project proposal - escamp.lk · project proposal development of nature based tourisum in knuckles...
TRANSCRIPT
PROJECT PROPOSAL
DEVELOPMENT OF NATURE BASED TOURISUM IN KNUCKLES CONSERVATION FOREST – MATALE RANGE
MAY 1, 2017
ECOSYSTEM CONSERVATION AND MANAGEMENT PROJECT, DIVISIONAL FOREST OFFICE , MATALE
FOREST DEPARTMENT
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 1 of 32
Project Title: Development of Nature Based Tourism in Knuckles
Conservation Forest – Matale Range
Name of the Department Forest Department
Mailing Address: B.O.Box 82, Rajamalwatta Road, Battaramulla
Physical Address: P.O.Box 82, Rajamalwatte Road, Battaramulla
Telephone: 0094112866632/31
Fax: 0094112866633
Email: [email protected]
Project Contact: H.M.A.B. Herath
Divisional Forest Officer
M.C. Road, Matale
Telephone: 0094662222138
Fax: 0094662222138
Email: [email protected]
Responsible staff in the field: Palitha Bandara
Range Forest Officer
Knuckles, Ellukkumbura
Telephone: 0094663682454
Email: [email protected]
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 2 of 32
Table of Content
I . Project proposal cover sheet 1
II. Table of content 2
II. Project Description 3
1. Project Background 3
2. Project Objectives and results 6
3. Description of Project Activities 8
4. Partnerships 10
5. Sustainability of the project 10
6. Risks to successful Implementation 10
7. Implementation Plan and Time Frame 12
8. Monitoring and Evaluation plan 17
III. Project Budget 18
1. Project Funding Summery 18
2. Project expenditures 18
IV. Procurement plan 20
V. Environmental & Social Assessment 29
VI. Annexes
1. Map of the Knuckles Conservation Forest/ Matale District 30
2. Map of the project sites (Related to activities) 31
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 3 of 32
Project Description 1. Background Knuckles area is rich in many scenic, environmental, sociological and cultural resources which are capable of attracting many local and foreign nature loving tourists. This area represents many climatic zones of the island. Presence of many vegetation types within 160 square kilometers enables visitors to get different kinds of vast experiences in a relatively short period of time. One can see montane forests, sub-montane forests, semi evergreen forests, montane grasslands and pigmy forests within two hours drive. Different species of woody plants, shrubs, ferns, vines, epiphytes as well as adaptations of these plants for different climatic conditions can be closely observed in 3 to 4 hours walk through the forest. Frequent change of climate within a very short period of time is also a very interesting experience one can entertain in this area. The Knuckles is an area which is rich in many species of animals. Chances to see various kinds of birds are very high throughout the area. In addition, chances to see giant squirrel, sandbur, mouse deer, barking deer, and wild boar are also high. However, opportunity to observe large mammals such as leopard and bear is remote although they have been recorded in the area. Pugmarks, wallowing signs, fecal matter and caves of such animals can be observed in the forest. Owing the resources mentioned above, complemented by a relatively safer area to travel in the island has made Knuckles into a popular destination for many local and foreign nature based tourists. Table 1.1 provides information on the number of visitors recorded by the Forest Department entering Knuckles Conservation Area through Ellukkumbura and Pitawala Pathana entry points during the period from 2014 – 2016 Table 1.1 - Recorded number of visitors to Knuckles Conservation Area (2013 – 2016)
Year Type of Visitors
Local Foreign
2013 20365 275
2014 25156 300
2015 28579 323
2016 52868 518
The present accommodation facilities available in and around the Knuckles Conservation Area are not sufficient to cater the provisional carrying capacity of local and foreign tourists. At the same time, the type and nature of the accommodation varies with the interests of different visitor types. There are three types of accommodation need to be considered in ecotourism development. There is only one dormitory available in Ellukumbura area which can accommodate about 30 visitors. There are two eco-lodges in Elukkumbura and Rambukoluwa each can accommodate
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 4 of 32
8 visitors. There is a camping sites maintained by the Forest Department at Rambukoluwa. This site is the one which is well known and most used by the campers. In addition to the Forest Department buildings, few lodges run by some private sector individuals and local entrepreneurs are also present in the peripheral areas. They attract both local as well as foreign tourists mainly through the Internet. There are 09 Nature Trails available in the Knuckles Conservation Area managed by the Forest Department at present. Details of those trails are given in the table 6.2. All trails are looped and developed to reasonably good standards. Table 1.2 - Nature Trails in the Knuckles Conservation Area
Trail Name Distance Type
Matale Division
1. Pitawalapatan – Mini Worlds’ End 0.75km Easy
2. Ellukkumbura – Kosgaswela 03km Easy
3. Kahagala – Pottatawela – Sera Ella 04km Easy
4. Ellukkumbura – Rambukoluwa 05km Moderately difficult
5. Ellukkumbura - Manigala – Etanwala 05km Moderately difficult
6. Rambukoluwa – Korahanagala 07km Moderately difficult
7. Narangamuwa – Lakegala 08km Moderately difficult
8. Rambukoluwa – Doowili Ella 08km Difficult
9. Etanwala – Walpolamulla – Doowili Ella 10km Difficult
Development and improvement of access roads is an essential and important activity in developing ecotourism in remote areas in order to attract more visitors to the area. The main access roads to the Knuckles Conservation Area are being managed by the Road Development Authority and the Central Provincial Council. The conditions of those are relatively satisfactory and can be traversed by any ordinary type vehicle. However, some interior roads leading to certain ecotourism destinations are in poor condition and should be upgraded. Access points Development of important access points with suitable infrastructure facilities and necessary information boards would be required to provide a better service to the visitors. Certain improvements are needed in the form of information material, resting places, and other necessary facilities in a number of access points of the Conservation Area for the benefit of the tourists. At present there is one information center available at the Ellukkumbura. Brochures and Leaflets available with the Forest Department are not adequate to provide sufficient information to the visitors. Well trained guides are essential to accompany visitors especially while trekking in the nature trails as well as camping inside the conservation area. At the same time, their service is also
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 5 of 32
very important for preventing any harmful activities to the environment by the tourists. Although Forest Department has taken some initiatives to train few guides selected from the Buffer Zone villages, at the moment there are no adequately trained guides serving in the area. Involvement of local communities and thereby improving their livelihoods is an essential element of ecotourism industry. The Ecotourism Development Plan prepared by the Forest Department in year 2001, recognized the importance in involving local communities in ecotourism industry. It has proposed several ways and means of involving them in various kinds of activities.
Problems Identified The present accommodation facilities available in and around Knuckles conservation
forest are not sufficient to cater the need of foreign and local visitors.
Lack of accommodation facilities at the places where there is a high demand from local
and foreign tourists.
The present number of trails operating are not in good condition and lack of trails at
high demanding places
The present information Centre has no adequate recourses and materials
An income generation opportunity for local people with regard to ecotourism is not
adequately addressed.
Lack of understanding on ecotourism approaches among villages
2. Project objectives and results Management objectives of Knuckles forest must be in line with the objectives of National
Forest Policy and legislations under which it has declared. In addition, it is an IUCN protected
area and also a proposed Mixed Cultural and Natural World Heritage site. Based on that,
management goal, purpose and objectives for Knuckles forest were formulated through
logical framework approach
Goal
To reduce the poverty of the villagers, who live in an around of knuckles conservation forest
and thereby increase the national income and of the country by improving recreational
capacity of knuckles conservation forest.
Purpose
The income of the peripheral community is enhanced for reducing their dependency on the
forest.
Objectives
The income of the peripheral community of knuckle conservation forest is enhanced
by 50% within 5-year period.
The income of the Knuckles Forest Range is increased by 50% within 5-year period
through ecotourism activities.
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 6 of 32
Results /Outcome
Table: 1.3 indicates the Expected results and the outcomes of the project.
Activity Expected result and Outcome
Nature based Tourism in PAs
Develop a comprehensive ecotourism plan Developed Eco tourism
Construction of Eco Lodges Supported for Accommodation facilities
Furniture and Equipment for ecologies Supported for Accommodation facilities
Construct Dormitory at Ellukkumbura (for 40 persons)
Supported for Accommodation facilities
Furniture and Equipment for Dormitory Supported for Accommodation facilities
Construction of new camping sites Attracted more tourist
Supporting equipment for camping Infrastructure facilitation
Encourage and educated villagers On Home stay Increase income of the villages & developed linkages with tourist
Improvements of Eco Lodges Facilitate accommodation and increase tourist
Furniture and kitchen equipment Supported for Accommodation facilities
Improve camping sites Attracted more tourist & facilitation of recreation
Furniture and kitchen equipment Supported for Accommodation facilities
Improvements to Nature Trails Attracted more tourist & facilitation of recreation
Development of Nature trails Attracted more tourist & facilitation of recreation
Access road improvements Infrastructure facilitation increased
Establish Sign Boards Aware the tourist
Parking place development Infrastructure facilitation
Improve Access Roads to access points Infrastructure facilitation & attract more tourists
Improve resting Place & toilets
Infrastructure & sanitary needs facilitation
Construct a main ticket counter & Check Point Control illegal entrance to forest and increased government income
Develop a viewing deck Increased recreational facilities
Improve appearance of entry point Attract more tourist
Conduct awareness programmes (Travel agencies, Hotel owners, Tour operators)
Increased Awareness and attracted more tourist
Disseminate Information Increased awareness about the Knuckles forest
Develop a Tour package Increase nature based tourism
Construction of Information Centre Provide information and increased awareness
Furniture for information centre Infrastructure Facilitation
Supply audio visual equipment Increased facilities & provide teaching tools to the visitors
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 7 of 32
Develop trail guides in different languages Increased awareness and provided information to tourists indifferent languages
Develop a video movies and audio visuals to visitors prior to the visit
Increased knowledge about Knuckles forest of the tourist
Documentary programme for mass media Information provided to local & international Communities
Requirement of guides Increased guiding facilities & income
Provide trainings for guides Increased capacities
Encourage community members for various services
Increased income of the villages
Waste Management Minimized environmental effect
Purchase a tipper Collected & Managed waste properly
Renovation of existing Range office at Ellukkumbura
Developed working environment
Construction of Manager quarters Facilitated accommodation to manager
Construction of BFO Quarters Facilitated accommodation to BFO
Improvement of existing BFO quarters at Ellukkumbura
Facilitated accommodation to BFo
Improve Drinking water facilities(Ellukumbura) Increased drinking Water facilities Note*: Construction of Manager quarters, Construction of BFO quarters, improvement of existing BFOs quarters at Ellukkumbura, please include under the 3a. Please note that all activities indicated in Red, which are new activities to be established for tourism, should be wetted against the Nature Based Tourism Plan (NBTP), i.e. verified via the plan, and appraised once the Plans are approved by the Bank. Therefore, they should be moved to later years aligned with plan completion and resubmitted as a new proposal. All rehabilitation work and improvements to existing facilities, parking facilities, access roads and minor support infrastructure such as waste disposal systems, water supply systems, waste water management systems, store rooms etc. can be financed prior to the NBTP. Disseminate Information, develop a Tour package, Construction of Information Centre, planning on tourism based marketing, communication etc. and it is advisable to hold some of these tasks till the planning is completed to ensure that things are done in a thematic manner, activities such as development of tour packages, trail guides, website etc. Actions identified in the plans such as development of marketing plans, engagements with the tourism sector etc. can commence simultaneously and be merged in to the plan. Furniture for information Centre, Audio visual equipment, other equipment, vehicles please include under the component 3c.
3 Descriptions of Project Activities Activity plan for the Knuckles Conservation Forest is shown below
No Activity 2017 Matale Total
Financ.Total
2017 2018 2019 2020 2021 Responsibility
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 8 of 32
3b Nature-based tourism in PAs
1 Develop a comprehensive ecotourism plan
1 1 350 √
DFO
2 Construction of Eco Lodges
1 1 8000 √ √ DFO
3 Furniture and Equipment for ecologies
1 500 √ DFO,RFO
4 Construct Dormitory at Ellukkumbura (for 40 persons)
1(dis)
1 20000 √
√
CF(PM)
5 Furniture and Equipment for Dormitory
1 3000 √
DFO,RFO
6 Construction Of new camping sites
9(dis)
9 9000 √ √ √ DFO,RFO
7 Supporting equipment for camping
9 4500 √ √
DFO,RFO
8 Encourage and educated villagers On Home stay
3 15 7500 √ √ √ √ FEO
9 Improvements Of Eco Lodges
3(dis)
3 3000 √ √ √ RFO
10 Furniture and kitchen equipment
2 1000 √
√
DFO,RFO
11 Improve camping sites 1(dis)
1 1000 √ √ RFO
12 Furniture and kitchen equipment
1 500 √
13 Improvements to Nature Trails
10 50 25000 √ √ √ RFO
14 Development of Nature trails
36 37500 √ √ √ √ DFO,RFO
15 Access road improvements
10 10000 √ √ √ RFO
16 Establish Sign Boards 10 500 √
√
RFO
17 Parking place development
3 3000 √ √ √
FEO
18 Improve Access Roads to access points
2 800 √
√
19 Improve resting Place & toilets
1 4 6000 √ √ √ √ RFO
20 Construct a main ticket counter & Check Point
5(dis)
5 5500 √
√
√
DFO/RFO
21 Develop a viewing deck
1 100 √
RFO
22 Improve appearance of entry point
1 2000 √
RFO
23 Conduct awareness programmes (Travel agencies, Hotel
2 200 √ √ CF (EM)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 9 of 32
owners, Tour operators)
24 Disseminate Information
150 √ √ √
CF (EM)
25 Develop a Tour package
300 √ √ CF (EM)
26 Construction of Information Centers
1 5000 √ CF (EM)
27 Furniture for information center
1 3500 √
DFO,RFO
28 Supply audio visual equipment
1000 √
CF(SF&E)
29 Develop trail guides in differentlanguages
15 3750 √ √ CF(SF&E)
30 Develop a video movies and audio visuals to visitors prior to the visit
750 √ CF (SF&E)
31 Documentary programme for mass media
1 1000 √ CF (SF&E)
32 Requirement of guides 10 4800 √ √ √ √ DFO
33 Provide trainings for guides
4 800 √ √ √ √ DFO
34 Encourage community members for various services
1 25 √ FEO
35 Waste Management 1 1 5000 √ √ √ √ RFO
36 Purchase a tipper 1 1 5000 √
CF (SF&E)
37 Renovation of existing Range office at Ellukkumbura
1 4000 √
38 Construction of Manager quarters
1 7500 √
CF (EM)
39 Construction of BFO Quarters
3 15000 √ √ √
CF (EM)
40 Improvement of existing bfo quarters at Ellukkumbura
1 1000 √ DFo,
41 Improve Drinking water facilities(Ellukumbura)
1 1500 √ DFO,RFO
Sub Total 208125
4. Partnership The primary implantation agency of this project is Forest Department. Wildlife Department,
Survey Department, Central Environmental Authority, Community Based
Organizations(CBOs) and Universities
5. Sustainability
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 10 of 32
• The officers of Forest Department will be trained in all aspects of conservation and
management and they will continue the same and innovative activities and after the
project period
• CBOs and community adjoining to the forest will be empowered in conservation and
management aspects and they also will continue the same after the project period
• Develop strong partnership with the community to maintain the demarcated
boundary, live fence and forest fire control.
• Discuss with the government, non-government organization and private sector (CSR
programmes) to ensure the financial recourses for the continue activities done the
after the project period
• Continuous data collection from established permanent sample plots to monitor the
improvement of biodiversity after the project period
6. Risk to successful implementation
Extreme weather conditions can be affected to the project activities particularly to
Construct, develop and improve buildings and sites in forest.
In the Remote are like Knuckles forest, Supply of construction materials, Electricity &
labor will be affected to the project activities. It will be change the project time frame
work.
Political and social pressure will affect the project implementation. Political issues
can be reduced by making awareness in district development committee. Villages
will make aware about the program and take them in planning process to solve this
issue.
Insufficient Contractors and Skill labors in the project area will be affected to the
project activities and also it will change the projected tome frame work.
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 11 of 32
7. Implementation plan
Implementation plan for the Knuckles Conservation Forest is shown below
No Activity 2
01
7
Tota
l
fin
anci
al T
ota
l
2017 2018 2019 2020 2021 Responsibility
1st
qu
arte
r
2n
d Q
uar
ter
3rd
Qu
arte
r
4th
Qu
arte
r
1st
qu
arte
r
2n
d Q
uar
3rd
Qu
arte
r
4th
Qu
arte
r
1st
qu
arte
r
2n
d Q
uar
3rd
Qu
arte
r
4th
Qu
arte
r
1st
qu
arte
r
2n
d Q
uar
ter
3rd
Qu
arte
r
4th
Qu
arte
r
1st
qu
arte
r
2n
d Q
uar
ter
3rd
Qu
arte
r
4th
Qu
arte
r
3b Nature-based tourism in PAs
1 Develop a comprehensive ecotourism plan
1 1 350 DFO
2 Construction of Eco Lodges
1 1 8000
DFO
3 Furniture and Equipment for ecologies
1 500 DFO,RFO
4 Construct Dormitory at Ellukkumbura (for 40 persons)
1(dis) 1 20000 CF(PM)
5 Furniture and Equipment for Dormitory
1 3000 DFO,RFO
6 Construction Of new camping sites
9 (dis)
9 9000 DFO,RFO
7 Supporting equipment for camping
9 4500 DFO,RFO
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 12 of 32
8 Encourage and educated villagers On Home stay
3 15 7500 FEO
9 Improvements Of Eco Lodges
3(dis) 3 3000 RFO
10 Furniture and kitchen equipment
2 1000 DFO,RFO
11 Improve camping sites
1(dis) 1 1000 RFO,BFO
12 Furniture and kitchen equipment
1 500
RFO
13 Improvements to Nature Trails
10 50 25000 RFO
14 Development of Nature trails
36 37500 DFO,RFO
15 Access road improvements
10 10000
RFO
16 Establish Sign Boards 10 500 RFO
17 Parking place development
3 3000 FEO
18 Improve Access Roads to access points
2 800
RFO, BFO
19 Improve resting Place & toilets
1 4 6000 RFO
20 Construct a main ticket counter & Check Point
5(dis) 5 5500 DFO/RFO
21 Develop a viewing deck
1 100 RFO
22 Improve appearance of entry point
1 2000 RFO
23
Conduct awareness programmes (Travel agencies, Hotel owners, Tour operators)
2 200 CF (EM)
24 Disseminate Information
150 CF (EM)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 13 of 32
25 Develop a Tour package
300 CF (EM)
26 Construction of Information Centers
1 5000 CF (EM)
27 Furniture for information center
1 3500 DFO,RFO
28 Supply audio visual equipment
1000 CF(SF&E)
29 Develop trail guides in differentlanguages
15 3750 CF(SF&E)
30
Develop a video movies and audio visuals to visitors prior to the visit
750 CF (SF&E)
31 Documentary programme for mass media
1 1000
CF (SF&E)
32 Requirement of guides
10 4800
DFO
33 Provide trainings for guides
4 800
DFO
34 Encourage community members for various services
1 25 FEO
35 Waste Management 1 1 5000 RFO
36 Purchase a tipper 1 1 5000 CF (SF&E)
37 Renovation of existing Range office at Ellukkumbura
1 4000
DFO,RFO
38 Construction of Manager quarters
1 7500
DFO,RFO
39 Construction of BFO Quarters
3 15000 CF (EM)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 14 of 32
40 Improvement of of existing bfo quarters at Ellukkumbura
1 1000
DFO,RFO
41 Improve Drinking water facilities(Ellukumbura)
1 1500 DFO,RFO
Sub Total 209025
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 15 of 32
8. Monitoring and evaluation plan
Following actions are proposed to develop an effective monitoring and evaluation system as well as to ensure adaptive management.
Prepare a monitoring plan consisting of the persons responsible for monitoring, target
dates for achievement of the results, monitoring intervals and a budget
Conduct Interim Evaluation after three years of implementation of the plan
Change management strategies based on the research findings, feedback of monitoring data and ongoing evaluation
Monthly progress will be reported to the regional Forest office by the DFO and the progress will be compiled by RDCF. The compiled progress report will be monitored by the CF (P&M) every month.
Following Activities to be monitored
Activity. Activity Date of completion
Output
3b Nature-based tourism in PAs
1 Develop a comprehensive ecotourism plan
30.12.2017 1 Eco tourism plan developed
2 Construction of Eco Lodges 30.12.2018 1 Eco- lodge constructed
3 Furniture and Equipment for ecologies 30.12.2018 Furnished the Eco lodge
4 Construct Dormitory at Ellukkumbura (for 40 persons)
30.12.2018 A dormitory constructed
5 Furniture and Equipment for Dormitory
30.12.2019 Furnished the dormitory
6 Construction Of new camping sites 30.12.2019 9 camping sites constructed
7 Supporting equipment for camping 30.12.2019 Equipment supplied
8 Encourage and educated villagers On Home stay
30.12.2020 15 programme conducted
9 Improvements Of Eco Lodges 30.12.2019 3 eco- lodges Improved
10 Furniture and kitchen equipment 30.12.2019 Furniture and kitchen equipment provided for Eco lodgers
11 Improve camping sites 30.12.2018 A camping site improved
12 Furniture and kitchen equipment 30.12.2018 Furniture and kitchen equipment provided for camping site
13 Improvements to Nature Trails 30.12.2019 50 nature trails improved
14 Development of Nature trails 30.12.2021 36 nature trails developed
15 Access road improvements 30.12.2020 10 access roads improved
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 16 of 32
16 Establish Sign Boards 30.12.2019 10 sign boards established
17 Parking place development 30.12.2020 3 parking places developed
18 Improve Access Roads to access points 30.12.2019 2 access points improved
19 Improve resting Place & toilets
30.12.2020 4 resting place & toilets improved
20 Construct a main ticket counter & Check Point
30.12.2019 A Main ticket counter & 4 check points constructed
21 Develop a viewing deck 30.12.2021 A viewing deck developed
22 Improve appearance of entry point 30.12.2019 Appearances of the entry points improved
23 Conduct awareness programmes (Travel agencies, Hotel owners, Tour operators)
30.12.2019 3 awareness programme conducted
24 Disseminate Information 30.12.2020
25 Develop a Tour package 30.12.2018 A tour package developed
26 Construction of Information Centre 30.12.2018 A n information Centre constructed
27 Furniture for information centre 30.12.2019 Furnished the information centre
28 Supply audio visual equipment 30.12.2018 Audio visual equipment provided
29 Develop trail guides in different languages
30.12.2019 15 trail guides developed
30 Develop a video movies and audio visuals to visitors prior to the visit
30.12.2018 A video movies and audio visuals developed
31 Documentary programme for mass media
30.12.2020 A documentary programme created
32 Requirement of guides 30.21.2021 10 guided required
33 Provide trainings for guides 30.12.2021 4 programme conducted
34 Encourage community members for various services
30.12.2018 1 programme conducted
35 Waste Management 30.12.2020 A Waste management programme developed
36 Purchase a tipper 30.12.2017 A tipper purchased
37 Renovation of existing Range office at Ellukkumbura
30.12.2019 Range office renovated
38 Construction of Manager quarters 30.12.2018 A manager Quarts constructed
39 Construction of BFO Quarters 30.12.2020 3 BFO Quarters constructed
40 Improvement of existing bfo quarters at Ellukkumbura
30.21.2018 A BFO Quarters improved
41 Improve Drinking water facilities(Ellukumbura)
30.12.2018 Drinking water facilities improved
III Project Budget
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 17 of 32
1. Project Funding Summery - total (in Rupees ‘000)
Component Total
financial(Rs.)
2017 2018 2019 2020 2021
Nature- based Tourism in PAs
204375 17090 96325 60420 19070 11470
Operation and maintenance cost (5%)
30656.25 2563.5 14448.8 9063 2860.5 1720.5
Total 235031.25 19653.5 110774 69483 21930.5 13190.5
Amount Requested from ESCAMP
219476 17944.5 104084 64753.5 20338.5 12355.4
Department Budget 0 0 0 0 0 0
Other contribution 0 0 0 0 0 0
Total 219476 17944.5 104084 64753.5 20338.5 12355.4
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 18 of 32
IV. Procurement Plan
Procurement Plan for - 2017
Expenditure Category Location Target Number Unit Cost Total Cost(000")
Responsible Officer
Goods Encourage and educated villagers On Home stay
Peripheral villages in the knuckles buffer Zone
3 prg. 900 FEO
Improvements to Nature Trails Knuckles Forest 10 2000 RFO Waste Management Knuckles forest sum 50 RFO Sub Total 2950 Labor Encourage and educated villagers On Home stay
Knuckles Buffer Zone 3 ptg. 300 FEO
Improvements to Nature Trails Knuckles Forest 10 3000 RFO Improve resting Place & toilets Knuckles Forest 1 60 RFO Construct a main ticket counter & Check Point
Riverstern, Atanwala, Seraella, Rambukoluwa and Pitawala patina
5 30 DFO/RFO
Waste Management Knuckles forest sum 1950 RFO Sub Total 5340 Training Encourage and educated villagers On Home stay
Peripheral villages in the knuckles buffer Zone
3 prg. 300 FEO
Improvements Of Eco Lodges Illukubhura 1 120 RFO Sub Total 420 Consultancy Develop a comprehensive ecotourism plan Knuckles forest 1 350 DFO Construction of Eco Lodges at Kolongasmulla desin. 480 DFO Construct Dormitory at Ellukkumbura (for 40 persons) Ellukkumbura
desin. 800 CF(PM)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 19 of 32
Construction Of new camping sites
Walpolamulla ,Watawala, Kalupahana, Redbana, Manigala, Atanwala , Kudadooviliella, Uyangamuwa and Kaluwalla Ella)
9 desin.
400
DFO,RFO Improvements Of Eco Lodges Illukubhura 1 150 RFO
Improve camping sites Knuckles forest 1 desin.
60
Improve resting Place & toilets Knuckles forest 1 300 RFO Construct a main ticket counter & Check Point
Riverstern, Atanwala, Seraella, Rambukoluwa and Pitawala patina
5 300 DFO/RFO
Sub Total 2840 Other Construct Dormitory at Ellukkumbura (for 40 persons) Ellukkumbura
desin. 400 CF(PM)
Construction Of new camping sites
Walpolamulla ,Watawala, Kalupahana, Redbana, Manigala, Atanwala , Kudadooviliella, Uyangamuwa and Kaluwalla Ella)
9 desin.
140
DFO,RFO Purchase a tipper Knuckles conservation Centre 1 5000 CF (SF&E) Sub Total 5540 Grand Total 17090
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 20 of 32
Procurement plan for - 2018
Expenditure Category Location Target Number Unit Cost
Total Cost(000") Responsible
Officer Goods Construction of Eco Lodges Kolongasmulla 1 3520 DFO/RFO
Furniture and Equipment for ecologies
Kolongasmulla 1 500 DFO,RFO
Encourage and educated villagers on home stay
Peripheral villages in the knuckles buffer Zone
5 1500 FEO
Improvements to Nature Trails Knuckles forest 25 1000 RFO
Waste Management Knuckles forest sum 50 RFO
Construct Dormitory at Ellukkumbura (for 40 persons)
Ellukkumbura 1 8800 CF(PM)
Supporting equipment for camping Walpolamulla ,Watawala, Kalupahana, Redbana, Manigala, Atanwala , Kudadooviliella, Uyangamuwa and Kaluwalla Ella)
sum 2500 DFO,RFO
Construction Of new camping sites
Walpolamulla ,Watawala, Kalupahana, Redbana, Manigala, Atanwala , Kudadooviliella, Uyangamuwa and Kaluwalla Ella)
4 2000 DFO,RFO
Improvements Of Eco Lodges Illukkbhura 1 600 RFO
Furniture and kitchen equipment Illukkbhura 1 500 DFO,RFO
Improve camping sites Knuckles forest 1 440 DFO, RFO
Furniture and kitchen equipment Knuckles forest 1 500 DFO,RFO
Development of Nature trails Knuckles forest 7 1200 RFO,DFO
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 21 of 32
Access road improvements Knuckles forest 3 1000 RFO
Parking place development Pitawala Patana 1 400 Improve Access Roads to access points
Knuckles forest 1 150 RFO
Improve resting Place & toilets knuckles forest 1 700 RFO
Construct a main ticket counter & Check Point
Riverstern, Atanwala, Seraella, Rambukoluwa and Pitawala patina
5 1400 DFO/RFO
Construction of Information Centers Pitawala patana 1 3000 CF (EM)
Furniture for information center Pitawala patana 1 3500 DFO/RFO
Supply audio visual equipment Knuckles Conservation center
sum 900 DFO/RFO
Construction of Manager quarters
Illukkubhura Conservation center
1 4000 CF (EM)
Construction of BFO Quarters Puwakpitiya, Alkaduwa and Hettipola
1 3000 CF (EM)
Improvement of of existing bfo quarters at Ellukkumbura
Illukkubhura 1 880 DFO,RFO
Sub Total 42040 Labor Encourage and educated villagers On Home stay
Peripheral villages in the knuckles buffer Zone
5 500 FEO
Improvements to Nature Trails Knuckles forest 25 11500 RFO
Construct a main ticket counter & Check Point
Riverstern, Atanwala, Seraella, Rambukoluwa and Pitawala patina
5 1600 DFO/RFO
Waste Management knuckles forest sum 900 RFO
Construction of Eco Lodges at Kolongasmulla 1 4000 DFOI
Construct Dormitory at Ellukkumbura (for 40 persons)
Ellukkumbura 1 10000 CF(PM)
Construction Of new camping sites Walpolamulla ,Watawala, Kalupahana, Redbana,
4 3460 DFO,RFO
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 22 of 32
Manigala, Atanwala , Kudadooviliella, Uyangamuwa and Kaluwalla Ella)
Improvements Of Eco Lodges Illukkubhura 1 900 RFO
Improve camping sites Knuckles forest 1 500 RFO
Development of Nature trails Knuckles forest 7 6080 RFO
Access road improvements Knuckles forest 3 1500 ,DFORFO,
Parking place development Pitawala Patana 1 600 RFO
Improve Access Roads to access points
Knuckles forest 1 250 RFO
Improve resting Place & toilets Knuckles forest 1 800 RFO
Construction of Information Centers Pitawala patana 1 1500 CF (EM)
Supply audio visual equipment Knuckles Conservation center
sum 50 CF (SF&E)
Construction of Manager quarters
at Illukkubhura Conservation center
1 3400 CF (EM)
Construction of BFO Quarters Puwakpitiya, Alkaduwa and Hettipola
1 1900 CF (EM)
Improvement of of existing bfo quarters at Ellukkumbura
Illukkubhura 1 600 DFO
Sub Total 50040 Training Encourage and educated villagers On Home stay
Peripheral villages in the knuckles buffer Zone
5 500 FEO
Conduct awareness programmes (Travel agencies, Hotel owners, Tour operators)
Knuckles Conservation center
1 100 CF (SF&E)
Supply audio visual equipment Knuckles Conservation center
sum 50 CF (SF&E)
Develop a video movies and audio visuals to visitors prior to the visit
Knuckles Conservation center
1 200 CF (SF&E)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 23 of 32
Encourage community members for various services
Peripheral villages in the knuckles buffer Zone
1 25 FEO
Sub Total 875 Consultancy Develop a Tour package Knuckles forest 150 CF (EM)
Construction of Information Centers Pitawala Patana 500 CF (EM)
Develop trail guides in different languages
Knuckles forest 2500 CF(SF&E)
Construction of Manager quarters
at Illukkubhura Conservation center
100 CF (EM)
Construction of BFO Quarters Puwakpitiya, Alkaduwa and Hettipola
100 CF (EM)
Improvement of of existing bfo quarters at Ellukkumbura
Illukkubhura 20 DFO,RFO
Sub Total 3370 Grand total 96,325
Construction & development activities which are proposed by this project proposal are planned to design in 2017 & 2018. Thus, detailed and final procurement plan will be submitted once such designing and BOQs are prepared.
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 24 of 32
Procurement Plan for the Entire Project Period
Expenditure Category
2017 2018 2019 2020 2021 TOTAL
Goods
Construction of Eco Lodges 0 3520 0 0 0 3520
Furniture and Equipment for ecologies 0 500 0 0 0 500
Furniture and Equipment for Dormitory 0 3000 0 0 3000
Encourage and educated villagers On Home stay 900 1500 2000 750 0 5150
Improvements to Nature Trails 2000 1000 500 0 0 3500
Waste Management 50 50 50 50 0 200
Construct Dormitory at Ellukkumbura (for 40 persons) 0 8800 0 0 0 8800
Renovation of existing Range office at Ellukkumbura 0 2000 0 0 2000
Supporting equipment for camping 0 2500 2000 0 0 4500
Construction Of new camping sites 0 2000 1000 0 0 3000
Improvements Of Eco Lodges 0 600 530 0 0 1130
Furniture and kitchen equipment 0 500 500 0 0 1000
Improve camping sites 0 440 0 0 0 440
Furniture and kitchen equipment 0 500 0 0 0 500
Development of Nature trails 0 1200 2270 1800 3830 9100
Access road improvements 0 1000 1000 2000 0 4000
Parking place development 0 400 400 600 0 1400
Improve Access Roads to access points 0 150 150 0 0 300
Improve resting Place & toilets 0 700 700 600 640 2640
Construct a main ticket counter & Check Point 0 1400 1170 0 0 2570
Construction of Information Centers 0 3000 0 0 0 3000
Furniture for information center 0 3500 0 0 0 3500
Supply audio visual equipment 0 900 0 0 0 900
Construction of Manager quarters 0 4000 0 0 0 4000
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 25 of 32
Construction of BFO Quarters 0 3000 3000 3000 0 9000
Improvement of of existing bfo quarters at Ellukkumbura 0 880 0 0 0 880
Improve appearance of entry point 0 0 1100 0 0 1100
Sub Total 2950 42040 21370 8800 4470 79630
Labor
Encourage and educated villagers On Home stay 300 500 500 250 0 1550
Improvements to Nature Trails 3000 11500 7000 0 0 21500
Improve resting Place & toilets 60 0 0 0 0 60
Construct a main ticket counter & Check Point 30 1600 1000 0 0 2630
Waste Management 1950 900 0 950 0 3800
Construction of Eco Lodges 0 4000 0 0 0 4000
Construct Dormitory at Ellukkumbura (for 40 persons) 0 10000 0 0 0 10000
Construction Of new camping sites 0 3460 0 0 0 3460
Improvements Of Eco Lodges 0 900 700 0 0 1600
Improve camping sites 0 500 0 0 0 500
Development of Nature trails 0 6080 16000 1320 5000 28400
Access road improvements 0 1500 1500 1500 0 4500
Parking place development 0 600 600 400 0 1600
Improve Access Roads to access points 0 250 250 0 500
Improve resting Place & toilets 0 800 800 900 500 3000
Construction of Information Centers 0 1500 0 0 0 1500
Supply audio visual equipment 0 50 0 0 50
Construction of Manager quarters 0 3400 0 0 0 3400
Construction of BFO Quarters 0 1900 1900 1900 0 5700
Improvement of of existing bfo quarters at Ellukkumbura
0 600 0 0 0 600
Construction Of new camping sites 0 0 2000 0 0 2000
Improve appearance of entry point 0 0 850 0 0 850
Renovation of existing Range office at Ellukkumbura 0 0 1960 0 100 2060
Develop a viewing deck 0 0 0 0 0 0
Sub Total 5340 50040 35060 7220 5600 103260
Training
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 26 of 32
Encourage and educated villagers On Home stay 300 500 0 0 0 800
Improvements Of Eco Lodges 120 0 0 0 0 120
Conduct awareness programmes (Travel agencies, Hotel owners, Tour operators)
0 100 200 0 0 300
Supply audio visual equipment 0 50 0 0 0 50
Develop a video movies and audio visuals to visitors prior to the visit
0 200 0 0 0 200
Encourage community members for various services 0 25 0 0 0 25
Provide trainings for guides 0 0 0 200 200 400
Sub Total 420 875 200 200 200 1895
Consultancy
Develop a comprehensive ecotourism plan 350 0 0 0 0 350
Construction of Eco Lodges 480 0 0 0 0 480
Construct Dormitory at Ellukkumbura (for 40 persons) 800 0 0 0 0 800
Construction Of new camping sites 400 0 0 0 0 400
Improvements Of Eco Lodges 150 0 0 0 0 150
Improve camping sites 60 0 0 0 0 60
Improve resting Place & toilets 300 0 0 0 0 300
Construct a main ticket counter & Check Point 300 0 0 0 0 300
Develop a Tour package 0 150 150 0 0 300
Construction of Information Centers 0 500 0 0 0 500
Develop trail guides in differentlanguages 0 2500 1250 0 0 3750
Construction of Manager quarters 0 100 0 0 0 100
Construction of BFO Quarters 0 100 100 100 0 300
Improvement of of existing bfo quarters at Ellukkumbura
0 20 0 1000 0 1020
Improve appearance of entry point 0 0 50 0 0 50
provide traininig for guide 0 0 200 0 0 200
Renovation of existing Range office at Ellukkumbura 0 0 40 0 0 40
Documentary programme for mass media 0 0 0 0 0 0
Sub Total 2840 3370 1790 1100 0 9100
*Other
Construct Dormitory at Ellukkumbura (for 40 persons) 400 0 0 0 0 400
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 27 of 32
Construction Of new camping sites 140 0 0 0 0 140
Purchase a tipper 5000 0 0 0 0 5000
Access road improvements 0 0 500 500 0 1000
Establishde sing board 0 0 250 0 250
Disseminate Information 0 0 50 50 0 100
Requirmrnt of guides 0 0 1200 1200 1200 3600
Sub Total 5540 0 2000 1750 1200 10490
Grand total 17090 96325 60420 19070 11470 204375
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 28 of 32
V. Environmental and Social Assessment
Project Activity
Environmental Issues
Mitigation Measures
Location Implementation Responsibility
Monitoring Frequency and Responsibility
Construction of buildings
Soil erosion Selecting suitable site to minimize erosion
Matale DFO 3 months
Based on the proposed project and the Social Management Framework, a Social Assessment may need to be carried out. Annex 02: Maps of the Project sites Construction of Dormitory (near Illukkubhura Conservation Center)
Annex 01: Map of the Knuckles Conservation Forest
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 29 of 32
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 30 of 32
Construction of Eco lodges ( Kolongasmulla - Illukkubhura)
Improvements of parking place
Construction of main ticket counter (Riverstorn) & check points (Rambukoluwa, Seraella, Atanwala and pitawala patina)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 31 of 32
Development of viewing deck (seraella)
Construction of Manager Quarters (Kolongasmulla)
ESCAMP/FD/MATALE/KNUCKLES/3b-07
Page 32 of 32
BFO Quarters – ( Elkaduwa, Puwakpitiya and Wallawala)