Page 1: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

PROJECT No. 20‐07 / Task 395MASH Equivalency of 

NCHRP 350‐Approved Bridge Railings

SCOBS T7 SubcommitteeJune 14, 2017

Page 2: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Disclaimer

“This investigation was sponsored by TRB under the NCHRP Program. Data reported are work in progress. The contents of this presentation has not been reviewed by the project panel or NCHRP, nor do they constitute a standard, specification, or regulation.”

Page 3: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Acknowledgements• Waseem Dekelbab, PhD, PE, PMP, Senior Program Officer 

• Project Panel– SCOBS T7, TCRS, State DOTs, Consultants 

3

Page 4: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Research Team

• Roger Bligh, P.I.• William Williams, Co‐P.I.• Chiara Silvestri Dobrovolny• Sana Moran• Nathan Schulz

Page 5: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Research Objectives• Identify and prioritize bridge rail systems • Determine MASH equivalent test levels• Determine whether individual bridge rails can be submitted to FHWA for determination of federal‐aid reimbursement eligibility or whether testing is needed. 

5

Page 6: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Tasks

6

Task 1.  Identification and Prioritization

Task 2.  Develop Methodology for Bridge Rail Analysis

Task 3.  Analysis of Bridge Rails

Task 4.  MASH Coordination Effort

Task 5.  Eligibility Letters

Task 6.  Presentations

Task 7.  Final Report

Page 7: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Task 1 – Collect Bridge Rail Information

7

• Electronic survey of State DOT personnel:

Type of bridge rails usedRelative frequency of usePrior test information Intended future use

• Categorize and prioritize systems

Page 8: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Bridge Rail Prioritization

8

34 survey responses (33 DOT Agencies and FHWA Federal Lands) Responses organized based on bridge rail categories and

subcategories:

Concrete-Onlyo Vertical profileo Post and beamo New Jersey profileo Single Slope profileo F-Shape profile

Metal-Onlyo Deck-Mountedo Side-Mounted

Combination Traffic-Pedestriano With Sidewalko Without Sidewalk

Metal on Concrete Curb/Parapet With Curb

o 3 metal memberso 2 metal memberso 1 metal member

With Parapeto 3 metal memberso 2 metal memberso 1 metal member

Wood-Only Noise Wall-Only Retrofit-Only

Page 9: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Weighted Frequency of Use (WFofU)

9

Page 10: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Prioritization by WFofU

10

WFofU10 ‐ 19

WFofU≥ 20

Page 11: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

11

Rail Selection – Example 1

Page 12: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

12

TL‐4 F‐Shape

Page 13: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

TL‐4; Concrete Only; F‐Shape(WFofU = 67)

• 32" F‐shape– Submitted by 10 states (WV, PA, VA, LA, OR, MA, ME, FL, WS, TX)

– Height inadequate for MASH TL‐4  Evaluate for TL‐3

– Select most critical configuration based on reinforcement

• 42" F‐shape– Submitted by 4 states (IL, ME, FL, WS)– Select most critical based on reinforcement

Page 14: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

14

Rail Selection – Example 2

Page 15: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

15

TL‐3 Combined w/ Curb (2 Metal Railing)

Page 16: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

• SBB36c Two Tube Rail (Wyoming)–MT

TL‐3; Combined w/ Curb (2 Metal Railing) (WFofU = 19)

Page 17: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Task 2 ‐ Assess Analysis Methodologies

• Assess methodologies previously used/accepted by FHWA

• Develop methodology for evaluating MASH compliance of existing bridge rails– Crash tested and/or FHWA eligible railings

• Consider:– Previous level of testing– MASH impact severity– MASH evaluation criteria

Page 18: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Simulation Study for MASH TL‐3 Bridge Rail Analysis

• Finite element simulations being conducted to determine minimum rail height and lateral impact loads for MASH Test Level 3– Rigid vertical wall– MASH 2270P vehicle

Page 19: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

27‐inch Rail Height

Page 20: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

29‐inch Rail Height

Page 21: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Stability

Minimum Rail Height (in)

Test Level NCHRP 350a MASH

3 27 29b

4 32 365 42 42

a AASHTO LRFD Bridge Design Specifications, Section 13b Resulting minimum rail height from simulation analysis

Page 22: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Strength

Test Level

NCHRP 350a MASH

Lateral Impact 

Force (kips)

Resultant Force 

Height (in)

Moment(kip‐in)

Lateral Impact 

Force (kips)

Resultant Force 

Height (in)

Moment(kip‐in)

TL‐3 54 24 1296 71 19.5 1385

TL‐4 54 32 1728 68b 25b 1700

a AASHTO LRFD Bridge Design Specifications, Section 13b Impact force and resulting height corresponds to 36 in tall barrier

Page 23: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

• AASHTO LRFD Bridge Design Specifications– Figures A13.1.1-2 and A13.1.1-3

Rail Geometrics

Page 24: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Rail Geometrics – Pickup Truck Crash Test Data

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0 2 4 6 8 10 12

Ratio

 of R

ail C

ontact W

idth to

 Heigh

t

Post Setback Distance (in)

Post Setback Criteria

350 TL‐3

MASH TL‐3

350 TL‐4

MASH TL‐4

MASH TL‐5

350 Failed Tests

MASH Failed Tests

Not Recommended

Preferred

Oregon Bridge Rail (Crooked River)

F411

NY (2‐member)

T4(A) Bridge Rail

T77

T101

Caltrans ST‐10T131

Page 25: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Rail Geometrics – Pickup Truck Crash Test Data

0

5

10

15

20

25

30

0 2 4 6 8 10 12 14

Vertical Clear Ope

ning

 (in)

Post Setback Distance (in)

Snag Potential

350 TL‐3

MASH TL‐3

350 TL‐4

MASH TL‐4

MASH TL‐5

350 Failed Tests

MASH Failed Tests

High Potential

Low Potential

T4(A)Bridge Rail

F411

T77

Oregon Bridge Rail (Crooked 

River)

NY (2‐member)

T101

T131Caltrans ST‐10

Page 26: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Rail Geometrics – Small Car Crash Test Data

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0 2 4 6 8 10 12

Ratio

 of R

ail C

ontact W

idth to

 Heigh

t

Post Setback Distance (in)

Post Setback Criteria

350 TL‐3

MASH TL‐3

350 TL‐4

MASH TL‐4

MASH TL‐5

350 Failed Test

Preferred

Not Recommended

T202

Page 27: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Rail Geometrics – Small Car Crash Test Data

0

2

4

6

8

10

12

14

16

18

20

0 2 4 6 8 10 12 14

Vertical Clear Ope

ning

 (in)

Post Setback Distance (in)

Snag Potential

350 TL‐3

MASH TL‐3

350 TL‐4

MASH TL‐4

MASH TL‐5

350 Failed Test

High Potential

Low Potential

T202

Page 28: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Caltrans ST‐10 Bridge Rail Test 

http://www.dot.ca.gov/research/operations/roadsidesafety/guardrail_system/index.htm

Page 29: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Caltrans ST‐10 Bridge Rail Test 

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0 2 4 6 8 10 12

Ratio

 of R

ail C

ontact W

idth to

 Heigh

t

Post Setback Distance (in)

Post Setback Criteria

Caltrans ST‐10

Preferred

Not Recommended0

2

4

6

8

10

12

14

16

0 2 4 6 8 10 12 14

Vertical Clear Ope

ning

 (in)

Post Setback Distance (in)

Snag Potential

Caltrans

High Potential

Low Potential

Page 30: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Caltrans ST‐10 Bridge Rail Test 

http://www.dot.ca.gov/research/operations/roadsidesafety/guardrail_system/index.htm

Page 31: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies• Bridge rail systems were separated into categories to establish global test equivalency– Solid Concrete Parapet– Concrete Post and Beam– Metal Rail 

• Deck or Side Mounted– Metal Rail on Curb

• Curb height less than or equal to 11 inches– Metal Rail on Concrete Parapet

• Concrete parapet height greater than or equal to 12 inches

Page 32: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Global Equivalencies

* Concrete parapet height greater than or equal to 24 inches

NCHRP 350 Rail System Type

MASH Test LevelTL‐2 TL‐3 TL‐4 TL‐5

Solid Concrete Parapet TL‐2TL‐3TL‐4

TL‐5

Concrete Post and Beam

TL‐2TL‐3TL‐4

TL‐5

Metal Rail Deck Mounted

TL‐2TL‐3TL‐4

TL‐5

Metal Rail on CurbTL‐2TL‐3TL‐4

TL‐5

Metal Rail on Concrete Parapet*

TL‐2TL‐3TL‐4

TL‐5

Page 33: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

• Analyze existing data to determine if equivalent MASH test levels can be established– Supplemented by limited finite element impact simulations

• Evaluate prioritized bridge rails (Task 1) using approved methodology (Task 2)– Conservative analysis–MASH equivalent test level– Crash testing needed?

Task 3 ‐ Analyze Selected Bridge Rails

Page 34: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Key MASH Considerations

• Structural Adequacy– Strength

• Rail Height– Stability

• Rail Geometry– Occupant risk

Page 35: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Structural Adequacy

• Increased impact severity results in increased impact forces

TestImpact Severity (k‐ft) Percent 

DifferenceNCHRP 350 MASH

3‐10 27.3 55.9 +105%

3‐11 101.4 115.2 +13%

4‐12 98.5 154.4 +56%

Page 36: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Structural Adequacy

Test Level

NCHRP 350a MASH

Lateral Impact 

Force (kips)

Resultant Force 

Height (in)

Moment(kip‐in)

Lateral Impact 

Force (kips)

Resultant Force 

Height (in)

Moment(kip‐in)

TL‐3 54 24 1296 71 19.5 1385

TL‐4 54 32 1728 68b 25b 1700

Page 37: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Rail height

• Minimum height for vehicle stability varies with test level

Test Level NCHRP 350* MASH

3 27 29

4 32 365 42 42

* AASHTO LRFD Bridge Design Specifications, Section 13

Page 38: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Rail Geometry

• Rail geometry effects vehicle‐barrier interaction– Post setback distance– Vertical clear opening– Contact surface area

• Increased impact severity increases       snagging potential

• Applicability of AASHTO LRFD Bridge Design Specification relationships unknown– Different vehicles– Different impact conditions

Page 39: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

• AASHTO LRFD Bridge Design Specifications– Figures A13.1.1-2 and A13.1.1-3

Rail Geometrics

Page 40: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Bridge Rail Analysis Categories

• Analysis templates created for the following categories:– Solid Concrete Parapet– Concrete Post and Beam– Steel Post and Beam– Combination Steel Post and Concrete Parapet

Page 41: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Stability Analysis• From templates

Note: Yellow cell = input; Green cell = results check

Page 42: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Geometric Analysis

• From templates

Note: Yellow cell = input; Green cell = results check

Page 43: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Strength Analysis• From templates

Note: Yellow cell = input; Green cell = results check

Page 44: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Analyzed Bridge Rails

44

Page 45: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Analyzed Bridge Rails

45

Page 46: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Analyzed Bridge Rails

46

Page 47: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

• Coordinate with pooled fund efforts and other research initiatives– Collect available information – Share information to avoid duplication of effort–Work toward compiling information on all MASH devices 

• Roadside Safety Pooled Fund Program–MASH Implementation Coordination Effort

• Develop and maintain databases for MASH implementation needs and testing

Task 4 – MASH Coordination

Page 48: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

MASH Database

Page 49: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Task 5 – FHWA Eligibility Requests

• Prepare necessary documentation and rationale for submission of eligibility requests to FHWA

• Selected, prioritized bridge rail systems• Methodology and rationale should be applicable to other rail systems

Page 50: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

FHWA Open Letter(May 26, 2017)

Page 51: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

FHWA Open Letter ‐ Interpretation

• “All roadside hardware devices must complete the full suite of recommended tests as described in AASHTO MASH” to be considered for an eligibility letter.

• Project team’s interpretation is that FHWA will not issue eligibility letters based on engineering analysis.

Page 52: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Project Schedule• Draft final report due August 6, 2017• Project end date October 6, 2017

Page 53: PROJECT No. 20‐07 / Task 395 MASH Equivalency of NCHRP 350 ... · Final Report. Task 1 –Collect Bridge Rail Information 7 • Electronic survey of State DOT personnel: Type of

Contact Information• William Williams

w‐[email protected]‐862‐2297

• Roger Blighr‐[email protected](979) 845‐6375