SLR Consulting (South Africa) (Pty) Ltd 1 PROJECT JORDAN BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED MAIZE WET MILL PLANT, GAUTENG PROVINCE June 2018 INTRODUCTION Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned (>51%) maize wet mill plant which would process raw non-GMO maize to produce glucose and starch products. Glucose and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the Emfuleni Local Municipality in Vereeniging, Gauteng Province. Refer to Figure 1 for the local setting of the project. ENVIRONMENTAL AUTHORISATION PROCESS In order for the proposed plant to go ahead, environmental authorisation is required. A Basic Assessment (BA) process is required as certain of the project activities are listed in Listing Notice 1 of the EIA Regulations, 2014. The BA process will inform an environmental authorisation decision which is required from the Gauteng Department of Agriculture and Rural Development (GDARD) in terms of Section 24(5) of the National Environmental Management Act (NEMA) (No. 107 of 1998). SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to manage the environmental impact assessment (EIA) process and conduct the public participation process in support of this application. PURPOSE OF THIS DOCUMENT This document has been prepared by SLR to inform you about: * The proposed project; * The baseline environment of the project area; * The regulatory process to be followed; * Possible environmental impacts; and * How you can have input into the BA process. YOUR ROLE You have been identified as an interested and/or affected party (I&AP) who may wish to be informed about the proposed project and have input into the environmental process and report. You have an opportunity to review this Background Information Document (BID) and to provide your initial comments to SLR for incorporation in the environmental process. You will also be given the opportunity to provide input at an information sharing meeting, and to review and comment on the Basic Assessment (BA) report. All comments will be recorded and included in the report submitted to the GDARD for decision- making. HOW TO RESPOND Responses to this document can be submitted by means of the attached comments sheet and/or through communication with the person listed below. WHO TO CONTACT SLR Consulting (South Africa) (Pty) Ltd Alex Pheiffer (011) 467 0945 (Tel) (011) 467 0978 (Fax) [email protected] PO Box 1596, Cramerview 2060* * If using post, please also contact us telephonically to notify us of your submission. Please submit initial comments to SLR by 26 July 2018. You will also have an opportunity to comment on the Basic Assessment Report.

Upload: others

Post on 27-Apr-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 1

PROJECT JORDAN

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED MAIZE

WET MILL PLANT, GAUTENG PROVINCE June 2018

INTRODUCTION

Corporate investor(s) in partnership with black owned

partner(s) intend to develop and operate a majority black

owned (>51%) maize wet mill plant which would process raw

non-GMO maize to produce glucose and starch products.

Glucose and starch are used as ingredients in the

manufacturing of beverage and food products.

The proposed plant would be located on Erf 188 and a portion

of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is

located within the Emfuleni Local Municipality in Vereeniging,

Gauteng Province. Refer to Figure 1 for the local setting of the

project.

ENVIRONMENTAL AUTHORISATION PROCESS

In order for the proposed plant to go ahead, environmental

authorisation is required. A Basic Assessment (BA) process is

required as certain of the project activities are listed in Listing

Notice 1 of the EIA Regulations, 2014. The BA process will

inform an environmental authorisation decision which is

required from the Gauteng Department of Agriculture and

Rural Development (GDARD) in terms of Section 24(5) of the

National Environmental Management Act (NEMA) (No. 107 of

1998).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent

firm of environmental consultants, has been appointed to

manage the environmental impact assessment (EIA) process

and conduct the public participation process in support of this

application.

PURPOSE OF THIS DOCUMENT

This document has been prepared by SLR to inform you about:

∗ The proposed project;

∗ The baseline environment of the project area;

∗ The regulatory process to be followed;

∗ Possible environmental impacts; and

∗ How you can have input into the BA process.

YOUR ROLE

You have been identified as an interested and/or

affected party (I&AP) who may wish to be

informed about the proposed project and have

input into the environmental process and

report.

You have an opportunity to review this

Background Information Document (BID) and to

provide your initial comments to SLR for

incorporation in the environmental process.

You will also be given the opportunity to provide

input at an information sharing meeting, and to

review and comment on the Basic Assessment

(BA) report.

All comments will be recorded and included in

the report submitted to the GDARD for decision-

making.

HOW TO RESPOND

Responses to this document can be submitted

by means of the attached comments sheet

and/or through communication with the person

listed below.

WHO TO CONTACT

SLR Consulting (South Africa) (Pty) Ltd

Alex Pheiffer

(011) 467 0945 (Tel)

(011) 467 0978 (Fax)

[email protected]

PO Box 1596, Cramerview 2060*

* If using post, please also contact us

telephonically to notify us of your submission.

Please submit initial comments to SLR by 26

July 2018. You will also have an opportunity

to comment on the Basic Assessment Report.

Page 2: PROJECT JORDAN - Amazon Web Services
Page 3: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 3

PROJECT OVERVIEW

INTRODUCTION

Corporate investor(s) in partnership with black owned partner(s) intend to

create the first majority black owned maize wet mill plant in Africa.

CONCEPTUAL PROCESS FLOW

The proposed maize wet mill’s primary raw material would be non-GMO

maize kernels which would be cleaned, steeped, ground and refined to

extract glucose and starch, as well as various by-products such as germ,

gluten and fibre. The conceptual process flow diagram of the proposed

project is illustrated below.

MAIZE INTAKE AND PREPARATION

Raw non-GMO maize would be delivered to site by truck where it would be

stored temporarily in silos. Prior to processing, the maize would be

mechanically cleaned to remove dust and materials such as cobs, husks

stones etc. In order to soften the kernels and separate the hull, germ and

fibre from each other, the cleaned maize would then be steeped (soaked in

50 degrees Celsius water which contains sodium metabisulfite) for 32-36

hours. The water for steeping would be heated by means of coal fired

boilers. Natural gas is also being considered as an alternative fuel source

for the boilers.

MILLING

The steeped water would then be drained off and the maize coarsely

ground in de-germ mills to free the germ from the grain. The germ would

then be separated, dried and maize oil extracted as a by-product. The

maize would then be ground in attrition mills, with germ meal remaining as

a by-product. Following germ separation, the slurry would be washed,

ground and screened to separate the starch and gluten from fibrous

material. The fibre would then be extracted as a by-product. The starch and

gluten would then report for centrifugation where gluten would be

removed and dried as a by-product.

REFINERY

Finally, the starch would be processed in the refinery where starch

conversion would take place through the addition of enzymes and

activated carbon to produce final products (glucose and starch).

FINAL PRODUCT AND BY-PRODUCT TRANSPORTATION

The final products (glucose and starch) would then be loaded and trucked

to the respective customer for use in the beverage and food manufacturing

process. The by-products (fibre, gluten, and germ) would typically be sold

as animal feed or for use in the paper and textile industries.

MOTIVATION FOR PROJECT

Corporate investor(s) in partnership

with black-owned partner(s) intend to

create the first majority black-owned

maize wet mill plant in Africa.

The facility would contribute toward

the corporate investors’ interests and

commitments of facilitating new

economic opportunities for local black

industrial suppliers in their supply

chains.

SUPPORT FACILITIES

Support services associated with the

proposed plant would include a

chemical storage area, a coal boiler

house (to provide steam to the plant),

a maintenance workshop/warehouse,

weigh bridges, waste water treatment

plant, stormwater management

infrastructure, fire-fighting room and

fire-water tank, truck wash-bay, office

building, canteen and guard house.

SERVICES

Access and Transport: Access to the

facility would be via Lager Avenue, off

the R28. Transport of goods to and

products from the facility would be by

truck.

Potable and process water: Would be

sourced from the Emfuleni Local

Municipality.

Electrical power: Would be sourced

from the Emfuleni Local Municipality.

The electrical connection would be via

underground cables from the Eskom

substation located just west of the R59.

Sewage: Generated at the facility

would be pumped to an existing

municipal pump station.

Solid waste: General and hazardous

waste would be temporarily stored in

designated areas and disposed at off

site permitted waste disposal facilities

by a third-party contractor.

Effluent: Plant effluent (waste water)

would be treated on site to meet

appropriate discharge standards prior

to being pumped to the Municipal

Waste Water Treatment Works located

south of the site (other side of the

R28).

Page 4: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 4

Schematic representation of the proposed maize wet mill plant

TIMING

Should environmental authorisation be granted it is

anticipated that construction of the facility would take

approximately 2 years. Full production would be reached

by year 2021. The planned life of the operations is at

least 20 years.

PROJECT ALTERNATIVES

The project team considered a number of site

alternatives for the project. The proposed site was

selected as the preferred location due to environmental,

social, services and economic factors. The process of

considering alternatives is on-going and will form part of

the BA permitting process.

OPERATING TIMES AND HOUSING

Operating times: The proposed facility would operate 24

hrs a day, with 4 x 8 hour continuous shifts.

Employment: Approximately 800 peak construction

phase jobs would be created. Operation of the facility

would create approximately 210 employment

opportunities. Employees would be sourced, as much as

is possible, from local communities and the greater

Vereeniging area.

Housing: No housing would be provided on-site during

the construction or operational phases.

Page 5: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 5

STATUS OF EXISTING ENVIRONMENT

This section provides a basic description of the current status of the biophysical and socio-economic environment of the

proposed project area. More detailed information will be sourced as part of the environmental impact assessment process,

with input from specialists (where relevant).

� Geology: The geology of the project area comprises intercalated shales, quarzitic sandstone and limited occurrence of

mudstone, all of the Ecca Group which is part of the Karoo Supergroup. The sediments are underlain by dolomites at

variable depths (potentially less than 30 m).

� Climate: The project area falls within the Highveld Climatic Zone, which is generally associated with a cool temperate

climate with high extremes between maximum summer and winter temperatures. The area is characterised by summer

rainfall with a mean annual precipitation of 662 mm. Average daytime temperatures are 16.3°C in winter and 26°C in

summer with night time temperatures in winter dropping to approximately 0.5°C. The area is prone to frost.

� Topography: The project area is largely flat with a slight slope to the south and east. The average height above sea level

for the area ranges from 1 440 – 1 450 m.

� Soils and land capability: All the soil in the area can be classified as Sterkspruit Form 1200 Bethulie Family.

� Biodiversity (terrestrial): The project area is dominated by the Soweto Highveld Grassland vegetation type. According

to the Gauteng Conservation Plan (V3.3) the project area and surrounds are not associated with any areas or features of

conservation concern, namely Critical Biodiversity Areas, Ecological Support Areas, Wetlands, Rivers or Ridges. The

Leeuwkuil Nature Reserve is situated approximately 600 m south of the project area, but the area does not fall within a

focus area as per the National Protected Areas Expansion Strategy. Part of the study area has historically been utilised

for cultivation purposes. The site is currently utilised for livestock grazing by subsistence farmers. The vegetation is

short to medium-high, dense, tufted grassland dominated by Cynodon dactylon and Themeda Triandra (red grass) with

a number of alien species also present. Floral species such as Hypoxis iridifolia, Ammocaris coranica, Haplocarpha lyrata

and Vernonia oligocephaela as well as Crinum macowanii were observed. Very little evidence of wild faunal populations

exists, due to the location within a highly urbanised area.

� Surface water: The project area is located in the Upper Vaal Water Management Area, within quaternary catchment

C22F. The closest watercourse is a tributary of the Vaal, located approximately 800 m south of the project area (south

of the R28). A stormwater drain is found 200 m east of the project area (adjacent to the R59). Surface water flow is

towards the south-east.

� Aquatic environment: No wetlands have been identified within the proposed project area. An excavated (man-made)

drainage channel/feature occurs on site and receives channelled stormwater from the prison area to the north.

� Groundwater: The average groundwater level within the project area ranges from 30 m to 50 m below ground level.

Groundwater yields are expected to be in the range of 0.3l/s. There are no known groundwater users in the immediate

vicinity of the site.

� Air quality: Vereeniging, and the project area, are located within the Vaal Triangle Airshed Priority Area. The priority

area was declared as a result of poor ambient air quality. The ambient air quality has been influenced by industries,

mines, power stations, household fuel combustion, vehicle tailpipe emissions, entrained dust and wind erosion from

exposed areas. The prevailing wind direction is from the north-west and the north-east. Data from a nearby ambient

monitoring station (south west of the project area) indicates that particulate matter (<2.5 and <10 micron in size)

already consistently exceeds the NAAQ standards and nitrogen dioxide sometimes exceeds standards.

� Noise: The greater area is likely to be subjected to elevated noise levels due high traffic volumes along the R59 and R28

roads. The current baseline noise level for the site and surrounds is considered typical of an urban setting.

� Visual: The natural visual character of the area has been influenced by various residential, industrial, road, powerline

and railway related activities. The open grassland and livestock add a rural element to the sense of place that is

otherwise typical of an urban area.

� Heritage/cultural and palaeontological resources: No heritage resources have been detected within the project site.

� Socio-economic: Gauteng faces a number of economic challenges, including high poverty levels, inequalities in terms of

incomes and opportunities and youth unemployment. Vereeniging is currently one of the most important industrial

manufacturing centres in South Africa, with its chief products being iron, steel, pipes, bricks, tiles and processed lime.

Vereeniging also has several Eskom thermal power plants. While Vereeniging has extensive power and water supply

networks, there are challenges with supply, particularly in the poorer areas.

� Land use: The project area is currently open space with indigenous vegetation that is subject to informal grazing. Erf

188 of Leeuwkuil 596 IQ has been zoned for industrial purposes, and although Portion 237 of Leeuwkuil 596 IQ is zoned

agricultural, it is earmarked for industrial and commercial use in the municipalities’ spatial development framework.

Adjacent land use includes open space, the SAB Vereeniging Depot, the Vereeniging Fresh Produce Market, the R28 and

R59 roads and the Leeuwkuil Water Care Works. Nearby receptors include the Wise Owl Pre-school, a Telkom facility, a

Department of Roads and Transport facility, a Department of Correctional Services facility, informal residences and

livestock kraals and the Leeuhof suburb.

Page 6: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 6

POTENTIAL ENVIRONMENTAL AND SOCIO-ECONOMIC IMPACTS

AND SPECIALIST INPUT

The preliminary list of potential impacts that have been identified and will be investigated as part of the BA process are

tabulated below. Where specialist input is required, this has also been indicated. Relevant issues gathered during the

stakeholder engagement process will further inform the identification and assessment of impacts in the BA Report.

BIOPHYSICAL/SOCIO-

ECONOMIC ASPECT

POTENTIAL IMPACT SPECIALIST INPUT (WHERE

RELEVANT)

Geology and

topography

Surface subsidence risks to infrastructure and creation of

hazardous excavations: The dolomites pose a risk of subsidence

and/or sinkhole formation, particularly with altered storm water

flows. The founding conditions present potential foundation and

stability related risks for heavier infrastructure.

Geotechnical investigation

Soils and land

capability

Loss of soil and land capability: The project has the potential to

compromise soil resources through physical disturbance (erosion

and compaction) and/or pollution, by the placement of

infrastructure. Loss of soil resources has a direct impact on the

natural capability of the land.

Soils and land capability

study

Biodiversity Loss of biodiversity (terrestrial and aquatic): The placement of

infrastructure has the potential to disturb and/or destroy

vegetation, terrestrial and aquatic habitat units and related

ecosystem functionality, including the disturbance of floral species

of concern.

Biodiversity study

(terrestrial and aquatic)

Surface water Alteration of natural drainage patterns and pollution: The project

has the potential to alter surface drainage patterns through the

placement of infrastructure and to pollute surface water

resources.

Storm water management

plan and hydrological study

Groundwater Groundwater contamination: The project has the potential to

contaminate groundwater resources.

Geohydrological study

Air Air quality: The proposed project has the potential to emit

pollution and have a negative impact on ambient air quality. The

emissions may pose risk to third party receptors.

Air quality study

Noise Disturbing noise levels: The project has the potential to cause

noise pollution through construction and operational activities.

This could affect receptors to the north and west of the site.

Noise study

Visual Negative visual views: The development of infrastructure has the

potential to create visual impacts.

Visual study

Traffic Road disturbance and traffic safety: The project has the potential

to result in an increase in traffic volumes along existing roads

resulting in safety risks to road users.

Traffic study

Heritage/cultural

and palaeontological

resources

Loss of heritage/cultural and palaeontological resources: The

project has the potential to damage any heritage/cultural and

palaeontological resources.

Heritage study

Social Loss of grazing for informal herdsmen: Conversion of the open

grassland to an industrial development could reduce grazing

available to the livestock.

Social study

Socio-economic Positive and negative socio-economic impact: The project has the

potential for positive and negative socio-economic impacts.

Positive impacts include job creation and stimulation of local and

regional economy. Negative impacts include the influx of job

seekers and related issues of crime, and disruption to social

structures

Economic study

Land use Change in land use: The proposed project has the potential to

impact on local and surrounding land uses such as residential

areas.

Will be addressed by

project team.

Page 7: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 7

ENVIRONMENTAL AUTHORISATION PROCESS

The BA regulatory process which will be followed:

∗ Provides information on the proposed project;

∗ Provides the environment in which the proposed project

is being undertaken;

∗ Identifies, in consultation with interested and/or

affected parties (I&APs), the potential negative as well

as positive impacts of the proposed project; and

∗ Reports on management measures required to mitigate

impacts to an acceptable level.

The likely process steps and timeframes are provided below.

The steps are in accordance with the EIA Regulations, 2014,

as amended. I&APs registered on the project’s database will

receive notification of public information-sharing meeting

and report review period in advance.

STEPS IN THE AUTHORISATION PROCESS

PHASE I - Pre-application phase (May –July 2018)

• Pre-application meeting with the GDARD;

• Notify other commenting authorities and I&APs of the

proposed project and Basic Assessment regulatory

process (via social scan, newspaper advertisements,

site notices and this BID);

• Commence with specialist studies;

• Public information-sharing meeting with I&APs; and

• Commence with compilation of BA Report.

PHASE II –Application and Basic Assessment phase (August

2018 to March 2019)

• Submission of NEMA application to the GDARD;

• Complete specialist studies;

• Complete BA Report;

• Submit BA Report to GDARD, I&APs and other

commenting authorities for review;

• Public review of BA Report (30 days);

• Update the BA Report with any comments received

during the review period;

• Submit BA Report to the GDARD for decision-making;

• Review of the BA Report by the GDARD (107 days);

• GDARD either grants or refuses the environmental

authorisation; and

• Circulate GDARD decision to registered I&APs.

NOTICE OF PUBLIC INFORMATION-SHARING

MEETING

All stakeholders are invited to attend.

Date Venue Time

26 July 2018

(Thursday)

School Hall, General Smuts

High School, Van Riebeeck

Street, Vereeniging

16h00*

* Please endeavour to arrive earlier than the specified time

in order to complete the meeting attendance register.

PARTIES INVOLVED IN THE ENVIRONMENTAL

IMPACT ASSESSMENT PROCESS

DECISION MAKING AUTHORITIES

∗ Gauteng Department of Agriculture and Rural

Development (GDARD)

I&APs

∗ Surrounding landowners, occupiers, adjacent

landowners and communities;

∗ Non-governmental organisations and

associations; and

∗ Parastatals

COMMENTING AUTHORITIES

∗ Department of Agriculture, Forestry and

Fisheries;

∗ South Africa Heritage Resource Agency;

∗ Gauteng Department of Roads and Transport;

∗ Gauteng Department of Rural Development and

Land Reform, including land claims

commissioner; and

∗ Department of Water and Sanitation.

LOCAL AUTHORITIES

∗ Emfuleni Metropolitan Municipality;

∗ Metsi A Lekoa; and

∗ Ward Councillors.

Please let us know if there are any additional

parties that should be involved.

Pre-application

consultation with GDARD

and I&APs

Compile specialist studies and BA Report

and distribute to I&APs and commenting

authorities for public review (30 days)

Update the BA Report with comments

received during the public review period

and submit final BA report to GDARD

GDARD to issue decision

Start date 90 Days

GDARD review BA Report (107 days)

We are

here

Submit NEMA application

19

7 D

ay

s

Page 8: PROJECT JORDAN - Amazon Web Services

SLR Consulting (South Africa) (Pty) Ltd 8

PROJECT JORDAN

BACKGROUND INFORMATION DOCUMENT FOR A MAIZE WET MILL PLANT, GAUTENG PROVINCE

REGISTRATION AND RESPONSE FORM FOR INTERESTED AND AFFECTED PARTIES

DATE TIME

PARTICULARS OF THE INTERESTED AND AFFECTED PARTY

NAME

POSTAL ADDRESS

POSTAL CODE

STREET ADDRESS

CODE

WORK/ DAY TELEPHONE

NUMBER

WORK/ DAY FAX NUMBER

CELL PHONE NUMBER E-MAIL ADDRESS

PLEASE IDENTIFY YOUR INTEREST IN THE PROPOSED PROJECT

PLEASE WRITE YOUR COMMENTS AND QUESTIONS HERE

Please return completed forms to:

SLR Consulting (South Africa) (Pty) Ltd

Alex Pheiffer

(011) 467 0945 (Tel)

(011) 467 0978 (Fax)

[email protected]

PO Box 1596, Cramerview 2060*

* If using post, please also contact us telephonically to notify us of your submission.

Please submit initial comments to SLR by 26 July 2018. You will also have an opportunity to comment on the Basic

Assessment Report.

Page 9: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 21 June 2018 13:54

To: [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]

inbev.com

Subject: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

Page 10: PROJECT JORDAN - Amazon Web Services

2

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 11: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 21 June 2018 14:01

To: [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

Page 12: PROJECT JORDAN - Amazon Web Services

2

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 13: PROJECT JORDAN - Amazon Web Services

1

Clive Phashe

From: Microsoft Outlook

To: [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]

Sent: 21 June 2018 02:01 PM

Subject: Relayed: Project Jordan: Notice of Environmental Authorisation process

Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

Page 15: PROJECT JORDAN - Amazon Web Services

1

Clive Phashe

From: Microsoft Outlook

To: [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]

Sent: 21 June 2018 01:55 PM

Subject: Relayed: Project Jordan: Notice of Environmental Authorisation process

Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected])

<mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

[email protected] ([email protected]) <mailto:[email protected]>

Page 17: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 26 June 2018 17:36

To: Mienie, Gerhard

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Thank you Gerhard.

In terms of getting comments from the residences, do you need me to provide you a number of hard copies of the BID

that you can distribute to them or have you forwarded the BID to them that I sent through?

Thank you

Alex

From: Mienie, Gerhard [mailto:[email protected]]

Sent: 22 June 2018 06:45 AM

To: Alex Pheiffer Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Morning Alex.

Thanks for the email. As discussed in meeting with Matthew I take note .

Gerhard

From: Alex Pheiffer [mailto:[email protected]]

Sent: Thursday, June 21, 2018 1:54 PM To: [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; Mienie, Gerhard; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

Page 18: PROJECT JORDAN - Amazon Web Services

2

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

Page 19: PROJECT JORDAN - Amazon Web Services

3

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

***************************************************************************** The

information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the

intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take

any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this

message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the

sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you

regard this message as spam, please inform us immediately by sending an email to [email protected].

*****************************************************************************

Page 20: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 26 June 2018 17:38

To: Bracey, Stanley (SD)

Cc: Gas-Sherq

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Thank you Stanley, your email is noted.

I will ensure that the developer understands the relevant contact point with regards to wayleaves.

Kind regards

Alex

From: Bracey, Stanley (SD) [mailto:[email protected]]

Sent: 22 June 2018 09:50 AM

To: Alex Pheiffer Cc: Gas-Sherq

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Good day Alex

It appears that Sasol is not affected although service crossings might still influence Sasol during execution phase. Our Wayleave office will respond formally. Please liaise with our [email protected] office for all service inquiries for service and road crossings before installation to do safety standby on site and ensure safety of staff, contractor public and Sasol pipeline during crossing of Sasol pipeline. Regards

20 Indianapolis Boulevard, Raceway Park, Germiston South Africa PO Box 5486, Johannesburg, 2000 www.sasol.com

Stanley Bracey Specialist Compliance & Threat Prevention Satellite Operations

Tel Cell

+27 (0)10 345 8502 +27 (0)82 772 8598

Fax +27 (0)11 522 1913

E-mail [email protected]

Environmental awareness starts with each of us – think before you print this page

Page 21: PROJECT JORDAN - Amazon Web Services

2

From: Alex Pheiffer [mailto:[email protected]]

Sent: Thursday, June 21, 2018 1:54 PM

To: [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; Reyneke, Sandra (S) <[email protected]>; Bracey, Stanley (SD)

<[email protected]>; Gas-Sherq <[email protected]>; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Page 22: PROJECT JORDAN - Amazon Web Services

3

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

-

SLR Consulting Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

NOTICE: This eMail message is from Sasol and is for the sole use of the intended recipient(s), and may contain

confidential and/or privileged material.

If you are not the intended recipient(s), please contact the sender immediately, and destroy all copies of the

original message. Any unauthorized review, use, copy, disclosure or distribution is prohibited. Please note that

this eMail, and the contents thereof, is also subject to the standard Sasol eMail Legal Notice which may be

found at: http://www.sasol.com/legal-notices.

disccsa41a3

Page 23: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 26 June 2018 17:31

To: [email protected]

Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

Dear Sir

Please see below and attached an email sent through to you last week for you attention which returned a delivery

failure receipt.

Should you have any questions please do not hesitate to contact me.

Kind regards

Alex

From: Alex Pheiffer

Sent: 21 June 2018 01:54 PM To: [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

Page 24: PROJECT JORDAN - Amazon Web Services

2

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

Page 25: PROJECT JORDAN - Amazon Web Services

3

ZAEXC1S

Page 26: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 26 June 2018 17:30

To: [email protected]; [email protected]

Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

Dear Sir/Madam

Please see below and attached an email sent through to you last week for you attention which returned a delivery

failure receipt.

Should you have any questions please do not hesitate to contact me.

Kind regards

Alex

From: Alex Pheiffer

Sent: 21 June 2018 02:01 PM To: [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

Page 27: PROJECT JORDAN - Amazon Web Services

2

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer

Page 28: PROJECT JORDAN - Amazon Web Services

3

This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 29: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 27 June 2018 13:58

To: [email protected]

Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

Dear Sir/Madam

Please see below and attached an email sent through to you last week for you attention which returned a delivery

failure receipt.

Should you have any questions please do not hesitate to contact me.

Kind regards

Alex

From: Alex Pheiffer

Sent: 26 June 2018 05:30 PM To: [email protected]; [email protected]

Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Dear Sir/Madam

Please see below and attached an email sent through to you last week for you attention which returned a delivery

failure receipt.

Should you have any questions please do not hesitate to contact me.

Kind regards

Alex

From: Alex Pheiffer Sent: 21 June 2018 02:01 PM

To: [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

Page 30: PROJECT JORDAN - Amazon Web Services

2

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Page 31: PROJECT JORDAN - Amazon Web Services

3

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 32: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 20 July 2018 06:48

To: [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Ms Unathi

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Page 33: PROJECT JORDAN - Amazon Web Services

2

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected] -

SLR Consulting Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 34: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 24 July 2018 18:37

To: [email protected]

Cc: Matthew Hemming; Clive Phashe

Subject: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Mr Tsotetsi

Your telephone conversation with our Clive Phashe has reference.

As indicated we would like to set up a focussed meeting with you for this week Thursday (26th

July) at 13h00. I will confirm

a venue in due course. I will also send through a separate meeting request. The purpose of the meeting will be to share

information with you on the project as well as provide an opportunity to provide input.

This email also serves to provide notice on the commencement of the application for Environmental Authorisation for

the above mentioned project. Further detail is provided below.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

Page 35: PROJECT JORDAN - Amazon Web Services

2

In addition the focussed meeting with yourself, a public information sharing meeting has been arranged. You are invited

to attend this meeting as well. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 36: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 18 June 2018 12:23

To: [email protected]

Cc: [email protected]; [email protected]; Kyle Day

Subject: Project Jordan: Proposed Maize Wet Mill plant - Background Information Document

Attachments: 2018-06-11 Project Jordan BID FINAL.pdf

Dear Garth

You have been identified as an interested and/or affected party (I&AP) who may wish to be informed about the

proposed Project Jordan. Your contact details have been added to the I&AP database.

Please find attached a background information document (BID) providing information on the project and environmental

assessment process.

Should you have any queries or comments please send these through.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected] -

SLR Consulting Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 37: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Alex Pheiffer

Sent: 16 September 2018 22:19

To: '[email protected]'

Subject: Jordan: Meeting with Transnet

Hello Suzan

Trust this email finds you well.

I tried to call on your landline but have not managed to get through.

The applicant for Project Jordan would like to set up a meeting to discuss the railway siding and line near the project site

to understand if it would be possible to consider rail as a future transport mechanism for the project.

Please could you let me know who I should speak to, to set this up.

Thanking you in advance.

Kind regards

Alex

Page 38: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: [email protected] Radebe <[email protected]>

Sent: 09 August 2018 11:57

To: Alex Pheiffer

Hi my name is Teboho im a young artisan and seeking opportunity and I strongly believe Project Jordan is the

way forward as it will be a production plant and thus will create amazing products as well as growth and

development to local residents by creating jobs and changing peoples life's as we currently battling poverty and

the high rate of unemployment,I have attached my cv and looking forward to hearing from u guys as I believe

with my skills and experience we would grow together

Page 39: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Cristiano DB <[email protected]>

Sent: 30 July 2018 09:41

To: Alex Pheiffer

Subject: New Corn mill, Starch and corn oil plants

Dear Mr. Pheiffer,

We are the world leading group supplying technologies to the edible oil sector.

I am looking for the contact details of the people in charge of this project as we need to present them our technology.

Looking forward to your kind reply,

Best regards

Cristiano M. Sassoli

www.desmetballestra.com

Mobile +27 82 422 8019 – Tel.: +27 21 871 1869 P.O. Box 3006, Paarl 7640, Western Province, RSA Suite 23, Monte Rosa Building, 276 Main Street, Paarl 7660, WP, RSA

Page 40: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Jan Mitchell <[email protected]>

Sent: 21 June 2018 14:05

To: Nosipho Mashazi

Cc: Alex Pheiffer

Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Attachments: Project Jordan BID-June 2018.pdf

Hi Nosipho

Application in your area.

Regards,

Jan

Signature Version 26/02/2018 08:30

From: Alex Pheiffer [mailto:[email protected]]

Sent: 21 June 2018 01:54 PM

To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; Jan Mitchell; wayleave.emm; Nosipho Mashazi; Lungile Motsisi; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

Page 41: PROJECT JORDAN - Amazon Web Services

2

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer

Page 42: PROJECT JORDAN - Amazon Web Services

3

This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL LEGAL NOTICE which

can be viewed at http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx

Page 43: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Mienie, Gerhard <[email protected]>

Sent: 27 June 2018 06:42

To: Alex Pheiffer

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Good Morning Alex.

If possible can you provide me plus minus 30 hard copies to hand out to members and I will get it back to you

Greetings

Gerhard

From: Alex Pheiffer [mailto:[email protected]]

Sent: Tuesday, June 26, 2018 5:36 PM To: Mienie, Gerhard

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Thank you Gerhard.

In terms of getting comments from the residences, do you need me to provide you a number of hard copies of the BID

that you can distribute to them or have you forwarded the BID to them that I sent through?

Thank you

Alex

From: Mienie, Gerhard [mailto:[email protected]]

Sent: 22 June 2018 06:45 AM To: Alex Pheiffer

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Morning Alex.

Thanks for the email. As discussed in meeting with Matthew I take note .

Gerhard

From: Alex Pheiffer [mailto:[email protected]]

Sent: Thursday, June 21, 2018 1:54 PM

To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

Page 44: PROJECT JORDAN - Amazon Web Services

2

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; Mienie, Gerhard; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected] Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Page 45: PROJECT JORDAN - Amazon Web Services

3

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

***************************************************************************** The

information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the

intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take

any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this

message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the

sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you

regard this message as spam, please inform us immediately by sending an email to [email protected].

*****************************************************************************

***************************************************************************** The

information contained in this e-mail is confidential and may be subject to legal privilege. If you are not the

intended recipient, you must not use, copy, distribute or disclose the e-mail or any part of its contents or take

any action in reliance on it. If you have received this e-mail in error, please e-mail the sender by replying to this

message. All reasonable precautions have been taken to ensure no viruses are present in this e-mail and the

sender cannot accept responsibility for loss or damage arising from the use of this e-mail or attachments. If you

regard this message as spam, please inform us immediately by sending an email to [email protected].

*****************************************************************************

Page 46: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Annette Stoltz <[email protected]>

Sent: 27 June 2018 15:45

To: Alex Pheiffer

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Good day Alex

No problem – I will send to registry to open a file. You will receive a reference number shortly.

Regards

Annette

From: Alex Pheiffer [mailto:[email protected]]

Sent: 27 June 2018 03:16 PM

To: Annette Stoltz Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Dear Annette

This would be the first notification you would have received for this project. It relates to the basic assessment process

that is required to inform a decision from GDARD. You are receiving the email as a commenting authority on the EIA

process.

Hopefully this provides some clarity. Should you have any further queries please feel free to give me a call or send

through an email.

Kind regards

Alex

From: Annette Stoltz [mailto:[email protected]]

Sent: 27 June 2018 08:59 AM To: Alex Pheiffer; [email protected]

Subject: RE: Project Jordan: Notice of Environmental Authorisation process

Good day Alex

Can you please confirm whether this is a new matter or an application that was sent to us before. Our system is off-line

and it is very difficult to confirm whether we have received applications or not.

Regards

Annette

From: Alex Pheiffer [mailto:[email protected]]

Sent: 26 June 2018 05:30 PM

To: Annette Stoltz; [email protected] Subject: FW: Project Jordan: Notice of Environmental Authorisation process

Dear Sir/Madam

Page 47: PROJECT JORDAN - Amazon Web Services

2

Please see below and attached an email sent through to you last week for you attention which returned a delivery

failure receipt.

Should you have any questions please do not hesitate to contact me.

Kind regards

Alex

From: Alex Pheiffer

Sent: 21 June 2018 02:01 PM

To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]

Subject: Project Jordan: Notice of Environmental Authorisation process

PROPOSED MAIZE WET MILL PLANT – PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

Page 48: PROJECT JORDAN - Amazon Web Services

3

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer

Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

Page 49: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Clive Phashe

Sent: 18 July 2018 09:55

To: Alex Pheiffer

Subject: Follow-up Call with Sigi

Dear Alex

As per her request left with our receptionist, I gave a lady (Sigi) a call on the 13th

of July 2018. Sigi is a resident of

Leeuhof, just across the Project sites for both Project Isanti and Project Jordan.

She made the following comments:

1. She indicated that herself, along with some residents in the same area have been waiting for Title Deeds

since 1994. In the event that people need to relocate as a result of the aforementioned projects, will they

still receive compensation even without possession of Title Deeds?

2. Years ago, the proposed sites for both Isanti and Project Jordan were earmarked for the building of RDP

houses for people in Sharpeville. She indicated that most of the residents in Sharpeville were placed there

temporarily as they were promised RDP houses on the project sites.

3. In terms of employment, will recruitment favour the locals (both skilled and un-skilled)? Over the years, job

promises were made to the residents by developers, but the posts were filled by people from faraway

places.

Regards

Clive Phashe on Behalf of Sigi

Clive Phashe-

+27 11 467 0945

[email protected] -

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

ZAEXC1S

Page 50: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Shoni Nevondo <[email protected]>

Sent: 16 July 2018 15:39

To: Alex Pheiffer

Subject: REGISTRATION AS INTERESTED AND AFFECTED PARTY

Attachments: SLeeuwkuil 18071615460.pdf

Afternoon,

Kindly register me as interested and affected party.

Regards

This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged

and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,

copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be

unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local

Municipality. >>> <[email protected]> 2018/07/16 03:17 PM >>>

Page 51: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Mmamotheo Priscilla Moche <[email protected]>

Sent: 16 July 2018 15:12

To: Alex Pheiffer

Cc: Shoni Nevondo

Subject: MAIZE WET MILL PLANT

Attachments: SLeeuwkuil 18071615210.pdf

Good day

Attached please find the response form as an affected party.

Regards,

Mmamotheo

This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged

and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,

copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be

unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local

Municipality.

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.

Page 52: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Yvonne Oosthuizen (YA) <[email protected]>

Sent: 02 July 2018 10:21

To: Alex Pheiffer

Cc: Victor Chetty (RS)

Subject: EIA: WC469/06/18

Attachments: 0226_001.pdf; 0225_001.pdf

Importance: High

Good day,

Description: EIA: PROPOSED GLASS BOTTLE MANUFACTURING PLANT AT PORTION 238 (A PORTION OF

PORTION 149) OF THE FARM LEEUWKUIL 596IQ

Kindly take note that we have no objection regarding your proposal and the proposal has been

approved.

Yvonne Oosthuizen

Administrative Support to Manager: April Leketa

Access Engineering & Build

Engineering Yard, 6 Lager Street, Leeuhof, Vereeniging

T: +27 16 451 9600/7

F: +27 86 478 6146

M: +27 65 962 4008

[email protected]

This e-mail is subject to the Openserve electronic communication legal notice, available at:

http://www.openserve.co.za/OpenserveEmailLegalNotice

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

This e-mail is subject to the Telkom SA SOC Ltd electronic communication legal notice,

available at : http://www.openserve.co.za/open/media/downloads/OpenserveEMailLegalNotice.pdf

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 53: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: SalomeS Strydom <[email protected]>

Sent: 21 June 2018 14:10

To: Alex Pheiffer

Cc: Cynthia Dlamini

Subject: Re: Project Jordan: Notice of Environmental Authorisation process (OUT OF THE OFFICE

NOTICE)

Good day, I will be out of the office from 22 June 2018 to 2 July 2018. Any urgent matters can be referred to Me Zanele Mudau, Acting Manager Planning & Projects, 016 986 8310 [email protected] For Wayleave enquiries please contact Ina Louw, 016 986 8364 [email protected]. For Building Plan approval and Sewer Layout enquiries please contact Ntombi Dhlamini, 016 986 8356 [email protected]. Thank you Salome Strydom Manager Planning, Assets & Projects >>> Alex Pheiffer <[email protected]> 06/21/18 13:54 >>>

PROPOSED MAIZE WET MILL PLANT โ€“ PROJECT JORDAN

NOTICE OF ENVIRONMENTAL AUTHORISATION PROCESS

Dear Sir/Madam

We hereby provide notice on the commencement of an application for Environmental Authorisation for the above

mentioned project.

Corporate investor(s) in partnership with black owned partner(s) intend to develop and operate a majority black owned

(>51%) maize wet mill plant which will process raw non-GMO maize to produce glucose and starch products. Glucose

and starch are used as ingredients in the manufacturing of beverage and food products. The proposed plant would be

located on Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ. The project site is located within the

Emfuleni Local Municipality in Vereeniging, Gauteng Province.

The proposed project requires Environmental Authorisation prior to the commencement. Environmental Authorisation

is required from the Gauteng Department of Agriculture and Rural Development in terms of the National Environmental

Management Act, 1998 (No. 107 of 1998) (NEMA). The application is subject to a Basic Assessment process as stipulated

in the Environmental Impact Assessment (EIA) Regulations, 2014 (GNR 982, 8 December 2014).

Page 54: PROJECT JORDAN - Amazon Web Services

2

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed to

manage the environmental regulatory processes and conduct the public participation process in support of this

application.

As part of the initial phase of public consultation, SLR is notifying and distributing information to as many interested or

affected parties as possible. Through various resources SLR has obtained contact details for potential stakeholders. Our

information leads us to believe that you or your organisation/department may have an interest in, or be affected by, the

project. We would thus like to notify you of the application and provide you with introductory information on the

proposed project. Please be so kind as to distribute this email and BID to other persons within your

organisation/department.

The Background Information Document (BID) contains information on the proposed project; the baseline environment

of the site; an outline of the Basic Assessment process; potential environmental impacts and specialist studies being

undertaken. The BID is attached and available at on our website at www.slrconsulting.com/za. Navigate to Public

Documents.

A public information sharing meeting has been arranged. You are invited to attend. The details are as follows:

Date Venue Time

26 July 2018 (Thursday) School Hall, General Smuts High School, Van Riebeeck

Street, Vereeniging

16h00 *

* Please endeavour to arrive earlier in order to complete the meeting attendance register.

Please register with SLR should you be an interested or affected party for the Basic Assessment process. You must

register if you wish to participate in the Basic Assessment process for the project. Details required for registration are

provided in the BID. For comments to be included in the Basic Assessment Report, please submit these to SLR before or

on 26 July 2018. As a registered interested or affected party, you will have an opportunity to review the Basic

Assessment Report and/or summary that are produced.

Please feel free to pass this document on to any other persons whom you believe may be interested in this project. We

welcome any comment or questions.

Thank you and Kind regards

Alex

Alex Pheiffer Senior Environmental Consultant-

+27 83 269 7545

+27 11 467 0945

2027

[email protected]

- SLR Consulting

Unit 7

Fourways Manor Office Park

1 MacBeth Avenue

Fourways, Johannesburg, Gauteng, 2191-

Confidentiality Notice and Disclaimer

Page 55: PROJECT JORDAN - Amazon Web Services

3

This communication and any attachment(s) contain information which is confidential and may also be legally privileged. It is intended for the exclusive use of the recipient(s) to

whom it is addressed. If you have received this communication in error, please email us by return mail and then delete the email from your system together with any copies of

it. Any views or opinions are solely those of the author and do not represent those of SLR Management Ltd, or any of its subsidiaries, unless specifically stated.

ZAEXC1S

-- This message has been scanned for viruses and dangerous content by E.F.A. Project, and is believed to be clean. Click here to report this message as spam. This e-mail and any file attachments transmitted with it are intended solely for the addressee(s) and may be legally privileged

and/or confidential. If you have received this e-mail in error, please destroy it. If you are not the addressee you may not disclose,

copy, distribute or take any action based on the contents hereof. Any unauthorized use or disclosure is prohibited and may be

unlawful. The views and opinions expressed in this e-mail message may not necessarily be those of the Emfuleni Local

Municipality.

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.

Page 56: PROJECT JORDAN - Amazon Web Services

1

Alex Pheiffer

From: Nosipho Mashazi <[email protected]>

Sent: 22 June 2018 05:49

To: Tsholo Maloka

Cc: Alex Pheiffer

Subject: Eskom:WLGOU20180622_4025| SLR Consulting | Project Jordan: Notice of

Environmental Authorisation process

Attachments: FW Project Jordan Notice of Environmental Authorisation process

Hi Tsholo

Please investigate and reply to applicant

Tsholofelo - +27117112516 / [email protected]

Admin Support - Nosipho Mashazi – +2711 711 2525 / +2712 421 3058 / [email protected]

Land and Rights Manager – Jason Kasper - +27117112057 / 2941/ +27785565407 / [email protected]

Applicant please follow up with allocated resource directly on progress.

Signature Version 26/02/2018 08:30

NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL LEGAL NOTICE which

can be viewed at http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx

Kind Regards

Nosipho Mashazi Eskom Holdings SOC Limited I Gauteng Operations Unit

Asset Creation Land & Rights

012 421 3058

[email protected]

083 959 4577

061 142 4479

www.eskom.co.za

086 609 8984

Eskom Centre, 204 Smit Street, Braamfontein, JHB