project process and schedule - sound transit...2017 - 2023: construction & service startup...

18
2012 - 2014: Environmental Review & Preliminary Engineering 2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWVRIZD\ Apply for FTA grant 3UHSDUH ÀQDO GHVLJQ Build project 7HVW V\VWHPV VHUYLFH Prepare preliminary HQJLQHHULQJ ÀQDO (,6 2010 - 2011: Alternatives Analysis Secure FTA grant 67 %RDUG LGHQWLÀHV Environmental Impact Statement (EIS) alternatives 67 LGHQWLÀHV preferred alternative ,VVXH ÀQDO (,6 DQG ST selects project WR EH EXLOW operated 2015 - 2017: Final Design & Permitting 2023: Target Start of Service FTA issues record of decision (ROD) and grants permission to EHJLQ ÀQDO GHVLJQ FTA: Federal Transit Administration ST: Sound Transit Public comment: Early public scoping (Oct. 2010) Public comment: Environmental scoping on QDUURZHG DOWHUQDWLYHV (Oct. 2011) Issue draft EIS for public comment WE ARE HERE 7.13 PROJECT PROCESS AND SCHEDULE

Upload: others

Post on 31-Dec-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

2012 - 2014: Environmental Review & Preliminary Engineering

2017 - 2023: Construction & Service Startup

Prepare draft EIS

Apply for FTA grant

Build project

Prepare preliminary

2010 - 2011: Alternatives Analysis

Secure FTA grant

Environmental Impact Statement (EIS) alternatives

preferred alternative

ST selects project

operated

2015 - 2017: Final Design & Permitting

2023: Target Start of Service

FTA issues record of decision (ROD) and grants permission to

FTA: Federal Transit AdministrationST: Sound Transit

Public comment:Early public scoping(Oct. 2010)

Public comment: Environmental scoping on

(Oct. 2011)

Issue draft EIS for public comment WE ARE

HERE

7.13

PROJECT PROCESS AND SCHEDULE

Page 2: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

Alternatives evaluated in the Draft EIS

2010

Leve

l 1

Eval

uati

onLe

vel

2 Ev

alua

tion

2012

2013

2011

Alte

rnat

ives

Ana

lysi

sD

raft

EIS

Early Public Scoping (October 2010)

Initial broad range of alternative concepts from public and agency outreach

for Level 1 screening

detailed screening

Alternatives Analysis Report (July 2011)

EIS Public Scoping (October 2011)

Draft EIS released

Sound Transit Board Motion M-2012-17

Sound Transit Board Motion M-2011-87

Alternatives

Not Advanced:Lake City Way

Not Advanced:15th Avenue NE Light Rail ConceptsSR 99 Fully At-Grade Light Rail AlignmentSR 99 Light Rail Sub-Alternative Alignments

Not Advanced:I-5 Bus Rapid Transit Alternavite

Not Advanced:Multi-Corridor Bus Rapid Transit Alternative

Not Advanced:Transportation Systems Management

SR 99 Elevated Light Rail

Not Advanced:Segment AAlternatives with:

NE 185th Street west side alignment and west side stations

NE 175th Street StationSegment BAlternatives with:

West side alignments from NE 185th Street to Mountlake Terrace

East side alignments from Mountlake Terrace to Lynnwood

Pre-screening

Initial screening: meets purpose & need?

Level 1 screening

Level 2 screening

7.13

DEFINING ALTERNATIVES

Page 3: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

522

AU

RO

RA

AV

E N

N 205TH ST

NE 125TH ST

15TH

AV

E N

E

5

5 6TH

AV

E W

N 185TH ST

523

99

524

236TH ST SW

ME

RID

IAN

AV

E N

5TH

AV

E N

E

AU

RO

RA

AV

E N

200TH ST SW

104

ROOSEVELT WAY N

NE NORTHGATE WAY

5

N 130TH ST

5

N 145TH ST

N 155TH ST

NE 205TH ST

220TH ST SW

99

PugetSound

LakeWashington

LY N N W O O D

B R I E R

W O O D W A Y

K E N M O R E

E D M O N D S

M O U N T L A K ET E R R A C E

S E A T T L E

S H O R E L I N E

L A K EF O R E S T

P A R K

King CountySnohomish County

King CountySnohomish County

Northgate Stationand Transit Center

Segment BSegment C

Segment ASegment B

Haller Lake

North City

Maple Leaf

Echo Lake

Pinehurst

Hazelwood

Gateway

Parkwood

Ballinger

CascadeView

Ridgecrest

MeridianPark

TownCenter

SouthLynnwood

LakeBallinger

MelodyHill

NorthCollege

Park

LynnwoodCity Center

Data Sources: (King County, Snohomish County, WSDOT, Sound Transit)

Figure 4.4-1Neighborhoods

Lynnwood Link Extension

0 1

Miles

Light Rail Alternatives

Station Location

RoadwayLocal Street

City Boundary

County Boundary

Waterbody

Study Area

Legend

7.13

NEIGHBORHOODS IN THE STUDY AREA

Page 4: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

COMMUNITY FACILITIES IN THE STUDY AREA

NE 1 t Street StatiA1 A3 A A7 A1 A11

NE 1 t Street StatiA A7

Hamlin Park

Ronald BogPark

ShorelinePark and

Pool

NorthcrestPark

CromwellPark

ParamountSchool Park

North CityPark

RidgecrestPark

Brugger'sBog Park

MeridianPark

Ballinger Park

JamesKeough

Park

BallingerOpenSpace

DarnellPark

EchoLakePark

McCormickPark

nteru an Bur e ilman Trail Connector

Interurban Trail

olyroodCemetery

Shoreline a e orest ar Senior Center Shoreline Con erence Center Shoreline S artan ecreation Center Shoreline School District Stadium Shoreline School District Administration

and aintenance acility

idgecrestlementary

Ballinger omes ( units)

cho a elementary

ar oodlementary

Aurora Churcho the a arene

Berean Bi le Church

Shoreline reeethodist Church

ach i ayadath

Cemetery

Shorelinei rary

Shoreline ire De t ,Station

e er Tree ( nits)

Bethel utheran Church

St Barna as Anglican Church

Sal ationArmy

Seattle Centralission Church

Shoreline Community Church

Shorelineastside

eigh orhoodolice Center

Shoreline ull os el ello shi Church

Trinity nitedres yterian Church

Ta ernacleBa tist Church

Seattle raceres yterian Church

eridian arlementary School

oom ineCommunity School

Korean ionres yterian

Church

King County District Court

ergreen Ba tist Church

St ar Catholic ChurchSt ar arish

and School

St Da id mmanuelisco al Church

W eigh orhoodShoreline Clinic

oung s o ileome ar

Korean

Wonderland De elo mental Center orth City Coo erati e reschool

Seg e t ASeg e t

1

2

2A

4

L A K EF O R E S T

P A R K

S H O R E L I N E

0 0.3

Miles

N

Mountlake TerraceFreeway Station

(B4)

200th StreetSW Station

(C1)

Mountlake TerraceTransit Center Station

(B1, B2, B2A)

LynnwoodTransit Center

Station(C2)

LynnwoodP&R

Station(C3)

220th Street SW Station(B2A)

EvergreenPark

eteransMemorial

Park

BallingerPlayfield

JackLongPark

Inte

rurb

an T

rail

Mini Park atSprague's Pond

South LynnwoodNeighborhood Park

ForestCrest

Playfield

ScriberCreekPark

TerraceCreekPark

Scriber LakePark

Interurban Trail

Interurban Trail

Ballinger Lake Park

Ballinger Lake Park Boat Fishing Access

LakeBallinger

HallLake

Mountlake TerraceHigh School

CreeksideChurch

Kings TempleChristian School

Pinewood(25 Units)

Robin Park(30 Units)

BethelChapel

Lynnwood Senior Center

Calvary Fellowship

Mt ZionLutheranChurch

Great LoveChurch of Seattle

Brentwood (34 Units)

Center MobileHome Park

First BaptistChurch

Mountain View VillaMobile Home Park

Bethesda Lutheran Church

River of Life Christian Center

Oxford Square (120 units)

MountlakeTerrace

Elementary

Mountlake Terrace City Hall

ChristHeritageChurch

J&L MobileHome Park

Mountlake Terrace Police and Fire

-The Expedition Christian Church-Cornerstone Christian School-Korean Presbyterian Church

Muslim Associationof the NW

Mountlake TerraceChristian Church

Price Evangelistic Church

Mountlake TerraceRecreation Pavillion

Terrace ParkSchool/

ChallengeElementary

St Pius X CatholicChurch and School

Marks MobileHome Park

Harvest TimeChurch

St Mary CopticOrthodoxChristianChurch

Woodland Greens Apartments (240 Units)

Medo Lynn MobileHome Park

Beardens MobileHome Park

Seattle HeightsMobile Home Park

Group HealthLynnwood

Medical Center

Smithwright Services (8 units)

Harvest Time Church School

North Terrace(30 units)

Cedar Park Christian School

Calvary Tabernacle United Church

Mountlake Terrace Public Library

Mountlake Terrace Senior Center

Segment BSegment C

B1,

B4

C3

C1 C2

B2

B4

E D M O N D S

L Y N N W O O D

M O U N T L A K ET E R R A C E

B R I E R

0 0.3

Miles

N

N 14 th Street Station(A1, A3, A10, A11)

!

Northgate Stationand Transit Center

N 1 th Street Station(A , A )

N 130th Street Station(A , A , A10, A11)

ackson Parkolf Course

win PondsPark

Southoods

NorthacresPark

itter LakePlayfield

ParamountSchool Park

hornton CreekPark 1

Paramountpen

Space

Inte

rur

an

rail

ineralSprings

Park

hornton CreekPark 2

hornton CreekPark 6

itter LakeReservoirpen Space

NorthgatePark

PinehurstPlayground

ictory HeightsPlayground

ictory Creek Park

PinehurstPocket Park

HeleneadisonPool

Hu ardHomestead

Park

re

HallerLake

North SeattleCommunity College

IngrahamHigh School

NorthwestHospitalMedicalCenter

LakesideUpper School

ParkwoodElementary

St Matthew Churchand School

NorthgateElementary

North SeattleAlliance Church

Evergreen Washelli Cemetery

UWNorthgate

Clinic

Vineyard Community Church

Haller LakeUnited Methodist

Church

Seattle PoliceNorth Precinct

Peace of ChristSeattle Korean

Church and School

Northgate Library

Philippi Presbyterian Church

International Full GospelFellowship (Indonesian)

LatvianEvangelical

Church

North SeattleChurch of God

Shoreline Fire Dept.,Station 65

Seattle FirstKorean Church

Seattle Jewish Community School

Grace ChineseLutheran Church

Cedarvale House (118 units)

St Barnabas Anglican Church

Berhane HiwotEritrean Church

Cedarvale Village (23 units)

Eritrean Kidisti Selassie (church)

Kindred Hospital

Shoreline Unitarian Universalist Church

Haller LakeBaptist Church

Northgate OpenBible Church

NorthgateMiddleCollege

PolyclinicNorthgate

St Nectarios AmericanOrthodox Church

Northgate SeattleJehovah's Witnesses

All ChurchServices

Meridian Manor(109 Units)

Pacific Medical Center-Northgate

Seattle Buddhist Center

North Seattle Churchof the Nazarene

LakesideMiddle School

EvergreenElementary

Shoreline Full Gospel Fellowship Church

Northgate Community Center

Colonial Garden Apartments

A1,

A3,

A, A

, A10

, A11

S H O R E L I N E

S E A T T L E

0 0.3

iles

N

Community and MunicipalLow- and Lower-Cost HousingSchoolsMedicalReligiousCemetery

Light Rail Alternatives

Station Location

Parcel Boundary

RoadwayLocal Street

City Boundary

County Boundary

Park

Waterbody

Half-mile Project Buffer

Legend

Mountlake Terrace and Lynnwood VicinityNorthgate Vicinity Shoreline Vicinity

Page 5: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

PROJECT FUNDING AND COMPARISON OF ALTERNATIVE CAPITAL COSTS

Capital Cost 2012 dollars (in millions)

$100 $200 $300 $400 $500 $600 $700 $800 $900

A1 $670 to $770 M

A3 $700 to $810 M

A5 $650 to $750 M

A7 $740 to $850 M

A10 $660 to $750 M

A11 $750 to $870 M

B1 $340 to $390 M

B2 $390 to $450 M

B2A $450 to $520 M

B4 $310 to $360 M

C1 $300 to $350 M

C2 $270 to $310 M

C3 $270 to $340 M

Seg

men

t A

lter

nat

ives

COSTS OF ALTERNATIVESFUNDINGThe Lynnwood Link Extension was part of the ST2 system expansion program approved by voters in 2008. Sound Transit’s financial plan assumes that at least $600 million in New Starts funding will be needed for the Lynnwood Link Extension. Building any of the Lynnwood Link Extension alternatives requires federal funding.

Total capital cost of the project is estimated to be $1.2 - $1.7 Billion.

ESTIMATED TOTAL CAPITAL COST OF THE PROJECT

One Segment A alternative

One Segment B alternative

One Segment C alternative = + +

Minimum Cost

Maximum Cost

Cost Range

Page 6: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

SB -5

NB -5

ABO 31 EE

P CAL -5 E AN SEC ON

-5SO BO N NOR BO N

ABO 31 EE

P CAL A - RA E SEC ON BES E -5

AR ES

m

P CA A G A E CEN E P A S A N BES E

1

3

m

P CA E E A E CEN E P A

3

62

P CA E E A E SEC N BES E

31

m

12

P CA A G A E S E P A S A N BES E

1 12

TYPICAL I-5 MEDIAN SECTION

TYPICAL AT-GRADE SIDE PLATFORM STATION BESIDE I-5

TYPICAL ELEVATED SECTION BESIDE I-5

TYPICAL AT-GRADE SECTION BESIDE I-5

TYPICAL AT-GRADE CENTER PLATFORM STATION BESIDE I-5

TYPICAL ELEVATED CENTER PLATFORM

7.13

TYPICAL LIGHT RAIL GUIDEWAYS AND STATIONS

Page 7: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE

15TH

AVE

NE

EVA N

AIDI

REM

AU

RO

RA

AVE

N

RO

OSE

VELT

WAY

NE

Northgate Station

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

(terminus for North Link)

A1: AT-GRADE/ELEVATED TO NE 145th AND NE 185th STATIONS

P

P

145th Station

185th Station

N 117TH ST

N 175TH ST

5

99

Option 1:At-grade station east of I-5 with 500-spacegarage to the west, realigns parts of 5th and7th Avenues NEand rebuildsN 185th Streetbridge.

Option 1:Elevated station with 500-space garage to the north.

ReplacesNE 117th Street

bridge.

N

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE E

N EVA HT51

MER

IDIA

N A

VE

N EVA AR

OR

UA

RO

OSE

VELT

WAY

NE

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

Northgate Station(terminus for North Link)

A3: MOSTLY ELEVATED TO NE 145th AND NE 185th STATIONS

5

99P

P

145th Station

185thStation

N 175TH ST

Option 2:Elevated station with 500-space garage to the east.

Option 2:Elevated station with 500-space garage to the east, revises interchange.

N

Elevated

At-grade

StationP

City Boundary

Parking Structure

Legend Figure 2-3Alternatives A1 and A3

Crosses underNE 185th

Street bridge.

ReconfiguresNE 130th Streetinterchange andramps.

A1 A3

AT-GRADE/ELEVATED TO NE 145TH AND NE 185TH STATIONS

MOSTLY ELEVATED TO NE 145TH AND NE 185TH STATIONS

7.13

SEGMENT A ALTERNATIVES (A1 AND A3)

Page 8: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

P

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE

15TH

AVE

NE

EVA N

AIDI

REM

AU

RO

RA

AVE

N

RO

OSE

VELT

WAY

NE

Northgate Station

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

(terminus for North Link)

A5: AT-GRADE/ELEVATED WITH NE 130th, NE 155th AND NE 185th STATIONS

P155th Station

185thStation

N 175TH ST

130th Station

5

99

Option 3:At-gradestation with 350 spacesof parking on surface lots to the east. Realigns part of 7th Avenue NE.

Option 1:Elevated station with 500-space garage.

N

Option 1:At-grade

station with 100 leased

parking spaces.

interchange.

P

P

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE E

N EVA HT51

MER

IDIA

N A

VE

N EVA AR

OR

UA

RO

OSE

VELT

WAY

NE

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

Northgate Station(terminus for North Link)

A7: MOSTLY ELEVATED WITH NE 130th, NE 155th AND NE 185th STATIONS

5

99

P155th Station

N 175TH ST

130th StationOption 2:Elevated

station with 100 spaces of parking to the

north.

Option 2:Elevatedstation with 500-spacegarage to the east.

Option 1:Elevated station with 500-space garage.

N

P 185thStation

P

Elevated

At-grade

Station

PCity Boundary

Parking Structure

Surface Parking

Legend Figure 2-4Alternatives A5 and A7

Crosses underNE 185th

Street bridge.

At-gradecrossing east of NE 117th Street

overpass.

A5 A7

AT-GRADE/ELEVATED WITH NE 130TH, NE 155TH AND NE 185TH STATIONS

MOSTLY ELEVATED WITH NE 130TH, NE 155TH AND NE 185TH STATIONS

7.13

SEGMENT A ALTERNATIVES (A5 AND A7)

Page 9: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE

15TH

AVE

NE

EVA N

AIDI

REM

AU

RO

RA

AVE

N

RO

OSE

VELT

WAY

NE

Northgate Station

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

(terminus for North Link)

A10: AT-GRADE/ELEVATED WITH NE 130th, NE 145th AND NE 185th STATIONS

P145th Station

N 175TH ST

130th Station

5

99

Option 3:At-gradestation with 350 parkingspaces on surface lots to the east.Realigns partof 7th Avenue NE.

Option 1:Elevated station with 50-space garage to the north.

N

Option 1:At-grade station

interchange (but no parking).

185thStation

P

N 185TH ST

N 155TH ST

N 125TH ST

N 130TH ST

N 115TH ST

N 145TH ST

5TH

AVE

NE E

N EVA HT51

MER

IDIA

N A

VE

N EVA AR

OR

UA

RO

OSE

VELT

WAY

NE

NE NORTHGATE WAY

ROOSEVELT WAY N

SHORELINE

SEATTLE

Northgate Station(terminus for North Link)

A11: MOSTLY ELEVATED WITH NE 130th, NE 145th AND NE 185th STATIONS

5

99P

P

145th Station

N 175TH ST

130th StationOption 2:Elevated station with 100 spaces

to the north.

Option 2:Elevatedstation with 500-spacegarage to the east.

Option 2:Elevated station with 500-space garage to the east revisesinterchange.

N

185thStation

P

P

Elevated

At-grade

Station

PCity Boundary

Parking Structure

Surface Parking

Legend Figure 2-5Alternatives A10 and A11

PCrosses under

NE 185thStreet bridge.

At-grade east of NE 117th Street

overpass.

A10 A11

AT-GRADE/ELEVATED WITH NE 130TH, NE 145TH AND NE 185TH STATIONS

MOSTLY ELEVATED WITH NE 130TH, NE 145TH AND NE 185TH STATIONS

7.13

SEGMENT A ALTERNATIVES (A10 AND A11)

Page 10: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

SEGMENT A STATION ALTERNATIVES

NE 130th St. Station – Option 1

A

B

NE 130th St. Station – Option 2

PlatformPlaza

Vertical Circulation

Ticketing/InformationAncillary Area

Bike StorageBus Load/Unload B

TBus Layover

Legend

Page 11: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

SEGMENT A STATION ALTERNATIVES

A

B

NE 145th St. Station – Option 1

I-5NB

+335'-0"

I-5SB

A

B

PARKING GARAGE FOR UP TO 500 CARS4 FLOORSLEVEL 1 +315'-0"LEVEL 2 +326'-0" (GARAGE ACCESS)LEVEL 3 +337'-0"LEVEL 4 +348'-0"

RELOCATED I-5 ON RAMP

RELOCATED I-5ON RAMP

NE 145th St. Station – Option 2

155th St. Station

PlatformPlaza

Vertical Circulation

Ticketing/InformationAncillary Area

Bike StorageBus Load/Unload B

TBus Layover

Legend

Page 12: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

SEGMENT A STATION ALTERNATIVES

NE 185th St. Station – Option 2

NE 185th St. Station - Option 1

PlatformPlaza

Vertical Circulation

Ticketing/InformationAncillary Area

Bike StorageBus Load/Unload B

TBus Layover

RECONSTRUCTED 5TH AVE NE

I-5NB

I-5SB

EL +388'

WSDOT COMPATIBILITY LINE

BIORETENTIONCELL

BIORETENTIONCELL

BUS LOAD/UNLOAD

PLATFORM BELOWEL +384'-9"

PLATFORM BELOWEL +386'-5"

BRIDGE EL +406'GRADE EL +388'

A

B

SEATTLE CITY LIGHT PROPERTYSEE SHEET 185-GS-AS102 FORPARKING LAYOUT

EMERGENCY EXIT STAIR, TYP

GRADE EL +390'

ESCALATOR, TYP

PUBLIC ACCESS STAIR, TYP

PUBLIC ACCESSSTAIR, TYP

ELEVATOR, TYP

SERVICE VEHICLEPARKING

TPSS / SIGNALS / COMM

NE 185th St. Station - Option 3

SURFACE PARKINGUP TO 205 SPACES

APPROX LOCATION OFEXISTING POWERTRANSMISSION POLES

SURFACE PARKINGUP TO 205 SPACES

APPROX LOCATION OFFFEXISTING POWERTRANSMISSION POLES

Legend

Page 13: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W W EVA HT85

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TY

KIN

GC

OU

NT

Y

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

MountlakeTerraceTransit CenterStation

P

5

99

104

5

Elevated station crossing over NE 236th Street and to the east of existing parking garage

Crossesto west side

B2: EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO WEST SIDE

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W W EVA HT85

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TY

KIN

GC

OU

NT

Y

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

5

99

104

5

Elevated station crossing over NE 236th Street and to the east of existing parking garage

Crossesto median

B1: EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO MEDIAN

MountlakeTerraceTransit CenterStation

P

Staysin median

B1 B2

EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO MEDIAN

EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO WEST SIDE

208TH ST SW

SHORELINE

MOUNTLA ETERRA E

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

TH A

VE W

58TH

AVE

W

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

O

UN

TY

ING

OU

NT

Y

LYNNWOOD212TH ST SW

LA EFORESTPAR

EDMONDS

N

5

99

104

5

Elevated station crossing over NE 23 th Street and to the east of e isting parking garage

Crossesto median

1: EAST SIDE TO MOUNTLA E TERRA E

Mount a eTerra eTran it enterStation

P

Staysin median

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W

58TH

AVE

W

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TYK

ING

CO

UN

TY

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

MountlakeTerraceTransit CenterStation

P

5

99

104

5

Elevated station crossing over NE 236th Street and to the east of existing parking garage

Crossesto west side

B2: EAST SIDE TO MOUNTLAKE TERRACE

P

ElevatedAt GradeStationStation ption

PCity BoundaryParking StructureSurface Parking

Legend

7.13

SEGMENT B ALTERNATIVES (B1 AND B2)

Page 14: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

P

Elevated

At rade

Station

Station Option

PCity Boundary

Parking Structure

Surface Parking

Legend

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W

W EVA HT85

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TYK

ING

CO

UN

TY

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

Mountlake TerraceTransit CenterStation

P

220t Station

5

99

104

5

Elevated station crossing over NE 236th Street and to the east of existing parking garage

elevated station south of 22 th west of with 2 space parking lot

Crossesto west side

B2A: EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO WEST SIDE WITH 220TH ST SW STATION

P

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W

W EVA HT85

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TYK

ING

CO

UN

TY

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

B4: EAST SIDE TO MOUNTLAKE TERRACE FWY STATION TO MEDIAN

Mountlake TerraceFree a Station

P

5

99

104

5

Crossesto median

Staysin median

Station in median replacing existing freeway us stationNew pedestrian ridge to the north

connecting east

B2A B4

EAST SIDE TO MOUNTLAKE TERRACE TRANSIT CENTER TO WEST SIDE WITH 220TH ST SW STATION

EAST SIDE TO MOUNTLAKE TERRACE FWY STATION TO MEDIAN

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W

58TH

AVE

W

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TYK

ING

CO

UN

TY

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

Mountlake TerraceTransit CenterStation

P

220t Station

5

99

104

5

Elevated station crossing over NE 236th Street and to the east of existing parking garage

Elevated station south of 22 th and west of with 2 space parking lot

Crossesto west side

B2A: EAST SIDE TO MOUNTLAKE TERRACE

PP

208TH ST SW

SHORELINE

MOUNTLAKETERRACE

220TH ST SW

230TH ST SW

NE 205TH ST

N 185TH ST

66TH

AVE

W

58TH

AVE

W

15TH

AVE

NE

5TH

AVE

NE

SN

OH

OM

ISH

CO

UN

TYK

ING

CO

UN

TY

LYNNWOOD212TH ST SW

LAKEFORESTPARK

EDMONDS

N

B4: EAST SIDE TO MOUNTLAKE TERRACE

Mountlake TerraceFree a Station

P

5

99

104

5

Crossesto median

Staysin median

Station in median replacing existing freeway us stationNew pedestrian ridge to the north

connecting east

7.13

SEGMENT B ALTERNATIVES (B2A AND B4)

Page 15: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

SEGMENT B STATION ALTERNATIVES

EXISTING MOUNTLAKE TERRACETRANSIT CENTER 660 CARS

RECONFIGURED SURFACE PARKING 206 STALLS

BUS BAY

VETERANS MEMORIALPARK

EXISTING PEDESTRIANPATH

UP

DN

DN

EMERGENCYEXIT STAIR, TYPESCALATOR, TYPPUBLIC ACCESSSTAIR, TYP

ELEVATOR, TYP

PLAZA+400'-0"

SERVICE VEHICLEPARKING

A

B

RETAINING WALL,TOP OF WALL EL 405'-0" EL 375'-0"

EL 395'-0"

Mountlake Terrace Freeway Station

220th St. SW Station

Mountlake Terrace Transit Center Station

PlatformPlaza

Vertical Circulation

Ticketing/InformationAncillary Area

Bike StorageBus Load/Unload B

TBus Layover

Legend

Page 16: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

Elevated

At rade

StationP

City Boundary

Parking Structure

Legend

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

W EVA D

N25212TH ST SW

200t Street Station

C1: 52ND AVE W TO 200TH ST STATION

E isting L nn oodTransit Center

P

5

99

524

Elevated station on south side of street with two multistory

garages to the south near existing

transit centerotal of 1

parking spaces ptions connect to Segment B alternatives from the median or west of

L nn ood Transit CenterCentral Station

C2: 52ND AVE W TO LYNNWOOD TRANSIT CENTER STATION

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

W EVA D

N25

212TH ST SW

P

5

99

524

E isting L nn oodTransit Center

Elevated station south of existing

transit center with multistory parking

garage on existing surface parking to the

southotal of 1

parking spaces ptions connect to Segment B alternatives from the median or west of

L nn ood Park-and-Ride Station

C3: ALONG I-5 TO LYNNWOOD PARK-AND-RIDE STATION

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

44TH

AVE

W

W EVA D

N25

212TH ST SW

P

5

99

524

E isting L nn oodTransit Center

ption 1 Elevated station with multistory parking garage on existing surface parking west of 6th Avenue est

ptions connect to Segment B alternatives from the median or west of

ption 2 Elevated station relocates

transit center to the east of

6th Avenue multistory garage

to the westotal of 1

parking spaces

48TH

AVE

W

44TH

AVE

W

48TH

AVE

W

44TH

AVE

W

48TH

AVE

WC1

C2

C3

ALONG I-5 TO LYNNWOOD PARK-AND-RIDE STATION

52ND AVE TO LYNNWOOD TRANSIT CENTER STATION

52ND AVE W TO 200TH ST STATION

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

W EVA D

N25212TH ST SW

200t Street Station

C1: 52ND AVE W TO 200TH ST STATION

E isting L nn oodTransit Center

P

5

99

524

Elevated station on south side of street with two multistory

garages to the south near existing

transit centerotal of 1

parking spaces ptions connect to Segment B alternatives from the median or west of

44TH

AVE

W

48TH

AVE

W

L nn ood Transit CenterCentral Station

C2: 52ND AVE W TO LYNNWOOD TRANSIT CENTER STATION

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

W EVA D

N25

212TH ST SW

P

5

99

524

E isting L nn oodTransit Center

Elevated station south of existing

transit center with multistory parking

garage on existing surface parking to the

southotal of 1

parking spaces ptions connect to Segment B alternatives from the median or west of

44TH

AVE

W

48TH

AVE

W

L nn ood Park-and-Ride Station

C3: ALONG I-5 TO LYNNWOOD PARK-AND-RIDE STATION

200TH ST SW

LYNNWOOD

204TH ST SW

208TH ST SW

44TH

AVE

W

W EVA D

N25

212TH ST SW

P

5

99

524

E isting L nn oodTransit Center

ption 1 Elevated station with multistory parking garage on existing surface parking west of 6th Avenue est

ptions connect to Segment B alternatives from the median or west of

ption 2 Elevated station relocates

transit center to the east of

6th Avenue multistory garage

to the westotal of 1

parking spaces

48TH

AVE

W

7.13

SEGMENT C ALTERNATIVES (C1, C2 AND C3)

Page 17: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

7.13

SEGMENT C STATION ALTERNATIVES

44TH

AVE W

+345'-0"

+345'-0"

EXISTINGVAULT

EXISTINGVAULT

LEVEL 1 +340'-0" (PEDESTRIAN ACCESS)LEVEL 2 +352'-0" (VEHICLE ACCESS)LEVEL 3 +364-0"LEVEL 4 +376'-0"LEVEL 5 +388'-0"LEVEL 6 +400'-0"

DN DN

UPUP

T

T

PARATRANSITKISS AND RIDE

SERVICEVEHICLEPARKING

I-5 SOUTHBOUND ON RAMP

SCRIBERCREEK TRAIL

A

B

PARKINGGARAGE FOR UPTO 1650 CARS6 FLOORS

B

200TH STREET SW

Lynnwood Park-and-Ride Station – Option 1

BUS AND SERVICE VEHICLE ONLY

DN

+345'-0"

EXISTINGVAULT

EXISTINGVAULT

TAIL TRACKS ANDCROSSOVER

SCRIBER CREEKTRAIL

KISS AND RIDEPARATRANSIT

200TH ST SW

DN DN

DN

T

+340'-0"

LEVEL 1 +340'-0"LEVEL 2 +352'-0"LEVEL 3 +364'-0"LEVEL 4 +376'-0"LEVEL 5 +388'-0"LEVEL 6 +400'-0"LEVEL 7 +412'-0"

B

A

B

B

Lynnwood Park-and-Ride Station – Option 2

BUS LOAD/UNLOAD

EXISTING TRANSIT CENTERWITH RECONFIGURED BUS FACILITY

EXISTING SURFACE PARKING FOR 560 CARS EXISTING SURFACE PARKING FOR 560 CARS

TAIL TRACKS AND CROSSOVER

+358'-0"

ELEVATED PLATFORM EL 399'-4"GRADE EL 360'-0"

ELEVATED PLATFORM EL 402'-2"GRADE EL 375'-0"

PARKING GARAGE3 FLOORS UP TO 330LEVEL 1 +365'-0" GARAGE ACCESSLEVEL 2 +376'-0"LEVEL3 +387'-0"

POTENTIAL RETAIL

KISS & RIDE

PARATRANSIT

ANCILLARY SPACES

SERVICE VEHICLE PARKING

PARKING GARAGE3 FLOORS UP TO 450 CARSLEVEL 1 +355'-0" GARAGE ACCESSLEVEL 2 +370'-0"LEVEL3 +382'-2"

DNDN

A

B

GRADE EL358'-0"

TPSS / SIGNALS / COMM

T

200th St. SW Station

DIR

ECT

AC

CES

S R

AM

P46

TH A

VE W

KISS AND RIDE

EXISTING VAULT

+342'-0"

44TH

AVE

W

ANCILLARY SPACES

TPSS / SIGNALS /COMM

EXISTING SURFACE PARKING FOR 250 CARS

48TH

AVE

W

TAIL TRACKS ANDCROSSOVER

EXISTING VAULT

ELEVATED PLATFORM EL 389'-2"

ELEVATED PLATFORM EL 387'-4"

PARATRANSIT

SERVICE VEHICLE PARKING

EXISTING TRANSIT CENTER WITH RECONFIGURED BUS PROGRAM

ELEVATOR, TYP

T T

A

B

EMERGENCY EXIT STAIR, TYP

SCRIBER CREEK TRAIL

+338'-0"LEVEL 1

+350'-0"LEVEL 2

T

Lynnwood Transit Center Station

PlatformPlaza

Vertical Circulation

Ticketing/InformationAncillary Area

Bike StorageBus Load/Unload B

TBus Layover

Legend

Page 18: PROJECT PROCESS AND SCHEDULE - Sound Transit...2017 - 2023: Construction & Service Startup 'HYHORS HYDOXDWH QDUURZ DOWHUQDWLYHV Prepare draft EIS 2EWDLQ SHUPLWV DFTXLUH ULJKWV RI ZD\

The Draft EIS includes visual simulations and illustrations showing existing views and computer-generated simulations that illustrate what the alternatives would look like if they were constructed.

UV522

AURO

RA

AVE

N

NE 205TH ST

NE 125TH ST

15TH

AVE

NE

56TH

AVE

W

N 185TH ST

UV523

UV99

UV524

236TH ST SW

MER

IDIA

N AV

E N

5TH

AVE

NE

200TH ST SW

UV104

ROOSEVELT WAY N

NE NORTHGATE WAY

N 130TH ST

N 145TH ST

N 155TH ST

NE 205TH ST

220TH ST SW

UV99

NE 120TH ST

LY N N W O O D

B R I E R

W O O D W A Y

K E N M O R E

E D M O N D S

M O U N T L A K ET E R R A C E

S E A T T L E

S H O R E L I N E

L A K EF O R E S T

P A R K

ing CountySnohomish County

0 1

iles

N

VVVVVVVVVVVVVVVUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU522UUU522UUUU522UU522UU522UU522UU522UU522U

AURO

RA

AVE

NAU

ROR

A AV

EE N

AUAUAUO

RA

AA

AVE

A A

A A

NE 205NE 205TNE

NE 125TH STH SE 1NE 12 ST25TH S

15TH

AVE

NE

VE E N

EAV

EE 5T

HE

AV

TH15

THH A

56T

5

N 185TH STNN H SH S 185N 18185TH 185THTH S

VVVVVVVVVVVVVVVVUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU523UU523UU523UU523UU523UU523UU523UU523UU523UU523UU523UU523U

VVVVVVVVVUUUUUUUUUUUUUUUUUUUU99UU99UU99UUU99U

VVVVVVUUUUUUUUUUUUUUUUUUU524UU524UU524UU524UU524UU524UU524UU524U

236TH ST SW236TTH S236T T S STH SH S

200TH ST SW200T SW ST S ST ST S ST ST ST

VVVVVVUUUUUUUUUUUUUUUUU104UU104U

ROOSEVELEVEL

ROOROOSEVE

SEVEL

OSEV

ROOSEVE

ROOOOSROOSROO

EVEL

OOSEROOSEVE

RO

THGATE WAYTHG TE HGATHG WGATTE TE AYTE W

N 130TN N N

N 145TH ST ST45TH S ST5TH45TTH

N 155TH ST 15NN TH55TTHN 1N N 5TH

E 205TH ST ST ST STTHTH05 20E 2E 2E 2 5TH

220TH ST SW ST220

VVVVVVVVVVVUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU99UU99U

NE 120TH STNE 0THNE 20T STH S12 NE 120TH ST NE 120TH ST

LY N N W O O DLYLLY NY NY NY NN NLY NLY N W OWLY

B R I E RB RRB RB R IRB RB RI E R

A YA YW O O D W A YO O AO D W AOW O A YA Y

K E N M O R EEN MMK E EK E NN ME NK EK N MN ME NN MNE N MK E N MK E O RK E

E D M O N D SOE D O N D SD SN DE DE DEEE

M O U N T L A K EO UO UM U NU N T LT LN TN TTU N TT LT LT LMM OOOMM L AL AL AT L AL AL AL A K EK EK ET E R R A C ET ET EE RT E RE RE RE RE RE RR RTT A C EC EA CA CC EA C EEC EC EAARRR A

S E A T T L EE AESSS EES ES ESS E T T

N EN EN EN EN ES H O R E L I N EE LE LH O RR ER ES HH OS O RS HH O E LO RH O I NR ER EH O E LH OH O RS R ES L I NE LR EE L IH I NN E

L A K EL A KL AA KL K EL A K EA KF O R E S TO R E SSS TF O E SE S TR E SF O RF O SS TS T

P A R KR KP A RA RA RP A KR KRA RRP AP AP A KA

ing County Countountountntyuntuntyntyuntng C untSnohomish Countyounmishsh C tytyntyuntynohSnoSnSS mis Couish Snnohohomish Cou CouoununtySnohomish CountySnSnohnohomhomomishish sh Co Couountynty

000000000 111

NE NORTHNENE RTH NOORTNE ORT

0TH STTH S0TH ST0TH ST

VELT WAY NAY N

LT WAT WAWAY N

LT WAAY N

LT WAT WAYAY NY N

ELT WA

MER

IDIA

N ER

IDM

EM

RID

RID

5TH

AVE

NE

H A

VEVE N

E A

VE5T5T5T

HE

VEEN

AVE

NVE

N A

VAVE

AVE

N N N

H STH STH ST5TH SH S5TH SH SH SH S NENE

56TH

AVE

W6T

H6T

HTH A

V6T

H W W

SW

W

ilesililesileilesilesililesileile

NNNN

30TH

MER

IDIA

N ER

ME

MR

IDN

AVE

NVE

AV

EAV

E N

EVELTVELT

05TH05TH

T SW SW SW SW SW

SW SW

5TH

AVE

NH

A5T

VE

RTHGTHTHGTH

56TH

A6T

HTH

55556TH

5

NE 2NE 2

E W

E W SWT SW SW

N A

N A

N A

N A

198TH ST SW

212TH ST SW

220TH ST SW

232ND ST SW

NE 190TH ST

NE 1 8TH ST

NE 152ND ST

NE 133RD ST

NE 115TH ST

Vie s ed 9

Vie s ed 8

Vie s ed

Vie s ed 6

Vie s ed 5

Vie s ed 4

Vie s ed 3

Vie s ed 2

Vie s ed 1

Vie s ed 10

SSSSSeeeeeeggg ennnntt BBBBSegggggggg eeeennttttt CCCCCCC

SSSSeeeeeeggg eeeeennnnntttttttt AAAAASSSSeeegg eeeeennnntttttt BBBBBB

5

5

5

1 2

34

5

6

8

9

1011

12

1516

1

181920

1413

21

22232425

26

2

28

2930

3132

33

3435

363

4345

4241

39 404438

Legendiewshed inesiewpoints

VIEWSHEDSThe viewsheds represent distinct landscape units that provide views of the alternatives. They encompass the travel lanes of I-5 for most of the route, and they also include areas on either side of the project corridor where people could see the project alternatives.

7.13

VISUALIZATION OF ALTERNATIVES