project light up
DESCRIPTION
Bringing solar-powered electricity into the Indonesian islands of Pulau Mendol & Pulau Tiga through a ‘light for work’ exchange program. Watch the first of a three-part story here: http://www.youtube.com/watch?v=SrgTq5IDwl4 Be challenged right here: http://www.youtube.com/watch?v=zI8lzwsWgGETRANSCRIPT
![Page 1: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/1.jpg)
Project Light-Up
Bringing solar-powered light to
Pulau Mendol & Pulau Tiga,
Building a brighter tomorrow
1
![Page 2: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/2.jpg)
Locations of Pulau Mendol & Pulau Tiga
- Part of the Riau Islands*
- 4-5hr travelling from Singapore
* To be confirmed
2
Sg Raya, Pulau Mendol
Tg Medan, Pulau Mendol
Kg Baru,
Pulau Tiga
![Page 3: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/3.jpg)
25 householdsMedian of 5 people
3
No stable source of electricity;
households use torch lights and kerosene lamps in the night
Lack of basic amenities
Profile of Sg Raya, Pulau Mendol
![Page 4: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/4.jpg)
Rice farming is the main livelihood
Household income
<US$100/month;
below poverty line of US$2/day 4
![Page 5: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/5.jpg)
Profile of Pulau Tiga
~ 400 households;
3 different kampongs
Clean water not readily
available
~ <10% are believers
![Page 6: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/6.jpg)
Vision
Helping to build a foundation for development for Pulau Mendol & Pulau Tiga by innovative and
dignified means
6
![Page 7: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/7.jpg)
..In exchange
for
MissionBringing solar-powered light into Pulau Mendol/Pulau
Tiga through a ‘light for work’ exchange/installment program
Solar lamps
Work.. ..LightRepairing the jetty
7
Installment program..
Responses to the program
![Page 8: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/8.jpg)
8
Jetty in Sept 2011 Jetty in Jan 2013
![Page 9: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/9.jpg)
Why Electricity/Solar Power?
Off the grid because it is a relatively small island with little economic value
3 key benefits:
Better healthStudying at night
Working at night
12
3
Healthier lungs
Better chances at school
Supplement income
9
![Page 10: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/10.jpg)
Cost &Benefits
IDR 96,720(USD 10)
Annual cost of kerosene
Annual Cost of Solar Lamp
9%
10
A family can save approximately IDR1.0mn (USD
100) annually or 10% of their income if kerosene
lamp use is fully substituted
![Page 11: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/11.jpg)
In Kg. Sungei Raya,
Pulau Mendol, it is
9 out of 10
Kerosene lamps are used instead, which are
ExpensiveDangerous
Here’s how
ONE
solar lamp
makes a
HUGEdifference!
Education
Health
Infrastructure
This
impacts
Poor in lighting
2 in 5 Indonesians
live without electricity
Every S$50 brings a lamp
into one home + part of
the jetty. Join us!
Through an innovative exchange program,villagers repair their community jetty in exchange for a lamp
A solar lamp
costs a tenthof a family’s
annual spend
on kerosene!
IN A NUTSHELL …
GOAL:
S$10,000 = 200 lamps
= 1,000 people
So FAR:
S$6,200
![Page 12: Project Light Up](https://reader034.vdocuments.net/reader034/viewer/2022042700/5599dd881a28abfc5d8b4816/html5/thumbnails/12.jpg)
12
Project team members (from top right, clockwise): Irene, Charlie, Kim Bok, Jason, David, Sarah & Mervyn
Connect with us!
Facebook: https://www.facebook.co
m/ProjectLightUp
Email:[email protected]