2
Project Reference First IEC 61850 substation for Philippines - Amadeo 230/115 kV substation Substation Automation Systems Project Meralco’s long term objectives is to build up a smart grid with digital substations, in order to make their network safer and easier to maintain. The ABB technologies delivered, provide the platform to achieve this goal. To improve their power distribution, Meralco built a new 230/115kV GIS substation in 2008, ABB Power Systems was given responsibility to supply redundant the substation automation systems, based on Reli- on ® 670 bay control and protection IED’s, complying to the international standard IEC 61850. ABB Power Systems has deliverd the first IEC 61850 Substation Automation Systems in Philippines to Meralco. Meralco, Manila Electric Company is the largest electricity distribution utility in the Philippines and serve power to more than 25 million customers. The substation automation system for the Amadeo Substation, is fully compliant with the internaltional standard IEC 61850 and involves third- party IEDs.

Upload: doankhuong

Post on 03-Jan-2017

328 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: Project Reference First IEC 61850 substation for Philippines

Project ReferenceFirst IEC 61850 substation for Philippines - Amadeo 230/115 kV substation

Substation Automation Systems

ProjectMeralco’s long term objectives is to build up a smart grid with digital substations, in order to make their network safer and easier to maintain. The ABB technologies delivered, provide the platform to achieve this goal. To improve their power distribution, Meralco built a new 230/115kV GIS substation in 2008, ABB Power Systems was given responsibility to supply redundant the substation automation systems, based on Reli-on® 670 bay control and protection IED’s, complying to the international standard IEC 61850.

ABB Power Systems has deliverd the first IEC 61850 Substation Automation Systems in Philippines to Meralco.Meralco, Manila Electric Company is the largest electricity distribution utility in the Philippines and serve power to more than 25 million customers. The substation automation system for the Amadeo Substation, is fully compliant with the internaltional standard IEC 61850 and involves third-party IEDs.

Page 2: Project Reference First IEC 61850 substation for Philippines

1KH

A -

001

511

- R

EN

-

July

201

5

©

Cop

yrig

ht 2

015

AB

B.

All

right

s re

serv

ed.

ABB SolutionIn cooperation with the local ABB unit in Philippines, ABB Power Systems was responsible for the overall technical concept and the desgin of the SA level, the configuration and parameterization of the protection and control IED’s, as well as for the Factory Acceptance Test and the customer training in Baden, Switzerland. ABB Philippines was responsible for manufacturing the protection and control panels and for the installation, the commissioning and the Site Aceptance Test of the complete system.

Scope of delivery − Fully compliant solution to IEC 61850 standard − Redundant substation automation system SAS 650 − Relion® 670 bay control & protection IED − Main 2 protection IED’s from third-party − Supply and cominissioning of the control and protection

panels.

Customer Benefits − ABB solution fully meet the technical requirement of Meralco − Well-trained and experienced local ABB engineers for

technical and after sales support − Modern state-of-the-art technology − Reduced operational and maintenance costs − Optimal life cycle management through future proof tech-

nology − Provided platfrom for their long term objective to build a

Smart Grid with digital substation

For more information, please contact: ABB Switzerland Ltd Power SystemsBruggerstrasse 72CH-5400 Baden, Switzerland Phone: +41 58 585 77 44 Fax: +41 58 585 55 77 E-mail: [email protected] www.abb.com/substationautomation

System overview for Amadeo substation

AFS675

AFS675

SYS600C

REC670REC670

Station Computer 2CCU-OMI-SDB(Stand-by)

Station Computer 1CCU-OMI-SDB(Hot)Public

telephonenetwork

ABB service modem Switch

Station bus LAN TCP/IP

Gateway ComputerGW-COM500

115kV RTU

Integration ofMetering IED‘s

NTP Timeserver

A4 Laser color printer

Dot matrixprinter

Station Ethernet (100Mbit/s)IEC 61850-8 (Ring configuration)

Engineering Workstation(ES)

Operator Workstation (MMI 1)

Operator Workstation (MMI 2)

Watchdog & AlarmAnnunciation

Remote Control Center

SAD 805

MeralcoTransco

GPS System clock

Ethernet SwitchRuggendcom

Control IEDREC670

Control IEDREC670

REC670

Control IEDREL670

Main protection 2MiCOM P5xxREC670REC670

Control IEDREC670

Control IEDREC670

REC670REC670

Control IEDREC670

Control IEDREC670

REC670REC670

Control IEDREC670

Control IEDREC670

Control & Protection

230kV Bay Control & Protection (BFP, AR, SYNCH) 230kV Dasma Line 1 230kV Dasma Line 2 230kV Calaca Line 1 230kV Calaca Line 2 230/115kV Power Transfomer 2 230kV Busbar Protection Common Alarm

Protection Protection

REC670

Control IEDREL670

Main protection 2MiCOM P5xx

Protection

REC670

Control IEDREL670

Main protection 2MiCOM P5xx

Protection Protection

REC670

Control IEDREL670

Main protection 2MiCOM P5xx

REC670

Protection IEDRET670

Protection unit REF610

Protection unit REF610

*) Meralco Supply

Tap changer controllerTapcon 240*

Temperature MonitorQualitrol*

Protection

REC670

REC670

Control IEDREL670

Bus B ProtectionREB670

Alarm UnitSACO 6404

REC650

REC650

ProtectionProtectionProtectionProtection