project manual appendix a, b, and c float pile ......appendix b references robbinston site photos...

14
MAINE BUREAU OF PARKS AND LANDS PROJECT MANUAL Appendix A, B, and C FLOAT PILE REPLACEMENT Chandler Bay and St Croix River Boat Launch Facilities, Jonesport and Robbinston, Maine BREM Project #3013 Issued for Bid - April 8, 2019 APPENDIX A PLANS Sheet J1 Jonesport Site Location Plan Sheet J2 Jonesport Plan Sheet J3 Jonesport Pile Details Sheet R1 Robbinston Site Location Plan Sheet R2 Robbinston Plan and ProDile Sheet R3 Robbinston Pile Details APPENDIX B Reference Documents for Robbinston Photos of Existing Site Record Drawings of Existing Site APPENDIX C Reference Documents for Jonesport Photos of Existing Site Record Drawings of Existing Site

Upload: others

Post on 26-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

MAINEBUREAUOFPARKSANDLANDS

PROJECTMANUALAppendixA,B,andC

FLOATPILEREPLACEMENTChandlerBayandStCroixRiverBoatLaunchFacilities,

JonesportandRobbinston,MaineBREMProject#3013

IssuedforBid-April8,2019APPENDIXA PLANS

SheetJ1 JonesportSiteLocationPlan

SheetJ2 JonesportPlan

SheetJ3 JonesportPileDetails

SheetR1 RobbinstonSiteLocationPlan

SheetR2 RobbinstonPlanandProDile

SheetR3 RobbinstonPileDetails

APPENDIXB ReferenceDocumentsforRobbinston

PhotosofExistingSite

RecordDrawingsofExistingSite

APPENDIXC ReferenceDocumentsforJonesport

PhotosofExistingSite

RecordDrawingsofExistingSite

Page 2: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

STATE OF MAINE

BOATING FACILITIES PROGRAM

FLOAT PILE REPLACEMENT

SITE LOCATION

JONESPORT, MAINE

STR

STR

BREM Project 3013

3-4-2019

J-1

REV. O

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\Jonesport 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

SITE LOCATION

JONESPORT, MAINE

SITE LOCATION

JONESPORT, MAINE

Ref: Matte, Wikipedia.org

Page 3: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

STATE OF MAINE

BOATING FACILITIES PROGRAM

FLOAT PILE REPLACEMENT PLAN

CHANDLER BAY, JONESPORT,MAINE

STR

STR

BREM Project 3013

3-4-2019

J-2

REV. O

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\Jonesport 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

Table of Dimensions for Locating

Piles

Point

Distance

from WP#1

Distance

from WP#3

Page 4: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

STATE OF MAINE

BOATING FACILITIES PROGRAM

FLOAT PILE REPLACEMENT DETAIL

CHANDLER BAY, JONESPORT,MAINE

STR

STR

BREM Project 3013

3-10-2019

J-3

REV. O

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\Jonesport 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

DETAIL 1

1

DOLPHIN PLAN VIEW

DOLPHIN ELEVATION

VIEW

Page 5: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

Robbinston Public Boating Facility

N

© 2018 Google

© 2018 G l

300 ft

STATE OF MAINE

BOATING FACILITIES PROGRAM

ROBBINSTON FLOAT PILE REPLACEMENT

SITE LOCATION

STR

STR

BREM Project 3013

3-4-2019

R-1

REV. O

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\R

obbinston 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

SITE LOCATION

Robbinston, MAINE

SITE LOCATION

Robbinston, MAINE

Ref: Matte, Wikipedia.org

Robbinston

Page 6: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

STATE OF MAINE

BOATING FACILITIES PROGRAM

ROBBINSTON FLOAT PILE REPLACEMENT

PLAN AND PROFILE

STR

STR

BREM Project 3013

3-10-2019

R2

REV. 1

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\R

obbinston 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

NOTES:

Page 7: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

STATE OF MAINE

BOATING FACILITIES PROGRAM

ROBBINSTON FLOAT PILE REPLACEMENT

TYPICAL DETAILS

STR

STR

BREM Project 3013

3-10-2019

R-3

REV. O

W:\pinnacle hill active\Jonesport -R

obbinston P

iles\D

raw

ings\R

obbinston 1.dw

gA

UT

OC

AD

2

01

1

11x17 =

F

ULL S

CA

LE

NO. REVISION DATE

DESIGNED BY

DRAWN BY

DATE REVISED

ZINC ANODE DETAIL

TYPICAL PILE

REPLACEMENT

DETAIL

Page 8: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

Appendix B References Robbinston Site Photos

Robbinston Appendix B

Generalviewsfrom2007and2019.Floatsarenotinplacein

thephotos.

Endoframpplanks

Typical8’x20’Bloatwithchainguideforpile.

Pile#8isontheright,Pile#9ispasttheendofplankramp.ThestubtipofPile#10justshowingtoleftofPile#9

Page 9: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

Appendix B References Robbinston Site Photos

Robbinston Appendix B

EndofpavedBloatlaydownarea.Pile#7isBirst

pileontheleft

Pile#8

Pile#8

Pile#9andendoframp

Pile#10remainingstub,phototakenatlowdraintide

Page 10: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in
Page 11: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in

Appendix C References Jonesport Site Photos

Jonesport Appendix C

Generalviewswinter2019.Floatsarenotinstalledinthesephotos.Thetwosinglepilesbetweenthe

dolphinsaremissing.

Typical8’x20’@loatwithchainguideforpile.ThisphotofromRobbinstonisthesametypeof@loat

Deteriorationofexistingpiles

ExistingPileDolphinstobereplaced ExistingPier

Page 12: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in
Page 13: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in
Page 14: PROJECT MANUAL Appendix A, B, and C FLOAT PILE ......Appendix B References Robbinston Site Photos Robbinston Appendix B General views from 2007 and 2019. Floats are not in place in