DECCAN GOLD MINES LIMITED
PROJECTS STRATEGICALLY LOCATED WITHIN WORLD CLASS ARCHAEN GOLD PROVINCE.
ANNUAL GENERAL MEETING
19TH SEPTEMBER 2019
No 5, 19th Main Road
4th Sector, HSR Lay Out
Bangalore – 560 102
Karnataka, India
www.deccangoldmines.com
1
Explored 7000 sq.km area in thestates of Karnataka, AP, Kerala andidentified 40 gold prospects forfurther detailed exploration.
A total of 21 Prospecting Licenceapplications (PL) and 2 Mining Leaseapplications (ML) have beensubmitted. These applications attractpreferential rights and are protectedas per section 10A (2)(b) of theM&M(D&R) act 1957 as amended in2015.
Key projects of the company include,1) Ganajur-Karjagi cluster 2)Magalgatti-Bhavihal cluster 3)Hirenagnur P, Hutti North P(HuttiBelt) and 4) Ramagiri
Drill indicated resources identified inGanajur Main, Ganajur SE, KarajgiMain, Mangalgatti, Bhavihal andHirenagnur projects
DGML’S FOOT PRINT OF GOLD TENEMENTS
2
DGML explored an area of around5000 sq km of the Dharwar-ShimogaGreenstone belt covered under 2 RPblocks. (Hanagal and Dharwar RPs)
Gold mineralization in all the prospectsis hosted within sulphidic bandedferruginous chert.
Successful in identifying 22 goldprospects.
Prospects around Dharwar towardsnorth (Dharwar Cluster) and Haveri inthe south (Ganajur-Karajgi Cluster) areconsidered as significant discoveries.
Seven (7) Prospecting Licence (PL)and two (2) Mining Lease (ML)applications covering all the importantprospects were filed.
DHARWAR SHIMOGA BELT PROJECT
Panaji
Dharwad
BANGALORE
Hyderabad
0 50
kilometers
Dharwad
Kalghatgi
Hanagal
North Hutti
Mangalur
100
Ramagiri
Hutti South
3
Sl.No PL No Name District Area Sq.kms
1 DES.PL-10 Mangalagatti Dharwar 4
2 DES.PL-6 Kulavalli 2
3 DES.PL-9 Bhavihal Dharwad 1.5
4 DES.PL-12 Lakkikoppa Haveri 5
5 DES-PL-8 Turkara-Sigihalli Belgaum 1.7
6 DES.PL-11
Ganajuru
Extension Haveri 8
7 DES ML-2 Ganajuru Haveri 0.29
8 DES.ML-5 Karajgi Haveri 2.8
PL Applications in Dharwar-Shimoga Belt,
Karnataka
1. Positive comments have been received from IBM for all the applications2. All applications are valid as per Section 10A(2)(b) of the MMDR Act.
SL NO TYPE OF EXPLORATION UNIT QUANTUM
1 TOPOGRAPHIC SURVEY SQ.KMS 2.2
2 GEOLOGICAL MAPPING (1: 2000 AND 1:5000 SCALE) SQ.KMS 2.2
3 GROUND GEOPHYSICAL MAGNETIC SURVEY LINE KMS 288
4 GROUND GEOPHYSICAL SP-RESISTIVITY SURVEY LINE KMS 24.83
5 GROUND GEOPHYSICAL IP SURVEY LINE KMS 31.25
6 GROUND GEOPHYSICAL EM SURVEY LINE KMS 9
7 TRENCHING/CHANNEL SAMPLING LENGTH (M) 2838.6
8 SAMPLING AND ANALYSIS Nos 7704
9 DRILLING
A. RC /DTH DRILLING METRES 6287.00
B. DIAMOND CORE DRILLING METRES 10670.54
16957.54
TOTAL DRILLING
10COMPREHENSIVE METALLURGICAL STUDIES OXIDE & SULPHIDE (ALS/AMMTEC)
KGS 587.27
11ARD, PREG-ROBBING INDEX, MULTI ELEMENT, WASTE ROCK GC , KINETIC TEST /ANALYSIS
SAMPLES 373
12 ENVIROMENTAL STUDIES(EIA/EMP) COMPLETED
13MINERAL RESOURCE/ORE RESERVE ESTIMATION FOR GANAJUR MAIN BY SNOWDEN (AS PER JORC)
COMPLETED
14 MINERAL RESOURCE ESTIMATION FOR GANAJUR SE PROSPECT COMPLETED
15 FEASIBILITY STUDIES (for Ganajur Main Gold Project) COMPLETED
16 LAND ACQUISITION , WATER, POWER ETC ADVANCED STAGE
SUMMARY OF EXPLORATION WORK CARRIED OUT IN
GANAJUR-KARAJGI CLUSTER
6
FEASIBILITY STUDIES FOR THE GANAJUR GOLD PROJECT:
DESPL commissioned SRK Mining Services (India) Pvt. Ltd, (SRK) in the year 2011to complete an updated mineral resource estimate and to undertake a ScopingStudy and Preliminary Economic Assessment for the Ganajur Main Gold Deposit.
The study indicated that the Ganajur Main Gold deposit is open pittable. Theproject has been found to be economically viable.
Following the positive scoping studies by SRK, DESPL appointed SnowdenMining Industry Consultants Pty Ltd (Snowden), headquartered in Perth toundertake a Definitive Feasibility Study for the project.
Feasibility study involved a detailed review of the project to take the Ganajur GoldMine into production.
Detailed work involved Resource geology and Ore reserves, Mine planning,Geochemistry, Process and metallurgy, Plant designing and engineering, Tailingsdisposal and design of the tailing dump, Geotechnical engineering, hydrology andhydro-geology, environmental studies etc. Ore reserves under proved andprobable categories were estimated as per JORC 2012 (equivalent of UNFC 111).
Several experts, both in country and abroad were involved in completion of the FS as per International Standards.
The FS indicated strong NPV that makes the project robust and economicallyattractive for commencement of the mine and the processing plant.
The entire feasibility studies were as per International standards that lasted nearly11 months to complete.
7
Classification Deposit Tonnes(Mt)
Au
Measured Oxide 0.58 2.8
Sulphide 1.70 4.0
Total Measured 2.30 3.7
Indicated Oxide 0.13 1.9
Sulphide 0.32 2.1
Total Indicated 0.45 2.1
Measured + Indicated
Total2.70
3.4
Inferred Oxide 0.10 2.3
Sulphide 0.11 2.3
Total Inferred 0.21 2.3
Upgradation of Mineral
Resources to Ore Reserves:
Snowden has estimated 2.14
million tonnes (Mt) @ 3.63
grams per tonne (g/t) gold as
Proved Ore Reserves, and
0.37 Mt @ 1.98 g/t gold as
Probable Ore Reserves for
the Ganajur Main Gold
Deposit, thereby identifying
the maiden mining inventory
on the new Mineral Resource
Estimates of August 2016.
It is to be noted that out of
300,000 ozs of gold
estimated under Measured
and Indicated Resource
categories, 273,000 ozs are
now placed under Proved
and Probable Ore Reserves;
Proved Ore Reserves account
for 85% of the total Ore
Reserves, which is a
significant milestone for
Ganajur Gold Project.
Classification Deposit Tonnes(Mt) Au
(g/t)
Proved Ore Reserve Oxide 0.568 2.76
Sulphide 1.567 3.94
Total Proved Ore Reserve 2.135 3.63
Probable Ore Reserve Oxide 0.122 1.78
Sulphide 0.250 2.08
Total Probable Ore Reserve 0.372 1.98
Total Ore Reserve 2.506 3.38
ORE RESERVES-GANAJUR MAIN GOLD DEPOSIT
MINERAL RESOURCE STATEMENT
8
HIGHLIGHTS OF FEASIBILITY STUDIES-FINANCIALThe financial model demonstrates net cash flows of USD 133 million (M) before tax over thelife of the mine (LOM). The Net Present Value (NPV) at 5% DCF is USD 91.6 M and USD 61.4M before and after tax respectively. The Internal Rate of Return (IRR) is a very healthy 39.1%and 29.6% before and after tax respectively, and the payback period for the Project is 2.7years.
Item Unit Value
Pre-production years 1.75
Life of process production years 8.35
Project life years 10.1
LOM ore mined Kilo tones (kt) 2,506
LOM waste mined kt 9,237LOM total material mined kt 11,743
Strip ratio Waste : Ore 3.68LOM ore processed kt 2,506
LOM average Au grade % 3.38
LOM average Au recovery sulphide ore % 79.0
LOM average Au recovery oxide ore % 90.0
LOM average gold recovery % 81.7LOM contained ounces Kilo ounze
(koz)273
LOM recovered ounces koz 221Average annual gold produced koz 27
Plant throughput (average) Mtpa 0.30
LOM Au price USD/oz 1,2509
Item Unit Value
Pre-production capital USD M 46.6
Production sustaining capital USD M 3.1
Total Capital Costs USD M 49.7
Total Mining USD M 21.6
Total Processing USD M 55.8
Onsite Labour USD M 1.2
Total Operating Costs USD M 78.5
Royalties USD M 14.9
Taxation USD M 39.8
TOTAL ALL COSTS USD M 183.0
Summary of total Life of Mine costs
Item Unit Value at USD 1,250/oz Au
Net cash flow USD M 133.0
NPV5 USD M 91.6
IRR % 39.1
Item Unit Value at USD 1,250/oz Au
Net cash flow USD M 93.1
NPV5 USD M 61.4
IRR % 29.6
Economic model headline results before
taxationEconomic model headline results after
taxation
10
Item Unit Breakeven
Gold price USD/oz Au 701
Gold grade g/t Au 1.90
Break Even:A break even analysis after taxation was undertaken on the gold price and gold grade forNPV(Table 8). The analysis shows that the Project breaks even at a gold price of USD 701/oz ofgold and gold grade of 1.90 g/t as compared to the average gold grade of 3.4 g/t at GanajurMain Gold deposit.
Item UnitValue at
$1,250/oz Au
Total value of product sold $ M 276.1
Cash cost $/oz 423
Total cost $/oz 829
Production year payback year 2.7Brooke Hunt methodology C1 cost $/oz 356Brooke Hunt methodology C2 cost $/oz 356Brooke Hunt methodology C3 cost $/oz 423
The Project LOM KPIs after taxation are presented
11
LAND ACQUISITION PROCESS
1. DESPL signed MOU with the Government of Karnataka during the Global
Investors Meet at Bangalore on 4.5.2010 for “Commencement of Gold Mine and
setting up Value Addition Mineral Processing Plant”.
2. State High Level Clearance committee (SHLCC) also has approved Ganajur Gold
project vide Government vide Order No CI 211 SPI 2010, Bangalore, dated 2-6-
2010 , and also in its 27th meeting held on 13.04-12 vide Government vide Order
No No CI 146 SPI 2012, Bangalore, dated 28-4-2012.
3. Our application for the allotment and acquisition of additional area of 55 acres
(total 255 acres) through KIADB was approved by the SLSWCC vide Order No CI
146 SPI 2012m Dated 09-08-2017.
• DESPL has obtained 90% consent from land owners.
• DESPL’s long term lease agreement with land owners of the proposed gold mine
will be an added advantage in the land acquisition process.
• KIADB has processed our application and sent a demand letter for payment of
advance towards land acquisition. We have paid the 40% of the advance which
amounts to 6.82 crores on 23rd April 2018 for the 200 acres of land.
GANAJUR GOLD MINE PROJECT – INFRASTRUCTURE
12
• Signed MOU with the Government
of Karnataka during the Global
Investors Meet on 4.5.2010 for
“Commencement of Gold Mine and
setting up Value Addition Mineral
Processing Plant”.
• State High Level Clearance
committee (SHLCC) also has
approved Ganajur Gold project.
• Land acquisition (255 acres)
through KIADB was approved by
the SLSWCC. DESPL has obtained
90% consent from land owners.
DESPL’s long term lease
agreement with land owners of the
proposed gold mine will be an
added advantage in the land
acquisition process.
• We have paid the 40% of the
advance to KIADB which amounts
to 6.82 crores on 23rd April 2018
for the 200 acres of land.
Power for Plant and Mine: DESPL's application for obtaining 5 MWpower from a HT110 kilovolt-amperes(kVa) power line from Basavanakattisubstation (13.24 kms) has been sanctionedby Karnataka Power TransmissionCorporation Limited (KPTCL) under selfexecution scheme in February 2017.
WaterDESPL Proposal to pump 1.08 millioncubic metres of water per year from VaradaRiver has received approval from variousauthorities. It was earlier approved bySHLCC.
Railways:
We have now entered into an agreementwith the South Western Railway forexecution of the project. SW Railway,Mysore accorded permission for layingwater pipe line below the railway line atKM 399/500-600 near Ganajur.
14
GANAJUR GOLD MINE PROJECT – CURRENT STATUS (Cont..)
HUT P 300 meters of strike
length was delineated
which is open along the strike
and depth. HIGH GRADE
GANAJUR SE P600 metres has
been delineated.
35000 OZS OF Au
KARAJGI MAIN P.Resource of 26800 ozs
averaging 3.06 g/t Au under JORC Indicated and
Inferred categories
GANAJUR MAIN P.MEASURED AND
INDICATED RESOURCE 305000
OZS. OPEN PITTABLE.
SIGNFICANT DEPTH POTENTIAL
CHARGEABILITY ANOMALY SLICE PLAN AT 24 M DEPTH 15
• Ganajur ML Approval Status
DESPL explored an area of 1,542 Sq km under a Reconnaissance Permit that resulted in locatingseveral significant gold prospects that include Ganajur Main Gold prospect and the adjacentprospects in the Ganajur-Karajgi cluster. The factual information about the Ganajur Gold Project isfurnished below:Hanagal RP (1542 sq.kms) was executed by DESPL on 17-1-2003.DESPL has preferential right under Section 11(1) of the MM (D & R) Act by virtue of holding thearea first under RP which was followed up by 2 PL applications. Post amendment of the MMDR act2015, the ML application and 2 PL applications are protected under Section 10A(2)(b) of the Act.The first PL application was dt. 17.10.2003 for 2.3 sq km area. The second PL application was dt.12.1.2005 for 8 sq km area. The first PL Deed No.3370 was executed on 25.9.2009 for 2.2 sq km area.Thus, the security of tenure was maintained.DESPL lodges an application over an area of 0.29 sq.kms for Ganajur, Dt.8.6.2006 vide ACK. no 567AML 06/3389. This application was lodged after ascertaining that the ML application has goldreserves as per UNFC guidelines and satisfies Section 5(2)(a) of the Act read with MoM’s detailedGuidelines dt. 24.6.2009.The ML application dt. 8.6.2006 overlapped the said 2 PL applications since the mineralized zone isa single entity. Subsequently, the applicant also carried out prospecting under the granted PL.The ML application was recommended by the State Govt. to the Ministry of Mines on 8.11.2010 i.e.after the applicant carried out prospecting in the main part of the Ganajur Gold Deposit. On21.4.2011 the State Govt. replied MoM’s queries and forwarded its recommendationDESPL has submitted the Technical Reports of 6 Monthly, Annual and the Final of the RP stageexploration as well as PL stage exploration to DMG & IBM and also GSI.State Government vide its Letter CI 30 MMM 2010 dated 11.06.2014 submitted information underthe revised New Checklist dated 11-2-2013 as prescribed by the Ministry of Mines. The Checklisthas reconfirmed that the DESPL's ML application satisfied all the provisions of Act, Rules andother guidelines of the Ministry of Mines, Government of India.
DESPL as a responsible company undertook several CSR activities in
and around Ganajur village particularly in improving health, sanitation,
cleanliness, waste management, water conservation, green development,
employment and culture.
DESPL has also been paying annual crop compensation to the land
owners of the ML and Plant area for several years what was very helpful
to the farmers during the summer and draught periods.
Corporate Social Responsibility shown
by DESPL in the project area
CHECK DAMS FOR WATER CONSERVATION AND PREVENT SOIL EROSION
Donating utensils for Hanuman
Temple trust
RENOVATION OF THE LOCAL
TEMPLE
DESILTING AND CLEANING OF LOCAL TANK FOR WATER CONSERVATION AND RAINWATER HARVESTING
READING ROOM FALILITIES WHICH IS BEING USED FULLY BY STUDENTS AND
VILLAGERS
Indian Bureau of Mines (IBM) vide letter No N-11011/20/93/CCOM/1999 dated 24-04-2015submitted a detailed and positive report with regard to mineralization and UNFC classification inresponse to the clarification sought by the Ministry of Mines. IBM clarified that out of total 1.47million tonnes of ore reserves (UNFC 121) reported in its letter dated 03-06-2013, 1.25 milliontonnes is in the granted PL area (44 acres) and rest 0.272 million tonnes is from the applied PL area(28 acres). The IBM also intimated that the DESPL continued it’s prospecting in the granted PL areaby drilling additional boreholes and the overall ore reserves has increased to 2.552 Million Tonnesunder UNFC 121 (Probable Mineral Reserves) and stated that an optimal and scientific mining plancan be prepared for the Ganajur ML area.
Based on the clarifications submitted by the State Government and the IBM, DESPL’s Mining Leaseapplication covering important Ganajur Gold deposit was approved by the Ministry of Mines,Government of India on 24.7.2015 vide Letter No 4/113/2010-M.IV over an area of 0.29 sq.kms fora period of 50 years.
Further, the Ministry of Mines, Government of India vide its Letter No.2/113/2010-M.IV dated07.02.2017 clarified that its prior approval has been granted under section 10A (2) (b) of the Act.
Ministry of Mines observed that since in the case of the DESPL, prior approval was already grantedon 24.07.2015, the State Government of Karnataka was specifically directed to execute the MiningLease in accordance with Law at the earliest.
Opinion of Law Department: The law department of the Karnataka State Government has given its positive opinion regarding
the ML application. It has clarified that the Central Government has accorded its approval underSection 10A(2)(b) of the MMDR Act after obtaining the necessary clarifications from the StateGovernment and the IBM and there is no need to seek further clarification from the centralgovernment .
Approval of Ganaju ML has followed all the due process of law, Rules and guidelines of theCentral Government. Delay in Grant of Mining Lease has affected development of the Gold Projectunnecessarily .
• Hutti Maski Greenstone belt is one of the most
important Archaean gold bearing belts in India.
• Remarkably similar to the classic Archaean
Superior Craton in Canada, the Yilgarn Craton
in Western Australia and the Kolar greenstone
belt in India.
• DGML carried out exploration over an area 851
sq km in the Hutti Belt under its two
Reconnaissance exploration Permits (RPs).
• The systematic exploration efforts of DGML
geologists resulted in defining 21 gold bearing
blocks. A total of 8 prospecting license (PLs)
applications have been filed with the Karnataka
State Government. These PL applications are
valid as per New MM&DR Act 2015.
• These were new discoveries with immence
geological potential.
• The overall geological potential may be
prognosticated to around 2 to 5 million
ounzes of gold. This however needs to be
confirmed by detailed exploration including
drilling.
HUTTI-MASKI GREENSTONE BELT PROSPECTS
22
A very important development for the company during this year was the landmarkjudgment delivered by the Hon’ble Supreme court on 08-05-2018 in favour ofDESPL with regard to HuttiMaski Belt projects. With this the following highlyprospective PL applications of DESPL have been restored and these are protectedunder Section 10A(2)(b) of the MMDR Act
Name of the PL application
Area Sq.kms DISTRICT State
• Hutti North 4.9 Raichur Karnataka• Uti 2.9 Raichur Karnataka
• Yatkal-Hirenagar 21 Raichur Karnataka
• Wandalli 90 Raichur Karnataka• Yelagatti 9 Raichur Karnataka
• Palkanmardi 6 Raichur Karnataka
• Bullapur 7 Raichur Karnataka
• Hirenagar 1.8 Raichur Karnataka
Further the Revision Authority In the final order dated 29th October 2018, set asidethe order of the State Government of Karnataka and directed it to consider the HuttiNorth PL application of DESPL in the light of the judgement of the Apex Court.DMG has started to process all the 8 applications. RO, IBM has forwarded itspositive comments for all 8 applications.This has opened up huge opportunity for DGML in developing the Hutti Projects
Status of PL applications in Hutti-Maski Belt, Karnataka
• Hutti North PL Block is located immediatelynorth of the currently operating Hutti GoldMine in Raichur District in Karnataka.
• The Hutti Gold Mines has produced in excess of1.8Moz to a vertical depth of 800m.
• A total of eight parallel gold bearing quartz-sulphide veins are known to exist in the HuttiMines.
• These lodes have been developped and minedupto the ML boundary of HGML towards norththat borders DGML;s PL Block.
• DESPL Explored North Hutti Block by moderrexploration techniquest under RP.
• The exploration efforts resulted in tracing theextensions of 5 of the gold lodes that are beingmined in the Hutti Gold Mines. Notablediscoveries include Main reef (16 g/t Au) andEast Reef analysing upt 10 g/t Au.
• Information across the world with similargeological set up and adjoining an operatingworld class mine suggests possibility of findingbig deposit of gold. Hutti North Prospect has agreat potential for hosting > million ounzes ofgold.
• This will be confirmed after carryiing outdetailed exploration by drilling.
EXTENSION OF HUTTI MINE LODES INTO DESPL’S APPLIED PL AREA- Hutti North PL Block
Hirenagnur Prospect:
• DGML considers Hirenagnurprospect as one of its bestdiscoveries which is located 6.5 kmssoutheast of Hutti Gold Mines.
• Systematic exploration by means ofgeochemistry, ground geophysics,RC drilling and structural mappinghas established a large mineralizedsystem of 2 kms length over awidth of nearly 50 metres.
• Preliminary drilling indicatedpresence of 4 parallel mineralisedzones of which the eastern mostzone, i.e., zone III has a strikelength of 600 metres.
• The data generated also suggeststhe possibility of open pit mining atHirenagnur.
26
HIRENAGNUR-YATKAL PL BLOCK
DISCOVERY SPOT 7.13 G/T
• A preliminary resource of 6.0 tonnes ofAu is estimated averaging 2.72 g/t over10-15 m width. This is just based on verylimited drilling.
• The results of Hirenagnur is lookingexciting and is akin to world classdeposits such as Cleo-Sunrise Damdeposit in Western Australia and minesin Lake Victoria in Tanzania with similargeological set up.
• The overall strike length is more than 1km and the shear zone is very wide.There is a possibility of finding > 1million ounzes of gold just by comparingit with other similar deposits elsewherein the world.
• The test indicated that the Hirenagnurore is mostly free milling with marginalamount of gold in sulphides.
• The study also indicates that by thestandard cyanide leaching process wecan achieve a recovery of 89% Au.Recovery can go upto 94% by furtherroasting. 27
DHN-4
(15m x 1g/t)
DHN-16
11m x 4.52 g/t
DHN-5
(9m x 2.77 g/t,
3m x 2.47 g/t
& 19m x 3.02 g/t)
DHN-6
(16m x 6.38 g/t)
DHN-1
(3m x 2.34g/t,
2m x 1.96 g/t,
& 9m x 1.26 g/t)
DHN-9
(9m x 2.21 g/t)
DHN-14
10m x 2.36 g/t
DHN-10
(2m x 3.72 g/t
12m x 1.5 g/t)
DHN-15
7m x 2.65 g/t
& 5m x 3.02 g/t
DHN-11
(9m x 1.24g/t)
IHN-2
8m x 3.52 g/t
& 2m x 1.73 g/t
IHN-4
5m x 1.3 g/t
& 6m x 2.94 g/t
IHN-6
4m x 1.45 g/t
DHN-3
(26m x 1.76g/t)
IHN-5
8m x 5.02 g/t
HW Sulphidic zone
FW Magnetite Zone
Central
Magnetite
Zone
200 km0
HIRENAGNUR PROSPECT
Hirenagnur Prospect, Cross section of BH DHN-2 & 5
87.0m86
84
80
82
78
74
76
72
70
68
66
62
64
0.62
0.78
0.90.3
9
0.69
0.2710
.540.
74
19m x3.02 g/t2.
31
11.2
2
4.28
0.67
7.16
0.26
2.87
6.22
5.06
0.67
2.29
1.49
5.66
0.75
0.030.1
6
0.19
0.06
0.31
2.92
0.21
0.11
0.42
0.17
11m x 2.17 g/t
3.15
0.87
0.52
0.38
0.69
1.67
0.38
0.24
2.95
1.51
0.56
0.08
0.1
0.06
1.34
0.220.0
6
30.0m
28
26
24
22
18
20
Magnetite
zone
?
Magnetite
zone
60
58
56
54
52
48
50
46
44
42
40
16
14
12
10
8
6
4
2
38
36
32
34
30
0.03
0.05
0.03
0.02
0.03
0.01
0.03
0.01
0.04
0.02
0.03
0.15
0.03
0.02
9m x 2.77 g/t
Sulphidic
zone
0.040.0
2
2.54
0.9
0.3
0.1
0.03
0
0.7
12.8
7
2.51
0.15.
33
DGH-2
2.49
NA
NA
NA
NA
NA
NA
0.28
10
6
8
2
4
28
26
24
20
22
16
18
14
12
NA
NA
NA
NA
NA
DHN-5 50 20
50
60
120
7580
70
70
Mag Anomaly
60 70
440
200
804
0
28
Chinchergi-Wandalli Prospect
29
1. This block is an excellentexploration target defined byDGML as a result of extensivegeochemical exploration, geologicalmapping, ground magnetic surveyand limited Reverse Circulationdrilling.
2. DGML targeted a part of the majorWNW trending Chinchergi-Amareshwara lineament betweenChinchergi Prospect and WandalliProspect. Several ancient workingsare seen all along this block.
3. Chinchergi prospect located some15 km east of Hutti Gold Mine is anarea of extensive ancient mining.
4. The British undertook extensiveU/G mining at Chinchergi.
5. A PL application has been lodgedto cover all the prospective area
Yatkal Prospect is situated alongthe southern margin of the NorthHuttti R.P. Block and gold is foundin the granites intruding the Huttivolcanic belt.Yatkal prospect is situated 10 kmssouth-east of Hutti. Goldmineralization is noticed in quartzveins emplaced along sheared andfractured granite. Mineralisation iscontrolled by NE-SW trendingfracture systems along whichseveral quartz veins are emplaced.
A 900 m long, 150 m wide NE trending soil geochemical in the western part and a NWtrending 400 m long narrow zone in the eastern part is noticed. The western anomalouszone shows sulphide rich granodiorites with 5 parallel zones of quartz veins. Rock chipsampling has revealed anomalous gold content in several samples with best valuesranging from 1 to 32.05 g/t.Preliminary exploration so far suggested a granite hosted gold mineralisation in Yatkalprospect.
YATKAL PROSPECT
30
• Buddinni PL block (14.7 sq.kms)
comprises of the Buddinni mine
prospect and Tuppadhur block.
• The gap area of 2.5 kms between
Tuppadhur P and Buddinni P were
explored under RP. Stream
geochemical sampling revealed
significant gold anomalies upto
829 ppb between Tuppadhur and
Buddinni.
• Gold mineralization is confined to
the central shear zone and is
generally found in quartz-ankerite
veins with the wall rock showing
intense chlorite and carbonate
alteration.
• At Buddini, four parallel lodes
have been identified. Extensive
British time old workings occur
along two of them – the Main and
Mopla Lodes. Samples from mine
dumps assayed up to 19.3 g/t
gold.
PROSPECTS IN SOUTH HUTTI BLOCK
The Maski Goldfields at E and NE of
Maski village, witnessed extensive
ancient mining activity in the past. The
ancient name of the present Maski village
was SWARNANAGARI meaning gold
town.
Thirteen old workings were reported in
this prospect in the early 1900s by the
Hyderabad Geological Survey. M/S John
Taylor and Sons developed one of these
workings with an average grade of 30 g/t
gold. All these old workings are presently
buried under black cotton soil.
DGML collected samples old Maski
Prospect returned significant gold values
such as 0.52, 0.21, 0.56, 1.30, 33.86,
0.3, 2.43, 0.64, 2.37, 3.76, 0.59, 0.68,
11.64, 10.5, 7.01. DGML considers that
the Maski area is an excellent target for
exploration.
Apart from Maski P, DGML also identified
Ashoka and Sanbal prospects.
SANBAL-MASKI PL BLOCK