www.bbi-uk.com www.pje-uk.com Group PROJECT: Reception Refurbishment Location: Cardiff Value: £70K Timescale: 7 Weeks The client Lambert Smith Hampton is a leading UK commercial and residential real estate consultancy with over 40 offices and 1700 staff across the UK and Irland The brief We were tasked with refurbishing the dated reception area within 6 Park Street in Cardiff and creating a modern show piece, as the main focal point upon entry to the building. Project delivery The dated reception area was dominated with cherry timber cladding. Our design team were given freedom to revolutionise the area with a minimal brief. Using LED lighting integrated within both the new bespoke Corian & oak reception desk and in the oak feature wall behind the reception desk. The area was transformed into a spacious and bright new showstopper, with the help of decorations and new wall graphics. Further work completed by us included the refurbishment of the ground floor toilets. The mixed-use facility required a new cubicle system, new sanitary ware and an overall facelift for the space. This was completed during the same time as the reception. The whole project was undertaken with 6 floors being fully oc- cupied, but with the help of the in-house security and careful planning & segregation, we were able to complete this project within the 7-week time frame with minimal disruption to the current building occupants. “client quotations can go here” Donald Trump, CEO

Upload: others

Post on 26-Mar-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

www.bbi-uk.com www.pje-uk.comGroup

PROJECT: Reception Refurbishment

Location: CardiffValue: £70KTimescale: 7 Weeks

The clientLambert Smith Hampton is a leading UK commercial and residential real estate consultancy with over 40 offices and 1700 staff across the UK and Irland

The briefWe were tasked with refurbishing the dated reception area within 6 Park Street in Cardiff and creating a modern show piece, as the main focal point upon entry to the building.

Project deliveryThe dated reception area was dominated with cherry timber cladding. Our design team were given freedom to revolutionise the area with a minimal brief. Using LED lighting integrated within both the new bespoke Corian & oak reception desk and in the oak feature wall behind the reception desk. The area was transformed into a spacious and bright new showstopper, with the help of decorations and new wall graphics.

Further work completed by us included the refurbishment of the ground floor toilets. The mixed-use facility required a new cubicle system, new sanitary ware and an overall facelift for the space. This was completed during the same time as the reception.

The whole project was undertaken with 6 floors being fully oc-cupied, but with the help of the in-house security and careful planning & segregation, we were able to complete this project within the 7-week time frame with minimal disruption to the current building occupants.

“client quotations can go here”Donald Trump, CEO