ROY HILL RAIL CLIENT Samsung C&T PROJECT Roy Hill Rail LOCATION Pilbara, Western Australia VALUE AU $632 million COMMENCED June 2013 COMPLETED April 2015 PROJECT SUMMARY Construction of approximately 330 kilometres of heavy haul rail formation and drainage between the Roy Hill Mine site and Port Hedland. Together with sidings, level crossing and associated works, overall materials moved was approximately 10.5 million cubic metres, of which over 3 million cubic metres was rock. The scope included in excess of 36 kilometres of culverts. Preliminary construction commenced in September 2013, the rail formation was progressively handed over with the final section completed in April 2015. At its peak, the project employed a workforce of up to 1,650 personnel and utilise approximately 800 items of earthmoving plant. PFS-C060 Current

Upload: damian-brandon

Post on 12-Apr-2017

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project - Roy Hill Rail

ROY HILL RAIL

CLIENTSamsung C&T

PROJECT Roy Hill Rail

LOCATIONPilbara, Western Australia

VALUEAU $632 million

COMMENCEDJune 2013

COMPLETEDApril 2015

PROJECT SUMMARY

Construction of approximately 330 kilometres of heavy haul rail formation and drainage between the Roy Hill Mine site and Port Hedland.

Together with sidings, level crossing and associated works, overall materials moved was approximately 10.5 million cubic metres, of which over 3 million cubic metres was rock. The scope included in excess of 36 kilometres of culverts. Preliminary construction commenced in September 2013, the rail formation was progressively handed over with the final section completed in April 2015.

At its peak, the project employed a workforce of up to 1,650 personnel and utilise approximately 800 items of earthmoving plant.