Project Purpose: Improve safety, increase capacity, and reduce congestion at the I-83 Exit 4 – Shrewsbury Interchange Project Objectives: Eliminate traffic back-ups on the ramps from I-83 Improve safety by reducing vehicular movement con- flicts Increase capacity and reduce congestion along the PA 851 corridor in the project area Replace the structurally deficient bridge on I-83 over PA 851 Improve roadway geometry so turning movements can be more safely negotiated by large trucks Lengthen the acceleration lanes and deceleration lanes on the I-83 ramps to improve safety and capacity of the merge areas Improve roadway signing to reduce driver confusion Reduce turning conflicts on the PA 851 corridor by re- ducing the number of driveways Location Map Project Area to York to Baltimore Project Need: The area surrounding the Exit 4 interchange has seen extensive growth that the existing interchange can no longer safely accommodate. The interchange experiences high levels of congestion. Exiting traffic backs up onto I-83 which is a safety concern. The bridge carrying I-83 over PA 851 is structurally deficient. April 24, 2018 PROJECT NEED, PURPOSE, AND OBJECTIVES

Upload: others

Post on 14-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT NEED, PURPOSE, AND OBJECTIVES · 2018-05-17 · Project Purpose: Improve safety, increase capacity, and reduce congestion at the I-83 Exit 4 – Shrewsbury Interchange Project

Project Purpose:

Improve safety, increase capacity, and reduce congestion

at the I-83 Exit 4 – Shrewsbury Interchange

Project Objectives:

• Eliminate traffic back-ups on the ramps from I-83

• Improve safety by reducing vehicular movement con-

flicts

• Increase capacity and reduce congestion along the PA

851 corridor in the project area

• Replace the structurally deficient bridge on I-83 over PA

851

• Improve roadway geometry so turning movements can

be more safely negotiated by large trucks

• Lengthen the acceleration lanes and deceleration lanes

on the I-83 ramps to improve safety and capacity of the

merge areas

• Improve roadway signing to reduce driver confusion

• Reduce turning conflicts on the PA 851 corridor by re-

ducing the number of driveways

Location Map

Project Area

to York

to Baltimore

Project Need: The area surrounding the Exit 4 interchange has seen

extensive growth that the existing interchange can no

longer safely accommodate. The interchange experiences

high levels of congestion. Exiting traffic backs up onto

I-83 which is a safety concern. The bridge carrying I-83

over PA 851 is structurally deficient.

April 24, 2018

PROJECT NEED, PURPOSE, AND OBJECTIVES