Project Management Case Studies Healthcare

Upload: phamnhu

Post on 01-May-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Project Management

Case Studies

Healthcare

Page 2: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

This 66-bed specialist nursing

and dementia care home is

equipped to hotel standards

and includes a sensory gardens. Pinders were responsible for

the full suite of project

management services;

publishing an OJEU notice,

preparation of and tender

analysis, contractor

appointment and providing

assistance with the CQC

registration.

Case Study

Foxburrow Grange,

Colchester

Service: Project

Management

Value: £4.7 million

Duration: 59 weeks

Page 3: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

This new three storey building

was constructed in the car

park behind the original

centre, which was demolished

to form a new car park. The

site is part of the Witney

Hospital complex.

Monitored on behalf of Lloyds

TSB Banking.

Case Study Windrush Health Centre,

Witney

Service: Project

Monitoring

Value: £5.68 million

Duration: 63 weeks

Page 4: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

This two storey 22 bedroom

timber frame extension to an

existing home incorporates

ground source heat pump and

heat recovery systems to

reduce energy consumption by

a predicted 63%.

The accommodation is

designed for residents with

dementia with additional day

care provision.

Case Study Wren Hall Nursing Home,

Selston

Project: New Care Home

Service: Project Mngt.

Value: £1.3 million

Duration: 39 weeks

Page 5: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

The 29 bed care home was

extensively extended and

refurbished to provide 64

bedrooms all with en suite

shower rooms. Carried out in

two phases to enable the home

to continue to operate, both

south and north extensions

were replaced with larger

extensions with the original

Victorian building being totally

repaired and refurbished.

Case Study St Cross Grange Care Home,

Winchester

Service: Project

Monitoring

Value: £4.9 million

Duration: 110 weeks

Page 6: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

Extension to an existing care

home in Norfolk and the

addition of a stand-alone

dementia care unit. Local resistance to the

development demanded

enhanced public consultation,

the provision of a model and a

planning review. The home won a National

Healthcare design award in the

best extension category.

Case Study

Halsey House Care Home,

Cromer

Service: Project Mngt,

Planning & CDM-C

Value: £6.35 million

Duration: 86 weeks

Page 7: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

Pinders achieved planning

consent for a 57 bed specialist

(dementia) nursing home on

the site of a previous hotel.

Working with the planners and

local neighbours, we were able

to prove that tourism facilities

would not be affected and

helped to provide a design and

parking facilities which would

“fit to the local street scene”.

Case Study New Nursing Home,

Fordingbridge

Service: Planning

Consultancy

Page 8: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

The works entailed the

removal of all defective plaster

throughout the property and

re-plastering and decorating.

To enable the home to

continue to operate, only eight

bedrooms at a time could be

undertaken on a phased basis

in this 49 bedroom care home.

Case Study

Blackwell Care Centre,

Alfreton

Project: Internal Repairs

Service: Project Mngt.

Value: £295,000

Duration: 45 weeks

Page 9: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

Internal reconfiguration to

provide additional day space

including the addition of two

conservatories, an extra

assisted bathroom and a

sensory garden.

Case Study Suffolk Lodge Care Home,

Wokingham

Project: Conservatory

Extensions &

Internal

Alterations

Service: Project Mngt.

Value: £286,300

Duration: 27 weeks

Page 10: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

Pinders obtained the change of

use for the Greenfield site and

project managed the

construction of a 90 bed

purpose built Care Home, 53

Extra Care Apartments and

Day Care Centre with offices

above.

Case Study Summer Lane Care Home

Diamond Court Apartments

Weston Super Mare

Project: New Care Village

Service: Project Mngt.

Value:

Care Home - £4.11 million

Apartments - £4.45 million

Duration:

Care Home – 14 months

Apartments – 17 months

Page 11: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

A development located in the

New Forest comprising 22 self

contained apartments, two

guest suites and a communal

suite. Sited in close proximity

to two existing care homes,

the scheme provides extra

care accommodation whilst

maintaining residents’

independence.

Case Study Dunwood Manor Care

Home, Romsey

Service: Project

Monitoring

Value: £4.59 million

Duration: 92 weeks

Page 12: Project Management Case Studies - Welcome to … studies/proj_health... ·  · 2016-09-07Project Management Case Studies Healthcare . Contact the Building Services Team on 01908

Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.

Pinders secured planning

approval for this purpose built

45 bed care home on the site

of a former vicarage.

Set in a conservation area on a

site with a number of trees

subject to TPOs, extensive

liaison was required with the

planners and English Heritage

along with public consultation.

Case Study Yardley Grange Care Home,

Yardley

Project: New Care Home

Service: Project Mngt

and Monitoring

Value: £1.61 million

Duration: 42 weeks