
x16
UP
UP
UP
26x14
18x1212x12
22x1212x12
8x10
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
8"øS-1265
TYP.3
8"øS-1200
TYP.3
16x12
12x1
612
x12
10"øS-1400
TYP.3
22x1
6
MD
MD
MD
MD
26x14 22x12 12x1248x1
638
x16
UP
UP
UP
26x14
18x12 12x12
22x12 12x12
8x10
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
8"øS-1265
TYP.3
8"øS-1200
TYP.3
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
8"øS-1265
TYP.3
8"øS-1200
TYP.3
16x12
12x1
612
x12
10"øS-1400
TYP.3
22x1
6
MD
MD
MD
MD
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductions arecopyrighted and the property of
Make3 architecture/planning/designand may not be used in any way
without their permission.© 2013
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Ren
ovat
ion
of B
oggs
Aud
itoriu
m
770
Sta
te S
tree
t
GE
OR
GIA
INS
TIT
UT
E O
F T
EC
HN
OLO
GY
12/15/15
M100
201511
HVAC NEWWORK FLOOR
PLANS
TFC TLN
50% CD 12/15/15
0 4 8 16 FT
SCALE: 1/8" = 1'-0"M1001 HVAC NEW WORK PLAN - LEVEL 0
0 4 8 16 FT
SCALE: 1/8" = 1'-0"M1002 HVAC NEW WORK PLAN - LEVEL 1
F
AIM
AOM
3
3 3
D
K
T
MC
S
P
TC
C
R
STR
ST
GF
C.T.
M
G
#
VFD
SPD
X
J J
J
J
T
M
W
FIRE ALARM SYMBOLS
CEILING MOUNTED SMOKE DETECTOR
DUCT MOUNTED SMOKE DETECTOR
COMBINATION VISUAL NOTIFICATION DEVICE
AUDIBLE NOTIFICATION DEVICE
VISUAL NOTIFICATION DEVICE
MANUAL STATION
FIRE ALARM CONTROL PANEL
ANNUNCIATOR PANEL
MONITOR MODULE ADDRESSABLE MODULE
CONTROL MODULE ADDRESSABLE MODULE
LIGHTING SYMBOLS
SURFACE MOUNTED LUMINAIRE
SURFACE MOUNTED LUMINAIRE,
UNSWITCHED EMERGENCY
SURFACE MOUNTED LUMINAIRE,
SWITCHED EMERGENCY
RECESSED LUMINAIRE
RECESSED LUMINAIRE, UNSWITCHED
EMERGENCY
RECESSED LUMINAIRE, SWITCHED
EMERGENCY
WALL MOUNTED LUMINAIRE.
WALL MOUNTED LUMINAIRE,
UNSWITCHED EMERGENCY
WALL MOUNTED LUMINAIRE,
SWITCHED EMERGENCY
PENDANT LUMINAIRE.
PENDANT LUMINAIRE, UNSWITCHED
EMERGENCY
PENDANT LUMINAIRE, SWITCHED
EMERGENCY
EMERGENCY LIGHTING UNIT
COMBINATION EMERGENCY
LIGHTING UNIT / EXIT SIGN
WALL/CEILING MOUNTED EXIT SIGN
PROVIDE WITH FACE ORIENTATION
AND ARROWS AS SHOWN ON FLOOR
PLANS
WALLWASH, ACCENT, OR
DIRECTIONAL LUMINAIRE
STEP LIGHT / PATHWAY LIGHT
SINGLE POLE SWITCH
TWO SINGLE POLE SWITCHES UNDER
COMMON FACEPLATE CONNECTED
FOR INNER/OUTER CONTROL OF
LAMPS
THREE WAY SWITCH
TWO THREE-WAY SWITCHES UNDER
COMMON FACEPLATE CONNECTED
FOR INNER/OUTER CONTROL OF
LAMPS FROM MULTIPLE LOCATIONS
WALL BOX DIMMER
KEY OPERATED SWITCH
TIME SWITCH
MOMENTARY CONTACT SWITCH
SWITCH FOR LIGHTING CONTROL
SYSTEM, TYPE AS SCHEDULED
OCCUPANCY SENSOR FOR LIGHTING
CONTROL, TYPE AS SCHEDULED
360° OCCUPANCY SENSOR FOR
LIGHTING CONTROL,
TYPE AS SCHEDULED
POWER PACK
PHOTO CELL
TIME CLOCK
REMOVE DEVICE AND CONDUCTORS
AND CAP OUTLET BOX WITH BLANK
COVERPLATE
REMOVE DEVICE, OUTLET BOX, AND
ASSOCIATED CONDUIT AND
CONDUCTORS
RELOCATE ITEM PER DRAWING
ONE LINE DIAGRAM SYMBOLS
BOLT-ON FUSED CIRCUIT BREAKER
PLUG-IN CIRCUIT BREAKER
BOLT-ON CIRCUIT BREAKER
COMBINATION STARTER INCLUDING MOTOR CIRCUIT
PROTECTOR TYPE (M.C.P.) ADJUSTABLE ONLY CIRCUIT
BREAKER
COMBINATION STARTER & CIRCUIT BREAKER DISCONNECT
STARTER
COMBINATION STARTER & FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
FUSE
NON-FUSED DISCONNECT SWITCH
SHUNT TRIP COIL
GROUND FAULT
CURRENT TRANSFORMER
UTILITY REVENUE METER
TRANSFORMER
GENERATOR
MOTOR-NUMERAL INDICATES THE HORSE POWER RATING
LUG
VARIABLE FREQUENCY DRIVE
GROUND
SURGE PROTECTIVE DEVICE
NORMALLY OPEN CONTACT/CLOSES WHEN COIL IS
ENERGIZED
NORMALLY CLOSED CONTACT/OPENS WHEN COIL IS
ENERGIZED
MISCELLANEOUS SYMBOLS
NOTE REFERENCE SYMBOL
FLUSH MOUNTED EQUIPMENT AS NOTED
POWER SYMBOLS
WALL/CEILING MOUNTED JUNCTION BOX
JUNCTION BOX MOUNTED UNDER RAISED FLOOR
POWER AND VOICE/DATA CONNECTION. SEE DETAIL
PULLBOX
CONDUIT STUBBED OUT ABOVE ACCESSIBLE CEILING
SLEEVE THROUGH WALL ABOVE CEILING.
SLEEVE THROUGH FLOOR-SIZE NOTED ON PLANS
EXISTING SURFACE MOUNTED PANELBOARD
EXISTING FLUSH MOUNTED PANELBOARD
EQUIPMENT AS NOTED
TRANSFORMER-TYPE AND CAPACITY AS NOTED
DISCONNECT SWITCH-TYPE AS NOTED. 30/3/F/WP
INDICATES 30AMP, 3-POLE, F=FUSED/NF=NON-FUSED,
WEATHERPROOF
COMBINATION STARTER-TYPE AS NOTED.
MOTOR STARTER-TYPE AS NOTED.
MOTOR
PLYWOOD EQUIPMENT BACKBOARD
SINGLE RECEPTACLE
DUPLEX RECEPTACLE
DUPLEX RECEPTACLE CEILING MOUNTED
DOUBLE DUPLEX RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER DUPLEX
RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER DOUBLE DUPLEX
RECEPTACLE
SPECIAL PURPOSE RECEPTACLE-TYPE AS NOTED
CEILING MOUNTED SPECIAL PURPOSE RECEPTACLE-TYPE
AS NOTED
MULTI-SERVICE ASSEMBLY FLOOR OUTLET-TYPE AS NOTED
MOTOR RATED SWITCH
42"INDICATES MOUNTING HEIGHT AFF IN INCHES TO
CENTERLINE EXCEPT AS NOTED
STRUCTURED CABLING SYSTEM SYMBOLS
WALL-MOUNTED DROP LOCATION AT 18" AFF, UNLESS
NOTED OTHERWISE
FLOOR-MOUNTED DROP LOCATION
CEILING-MOUNTED DROP LOCATION
SYSTEMS FURNITURE-MOUNTED DROP LOCATION
# INDICATES NUMBER OF TELECOMMUNICATIONS OUTLETS
TO BE INSTALLED AT DROP LOCATION. PROVIDE ONE
TELECOMMUNICATIONS OUTLET AT DROP LOCATIONS
WITH NO #.
DROP LOCATION WITH (1) TELECOMMUNICATIONS OUTLET
AND FACEPLATE FOR WALL-MOUNT TELEPHONE,
MOUNTED AT 44" AFF
APINDICATES DROP LOCATION FOR WIRELESS ACCESS POINT
48"INDICATES DROP LOCATION MOUNTING HEIGHT AFF
EQUIPMENT RACK WITH VERTICAL CABLE MANAGERS
WALL OR FLOOR SLEEVE
VERTICAL CONDUIT OR SLEEVE THROUGH FLOOR
VERTICAL CONDUIT OR SLEEVE THROUGH CEILING
STACKED VERTICAL CONDUIT OR SLEEVE THROUGH
FLOOR AND CEILING
SYMBOLS LEGEND
E 321
ELECTRICAL DISCIPLINE
SUB-DISCIPLINE/ SYSTEM 0 = General - Site - Demolition 1 = One Line Diagrams 2 = Power 3 = Lighting 4 = Fire Alarm 5 = LV - Voice/Data - Structured Cabling Systems 6 = Security 7 = Intercom - Nurse Call - Audio/Video - CATV 8 = Lightning Protection - Grounding 9 = Schedules & Details
FLOOR LEVEL
PHASE 0 = Demolition 1 = New Work- OR -PARTIAL PLAN 2 = Partial Plan
ARROW DENOTESHOMERUN
NUMBER OF HASHMARKSINDICATES NUMBER OF
UNGROUNDED PHASECONDUCTORS
INDICATESNEUTRALCONDUCTOR
INDICATESGROUNDCONDUCTOR
EXISTING CONSTRUCTION,EQUIPMENT, OR WIRING
DEMOLITION WORK: EXISTINGCONSTRUCTION, EQUIPMENT, ORWIRING TO BE REMOVED
NEW WORK, EQUIPMENT, OR WIRING
FUTURE WORK, EQUIPMENT, ORWIRING
HATCHED AREA INDICATES EXISTINGCONSTRUCTION TO REMAIN; NOT INCONTRACT SCOPE
NEW RACEWAY EXPOSED
NEW RACEWAY CONCEALED IN FLOORSLAB, BELOW SLAB OR GRADE, ORUNDER RAISED ACCESS FLOOR
NEW RACEWAY CONCEALED IN WALLOR ABOVE CEILING
N : LPE : ELP
PANEL(S) THATSERVE THIS AREA
5
WIRE ALL DEVICESWITHIN BOUNDARY TO
THE PANEL(S)INDICATED U.O.N.
RECEPTACLE WIREDTO PANEL 'LP'
CIRCUIT #5
E5RECEPTACLE WIREDTO PANEL 'ELP'
CIRCUIT #5
b
F2
E5
LUMINAIRE
LUMINAIRE TYPE
SWITCHING IDENTIFIER
PANEL IDENTIFIER
CIRCUIT NUMBER
E5
PANEL IDENTIFIER
CIRCUIT NUMBER
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 000
201511
DRAWINGINDEX,
GENERALNOTES, &LEGENDS
BCE BCE
ELECTRICAL ANNOTATIONABBREVIATIONS
SWBD SWITCHBOARD
SWGR SWITCHGEAR
T, TEL,TELE
TELEPHONE
T-STAT THERMOSTAT
TB TAP BOX
TBB TELECOMMUNICATIONS BACKBOARD
TBD TO BE DETERMINED
TC TIME CLOCK
TEMP TEMPORARY
TERM TERMINAL, TERMINATE
THW PVC INSULATED WIRE
THWN/THHN
PVC & NYLON INSULATED WIRE
TSS TWO SPEED STARTER
TVSS TRANSIENT VOLTAGE SURGESUPPRESSOR
TWU THROUGH-THE-WALL UNIT
TYP TYPICAL
U ULTRASONIC
UC UNDER COUNTER
UG UNDERGROUND
UH UNIT HEATER
UON,UNO
UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UTP UNSHIELDED TWISTED PAIR
V VOLT(S)
VA VOLT-AMPERES
VAR REACTIVE VOLT AMPS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WIRE
W WATTS
W/ WITH
WP WEATHERPROOF
WT WATERTIGHT
XFMR TRANSFORMER
XHHW CROSS LINKED POLYETHYLENEINSULATED WIRE
XP EXPLOSION PROOF
Y WYE CONNECTION
MTR MOTOR CONTROL CETNER
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MW MEGA WATTS
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NF NON-FUSED
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OH OVERHEAD
OHD OVERHEAD DOOR OPERATOR
OL OVERLOAD
P POLE(S)
P/T/Z PAN TILT ZOOM
PB PUSHBUTTON
PB PULLBOX
PC PHOTOCELL
PF POWER FACTOR
PH PHASE
PL PILOT LIGHT
PNL PANEL
PR PAIR
PRI PRIMARY
PVC POLYVINYL CHLORIDE
PWR POWER
REC RECEPTACLE
RECT RECTIFIER
REFR REFRIGERATOR
RGS RIGID GALVANIZED STEEL CONDUIT
RHW EPR INSULATED WIRE
RM ROOM
SB SWITCHBOARD
SCH SCHEDULE
SEC SECONDARY
SFL SUB-FEED LUGS
SHT SHEET
SPC SPACE
SPKR SPEAKER
SPR SPARE
SQ SQUARE
SS STAINLESS STEEL
SSRVS SOLID STATE REDUCED VOLTAGESTARTER
ST SHUNT TRIP
STP SHIELDED TWISTED PAIR
STS STATIC TRANSFER SWITCH
SUSP SUSPEND(ED)
SW SWITCH
GALV GALVANIZE(D)
GEN GENERATOR
GFCI GROUND FAULT CIRCUITINTERRUPTER
GFP GROUND FAULT PROTECTION
HD HEAVY DUTY
HGT, HT HEIGHT
HH HAND HOLE
HID HIGH INTENSITY DISCHARGE
HO HIGH OUTPUT
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HPF HIGH POWER FACTOR
HPS HIGH PRESSURE SODIUM
HTR HEATER
HV HIGH VOLTAGE
IC INTERCOMMUNCATION
ID IDENTIFY, IDENTIFICATION
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
INSUL INSULATION
IPS INTERRUPTIBLE POWER SUPPLY
IR PASSIVE INFRARED
JB, J-BOX JUNCTION BOX
JCT JUNCTION
KA KILAMPERES
KCMIL THOUSAND CIRCULAR MILS
KILO THOUSAND
KV KILOVOLTS
KVA KILOVOLT-AMPERES
KVAR KILOVARS
KW KILOWATTS
LT(S) LIGHT(S)
LTG LIGHTING
MA MILLIAMPERE
MAINT MAINTAINED
MAN MANUAL
MAX MAXIMUM
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CETNER
MCM THOUSAND CIRCULAR MILS
MDP MAIN DISTRIBUTION PANEL
MEGA MILLION
MFR MANUFACTURER
MGB MAIN GROUND BUS
MH METAL HALIDE
MIN MINIMUM
MLO MAIN LUGS ONLY
MO MANUALLY OPERATED
MTD MOUNT(ED)
D DEEP
D ∆ DELTA CONNECTION
DB DECIBEL
DC DIRECT CURRENT
DET DETECTOR
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DP DISTRIBUTION PANEL
DWG DRAWING
EA EACH
EF EXHAUST FAN
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC(AL)
ELU EMERGENCY LIGHT UNIT
EMER EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EO ELECTRONICALLY OPERATED
EPO EMERGENCY POWER OFF
EPR ETHYLENE PROPYLENE RUBBERINSULATION
EQ EQUAL
EQUIP,EQPM
EQUIPMENT
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
EX,EXIST
EXISTING
EXR EXISTING RELOCATED TO LOCATIONON PLAN
EXT EXTERIOR
F FUSE(D)
FA FIRE ALARM
FACP FIRE ALARM CONTROL PAEL
FCU FAN COIL UNIT
FIXT FIXTURE
FL FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE
FLR FLOOR
FLUOR FLUORESCENT
FO FIBER OPTIC
FRA FIRE ALARM REMOTE ANNUNCIATOR
FURN FURNISH
FUT FUTURE
FVNR FULL VOLTAGE NON-REVERSING
G, GND GROUND
A AMPERES
AB ABOVE
AC ALTERNATING CURRENT
AF AMPERE FRAME
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHC ABOVE HUNG CEILING
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
ANN ANNUNCIATOR
ASSD AIR SAMPLING SMOKE DETECTION
ASTS AUTOMATIC STATIC TRANSFERSWITCH
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BB BACKBOARD
BC BARE COPPER
BC/BF DEVICES MOUNTED BELOWSUSPENDED CEILING AND BELOWRAISED FLOOR
BFF BELOW FINISHED FLOOR
BKR BREAKER
BLDG BUILDING
BRF BELOW RAISED FLOOR
BTM BOTTOM
BW BOTH WAYS
C CONDUIT
CAB CABINET
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CC CCTV CAMERA
CKT CIRCUIT
CL CENTERLINE
CLG CEILING
CO COMPANY
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION, CONNECT
CONTR CONTRACTOR
COORD COORDINATE
CT CURRENT TRANSFORMER
CUH CABINET UNIT HEATER
CW COOL WHITE
NOT TO SCALE1
Sheet Numbering System
NOT TO SCALE2
Wiring Annotation
NOT TO SCALE3
Electrical Line Types - Phasing
NOT TO SCALE4
Electrical Line Types - Wiring
NOT TO SCALE5
Electrical Plan Annotation
NOT TO SCALE6
Device/Eqpm Identification
DRAWING INDEXELECTRICAL
E 000 DRAWING INDEX, GENERAL NOTES, & LEGENDS
E 020 DEMOLITION PLANS - POWER & FIRE ALARM
E 021 DEMOLITION PLANS - LIGHTING
E 201 POWER PLANS
E 301 LIGHTING PLANS
E 302 LIGHTING PLANS - STEP LIGHTING
E 401 FIRE ALARM PLANS
E 901 PANEL SCHEDULES
E 931 SCHEDULES & DETAILS - LIGHTING
9
F
M M M M J J
F
F
F
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
ex
ex
ex
ex
ex
ex
ex
ex
ex
2 2
11
2typ
22
ex
PNL AD
PNL AC
PNL XCPNL LE
PNL LE1
PNL AB
PNL No Name
PNL Pole Lights
PNL AA-2
PNL AA
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
ex
ex
ex
ex
ex
ex
ex
ex
2 2
2typ
2typ
1
1
DEMOLITION NOTES - POWERGENERAL NOTES:
A. Existing conduit may be reused where appropriate.
B. Shaded area indicates area not in renovation area.
C. Provide revised panelboard schedules for all panelboards modified during theproject.
D. Remove devices in walls scheduled for removal.
E. Maintain continuity of wiring not scheduled for removal, which serves equipmentand devices not scheduled for removal.
F. Existing electrical equipment is scheduled to remain in place, unless notedotherwise.
G. Prior to beginning work, field-verify existing equipment configuration and ratings.where discrepancies exist, notify the owner prior to proceeding with the work.
KEYNOTES:
1. Remove existing fire alarm device to accommodate architectural demolition.Protect wiring and device for reinstallation. Reinstall where indicated on E-401.
2. Remove device, wiring, and conduit back to panelboard, typical.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 020
201511
DEMOLITIONPLANS -
POWER &FIRE ALARM
Author Checker
1/8" = 1'-0"1 DEMOLITION PLAN - LEVEL 0
1/8" = 1'-0"2 DEMOLITION PLAN - LEVEL 1
N0' 1' 2' 4' 8' 16'
N0' 1' 2' 4' 8' 16'
3
3 4
4
3
3 3
3
4
3 3 3 3 3 3
3 3 3 3 3
3 3 3 3 3
3 3 3 3 3
3
3
3
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
1
typ
4typ
4typ
1typ
ex
ex
ex
ex
ex
ex
22
PNL AC
PNL XC
PNL AD
PNL LE
PNL LE1
PNL AB
PNL Pole Lights
PNL AA-2
PNL AA
PNL No Name
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
1
(typ)
1
DEMOLITION NOTES - LIGHTINGGENERAL NOTES:
A. Existing conduit may be reused where appropriate.
B. Shaded area indicates area not in renovation area.
C. Provide revised panelboard schedules for all panelboards modified during theproject.
D. Remove light fixtures and devices in walls and ceilings scheduled for removal.
E. Remove exit signs in renovation area and replace with new.
F. Maintain continuity of wiring not scheduled for removal, which serves equipment anddevices not scheduled for removal.
G. Existing electrical equipment is scheduled to remain in place, unless notedotherwise.
H. Prior to beginning work, field-verify existing equipment configuration and ratings.where discrepancies exist, notify the owner prior to proceeding with the work.
KEYNOTES:
1. Remove existing light fixtures in renovation area. Coordinate removal witharchitectural plans. Dispose of lamps in accordance with Georgia Tech standards.
2. Existing lighting to remain.
3. Remove light switch, wiring and conduit back to panelboard. Install blank coverplate.
4. Remove device, wiring, and conduit back to panelboard, typical.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 021
201511
DEMOLITIONPLANS -
LIGHTING
BCE BCE
1/8" = 1'-0"1 DEMOLITION PLAN - LEVEL 0
1/8" = 1'-0"2 DEMOLITION PLAN - LEVEL 1
N0' 1' 2' 4' 8' 16'
N0' 1' 2' 4' 8' 16'
J
J
J
J J J
J J J
J J J
J J J J
J J J J
J J J J J J
J J J J J J J
J J J J J J
J
J
J
J J J J J J J
J J J J J J J
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
PNL LE
PNL LE1
PNL AB
PNL No Name
PNL Pole Lights
PNL AA-2
PNL AA
PNL AD
PNL AC
PNL XCPNL BB
BB-1,3BB-5,7
ex
exSTO
B-3
STO
B-3ASTUDY
B-1C
VESTIBULE
B-3B
ENTRY
VESTIBULE
B-1A
ENTRY
VESTIBULE
B-1B
LOBBY
B-1
VENDING
B-1D
LECTURE
HALL
B-6A
LECTURE
HALL
B-6
ELEC
B-4A
ELEC
B-4
HAZARD
WASTE
B-12B
STORAGE
B-12A
MECHANICAL
B-10
MECHANICAL
B-10A
1 (TYP)
BB-2,4 BB-6,8
1(TYP)
LE1-16
LE1-16
LE1-16
LE1-18
LE1-18
LE1-18LE1-18
LE1-18
LE1-18
LE1-20LE1-20LE1-20 LE1-22
LE1-22
LE1-22
EBH-3
EBH-4
EBH-1
EBH-2
(NEW)
2
22
2
4AA-2-314 AC-17
BB-30
BB-30
BB-30
LE1-20 LE1-20
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
BB-13,15
ex
ex
ex
ex
1
(TYP)
BB-10,12 BB-14,16 BB-18,20 BB-22,24
1
(TYP)
AA-2-7AC-5
33
BB-9,11BB-17,19BB-21,23
POWER NOTESGENERAL NOTES:
A. COORDINATE HEIGHT OF ALL OUTLETS WITH ARCHITECTURALDRAWINGS.
B. REFER TO T-SERIES DRAWINGS FOR VOICE/DATA, WIRELESS ACCESSPOINTS, AND RACEWAY REQUIREMENTS.
KEYNOTES:
1. STUB UP FROM THE FLOOR AND CONNECT TO THE POWER FEED INSIDEPEDESTAL, TYPICAL. COORDINATE WITH FINAL EQUIPMENT SELECTION.
2. REFER TO ELECTRICAL CONNECTION SCHEDULE FOR MECHANICALEQUIPMENT ON SHEET E-901 FOR BRANCH CIRCUIT INFORMATION ANDDISCONNECTING MEANS, TYPICAL.
3. CONNECT NEW PROJECTORS TO EXISTING BRANCH CIRCUITPREVIOUSLY SERVING PROJECTOR IN THIS LECTURE HALL. COORDINATEEXACT PROJECTOR LOCATIONS WITH ARCHITECTURAL DRAWINGS.
4. CONNECT NEW FLOORBOX TO LECTURN PROVIDED. CONNECTFLOORBOX TO BRANCH CIRCUIT ON SAME ELECTRICAL PHASE ASPROJECTOR SERVING THIS LECTURE HALL. FLOORBOX TYPE FSR500P ORAPPROVED EQUAL. COORDINATE WITH EQUIPMENT PROVIDED.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 201
201511
POWERPLANS
BCE BCE
1/8" = 1'-0"1 POWER PLAN - LEVEL 0
1/8" = 1'-0"2 POWER PLAN - LEVEL 1
N0' 1' 2' 4' 8' 16'
N0' 1' 2' 4' 8' 16'
C
C
C
C
A A
A
A
R
R R
C
C
R
C
C
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
X
X
RL4RL4
RL4RL4
RL4RL4
RL4RL4
SL8SL8 SL8SL8
SL8SL8 SL8SL8
SL8SL8 SL8SL8
SL8SL8 SL8SL8
RP8 RP8 RP8 RP8 RP8 RP3
RP8 RP8 RP8 RP8 RP8
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL4
CL
CL
CL
CL
RL4
SL8 SL8SL8 SL8
SL8 SL8SL8 SL8
SL8 SL8SL8 SL8
SL8 SL8SL8 SL8
RP8RP8
RP8RP8
RP8RP8 RP8
RP8RP8RP8
CL
CL
CL
CL
RL4
RL4RP3
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
RL6
2
2 2
2
LIGHTING NOTESGENERAL NOTES:
A. REFER TO ARCHITECTURAL ELEVATIONS FOR FIXTURE MOUNTINGHEIGHTS.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FORDIMENSIONED LOCATION OF FIXTURES.
KEYNOTES:
1. PROVIDE LUTRON GRAPHIK EYE FOR LECTURE HALL LIGHTING CONTROL.REFER TO DETAIL 1/E-931 FOR DETAILS.
2. AIM OCCUPANCY SENSORS PER MANUFACTURER'S RECOMMENDATIONS.
3. PROVIDE STEP LIGHTING ALONG EACH RISER PER ARCHITECTURALDRAWINGS. PROVIDE 1#10, 1#10N, 1#10G IN 0.75" CONDUIT. CONNECT NEWSTEP LIGHTING THROUGH LIGHTING INVERTER. CONNECT FOR UNSWITCHEDOPERATION.
4. PROVIDE ADDITIONAL SWITCH STATION FOR GRAPHIK EYE SYSTEMCONTROL.
5. PROVIDE 350W LIGHTING INVERTER FOR STEP LIGHTING; 120V INPUT / 120VOUTPUT, UL 924 90 MINUTE BATTERY. PROVIDE 1#10, 1#10N, 1#10 GROUNDFROM PANEL AD, CIRCUIT 7. INSTALL LIGHTING INVERTER IN ELECTRICALROOM.
6. PROVIDE 350W LIGHTING INVERTER FOR STEP LIGHTING; 120V INPUT / 120VOUTPUT, UL 924 90 MINUTE BATTERY. PROVIDE 1#10, 1#10N, 1#10 GROUNDFROM PANEL AB, CIRCUIT 11. INSTALL LIGHTING INVERTER IN ELECTRICALROOM.
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
B6-1B6A-1
B6A-2
B6-2
RL4
R2
RL4RL4 RL4 RL4RL4
RL4 RL4 RL2RL4RL4 RL4
RL4 RL4 RL4
RL4 RL4 RL4
R2
RL4
RL4
RL4RL4RL4
D1
RL2
RL2
RL2
RL2
RL2
RL2
D1 D1 DW DW DWD1D1DWDWDW
D1
D1
D1
D1
AL4
AL4
AL4
AL4
AL3
AL4
AL4
AL4
AL3
AL4
AL4
R2 R2D1
AL4
AL4
AL4
AL3
AL4
AL4
AL3
RL2 RL2
R1R1 R1R1
X X
X
XX
X
P1 P1 P1 P1 P1
PL8
PL8
PL8 PL8
PL8
PL8
PL8PL8
PL4 PL4 PL4
PL4
PL4 PL4 PL4
PL4
PL4
PL4
1
1
4 4
5 6 ELUL
ELUL
E E
E
E EE
ELUL
ELUL
STO
B-3
STO
B-3A
LECTURE
HALL
B-6A
LECTURE
HALL
B-6
ELEC
B-4A
ELEC
B-4
MECHANICAL
B-10
MECHANICAL
B-10A
LOBBY
B-1
ENTRY
VESTIBULE
B-1A
ENTRY
VESTIBULE
B-1B
VESTIBULE
B-3B
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 301
201511
LIGHTINGPLANS
BCE BCE
1/8" = 1'-0"2 LIGHTING PLAN - LEVEL 1
1/8" = 1'-0"1 LIGHTING PLAN - LEVEL 0
N0' 1' 2' 4' 8' 16'
N0' 1' 2' 4' 8' 16'
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
3
typ
3typ
LECTURE
HALL
B-6A
LECTURE
HALL
B-6
LIGHTING NOTESGENERAL NOTES:
A. REFER TO ARCHITECTURAL ELEVATIONS FOR FIXTURE MOUNTINGHEIGHTS.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FORDIMENSIONED LOCATION OF FIXTURES.
KEYNOTES:
1. PROVIDE LUTRON GRAPHIK EYE FOR LECTURE HALL LIGHTING CONTROL.REFER TO DETAIL 1/E-931 FOR DETAILS.
2. AIM OCCUPANCY SENSORS PER MANUFACTURER'S RECOMMENDATIONS.
3. PROVIDE STEP LIGHTING ALONG EACH RISER PER ARCHITECTURALDRAWINGS. PROVIDE 1#10, 1#10N, 1#10G IN 0.75" CONDUIT. CONNECT NEWSTEP LIGHTING THROUGH LIGHTING INVERTER. CONNECT FOR UNSWITCHEDOPERATION.
4. PROVIDE ADDITIONAL SWITCH STATION FOR GRAPHIK EYE SYSTEMCONTROL.
5. PROVIDE 350W LIGHTING INVERTER FOR STEP LIGHTING; 120V INPUT / 120VOUTPUT, UL 924 90 MINUTE BATTERY. PROVIDE 1#10, 1#10N, 1#10 GROUNDFROM PANEL AD, CIRCUIT 7. INSTALL LIGHTING INVERTER IN ELECTRICALROOM.
6. PROVIDE 350W LIGHTING INVERTER FOR STEP LIGHTING; 120V INPUT / 120VOUTPUT, UL 924 90 MINUTE BATTERY. PROVIDE 1#10, 1#10N, 1#10 GROUNDFROM PANEL AB, CIRCUIT 11. INSTALL LIGHTING INVERTER IN ELECTRICALROOM.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/15
E 302
201511
LIGHTINGPLANS - STEP
LIGHTING
Author Checker
1/8" = 1'-0"1 LIGHTING PLAN - LEVEL 0
N0' 1' 2' 4' 8' 16'
F F
F
F
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
exex
ex ex
ex
exrexr
11
ex
3 3
3 3
3
STO
B-3
STO
B-3A
LECTURE
HALL
B-6A
LECTURE
HALL
B-6
ELEC
B-4A
ELEC
B-4
MECHANICAL
B-10
MECHANICAL
B-10A
LOBBY
B-1
ENTRY
VESTIBULE
B-1A
ENTRY
VESTIBULE
B-1B
T
P
M
L
J
1 2 3 4 5 6 7 8 9 10 11 12 13
V
U
14
exr
exr
exex
ex
ex
exr
exr
2 2
FIRE ALARM NOTES
GENERAL NOTES:
A. IN COMPLIANCE WITH NFPA 101, LIFE SAFETY CODE: WHERE A REQUIREDFIRE ALARM SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS IN A 24HOUR PERIOD, THE AUDHORITY HAVING JURISDICTION SHALL BE NOTIFIEDAND THE BUILDING SHALL BE EVACUATED OR AN APPROVED FIRE WATCHSHALL BE PERFROMED FOR ALL PARTIES LEFT UNPROTECTED BY THESHUTDOWN UNTIL THE FIRE ALARM SYSTEM HAS BEEN RETURNED TOSERVICE.
B. OPERABLE PART OF EACH MANUAL FIRE ALARM BOX SHALL BE NOT LESSTHAN 3-1/2' AND NOT MORE THAN 4-1/2' ABOVE FLOOR LEVEL. TYPICAL FORALL LOCATIONS.
C. WALL MOUNTED APPLIANCES SHALL BE MOUNTED SUCH THAT THEENTIRE LENS IS NOT LESS THAN 80 INCHES AND NOT GREATER THAN 96INCHES ABOVE THE FINISHED FLOOR. TYPICAL FOR ALL LOCATIONS.
D. COORDINATE EXACT LOCATION APPLIANCES WITH ARCHITECT, TYPICAL.
E. PROVIDE FIRE ALARM INTERFACE TO RELEASE DOORS UPON FIREALARM CONDITION. MOUNT FIRE ALARM INTERFACE DEVICE ABOVENEAREST ACCESSIBLE CEILING.
KEYNOTES:
1.REINSTALL EXISTING NOTIFICATION APPLIANCES IN NEW FURRED WALL.CONNECT TO EXISTING FIRE ALARM SYSTEM, TYPICAL.
2. REINSTALL EXISTING BEAM SMOKE DETECTOR AND RECEIVER IN NEWFURRED WALL. CONNECT TO EXISTING FIRE ALARM SYSTEM.
3. CONNECT NEW DEVICE TO EXISTING FIRE ALARM SYSTEM.
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 401
201511
FIRE ALARMPLANS
Author Checker
1/8" = 1'-0"1 FIRE ALARM - LEVEL 0
1/8" = 1'-0"2 FIRE ALARM - LEVEL 1
N0' 1' 2' 4' 8' 16'
N0' 1' 2' 4' 8' 16'
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 901
201511
PANELSCHEDULES
BCE BCE
NOTES:
TOTAL EST. DEMAND: 35 A
TOTAL CONN.: 35 A
REC 0.54 kVA 100.00% 0.54 kVA TOTALL EST. DEMAND: 12.78 kVA
POWR 12.24 kVA 100.00% 12.24 kVA TOTAL CONN. LOAD: 12.78 kVA
HVAC 0.00 kVA 0.00% 0.00 kVA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
GFP PROVIDE GROUND FAULT BREAKER - PERSONNEL ST PROVIDE SHUNT TRIP BREAKER
GFE PROVIDE GROUND FAULT BREAKER - EQUIPMENT AF PROVIDE AFCI BREAKER
LEGEND:
TOTAL AMPS: 38 A 32 A 37 A
TOTAL LOAD: 4.52 kVA 3.86 kVA 4.40 kVA
41 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 42
39 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 40
37 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 38
35 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 36
33 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 34
31 -- -- -- -- 20 A 1 0.00 0.00 1 20 A -- -- -- -- 32
29 -- -- -- -- 20 A 1 0.00 0.54 1 20 A 0.75" 1#12, 1#12, 1#12 REC LECTURE HALL B-6- 30
27 -- -- -- -- 20 A 1 0.00 0.00 1 20 A 0.75" 1#12, 1#12, 1#12 HVAC ENTRY VESTIBULE B-1A- 28
25 -- -- -- -- 20 A 1 0.00 0.00 1 20 A 0.75" 1#12, 1#12, 1#12 HVAC ENTRY VESTIBULE B-1A- 26
23 0.40 0.20 24
21POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.40 0.202 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A -FURN-
22
19 0.60 0.40 20
17POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.60 0.402 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A -FURN-
18
15 0.60 0.40 16
13POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.60 0.402 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A -FURN-
14
11 0.60 0.40 12
9POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.60 0.402 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A -FURN-
10
7 0.60 0.66 8
5POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.60 0.662 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A - FURN-
6
3 0.60 0.66 4
1POWR LECTURE HALL B-6 - FURN- 2#10, 1#10, 1#10 0.75" 20 A 2
0.60 0.662 20 A 0.75" 2#10, 1#10, 1#10 POWR LECTURE HALL B-6A -FURN-
2
CKT DESCRIPTION WIRE SIZE
(PH, N, GND) COND NOTES BKR P A B C P BKR NOTES COND WIRE SIZE
(PH, N, GND) DESCRIPTION CKT
1. Provide with 100A feeder from existing Panelboard AA.NOTES:
ENCLOSURE: Type 1 MCB RATING:
MOUNTING: Surface WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: PHASES: 3 MAINS TYPE:
LOCATION: ELEC B-4 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: BB
MECHANICAL EQUIPMENT - ELECTRICAL CONNECTION SCHEDULE
Comments VOLTAGENUMBER OF
POLES PANELCIRCUITNUMBER Mech Disconnecting Means
EBH-1 120 V 1 BB 26 DIVISION 23
EBH-2 120 V 1 BB 28 DIVISION 23
EBH-3 120 V 1 LE1 24 DIVISION 23
EBH-4 120 V 1 LE1 26 DIVISION 23
GRAFIK Eye. QS Load Schedule
LECTURE HALL B6Model Number: QSGRJ-6P-WH
Phase Control Zones
Zone Name Load Type No. Fixtures Wattage/Fixture Total Wattage
1 4 Rows Linear LED 0-10V 32 51 1632
2 SPARE Non-dim / Switched
3 White Board LED 0-10V 15 31 465
4 Lecture Front LED 0-10V 15 51 765
5 Perimeter LED 0-10V 16 23 368
6 Cove Lighting LED 0-10V 8 28 224
GRAFIK Eye. QS Load Schedule
LECTURE HALL B6AModel Number: QSGRJ-6P-WH
Phase Control Zones
Zone Name Load Type No. Fixtures Wattage/Fixture Total Wattage
1 4 Rows Linear LED 0-10V 32 51 1632
2 SPARE Non-dim / Switched
3 White Board LED 0-10V 15 31 465
4 Lecture Front LED 0-10V 15 51 765
5 Perimeter LED 0-10V 16 23 368
6 Cove Lighting LED 0-10V 8 28 224
GRAFIK Eye® QS
QSGRJ-6P-WH
Line In
(120 VAC)
120 VPANELAD-2
PP-120H
LOS-WDT-WH
(Qty: 2)GRX-TVI (1)
120 V; PANEL AD-3
Cove Lighting
LED 0-10V 224W
GRX-TVI (1)
120 V; PANEL AD-3
Perimeter
LED 0-10V 368W
GRX-TVI (1)
120 V; PANEL AD-4
Lecture Front
LED 0-10V 765W
GRX-TVI (1)
120 V; PANEL AD-4
White Board
LED 0-10V 465W
PHPM-SW-DV-WH (1)
SPARE
Non-dim / Switched 220W
GRX-TVI (1)
120 V; PANEL AD-5
4 Rows Linear
LED 0-10V 1632W
QSWS2-5BRLI-WH QSWS2-5BRLI-WH
Wiring Notes: 2 #12 AWG (2.5 mm 2 ) 2 #18 AWG (1.0 mm 2 ) 277 VAC Input Power Lutron GRX-CBL-346S or GRX-PCBL-346S
3 #18 AWG (1.0 mm 2 ) 120 VAC Input Power * Only connect 3 wires (Common, mux, mux)
GRAFIK Eye® QS One Line Diagram
GRAFIK Eye® QS
QSGRJ-6P-WH
Line In
(120 VAC)PANELAB-1
120 VPANELAB-3
PP-120H
LOS-WDT-WH
(Qty: 2)GRX-TVI (1)
120 V; PANEL AB-5
Cove Lighting
LED 0-10V 224W
GRX-TVI (1)
120 V; PANEL AB-5
Perimeter
LED 0-10V 368W
GRX-TVI (1)
120 V; PANEL AB-7
Lecture Front
LED 0-10V 765W
GRX-TVI (1)
120 V; PANEL AB-7
White Board
LED 0-10V 465W
PHPM-SW-DV-WH (1)
SPARE
Non-dim / Switched 220W
GRX-TVI (1)
120 V; PANEL AB-9
4 Rows Linear
LED 0-10V 1632W
QSWS2-5BRLI-WH QSWS2-5BRLI-WH
LECTURE HALL B6 LECTURE HALL B6A
PANELAD-1
A
B
D
E
C
6 3 15 4 2
This drawing and all reproductionsare copyrighted and the property ofMake3 architecture/planning/design
and may not be used in any waywithout their permission.
© 2015
S H E E T N U M B E R
P R O J E C T N U M B E R
T I T L E
R E V I S I O N
D A T E
CHECKED BY
C O P Y R I G H T
DRAWN BY
NOT RELEASED FOR CONSTRUCTION
7
F
Boggs: Lectu
re H
alls
B6, B
6A
and
Hall
Lobby R
edesig
n &
Refr
esh
770 S
tate
Str
eet
GE
OR
GIA
IN
ST
ITU
TE
OF
TE
CH
NO
LO
GY
12/15/2015
E 931
201511
SCHEDULES &DETAILS -LIGHTING
BCE BCE
LUMINAIRE SCHEDULE
OCCUPANCY SENSOR SCHEDULE
LUMINAIRE SCHEDULE NOTES:1. PROVIDE SELF DIAGNOSTICS AND MAINTENANCE FREE NICKEL-CADMIUM BATTERY.2. PROVIDE CLEAR BACKGROUND FOR SINGLE FACE FIXTURES AND MIRROR FACE FOR DOUBLE FACE FIXTURES.3. PROVIDE STEPPED DIMMING BALLAST AS REQUIRED FOR MULTI-LEVEL SWITCHING.4. PROVIDE EMERGENCY BATTERY BALLAST BACKUP FOR LUMINAIRES INDICATED ON FLOOR PLANS AS EMERGENCY.
OCCUPANCY SENSOR SCHEDULE NOTES:CONTRACTOR SHALL REVIEW PROPOSED SETTINGS WITH OWNER PRIOR TO INSTALLATION.
TYPEMARK/ ID DESCRIPTION LAMP QTY.
LAMPTYPE BALLAST MOUNTING
BASIS OF DESIGN ALTERNATE(S)
NOTESMANUFACTURER SERIES - MODEL MANUFACTURER(S) SERIES - MODEL
AL3 4” wide, Asymmetric, recessed slot LED; 3500K; Provide in lengths asshown on the drawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point SEEM 4 Asym
AL4 4” wide, Asymmetric, recessed slot LED; 3500K; Provide in lengths asshown on the drawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point SEEM 4 Asym
CL Asymmetric, LED cove light;3500K; Provide in lengths as shown ondrawing; Provide with 0-10V dimming.
1 LED Recessed Ecosense Lighting Trov L50 Asym
D1 4.5” LED Square, recessed open downlight with aluminum reflector and55 degree beam spread; 3500K; Provide with 0-10V dimming.
1 LED Recessed Focal Point FLC44D
DW 4.5” LED Square, recessed open wall washer with aluminum reflector;3500K; Provide with 0-10V dimming.
1 LED Recessed Focal Point FLC44W
ELUL LED emergency lighting unit. Provide with self diagnostics andmaintenance free nickel-cadmium battery.
2 LED Surface - wall Lithonia WLTU-LED
P1 Opal glass pendant; provide with LED screw base equal to 60W A-lamp;3500K; Provide with 0-10V dimming.
1 LED Pendant Delray Lighting Kone 623
PL4 4" wide, direct LED linear pendant; 3500K; Provide in lengths as shownon drawings.
1 LED Pendant Focal Point SEEM 4
PL8 4" wide, direct LED linear pendant; 3500K; Provide in lengths as shownon drawings.
1 LED Pendant Focal Point SEEM 4
R1 1' x 4' recessed, LED lensed diffuser; 3500K 1 LED Recessed Focal Point Equation
R2 2' x 4' recessed, LED lensed diffuser; 3500K 1 LED Recessed Focal Point Equation
RL2 4” wide, recessed slot LED; 3500K; Provide in lengths as shown on thedrawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point SEEM 4 4
RL4 4” wide, recessed slot LED; 3500K; Provide in lengths as shown on thedrawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point SEEM 4 4
RL6 6” wide, recessed slot LED; 3500K; Provide in lengths as shown on thedrawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point SEEM 6
RP3 3” wide, perimeter LED; 3500K; Provide in lengths as shown on thedrawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point Trace
RP8 3” wide, perimeter LED; 3500K; Provide in lengths as shown on thedrawings. Provide with 0-10V dimming.
1 LED Recessed Focal Point Trace
RS LED Architectural step light, louvered door cover, extruded aluminumreflector, 3000K
1 LED Recessed Vista Pro Model 1501
SL8 Linear, surface mounted LED with drop down, square, three-sided lens;3500K; Provide with 0-10V dimming. Provide in lengths as shown ondrawings.
1 LED Surface Bartco BSS210
X LED edge lit emergency exit sign; Provide with red letters and recessedhousing. Provide with self diagnostics and maintenance freenickel-cadmium battery.
0 LED Recessed Lithonia Precise LRP
TYPEMARK/ ID DESCRIPTION MOUNTING
BASIS OF DESIGN ALTERNATE(S)
NOTESMANUFACTURER SERIES - MODEL MANUFACTURER(S) SERIES - MODELA DUAL TECHNOLOGY WALL SWITCH; LINE VOLTAGE; 1000SF COVERAGE AREA; MANUAL ON/ AUTO OFF. WALL MOUNTED @ 48
IN. A.F.F.WATTSTOPPER DW-100
C ULTRASONIC, 32kHz; TAMPER PROOF AND VANDAL RESISTANT IF MOUNTED AT 8'-6" AFF OR LESS; 2000SF COVERAGEAREA; BAS OUTPUT
WALL MOUNTED WATTSTOPPER W-2000
R 360 DEGREE ULTRASONIC, 32kHz; 1100SF COVERAGE AREA; SET FOR AUTO ON/ AUTO OFF. CEILING WATTSTOPPER W-1000
NOT TO SCALE1
TYPICAL LECTURE HALL DIMMINGCONTROL WIRING DETAIL