    NO SINIFICANT RE!ATIONSHIP WASNOTED FROM THE PARETO ANA!YSIS.

    THE REJECTIONS SEEMS TO E FAIR!Y

    CONSTANT IRRESPECTIVE OF THE DAYOF THE WEE.

    TOM JIM JOHN ED0

    5

    10

    15

    20

    25

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    22 20 19 16

    29%

    55%

    79%

    100%REJECTIONS Y O!ERATOR

    DEFECTS

    QUANTITY CUMM%

    FRI MON TH WED TE

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    17 16 16 15 13

    22%

    43%

    64%

    83%

    100%REJECTIONS Y DAY OF T"E #EE$

    ASSEMLY SECTION

    QUANTITY

    C&&%

    REASON FORIMPROVEMENT

    THE TEAM THEN REVIEWED THEREJECTION DATA Y THE OPERATORMANFACTRIN THE ASSEM!Y TO

    NDERSTAND IF THE REJECTIONS ARECASED Y ANY PARTIC!AROPERATOR.

    THE TEAM NARROWED ITS FINDINSFROM THE PARETO ANA!YSIS TODEVE!OP THE THEME FORIMRPOVEMENT.

    WE A!SO DECIDED TO !OO IF THEREWAS ANY RE!ATION ETWEEN THEREJECTIONS AND THE DAY OF THE

    WEE IT WAS CASED.

    THE NMER OF REJECTION IS FAIR!YCONSTANT REARD!ESS OF THE

    OPERATORHENCE THE TEAM CO!D NOTATTRITE THE NMER OFREJECTIONS TO ANY PARTIC!AROPERATOR.

  • 7/25/2019 Project Final 11 26

    3/15

    THEME AND INDICATOR

    OVER !AST ONE YEAR 83% OF THERI AP ISSES WERE FOND IN THE!E02 SECTION

    FINDINGS

    REDCE THE RI AP ISSE IN !E02SECTION

    T"EME

  • 7/25/2019 Project Final 11 26

    4/15

    THE TEAM REVIEWED THE REJECTIONDATA OF 64 !E02 ASSEM!IES

    CRRENT SITATION

    RI 1 RI 6 RI 2 RI 5 RI 4 RI 30

    10

    20

    30

    40

    5060

    70

    0%

    20%

    40%

    60%

    80%

    100%

    64 57

    6 4

    2 2

    47%

    90% 94% 97%

    99% 100%

    NUMER OF REJECTIONS Y RI'

    RIS

    Q()*+*, C&&%

    90% OF THE REJECTIONS IN !E02 ARECASED DE TO RI HEIHT ISSES INRI;1 AND RI;6

    THE RI HEIHT DATA OF RI;1 AND RI;6FROM REJECTED NIT ED

    RI'

    1

    RI'

    S? 16.240@0?.005

    MA" 16.240MIN 16.210

    RANE OF OOT .0030

    S? 10.082@0?.005

    MA" 10.090MIN 10.060

    RANE OF OOT .0030

    THE RI HEIHT DATA OF DETAI!ED RI;1 ANDRI;6 WAS A!SO ANA!Y>ED AND FOND TO EIN TO!ERANCE

    THIS ANA!YSIS SHOWED THAT RIS AREFO!!OWIN OOT AFTER ASSEM!Y PROCESS

    R#$;6

    R#$;5

    R#$;4

    R#$;3

    R#$;2

    R#$;1

    S#*

    P,-*B

    R#$

    0-#%0+

  • 7/25/2019 Project Final 11 26

    5/15

    CRRENT SITATION

    TO ETTER NDERSTAND THE REASONS FOR REJECTION THE TEAM REVIEWED THE ASSEM!YPROCESS OF !E02 SECTION.

    1/!OAD SINAND RIS ON

    TO AF

    2/DRI!!

    HO!ES C?TMONTIN

    STRAPSAND RISSIN DJ

    /DERRCS AND

    ATTACH THERIS TO THESIN SIN

    HI!OS

    4/!OCATEP!ENMS

    ANDTRANSFERDRI!! HO!ES

    TO THE SIN

    5/DERRCS AND

    ATTACH THEP!ENMS TOSIN SIN

    RIVETS

    /FINA! FINISH

    ANDINSPECTION

    RI HIEHT MEASREMENTS ON RI ;1 AND RI; 6 WERE TAEN AT EACH STEP OF THE I!DPROCESS FOR TWO CONSECTIVE NITS

    LE02S.NO 227

    NOMINAL0-.005

    D3*(+(6*

    D3*(6o&

    )o&+)(

    1/Co)8*6(+)* +) AF

    D3*(6o&

    )o&+)(

    /I)8*((*+o) o "+o98

    D3*(6o&

    )o&+)(

    5/I)8*((*+o

    ) o!3)&

    D3*(F6o&

    No&+)(RI ; 1 !E02 IND 16.24 16.236 0.004 16.24 0 16.226 0.014 16.226 0.014RI; 6 !E02 OTD 10.082 10.080 0.002 10.088 0.006 10.067 0.015 10.069 0.013

    LE02S.NO 22:

    NOMINAL0-.005

    D3*(+(6*

    D3*(

    6o&)o&+)(

    1/

    Co)8*6(+)* +) AF

    D3*(6o&

    )o&+)(

    /

    I)8*((*+o) o "+o98

    D3*(

    6o&)o&+)(

    5/I)8*((*+o

    ) o!3)&

    D3*(

    F6o&No&+)(

    RI; 1 !E02 IND 16.24 16.239 0.001 16.237 0.003 16.216 0.024 16.217 0.023RI; 6 !E02 OTD 10.082 10.081 0.001 10.081 0.001 10.067 0.015 10.068 0.014MAJOR DEVIATION IN THE RI HEIHT IS OSERVED AFTER THE INSTA!!ATION OF HI!OS WHICH

    ARE SED TO SECRE THE RI TO THE SIN.

  • 7/25/2019 Project Final 11 26

    6/15

    ANA!YSIS

    R+;

    C

  • 7/25/2019 Project Final 11 26

    7/15

    ANA!YSIS..CONTD

    THE TEAM PROPOSED AND CONDCTED TESTS TO VERIFY PROA!E ROOT CASES.

    SUMMARY OF TERMINOLOGY AND MEASUREMENTS>IN THE FO!!OWIN TESTS CRITERIA WERE ESTA!ISHED FOR RI TERMINO!OY AND STANDARD POINTS OF MEASRE

    A STANDARD CHEC SHEET WAS DEVE!OPED TO RECORD THE DATA AS SHOWN E!OW.RI; 1 WAS SE!ECTED FOR THESE TESTS.

    MEASREMENTS WERE TAEN AT OTH INOARD AND OTOARD !OCATION OF THE RI ASSHOWN FOR A!! THE TESTS

    WE ENSRED THAT A!! THE TESTS WERE CONDCTED Y THE SAME OPERATOR AND THAT A!!THE MEASREMENTS WERE TAEN Y THE SAME INSPECTOR

    PPER

    !OWER

  • 7/25/2019 Project Final 11 26

    8/15

    ANA!YSIS..CONTD

    TEST 1

    TEST WAS CONDCTED TO MEASRE THE DEFE!ECTION DRIN THE DRI!!IN AND FASTENER

    INSTA!!ATION PROCESS FOR TWO DIFFERENT ASSEM!IES. THE MEASREMENTS WERE TAEN ATEACH PROCESS STEP OF DRI!!IN AND INSTA!!IN TWO FASTENERS. THE MEASREMENTS WERERECORDED AT EACH STEP.

    SIGNIFICANT RESULTS NOTED1 THE RI EIN TO DEF!ECT AS FASTENERS IN THE CROWN AREA WERE INSTA!!ED AND

    TOR:ED TO FINA! CO!!AR REAOFF.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE INTERFACE

    PADS INDICATED THAT THE RI !ES TWISTED FROM THEIR FREE STATE CONDITION.3 DEF!ECTION OF .015 OTOARD AND .020 INOARD WAS NOTED.

    1 2 3 4 5 6 7 8 9

    16.220

    16.225

    16.230

    16.235

    16.240

    16.245

    TEST 1> UNIT 2

    DRILLING AND INSTALLATION OF FASTENER

    OB+$)&(I*$)&(STE!

    MEASUREMENT

    C()* Beyond Crown

    1 2 3 4 5 6 7 8 9

    16.220

    16.225

    16.230

    16.235

    16.240

    16.245

    TEST1 > UNIT 1

    DRILLING AND INSTALLATION OF FASTENER

    OB+$)&(

    STE!

    MEASUREMENT

    Beyond Crown

    C()*

  • 7/25/2019 Project Final 11 26

    9/15

    ANA!YSIS..CONTD

    TEST 2

    TEST 2 WAS CONDCTED ON AN ASSEM!Y TO INSTA!! C!EARANCE FIT FASTENERS AT THE CROWN

    AREA TO VA!IDATE THE EFFECT OF FASTENER FIT IN THE HO!ES.

    SIGNIFICANT RESULTS NOTED1 THE RI DIMENSIONS REMAINED STA!E AS FASTENERS OVER THE ENTIRE RI WERE DRI!!ED

    INSTA!!ED AND TOR:ED TO FINA! CO!!AR REAOFF.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE RI

    INTERFACE PADS INDICATED THAT THE RI !ES DID NOT TWIST FROM THEIR FREE STATECONDITION.

    1 2 3 4 5 6 7 8 9

    16.230

    16.235

    16.240

    16.245

    TEST 2INSTALLATION OF CLEARANCE FASTENERS

    OB+$)&

    (

    STE!

    MEASUREMENT

    T),-(&*/- >)*-

    C()* Beyond Crown

  • 7/25/2019 Project Final 11 26

    10/15

    ANA!YSIS..CONTD

    TEST

    TEST 3 WAS CONDCTED ON AN ASSEM!Y TO RESE:ENCE THE DRI!!IN AND INSTA!!ATION OF

    FASTENERS TO START FROM CROWN AND MOVE TOWARDS THE !E AND A!TERNATIN FROM PPERTO !OWER !ES

    SIGNIFICANT RESULTS NOTED1 THE RI DIMENSIONS SHOWED DEF!ECTION T WERE ON!Y .003 EYOND !OW !IMIT.2 MEASREMENTS ETWEEN INOARD AND OTOARD POINTS OF MEASRE ON THE RI

    INTERFACE PADS INDICATED THAT THE RI !ES SHOWED TWISTIN FROM THEIR FREE STATECONDITION.

    1 2 3 4 5 6 7 8 9

    16.230

    16.235

    16.240

    16.245

    TEST RESEQUENCED INSTALLTION OF FASTENER

    OB+$)&

    (

    STE!

    MEASUREMENTS

    Beyond Crown

    C()*

  • 7/25/2019 Project Final 11 26

    11/15

    ANA!YSIS..CONTD

    TEST 4

    IN TEST 4 FINITE E!EMENT ANA!YSIS WAS CONDCTED TO DEMONSTRATE !OCATION OF STRESS

    CONCENTRATIONS IN THE PRESENT RI DESIN SIN A SIMP!E !OADIN CONDITION. THE TEST WASCONDSCTED TO VA!IDATE THE !IHT WEIHT DESIN OF THE RI

    SIGNIFICANT RESULTS NOTEDLESS THAN 30 LB. IS REQUIRED TO CLOSE THE RIB 0.030 IN.

    D 0.030D

    Max Principa

    S!r"## $ %&'0 p#i

    Min PrincipaS!r"## 3()0 p#i

    THE TEAM WAS NOW READY TO DEVE!OP THE CORRECTIVE ACTIONS FOR THE ROOT CASES WHICHWERE ESTA!ISHED Y TEST 1 2 3 AND 4

  • 7/25/2019 Project Final 11 26

    12/15

    CONTERMEASRES

    FOUR 4/ !RACTICAL MET"ODS #ERE SELECTED FORIM!LEMENTATION

    RI4

    HEI5HT

    O

    TOF

    TO!ERANC

    E

    DRI!!IN SE:ENCE

    RESE:ENCE THEDRI!!IN AND

    INSTA!!ATION OFFASTENERS

    REVISE THE OPERATIONWOR SHEET

    TRAIN THE OPERATORSWITH NEW SE:ENCE

    DESINED TRANSITIONFIT OF FASTENERS

    REDESIN FORC!EARANCE FIT OF

    FASTENERS

    DRI!! THE HO!ES TOHIH END OFTO!ERANCE

    RE:EST CSTOMERTO PDATE THE HO!E

    TO!ERANCE

    !IHT WEIHT RIDESIN

    REDESIN THE RISFOR !ESS DEF!ECTION

    RE:EST CSTOMERFOR STRENTHENIN

    THE RI !ES

    EFF.

    FEAS.

    YN?

    3 5 15

    4 5 20

    2 3 6

    4 5 20

    5 4 25

    COUNTERMEASUREMATRI@

    !ROLEM

    ROOTCAUSES

    COUNTERMEAUSRE

    !RACTICALMET"ODS

    A

    D

    E

    C

    A E PRACTICA!METHODS

    !OW HIH

    1 5

    !EENDS

    CONTERMEASRES

  • 7/25/2019 Project Final 11 26

    13/15

    CONTERMEASRESCONTD

    ARRIERS AIDS

    CSTOMERS WI!!INNESS REDCED REJECTION

    COSTINCREASED CSTOMER

    SATISFACTION

    TIME REDCED !EAD TIME

    ENINEERIN MANPOWER REDCED REWOR

    IMPROVED F!OW

    MEET SCHED!E

    ARRIERS ANDAIDS

  • 7/25/2019 Project Final 11 26

    14/15

    RES!TS

    THE CONTERMEASRES WERE PROPOSED AND HAVE NOT EENIMP!EMENTED YET..

    TO E

    DETERMINED

  • 7/25/2019 Project Final 11 26

    15/15

    STANDARDI>ATION