project spotlight - amcase · remodeling project. though the lab had been in place for a number of...
TRANSCRIPT
Old and NewThere is something satisfying about seeing a renovation from start to finish.
It’s even more gratifying to see the before and after comparisons.
AMCASE® had the privilege of being a part of this school’s science lab
remodeling project. Though the lab had been in place for a number of years,
everything needed to go…everything except the hardwood floors. The floors
were refinished, retaining some of the old while ushering in the new with
modular casework to create a uniqueness all its own.
Project Info:Client: School
Location: NJ
Project Spotlight#13
© AMCASE® inc.
Before
www.amcase.com
www.amcase.com
Extreme MakeoverThE ChallENgEThis was an extensive project which required coordinating multiple trades
to renovate the entire science room lab from top to bottom. New piping had
to be run, along with refinishing the existing hardwood floors and repainting
the walls before the casework could be installed.
ThE aMCaSE® SOluTiONGood communication, patience, and coordination between the trades was
essential due to the plumbing, electrical, and gas lines that needed to be
installed or modified to work properly with the casework installation. The
transformation was remarkable, and the results were immediately evident.
Every solution is different; that’s why there’s AMCASE®.
© AMCASE® inc. All rights reserved.
Before After
School labNew Jersey
Fun Facts
30+ - number of years the
science lab millwork furniture
was in service.
10-25 - average lifespan
in years for lab furniture.