project sanction no. goi:s.no.1/ rajasthan/...
TRANSCRIPT
Project Sanction No. – GOI:S.No.1/ RAJASTHAN/ 2010-11- IWMP Dt.
Administrative and Financial Sanction –RD & PRD
commissionerate
WATERSHED PROJECT : BALOTRA (IWMP) - 37 Year 2010-11
BLOCK – BALOTRA
PIA – Asst. Engineer (WD&SC) Panchayat Samiti – BALOTRA
DISRTICT WATERSHED DEVELOPMETN UNIT, BARMER
DEPARTMENT OF SOIL & WATER
CONSERVATION,RAJASTHAN
CHAPTER – I
INTRODUCTION
Location.
BARMER IWMP 37 Project is located in KHANNORA-SIMHARKIYA GRAM
PANCHAYAT (BALOTRA) Block, of BARMER district. The project area is
between the latitudes 26°07’58.38” N &72°32 ’04.76” E longitudes. It is at a
distance of 49 km from its Block head quarters and 165 Kms from the district head
quarters. There are 8 no. of habitations in the Project area and other details are given
below.
General features of watershed
S.No. Name of Project(as per GOI) BARMER
IWMP-37
(a) Name of Catchment CLUSTER
(b) Name of watershed area(local
name)
KHANNORA-
SIMARKHIYA
(c) Project Area 7693 Ha
(d) Net treatable Area 7693Ha
e) Cost of Project 115395000
f) Cost/hectare 15000
g) Year of Sanction 2010-2011
h) Watershed Code IWMP-37
i) No. of Gram Panchayats in
project area
4
j) No. of villages in project area 8
k) Type of Project (Desert/other)
DESERT
l) Elevation (metres˝) 572 ft.
m) Major streams NIL
n) Slope range (%) 47.18%
Information About Villages:-
The watershed falls in Agroclimatic Zone Dry Arid Hot The soil texture is
LOAMMY - SANDY The average rainfall is 100-250 mm. The temperatures in
the area are in the range between 45º centigrade during summer and 10º-15º
centigrade during winter. The major crops in the area are BAJRA, MOONG,
MOTH, TILL. GAWAR % land is under cultivation 19.97% land fallow,
10.42% land is wasteland.28.99 % land is irrigated through 250 No of households
are BPL(22.46% households) 30 are landless households (2.69% households)
and 529 household are small and marginal farmers(47.52%household) .Average
land holding in the area is 5780 ha. 61.24% area is single cropped area and 0% is
double cropped. The main source of irrigation is NIL. The average annual rainfall (5
years) in the area is 281.95 mm. There is no Major streams in the project area. The
major festivals in the village are HOLI, DIWALI, RAMNAVMI,
AKSHAYTRITYA, JANMASTHMI, RAKSHABANDAN. At present this
village is having 8231 population with Communities like Muslim, Rajpurohit, jat,
tailor, Suthar, Rajput , Ravnarajput, Megwal, Bhil,kalbi .
Macro/micro
Name of Gram
Panchayat
Name of Villages Covered Census code of
villages
Area
1.PATODI 1.PATODI 02145300 518
CLUSTER
601,02,701,
02,801,02,0
3,901,02,03
2.KHANORA
1.KHARDI
2.CHIDIYARA
02145500
02145400
1726
487
3.THOB
1.RAJPURA
2.RAJESHWAR NAGAR
3.RAJNAGAR
4.THOB
02147900
02148000
NEWVILLAGE
02147800
1090
500
1194
1967
4. SIMARKHIYA 1.KELANKOT 02147700 211
1 Average Annual Rainfall(mm)
Year Average Annual Rainfall(mm)
1. 2010 41.75
2. 2009 160
3. 2008 374
4. 2007 294
5. 2006 540
6. 2005 266
7. 2004 291
8. 2003 506
9. 2002 166
10. 2001 236
11. 2000 224
2 Average Monthly rainfall (last ten years)
Month Rainfall(mm)
i) June 2008 14
ii) July 124
iii) August 213
iv) September 0
3 Maximum rainfall intensity (mm)
Duration rainfall intensity(mm)
i) 15 minute duration 49
ii) 30 minute duration 36
iii) 60 minute duration 15
4 Temperature (Degree C)
Season Max Min
i) Summer Season 48ºC 35ºC
ii) Winter Season 30ºC 10ºC
iii) Rainy Season 35ºC 20º C
5 Potential Evaporation Transpiration (PET) (mm/day)
Season PET
i) Summer 4.7
ii) Winter 1.2
iii) Rainy 5.5
6 Runoff
i) Peak Rate (cum/hr) 250
ii) Total run off volume of rainy season (ha.m.) 5.153
iii) Time of return of maximum flood 5 years no flood.
10 years no flood.
In-Year
iv)Periodicity of Drought in village area
Three
years of
Drought.
Six
years of
Drought.
In Four
Years
Three
Years of
Drought.
Other Development Schemes in the project area
S.No Scheme
Name of the department
Key interventions under the Scheme
Targeted Beneficiaries
Provisions under the Scheme
1 MNREGS RD
Construction of Tanka,Khadeen,Gravel Road,Nadi etc.
SC,ST,BPL & Others
100 DAYS Guranted employment
2 BRGF RD
Construction of Anganwadi , School Building, Sub Centre Community Centre
Common Work
Gap filling for infrastructure properly use
3 TFC,SFC RD
Construction of Tanka, GLR ,Pipelines for Drinking Water, Toilets
Common work
Drinking Water & sanitation
4 IAY RD
Construction of House
BPL Families
Provide House for poor people
5
ANGANWADI RD
Devlopment for Women & Children
Women & Children
Development for women & Children
6 TSC RD
Construction of Toilets
BPL Families Sanitation
Details of infrastructure in the project areas
Parameters Status
(i) No. of villages connected to the main road by an all-weather road
2
(ii) No. of villages provided with electricity 8 (iii) No. of households without access to
drinking water
(iv) No. of educational institutions : (P)
5
(S)
1
(HS)
2
OTHER
3 Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(v) No. of villages with access to Primary Health Centre
3
(vi) No. of villages with access to Veterinary Dispensary
-
(vii) No. of villages with access to Post Office
2
(viii) No. of villages with access to Banks 1
(ix) No. of villages with access to Markets/ mandis
-
(x) No. of villages with access to Agro-industries
-
(xi) Total quantity of surplus milk - (xii) No. of milk collection centres (U) (S)
(PA) (O)
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(xiii) No. of villages with access B to Anganwadi
13
(xiv) Any other facilities with no. of villages (please specify)
(xv) Nearest KVK BARMER
(xvi) cooperative society 1
(xvii) NGOs -
(xviii) Credit institutions -
(i) Bank 1
(ii) Cooperative Society 1
(xix) Agro Service Centre's -
Institutional arrangements (SLNA,DWDU,PIA,WDT,WC, Secretary)
DWDU Details
1 2 3
S.No Particulars Details of DWDU
• PM ,DWDU Xen/Project Manager
• Address with contact no.,
website
ZILA PARISHAD (RDC)-BARMER
• Telephone 02982-220893
• Fax 02982-222041
• E-mail [email protected]
PIA particulars
1 2 3
S.No Particulars Details of PIA
• Name of PIA SOHANLAL
• Designation Assistant Engineer
• Address with contact no.,
website
Panchayat samiti Balotra -9414633915
• Telephone -
• Fax -
• E-mail [email protected]
WDT Particulars:
1 2 3 4 5 6
7 8
S.N
o
Name of
WDT
member
M/
F
Ag
e
Qualificati
on
Experience
in
watershed(Y
rs)
Description
of
professiona
l training
Role/
Function
1. BHAGWA
TI SONI
F
27 B.A. 5YEARS KVK-
BARMER,I
GP
SOCIAL
WORKER
2. PUSHARA
M
M
38 B.S.C.AG 1 YEAR KVK,IGP AGRICULTU
RE
3.
PRATAP
SINGH
M
22 A.H.D.P.
1 YEAR KVK,IGP VET.
4. DIWAN
M
28 A.H.D.P.
1 YEAR KVK,IGP VET.
Details of Watershed Committees (WC) Date of Registration as a Society
Date of Gram Sabha for WC:2/11/2010
Name of WCs: KHANNORA
S.N
.
Designatio
n Name M/F
SC/ST/OBC
/
General
Landless/
MF/SF/
BF
Name of
UG/SHG
Educational
qualification
1.
President ALI KHAN/FATEH KHAN M OBC
- - -
Secretary GANGA RAM/RANARAM M ST - - -
Member KHET SINGH/MAGH SINGH M GENERAL - - -
Member TULSARAM/CHOGHA RAM M SC - - -
Member SMT.SOMTI/RUPARAM F GENERAL - - -
Member SMT.BISMILLAH/MUSE KHAN F OBC - - -
Member TAIB KHAN/BHAI KHAN M OBC - - -
Member PRATAPRAM/MOTIRAM M ST - - -
Member
SMT.UGAM
KANWAR/BHANWAR F GENERAL
-
- -
Member BARKAT KHAN/DINNU KHAN M OBC - - -
Member CHAINARAM/LUMBARAM M ST - - -
Member SURTAN KHAN/HATTU KHAN M OBC - - -
Member PUKHRAJ/RUGHA RAM M OBC - - -
Member RAMA RAM/LALURAM M OBC - - -
Member
SMT.MEHRI/MOHAMMAD
KHAN F OBC
-
- -
Member SMT.SUGNA /ALI MOHAMMAD F OBC - - -
Member SMT.PAPLI/BHERARAM F ST - - -
Member J.EN/A.EN M - - - -
Details of Watershed Committees (WC) Date of Registration as a Society
Date of Gram Sabha for WC:THOB
Name of WCs:27/01/2011
S.N. Designatio
n Name M/F
SC/ST/OBC
/
General
Landless/
MF/SF/
BF
Name of
UG/SHG
Educational
qualification
1.
President DHANARAM/POONAMJI M OBC
- - 8th
Secretary
VIRENDRA SINGH/CHATTAR
SINGH M OBC
-
- M.A
Member HARARAM/LAKHARAM M ST - - 5th
Member BHOLARAM/CHOTARAM M SC - - -
Member RAMARAM/BALURAM M OBC - - -
Member SMT.KAMLI/HEMARAM F OBC - - -
Member SMT.TARO/JAIROOPARAM F OBC - - -
Member SMT.SAKU/NOORE KHAN F OBC - - -
Member SMT.TEEJO/VEERAMPURI F GENERAL - - -
Member
MAHIPAL SINGH UMAID
SINGH M GENERAL
-
- 12th
Member PURARAM/HARJIRAM M OBC - - 10th
Member GANGA SINGH /MAGAN SINGH M GENERAL - - 5th
Member BHANWARLAL SOLANKI M OBC - -
Details of Watershed Committees (WC) Date of Registration as a Society
Date of Gram Sabha for WC:PATODI
Name of WCs:
S.N. Designatio
n Name M/F
SC/ST/OBC
/
General
Landless/
MF/SF/
BF
Name of
UG/SHG
Educational
qualification
1.
President MD. KHAN M OBC
- - 8th
Secretary SMT.SUMAN KANWAR M GENERAL - - B.A
Member RADHARAM M OBC - UG 8th
Member ISHWARRAM M OBC - - -
Member POONAM SINGH M GENERAL - - 4th
Member GANPAT RAM M OBC - - 8th
Member INSAF KHAN M OBC - - 8th
Member SMT.VIRA DEVI F SC - SHG 5th
Member SMT. GULABI DEVI F OBC - SHG -
Member PEMARAM M SC - - 5th
Member SUBAN KHAN M OBC - - 5th
Member SMT.SHANTI F OBC - SHG 5th
Member BHANWARLAL SOLANKI M OBC - -
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased
production which can be achieved through expansion in cultivated area and
productivity enhancement. land is arable wasteland and ha is fallow can be brought
under cultivation.
0 ha is only irrigated and with efforts this can be increased to 25. The productivity
gap of major crops in the area as compared with district and with areas in the same
agro climatic zones indicate potential to increase the productivity. The demonstration
of improved package of practices, improved varieties, increased irrigation facilities
and soil conservation measures under the project can bridge this gap. Due to small
land holdings in the area focus of the project would be on diversification in agriculture
(horticulture, vegetables, green houses, Agro forestry, fodder crops)and
diversification in Livelihoods(Agriculture, Animal husbandry, self employment)
Quintal fodder scarcity can be met out through Pasture development .Improved
animal Husbandry practices can increase the productivity of livestock.236 no of
persons migrate due to Lacs of job this migration can be checked through creation of
employment opportunities in the project area through increase in production and
diver
CHAPTER – II Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population
Male Female Total SC ST
4502 3729 8231 1544 864
Household Details
BPL household
L. Less
Small Farmer
M. Farmer
Total household
SC household
ST household
250 30 209 320 1113 150 145
Table 2.2 Development indicators
S. No. Development Indicators State Project Area
1 Per capita income (Rs.) 16260 11800
2 Poverty ratio 0.22 0.22
3 Literacy (%) 0.604 0.55
4 Sex Ratio 921 800
5 infant mortality rate 78 63
6 maternal mortality ratio 388 180
The table indicates poor socio economic conditions.
S.No Present land use Area in Hact.
1 Total geographical area 7693 Ha.
i Non arable land 1913 Ha.
ii Arable land 5780 Ha.
2 Non arable land
i Forest land 0 Ha.
ii Panchayat & pasture land 1100 Ha.
iii Govt. waste land 802 Ha.
iv Area not available for development (Habitation,
roads, mines, rails etc. 11 Ha.
3 Arable land
i Irrigated -
ii Un irrigated 5780 Ha.
Total arable land 5780 Ha.
4 Land available for treatment
i Non arable land 1902 Ha.
ii Arable land 5780 Ha.
Total 7682 Ha.
Table 2.3 Land Use
The project area has ha of cultivable wasteland .1498.01 ha of fallow land (total ha)
can be brought under cultivation if some irrigation source can be provided through
Construction of WHS like Khadin, Tanka, Farm ponds etc. and also through
demonstration of rainfed varieties of crops. Construction of WHS can also increase
in area under irrigation which is only 15%
ha. (0.03 % of the project area)is under wastelands and can be brought under
vegetative cover, with reasonable effort .Activities like Earthen check dams,
Vegetative filter strip, V-ditches, staggered trenches ,WHS (Johad) Afforestation of
wastelands and Pasture development will be taken up on these lands
Pasture development the land use table shows that there is hectare pasture land
(3.25%)This emphasizes the need for taking up pastureland development works
through sowing of promising species of grasses and plantation.
Cropping status
S No
Season Crop sown
Rainfed Irrigated Total
Varieties Area (ha)
Production (Ton)
Productivity (kg/ha)
Varieties
Area (ha)
Production (Ton)
Productivity (kg/ha)
Area (ha)
Production (Ton)
Productivity (kg/ha)
1. Kharif Bajra Pro Agro-9444-I
2340 Rainfed-60% 2 k.g /ha.
140 2340 140
HHB-67 - - - - - -
Nandi 52,32,5-I
- - - - - -
Local Seeds
- - - - - - -
- - - -
Moth Rmo-40 510 85 kg/ha. 180 - - - - 510 - 180
Rmo-435
Gawar RG C-936 240 85 KG /ha. 85 240 85
HG-365
Moong 450 70 kg /ha 110 450 110
Table 2.4 .a Agriculture and Horticulture status and fuel availability.
Table 2.4.b Abstract of cropped Area(ha)
Area under Single crop 3540
Area under Double crop NIL
Area under Multiple crop NIL
The farmers are using -HHB 67 ,NANDI 52--NANDI 32, PRO AGRO
9444varieties of Bajra, whereas varieties like MOTH can increase the production.
Crop Rotation**will vary from project to project
BAJRA - MOONG
MOONG - JAWAR
FALLOW - BAJRA
MOTH - FALLOW
GAWAR – FALLOW
The table shows that only SINGLE CROP AREA . Also the crop rotation shows that
fallow lands are there. This indicates that there is scope for change in crop rotation in
fields where there are fallow lands through Soil and Water conservation measures,
crop demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under
cultivation can change the area under single cropping to double and multiple
cropping.
Table 2.4. Productivity Gap Analysis (The table can also be given in bar chart form)
Name of the crop
Productivity kg/ha
India
Highest Average
in Rajasthan
Highest Average of Agro climatic zone District
Project Area
BAJRA 738 645 380 180 140
MOONG 465 305 210 115 110
MOTH 410 338 225 105 105
GAWAR 315 198 165 90 85
Analysis of the above table indicate that besides national gap there is wide gap in
productivity within state and even within same agro climatic zones.
The reasons for this variation are
1. The farmers are using varieties a Indigenous of Bajra whereas the
recommended varieties like Bajra-ICMH-356,RHB-30,RHB-131,HHB-67,CZP-
9802 can increase the production of Bajra. GUAR-RGC-936, RGC-1002, RGC-
1003, RGM-112 can increase the production of Guar. MOONG- RMG-62, K-851
can increase the production of Moong. MOTH-RMO-40, RMO-257, RMO-435 can
increase the production of Moth.
• Lack of Availability of good quality seeds of desired crop and variety in
adequate quantities and time to the farmers.
• Availability of water for cultivation(25% is irrigated table)
The productivity gap and reasons of it indicate potential to increase the productivity
through crop demonstration .Crop demonstrations would be carried out on improved
crops/ varieties, improved agronomic practices. INM, IPM, Mixed cropping,
distribution of fodder seed mini kit. Demonstration of improved methods and
economics of fodder crops cultivation and also distribution foundation seeds of
Forage Crops for further multiplication, introduction of fodder crops in the existing
crop rotations
Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)
Activity Area Species Varieties Recommended varieties Production
Horticulture - - - - -
Vegetables - - - - -
Floriculture - - - - -
Medicinal Plants - - - - -
Table 2.6 Land holding Pattern in project area
Type of Farmer
Total Households
Land holding (ha) irrigation source wise
Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total
General
SC ST OBC BPL
(i)Large farmer 304 - 2533 2533 833
550
250
553
-
(ii) Small farmer 209 - 2380 2380
700
580
400
484
-
(iii) Marginal farmer 320 - 2283 2283
650
570
500
563
-
(iv) Landless person 30 - - -
30
38
20
39
-
(V)No. of BPL households 250 - - -
5
16
10
19
-
Total 1113 7196 7196
2218 175
4
1180 1658 -
55.68% land holdings belong to small and marginal farmers who own 63.66% of total
cultivated area. Horticulture/vegetables could be more economical to Small and
marginal farmers with irrigation source. For large farmers with no irrigation facility
Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka
construction.
The following activities will be more beneficial for small land holdings and for
diversification and income for large farmers
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As
discussed earlier . Horticulture/vegetables could be more economical to Small and
marginal farmers with irrigation source. Also the project area has good potential for
medicinal & aromatic crops like Sonamukhi, Isabgol, Ashwagandha, Khus, Mehandi
etc.
Agro forestry plantation: To increase the income of farmers and also for shelter
belt plantation as wind velocity is high in the project area.
Setting of Vermi Compost Units - Keeping in view the side effect of residues of
chemicals and fertilizers on human health the emphasis would be on cultivation of
organic produce through motivating farmers and providing assistance for production
of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good
quality seed is available for cultivators for which adequate seed production would be
initiated in watershed areas with the assistance of private sector and agriculture
department technologies
Sprinklers and pipelines for efficient water management practices emphasis on
demonstration of sprinklers with adequate financial support and convergence/private
partnership.
Establishment of Green House - For growing off season vegetables seedlings and
other horticultural crops under controlled atmospheric conditions of green house.
Establishment of nurseries: Most of the planting material is procured from other
parts of the State/ country. The procurement of planting material from distant places
causes damage to the planting material and often results in untimely supply. Hence
nursery development activity in area.
Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented
projects like mushroom cultivation, floriculture, etc which are in negligible existence at
present, can be implemented by individual farmers / private companies.
Drip irrigation Drip irrigation will be promoted in all horticulture plantations,
vegetables, green houses and in nurseries for rational use of irrigation higher yields
and quality produce.
Table 2.7 FODDER REQUIREMENT & AVAILABILITY IS AS CALCULATED BELOW REQUIREMENT
S.No.
Animals Population in No.
Equ. cow units
Average Dry Matter
requirement per Day
Dry matter requirement
per year (7Kg per animal.)
Total requirement
in M.T.
1 Cows 3100 3100 7 Kg 7902500 7902.500
2 Buffaloes
1620
1620
7 Kg
4139100 4139.100
3 Goat 7150 3575
7 Kg 9134125 9134.125
4 Sheep 3200 1600
7 Kg 4088000 4088.000
5 Camel 55 55
7 Kg 140525 140.525
Total 15125 25404250 25404.250 In spite of the large number of livestock, production is less hence increase in
productivity across all species, is a major challenge. To reduce production of
unproductive cattle and improve the productivity by improving the breeds by
breeding management following activities will be taken up
• Castration
• Artificial insemination
• Distribution of superior Breeding bulls for use in Cattle and Buffalo
• Breeding distribution crossbred rams
Besides breed improvement other animal husbandry practices like better health,
hygiene and feeding practices can increase productivity of livestock. Hence Activities
like Animal health camps ,Urea-Molasses treatment demonstration ,demonstration of
improved methods of conservation and utilization of Forage crops are proposed.
Table 2.8 Existing area under fodder (ha)
S.No Item Unit Area/Quantity
1 Existing Cultivable area under Fodder
Ha 5433
2 Production of Green
fodder
Tonns/year 21732
3 Production of Dry fodder Tonns/ Year 16299
4 Area under Pastures Ha 60
5 Production of fodder Tonns/year 390
6 Existing area under Fuel
wood
Ha -
7 Supplementary feed Kgs/ day NIL
8 Silage Pits No NIL
9 Availability of fodder quintals 408000 M.T
10 Deficiency/excess of
fodder
quintals 60650.87
The table above shows there is fodder deficiency (Requirement is 46865.087
M.T and availability 408000 M.T)
To minimize the large and expanding gap between feed and fodder resource
availability and demand there is need for
• Increase in area under fodder crops
• Increase in productivity of fodder crops
• Development of pastures
• And reduction in large number of livestock production through replacement by few
but productive animals
Table 2.9 Agriculture implements
1 2 3
S. No Implements Nos.
1 Tractor 45
2 Sprayers-manual/ power -
3 Cultivators/Harrows 45
4 Seed drill 13
5 Any Other -
Farm mechanization and seed banks: As discussed earlier 55.68% land holdings belong to small and marginal farmers who own only 13% of total cultivated area so owning of big farm implements by individual farmers is not economical so SHG would be promoted to buy farm implements and rent to farmer
Table 2.10 NREGA Status - No. of Card Holder, activities taken so far,
employment status.
Sr. no.
Name of village
Total No .of job cards
Employment Status
Activity taken up so far
1.
KHARDI 360 120
1.Excavation of Talab / Nadi
2.Constructionof Gravel Road
3.Construction of Tanka
2.
CHIDIYARA 13 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
3.
THOB 1809 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
4.
RAJNAGAR 670 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
5.
RAJPURA 560 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
6.
RAJESHWAR
NAGAR 300 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
7.
PATODI 200 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
8.
KELANKOT
250 120
1.Excavation of Talab / Nadi
2.Construction ofGravel Road
3.Construction of Tanka
Table 2.11 Migration Details
Name of village
No. of persons migrating
No. of days per year of
migration
Major reason(s)
for migrating
Distance of
destination of
migration from
the village (km)
Occupation during
migration
Income from such occupation (Rs. in lakh)
KHARDI
75
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
CHIDIYARA
70
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
THOB
78
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
RAJNAGAR
79
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
RAJPURA
65
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
RAJESHWA
R NAGAR
48
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
PATODI
73
160&190
Scarcity of
Labour &
Fodder
500
LABOUR
0.75
KELANKOT 77 160&190 Scarcity of
Labour &
Fodder
500 LABOUR 0.75
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods .
The existing livelihoods Village are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income from
the
Cultivators 1050 100000
Dairying - -
Shop 90 30000
Goat& Sheep rearing 180 40000
Landless Agri. Labourers
- -
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income from
the
Artisans 6 55000 Carpenter 25 110000 Blacksmith 10 30000 Leather Craft 6 - Porter 29 80000 Mason - - Others specify (Cycle Repair ,STD,Craft etc)
90 90000
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
S.No Name of SHG Membe
rs
Activity involved
Monthly
income
Fund availabl
e
Assistance
available
Source of assistance
Training received
1.
AIIMATA 10
ANGANWAD
I
POSHAHAR
200 - - SAVING -
2 SINGHARI
10 - 300 - - SAVING -
3. LAXMI
10 - 300 - - SAVING -
4.
DR.
BHIMRAO
AMBEDKAR 12
ANGANWAD
I
POSHAHAR
200 - - SAVING -
5. BABA
RAMDEV 7 - - - SAVING
6. RAJARAM
10 KASIDAKAR
I 500 3000 - SAVING -
7. JINMATA
10 KASIDAKAR
I 500 3500 - SAVING -
8. KHTESHWAR
10 TAILORING 500 3500 - SAVING -
9. RAJGURU
10 TAILORING 500 3000- - SAVING -
10 THAKURJI
10 HANDICRAF
T 500 1500- - SAVING -
11. KRISHNA
10 MASALA
PACK 500 2000- - SAVING -
12. SUMAN
10
PAPAD
NIRMAN
WORK
500 1500 - SAVING -
13. PATEL
10 MASALA
UDYOG 500 1000 - SAVING -
14. KHUSBU
10 MASLA
UDYOG 500 1000 - SAVING -
15. MAYANK
10 KASIDAKAR
I 500 1000 - SAVING -
16. KARNIMATA
10 SOAP
MANU. 500 1000 - SAVING -
17. ASHAPURA
10 TOYS
MANU. 500 1500 - SAVING -
18. SHYAD
BADSHAH 10 MASHROOM
KHETI 500 1500 - SAVING -
19. KHUDABAKS
BABA 10 ACHAR
NIRMAN WORK
500 2000 - SAVING -
20. RAZIA
SULTAN 10 ACHAR
NIRMAN 500 2000 - SAVING -
21. TANHAPIR
10 KER SANGIRI
UDYOG 500 1000 - SAVING -
22. HAZRAT MD.
10 SILAI 500 1000 - SAVING -
23. MALIK SAHA
10 SILAI 500 1000 - SAVING -
24. NEHAR KHAN
10 KASIDAKARI 500 1000 - SAVING -
25. MASTANA
10 KASIDAKARI 500 1000 - SAVING -
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance II. Technical Features
Table 2.14 Ground Water
S.No Source No. Functional depth
Dry Area irrigated
Water availability(days)
i) Dug wells 130 80 ft. - - 245
ii) Shallow tube wells
- - - - -
iii) Pumping sets - - -
iv) Deep Tube Wells
49 250 ft. 190
Total 179 330 ft. - - 435
Table 2.15 Availability of drinking water
S.No Name of the
village
Drinking water requirement Ltrs/day
Present availability of drinking water Ltrs/day
No. of drinking water sources available
No. functional
No. requires repairs
No. defunct
1. PATODI
15000 11000 4 3 - -
2. KHARDI
23450 13500 4 4 - -
3. CHIDIYARA
13900 7500 3 2 - -
4. RAJPURA
19000 16000 3 3 - -
RAJESHWAR
NAGAR 14500 11000 4 3 - -
6. RAJNAGAR 20000 15000 4 3 - -
7. THOB 25000 18000 4 3 - -
8. KELANKOT 10000 7500 3 2 - -
Table 2.16 Water Use efficiency
Name of major crop
Area (Hectare)
through water saving devices(Drip/Sprinklers
)
through water
conserving agronomic practices#
Any other (pl.
specify) Total
BAJRA - - - - TIL - - - -
MOTH - - - -
MOONG - - - -
GAWAR - - - -
TOTAL - - - -
The tables above indicate need for judicious use of available Water.
Encouraging optimum use of water through installation of sprinklers on every operational wells
Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% - 2 3 to 8% - 3 8 to 25% - 4 > 25% -
As most of the area has slope less than 3% construction of contour bunds can solve
the problem of water erosion in agriculture fields and protect washing of top soil and
manures/fertilisers
Table 2.18 Details of already stored runoff(Surface Water structures)
S.No. Name No. Storage Capacity (cum)
Area irrigated (ha)
i) Major Irrigation Project - - - ii) Medium Irrigation Project - - - iii) Form Ponds/Tanks 411 12330 - iv) Anicuts 3 12000 - Total 414 24330 - Table 2.19 Soil details Soil Profile
S.No. Major Soil Classes Area in hectares
1. SANDY 3408
2. LOAMMY 3566
Soil Depth :
B Depth (Cms.) Area in hectares
1. 0.00 to 7.50 700
2. 7.50 to 45.00 5000
3. > 45.00 500
C Soil fertility Status Kg/ha Recommended
N 25 60-90 Kg
P 31 40-60Kg
K 307 -
Micronutrients PPM-LOW
Zn+1,cu++,mg ++,clˉ1 200-250 ppm
The analysis of table shows need to improve and maintain soil fertility. Soil health
card to every farmer every crop season will be provided, which will include the
recommendation for Application micro nutrient and fertilizers
Table 2.20 Erosion details
Erosion status in project Area
Cause
Type of
erosion
Area affected
(ha)
Run off(mm/
year) Average soil loss
(Tonnes/ ha/ year)
Water erosion
a Sheet - - -
b
Rill - 205 MM 0.38
T/ha/year
c Gully 2225
Sub-Total
Wind erosion 7693
Total for project 7693
The need is:
• To check land degradation • To reduce excessive biotic pressure by containing the number and increase of
livestock • To check cultivation on sloping lands without adequate precautions of soil and
water conservation measures • To discourage cultivation along susceptible nallah beds • To check Faulty agriculture techniques • To check Uncontrolled grazing and developed cattle tracks • To check Deforestation of steep slopes • To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and
to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.
CHAPTER - III Proposed Development Plan:
Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign,
slogans and wall writings etc. were carried out in all the habitations of
BARMER IWMP- 37 Micro Watershed. A series of meetings were
conducted with GP members, community and discussed about the
implementation of IWMP programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting
the watershed committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama
Sabha approved EPA
1. KHANNORA 4/10/2010
2. THOB -
3. PATODI -
4. SIMARKHIYA -
1 2 3 4 5 6 7 8 9
S. No.
Names of village
Amount earmarked
for EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred
Balance Expected outcome
Actual outcome
1. PATODI 310800 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
2. KHARDI 1035600 Community
Tanka for
drinking
water.
Pashu
Kheli
GLR
1.35
1.35
1.50
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
3. CHIDIYARA 292200 Community
Tanka for
drinking
water.
Pashu
Kheli
GLR
1.35
1.35
1.50
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
4. RAJPURA
654000 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
5. RAJESHWAR
NAGAR
300000 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
6. RAJNAGAR 716400 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
7. THOB 1180200 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
8. KELANKOT 126600 Community
Tanka for
drinking
water
1.35
- - FACILITY
OF
DRINKING
WATER
FACILITY
OF
DRINKING
WATER
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the
village/Habitation
Date on which PRA
conducted
1. KHARDI 15/3/2011
2. CHIDIYARA 16/3/2011
3. THOB 18/3/2011
4. RAJNAGAR 19/3/2011
5. RAJPURA 21/3/2011
6. RAJESHWAR NAGAR 22/3/2011
7. PATODI 23/3/2011
8. KELANKOT 25/3/2011
Transact walk were carried out involving the community for Social mapping,
Resource mapping. Detailed discussions and deliberations with all the primary
stakeholders were carried out.
Socio-economic survey was carried out during 20/07/2010 to 21/04/11 (dates)
period covering all the households and primary data on demography, Land
holdings, Employment status, Community activities etc. was collected as
mentioned in chapter 2.
State remote sensing department was assigned the work of preparing
various thematic layers using Cartosat-1 and LISS-3 imageries for Creation,
development and management of geo-spatial database depicting present
conditions of land (terrain), water and vegetation with respect to watershed under
different ownerships at village level
Various thematic layers provided by SRSAC are :
• Delineation of Macro/Micro watershed boundaries. • Digitised Khasara maps of the villages falling in project area. • Network of Drainage lines, existing water bodies, falling in the project area. • Base maps (transport network, village/boundaries, and settlements). • Land Use / Land cover map. • Contours at 1 meter interval, slope map
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark
data (as discussed in chapter 2) final Treatment plan on revenue map for
implementation has been framed. Thus each intervention identified has been
marked on revenue map (map enclosed in DPR as annexure).The GIS based
intervention map, PRA based intervention map are annexed as.
Proposed Development Plan
Thob
(A) Preparatory phase activities capacity building trainings & EPA
Activity Unit Unit Cost
GP1
Quantity Total Cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution
Admn. 10% 71.27 10%
Monitoring 1% 7.13 1%
Evaluation 1% 7.13 1%
EPA 4% 28.51 4% 0
I & CB 5% 35.63 5%
DPR 1% 7.13 1%
Total (A) 156.78 156.78 0 0
(B) Natural resource management (60%)
Conservation measures for arable land(private land)
Farm Pond
(Tanka) Nos 1.32 130 171.60 171.60
5-10%
towards WDF Khadeen Nos 5.379 18 96.82 96.82
Field Bunding Ha 0.166 450 74.70 74.70
Plantation Ha 1.316 0 0.00 0.00
Khadeen/Tanka Nos 1.32 179 236.28 0 236.28
Conservation measures for non arable land
Silvi pasture Ha 1.322 20 26.44 26.44 0
LSCD Mtr 0.116 15 1.694 1.69 0
Drainage line treatment
Anicut Nos 9.276 3 27.828 27.828 0
Total (B) 635.36 399.08 236.28
( C ) Production System and micro enterprise(15%)
Production measures for arable land
10-20% towards
project cost
Sprinklers and Drip irrigation
6 1.40 1.40
Crop Demonstration
Kharif Crop
Demonstration Ha 0.010 3566 35.660 35.660
Rabi Crop
Demonstration Ha 0.020 0 0.000 0.000
Kitchen Garden Ha 0.005 201 1.005 1.005
Horticulture Ha 0.300 20 6.000 6.000
Agro forestry Ha 0.200 30 6.000 6.000
Compost pit Ha 0.100 200 20.000 20.000
Soil & Water
Testing Nos 0.002 300 0.600 0.600
Live stock camp Nos 0.240 0 0.000 0.000
Live stock breed
improvement Nos 0.500 4 2.000 2.000
Micro Enterprise
SHG Revolving
Fund
SHG % 0.25 63 40.407 40.407
Indivisual % 0.25 7 4.490 4.490
SHG Fedration % 2.00 30 19.242 19.242
Vaccination Nos 5000 0 0
Total (C) 136.804 135.404 1.4
(D) Consolidation
3%
21.3795 21.3795 0
Grand Total 950.33 712.65 237.68
Proposed Development Plan
Khannora
(A) Preparatory phase activities capacity building trainings & EPA
Activity Unit Unit Cost
GP2
Quantity Total Cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution
Admn. 10% 33.20 10%
Monitoring 1% 3.32 1%
Evaluation 1% 3.32 1%
EPA 4% 13.28 4% 0
I & CB 5% 16.60 5%
DPR 1% 3.32 1%
Total (A) 73.03 73.03 0 0
(B) Natural resource management (60%)
Conservation measures for arable land(private land)
Farm Pond
(Tanka) Nos 1.32 70 92.40 92.40
5-10% towards WDF Khadeen Nos 5.379 4 21.52 21.52
Field Bunding Ha 0.166 80 13.28 13.28
Plantation Ha 1.316 20 26.32 26.32
Khadeen/Tanka Nos 1.32 124 163.68 0 163.68
Conservation measures for non arable land
Silvi pasture Ha 1.322 10 13.22 13.22 0
LSCD Mtr 0.12 5 0.60 0.60 0
Drainage line treatment
Anicut Nos 9.276 2 18.552 18.552 0
Total (B) 349.57 185.89 163.68
( C ) Production System and micro enterprise(15%)
Production measures for arable land
10-20% towards
project cost
Sprinklers and Drip irrigation
10 2.40 2.40
Crop Demonstration
Kharif Crop
Demonstration Ha 0.010 2500 25.000 25.000
Rabi Crop
Demonstration Ha 0.020 0 0.000 0.000
Kitchen Garden Ha 0.005 51 0.255 0.255
Horticulture Ha 0.300 9 2.700 2.700
Agro forestry Ha 0.200 10 2.000 2.000
Compost pit Ha 0.100 15 1.500 1.500
Soil & Water
Testing Nos 0.002 120 0.240 0.240
Live stock camp Nos 0.240 0 0.000 0.000
Live stock breed
improvement Nos 0.500 3 1.500 1.500
Micro Enterprise
Vaccination Nos 2000 0 0
SHG Revolving
Fund
SHG % 0.25 63 18.822 18.822
Indivisual % 0.25 7 2.091 2.091
SHG Fedration % 2.00 30 8.963 8.963
Total (C) 65.4705 63.0705 2.4
(D) Consolidation
3%
9.9585 9.9585 0
Grand Total 498.03 331.95 166.08
Proposed Development Plan
Simarkhiya
(A) Preparatory phase activities capacity building trainings & EPA
Activity Unit Unit Cost
GP2
Quantity Total Cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution
Admn. 10% 3.00 10%
Monitoring 1% 0.30 1%
Evaluation 1% 0.30 1%
EPA 4% 1.20 4% 0
I & CB 5% 1.50 5%
DPR 1% 0.30 1%
Total (A) 6.60 6.60 0 0
(B) Natural resource management (60%)
Conservation measures for arable land(private land)
Farm Pond
(Tanka) Nos 1.32 11 14.52 14.52
5-10% towards WDF Khadeen Nos 5.379 0 0.00 0.00
Field Bunding Ha 0.166 14 2.28 2.28
Plantation Ha 1.316 0 0.00 0.00
Khadeen/Tanka Nos 1.32 30 39.60 0 39.60
Conservation measures for non arable land
Silvi pasture Ha 1.322 0 0 0 0
LSCD Mtr 0.116 0 0.00 0.00 0
Drainage line treatment
Anicut Nos 9.276 0 0 0 0
Total (B) 56.40 16.80 39.60
( C ) Production System and micro enterprise(15%)
Production measures for arable land
10-20% towards
project cost
Sprinklers and Drip irrigation
0 0.00 0.00
Crop Demonstration
Kharif Crop
Demonstration Ha 0.010 60 0.600 0.600
Rabi Crop
Demonstration Ha 0.020 0 0.000 0.000
Kitchen Garden Ha 0.005 0 0.000 0.000
Horticulture Ha 0.300 1 0.300 0.300
Agro forestry Ha 0.200 3 0.600 0.600
Compost pit Ha 0.100 10 1.000 1.000
Soil & Water
Testing Nos 0.002 0 0.000 0.000
Live stock camp Nos 0.240 0 0.000 0.000
Live stock breed
improvement Nos 0.500 1 0.500 0.500
Micro Enterprise
Vaccination Nos 1000 0 0
SHG Revolving
Fund
SHG % 0.25 63 1.701 1.701
Indivisual % 0.25 7 0.189 0.189
SHG Fedration % 2.00 30 0.810 0.810
Total (C) 5.7 5.7 0
(D) Consolidation
3%
0.9 0.9 0
Grand Total 69.60 30.00 39.60
Proposed Development Plan
Patodi
(A) Preparatory phase activities capacity building trainings & EPA
Activity Unit Unit Cost
GP2
Quantity Total Cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution
Admn. 10% 7.77 10%
Monitoring 1% 0.78 1%
Evaluation 1% 0.78 1%
EPA 4% 3.11 4% 0
I & CB 5% 3.89 5%
DPR 1% 0.78 1%
Total (A) 17.09 17.09 0 0
(B) Natural resource management (60%)
Conservation measures for arable land(private land)
Farm Pond
(Tanka) Nos 1.32 24 31.68 31.68
5-10% towards WDF Khadeen Nos 5.379 1 5.38 5.38
Field Bunding Ha 0.166 39 6.45 6.45
Plantation Ha 1.316 0 0.00 0.00
Khadeen/Tanka Nos 1.32 74 97.68 0 97.68
Conservation measures for non arable land
Silvi pasture Ha 1.322 0 0.00 0.00 0
LSCD Mtr 0.116 0 0.00 0.00 0
Drainage line treatment
Anicut Nos 9.276 0 0 0 0
Total (B) 141.19 43.51 97.68
( C ) Production System and micro enterprise(15%)
Production measures for arable land
10-20% towards
project cost
Sprinklers and Drip irrigation
5 1.20 1.20
Crop Demonstration
Kharif Crop
Demonstration Ha 0.010 356 3.560 3.560
Rabi Crop
Demonstration Ha 0.020 0 0.000 0.000
Kitchen Garden Ha 0.005 2 0.010 0.010
Horticulture Ha 0.300 3 0.900 0.900
Agro forestry Ha 0.200 5 1.000 1.000
Compost pit Ha 0.100 10 1.000 1.000
Soil & Water
Testing Nos 0.002 150 0.300 0.300
Live stock camp Nos 0.240 0 0.000 0.000
Live stock breed
improvement Nos 0.500 2 1.000 1.000
Micro Enterprise
Vaccination Nos 1500 0 0
SHG Revolving
Fund
SHG % 0.25 63 4.406 4.406
Indivisual % 0.25 7 0.490 0.490
SHG Fedration % 2.00 30 2.098 2.098
Total (C) 15.963 14.763 1.2
(D) Consolidation
3%
2.331 2.331 0
Grand Total 176.58 77.70 98.88
Proposed Development Plan
Barmer- 37
(A) Preparatory phase activities capacity building trainings & EPA
Activity Unit Unit Cost
GP1
Quantity Total Cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution
Admn. 10% 115.23 10%
Monitoring 1% 11.52 1%
Evaluation 1% 11.52 1%
EPA 4% 46.09 0
I & CB 5% 57.62 5%
DPR 1% 11.52 1%
Total (A) 253.51 253.51 0 0
(B) Natural resource management (60%)
Conservation measures for arable land(private land)
Farm Pond
(Tanka) Nos 1.32 235 310.20 310.20
5-10% towards WDF Khadeen Nos 5.379 23 123.72 123.72
Field Bunding Ha 0.166 583 96.71 96.71
Plantation Ha 1.316 20 26.32 26.32
Khadeen/Tanka Nos 1.32 407 537.24 0 537.24
Conservation measures for non arable land
Silvi pasture Mtr 1.322 30 39.66 39.66 0
LSCD Mtr 0.116 20 2.298 2.298 0
Drainage line treatment
Anicut Nos 9.276 5 46.38 46.38 0
Total (B) 1182.53 645.29 537.24
( C ) Production System and micro enterprise(15%)
Production measures for arable land
10-20% towards
project cost
Sprinklers and Drip irrigation
21 5.00 5.00
Crop Demonstration
Kharif Crop
Demonstration Ha 0.010 6482 64.820 64.820
Rabi Crop
Demonstration Ha 0.020 0 0.000 0.000
Kitchen Garden Ha 0.005 254 1.270 1.270
Horticulture Ha 0.300 33 9.900 9.900
Agro forestry Ha 0.200 48 9.600 9.600
Compost pit Ha 0.100 235 23.500 23.500
Soil & Water
Testing Nos 0.002 570 1.140 1.140
Live stock camp Nos 0.240 0 0.000 0.000
Live stock breed
improvement Nos 0.500 10 5.000 5.000
Micro Enterprise
Vaccination Nos 9500 0 0
SHG Revolving
Fund
SHG % 0.25 63 65.335 65.335
Indivisual % 0.25 7 7.259 7.259
SHG Fedration % 2.00 30 31.112 31.112
Total (C) 223.937 218.94 5
(D) Consolidation
3%
34.57 34.569 0
Grand Total 1694.54 1152.30 542.24
CHAPTER -IV Activity wise Total Abstract of cost
Thob
Activity Unit Quantity Unit cost
Total cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution*
Admn.
22% 156.78 156.78 Farm Pond (TANKA) Nos 130 1.32 171.60 171.60 12.87
Khadeen Nos 18 5.38 96.82 96.82 7.26
Field Bunding Ha 450 0.17 74.70 74.70 5.60
Plantation Ha 0 1.32 0.00 0.00
Silvi pasture Ha 20 1.32 26.44 26.44
LSCD Mtr 15 0.12 1.69 1.69
Anicut Nos 3 9.28 27.83 27.83
Drip irragation of Tube well 1 0.30 0.30 0.30
Drip irragation of Only Horticulture 1 0.30 0.30 0.30
Sprinkelar Irrigation
Marginal & small farmers 2 0.20 0.40 0.40
Large farmer 2 0.20 0.40 0.40
Tanka work /khadeen 179 1.32 236.28 236.28
Vaccination 5000 0 0.00 0.00
SHG Revolving Fund
SHG % 63 0.25 40.407 40.407
Indivisual % 7 0.25 4.490 4.490
SHG Fedration % 30 2.00 19.242 19.242
Kharif Crop
Demonstration Ha
3566 0.010 35.660 35.660
Rabi Crop
Demonstration Ha
0 0.020 0.000 0.000
Kitchen Garden Ha 201 0.005 1.005 1.005
Horticulture Ha 20 0.300 6.000 6.000
Agro forestry Ha 30 0.200 6.000 6.000
Compost pit Ha 200 0.100 20.000 20.000
Soil & Water Testing Nos 300 0.002 0.600 0.600
Live stock camp Nos 0 0.240 0.000 0.000
Live stock breed
improvement Nos
4 0.500 2.000 2.000
Consolidated Phase 3% 21.3795 21.3795
5820.6 950.33 712.65 237.68 25.73
*Tentative and will vary during execution according to beneficiary
CHAPTER -I V Activity wise Total Abstract of cost
Khannora
Activity Unit Quantity Unit cost
Total cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution*
Admn.
22% 73.03 73.03 Farm Pond (TANKA) Nos 70 1.32 92.40 92.40 6.93
Khadeen Nos 4 5.38 21.52 21.52 1.61
Field Bunding Ha 80 0.17 13.28 13.28 1.00
Plantation Ha 20 1.32 26.32 26.32
Silvi pasture Ha 10 1.32 13.22 13.22
LSCD Mtr 5 0.12 0.60 0.60
Anicut Nos 2 9.28 18.55 18.55
Drip irragation of Tube well 2 0.30 0.60 0.60
Drip irragation of Only Horticulture 2 0.30 0.60 0.60
Sprinkelar Irrigation
Marginal & small farmers 4 0.20 0.80 0.80
Large farmer 2 0.20 0.40 0.40
Tanka work /khadeen 124 1.32 163.68 163.68
Vaccination 2000 0 0.00 0.00
SHG Revolving Fund
SHG % 63 0.250 18.822 18.822
Indivisual % 7 0.250 2.091 2.091
SHG Fedration % 30 2.000 8.963 8.963
Kharif Crop
Demonstration Ha
2500 0.010 25.000 25.000
Rabi Crop
Demonstration Ha
0 0.020 0.000 0.000
Kitchen Garden Ha 51 0.005 0.255 0.255
Horticulture Ha 9 0.300 2.700 2.700
Agro forestry Ha 10 0.200 2.000 2.000
Compost pit Ha 15 0.100 1.500 1.500
Soil & Water Testing Nos 120 0.002 0.240 0.240
Live stock camp Nos 0 0.240 0.000 0.000
Live stock breed
improvement Nos
3 0.500 1.500 1.500
Consolidated Phase 3% 9.9585 9.9585
2325.21 498.03 331.95 166.08 9.54
*Tentative and will vary during execution according to beneficiary
CHAPTER -I V
Activity wise Total Abstract of cost
Simarkhiya
Activity Unit Quantity Unit cost
Total cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution*
Admn.
22% 6.60 6.60 Farm Pond (TANKA) Nos 11 1.32 14.52 14.52 1.09
Khadeen Nos 0 5.38 0.00 0.00 0.00
Field Bunding Ha 14 0.17 2.28 2.28 0.17
Plantation Ha 0 1.32 0.00 0.00
Silvi pasture Ha 0 1.32 0.00 0.00
LSCD Mtr 0 0.12 0.00 0.00
Anicut Nos 0 9.28 0.00 0.00
Drip irragation of Tube well 0 0.30 0.00 0.00
Drip irragation of Only Horticulture 0 0.30 0.00 0.00
Sprinkelar Irrigation
Marginal & small farmers 0 0.20 0.00 0.00
Large farmer 0 0.20 0.00 0.00
Tanka work /khadeen 30 1.32 39.60 39.60
Vaccination 1000 0 0.00 0.00
SHG Revolving Fund
SHG % 63 0.250 1.701 1.701
Indivisual % 7 0.250 0.189 0.189
SHG Fedration % 30 2.000 0.810 0.810
Kharif Crop
Demonstration Ha
60 0.010 0.600 0.600
Rabi Crop
Demonstration Ha
0 0.020 0.000 0.000
Kitchen Garden Ha 0 0.005 0.000 0.000
Horticulture Ha 1 0.300 0.300 0.300
Agro forestry Ha 3 0.200 0.600 0.600
Compost pit Ha 10 0.100 1.000 1.000
Soil & Water Testing Nos 0 0.002 0.000 0.000
Live stock camp Nos 0 0.240 0.000 0.000
Live stock breed
improvement Nos
1 0.500 0.500 0.500
Consolidated Phase 3% 0.900 0.900
1054.73 69.60 30.00 39.60 1.26
*Tentative and will vary during execution according to beneficiary
CHAPTER -I V
Activity wise Total Abstract of cost
Patodi
Activity Unit Quantity Unit cost
Total cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution*
Admn.
22% 17.09 17.09 Farm Pond (TANKA) Nos 24 1.32 31.68 31.68 2.38
Khadeen Nos 1 5.38 5.38 5.38 0.40
Field Bunding Ha 39 0.17 6.45 6.45 0.48
Plantation Ha 0 1.32 0.00 0.00
Silvi pasture Ha 0 1.32 0.00 0.00
LSCD Mtr 0 0.12 0.00 0.00
Anicut Nos 0 9.28 0.00 0.00
Drip irragation of Tube well 1 0.30 0.30 0.30
Drip irragation of Only Horticulture 1 0.30 0.30 0.30
Sprinkelar Irrigation
Marginal & small farmers 2 0.20 0.40 0.40
Large farmer 1 0.20 0.20 0.20
Tanka work /khadeen 74 1.32 97.68 97.68
Vaccination 1500 0 0.00 0.00
SHG Revolving Fund
SHG % 63 0.250 4.406 4.406
Indivisual % 7 0.250 0.490 0.490
SHG Fedration % 30 2.000 2.098 2.098
Kharif Crop
Demonstration Ha
356 0.010 3.560 3.560
Rabi Crop
Demonstration Ha
0 0.020 0.000 0.000
Kitchen Garden Ha 2 0.005 0.010 0.010
Horticulture Ha 3 0.300 0.900 0.900
Agro forestry Ha 5 0.200 1.000 1.000
Compost pit Ha 10 0.100 1.000 1.000
Soil & Water Testing Nos 150 0.002 0.300 0.300
Live stock camp Nos 0 0.240 0.000 0.000
Live stock breed
improvement Nos
2 0.500 1.000 1.000
Consolidated Phase 3% 2.331 2.331
1642.87 176.58 77.70 98.88 3.26
*Tentative and will vary during execution according to beneficiary
CHAPTER -I V
Activity wise Total Abstract of cost
Barmer- 37
Activity Unit Quantity Unit cost
Total cost
Cost from
Project Fund
Convergence Fund
Beneficiary Contribution*
Admn.
22% 253.51 253.51 Farm Pond (TANKA) Nos 235 1.32 310.20 310.20 23.27
Khadeen Nos 23 5.38 123.72 123.72 9.28
Field Bunding Ha 583 0.17 96.71 96.71 7.25
Field Bunding Ha 20 1.32 26.32 26.32 1.97
Silvi pasture Mtr 30 1.32 39.66 39.66
LSCD Mtr 20 0.12 2.30 2.30
Anicut Nos 5 9.28 46.38 46.38
Drip irragation of Tube well 4 0.30 1.20 1.20
Drip irragation of Only Horticulture 4 0.30 1.20 1.20
Sprinkelar Irrigation 0 0.00
Marginal & small farmers 8 0.20 1.60 1.60
Large farmer 5 0.20 1.00 1.00
Tanka work /khadeen 407 1.32 537.24 537.24
Vaccination 9500 0.00 0.00 0.00
SHG Revolving Fund 0 0.00
SHG % 63 0.25 65.335 65.335
Indivisual % 7 0.25 7.259 7.259
SHG Fedration % 30 2.00 31.112 31.112
Kharif Crop
Demonstration Ha
6482 0.01 64.820 64.820
Rabi Crop
Demonstration Ha
0 0.02 0.000 0.000
Kitchen Garden Ha 254 0.005 1.270 1.270
Horticulture Ha 33 0.30 9.900 9.900
Agro forestry Ha 48 0.20 9.600 9.600
Compost pit Ha 235 0.10 23.500 23.500
Soil & Water Testing Nos 570 0.00 1.140 1.140
Live stock camp Nos 0 0.24 0.000 0.000
Live stock breed
improvement Nos
10 0.50 5.000 5.000
Consolidated Phase 3% 34.57 34.569
10843.4 1694.54 1152.30 542.24 41.77
*Tentative and will vary during execution according to beneficiary
Name of the W. C. Thob
Macro/Micro Geographical Area
4751 Ha
G.P. Thob
Scheme IWMP
Effective
Area
4751 Ha
Block Balotra
Date of Sanction 11.11.2010 Total Arable land
Ha
District. BARMER
Date of Appoval of the
work plan
1.
Irrigated
0 Ha
Village Covered 4 NO.
2. Unirrigated
Ha
Project outlay 712.65 LAC
No. of SHG's formed 4
Total Nonarable
land
Ha
Total Area 4751 Hactare No. of UG's formed 4
1. Pasture
Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND
0 Ha
YEARWISE WORK PLAN OF WATERSHED COMMITTEE THOB
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2010-11 2011-12 2012-13 2013-14 2015-16 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 71.265 14.253 14.253 14.253 14.253 14.253 10% 71.265
II Monitoring 1% 7.127 1.4253 1.425 1.425 1.425 1.425 1% 7.127
III Evaluation 1% 7.127 3.563 3.563 1% 7.127
IV Entry point activity 4% 28.506 22 28.506 4% 28.506
V Inst. & Capacity
Building
5% 35.633 3.563 17.816 10.690 3.563 5% 35.633
VI DPR Preparation 1% 7.127 1 4.276 1 2.851 1% 7.127
TOTAL (A) 156.783 23.517 64.851 26.368 22.805 19.242 156.783
W/S WORK PHASE
VII NRM 56% 399.084
1 Conservation measures
for areable land (private
land)
(i) Farm Pond (Tanka) Nos 130 132000 171.600 0 0.000 0 0.000 16 21.450 65 85.800 49 64.350 130 171.600
(ii) Khadeen Nos 18 537900 96.822 0 0.000 0 0.000 2 12.103 9 48.411 7 36.308 18 96.822
(iii) Field Bunding Ha 450 16600 74.700 0 0.000 0 0.000 56 9.338 225 37.350 169 28.013 450 74.700
(iv) Plantation Ha 0 131600 0.000 0 0.000 0 0.000 0.000 0.000 0.000 0 0.000
2 Conservation measures
for non areable land
(i) Silvi pasture Ha 20 132200 26.440 0 0.000 20 12.750 6.540 4.160 2.990 20 26.440
(ii) LSCD Mtr 15 11600 1.694 0 0.000 0 0.000 7 0.847 7 0.847 0 0.000 15 1.694
3 Drainage line treatment
(i) Anicut Nos 3 927600 27.828 0.000 0 0.000 0 0.000 0 27.828 0 27.828
TOTAL (B) 38 399.084 20 12.750 7 50.277 7 176.57 0 159.49 633 399.084
VIII Livelihoods 9% 64.139
a SHG Revolving Fund
(i) SHG % 63 0.25 40.407 0.000 0.000 7 4.490 42 26.938 14 8.979 63 40.407
(ii) Indivisual % 7 0.25 4.490 0.000 0.000 1 0.499 5 2.993 2 0.998 7 4.490
(iii) SHG Fedration % 30 2.00 19.242 0.000 0.000 3 2.138 20 12.828 7 4.276 30 19.242
TOTAL (C) 100 64.139 0.000 0.000 7.127 42.759 14.253 64.139
IX Production System and
micro enterprise
10% 71.265
(i) Kharif Crop
Demonstration Ha
3566 0.010 35.660 0 0.000 0 0.000 357 3.566 2140 21.396 1070 10.698 3566 35.660
(ii) Rabi Crop
Demonstration Ha
0 0.020 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iii) Kitchen Garden Ha 201 0.005 1.005 0 0.000 0 0.000 20 0.101 121 0.603 60 0.302 201 1.005
(iv) Horticulture Ha 20 0.300 6.000 0 0.000 0 0.000 2 0.600 12 3.600 6 1.800 20 6.000
(v) Agro forestry Ha 30 0.200 6.000 0 0.000 0 0.000 3 0.600 18 3.600 9 1.800 30 6.000
(vi) Compost pit Ha 200 0.100 20.000 0 0.000 0 0.000 20 2.000 120 12.000 60 6.000 200 20.000
(vii) Soil & Water Testing Nos 300 0.002 0.600 0 0.000 0 0.000 30 0.060 180 0.360 90 0.180 300 0.600
(viii) Live stock camp Nos 0 0.240 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(Ix) Live stock breed
improvement Nos
4 0.500 2.000 0 0.000 0 0.000 0 0.200 2 1.200 1 0.600 4 2.000
TOTAL (D) 71.265 0.000 0.000 7.127 42.759 21.380 71.265
X CONSOLIDATED
PHASE
3% 21.380 0.000 0.000 0.000 12.828 8.552 3% 21.380
GRAND TOTAL 712.65 23.52 77.60 90.90 297.72 222.91 712.65
CHAPTER-V
Name of the W. C. Khannora
Macro/Micro Geographical Area
2213 Ha
G.P. Khannora
Scheme IWMP
Effective
Area
2213 Ha
Block Balotra
Date of Sanction 11.11.2010 Total Arable land
0 Ha
District. BARMER
Date of Appoval of the
work plan
1.
Irrigated
0 Ha
Village Covered 2 NO.
2. Unirrigated
0 Ha
Project outlay 331.95 LAC
No. of SHG's formed 4
Total Nonarable
land
0 Ha
Total Area 2213 Hactare No. of UG's formed 3
1. Pasture
0 Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND
0 Ha
YEARWISE WORK PLAN OF WATERSHED COMMITTEE KHANNORA
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2010-11 2011-12 2012-13 2013-14 2014-15 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 33.195 6.639 6.639 6.639 6.639 6.639 10% 33.195
II Monitoring 1% 3.320 0.6639 0.664 0.664 0.664 0.664 1% 3.320
III Evaluation 1% 3.320 1.660 1.660 1% 3.320
IV Entry point activity 4% 13.278 10 13.278 4% 13.278
V Inst. & Capacity
Building
5% 16.598 1.660 8.299 4.979 1.660 5% 16.598
VI DPR Preparation 1% 3.320 1 1.992 1 1.328 1% 3.320
TOTAL (A) 73.029 10.954 30.207 12.282 10.622 8.963 73.029
W/S WORK PHASE
VII NRM 56% 185.892
1 Conservation measures
for areable land (private
land)
(i) Farm Pond (Tanka) Nos 70 132000 92.400 0 0.000 0 0.000 9 11.550 35 46.200 26 34.650 70 92.400
(ii) Khadeen Nos 4 537900 21.516 0 0.000 0 0.000 1 2.690 2 10.758 2 8.069 4 21.516
(iii) Field Bunding Ha 80 16600 13.280 0 0.000 0 0.000 10 1.660 40 6.640 30 4.980 80 13.280
(iv) Plantation Ha 20 131600 26.320 0 0.000 20 12.630 6.540 4.160 2.990 20 26.320
2 Conservation measures
for non areable land
.
(i) Silvi pasture Ha 10 132200 13.220 0 0.000 10 5.660 3.510 2.320 1.730 10 13.220
(ii) LSCD Mtr 5 11600 0.604 0 0.000 0 0.000 3 0.302 3 0.302 0 0.000 5 0.604
3 Drainage line treatment
(i) Anicut Nos 2 927600 18.552 0.000 0 0.000 1 9.276 0 9.276 1 18.552
TOTAL (B) 17 185.892 10 5.660 3 26.251 4 79.66 0 61.69 190 185.892
VIII Livelihoods 9% 29.876 3.320 19.917 6.639
a SHG Revolving Fund
(i) SHG % 63 0.25 18.822 0.000 0.000 7 2.091 42 12.548 14 4.183 63 18.822
(ii) Indivisual % 7 0.25 2.091 0.000 0.000 1 0.232 5 1.394 2 0.465 7 2.091
(iii) SHG Fedration % 30 2.00 8.963 0.000 0.000 3 0.996 20 5.975 7 1.992 30 8.963
TOTAL (C) 100 29.876 0.000 0.000 3.320 19.917 6.639 29.876
IX Production System and
micro enterprise
10% 33.195 3.320 19.917 9.959
(i) Kharif Crop
Demonstration Ha
2500 0.010 25.000 0 0.000 0 0.000 250 2.500 1500 15.000 750 7.500 2500 25.000
(ii) Rabi Crop
Demonstration Ha
0 0.020 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iii) Kitchen Garden Ha 51 0.005 0.255 0 0.000 0 0.000 5 0.026 31 0.153 15 0.077 51 0.255
(iv) Horticulture Ha 9 0.300 2.700 0 0.000 0 0.000 1 0.270 5 1.620 3 0.810 9 2.700
(v) Agro forestry Ha 10 0.200 2.000 0 0.000 0 0.000 1 0.200 6 1.200 3 0.600 10 2.000
(vi) Compost pit Ha 15 0.100 1.500 0 0.000 0 0.000 2 0.150 9 0.900 5 0.450 15 1.500
(vii) Soil & Water Testing Nos 120 0.002 0.240 0 0.000 0 0.000 12 0.024 72 0.144 36 0.072 120 0.240
(viii) Live stock camp Nos 0 0.240 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(ix) Live stock breed
improvement Nos
3 0.500 1.500 0 0.000 0 0.000 0 0.150 2 0.900 1 0.450 3 1.500
TOTAL (D) 33.195 0.000 0.000 3.320 19.917 9.959 33.195
X CONSOLIDATED
PHASE
3% 9.959 0.000 0.000 0.000 5.975 3.983 3% 9.959
GRAND TOTAL 331.95 10.95 35.87 45.17 136.09 91.24 331.95
CHAPTER-V
Name of the W. C. Simarkhiya
Macro/Micro Geographical Area
211 Ha
G.P. Simarkhiya
Scheme IWMP
Effective
Area
200 Ha
Block Balotra
Date of Sanction 11.11.2010 Total Arable land
0 Ha
District. BARMER
Date of Appoval of the
work plan
1.
Irrigated
0 Ha
Village Covered 1 NO.
2. Unirrigated
0 Ha
Project outlay 30 LAC
No. of SHG's formed 0
Total Nonarable
land
0 Ha
Total Area 200 Hactare No. of UG's formed 0
1. Pasture
0 Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND
0 Ha
YEARWISE WORK PLAN OF WATERSHED COMMITTEE SIMARKHIYA
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2010-11 2011-12 2012-13 2013-14 2014-15 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 3 0.6 0.600 0.600 0.600 0.600 10% 3.000
II Monitoring 1% 0.300 0.06 0.060 0.060 0.060 0.060 1% 0.300
III Evaluation 1% 0.300 0.150 0.150 1% 0.300
IV Entry point activity 4% 1.200 1 1.200 4% 1.200
V Inst. & Capacity
Building
5% 1.500 0.150 0.750 0.450 0.150 5% 1.500
VI DPR Preparation 1% 0.300 1 0.180 1 0.120 1% 0.300
TOTAL (A) 6.600 0.990 2.730 1.110 0.960 0.810 6.600
W/S WORK PHASE
VII NRM 56% 16.800
1 Conservation measures
for areable land (private
land)
(i) Farm Pond (Tanka) Nos 11 132000 14.520 0 0.000 0 0.000 1 1.815 6 7.260 4 5.445 11 14.520
(ii) Khadeen Nos 0 537900 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iii) Field Bunding Ha 14 16600 2.280 0 0.000 0 0.000 2 0.285 7 1.140 5 0.855 14 2.280
(iv) Plantation Ha 0 131600 0.000 0 0.000 0 0.000 0.000 0.000 0.000 0 0.000
2 Conservation measures
for non areable land
.
(i) Silvi pasture Ha 0 132200 0.000 0 0.000 0 0.000 0.000 0.000 0.000 0 0.000
(ii) LSCD Mtr 0 11600 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
3 Drainage line treatment
(i) Anicut Nos 0 927600 0.000 0.000 0 0.000 0 0.000 0 0.000 0 0.000
TOTAL (B) 0 16.800 0 0.000 0 2.100 0 8.40 0 6.30 25 16.800
VIII Livelihoods 9% 2.700 0.300 1.800 0.600
a SHG Revolving Fund
(i) SHG % 63 0.25 1.701 0.000 0.000 7 0.189 42 1.134 14 0.378 63 1.701
(ii) Indivisual % 7 0.25 0.189 0.000 0.000 1 0.021 5 0.126 2 0.042 7 0.189
(iii) SHG Fedration % 30 2.00 0.810 0.000 0.000 3 0.090 20 0.540 7 0.180 30 0.810
TOTAL (C) 100 2.700 0.000 0.000 0.300 1.800 0.600 2.700
IX Production System and
micro enterprise
10% 3.000 0.300 1.800 0.900
(i) Kharif Crop
Demonstration Ha
60 0.010 0.600 0 0.000 0 0.000 6 0.060 36 0.360 18 0.180 60 0.600
(ii) Rabi Crop
Demonstration Ha
0 0.020 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iii) Kitchen Garden Ha 0 0.005 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iv) Horticulture Ha 1 0.300 0.300 0 0.000 0 0.000 0 0.030 1 0.180 0 0.090 1 0.300
(v) Agro forestry Ha 3 0.200 0.600 0 0.000 0 0.000 0 0.060 2 0.360 1 0.180 3 0.600
(vi) Compost pit Ha 10 0.100 1.000 0 0.000 0 0.000 1 0.100 6 0.600 3 0.300 10 1.000
(vii) Soil & Water Testing Nos 0 0.002 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(viii) Live stock camp Nos 0 0.240 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(ix) Live stock breed
improvement Nos
1 0.500 0.500 0 0.000 0 0.000 0 0.050 1 0.300 0 0.150 1 0.500
TOTAL (D) 3.000 0.000 0.000 0.300 1.800 0.900 3.000
X CONSOLIDATED
PHASE
3% 0.900 0.000 0.000 0.000 0.540 0.360 3% 0.900
GRAND TOTAL 30.00 0.99 2.73 3.81 13.50 8.97 30.00
CHAPTER-V
Name of the W. C. Patodi
Macro/Micro Geographical Area
518 Ha
G.P. Patodi
Scheme IWMP
Effective
Area
518 Ha
Block Balotra
Date of Sanction 11.11.2010 Total Arable land
0 Ha
District. BARMER
Date of Appoval of the
work plan
1.
Irrigated
0 Ha
Village Covered 1 NO.
2. Unirrigated
0 Ha
Project outlay 77.7 LAC
No. of SHG's formed 1
Total Nonarable
land
0 Ha
Total Area 518 Hactare No. of UG's formed 1
1. Pasture
0 Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND
0 Ha
YEARWISE WORK PLAN OF WATERSHED COMMITTEE PATODI
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2010-11 2011-12 2012-13 2013-14 2014-15 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 7.77 1.554 1.554 1.554 1.554 1.554 10% 7.770
II Monitoring 1% 0.777 0.1554 0.155 0.155 0.155 0.155 1% 0.777
III Evaluation 1% 0.777 0.389 0.389 1% 0.777
IV Entry point activity 4% 3.108 2 3.108 4% 3.108
V Inst. & Capacity
Building
5% 3.885 0.389 1.943 1.166 0.389 5% 3.885
VI DPR Preparation 1% 0.777 1 0.466 1 0.311 1% 0.777
TOTAL (A) 17.094 2.564 7.071 2.875 2.486 2.098 17.094
W/S WORK PHASE
VII NRM 56% 43.512
1 Conservation measures
for areable land (private
land)
(i) Farm Pond (Tanka) Nos 24 132000 31.680 0 0.000 0 0.000 3 3.960 12 15.840 9 11.880 24 31.680
(ii) Khadeen Nos 1 537900 5.379 0 0.000 0 0.000 0 0.672 1 2.690 0 2.017 1 5.379
(iii) Field Bunding Ha 39 16600 6.453 0 0.000 0 0.000 5 0.807 19 3.226 15 2.420 39 6.453
(iv) Plantation Ha 0 131600 0.000 0 0.000 0 0.000 0.000 0.000 0.000 0 0.000
2 Conservation measures
for non areable land
.
(i) Silvi pasture Ha 0 132200 0.000 0 0.000 0 0.000 0.000 0.000 0.000 0 0.000
(ii) LSCD Mtr 0 11600 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
3 Drainage line treatment
(i) Anicut Nos 0 927600 0.000 0.000 0 0.000 0 0.000 0 0.000 0 0.000
TOTAL (B) 0 43.512 0 0.000 0 5.439 0 21.76 0 16.32 64 43.512
VIII Livelihoods 9% 6.993 0.777 4.662 1.554
a SHG Revolving Fund
(i) SHG % 63 0.25 4.406 0.000 0.000 7 0.490 42 2.937 14 0.979 63 4.406
(ii) Indivisual % 7 0.25 0.490 0.000 0.000 1 0.054 5 0.326 2 0.109 7 0.490
(iii) SHG Fedration % 30 2.00 2.098 0.000 0.000 3 0.233 20 1.399 7 0.466 30 2.098
TOTAL (C) 100 6.993 0.000 0.000 0.777 4.662 1.554 6.993
IX Production System and
micro enterprise
10% 7.770 0.777 4.662 2.331
(i) Kharif Crop
Demonstration Ha
356 0.010 3.560 0 0.000 0 0.000 36 0.356 214 2.136 107 1.068 356 3.560
(ii) Rabi Crop
Demonstration Ha
0 0.020 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(iii) Kitchen Garden Ha 2 0.005 0.010 0 0.000 0 0.000 0 0.001 1 0.006 1 0.003 2 0.010
(iv) Horticulture Ha 3 0.300 0.900 0 0.000 0 0.000 0 0.090 2 0.540 1 0.270 3 0.900
(v) Agro forestry Ha 5 0.200 1.000 0 0.000 0 0.000 1 0.100 3 0.600 2 0.300 5 1.000
(vi) Compost pit Ha 10 0.100 1.000 0 0.000 0 0.000 1 0.100 6 0.600 3 0.300 10 1.000
(vii) Soil & Water Testing Nos 150 0.002 0.300 0 0.000 0 0.000 15 0.030 90 0.180 45 0.090 150 0.300
(viii) Live stock camp Nos 0 0.240 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000
(ix) Live stock breed
improvement Nos
2 0.500 1.000 0 0.000 0 0.000 0 0.100 1 0.600 1 0.300 2 1.000
TOTAL (D) 7.770 0.000 0.000 0.777 4.662 2.331 7.770
X CONSOLIDATED
PHASE
3% 2.331 0.000 0.000 0.000 1.399 0.932 3% 2.331
GRAND TOTAL 77.70 2.56 7.07 9.87 34.96 23.23 77.70
CHAPTER-V
Name of the W. C. Barmer-37
Macro/Micro Geographical Area
7693 Ha
G.P. Barmer-37
Scheme IWMP
Effective
Area
7682 Ha
Block BALOTRA
Date of Sanction 11.11.2010 Total Arable land
5780 Ha
District. BARMER
Date of Appoval of the
work plan
1.
Irrigated
0 Ha
Village Covered 8 NO.
2. Unirrigated
5780 Ha
Project outlay 1152.3 LAC
No. of SHG's formed 9
Total Nonarable
land
1291 Ha
Total Area 7682 Hactare No. of UG's formed 8
1. Pasture
1100 Ha
No. of WC's formed 4
2. Govt. / waste /OTHER LAND
802 Ha
YEARWISE WORK PLAN OF WATERSHED BARMER-37
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2010-11 2011-12 2012-13 2013-14 2014-15 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 115.23 23.046 23.046 23.046 23.046 23.046 10% 115.230
II Monitoring 1% 11.523 2.3046 2.305 2.305 2.305 2.305 1% 11.523
III Evaluation 1% 11.523 5.762 5.762 1% 11.523
IV Entry point activity 4% 46.092 35 46.092 4% 46.092
V Inst. & Capacity
Building
5% 57.615 5.762 28.808 17.285 5.762 5% 57.615
VI DPR Preparation 1% 11.523 1 6.914 1 4.609 1% 11.523
TOTAL (A) 253.506 38.026 104.859 42.635 36.874 31.112 253.506
W/S WORK PHASE
VII NRM 56% 645.288
1 Conservation measures
for areable land (private
land)
(i) Farm Pond (Tanka) Nos 235 132000 310.200 0 0.00 0 0.00 29 38.78 118 155.10 88 116.33 235 310.20
(ii) Khadeen Nos 23 537900 123.717 0 0.00 0 0.00 3 15.46 12 61.86 9 46.39 23 123.72
(iii) Field Bunding Ha 582.61 16600 96.713 0 0.00 0 0.00 73 12.09 291 48.36 218 36.27 583 96.71
(iv) Plantation Ha 20 131600 26.320 0 0.00 20 12.63 0 6.54 0 4.16 0 2.99 20 26.320
2 Conservation measures
for non areable land
(i) Silvi pasture Mtr 30 132200 39.660 0 0.00 30 18.41 0 10.05 0 6.48 0 4.72 30 39.66
(ii) LSCD Mtr 19.81 11600 2.298 0 0.00 0 0.00 10 1.15 10 1.15 0 0.00 20 2.30
3 Drainage line treatment
(i) Anicut Nos 5 927600 46.380 0 0.00 0 0.00 0 0.00 1 9.28 0 37.10 1 46.38
TOTAL (B) 55 645.288 30 18.410 10 84.068 11 286.38 0 243.80 911 645.288
VIII Livelihoods 9% 103.707 11.523 69.138 23.046
a SHG Revolving Fund
(i) SHG % 63 0.25 65.335 0 0.00 0 0.00 28 7.26 168 43.56 56 14.52 252 65.335
(ii) Indivisual % 7 0.25 7.259 0 0.00 0 0.00 3 0.81 19 4.84 6 1.61 28 7.259
(iii) SHG Fedration % 30 2.00 31.112 0 0.00 0 0.00 13 3.46 80 20.74 27 6.91 120 31.112
TOTAL (C) 100 103.707 0.000 0.000 11.523 69.138 23.046 103.707
IX Production System and
micro enterprise
10% 115.230
(i) Kharif Crop
Demonstration Ha
6482 0.010 64.820 0 0.00 0 0.00 648 6.48 3889 38.89 1945 19.45 6482 64.820
(ii) Rabi Crop
Demonstration Ha
0 0.020 0.000 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
(iii) Kitchen Garden Ha 254 0.005 1.270 0 0.00 0 0.00 25 0.13 152 0.76 76 0.38 254 1.270
(iv) Horticulture Ha 33 0.300 9.900 0 0.00 0 0.00 3 0.99 20 5.94 10 2.97 33 9.900
(v) Agro forestry Ha 48 0.200 9.600 0 0.00 0 0.00 5 0.96 29 5.76 14 2.88 48 9.600
(vi) Compost pit Ha 235 0.100 23.500 0 0.00 0 0.00 24 2.35 141 14.10 71 7.05 235 23.500
(vii) Soil & Water Testing Nos 570 0.002 1.140 0 0.00 0 0.00 57 0.11 342 0.68 171 0.34 570 1.140
(viii) Live stock camp Nos 0 0.240 0.000 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
(ix) Live stock breed
improvement Nos
10 0.500 5.000 0 0.00 0 0.00 1 0.50 6 3.00 3 1.50 10 5.000
TOTAL (D) 115.230 0.000 0.000 11.523 69.138 34.569 115.230
X CONSOLIDATED
PHASE
3% 34.57 0.00 0.00 0.00 20.74 13.83 3% 34.57
GRAND TOTAL 1152.30 38.03 123.27 149.75 482.27 346.35 1152.30
CHAPTER – V
Thob
Convergence with NREGA , Agriculture ext. & Animal health department
Activity no Unit cost
Total cost
1st year 2nd year 3rd year
4th year
5th year
Phy Fin Phy Fin Phy Fin Phy Fin
Agriculture ext.department
1 Drip irragation of tanka 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2
Drip irragation of Tube well 1 0.30 0.30 1 0.30 0 0.00 0 0.00 0 0.00 0 0.00
Drip irragation of Only Horticulture 1 0.30 0.30 1 0.30 0 0.00 0 0.00 0 0.00 0 0.00
3 Sprinkelar Irrigation
A
Marginal & small farmers 2 0.20 0.40 2 0.40 0 0.00 0 0.00 0 0.00 0 0.00
B Large farmer 2 0.20 0.40 2 0.40 0 0.00 0 0.00 0 0.00 0 0.00
Total (A) 1.40 1.40 0.00 0.00 0.00 0.00
NREGA
1 Tanka work /khadeen 179 1.32 236.28 179 236.28 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 236.28 236.28 0.00 0.00 0.00 0.00
Animal health
1 Vaccination 5000 0.00 1000 0.000 1000 0.000 1000 0.000 1000 0.000 1000 0.000
Grand Total 5179 237.68 1185 237.68 1000 0.00 1000 0.00 1000 0.00 1000 0.00
Khannora
Convergence with NREGA , Agriculture ext. & Animal health department
Activity no Unit cost
Total cost
1st year 2nd year 3rd year
4th year
5th year
Phy Fin Phy Fin Phy Fin Phy Fin
Agriculture ext.department
1 Drip irragation of tanka 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2
Drip irragation of Tube well 2 0.30 0.60 2 0.60 0 0.00 0 0.00 0 0.00 0 0.00
Drip irragation of Only Horticulture 2 0.30 0.60 2 0.60 0 0.00 0 0.00 0 0.00 0 0.00
3 Sprinkelar Irrigation
A
Marginal & small farmers 4 0.20 0.80 4 0.80 0 0.00 0 0.00 0 0.00 0 0.00
B Large farmer 2 0.20 0.40 2 0.40 0 0.00 0 0.00 0 0.00 0 0.00
Total (A) 2.40 2.40 0.00 0.00 0.00 0.00
NREGA
1 Tanka work /khadeen 124 1.32 163.68 124 163.68 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 163.68 163.68 0.00 0.00 0.00 0.00
Animal health
1 Vaccination 2000 0.00 400 0.000 400 0.000 400 0.000 400 0.000 400 0.000
Grand Total 2124 166.08 534 166.08 400 0.00 400 0.00 400 0.00 400 0.00
Simarkhiya
Convergence with NREGA , Agriculture ext. & Animal health department
Activity no Unit cost
Total cost
1st year 2nd year 3rd year
4th year
5th year
Phy Fin Phy Fin Phy Fin Phy Fin
Agriculture ext.department
1 Drip irragation of tanka 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2
Drip irragation of Tube well 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Drip irragation of Only Horticulture 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
3 Sprinkelar Irrigation
A
Marginal & small farmers 0 0.20 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
B Large farmer 0 0.20 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total (A) 0.00 0.00 0.00 0.00 0.00 0.00
NREGA
1 Tanka work /khadeen 30 1.32 39.60 30 39.60 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 39.60 39.60 0.00 0.00 0.00 0.00
Animal health
1 Vaccination 1000 0.00 200 0.000 200 0.000 200 0.000 200 0.000 200 0.000
Grand Total 1030 39.60 230 39.60 200 0.00 200 0.00 200 0.00 200 0.00
Patodi
Convergence with NREGA , Agriculture ext. & Animal health department
Activity no Unit cost
Total cost
1st year 2nd year 3rd year
4th year
5th year
Phy Fin Phy Fin Phy Fin Phy Fin
Agriculture ext.department
1 Drip irragation of tanka 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2
Drip irragation of Tube well 1 0.30 0.30 1 0.30 0 0.00 0 0.00 0 0.00 0 0.00
Drip irragation of Only Horticulture 1 0.30 0.30 1 0.30 0 0.00 0 0.00 0 0.00 0 0.00
3 Sprinkelar Irrigation
A
Marginal & small farmers 2 0.20 0.40 2 0.40 0 0.00 0 0.00 0 0.00 0 0.00
B Large farmer 1 0.20 0.20 1 0.20 0 0.00 0 0.00 0 0.00 0 0.00
Total (A) 1.20 1.20 0.00 0.00 0.00 0.00
NREGA
1 Tanka work /khadeen 74 1.32 97.68 74 97.68 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 97.68 97.68 0.00 0.00 0.00 0.00
Animal health
1 Vaccination 1500 0.00 300 0.000 300 0.000 300 0.000 300 0.000 300 0.000
Grand Total 1574 98.88 379 98.88 300 0.00 300 0.00 300 0.00 300 0.00
Barmer-37
Convergence with NREGA , Agriculture ext. & Animal health department
Activity no Unit cost
Total cost
1st year 2nd year 3rd year
4th year
5th year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Agriculture ext.department
1 Drip irragation of tanka 0 0.30 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2
Drip irragation of Tube well 4 0.30 1.20 4 1.20 0 0.00 0 0.00 0 0.00 0 0.00
Drip irragation of Only Horticulture 4 0.30 1.20 4 1.20 0 0.00 0 0.00 0 0.00 0 0.00
3 Sprinkelar Irrigation
A
Marginal & small farmers 8 0.20 1.60 8 1.60 0 0.00 0 0.00 0 0.00 0 0.00
B Large farmer 5 0.20 1.00 5 1.00 0 0.00 0 0.00 0 0.00 0 0.00
Total (A) 5.00 5.00 0.00 0.00 0.00 0.00
NREGA
1 Tanka work /khadeen 407 1.32 537.24 407 537.24 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 537.24 537.24 0.00 0.00 0.00 0.00
Animal health
1 Vaccination 9500 0.00 1400 0.000 1900 0.000 1900 0.000 1900 0.000 1900 0.000
Grand Total 9907 542.24 1828 542.24 1900 0.00 1900 0.00 1900 0.00 1900 0.00
CHAPTER – VI EXPECTED OUT COMES
1 2 3 4 5 6
S. No. Item Unit of
measurement
Pre-
project
Status
Expected Post-
project Status Remarks
1 Status of water table (Depth
to Ground water level)
Meters - -
2 Ground water structures
repaired/ rejuvenated
No. - -
3 Quality of drinking water Description POTABLE POTABLE
4 Availability of drinking water Description 10 Month 12 Month
5 Change in irrigated Area Ha - 350
6 Change in cropping/ land use
pattern
Description - -
7 Area under agricultural crop Ha - -
I Area under single crop Ha 3540 4100
Ii Area under double
crop
Ha - -
Iii Area under multiple
crop
Ha - -
8 Change in cultivated Area Ha
9 yield of
major
crops of
area
Yield of Bajra q/ha 10 11
Yield of Wheat q/ha - -
Yield of Gram q/ha - -
Yield of Mustard q/ha - -
10
production
of major
crops of
area
Production of Bajra ton 2340 3200
Production of Wheat ton - -
Production of Gram ton - -
Production of Mustard ton - -
11 Area under vegetation Ha - 50
12 Area under horticulture Ha - 23
13 Area under fuel Ha - -
14 Area under Fodder Ha - 35
15 Fodder production Q 3586 4500
16 Milk production Litres/day 3500 4000
17 SHGs Active No. 22 28
18 No. of livelihoods No. - 28
19 Income Rs.in la 11800 14000
20 Migration No. 565 390
21 SHG Federations formed No. - 4
Critical Assumption
• No severe droughts/ unexpected floods/ natural disasters
• Adequate funds are allocated for the same and released on time.
• There is no significant pest/ disease attack, and if so, then it will have been contained before irreversible damage is done.
• Adverse market conditions do not persist long.
• Sound macro-economic and growth conditions continue and the benefits are widely distributed particularly in the rural areas.
• Facilitating agencies and resource providers have the required competent staff so that timely and appropriate technical advice and services
are provided to farmers whenever required.
• The Capacity Building Plan is implemented, monitored and modified to address evolving needs and feedback from participants.
• The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and State level Implementing Agencies
Means of Verification of indicators
• Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-term and end of the project period
• Annual participatory assessment by communities during project period.
• Regular project monitoring reports prepared by project monitoring teams/ agencies.
• Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual beneficiaries/project-related village and
local bodies/PRIs.
• External review missions
• Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal Husbandry
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
DETAILED - ESTIMATE (Anicut)
ekWMy & ,uhdV fuekZ.k
yEckbZ & 15.00 ehVj ÅapkbZ & 1.80 ehVj
Location -
Item No.
Of GKN-
06
S.No. Item No. L B H Qty. Amount Labour Component
168¼c½ 1 Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 Mtr. including taking out the excavated soil as directed within a lead of 50 Mtr.
(a) Hard/dense soil Mixed with boulder
HW 1x15x(2.5+0.45)x1.8 79.650 cu.m
SideWall with US 2x7.7x1.1x1.8 30.492 cu.m
WW-US-1 1x2.58x1.1x1.8 5.108 cu.m
WW-US-2 1x2.58x1.1x1.8 5.108 cu.m
WW-DS-1 1x2.58x0.9x1.2 2.786 cu.m
WW-DS-2 1x2.58x0.9x1.2 2.786 cu.m
HWE 2x3.5x1.47x(1.8+1.8) 37.044 cu.m
HWE-2 0x2.1x0.9x0.9 0.000 cu.m
Apron 1x15x4.7x0.3 21.150 cu.m
TW 1x15x0.6x1 9.000 cu.m
Hard soil + Hard Rock
Total 193.124 cu.m
Un skilled Labour @ Rs. 92.00 Cu.m.
Labour 17767.41
Total Labour @Rs. 92.00 Cu.m.
Rs. 17767.41
G. Total 92.00
17767.41 Note : Add Extra Lift qt.@11/- cum
171 2 Providing and laying cement concrete including curing compaction etc complete using stone aggregate 40mm nominal size (hand broken) in foundation plinth, excluding the cot of shuttering, using.
(a) 1 cement : 4sand : 8aggregate
HW 1x15x2.5x0.3 11.250 cu.m
SideWall with US 2x7.7x1.1x0.15 2.541 cu.m
WW-US-1 1x2.58x1.1x0.15 0.426 cu.m
WW-US-2 1x2.58x1.1x0.15 0.426 cu.m
WW-DS-1 1x2.58x0.9x0.15 0.348 cu.m
WW-DS-2 1x2.58x0.9x0.15 0.348 cu.m
HWE 2x3.5x1.47x0.15 1.544 cu.m
HWE-2 0x2.1x0.9x0.15 0.000 cu.m
Apron 1x15x4.7x 0.000 cu.m
TW 1x15x0.6x0.15 1.350 cu.m
Total 18.233 cu.m.
Un skilled Labour @ Rs. 288.00 Cu.m.
Labour 5251.10
Total Labour @Rs. 333.00 Cu.m.
Rs. 6071.59
G. Total 1892.00
34496.84 27¼v½ 3 Random Rubble stone masonry for
foundation and plinth in cement sand mortar 1 : 6 (1cement : 6 sand) for above 30 cm. thick walls.
HW
1x15x2.2x(1.8-0.3) 49.500 cu.m
HW-plinth 1x15x2.2x0 0.000 cu.m
SideWall with US 2x7.7x1.1x(1.8-0.15) 27.951 cu.m
WW-US-1 1x2.58x1.1x(1.8-0.15) 4.683 cu.m
WW-US-2 1x2.58x1.1x(1.8-0.15) 4.683 cu.m
WW-DS-1 1x2.58x0.9x(1.2-0.15) 2.438 cu.m
WW-DS-2 1x2.58x0.9x(1.2-0.15) 2.438 cu.m
HWE 2x3.5x1.47x(1.8-0.15) 16.979 cu.m
HWE-2 0x2.1x0.9x(0.9-0.15) 0.000 cu.m
TW 1x15x0.6x(1-0.15) 7.650 cu.m
Total 116.322 cu.m.
Un skilled Labour @ Rs. 189.00 Cu.m.
Labour 21984.86
Total Labour @Rs. 509 Cu.m.
Rs. 59207.90
G. Total 2126.00
247300.57 27¼v½+$28 4 Random rubble stone masonry in
superstructure up to 4.5Mtr. height above plinth level in cement sand mortar 1 : 6 (1 cement : 6 sand) wall thickness above 30 Cm
HW 1x15x[(0.7+2.2)/2]x1.8 39.150 cu.m.
SideWall with US 2x7.7x[(0.45+1.1)/2]x3.43 40.937 cu.m.
WW-US-1 1x2.58x[(0.45+1.1)/2]x[(3.43+3.43)/2] 6.858 cu.m.
WW-US-2 1x2.58x[(0.45+1.1)/2]x[(3.43+3.43)/2] 6.858 cu.m.
WW-DS-1 1x2.58x[(0.45+0.9)/2]x[(3.43+1.2)/2] 4.032 cu.m
WW-DS-2 1x2.58x[(0.45+0.9)/2]x[(3.43+1.2)/2] 4.032 cu.m
HWE 2x3.5x[(0.45+1.47)/2]x3.43 23.050 cu.m
HWE-2 0x2.1x[(0.45+0.9)/2]x0.6 0.000 cu.m
TW 1x15x[(0.45+0.6)/2]x0.45 3.544 cu.m
Total 128.461 cu.m
Un skilled Labour @ Rs. 236.00 Cu.m.
Labour 30316.80
Total Labour @Rs. 691.00 Cu.m.
Rs. 88766.55
G. Total 2308.00
296487.99 73¼v½ 5 Plaster on new surface on walls in
cement sand mortar 1:6 including racking of joint etc. complete fine finished :
(a) 25mm Thick
HW 1x15x[(1.8-0.3+0)+1.8+[Sqrt{(1.8^2)+((2.2-0.7)^2)}]] 84.646 Sq.m.
SideWall with US 2x7.7x[(1.8-0.15)+3.43] 78.232 Sq.m.
WW-US-1 1x2.58x[(3.43+3.43)/2] 8.849 Sq.m.
WW-US-2 1x2.58x[(3.43+3.43)/2] 8.849 Sq.m.
WW-DS-1 1x2.58x[(3.43+1.2)/2] 5.973 Sq.m.
WW-DS-2 1x2.58x[(3.43+1.2)/2] 5.973 Sq.m.
TW 2x15x0.45 13.500 Sq.m.
HWE-2 2x0x2.1x0.6 0.000 Sq.m.
Total 206.022 Sq.m.
Un skilled Labour @ Rs. 26.00 Sq.m.
Labour 5356.57
Total Labour @Rs. 85.00 Sq.m.
Rs. 17511.87
G. Total 148.00
30491.26 6 Filling in plinth with River sand/Earth
under floors including watering ramming consolidation and dressing complete including cost of sand/earth Lead Avg 1 Km.
Deduction as per item No.1 -193.124 Cu.m.
Filling in between US & DS W.Walls 2x[7.7+(7.7+2.58)]/2x2.23428x3.43 137.791 Cu.m.
Embk-1 US Slope 2.5:1 80x[(2+13.0925)/2]x[(3.43+1.5)/2] 1488.121 Cu.m.
Embk-2 64x[(2+13.0925)/2]x[(3.43+1.5)/2] 1190.496 Cu.m.
Total 2623.284 Cu.m.
Un skilled Labour @ Rs. 84.00 Cu.m.
Labour 220355.86
Total Labour @Rs. 84.00 Cu.m.
Rs. 220355.86
G. Total 84.00
220355.86
172 7 Providing and laying cement concrete including curing compaction etc complete using stone aggregate 20mm nominal size (crusher broken) in foundation plinth, excluding the cot of shuttering, using.
(a) 1 cement : 2sand : 4aggregate
HW 15x0.7x0.1 1.050 cu.m
Coping [2.58+2.58+2.58+2.58]x0.45x0.05 0.232 cu.m
SideWall with US 2x7.7x0.45x0.05 0.347 cu.m
Apron 15x4.7x0.1 7.050 cu.m
TW 15x0.45x0.1 0.675 cu.m
HWE 2x3.5x0.45x0.05 0.158 cu.m
HWE-2 0x2.1x0.45x0.05 0.000 cu.m
Total 9.512 cu.m.
Un skilled Labour @ Rs. 262.00 Cu.m.
Labour 2492.14
Total Labour @Rs. 370.00 Cu.m.
Rs. 3519.44
G. Total 3009.00
28621.61
8 Spreading query rubbish under pitching as filter media including spreading and ramming etc.
80x6.637x0.10 0.000 cu.m
64x6.637x0.10 0.000 cu.m
Total 0.000 cu.m
Un skilled Labour @ Rs. 35.00 Cu.m.
Labour 0.00
Total Labour @Rs. 35.00 Cu.m.
Rs. 0.00
G. Total 160.40
0.00 124¼c½ 9 Random rubble stone kharanja under
floor in CM 1:6
as per GKN Rates
Apron 15x4.7 70.500 Sqm
Total 70.500 Sqm
Un skilled Labour @ Rs. 43.20 sqm
Labour 3045.60
Total Labour @Rs. 133.00 sqm
Rs. 9376.50
G. Total 346.00
24393.00 10 Filling ofsand in Black Cotton Soil with
watering & Ramming complete in jhiri U/S Side with all lead & lift
1x15x0.45x1.8 12.150 cum
Total 12.150 cum
Un skilled Labour @ Rs. 55.00 Cu.m.
Labour 668.25
Total Labour @Rs. 55.00 Cu.m.
Rs. 668.25
G. Total 55.00
668.25 11 RR Dry Stone Pitching
xxxxx 0.000 cum
xxxxx 0.000 cum
Total 0.000 cum
Un skilled Labour @ Rs. 68.00 Cu.m.
Labour 0.00
Total Labour @Rs. 216.00 Cu.m.
Rs. 0.00
G. Total 880.00
0.00 12 S/F Anchor Bars of Dia.16mm 1Mtr
C/C in zig-zag way 2 Mtr Long
No. of Bars T-Length T-Weight
Anchor Bars 0 0 0 Kgs
Reinforcement in Apron 8mm dia @0.50 Mtrc/c
0 Kgs
Total 0.000 Kgs
Un skilled Labour @ Rs. 1.40 Cu.m.
Labour 0.00
Total Labour @Rs. 5.90 Cu.m.
Rs. 0.00
G. Total 63.00
0.00
TOTAL Rs. 900582.77
Add. 3% Cont. Rs. 27017.48
A-
Grand Total Rs. 927600.26
B-
Labour Rs. 307239.00
C- Add 30% reduction in task as per order of govt.on A 0.00
D-
Total Cost
( A+ C ) 927600.26
Say Rs. 927600.00
LABOUR (B+C) Rs. 307239.00 33%
MATERIAL . Rs. 620361.00 67%
Note - 1-Foundation depth should not be more than 1.80 Mtr.
2-If sandy(Bajari) strata is available up to 1.8 Mtr Depth than excavate the foundation up to the soil (Loam etc.) .After wards the Site Engineer feels further excavation is required than provide cut off trench.
,fudV fuekZ.ks xzke & xzke iapk;r&
Location - 0
U/S WW
PLAN
2.58
3.00
15.00
0.70
2.20
7.70
3.50
Side Wall
HWE
APRON 4.70
0.45
D/S WW
2.58
0.70
0.45
1.80
3.43
Plaster
4.70
BlackCotton Soil
NSL
0.00
2.20
1.47
1.50
1.80
0.15 CC
0.30 CC
X-Head Wall
X-Head Wall Extension
0.45
3.43
1.10
1.80
0.15 CC
X-Side Wall
CROSS SECTION OF KHADIN
0.6
U/S
D/S
2.5:01:00 AM
1.5:01:00 AM
0.75
1.0
3.00
(All Measurement in Meter)
DETAILED ESTIMATE
NAME OF WORK Field Bunding
NAME OF VILLAGE Thob
NAME OF WS Barmer-37
(with central waste weir)
NO. ITEM No. L B H QUANTITY
1 Dag belling 5cm to 7cm deeo (As per item no. page no. of BSR irrg cricle Ajmer 1 100 3.00 300 Sqm
2 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on khadeen bund. 1 100 12.00 1200 Sqm
3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m( 1 100 1.8 0.75 135 Cum
4 Sowing of Dhaman Seed in 3 rows complete work 3 100 300 Mtr
5 Purchasing of Dhaman Seed 1 1 1 Kg
ABSTRACT OF ESTIMATE
NAME OF WORK Field Bunding
NAME OF VILLAGE Thob
NAME OF WS Barmer-37
NO. ITEM Qnty. Unit
Rate Amount
Labour Total Labour Total
1 Dag belling 5cm to 7cm deep 300 Sqm 0.28 0.28 84 84
2 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on khadeen bund. 1200 Sqm 3.70 3.70 4440 4440
3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m 135 Cum 84 84 11340 11340
4 Sowing of Dhaman Seed in 3 rows complete work 300 Mtr 0.65 0.65 195 195
5 Purchasing of Dhaman Seed 1 Kg 75 0 75
6 Contigency 3% 482
Total 16059 16616
Say Rs.
16600
Model Estimate of Silvi Pasture Afforestation Platation - 10 Ha
1. Plantation Unit
5. Periferi Lenth - m 1070
2. Plantation - 400 Per Ha
6. Periferi Lenth (Mt. per Ha)
107
3. Plantaion Distance - 5 m X 5 m
7. Labour Rate- 135 Per day
4. Model Calculation - Per ha
8. Toatl -Five Yr
Advance work & 0 Year 10 Ha
S. No.
Work Particulars Unit Qty Labour Total Labour Total
1 Survey of the area by chain and compass, demarcation, layout and lien cutting and making kachhi muddis
Ha 10 121.04 121.04 1210.4 1210.4
2 Fencing of area by 1.50 m angle iron post with four line barbed wire fencing including interlencing.
RM 1070 55.89 93.15 59802.3 99671
3 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment
NO. 4000 3.70 3.7 14800 14800
4 Purchase of insecticides & organic manure
Per Plant
4000 0.00 1.53 0 6120
5 Collection & purchase of sewan/dhaman Grass seed or local species of trees seed 6 Kg Per ha
Kg 60 0.00 75 0 4500
6 Construction of cattle guard hut No. 1 10000 20000 10000 20000
7 Plantation Board No. 1 1000 5000 1000 5000
8 Plantation Gate No.
1 1500 6000 1500 6000
9 Construction of water storage tank No. 4 15000 40000 60000 160000
10 Extra exp. 700
;ksx%& 148313 318000.9
Platation-First year 10 Ha
11 Purchase of Plants No. 4000 0 8.00 0 32000
12 Transportation of plants from nursery to plantation site by camel cart
N0. 4000 0 2.52 0 10080
13 Plantation of plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 4000 0 15.32 0 61280
14 Watering 15 Litre per plant eight times in a year.
No. 4000 22.16 54.72 88640 218880
15 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 4000 14.24 14.24 56960 56960
16 Prepairing of seed balls in ratio (1:1:2:2) mixing of 1 Kg seed, manure, sandy soil, loamy soil. Total materil 36Kg per ha.
Kg 60 24.04 24.04 1442.4 1442.4
17 Sowing of seed balls by dibbling method/tractor
Ha 10 456 869 4560 8690
18 Prooning of 10 percent Plants upto 1/3 ht.
No. 400 1.2 1.2 480 480
19 Watch & ward Month 12 4050 4050 48600 48600
20 Extra exp. 700
Total 200682 439112
Platation- Second year 10 Ha
21 Purchase of 20 % Plants for replacement
No. 800 0 8.00 0 6400
22 Transportation of plants from nursery to plantation site by camel cart
N0. 800 0 2.52 0 2016
23 Plantation of 20 % plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 800 0 15.32 0 12256
24 Watering 15 Litre per plant eight times in a year.
N0. 4000 22.16 54.72 88640 218880
25 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 4000 14.24 14.24 56960 56960
26 Collection & purchase of sewan/dhaman Grass seed or local species of trees seed 2 Kg Per ha
Kg 20 0 75 0 1500
27 Prepairing of seed balls in ratio (1:1:2:2) mixing of 1 Kg seed, manure, sandy soil, loamy soil. Total materil 12 Kg per ha.
Kg 20 24.04 24.04 480.8 480.8
28 Sowing of seed balls by dibbling method/tractor
Ha 3.33 456 869 1520 2896.67
29 Prooning of 70 percent Plants upto 1/3 ht.
No. 560 1.2 1.2 672 672
30 Watch & ward Month 12 4050 4050 48600 48600
31 Extra exp. 700
Total 196873 351361
Platation- Third year 10 Ha
32 Watering 15 Litre per plant six times in a year.
N0. 4000 16.62 34.26 66480 137040
33 One Hoeing and weeding after rain and 6 times hoeing after watering
No. 4000 11.28 11.28 45120 45120
34 Prooning of 20 percent Plants upto 1/3 ht.
No. 800 1.2 1.2 960 960
35 Watch & ward Month 12 4050 4050 48600 48600
36 Extra exp. 700
Total 161160 232420
Platation- Fourth year 10 Ha
37 Watering 15 Litre per plant four times in a year.
N0. 4000 11.08 22.84 44320 91360
38 One Hoeing and weeding after rain and 4 times hoeing after watering No. 4000 8.32 8.32 33280 33280
39 Watch & ward Month 12 4050 4050 48600 48600
40 Extra exp. 700
Total 126200 173940
Grant Total 833228 1514835
Say 1515000
Cost per Ha. 151500
Model Estimate of Silvi Pasture Afforestation Platation - 20 Ha
1. Plantation Unit
5. Periferi Lenth - m 2140
2. Plantation - 400 Per Ha
6. Periferi Lenth (Mt. per Ha)
107
3. Plantaion Distance - 5 m X 5 m
7. Labour Rate- 135 Per day
4. Model Calculation - Per ha
8. Toatl -Five Yr
Advance work & 0 Year 20 Ha
S. No.
Work Particulars Unit Qty Labour Total Labour Total
1 Survey of the area by chain and compass, demarcation, layout and lien cutting and making kachhi muddis
Ha 20 121.04 121.04 2420.8 2420.8
2 Fencing of area by 1.50 m angle iron post with four line barbed wire fencing including interlencing.
RM 2140 55.89 93.15 119605 199341
3 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment
NO. 8000 3.70 3.7 29600 29600
4 Purchase of insecticides & organic manure
Per Plant
8000 0.00 1.53 0 12240
5 Collection & purchase of sewan/dhaman Grass seed or local species of trees seed 6 Kg Per ha
Kg 120 0.00 75 0 9000
6 Construction of cattle guard hut No. 1 10000 20000 10000 20000
7 Plantation Board No. 1 1000 5000 1000 5000
8 Plantation Gate No.
1 1500 6000 1500 6000
9 Construction of water storage tank No. 4 15000 40000 60000 160000
10 Extra exp. 1400
;ksx%& 224125 445001.8
Platation-First year 20 Ha
11 Purchase of Plants No. 8000 0 8.00 0 64000
12 Transportation of plants from nursery to plantation site by camel cart
N0. 8000 0 2.52 0 20160
13 Plantation of plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 8000 0 15.32 0 122560
14 Watering 15 Litre per plant eight times in a year.
No. 8000 22.16 54.72 177280 437760
15 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 8000 14.24 14.24 113920 113920
16 Prepairing of seed balls in ratio (1:1:2:2) mixing of 1 Kg seed, manure, sandy soil, loamy soil. Total materil 36Kg per ha.
Kg 120 24.04 24.04 2884.8 2884.8
17 Sowing of seed balls by dibbling method/tractor
Ha 20 456 869 9120 17380
18 Prooning of 10 percent Plants upto 1/3 ht.
No. 800 1.2 1.2 960 960
19 Watch & ward Month 12 4050 4050 48600 48600
20 Extra exp. 1400
Total 352765 829625
Platation- Second year 20 Ha
21 Purchase of 20 % Plants for replacement
No. 1600 0 8.00 0 12800
22 Transportation of plants from nursery to plantation site by camel cart
N0. 1600 0 2.52 0 4032
23 Plantation of 20 % plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 1600 0 15.32 0 24512
24 Watering 15 Litre per plant eight times in a year.
N0. 8000 22.16 54.72 177280 437760
25 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 8000 14.24 14.24 113920 113920
26 Collection & purchase of sewan/dhaman Grass seed or local species of trees seed 2 Kg Per ha
Kg 40 0 75 0 3000
27 Prepairing of seed balls in ratio (1:1:2:2) mixing of 1 Kg seed, manure, sandy soil, loamy soil. Total materil 12 Kg per ha.
Kg 40 24.04 24.04 961.6 961.6
28 Sowing of seed balls by dibbling method/tractor
Ha 6.67 456 869 3040 5793.33
29 Prooning of 70 percent Plants upto 1/3 ht.
No. 1120 1.2 1.2 1344 1344
30 Watch & ward Month 12 4050 4050 48600 48600
31 Extra exp. 1400
Total 345146 654123
Platation- Third year 20 Ha
32 Watering 15 Litre per plant six times in a year.
N0. 8000 16.62 34.26 132960 274080
33 One Hoeing and weeding after rain and 6 times hoeing after watering
No. 8000 11.28 11.28 90240 90240
34 Prooning of 20 percent Plants upto 1/3 ht.
No. 1600 1.2 1.2 1920 1920
35 Watch & ward Month 12 4050 4050 48600 48600
36 Extra exp. 1400
Total 273720 416240
Platation- Fourth year 20 Ha
37 Watering 15 Litre per plant four times in a year.
N0. 8000 11.08 22.84 88640 182720
38 One Hoeing and weeding after rain and 4 times hoeing after watering No. 8000 8.32 8.32 66560 66560
39 Watch & ward Month 12 4050 4050 48600 48600
40 Extra exp. 1400
Total 203800 299280
Grant Total 1399556 2644270
Say 2644000
Cost per Ha. 132200
Model Estimate of Plantation Afforestation Platation - 20 Ha
1. Plantation Unit
5. Periferi Lenth - m 2140
2. Plantation - 400 Per Ha
6. Periferi Lenth (Mt. per Ha)
107
3. Plantaion Distance - 5 m X 5 m
7. Labour Rate- 135 Per day
4. Model Calculation - Per ha
8. Toatl -Five Yr
Advance work & 0 Year 20 Ha
S. No.
Work Particulars Unit Qty Labour Total Labour Total
1 Survey of the area by chain and compass, demarcation, layout and lien cutting and making kachhi muddis
Ha 20 121.04 121.04 2420.8 2420.8
2 Fencing of area by 1.50 m angle iron post with four line barbed wire fencing including interlencing.
RM 2140 55.89 93.15 119605 199341
3 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment
NO. 8000 3.70 3.7 29600 29600
4 Purchase of insecticides & organic manure
Per Plant
8000 0.00 1.53 0 12240
5 Construction of cattle guard hut No. 1 10000 20000 10000 20000
6 Plantation Board No. 1 1000 5000 1000 5000
7 Plantation Gate No.
1 1500 6000 1500 6000
8 Construction of water storage tank No. 4 15000 40000 60000 160000
9 Extra exp. 1400
;ksx%& 224125 436001.8
Platation-First year 20 Ha
10 Purchase of Plants No. 8000 0 8.00 0 64000
11 Transportation of plants from nursery to plantation site by camel cart
N0. 8000 0 2.52 0 20160
12 Plantation of plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 8000 0 15.32 0 122560
13 Watering 15 Litre per plant eight times in a year.
No. 8000 22.16 54.72 177280 437760
14 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 8000 14.24 14.24 113920 113920
15 Sowing of seed balls by dibbling method/tractor
Ha 20 456 869 9120 17380
16 Prooning of 10 percent Plants upto 1/3 ht.
No. 800 1.2 1.2 960 960
17 Watch & ward Month 12 4050 4050 48600 48600
18 Extra exp. 1400
Total 349880 826740
Platation- Second year 20 Ha
19 Purchase of 20 % Plants for replacement
No. 1600 0 8.00 0 12800
20 Transportation of plants from nursery to plantation site by camel cart
N0. 1600 0 2.52 0 4032
21 Plantation of 20 % plants with treatment, organic manure, primary irrigation, making of thawala & local transportation
No. 1600 0 15.32 0 24512
22 Watering 15 Litre per plant eight times in a year.
N0. 8000 22.16 54.72 177280 437760
23 One Hoeing and weeding after rain and 8 times hoeing after watering
No. 8000 14.24 14.24 113920 113920
24 Collection & purchase of sewan/dhaman Grass seed or local species of trees seed 2 Kg Per ha
Kg 40 0 75 0 3000
25 Prepairing of seed balls in ratio (1:1:2:2) mixing of 1 Kg seed, manure, sandy soil, loamy soil. Total materil 12 Kg per ha.
Kg 40 24.04 24.04 961.6 961.6
26 Sowing of seed balls by dibbling method/tractor
Ha 6.67 456 869 3040 5793.33
27 Prooning of 70 percent Plants upto 1/3 ht.
No. 1120 1.2 1.2 1344 1344
28 Watch & ward Month 12 4050 4050 48600 48600
29 Extra exp. 1400
Total 345146 654123
Platation- Third year 20 Ha
30 Watering 15 Litre per plant six times in a year.
N0. 8000 16.62 34.26 132960 274080
31 One Hoeing and weeding after rain and 6 times hoeing after watering
No. 8000 11.28 11.28 90240 90240
32 Prooning of 20 percent Plants upto 1/3 ht.
No. 1600 1.2 1.2 1920 1920
33 Watch & ward Month 12 4050 4050 48600 48600
34 Extra exp. 1400
Total 273720 416240
Platation- Fourth year 20 Ha
35 Watering 15 Litre per plant four times in a year.
N0. 8000 11.08 22.84 88640 182720
36 One Hoeing and weeding after rain and 4 times hoeing after watering No. 8000 8.32 8.32 66560 66560
37 Watch & ward Month 12 4050 4050 48600 48600
38 Extra exp. 1400
Total 203800 299280
Grant Total 1396671 2632385
Say 2632000
Cost per Ha. 131600
ABSTRACT OF ESTIMATE
NAME OF WORK CONSTRUCTION OF KHADIN
NAME OF VILLAGE Thob
NAME OF WS BARMER-37
(with central waste weir)
NO. ITEM Qnty. Unit
Rate Amount
Labour Total Labour Total
1 Dag belling 5cm to 7cm deep 2440 Sqm 0.28 0.28 683 683
2 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on khadeen bund. 9760 Sqm 3.70 3.70 36112 36112
3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m 4130.532 Cum 84 84 346965 346965
4 excavation in ordanary murrum or earth mixed with bajarl kankar bodders dry or moist including disposal of excavated material with intial of 30m & lift of 1.5m 31.616 Cum 122 122 3857 3857
5 cement concerete well mixed in cement mortor (1:4:8)laying in position complete including carring with maximum sixe aggrigare upto 20mm (for waste weir and piller 10.326 Cum 333 1892 3438 19536
6 R.r stone massonary in cement mortor (1:6)(a) for fundation, 28.311 Cum 509 2126 14410 60188
R.r stone massonary in cement mortor (1:6)(a) for superstructure, 21.571 Cum 691 2308 14906 49786
Cement concerete well mixed in cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm (for waste weir and piller) 3.70 Cum 370 3009 1371 11148
7 Cement plaster in cement mortor (1:4) 56.95 Sqm 85 169 4841 9624
8 Contingency 3 % 16137
426583 537900
Material
1 Cement 161 Begs
2 Sand 33.59 Cum
3 Agg 20 mm 3.33 Cum
4 Agg 40 mm 28.45 Cum
5 Stone 49.88 Cum
CROSS SECTION OF KHADIN
1.9
U/S
D/S
2.5:01:00 AM
1.5:01:00 AM
1.90
1.0
12.35
(All Measurement in Meter)
CONSTRUCTION OF KHADIN
CROSS SECTIONS OF DIFFERENT COMPONENTS
0.60
CC (1:2:4)
0.30
G.l.
0.60
1.90
2.3
Stone Khranja in CM(1:6)
0.30
1.4
CC (1:3:6)
cut of Section of anicut (Head Wall ,Appron & Toe Wall)
0.6
1.40
NSL
1.90
0.30
1.2 CC (1:3:6)
C/S OF HEAD WALL EXTENTION
0.6
1.40
0.6
1.70
NSL
NSL
0.6
0.6
0.30
0.30
1.2
CC (1:3:6)
CC (1:3:6)
C/S OF SIDE WALL At HWExt Juct.
C/S OF WING WALL At.S.W. Juct.
Prepared By Checked By
Approved By
Jr Engineer Asst. Engineer
Ex. Engineer
Not to the Scale
All Dimension in Meter
PS CHOHTAN DIST. BARMER
2.40
4.00 m
2.40
HWExt(R)
0.60
Head Wall 1.4
HWExt(L)
3.70
2.30
APRON
SIDE WALL
0.6 TOE WALL
WING WALL
2
PLAN
H/W Extension(R)
H/W Extension (L)
1.10
0.30 HEAD WALL
G.L.
TOE WALL 0.3
G.L.
CROSS SECTION OF L.S.C.D
1.00 1.00
1:01
1.00
1.0
0.45
2.45
Ground Level
Cross Sec.= ((1.00+2.00) /2)x1.00
= 1.50 Sqm
Model Estimate of Loose stone check dame
Name of work
Loose stone check dame
Name of watershed project
Barmer (IWMP) - 37
S. NO. Particular
Qty
Rate Amount
Labour Total Labour Total
1 Excavation For fundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead
(a) hard soil
1.00 x 3.04 x 2.45 x 0.45 = 3.35 92 92 308 308
2 R/R stone massonary in Loose boulder
Botom 1.00 x 3.04 x 2.45 x 0.45 = 3.35
1.00 x 3.04 x 1.50 x 1.00 = 4.56
7.91 344 1385 2722 10958
3030 11266
3 Contigency 3 percent 0 338
3030 11604
LABOUR 3000
MATERIAL 8600
TOTAL 11600
Material Stone 7.91 Cum
DETAILED ESTIMATE
NAME OF WORK CONSTRUCTION OF KHADIN
NAME OF VILLAGE Thob
NAME OF WS BARMER-37
(with central waste weir)
NO. ITEM No. L B H QUANTITY
1 Dag belling 5cm to 7cm deeo (As per item no. page no. of BSR irrg cricle Ajmer 1 400 6.10 2440 Sqm
2 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on khadeen bund.
1 400 24.40 9760 Sqm
3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m(
4130.532 Cum
4 excavation in ordanary murrum or earth mixed with bajarl kankar bodders dry or moist including disposal of excavated material with intial of 30m & lift of 1.5m
Head wall
1 4.00 1.00 1.50 6.00
Cum
Head wall extention 1 1.95 1.00 1.50 2.92
side wall 1 12.70 1.00 1.50 19.05
wing wall 1 1.10 0.90 1.50 1.49
Toe wall 1 4.00 0.60 0.90 2.16
Total. 31.616
5 cement concerete well mixed in cement mortor (1:4:8)laying in position complete including carring with maximum sixe aggrigare upto 20mm (for waste weir and piller
Head wall 1 4.00 1.00 0.15 0.60
Cum
Head wall extention 1 1.95 1.00 0.15 0.29
side wall 1 12.70 1.00 0.15 1.91
wing wall 1 1.10 0.90 0.15 0.15
Toe wall 1 4.00 0.60 0.15 0.36
Apron 1 4.00 5.85 0.30 7.02
Total. 10.326
6 R.r stone massonary in cement mortor (1:6)(a) for fundation,
Head wall 1 4.00 1.00 1.35 5.40
Cum
Head wall extention 1 1.95 1.00 1.35 2.63
side wall 1 12.70 1.00 1.35 17.15
wing wall 1 1.10 0.90 1.35 1.34
Toe wall 1 4.00 0.60 0.75 1.80
Total. 28.311
7 R.r stone massonary in cement mortor (1:6)(b) for superstructure
Head wall 1 4.00 0.80 0.90 2.88
Cum
Head wall extention 1 1.95 0.80 2.40 3.74
side wall 1 7.30 0.80 2.40 14.02
wing wall 1 1.10 0.45 0.80 0.40
Toe wall 1 4.00 0.30 0.45 0.54
Total. 21.571
8 Cement concerete well mixed in cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm (for waste weir and piller)
Head wall 1 4.00 0.60 0.10 0.24
Cum
Head wall extention 1 1.95 0.60 0.10 0.12
side wall 1 12.70 0.60 0.10 0.76
wing wall 1 1.10 0.60 0.10 0.07
Toe wall 1 4.00 0.45 0.10 0.18
Apron 1 4.00 5.85 0.10 2.34
Total. 3.70
9 25 mm Cement plaster in cement mortor (1:4)
Head wall 2 4.00 0.90 7.20
Sqm
Head wall extention 2 1.95 2.40 9.35
side wall 2 7.30 2.40 35.04
wing wall 2 1.10 0.80 1.76
Toe wall 2 4.00 0.45 3.60
Total. 56.948
CHAPTER - VIII Enclosures -
• Location –District, block, village, watershed location map
• Map of BALOTRA BLOCK-IWMP 37 IWMP Project (Watershed Boundary demarcation in cadastral & Topo Sheet)
• PRA Map (along with photos & paper drawing)
• Treatment map (Indicate proposed works)
• Cadastral Map on watershed boundary
• Information on Soils, Soil fertility, Land capability, Soil chemical problems like salinity, alkalinity
• Land Use Land Cover map
• Information on existing water harvesting structures & well inventory along with GPS co-ordinates.
• High resolution, latest Remote Sensing Satellite data
Documents of Agreements: Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Proceedings of gram sabha for DPR approval
DPR approval by district
Watershed Committee Registration certificate
MoU – PIA – DWMA, PIA – WC(in case of NGO as PIA)