Quick Reference Guide Project Site MSES Sampling 1 11/12/2014 This Quick Reference Guide covers the process of logging samples for MSES backfill material. This process assumes a user will begin the sample entry from the Material Inspection Detail (MID) window, in the Daily Work Report (DWR) area. Samples can also be logged by navigating directly to the Sample Information window, but the system will not pre-fill some sample details using this approach. Samples entered directly into the Sample Information window will need more details entered manually. Here is an example on logging a sample of MSES backfill materials from the DWR area of SiteManager. On the Main Panel, double-click on the Daily Work Reports (+) icon.

Upload: others

Post on 13-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

1 11/12/2014

This Quick Reference Guide covers the process of logging samples for MSES backfill material. This process assumes a user will begin the sample entry from the Material Inspection Detail (MID) window, in the Daily Work Report (DWR) area. Samples can also be logged by navigating directly to the Sample Information window, but the system will not pre-fill some sample details using this approach. Samples entered directly into the Sample Information window will need more details entered manually.

Here is an example on logging a sample of MSES backfill materials from the DWR area of SiteManager.

On the Main Panel, double-click on the Daily Work Reports (+) icon.

Page 2: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

2 11/12/2014

Then double-click on the Daily Work Reports icon.

Page 3: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

3 11/12/2014

Open the DWR for the contract, Inspector and date of the installation. You can pick the inspector or EIC, someone on the project who has a DWR for that day. In general, DWR’s are entered each day by inspectors.

Page 4: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

4 11/12/2014

Page 5: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

5 11/12/2014

This message is OK. You can not edit the DWR, but you have Read access. You can still document a sample for a specific pay item, with Read access to somebody else’s DWR.

Page 6: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

6 11/12/2014

Click on the Work Items Tab.

Page 7: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

7 11/12/2014

Any pay items that were installed that day will sort to the top, and be checked. The rest of the pay items will be sorted by Line Item Number, not necessarily Item Code. Watch out! Some jobs, like this one, have more than one Item for MSES! Some contracts may repeat pay item codes across several different payment sources (shares). Funding sources or shares are shown under Category Number. Be sure to tie your MSES backfill sample to the correct combination of pay item and category number (e.g. 0001). Scroll down to find it.

Page 8: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

8 11/12/2014

Double-click the Item to open the Location details.

Page 9: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

9 11/12/2014

Click the Red Triangle to open the Material Inspection Details (MID) window.

Refer to the values in the Cont Est Matrl Qty column.

Note that four possible material components are available for this MSES pay item. By default, MSES walls will use MSES Backfill material, but it is the contractor’s option. MSES backfill material has a value of 501.000 in the Cont Est Matrl Qty column, indicating this material components is “turned on” for this pay item. The remaining three material components show 0.000, meaning these material’s sampling and testing requirements have been turned off for this contract. If the contractor elects to use another backfill material, project staff will turn off MSES backfill, and turn on MSES backfill RCA, for example.

Page 10: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

10 11/12/2014

Click the Lightning Bolt to launch the Sample Information window, with some fields pre-filled from known information, like Material and Contract data.

Each test method shown in the lower window equals a basis of acceptance for the MSES Backfill material (733-0211). To satisfy (top row) the acceptance requirement that a monitoring sample of backfill material be taken for this pay item, a sample needs to be entered at a rate of 1 per 60, and these samples need to entered using a Sample Type of Project Granular Material Acceptance (see sample record on the next page).

Page 11: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

11 11/12/2014

- Basic Sample Data Tab o Fill in Sample Date:

Assumes date of DWR o Sample Type: (select dropdown, scroll to find)

Use “Monitor” o Material: From MID window selection.

Section 733 was created to separate the Material information from the Pay Items. For example, for Item 554.0101, the Material Code 733-0211 is turned on, and 733-0212, 733-0221 and 733-0222 are off. Use the backfill material that is on your contract, which appears in the center window on the MID window.

o P/S: select Source supplying material Hover over field, right click, select search, select Source

o Geog. Area: select the Region where sample was taken, required field Not where the material source is, which may be another Region, or even out of state, but

where the Project is located. o SAVE

Page 12: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

12 11/12/2014

- Additional Sample Data Tab o Fill in Distance from Grade (depth) o Fill in Station, Offset, Reference (line e.g., CL, ML, BL, etc): o Fill in Smpld From (this is a type in field) o SAVE

Page 13: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

13 11/12/2014

- Contract Tab o Information carried over from MID window

By tying to the Contract, the Project Name, PIN, and County are also tied to the Sample o Since MSES samples are tracked by the number of samples, not by Represented Quantity, use

zero (0) in the field for Represented Quantity. o You still must SAVE the Contract Tab (with a zero Rep. Qty) to tie this sample to the

contract.

- Other Tab

o In Type column, take dropdown, select Destination Lab (first choice in list) o In ID column, hover, right click, take search, select your Regional Lab Building. o SAVE o Enter additional data as desired.

Page 14: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

14 11/12/2014

- Assign Tests o Select Assign Test Button o Choose “Accept Default Tests”

Sample has been logged, status should change to “Logged”

Print a label, and send the backfill sample to Reg. Lab for “testing”. If you are the Lab, keep reading. Launch LIMS using the bulldozer Icon (blue circle).

Page 15: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

15 11/12/2014

Receive the sample in the Regional Lab Unit. If the sample was Logged in the field, by the EIC or Inspector, the process may begin here for Regional lab staff.

Page 16: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

16 11/12/2014

Check the sample to indicate you received the sample, and click Save.

Page 17: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

17 11/12/2014

Select Enter Test Results from the LIMS main panel, to record test details. For the MSES backfill process, “testing” involves just indicating that the sample was received by the Regional GEB lab. (see next page for screen details)

Page 18: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

18 11/12/2014

You must indicate that you received a sample. Just type something in the box, check Test Complete and click Save.

Once this test screen has been completed and saved, the sample should move forward on to the Review Sample window in LIMS.

Page 19: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

19 11/12/2014

Double-click Review Samples. You must Authorize (finalize) the samples to have them count on the project. If this process is not completed here, and an estimate is run to pay for quantities of the MSES item (554.0101), the estimate process will be looking for 1 sample for each 60 square meters of MSES wall installed.

Page 20: Project Site MSES Sampling · Project Site MSES Sampling 20 11/12/2014 Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this

Quick Reference Guide Project Site

MSES Sampling

20 11/12/2014

Select your sample, select Complete, Accept, and click Authorize. These are the only valid selections for this sample type. If they do not match, the sample will not satisfy the contract’s sampling and testing requirements for MSES wall pay item, for the 733-0211 backfill material component.

You have successfully completed the Sampling and Testing requirement for MSES Backfill for SiteManager. This completes the project portion of this process. The project portion of this process is designed to insure that backfill samples are taken for MSES pay items, to double check that the correct stockpile was used to construct the MSES wall.

The sample can now be sent to Albany for verification testing using the GSLA system, using the appropriate procedures in place today. At some point in the future, it is envisioned that GSLA testing will also be done in SiteManager.