LIGHTING UP VICTORIA THREE MONTHS AHEAD OF SCHEDULE. MACARTHUR WIND FARM, VICTORIA, AUSTRALIA

Upload: kamil

Post on 17-Aug-2015

225 views

Category:

Documents


1 download

DESCRIPTION

Doc

TRANSCRIPT

LIGHTING UP VICTORIA THREE MONTHS AHEAD OF SCHEDULE.MACARTHUR WIND FARM, VICTORIA, AUSTRALIADiscover more on www.mammoet.comOCT 242011 NOV 2012INSTALLING ONE OF140 WIND TURBINESTHE WIND FARM FROM A ROTOR BLADES PERSPECTIVESCALE PLUS EXPERIENCE EQUALS UNPARALLELED PRODUCTIVITY.OCT 182012ANOTHER TIMELY INSTALLATION DEC 8 2011ROUND THE CLOCK OPERATIONA ZThe 420-megawatt MacArthur Wind Farm in Australia is the biggest in the Southern Hemi-sphere. Mammoet Wind played a key role in MacArthurs realization by installing 140 3-megawatt wind turbines. Prior to this ambitious wind project, only four turbines of this type had ever been installed anywhere in the world. Relying on extensive experience, operational excel-lence and cranes that require minimal civil works, Mammoet Wind completed the enormous job three months ahead of schedule installing one full turbine every eight hours. Installing large-scale wind farms typically involves many repetitions of a single set of activities. The key to saving time is a combination of scale, efcient project management and operational excellence. For the McArthur project, Mammoet Wind achieved this synergy by pairing its installation expertise with the vast Mammoet equipment base. As a result, Mammoet was able to realize a swift mobilization of resources in the remote Victorian hills. Mammoet Wind compiled a eet of cranes that could complete the installation well before the deadline. But while time was of the essence, the high prole nature of the project made safety just as important as fast delivery. Therefore, Mammoet Wind was selected for its track record and safety culture.Before installing the rst turbine, Mammoet Wind had already won time by bringing in its narrow track cranes that could maneuver on roads only 5.5-meters wide. With 140 turbines to install, this narrow road requirement resulted in huge time and cost savings on road construction. Using the CC2800 Narrow Track and TC2800 as the two main cranes, together with the LR1300W Narrow Track as the base and mid-tower crane, Mammoet Wind was able to keep up a high installation pace. A total of more than 1,120 critical lifts were carried out over a period of 11 months. The heaviest were the lifts of the nacelles, which could be installedin one piece with the narrow track crane conguration.The entire project took 15 months from planning to demobilization. Extensive experience in building wind farms enabled Mammoet Wind to ensure fast and safe installation of the turbines and relocation of the cranes between the 140 turbines. The time saved on turbine installation resulted in an early connection to the grid three months sooner than originally planned.RESOURCES CRANES 2 crawler cranes (narrow track) 1 lattice boom truck crane4 hydraulic cranesTRANSPORT 4 prime movers8 conventional trailersCREW 48 Mammoet professionals