Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102,000.00 (Ph. 1) Source of Funds: Fund 101DBP 1st Floor Area: 746.03 sq.m. Floor Area: 1,379.88 sq.m. (1 st & 2 nd floors only) Cost per sq.m.: Php18,914.69 2nd Floor Area: 633.85 sq.m. Total Building Cost: Php38,802,000.00 Phase 1: 26,102,000.00 Phase 2: 12,700,000.00 3rd Floor Area: 633.85 sq.m.

Upload: kellie-lang

Post on 01-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1)

Approved Budget for the Contract (ABC):

Php 26,102,000.00 (Ph. 1)Source of Funds: Fund 101DBP

• 1st Floor Area: 746.03 sq.m.

Floor Area: 1,379.88 sq.m. (1st & 2nd floors only)

Cost per sq.m.: Php18,914.69

• 2nd Floor Area: 633.85 sq.m.

Total Building Cost: Php38,802,000.00

• Phase 1: 26,102,000.00

• Phase 2: 12,700,000.00

• 3rd Floor Area: 633.85 sq.m.