Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA Project No.: 2015009.02 Date of Site Visit: 30 October, 2017 Routed to: Bill Cundiff Adam Furno Larry Lench Mark McKernan GRLA Project File Date Produced: 31 October, 2017 Temperature: 54 o F Weather: Sunny Time: 11:30 am- 12:00 pm PRESENT AT SITE: Adam Furno, Town of Douglas Mike Fitzpatrick, Douglas Building Committee Nima Mansour, GRLA George O’Neill, GRLA OBSERVATIONS: 1.1 Three (3) roof leaks were observed at the interior of the gymnasium (See attached annotated floor plan): - Over bleachers at west end of south wall (photo 1) - At 3-point line at far (west) end of court) - At east wall and on wall mats (photo 2) - Two of these leaks had been reported the previous Friday (10/27/17) by Adam Furno and the 3 rd was noted by Matt Wojcik on Monday morning (10/30/17). 1.2 Water marks were observed at ceiling of equipment room (photo 3) and locker room (photo 4). - These water marks are at the underside of where the locker room roof meets the east wall of the Gym. 1.3 Source of this water is yet to be determined, and may be from a failure of the locker room roof or water infiltration within the east wall. 1.4 Ponding water was observed near the roof edge at the southwest corner of the gym roof ( photo 5). - Numerous seams and patches are within the area of this ponding water. - One lifted seam was observed at this area (photo 6), which is within the zone of the leak above the bleachers at the interior below. 1.5 A heavily patched area of membrane at the vertical parapet of the east wall was observed at the zone above the water leak at the interior of the east wall below (photo 7 & 8). - It was observed that there is no sealant under the bottom edge of the aluminum drip edge/fascia; 1.6 The east wall (photo 9 & 10) includes the upper parapet/ roof edge of the Gym roof, an aged window and aged masonry. - The Architect recommended a testing program to determine the source of the leak at this east wall, starting low and working up: o lower (locker room) roof/ wall intersection, o window assembly

Upload: others

Post on 19-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

Field Report Report No.: 01

Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks

GRLA Project No.: 2015009.02

Date of Site Visit: 30 October, 2017 Routed to: Bill Cundiff Adam Furno Larry Lench Mark McKernan GRLA Project File

Date Produced: 31 October, 2017 Temperature: 54o F Weather: Sunny Time: 11:30 am- 12:00 pm

PRESENT AT SITE:

Adam Furno, Town of Douglas

Mike Fitzpatrick, Douglas Building Committee

Nima Mansour, GRLA

George O’Neill, GRLA

OBSERVATIONS:

1.1 Three (3) roof leaks were observed at the interior of the gymnasium (See attached annotated floor plan):

- Over bleachers at west end of south wall (photo 1)

- At 3-point line at far (west) end of court)

- At east wall and on wall mats (photo 2)

- Two of these leaks had been reported the previous Friday (10/27/17) by Adam Furno and the 3rd was noted by Matt Wojcik on Monday morning (10/30/17).

1.2 Water marks were observed at ceiling of equipment room (photo 3) and locker room (photo 4).

- These water marks are at the underside of where the locker room roof meets the east wall of the Gym.

1.3 Source of this water is yet to be determined, and may be from a failure of the locker room roof or water infiltration within the east wall.

1.4 Ponding water was observed near the roof edge at the southwest corner of the gym roof (photo 5).

- Numerous seams and patches are within the area of this ponding water.

- One lifted seam was observed at this area (photo 6), which is within the zone of the leak above the bleachers at the interior below.

1.5 A heavily patched area of membrane at the vertical parapet of the east wall was observed at the zone above the water leak at the interior of the east wall below (photo 7 & 8).

- It was observed that there is no sealant under the bottom edge of the aluminum drip edge/fascia;

1.6 The east wall (photo 9 & 10) includes the upper parapet/ roof edge of the Gym roof, an aged window and aged masonry.

- The Architect recommended a testing program to determine the source of the leak at this east wall, starting low and working up:

o lower (locker room) roof/ wall intersection,

o window assembly

Page 2: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

Douglas Municipal Bldg Window Replacement Field Report-Roof Leaks October 30, 2017

G | R | L | A 239 South Street, Hopkinton, MA 01748

Gorman Richardson Lewis Architects T-508.544.2600 F-508.435.0072

Page 2 of 2

o upper parapet assembly

1.7 Other deficiencies and areas of concern were observed, including:

- Termination of roof system and ends of parapets (photo 11) have open edges of membrane;

- Patches without sealant at edges (photo 12);

- Mike Fitzpatrick noted that the sealant around the edges of roof patches were tooled flat rather than maintaining a raised form to channel water away from the edges of the patch.

- Regularly spaced membrane patches along tops of parapets at east and west ends of Gym roof (photo 13); What was the reason for these patches?

- Open joints at laps of stainless steel through-wall flashing are not sealed (photo 14).

1.8 The Architect recommends the following actions:

- Notify roof system manufacturer (Versico) that the roof system has developed leaks and request inspection of roof by manufacturer’s technical field representative to confirm required repairs to maintain warranty;

- Water testing of east wall to determine source of leaks at east wall as noted above.

1.9 Adam Furno noted that Greenwood Industries (Roofer and GC for the roofing project) was notified of the leaks and were on their way to visit the site.

- The Greenwood rep was delayed due to power outage at his home over the weekend due to the heavy wind storm.

END OF FIELD REPORT

Respectfully submitted, GORMAN RICHARDSON LEWIS ARCHITECTS

George O’Neill Senior Project Manager Attachments: • Photos • Annotated Floor Plan • Annotated Roof Plan

Page 3: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 1

1. Leak above bleachers

2. Leak at front wall and on wall mats

Page 4: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 2

3. Leaks at equipment room ceiling

4. Water marks at locker room ceiling

Page 5: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 3

5. Ponding water at southwest corner

6. Lifted seam at south roof edge

Page 6: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 4

7. Built up patch at parapet on east

8. Detail of patch at east wall parapet

Page 7: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 5

9. View of east wall – exterior side of photo 8

10. Interior view of east wall where leak occurred

Page 8: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 6

11. Open vertical end seam at northwest wall

12. Patch without edge sealant

Page 9: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

10/30/2017 Douglas Municipal Gym Roof Leaks 7

13. Patches on top of parapet- what are these?

14. Open joint at stainless steel flashing (typical)

Page 10: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

COMMUNITY

MTG. ROOM

1-125

BOARD OF

HEALTH

1-124

BUILDING

DEPT.

1-122

BUILDING

OFFICIAL

1-122A

TOWN

ENG.

1-122B

KITCHEN

1-121

WOMEN

TOILETS

1-120

ENTRY

LOBBY

1-110

GYMNASIUM

1-115

LOCKERS

1-116

STORAGE

1-118

VESTIBULE

1-111

MEN

1-114

WOMEN

1-113

ELEV.

MACH.

1-112

ELEV.

---

STAIR 1

---

ASSESSORS

1-108

OFFICE

1-109

OFFICE

1-107

TOWN

CLERK

1-106

TREASURER

1-103

TOWN

ACCOUNT

1-102

TAX

COLLECTOR

1-104

COPY

ROOM

1-131

OPEN

OFFICE

1-132

SELECTMAN'S

OFFICE

1-133

RESOURCE

ROOM

1-128

STOR.

1-128B

STOR.

1-128A

STOR.

1-128C

SUPPLY

ROOM

129

CORRIDOR

1-100

MECH.

1-119

MEN

TOILETS

1-126

EGRESS

LOBBY

1-127

CORR.

1-130

DN

UP

UP

UP

DN UP

UP

DN

DN

DN

DN

UP

ALTERNATE 1

ALTERNATE 2

ALTERNATE 3

GENERAL PLAN NOTES

RESTROOM

1-106A

RESTROOM

1-104A

KEY NOTES LEGEND

4

REINSTALL MECHANICAL PIPING AND REACTIVATE MECH. UNITS - SEAL NEW PENETRATIONS

THROUGH NEW INFILL PANEL AS REQUIRED AND SPECIFIED.

1

INSTALL NEW WINDOW ASSEMBLY AND RELATED ACCESSORIES AS DETAILED AND SPECIFIED -

REFER TO BUILDING ELEVATIONS AND WINDOW SCHEDULE FOR LOCATIONS AND

CONFIGURATIONS - ALL DIMENSIONS TO BE V.I.F. BY CONTRACTOR.

11111111

111

1

1

1 1 1 1 1 1 1 11

1

REINSTALL SALVAGED VERTICAL WINDOW BLIND ASSEMBLY AND ASSOCIATED HARDWARE.

5

5

CORRIDOR

1-101

1

A3.0

2

A3.0

3

A3.0

1.) ALL EXISTING SURFACES TO REMAIN THAT ARE DAMAGED DURING DEMOLITION AND NEW WORK

SCOPE SHALL BE PATCHED AND REPAIRED TO LIKE NEW CONDITION TO MATCH EXISTING.

2.) AREA OF WORK INDICATED ON THIS DRAWING IS PROVIDED AS ONLY A GUIDE AND DOES NOT

FULLY ENCOMPASS THE ENTIRETY OF WORK AREA SCOPE BASED ON OTHER DISCIPLINES AND

UNFORESEEN CONDITIONS. IT IS THE RESPONSIBILITY OF THE G.C./CONTRACTOR TO VERIFY

ALL EXISTING CONDITIONS AGAINST PROPOSED WORK SCOPE SO TO FULLY ASSESS THE EXTENTS

OF THE REQUIRED WORK AREA.

3.) ALL EXISTING MASONRY WINDOW OPENINGS TO RECEIVE NEW WORK SHALL BE SPOT CLEANED

AND REPAIRED (MORTAR AND MASONRY), AS NECESSARY, PRIOR TO NEW WORK INSTALLATION.

4.) REINSTALL ALL REMOVED CEILING TILE, TRACKS AND ASSOCIATED HARDWARE AFTER NEW

WINDOW REPLACEMENT. REPLACE ANY DAMAGED OR STAINED TILES IMPACTED BY WINDOW

REPLACEMENT SCOPE OF WORK.

5.) ALTERNATES SHALL BE DESCRIBED IN PROJECT MANUAL AND THROUGHOUT THESE DRAWINGS.

CONTRACTOR IS RESPONSIBLE FOR PRICING INDICATED SCOPE AND NECESSARY WORK FOR EACH

ALTERNATE AS SPECIFIED. THERE ARE 3 ALTERNATES INDICATED PER THESE PROJECT

DRAWINGS.

3

REFINISH AND INSTALL SALVAGED EXTERIOR MECHANICAL GRILL - RECONNECT TO EXISTING

DUCTWORK. REPLACE ANY DAMAGED GRILLS AND DUCTWORK HARDWARE. REACTIVE

ASSOCIATED SYSTEMS AS REQUIRED.

2

INSTALL NEW EXTERIOR INFILL PANEL, FLASHING AND TRIM ABOVE WINDOW UNIT AS DETAILED

AND SPECIFIED.

252525252525252

5

2

525252

5

2

5

2

2 52 52 52 52 52 52 52 52

4

3 33

3

1

FIRST FLOOR PROPOSED PLAN

SCALE: 1/8" = 1'-0"

ALTERNATE 3ALTERNATE 1

ALTERNATE 1

ALTERNATE 1

ALTERNATE 2 ALTERNATE 2

ALTERNATE 2

ALTERNATE 2 ALTERNATE 2

© COPYRIGHT 2016

ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSHEREIN IS NOT GUARANTEED AGAINST DEFECTS THATINCLUDE, BUT ARE NOT LIMITED TO, ERRORS ANDOMISSIONS, DESIGN CALCULATIONS AND DIMENSIONS,DATA TRANSMISSION, OR DATA TRANSLATION.

ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSAPPEARING HEREIN SHALL REMAIN THE PROPERTY OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.AND AS SUCH IS NOT TO BE DUPLICATED INANY FORM OR DISCLOSED OR OTHERWISE USEDWITHOUT T H E EXPRESS WRITTEN CONSENT OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.

20

15

00

9.0

2 - TO

WN

O

F D

OU

GLA

S, M

A - D

OU

GLA

S M

UN

IC

IP

AL B

LD

G. W

IN

D/

RO

OF A

ND

P

RIM

AR

Y S

CH

OO

L R

OO

F - B

ID

D

OC

UM

EN

TS

- M

AY

2

4, 2

01

6

North

Project North

T:\PRO

J2015\2015009\02\_D

raw

ing_Set\_FO

RM

AT_SH

EETS\A1_1.dw

g, 5/13/2016 7:57:51 PM

, lspear

goneill
Oval
goneill
Oval
goneill
Oval
goneill
Text Box
Puddle of water on floor on 3-point line
goneill
Text Box
Puddle of water on bleachers
goneill
Line
goneill
Line
goneill
Text Box
Puddle of water on floor and water marks on blue wall pads
goneill
Line
Page 11: Project: Douglas Municipal Building Gym GRLA Project No.: … · 2018-01-18 · Field Report Report No.: 01 Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks GRLA

GYMNASIUM

ROOF

---

MUNICIPAL BLDG.

ROOF

---

EXISTING RTU

EXISTING RTU

EXISTING RTU

EXISTING RTU

EXISTING VENTEXISTING VENT

EXISTING ROOF HATCH

EXISTING ROOF HATCH

EXISTING EXHAUST

EXISTING EXHAUST

EXISTING

ROOF DRAIN

1.) REMOVE EXISTING ROOF SYSTEM DOWN TO THE DECK AND REPLACE WITH A NEW EPDM MEMBRANE SYSTEM AS

SPECIFIED AND DETAILED.

2.) ANY ROOF LEAKS OR DEFICIENT ROOF CONDITIONS DISCOVERED DURING ORIGINAL SCOPE OF WORK SHALL BE

IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND/OR ARCHITECT FOR FURTHER REVIEW AND

ADVISEMENT.

3.) ALL EXISTING SURFACES TO REMAIN THAT ARE DAMAGED DURING DEMOLITION AND NEW WORK SCOPE SHALL BE

PATCHED AND REPAIRED TO LIKE NEW CONDITION TO MATCH EXISTING.

4.) AREA OF WORK INDICATED ON THIS DRAWINGS IS PROVIDED AS ONLY A GUIDE AND DOES NOT FULLY ENCOMPASS THE

ENTIRETY OF WORK AREA SCOPE BASED ON OTHER DISCIPLINES AND UNFORESEEN CONDITIONS. IT IS THE

RESPONSIBILITY OF THE G.C./CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AGAINST PROPOSED WORK SCOPE

SO TO FULLY ASSESS THE EXTENTS OF THE REQUIRED WORK AREA. REFER TO OTHER DISCIPLINE DRAWINGS WITHIN

THIS SET FOR FURTHER WORK SCOPE REQUIREMENTS.

GENERAL ROOF PLAN NOTES

AREA OF WORK

EXHAUST FAN

NEW ROOF INSULATION AND MEMBRANE SYSTEM OVER

EXISTING SUPPORT STRUCTURE AND DECKING

4

A7.3SIM.

5

A7.3

6

A7.3

7

A7.3

3

A7.3

4

A7.3

3

A7.3 SIM.

± 91'-8"

V.I.F.

± 76'-8"

V.I.F.

NEW GALV. & PTD. 42" HIGH GUARD RAIL -

SUPPORT POSTS TO BE ANCHORED

TO EXISTING ROOF STRUCTURE

5'-0"

5'-0"

11

A7.3

SEAL GUARD POST PENETRATIONS IN

ACCORDANCE WITH MEMBRANE ROOF

MANUFACTURER GUIDELINES AND

DETAIL 10/A7.3 - TYP. OF 6 LOCATIONS

© COPYRIGHT 2016

ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSHEREIN IS NOT GUARANTEED AGAINST DEFECTS THATINCLUDE, BUT ARE NOT LIMITED TO, ERRORS ANDOMISSIONS, DESIGN CALCULATIONS AND DIMENSIONS,DATA TRANSMISSION, OR DATA TRANSLATION.

ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSAPPEARING HEREIN SHALL REMAIN THE PROPERTY OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.AND AS SUCH IS NOT TO BE DUPLICATED INANY FORM OR DISCLOSED OR OTHERWISE USEDWITHOUT T H E EXPRESS WRITTEN CONSENT OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.

20

15

00

9.0

2 - TO

WN

O

F D

OU

GLA

S, M

A - D

OU

GLA

S M

UN

IC

IP

AL B

LD

G. W

IN

D/

RO

OF A

ND

P

RIM

AR

Y S

CH

OO

L R

OO

F - B

ID

D

OC

UM

EN

TS

- M

AY

2

4, 2

01

6

North

Project North

T:\PRO

J2015\2015009\02\_D

raw

ing_Set\_FO

RM

AT_SH

EETS\A1_3.dw

g, 5/13/2016 7:57:56 PM

, lspear

goneill
Oval
goneill
Oval
goneill
Oval
goneill
Oval
goneill
Line
goneill
Oval
goneill
Underline
goneill
Underline
goneill
Text Box
photo 5
goneill
Text Box
photo 6
goneill
Text Box
photo 8
goneill
Text Box
photo 8
goneill
Line
goneill
Text Box
photo 7
goneill
Line
goneill
Text Box
photo 11
goneill
Text Box
photo 12
goneill
Oval
goneill
Text Box
photo 13