    Definations:

    Hazard: Any thing capable of producing adverse

    effect on health & safety of humans

    Risk: The probability of an event occurring and the

    consequence if it does occur.

    Accident: A sequence of events resulting in injury /

    illness / property damage or with potential to do so.Accident happen when physical systems fail,

    unforeseen events occur or human coming into

    contact with systems make errors

    Safety: Safety can be defined as the identificationand prevention of the harm by a process or the acts

    involved therein to men, material and total system

    functioning around

  • 8/6/2019 Project Safety Management ( Psm )_150510

    3/30

    Content Elements of PSM

    Benefits of safety programme

    Hidden Costs

    How to do?

    Planning a Project

    Roles and responsibilities

    Roles & responsibilities of safetyprofessionals

  • 8/6/2019 Project Safety Management ( Psm )_150510

    4/30

    Content (Cont.)

    Reasons for planning a Project for

    Safefty

    Typical programmes How to formulate a plan?

    Why to implement?

    General requirements

    Conclusion

    Summary

  • 8/6/2019 Project Safety Management ( Psm )_150510

    5/30

    Elements of PSM

    Safety programme development.

    Assignment of responsibility.

    Hazard identification & control. Safety training & communication.

    Documentation & enforcement of safety

    rules.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    6/30

    Elements of PSM (Cont)

    Maintenance of safe working conditions.

    Setting up performance goals in safety. Rewarding safety performers.

    Review circumstances involved in

    incidents / accidents.

    Taking appropriate corrective action.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    7/30

    Elements of PSM (Cont)

    Establishing safety performance

    objectives for all levels of management. Include safety as a part of management

    performance review.

    Measuring safety performance.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    8/30

    Benefits of Safety

    Programme

    Reduced worker compensation claims.

    Reduced injury expenses. Reduced absenteeism.

    Lower employee complaints.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    9/30

    Benefits (Cont)

    Improved employee morale &

    satisfaction.

    Increased productivity.

    Reduction of hidden cost.

    Reduced insurance cost.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    10/30

    Hidden Costs

    Workers compensation cost.

    Replacement & training cost for new orsubstitute employees.

    Poor quality.

    Penalties for non-compliances.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    11/30

    How to do ?

    ESTABLISH PROJECT SPECIFICACTIVITIES

  • 8/6/2019 Project Safety Management ( Psm )_150510

    12/30

    Planning a Project / Job

    Develop goals & objectives.

    Define project team ( including projectmanager , site supervisor, site safety co-

    ordinatar etc. ).

    Plan other programmes.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    13/30

    Roles & Responsibilities

    SUPERVISORS / MANAGEMENT

    A) Establish safe work practices.

    B) Enforce safety rules & procedures. C) Train employees how to avoid

    hazards.

    D) Enforce reporting near-misses

    also. `

  • 8/6/2019 Project Safety Management ( Psm )_150510

    14/30

    Roles & Responsibilities

    (Cont...)

    E) Investigate causes of accidents &

    near-misses.

    F) Take appropriate action to prevent re-

    occurrences.

    G) Ensure prompt medical attention.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    15/30

    Roles & Responsibilities of

    Safety Professionals. Develop & implement accident

    prevention Programmes.

    Advise project management oncompany policies about safety & legal

    requirements.

    Evaluate effectiveness of existing safety

    Programmes.

    Train management persons in safety

    inspection & safety audit techniques.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    16/30

    Reasons for Planning a

    Project for Safety

    Designed to protect personnel

    ,environment , public & operations &

    equipments.

    To take care of Govt. rules.

    Take care of public / private requirement

  • 8/6/2019 Project Safety Management ( Psm )_150510

    17/30

    Typical Programmes

    Record keeping as per Govt. rules ,

    medical records etc.

    Personal Protective Equipments ( PPE )

    issue , proper selection ,training ,

    enforcement etc.

    Hazard Communication ( as per the

    hazard like mechanical , chemical , toxicetc. )

  • 8/6/2019 Project Safety Management ( Psm )_150510

    18/30

    Typical Programmes (Cont...)

    Machine guarding ( guard replacement

    after maintenance , inadequate guard ,

    improper functioning of interlocks etc. )

    Equipment repairs.

    Lock out / tag out ( system established &

    persons trained ).

    Others ( confined space entry,excavation ,heavy equipment lifting etc.)

  • 8/6/2019 Project Safety Management ( Psm )_150510

    19/30

    How to Formulate a Plan ?

    Team effort required.

    Develop scope of work.

    Identify controls for eliminating / reducing

    hazards. Review hazard of each task.

    Review facility for operations involvinghazardous materials.

    Make the plan user-friendly.

    Make a review & conduct safety audit byoutside agency.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    20/30

    Why To Implement ?

    Essential in reducing injuries.

    Maintains a safe environment.

    Protects employees ,company s property

    & public.

    Ensures pre-entry briefing to alert workers

    about hazards.

    Conduct job hazard / safety analysis. Ensures periodic inspections.

    Ensures review & up-dates.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    21/30

    GeneralRequirements

    Company policy.

    Site descriptions, backgroundinformation.

    Site security.

    Emergency response.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    22/30

    Project Specific Requirements

    Job safety / hazard analysis.

    Pre-qualification of contractors.

    Review contractors safety policy &safety plan.

    Site specific training for all workers

    including contractors workers.

    Contractors relationship ( supervisor at

    site , sharing equal responsibility )

  • 8/6/2019 Project Safety Management ( Psm )_150510

    23/30

    Conclusion

    For the workers, Line Managers

    represent management. If the

    Manager does not take Safety

    seriously, those under him will not

    either. On the other hand, Ifhe shows

    that Safety has to be considered all

    the time and if he himself does everything that reasonably can be done to

    prevent accidents, workers will follow

    his examples.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    24/30

    Conclusion (Cont)

    Carelessness is not a good word to

    be used in connection with

    Accident Analysis. It is humannature to make mistakes, to forget,

    to take short-cuts e.t.c. It is

    managements responsibility toeliminate as much as possible the

    conditions that bring accidents

    about.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    25/30

    Summary

    Eliminates hazards.

    Reduce risks when hazards cannot be

    eliminated.

    Provide warning devices.

    Develop & implement procedures &

    training.

    Use emergency controls.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    26/30

    Summary (Cont)

    Ensures that accountability is present at

    all levels.

    Management commitment is visible.

    Teamwork is ensured.

    PAPER safety programmes are not

    accepted.

  • 8/6/2019 Project Safety Management ( Psm )_150510

    27/30

    THANKS

  • 8/6/2019 Project Safety Management ( Psm )_150510

    28/30

    COMMON HAZARDS

    AT A PROJECT SITE

    FALL OF MATERIAL FROMHEIGHT

    ELECTRIC SHOCKHIT BY SPEEDING VEHICLE

    HIT BY EARTH MOVING EQPTS.

    FIRE

    ACCIDNTIAL ACTUATING OFTOOLS

  • 8/6/2019 Project Safety Management ( Psm )_150510

    29/30

    Cont

    DISCONNETION OF PNEUMATIC

    TOOLS.

    DUSTS & FUMES

    HANDLING

    SOLVENTS,PAINTS,THINNERS

    EXPLOSIVES

    HEAT/RADIATION

    WRONG POSTER OF WORK

  • 8/6/2019 Project Safety Management ( Psm )_150510

    30/30

    CONTROL MEASURES

    (i) Good Housekeeping

    (ii) Removal of unwanted material from time

    to time

    (iii) All elect. Connections to be routed

    above ground or underground