project management knowledge area applied on bahria grand mosque karachi
TRANSCRIPT
FINAL YEAR PROJECT PRESENTATION
GROUP 4
PROJECT MANAGEMENT KNOWLEDGE AREA APPLIED ON BAHRIA GRAND
MOSQUE
GROUP MEMBERS
AHMED ZAKARIA
SHAHZAEB NAZEER
MOHAMMAD HAMMAD KHAN
SHAHRUKH AQIQ
MAAZ AHMED NAQVI
CONTENTS
INTRODUCTION
METHODOLOGY & PROCEDURE
OBJECTIVES OF THE PROJECT
CONCLUSION & RECOMENDATIONS
BAHRIA GRAND MOSQUE INTERNATIONAL STANDARD
CONSTRUCTION 50 ACRES LAND 60 FEET HIGH
HILL DEDICATED THERMAL POWER
STATION
FYP REPORT SCHEDULE
OBJECTIVES OF PROJECT
ARCHITECTURAL DRAWING
PROJECT MANAGEMENT RISK CALCULATION
AND SAFETY MANAGEMENT
QUALITY
COST
TIME MPROJETANAGEMENT
MPROJETANAGER
CONTRACTOR
ARCHITECT CLIENT
54321SWITCH
METHODOLOGY & PROCEDURE
GRAND MOSQUE ARCHITECTURE
HISTORICAL AND CULTURALLY RICH DESIGNINTERIOR IS EQUIPPED SHAMADANEXTERIOR IS FLOODLIT WITH MODERN LIGHTENING
DOMESTHERE ARE 12 LARGE DOMES IN THE MOSQUE WHICH ARE
LOCATED AT THE TOP OF THE BOUNDARY WALL. THE SIZE OF THESE DOMES ARE 60’*60’.
THERE ARE MORE THEN 100 SMALL DOMES WHICH ARE BUILT OVER THE BOUNDARY WALL AND THEY ARE POINTING TOWARDS THE SKY. THE SIZE OF THESE DOMES ARE 20’*20’.
THERE IS A ONE HUGE DOME WHICH WILL BUILT RIGHT AT THE TOP OF THE MEHRAB.
MINARETS
THERE IS ONLY ONE MINARET BUILT IN BAHRIA TOWN MOSQUE.
THE LEVEL IS TAKEN OUT FROM THE SEA WHICH IS 600 FEET, IS ALSO KNOWN AS FLOOR LEVEL.
THE MINARET HEIGHT IS OF 300 FEET FROM THE FLOOR LEVEL.
THE MINARET IS MADE OF RCC WITH VERY HIGH REINFORCEMENT IN IT.
IT IS ALSO EQUIPPED WITH A LIFT INSIDE FOR FUTURE MAINTENANCE WORK
GRAND MOSQUE BUILDING
THERE IS A STATE OF ART ISLAMIC RESEARCH CENTER,
AN UNDERGROUND ISLAMIC MUSEUM
THERE IS A WORLD CLASS INTERNATIONAL ISLAMIC UNIVERSITY.
54321SWITCH
SCHEDULING
CONTROLLING:
PLANNING:
PROJECT GOALS
PROJECT DELIVERABLES
PROJECT SCHEDULE
WBS
GANTT CHART
PLANNING & SCHEDULING OF BAHRIA GRAND MOSQUE USING
PRIMAVERA.
SCHEDULING
CONTROLLING:
PLANNING:
ORGANIZE METHOD
WHEN ACTIVITIES TO BE START
HOW LONG ACTIVITIES ARE PLANNED
WHEN ACTIVATES ARE TO BE PLANNED
WBS
GANTT CHART
SCHEDULING
CONTROLLING:
PLANNING: CONTROLLING PHASE IS
DURING PROJECT IMPLEMENTATION
RE-PLAN OR RESCHEDULE
FLOW OF RESOURCEWBS
GANTT CHART
SCHEDULING
CONTROLLING:
PLANNING: A DETAILED HIERARCHICAL TREE STRUCTURE OF DELIVERABLES AND TASKS THAT NEED TO BE PERFORMED
TO IDENTIFY ACTUAL TASK TO BE DONE
SERVES AS BASIS FOR PROJECT PLANNING
WBSGANTT CHART
SCHEDULING
CONTROLLING:
PLANNING: A BAR CHART
VISUALLY APPEALING ON A TASK AND DURATION BASIS
DOES NOT SHOW TASK OR RESOURCE RELATIONSHIP
EASY TO MAINTAIN AND READ
WBSGANTT CHART
BAHRIA GRAND MOSQUE WBS
BAHRIA GRAND MOSQUE WBS
54321SWITCH
PROJECT PROCUREMENTPROCUREMENT MEANS ACQUIRING GOODS
OR SERVICE FROM AN OUTSIDE SOURCEPlanni
ng
Purchasing
Monitoring
Closeout
VSBuild
Buy
Planning
Purchasing
Material
Cement Sand & Crush Steel
Machinery Workforce
Purchasing
MATERIAL OBSERVATION DURING PROJECT.
MACHINERY & WORKFORCE DEPLOYMENT AS PER NEEDED.
Monitoring
Closeout
PROCUREMENT WORK ENDS WITH PROJECT COMPLETION
54321SWITCH
WHAT IS RISK MANAGEMENT?• PROJECT RISK MANAGEMENT INCLUDES:
o RISK MANAGEMENT PLANNING,o IDENTIFICATION, o ANALYSIS,o RESPONSE PLANNING, AND o CONTROLLING RISK ON A PROJECT.
RISK MANAGEMENT
OBJECTIVE OF RISK MANAGEMENT
TO INCREASE THE IMPACT OF POSITIVE EVENTS,
TO DECREASE THE IMPACT OF NEGATIVE EVENTS IN THE PROJECT.
TO MANAGE RISK WE USE THESE RISK MANAGEMENT PROCESSES.
PLAN RISK MANAGEMENT.IDENTIFY RISK.PERFORM QUALITATIVE ANALYSIS.PERFORM QUANTITATIVE RISK ANALYSIS.
PLAN RISK RESPONSE
PLAN RISK MANAGEMENT
PLAN RISK MANAGEMENT IS THE PROCESS OF DEFINING HOW TO CONDUCT RISK MANAGEMENT ACTIVITIES FOR A PROJECT.
INPUTS:PROJECT MANAGEMENT PLAN.PROJECT CHARTER.STAKE HOLDER REGISTER.ORGANIZATIONAL PROCESS ASSETS.
TOOLS AND TECHNIQUE
EXPERTS JUDGEMENTS.MEETINGS.
OUTPUT
PLAN MANAGEMENT.
IDENTIFY RISKS
• IDENTIFY RISKS IS THE PROCESS OF DETERMINING WHICH RISKS MAY AFFECT THE PROJECT AND DOCUMENTING THEIR CHARACTERISTICS.
INPUTS• RISK MANAGEMENT PLAN.• QUALITY MANAGEMENT PLAN.• STAKE HOLDERS REGISTER.• ORGANIZATIONAL PROCESS ASSETS.
TOOLS AND TECHNIQUES
INFORMATION GATHERING.EXPERTS JUDGMENT.
OUTPUT RISK REGISTER.
RISKSDELAY IN COMPLETION MAY LEAD FAILURE IN MARKETING
SUCCESS.
TIMELY CONSTRUCTION CONSTRAINTS
CONSTRUCTION MANPOWER AVALIBILITY IS REMOTE LOCALITY.
STRUCTURE HEIGHT AND GEOGRAPHY MAY RISE WEATHER INCONSISTENCY
DUE TO REMOTE LOCALITY, TRANSPORTATION COST OF EVERY MATERIAL WILL BE INCREASED.
PERFORM QUALITATIVE RISK ANALYSIS
PERFORM QUALITATIVE RISK ANALYSIS IS THE PROCESS OF PRIORITIZING RISKS FOR FURTHER ANALYSIS OR ACTION BY ASSESSING AND COMBINING THEIR PROBABILITY OF OCCURRENCE AND IMPACT.
PERFORM QUANTITATIVE RISK ANALYSIS
PERFORM QUANTITATIVE RISK ANALYSIS IS THE PROCESS OF NUMERICALLY ANALYZING THE EFFECT OF IDENTIFIED RISKS ON OVERALL PROJECT OBJECTIVES.
PLAN RISK RESPONSES
PLAN RISK RESPONSES IS THE PROCESS OF DEVELOPING OPTIONS AND ACTIONS TO ENHANCE OPPORTUNITIES AND TO REDUCE THREATS TO PROJECT OBJECTIVES.
RECOMMENDATION & CONCLUSION
FINISH ON TIME.FINISH UNDER BUDGET.MEET REQUIREMENTS.QUALITY ASSURANCE AND CONTROL.
CONSIDER ALL SAFETY ASPECTS.
REFERENCES
• HTTPS://WWW.PROJECTSMART.CO.UK/PROJECT-PLANNING-STEP-BY-STEP.PHP• HTTPS://SUNDAY.COM.PK/NAYYAR-ALI-DADA/• HTTP://WWW.SLIDESHARE.NET/KISHANPHADTE/CHAP12-PROJECT-
PROCUREMENT-MANAGEMENT
Thank You
Any Questions?