NO SINIFICANT RE!ATIONSHIP WASNOTED FROM THE PARETO ANA!YSIS.
THE REJECTIONS SEEMS TO E FAIR!Y
CONSTANT IRRESPECTIVE OF THE DAYOF THE WEE.
TOM JIM JOHN ED0
5
10
15
20
25
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
22 20 19 16
29%
55%
79%
100%REJECTIONS Y O!ERATOR
DEFECTS
QUANTITY CUMM%
FRI MON TH WED TE
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
17 16 16 15 13
22%
43%
64%
83%
100%REJECTIONS Y DAY OF T"E #EE$
ASSEMLY SECTION
QUANTITY
C&&%
REASON FORIMPROVEMENT
THE TEAM THEN REVIEWED THEREJECTION DATA Y THE OPERATORMANFACTRIN THE ASSEM!Y TO
NDERSTAND IF THE REJECTIONS ARECASED Y ANY PARTIC!AROPERATOR.
THE TEAM NARROWED ITS FINDINSFROM THE PARETO ANA!YSIS TODEVE!OP THE THEME FORIMRPOVEMENT.
WE A!SO DECIDED TO !OO IF THEREWAS ANY RE!ATION ETWEEN THEREJECTIONS AND THE DAY OF THE
WEE IT WAS CASED.
THE NMER OF REJECTION IS FAIR!YCONSTANT REARD!ESS OF THE
OPERATORHENCE THE TEAM CO!D NOTATTRITE THE NMER OFREJECTIONS TO ANY PARTIC!AROPERATOR.
-
7/25/2019 Project Final 11 26
3/15
THEME AND INDICATOR
OVER !AST ONE YEAR 83% OF THERI AP ISSES WERE FOND IN THE!E02 SECTION
FINDINGS
REDCE THE RI AP ISSE IN !E02SECTION
T"EME
-
7/25/2019 Project Final 11 26
4/15
THE TEAM REVIEWED THE REJECTIONDATA OF 64 !E02 ASSEM!IES
CRRENT SITATION
RI 1 RI 6 RI 2 RI 5 RI 4 RI 30
10
20
30
40
5060
70
0%
20%
40%
60%
80%
100%
64 57
6 4
2 2
47%
90% 94% 97%
99% 100%
NUMER OF REJECTIONS Y RI'
RIS
Q()*+*, C&&%
90% OF THE REJECTIONS IN !E02 ARECASED DE TO RI HEIHT ISSES INRI;1 AND RI;6
THE RI HEIHT DATA OF RI;1 AND RI;6FROM REJECTED NIT ED
RI'
1
RI'
S? 16.240@0?.005
MA" 16.240MIN 16.210
RANE OF OOT .0030
S? 10.082@0?.005
MA" 10.090MIN 10.060
RANE OF OOT .0030
THE RI HEIHT DATA OF DETAI!ED RI;1 ANDRI;6 WAS A!SO ANA!Y>ED AND FOND TO EIN TO!ERANCE
THIS ANA!YSIS SHOWED THAT RIS AREFO!!OWIN OOT AFTER ASSEM!Y PROCESS
R#$;6
R#$;5
R#$;4
R#$;3
R#$;2
R#$;1
S#*
P,-*B
R#$
0-#%0+
-
7/25/2019 Project Final 11 26
5/15
CRRENT SITATION
TO ETTER NDERSTAND THE REASONS FOR REJECTION THE TEAM REVIEWED THE ASSEM!YPROCESS OF !E02 SECTION.
1/!OAD SINAND RIS ON
TO AF
2/DRI!!
HO!ES C?TMONTIN
STRAPSAND RISSIN DJ
/DERRCS AND
ATTACH THERIS TO THESIN SIN
HI!OS
4/!OCATEP!ENMS
ANDTRANSFERDRI!! HO!ES
TO THE SIN
5/DERRCS AND
ATTACH THEP!ENMS TOSIN SIN
RIVETS
/FINA! FINISH
ANDINSPECTION
RI HIEHT MEASREMENTS ON RI ;1 AND RI; 6 WERE TAEN AT EACH STEP OF THE I!DPROCESS FOR TWO CONSECTIVE NITS
LE02S.NO 227
NOMINAL0-.005
D3*(+(6*
D3*(6o&
)o&+)(
1/Co)8*6(+)* +) AF
D3*(6o&
)o&+)(
/I)8*((*+o) o "+o98
D3*(6o&
)o&+)(
5/I)8*((*+o
) o!3)&
D3*(F6o&
No&+)(RI ; 1 !E02 IND 16.24 16.236 0.004 16.24 0 16.226 0.014 16.226 0.014RI; 6 !E02 OTD 10.082 10.080 0.002 10.088 0.006 10.067 0.015 10.069 0.013
LE02S.NO 22:
NOMINAL0-.005
D3*(+(6*
D3*(
6o&)o&+)(
1/
Co)8*6(+)* +) AF
D3*(6o&
)o&+)(
/
I)8*((*+o) o "+o98
D3*(
6o&)o&+)(
5/I)8*((*+o
) o!3)&
D3*(
F6o&No&+)(
RI; 1 !E02 IND 16.24 16.239 0.001 16.237 0.003 16.216 0.024 16.217 0.023RI; 6 !E02 OTD 10.082 10.081 0.001 10.081 0.001 10.067 0.015 10.068 0.014MAJOR DEVIATION IN THE RI HEIHT IS OSERVED AFTER THE INSTA!!ATION OF HI!OS WHICH
ARE SED TO SECRE THE RI TO THE SIN.
-
7/25/2019 Project Final 11 26
6/15
ANA!YSIS
R+;
C
-
7/25/2019 Project Final 11 26
7/15
ANA!YSIS..CONTD
THE TEAM PROPOSED AND CONDCTED TESTS TO VERIFY PROA!E ROOT CASES.
SUMMARY OF TERMINOLOGY AND MEASUREMENTS>IN THE FO!!OWIN TESTS CRITERIA WERE ESTA!ISHED FOR RI TERMINO!OY AND STANDARD POINTS OF MEASRE
A STANDARD CHEC SHEET WAS DEVE!OPED TO RECORD THE DATA AS SHOWN E!OW.RI; 1 WAS SE!ECTED FOR THESE TESTS.
MEASREMENTS WERE TAEN AT OTH INOARD AND OTOARD !OCATION OF THE RI ASSHOWN FOR A!! THE TESTS
WE ENSRED THAT A!! THE TESTS WERE CONDCTED Y THE SAME OPERATOR AND THAT A!!THE MEASREMENTS WERE TAEN Y THE SAME INSPECTOR
PPER
!OWER
-
7/25/2019 Project Final 11 26
8/15
ANA!YSIS..CONTD
TEST 1
TEST WAS CONDCTED TO MEASRE THE DEFE!ECTION DRIN THE DRI!!IN AND FASTENER
INSTA!!ATION PROCESS FOR TWO DIFFERENT ASSEM!IES. THE MEASREMENTS WERE TAEN ATEACH PROCESS STEP OF DRI!!IN AND INSTA!!IN TWO FASTENERS. THE MEASREMENTS WERERECORDED AT EACH STEP.
SIGNIFICANT RESULTS NOTED1 THE RI EIN TO DEF!ECT AS FASTENERS IN THE CROWN AREA WERE INSTA!!ED AND
TOR:ED TO FINA! CO!!AR REAOFF.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE INTERFACE
PADS INDICATED THAT THE RI !ES TWISTED FROM THEIR FREE STATE CONDITION.3 DEF!ECTION OF .015 OTOARD AND .020 INOARD WAS NOTED.
1 2 3 4 5 6 7 8 9
16.220
16.225
16.230
16.235
16.240
16.245
TEST 1> UNIT 2
DRILLING AND INSTALLATION OF FASTENER
OB+$)&(I*$)&(STE!
MEASUREMENT
C()* Beyond Crown
1 2 3 4 5 6 7 8 9
16.220
16.225
16.230
16.235
16.240
16.245
TEST1 > UNIT 1
DRILLING AND INSTALLATION OF FASTENER
OB+$)&(
STE!
MEASUREMENT
Beyond Crown
C()*
-
7/25/2019 Project Final 11 26
9/15
ANA!YSIS..CONTD
TEST 2
TEST 2 WAS CONDCTED ON AN ASSEM!Y TO INSTA!! C!EARANCE FIT FASTENERS AT THE CROWN
AREA TO VA!IDATE THE EFFECT OF FASTENER FIT IN THE HO!ES.
SIGNIFICANT RESULTS NOTED1 THE RI DIMENSIONS REMAINED STA!E AS FASTENERS OVER THE ENTIRE RI WERE DRI!!ED
INSTA!!ED AND TOR:ED TO FINA! CO!!AR REAOFF.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE RI
INTERFACE PADS INDICATED THAT THE RI !ES DID NOT TWIST FROM THEIR FREE STATECONDITION.
1 2 3 4 5 6 7 8 9
16.230
16.235
16.240
16.245
TEST 2INSTALLATION OF CLEARANCE FASTENERS
OB+$)&
(
STE!
MEASUREMENT
T),-(&*/- >)*-
C()* Beyond Crown
-
7/25/2019 Project Final 11 26
10/15
ANA!YSIS..CONTD
TEST
TEST 3 WAS CONDCTED ON AN ASSEM!Y TO RESE:ENCE THE DRI!!IN AND INSTA!!ATION OF
FASTENERS TO START FROM CROWN AND MOVE TOWARDS THE !E AND A!TERNATIN FROM PPERTO !OWER !ES
SIGNIFICANT RESULTS NOTED1 THE RI DIMENSIONS SHOWED DEF!ECTION T WERE ON!Y .003 EYOND !OW !IMIT.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE RI
INTERFACE PADS INDICATED THAT THE RI !ES SHOWED TWISTIN FROM THEIR FREE STATECONDITION.
1 2 3 4 5 6 7 8 9
16.230
16.235
16.240
16.245
TEST RESEQUENCED INSTALLTION OF FASTENER
OB+$)&
(
STE!
MEASUREMENTS
Beyond Crown
C()*
-
7/25/2019 Project Final 11 26
11/15
ANA!YSIS..CONTD
TEST 4
IN TEST 4 FINITE E!EMENT ANA!YSIS WAS CONDCTED TO DEMONSTRATE !OCATION OF STRESS
CONCENTRATIONS IN THE PRESENT RI DESIN SIN A SIMP!E !OADIN CONDITION. THE TEST WASCONDSCTED TO VA!IDATE THE !IHT WEIHT DESIN OF THE RI
SIGNIFICANT RESULTS NOTEDLESS THAN 30 LB. IS REQUIRED TO CLOSE THE RIB 0.030 IN.
D 0.030D
Max Principa
S!r"## $ %&'0 p#i
Min PrincipaS!r"## 3()0 p#i
THE TEAM WAS NOW READY TO DEVE!OP THE CORRECTIVE ACTIONS FOR THE ROOT CASES WHICHWERE ESTA!ISHED Y TEST 1 2 3 AND 4
-
7/25/2019 Project Final 11 26
12/15
CONTERMEASRES
FOUR 4/ !RACTICAL MET"ODS #ERE SELECTED FORIM!LEMENTATION
RI4
HEI5HT
O
TOF
TO!ERANC
E
DRI!!IN SE:ENCE
RESE:ENCE THEDRI!!IN AND
INSTA!!ATION OFFASTENERS
REVISE THE OPERATIONWOR SHEET
TRAIN THE OPERATORSWITH NEW SE:ENCE
DESINED TRANSITIONFIT OF FASTENERS
REDESIN FORC!EARANCE FIT OF
FASTENERS
DRI!! THE HO!ES TOHIH END OFTO!ERANCE
RE:EST CSTOMERTO PDATE THE HO!E
TO!ERANCE
!IHT WEIHT RIDESIN
REDESIN THE RISFOR !ESS DEF!ECTION
RE:EST CSTOMERFOR STRENTHENIN
THE RI !ES
EFF.
FEAS.
YN?
3 5 15
4 5 20
2 3 6
4 5 20
5 4 25
COUNTERMEASUREMATRI@
!ROLEM
ROOTCAUSES
COUNTERMEAUSRE
!RACTICALMET"ODS
A
D
E
C
A E PRACTICA!METHODS
!OW HIH
1 5
!EENDS
CONTERMEASRES
-
7/25/2019 Project Final 11 26
13/15
CONTERMEASRESCONTD
ARRIERS AIDS
CSTOMERS WI!!INNESS REDCED REJECTION
COSTINCREASED CSTOMER
SATISFACTION
TIME REDCED !EAD TIME
ENINEERIN MANPOWER REDCED REWOR
IMPROVED F!OW
MEET SCHED!E
ARRIERS ANDAIDS
-
7/25/2019 Project Final 11 26
14/15
RES!TS
THE CONTERMEASRES WERE PROPOSED AND HAVE NOT EENIMP!EMENTED YET..
TO E
DETERMINED
-
7/25/2019 Project Final 11 26
15/15
STANDARDI>ATION
TO EDETERMINED