SLR Consulting (South Africa) (Pty) Ltd 1
PROJECT JORDAN
BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED MAIZE
WET MILL PLANT, GAUTENG PROVINCE June 2018
INTRODUCTION
Corporate investor(s) in partnership with black owned
partner(s) intend to develop and operate a majority black
owned (>51%) maize wet mill plant which would process raw
non-GMO maize to produce glucose and starch products.
Glucose and starch are used as ingredients in the
manufacturing of beverage and food products.
The proposed plant would be located on Erf 188 and a portion
of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is
located within the Emfuleni Local Municipality in Vereeniging,
Gauteng Province. Refer to Figure 1 for the local setting of the
project.
ENVIRONMENTAL AUTHORISATION PROCESS
In order for the proposed plant to go ahead, environmental
authorisation is required. A Basic Assessment (BA) process is
required as certain of the project activities are listed in Listing
Notice 1 of the EIA Regulations, 2014. The BA process will
inform an environmental authorisation decision which is
required from the Gauteng Department of Agriculture and
Rural Development (GDARD) in terms of Section 24(5) of the
National Environmental Management Act (NEMA) (No. 107 of
1998).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent
firm of environmental consultants, has been appointed to
manage the environmental impact assessment (EIA) process
and conduct the public participation process in support of this
application.
PURPOSE OF THIS DOCUMENT
This document has been prepared by SLR to inform you about:
∗ The proposed project;
∗ The baseline environment of the project area;
∗ The regulatory process to be followed;
∗ Possible environmental impacts; and
∗ How you can have input into the BA process.
YOUR ROLE
You have been identified as an interested and/or
affected party (I&AP) who may wish to be
informed about the proposed project and have
input into the environmental process and
report.
You have an opportunity to review this
Background Information Document (BID) and to
provide your initial comments to SLR for
incorporation in the environmental process.
You will also be given the opportunity to provide
input at an information sharing meeting, and to
review and comment on the Basic Assessment
(BA) report.
All comments will be recorded and included in
the report submitted to the GDARD for decision-
making.
HOW TO RESPOND
Responses to this document can be submitted
by means of the attached comments sheet
and/or through communication with the person
listed below.
WHO TO CONTACT
SLR Consulting (South Africa) (Pty) Ltd
Alex Pheiffer
(011) 467 0945 (Tel)
(011) 467 0978 (Fax)
PO Box 1596, Cramerview 2060*
* If using post, please also contact us
telephonically to notify us of your submission.
Please submit initial comments to SLR by 26
July 2018. You will also have an opportunity
to comment on the Basic Assessment Report.
SLR Consulting (South Africa) (Pty) Ltd 3
PROJECT OVERVIEW
INTRODUCTION
Corporate investor(s) in partnership with black owned partner(s) intend to
create the first majority black owned maize wet mill plant in Africa.
CONCEPTUAL PROCESS FLOW
The proposed maize wet mill’s primary raw material would be non-GMO
maize kernels which would be cleaned, steeped, ground and refined to
extract glucose and starch, as well as various by-products such as germ,
gluten and fibre. The conceptual process flow diagram of the proposed
project is illustrated below.
MAIZE INTAKE AND PREPARATION
Raw non-GMO maize would be delivered to site by truck where it would be
stored temporarily in silos. Prior to processing, the maize would be
mechanically cleaned to remove dust and materials such as cobs, husks
stones etc. In order to soften the kernels and separate the hull, germ and
fibre from each other, the cleaned maize would then be steeped (soaked in
50 degrees Celsius water which contains sodium metabisulfite) for 32-36
hours. The water for steeping would be heated by means of coal fired
boilers. Natural gas is also being considered as an alternative fuel source
for the boilers.
MILLING
The steeped water would then be drained off and the maize coarsely
ground in de-germ mills to free the germ from the grain. The germ would
then be separated, dried and maize oil extracted as a by-product. The
maize would then be ground in attrition mills, with germ meal remaining as
a by-product. Following germ separation, the slurry would be washed,
ground and screened to separate the starch and gluten from fibrous
material. The fibre would then be extracted as a by-product. The starch and
gluten would then report for centrifugation where gluten would be
removed and dried as a by-product.
REFINERY
Finally, the starch would be processed in the refinery where starch
conversion would take place through the addition of enzymes and
activated carbon to produce final products (glucose and starch).
FINAL PRODUCT AND BY-PRODUCT TRANSPORTATION
The final products (glucose and starch) would then be loaded and trucked
to the respective customer for use in the beverage and food manufacturing
process. The by-products (fibre, gluten, and germ) would typically be sold
as animal feed or for use in the paper and textile industries.
MOTIVATION FOR PROJECT
Corporate investor(s) in partnership
with black-owned partner(s) intend to
create the first majority black-owned
maize wet mill plant in Africa.
The facility would contribute toward
the corporate investors’ interests and
commitments of facilitating new
economic opportunities for local black
industrial suppliers in their supply
chains.
SUPPORT FACILITIES
Support services associated with the
proposed plant would include a
chemical storage area, a coal boiler
house (to provide steam to the plant),
a maintenance workshop/warehouse,
weigh bridges, waste water treatment
plant, stormwater management
infrastructure, fire-fighting room and
fire-water tank, truck wash-bay, office
building, canteen and guard house.
SERVICES
Access and Transport: Access to the
facility would be via Lager Avenue, off
the R28. Transport of goods to and
products from the facility would be by
truck.
Potable and process water: Would be
sourced from the Emfuleni Local
Municipality.
Electrical power: Would be sourced
from the Emfuleni Local Municipality.
The electrical connection would be via
underground cables from the Eskom
substation located just west of the R59.
Sewage: Generated at the facility
would be pumped to an existing
municipal pump station.
Solid waste: General and hazardous
waste would be temporarily stored in
designated areas and disposed at off
site permitted waste disposal facilities
by a third-party contractor.
Effluent: Plant effluent (waste water)
would be treated on site to meet
appropriate discharge standards prior
to being pumped to the Municipal
Waste Water Treatment Works located
south of the site (other side of the
R28).
SLR Consulting (South Africa) (Pty) Ltd 4
Schematic representation of the proposed maize wet mill plant
TIMING
Should environmental authorisation be granted it is
anticipated that construction of the facility would take
approximately 2 years. Full production would be reached
by year 2021. The planned life of the operations is at
least 20 years.
PROJECT ALTERNATIVES
The project team considered a number of site
alternatives for the project. The proposed site was
selected as the preferred location due to environmental,
social, services and economic factors. The process of
considering alternatives is on-going and will form part of
the BA permitting process.
OPERATING TIMES AND HOUSING
Operating times: The proposed facility would operate 24
hrs a day, with 4 x 8 hour continuous shifts.
Employment: Approximately 800 peak construction
phase jobs would be created. Operation of the facility
would create approximately 210 employment
opportunities. Employees would be sourced, as much as
is possible, from local communities and the greater
Vereeniging area.
Housing: No housing would be provided on-site during
the construction or operational phases.
SLR Consulting (South Africa) (Pty) Ltd 5
STATUS OF EXISTING ENVIRONMENT
This section provides a basic description of the current status of the biophysical and socio-economic environment of the
proposed project area. More detailed information will be sourced as part of the environmental impact assessment process,
with input from specialists (where relevant).
� Geology: The geology of the project area comprises intercalated shales, quarzitic sandstone and limited occurrence of
mudstone, all of the Ecca Group which is part of the Karoo Supergroup. The sediments are underlain by dolomites at
variable depths (potentially less than 30 m).
� Climate: The project area falls within the Highveld Climatic Zone, which is generally associated with a cool temperate
climate with high extremes between maximum summer and winter temperatures. The area is characterised by summer
rainfall with a mean annual precipitation of 662 mm. Average daytime temperatures are 16.3°C in winter and 26°C in
summer with night time temperatures in winter dropping to approximately 0.5°C. The area is prone to frost.
� Topography: The project area is largely flat with a slight slope to the south and east. The average height above sea level
for the area ranges from 1 440 – 1 450 m.
� Soils and land capability: All the soil in the area can be classified as Sterkspruit Form 1200 Bethulie Family.
� Biodiversity (terrestrial): The project area is dominated by the Soweto Highveld Grassland vegetation type. According
to the Gauteng Conservation Plan (V3.3) the project area and surrounds are not associated with any areas or features of
conservation concern, namely Critical Biodiversity Areas, Ecological Support Areas, Wetlands, Rivers or Ridges. The
Leeuwkuil Nature Reserve is situated approximately 600 m south of the project area, but the area does not fall within a
focus area as per the National Protected Areas Expansion Strategy. Part of the study area has historically been utilised
for cultivation purposes. The site is currently utilised for livestock grazing by subsistence farmers. The vegetation is
short to medium-high, dense, tufted grassland dominated by Cynodon dactylon and Themeda Triandra (red grass) with
a number of alien species also present. Floral species such as Hypoxis iridifolia, Ammocaris coranica, Haplocarpha lyrata
and Vernonia oligocephaela as well as Crinum macowanii were observed. Very little evidence of wild faunal populations
exists, due to the location within a highly urbanised area.
� Surface water: The project area is located in the Upper Vaal Water Management Area, within quaternary catchment
C22F. The closest watercourse is a tributary of the Vaal, located approximately 800 m south of the project area (south
of the R28). A stormwater drain is found 200 m east of the project area (adjacent to the R59). Surface water flow is
towards the south-east.
� Aquatic environment: No wetlands have been identified within the proposed project area. An excavated (man-made)
drainage channel/feature occurs on site and receives channelled stormwater from the prison area to the north.
� Groundwater: The average groundwater level within the project area ranges from 30 m to 50 m below ground level.
Groundwater yields are expected to be in the range of 0.3l/s. There are no known groundwater users in the immediate
vicinity of the site.
� Air quality: Vereeniging, and the project area, are located within the Vaal Triangle Airshed Priority Area. The priority
area was declared as a result of poor ambient air quality. The ambient air quality has been influenced by industries,
mines, power stations, household fuel combustion, vehicle tailpipe emissions, entrained dust and wind erosion from
exposed areas. The prevailing wind direction is from the north-west and the north-east. Data from a nearby ambient
monitoring station (south west of the project area) indicates that particulate matter (<2.5 and <10 micron in size)
already consistently exceeds the NAAQ standards and nitrogen dioxide sometimes exceeds standards.
� Noise: The greater area is likely to be subjected to elevated noise levels due high traffic volumes along the R59 and R28
roads. The current baseline noise level for the site and surrounds is considered typical of an urban setting.
� Visual: The natural visual character of the area has been influenced by various residential, industrial, road, powerline
and railway related activities. The open grassland and livestock add a rural element to the sense of place that is
otherwise typical of an urban area.
� Heritage/cultural and palaeontological resources: No heritage resources have been detected within the project site.
� Socio-economic: Gauteng faces a number of economic challenges, including high poverty levels, inequalities in terms of
incomes and opportunities and youth unemployment. Vereeniging is currently one of the most important industrial
manufacturing centres in South Africa, with its chief products being iron, steel, pipes, bricks, tiles and processed lime.
Vereeniging also has several Eskom thermal power plants. While Vereeniging has extensive power and water supply
networks, there are challenges with supply, particularly in the poorer areas.
� Land use: The project area is currently open space with indigenous vegetation that is subject to informal grazing. Erf
188 of Leeuwkuil 596 IQ has been zoned for industrial purposes, and although Portion 237 of Leeuwkuil 596 IQ is zoned
agricultural, it is earmarked for industrial and commercial use in the municipalities’ spatial development framework.
Adjacent land use includes open space, the SAB Vereeniging Depot, the Vereeniging Fresh Produce Market, the R28 and
R59 roads and the Leeuwkuil Water Care Works. Nearby receptors include the Wise Owl Pre-school, a Telkom facility, a
Department of Roads and Transport facility, a Department of Correctional Services facility, informal residences and
livestock kraals and the Leeuhof suburb.
SLR Consulting (South Africa) (Pty) Ltd 6
POTENTIAL ENVIRONMENTAL AND SOCIO-ECONOMIC IMPACTS
AND SPECIALIST INPUT
The preliminary list of potential impacts that have been identified and will be investigated as part of the BA process are
tabulated below. Where specialist input is required, this has also been indicated. Relevant issues gathered during the
stakeholder engagement process will further inform the identification and assessment of impacts in the BA Report.
BIOPHYSICAL/SOCIO-
ECONOMIC ASPECT
POTENTIAL IMPACT SPECIALIST INPUT (WHERE
RELEVANT)
Geology and
topography
Surface subsidence risks to infrastructure and creation of
hazardous excavations: The dolomites pose a risk of subsidence
and/or sinkhole formation, particularly with altered storm water
flows. The founding conditions present potential foundation and
stability related risks for heavier infrastructure.
Geotechnical investigation
Soils and land
capability
Loss of soil and land capability: The project has the potential to
compromise soil resources through physical disturbance (erosion
and compaction) and/or pollution, by the placement of
infrastructure. Loss of soil resources has a direct impact on the
natural capability of the land.
Soils and land capability
study
Biodiversity Loss of biodiversity (terrestrial and aquatic): The placement of
infrastructure has the potential to disturb and/or destroy
vegetation, terrestrial and aquatic habitat units and related
ecosystem functionality, including the disturbance of floral species
of concern.
Biodiversity study
(terrestrial and aquatic)
Surface water Alteration of natural drainage patterns and pollution: The project
has the potential to alter surface drainage patterns through the
placement of infrastructure and to pollute surface water
resources.
Storm water management
plan and hydrological study
Groundwater Groundwater contamination: The project has the potential to
contaminate groundwater resources.
Geohydrological study
Air Air quality: The proposed project has the potential to emit
pollution and have a negative impact on ambient air quality. The
emissions may pose risk to third party receptors.
Air quality study
Noise Disturbing noise levels: The project has the potential to cause
noise pollution through construction and operational activities.
This could affect receptors to the north and west of the site.
Noise study
Visual Negative visual views: The development of infrastructure has the
potential to create visual impacts.
Visual study
Traffic Road disturbance and traffic safety: The project has the potential
to result in an increase in traffic volumes along existing roads
resulting in safety risks to road users.
Traffic study
Heritage/cultural
and palaeontological
resources
Loss of heritage/cultural and palaeontological resources: The
project has the potential to damage any heritage/cultural and
palaeontological resources.
Heritage study
Social Loss of grazing for informal herdsmen: Conversion of the open
grassland to an industrial development could reduce grazing
available to the livestock.
Social study
Socio-economic Positive and negative socio-economic impact: The project has the
potential for positive and negative socio-economic impacts.
Positive impacts include job creation and stimulation of local and
regional economy. Negative impacts include the influx of job
seekers and related issues of crime, and disruption to social
structures
Economic study
Land use Change in land use: The proposed project has the potential to
impact on local and surrounding land uses such as residential
areas.
Will be addressed by
project team.
SLR Consulting (South Africa) (Pty) Ltd 7
ENVIRONMENTAL AUTHORISATION PROCESS
The BA regulatory process which will be followed:
∗ Provides information on the proposed project;
∗ Provides the environment in which the proposed project
is being undertaken;
∗ Identifies, in consultation with interested and/or
affected parties (I&APs), the potential negative as well
as positive impacts of the proposed project; and
∗ Reports on management measures required to mitigate
impacts to an acceptable level.
The likely process steps and timeframes are provided below.
The steps are in accordance with the EIA Regulations, 2014,
as amended. I&APs registered on the project’s database will
receive notification of public information-sharing meeting
and report review period in advance.
STEPS IN THE AUTHORISATION PROCESS
PHASE I - Pre-application phase (May –July 2018)
• Pre-application meeting with the GDARD;
• Notify other commenting authorities and I&APs of the
proposed project and Basic Assessment regulatory
process (via social scan, newspaper advertisements,
site notices and this BID);
• Commence with specialist studies;
• Public information-sharing meeting with I&APs; and
• Commence with compilation of BA Report.
PHASE II –Application and Basic Assessment phase (August
2018 to March 2019)
• Submission of NEMA application to the GDARD;
• Complete specialist studies;
• Complete BA Report;
• Submit BA Report to GDARD, I&APs and other
commenting authorities for review;
• Public review of BA Report (30 days);
• Update the BA Report with any comments received
during the review period;
• Submit BA Report to the GDARD for decision-making;
• Review of the BA Report by the GDARD (107 days);
• GDARD either grants or refuses the environmental
authorisation; and
• Circulate GDARD decision to registered I&APs.
NOTICE OF PUBLIC INFORMATION-SHARING
MEETING
All stakeholders are invited to attend.
Date Venue Time
26 July 2018
(Thursday)
School Hall, General Smuts
High School, Van Riebeeck
Street, Vereeniging
16h00*
* Please endeavour to arrive earlier than the specified time
in order to complete the meeting attendance register.
PARTIES INVOLVED IN THE ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS
DECISION MAKING AUTHORITIES
∗ Gauteng Department of Agriculture and Rural
Development (GDARD)
I&APs
∗ Surrounding landowners, occupiers, adjacent
landowners and communities;
∗ Non-governmental organisations and
associations; and
∗ Parastatals
COMMENTING AUTHORITIES
∗ Department of Agriculture, Forestry and
Fisheries;
∗ South Africa Heritage Resource Agency;
∗ Gauteng Department of Roads and Transport;
∗ Gauteng Department of Rural Development and
Land Reform, including land claims
commissioner; and
∗ Department of Water and Sanitation.
LOCAL AUTHORITIES
∗ Emfuleni Metropolitan Municipality;
∗ Metsi A Lekoa; and
∗ Ward Councillors.
Please let us know if there are any additional
parties that should be involved.
Pre-application
consultation with GDARD
and I&APs
Compile specialist studies and BA Report
and distribute to I&APs and commenting
authorities for public review (30 days)
Update the BA Report with comments
received during the public review period
and submit final BA report to GDARD
GDARD to issue decision
Start date 90 Days
GDARD review BA Report (107 days)
We are
here
Submit NEMA application
19
7 D
ay
s
SLR Consulting (South Africa) (Pty) Ltd 8
PROJECT JORDAN
BACKGROUND INFORMATION DOCUMENT FOR A MAIZE WET MILL PLANT, GAUTENG PROVINCE
REGISTRATION AND RESPONSE FORM FOR INTERESTED AND AFFECTED PARTIES
DATE TIME
PARTICULARS OF THE INTERESTED AND AFFECTED PARTY
NAME
POSTAL ADDRESS
POSTAL CODE
STREET ADDRESS
CODE
WORK/ DAY TELEPHONE
NUMBER
WORK/ DAY FAX NUMBER
CELL PHONE NUMBER E-MAIL ADDRESS
PLEASE IDENTIFY YOUR INTEREST IN THE PROPOSED PROJECT
PLEASE WRITE YOUR COMMENTS AND QUESTIONS HERE
Please return completed forms to:
SLR Consulting (South Africa) (Pty) Ltd
Alex Pheiffer
(011) 467 0945 (Tel)
(011) 467 0978 (Fax)
PO Box 1596, Cramerview 2060*
* If using post, please also contact us telephonically to notify us of your submission.
Please submit initial comments to SLR by 26 July 2018. You will also have an opportunity to comment on the Basic
Assessment Report.
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 21 June 2018 13:54
To: [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]
inbev.com
Subject: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
2
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 21 June 2018 14:01
To: [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
2
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Clive Phashe
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]
Sent: 21 June 2018 02:01 PM
Subject: Relayed: Project Jordan: Notice of Environmental Authorisation process
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
2
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected])
<mailto:[email protected]>
[email protected] ([email protected])
<mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected])
<mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
Subject: Project Jordan: Notice of Environmental Authorisation process
1
Clive Phashe
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]; [email protected];
Sent: 21 June 2018 01:55 PM
Subject: Relayed: Project Jordan: Notice of Environmental Authorisation process
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected])
<mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
2
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected])
<mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]>
[email protected] ([email protected]) <mailto:[email protected]
inbev.com>
Subject: Project Jordan: Notice of Environmental Authorisation process
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 26 June 2018 17:36
To: Mienie, Gerhard
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Thank you Gerhard.
In terms of getting comments from the residences, do you need me to provide you a number of hard copies of the BID
that you can distribute to them or have you forwarded the BID to them that I sent through?
Thank you
Alex
From: Mienie, Gerhard [mailto:[email protected]]
Sent: 22 June 2018 06:45 AM
To: Alex Pheiffer Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Morning Alex.
Thanks for the email. As discussed in meeting with Matthew I take note .
Gerhard
From: Alex Pheiffer [mailto:[email protected]]
Sent: Thursday, June 21, 2018 1:54 PM To: [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; Mienie, Gerhard; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
2
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
3
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
***************************************************************************** The
information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the
intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take
any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this
message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the
sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you
regard this message as spam, please inform us immediately by sending an email to [email protected].
*****************************************************************************
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 26 June 2018 17:38
To: Bracey, Stanley (SD)
Cc: Gas-Sherq
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Thank you Stanley, your email is noted.
I will ensure that the developer understands the relevant contact point with regards to wayleaves.
Kind regards
Alex
From: Bracey, Stanley (SD) [mailto:[email protected]]
Sent: 22 June 2018 09:50 AM
To: Alex Pheiffer Cc: Gas-Sherq
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Good day Alex
It appears that Sasol is not affected although service crossings might still influence Sasol during execution phase. Our Wayleave office will respond formally. Please liaise with our [email protected] office for all service inquiries for service and road crossings before installation to do safety standby on site and ensure safety of staff, contractor public and Sasol pipeline during crossing of Sasol pipeline. Regards
20 Indianapolis Boulevard, Raceway Park, Germiston South Africa PO Box 5486, Johannesburg, 2000 www.sasol.com
Stanley Bracey Specialist Compliance & Threat Prevention Satellite Operations
Tel Cell
+27 (0)10 345 8502 +27 (0)82 772 8598
Fax +27 (0)11 522 1913
E-mail [email protected]
Environmental awareness starts with each of us – think before you print this page
2
From: Alex Pheiffer [mailto:[email protected]]
Sent: Thursday, June 21, 2018 1:54 PM
To: [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; Reyneke, Sandra (S) <[email protected]>; Bracey, Stanley (SD)
<[email protected]>; Gas-Sherq <[email protected]>; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
3
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
-
SLR Consulting Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
NOTICE: This eMail message is from Sasol and is for the sole use of the intended recipient(s), and may contain
confidential and/or privileged material.
If you are not the intended recipient(s), please contact the sender immediately, and destroy all copies of the
original message. Any unauthorized review, use, copy, disclosure or distribution is prohibited. Please note that
this eMail, and the contents thereof, is also subject to the standard Sasol eMail Legal Notice which may be
found at: http://www.sasol.com/legal-notices.
disccsa41a3
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 26 June 2018 17:31
Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
Dear Sir
Please see below and attached an email sent through to you last week for you attention which returned a delivery
failure receipt.
Should you have any questions please do not hesitate to contact me.
Kind regards
Alex
From: Alex Pheiffer
Sent: 21 June 2018 01:54 PM To: [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
2
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
3
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 26 June 2018 17:30
To: [email protected]; [email protected]
Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
Dear Sir/Madam
Please see below and attached an email sent through to you last week for you attention which returned a delivery
failure receipt.
Should you have any questions please do not hesitate to contact me.
Kind regards
Alex
From: Alex Pheiffer
Sent: 21 June 2018 02:01 PM To: [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
2
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer
3
This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 27 June 2018 13:58
Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
Dear Sir/Madam
Please see below and attached an email sent through to you last week for you attention which returned a delivery
failure receipt.
Should you have any questions please do not hesitate to contact me.
Kind regards
Alex
From: Alex Pheiffer
Sent: 26 June 2018 05:30 PM To: [email protected]; [email protected]
Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Dear Sir/Madam
Please see below and attached an email sent through to you last week for you attention which returned a delivery
failure receipt.
Should you have any questions please do not hesitate to contact me.
Kind regards
Alex
From: Alex Pheiffer Sent: 21 June 2018 02:01 PM
To: [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
2
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
3
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 20 July 2018 06:48
Subject: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Ms Unathi
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
2
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
SLR Consulting Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 24 July 2018 18:37
Cc: Matthew Hemming; Clive Phashe
Subject: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Mr Tsotetsi
Your telephone conversation with our Clive Phashe has reference.
As indicated we would like to set up a focussed meeting with you for this week Thursday (26th
July) at 13h00. I will confirm
a venue in due course. I will also send through a separate meeting request. The purpose of the meeting will be to share
information with you on the project as well as provide an opportunity to provide input.
This email also serves to provide notice on the commencement of the application for Environmental Authorisation for
the above mentioned project. Further detail is provided below.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
2
In addition the focussed meeting with yourself, a public information sharing meeting has been arranged. You are invited
to attend this meeting as well. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 18 June 2018 12:23
Cc: [email protected]; [email protected]; Kyle Day
Subject: Project Jordan: Proposed Maize Wet Mill plant - Background Information Document
Attachments: 2018-06-11 Project Jordan BID FINAL.pdf
Dear Garth
You have been identified as an interested and/or affected party (I&AP) who may wish to be informed about the
proposed Project Jordan. Your contact details have been added to the I&AP database.
Please find attached a background information document (BID) providing information on the project and environmental
assessment process.
Should you have any queries or comments please send these through.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
SLR Consulting Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Alex Pheiffer
Sent: 16 September 2018 22:19
To: '[email protected]'
Subject: Jordan: Meeting with Transnet
Hello Suzan
Trust this email finds you well.
I tried to call on your landline but have not managed to get through.
The applicant for Project Jordan would like to set up a meeting to discuss the railway siding and line near the project site
to understand if it would be possible to consider rail as a future transport mechanism for the project.
Please could you let me know who I should speak to, to set this up.
Thanking you in advance.
Kind regards
Alex
1
Alex Pheiffer
From: [email protected] Radebe <[email protected]>
Sent: 09 August 2018 11:57
To: Alex Pheiffer
Hi my name is Teboho im a young artisan and seeking opportunity and I strongly believe Project Jordan is the
way forward as it will be a production plant and thus will create amazing products as well as growth and
development to local residents by creating jobs and changing peoples life's as we currently battling poverty and
the high rate of unemployment,I have attached my cv and looking forward to hearing from u guys as I believe
with my skills and experience we would grow together
1
Alex Pheiffer
From: Cristiano DB <[email protected]>
Sent: 30 July 2018 09:41
To: Alex Pheiffer
Subject: New Corn mill, Starch and corn oil plants
Dear Mr. Pheiffer,
We are the world leading group supplying technologies to the edible oil sector.
I am looking for the contact details of the people in charge of this project as we need to present them our technology.
Looking forward to your kind reply,
Best regards
Cristiano M. Sassoli
www.desmetballestra.com
Mobile +27 82 422 8019 – Tel.: +27 21 871 1869 P.O. Box 3006, Paarl 7640, Western Province, RSA Suite 23, Monte Rosa Building, 276 Main Street, Paarl 7660, WP, RSA
1
Alex Pheiffer
From: Jan Mitchell <[email protected]>
Sent: 21 June 2018 14:05
To: Nosipho Mashazi
Cc: Alex Pheiffer
Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Attachments: Project Jordan BID-June 2018.pdf
Hi Nosipho
Application in your area.
Regards,
Jan
Signature Version 26/02/2018 08:30
From: Alex Pheiffer [mailto:[email protected]]
Sent: 21 June 2018 01:54 PM
To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; Jan Mitchell; wayleave.emm; Nosipho Mashazi; Lungile Motsisi; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
2
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer
3
This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL LEGAL NOTICE which
can be viewed at http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
1
Alex Pheiffer
From: Mienie, Gerhard <[email protected]>
Sent: 27 June 2018 06:42
To: Alex Pheiffer
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Good Morning Alex.
If possible can you provide me plus minus 30 hard copies to hand out to members and I will get it back to you
Greetings
Gerhard
From: Alex Pheiffer [mailto:[email protected]]
Sent: Tuesday, June 26, 2018 5:36 PM To: Mienie, Gerhard
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Thank you Gerhard.
In terms of getting comments from the residences, do you need me to provide you a number of hard copies of the BID
that you can distribute to them or have you forwarded the BID to them that I sent through?
Thank you
Alex
From: Mienie, Gerhard [mailto:[email protected]]
Sent: 22 June 2018 06:45 AM To: Alex Pheiffer
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Morning Alex.
Thanks for the email. As discussed in meeting with Matthew I take note .
Gerhard
From: Alex Pheiffer [mailto:[email protected]]
Sent: Thursday, June 21, 2018 1:54 PM
To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected];
2
[email protected]; [email protected]; [email protected]; [email protected];
[email protected]; Mienie, Gerhard; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
3
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
***************************************************************************** The
information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the
intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take
any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this
message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the
sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you
regard this message as spam, please inform us immediately by sending an email to [email protected].
*****************************************************************************
***************************************************************************** The
information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the
intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take
any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this
message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the
sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you
regard this message as spam, please inform us immediately by sending an email to [email protected].
*****************************************************************************
1
Alex Pheiffer
From: Annette Stoltz <[email protected]>
Sent: 27 June 2018 15:45
To: Alex Pheiffer
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Good day Alex
No problem – I will send to registry to open a file. You will receive a reference number shortly.
Regards
Annette
From: Alex Pheiffer [mailto:[email protected]]
Sent: 27 June 2018 03:16 PM
To: Annette Stoltz Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Dear Annette
This would be the first notification you would have received for this project. It relates to the basic assessment process
that is required to inform a decision from GDARD. You are receiving the email as a commenting authority on the EIA
process.
Hopefully this provides some clarity. Should you have any further queries please feel free to give me a call or send
through an email.
Kind regards
Alex
From: Annette Stoltz [mailto:[email protected]]
Sent: 27 June 2018 08:59 AM To: Alex Pheiffer; [email protected]
Subject: RE: Project Jordan: Notice of Environmental Authorisation process
Good day Alex
Can you please confirm whether this is a new matter or an application that was sent to us before. Our system is off-line
and it is very difficult to confirm whether we have received applications or not.
Regards
Annette
From: Alex Pheiffer [mailto:[email protected]]
Sent: 26 June 2018 05:30 PM
To: Annette Stoltz; [email protected] Subject: FW: Project Jordan: Notice of Environmental Authorisation process
Dear Sir/Madam
2
Please see below and attached an email sent through to you last week for you attention which returned a delivery
failure receipt.
Should you have any questions please do not hesitate to contact me.
Kind regards
Alex
From: Alex Pheiffer
Sent: 21 June 2018 02:01 PM
To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];
[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Subject: Project Jordan: Notice of Environmental Authorisation process
PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
3
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer
Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
1
Alex Pheiffer
From: Clive Phashe
Sent: 18 July 2018 09:55
To: Alex Pheiffer
Subject: Follow-up Call with Sigi
Dear Alex
As per her request left with our receptionist, I gave a lady (Sigi) a call on the 13th
of July 2018. Sigi is a resident of
Leeuhof, just across the Project sites for both Project Isanti and Project Jordan.
She made the following comments:
1. She indicated that herself, along with some residents in the same area have been waiting for Title Deeds
since 1994. In the event that people need to relocate as a result of the aforementioned projects, will they
still receive compensation even without possession of Title Deeds?
2. Years ago, the proposed sites for both Isanti and Project Jordan were earmarked for the building of RDP
houses for people in Sharpeville. She indicated that most of the residents in Sharpeville were placed there
temporarily as they were promised RDP houses on the project sites.
3. In terms of employment, will recruitment favour the locals (both skilled and un-skilled)? Over the years, job
promises were made to the residents by developers, but the posts were filled by people from faraway
places.
Regards
Clive Phashe on Behalf of Sigi
Clive Phashe-
+27 11 467 0945
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
ZAEXC1S
1
Alex Pheiffer
From: Shoni Nevondo <[email protected]>
Sent: 16 July 2018 15:39
To: Alex Pheiffer
Subject: REGISTRATION AS INTERESTED AND AFFECTED PARTY
Attachments: SLeeuwkuil 18071615460.pdf
Afternoon,
Kindly register me as interested and affected party.
Regards
This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged
and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,
copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be
unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local
Municipality. >>> <[email protected]> 2018/07/16 03:17 PM >>>
1
Alex Pheiffer
From: Mmamotheo Priscilla Moche <[email protected]>
Sent: 16 July 2018 15:12
To: Alex Pheiffer
Cc: Shoni Nevondo
Subject: MAIZE WET MILL PLANT
Attachments: SLeeuwkuil 18071615210.pdf
Good day
Attached please find the response form as an affected party.
Regards,
Mmamotheo
This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged
and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,
copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be
unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local
Municipality.
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.
1
Alex Pheiffer
From: Yvonne Oosthuizen (YA) <[email protected]>
Sent: 02 July 2018 10:21
To: Alex Pheiffer
Cc: Victor Chetty (RS)
Subject: EIA: WC469/06/18
Attachments: 0226_001.pdf; 0225_001.pdf
Importance: High
Good day,
Description: EIA: PROPOSED GLASS BOTTLE MANUFACTURING PLANT AT PORTION 238 (A PORTION OF
PORTION 149) OF THE FARM LEEUWKUIL 596IQ
Kindly take note that we have no objection regarding your proposal and the proposal has been
approved.
Yvonne Oosthuizen
Administrative Support to Manager: April Leketa
Access Engineering & Build
Engineering Yard, 6 Lager Street, Leeuhof, Vereeniging
T: +27 16 451 9600/7
F: +27 86 478 6146
M: +27 65 962 4008
This e-mail is subject to the Openserve electronic communication legal notice, available at:
http://www.openserve.co.za/OpenserveEmailLegalNotice
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
This e-mail is subject to the Telkom SA SOC Ltd electronic communication legal notice,
available at : http://www.openserve.co.za/open/media/downloads/OpenserveEMailLegalNotice.pdf
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1
Alex Pheiffer
From: SalomeS Strydom <[email protected]>
Sent: 21 June 2018 14:10
To: Alex Pheiffer
Cc: Cynthia Dlamini
Subject: Re: Project Jordan: Notice of Environmental Authorisation process (OUT OF THE OFFICE
NOTICE)
Good day, I will be out of the office from 22 June 2018 to 2 July 2018. Any urgent matters can be referred to Me Zanele Mudau, Acting Manager Planning & Projects, 016 986 8310 [email protected] For Wayleave enquiries please contact Ina Louw, 016 986 8364 [email protected]. For Building Plan approval and Sewer Layout enquiries please contact Ntombi Dhlamini, 016 986 8356 [email protected]. Thank you Salome Strydom Manager Planning, Assets & Projects >>> Alex Pheiffer <[email protected]> 06/21/18 13:54 >>>
PROPOSED MAIZE WET MILL PLANT โ€“ PROJECT JORDAN
NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS
Dear Sir/Madam
We hereby provide notice on the commencement of an application for Environmental Authorisation for the above
mentioned project.
Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned
(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose
and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be
located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the
Emfuleni Local Municipality in Vereeniging, Gauteng Province.
The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation
is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental
Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated
in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).
2
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to
manage the environmental regulatory processes and conduct the public participation process in support of this
application.
As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or
affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our
information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the
project. We would thus like to notify you of the application and provide you with introductory information on the
proposed project. Please be so kind as to distribute this email and BID to other persons within your
organisation/department.
The Background Information Document (BID) contains information on the proposed project; the baseline environment
of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being
undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public
Documents.
A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:
Date Venue Time
26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck
Street, Vereeniging
16h00 *
* Please endeavour to arrive earlier in order to complete the meeting attendance register.
Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must
register if you wish to participate in the Basic Assessment process for the project. Details required for registration are
provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or
on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic
Assessment Report and/or summary that are produced.
Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We
welcome any comment or questions.
Thank you and Kind regards
Alex
Alex Pheiffer Senior Environmental Consultant-
+27 83 269 7545
+27 11 467 0945
2027
- SLR Consulting
Unit 7
Fourways Manor Office Park
1 MacBeth Avenue
Fourways, Johannesburg, Gauteng, 2191-
Confidentiality Notice and Disclaimer
3
This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to
whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of
it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.
ZAEXC1S
-- This message has been scanned for viruses and dangerous content by E.F.A. Project, and is believed to be clean. Click here to report this message as spam. This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged
and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,
copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be
unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local
Municipality.
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.
1
Alex Pheiffer
From: Nosipho Mashazi <[email protected]>
Sent: 22 June 2018 05:49
To: Tsholo Maloka
Cc: Alex Pheiffer
Subject: Eskom:WLGOU20180622_4025| SLR Consulting | Project Jordan: Notice of
Environmental Authorisation process
Attachments: FW Project Jordan Notice of Environmental Authorisation process
Hi Tsholo
Please investigate and reply to applicant
Tsholofelo - +27117112516 / [email protected]
Admin Support - Nosipho Mashazi – +2711 711 2525 / +2712 421 3058 / [email protected]
Land and Rights Manager – Jason Kasper - +27117112057 / 2941/ +27785565407 / [email protected]
Applicant please follow up with allocated resource directly on progress.
Signature Version 26/02/2018 08:30
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL LEGAL NOTICE which
can be viewed at http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Kind Regards
Nosipho Mashazi Eskom Holdings SOC Limited I Gauteng Operations Unit
Asset Creation Land & Rights
012 421 3058
083 959 4577
061 142 4479
www.eskom.co.za
086 609 8984
Eskom Centre, 204 Smit Street, Braamfontein, JHB