SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 Project Site

Upload: others

Post on 16-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

SFO LONG TERM PARKING GARAGE 2

CIVIC DESIGN REVIEW PRESENTATION

OCTOBER 17, 2016

Project Site

Page 2: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

AgendaAgendaAgendaAgenda

1. Project ContextLong Term Parking and Existing Site

2. Functioning and OperationSite Plan and Floor Plans

3. DesignElevations and Renderings

4. MaterialsPrimary Exterior Wall and Floor Areas

5. LandscapePlants and plan

6. Questions and Discussion

Page 3: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Project Narrative Project Narrative Project Narrative Project Narrative (printed version only)(printed version only)(printed version only)(printed version only)

Located at the northwest corner of lot DD, the proposed long term parking garage no. 2 is a new 6 level parking structure, with a vehicular connector to the existing LTPG 1 at levels 3 and 5. The most prominent feature of the new structure will be the pedestrian connector at level 5 linking the new garage to LTPG 1, to the future AirTrain station, and to the future CONRAC. This feature lines up with the vehicular gates to create an entry portal to the SFO long-term parking garage campus.

The new garage 2 is designed to provide a parking structure with world-class functionality for vehicles and pedestrian traffic. It includes innovative technology features and advanced wayfinding systems, including APGS, PARCS, and FID’s. 3% of the parking stalls will have electric vehicle charging stations (EVCS) installed with infrastructure for future 100% EV charging. The project will pursue parksmart 1.0 gold certification by incorporating sustainability features, such as net zero energy consumption utilizing photovoltaic panels at the roof level. Two light wells provide relief from the darkness of the large floor plates and feature towers housing the data & electrical rooms.

The building maximizes the use of the triangular geometry of the site. The internal configuration features drive/parking aisles and speed ramp running diagonally, pointing in the direction of the elevator cores. Split elevator cores are located on the east and south sides. The ground floor includes 5,000 sf of space for potential amenities and back-of-house options, including baggage services, car wash services, kennel services, laundry drop-off, valet parking, and other ancillary uses. Amenities are accessed by temporary parking on the garage's exterior. Storage and utility rooms are located on each level, while restrooms are located on the ground level and level 5.

Page 4: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Project ContextProject ContextProject ContextProject Context

FUTURE LTPG 3

FUTURE CONRAC

AIRTRAIN

SO AIRPORT BLVD

US 101

LTPG 1

N

Page 5: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Site PhotographsSite PhotographsSite PhotographsSite Photographs

Page 6: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Site PlanSite PlanSite PlanSite Plan

Page 7: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 1 (ground)Level 1 (ground)Level 1 (ground)Level 1 (ground)

Page 8: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 2Level 2Level 2Level 2

Page 9: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 3Level 3Level 3Level 3

Page 10: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 4Level 4Level 4Level 4

Page 11: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 5Level 5Level 5Level 5

Page 12: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Level 6 (roof)Level 6 (roof)Level 6 (roof)Level 6 (roof)

Page 13: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Project OverviewProject OverviewProject OverviewProject Overview

Page 14: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

ElevationsElevationsElevationsElevations

North Façade (Entrance)

East Façade (Parking Lot)

West Façade (Freeway)

Aluminum Louvers

Aluminum Window Wall with Clear Glass

White High Gloss Trespa Panel

White High Gloss Trespa Panel at Crashwalls

Grey Cast-in-place Concrete Structure

Light Yellow, Columns Sides Only

Silver/Aluminum Trespa Panel Canopy

Dark Grey Stairs Beyond

Dark Grey Solar Array Beyond

Page 15: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

EntranceEntranceEntranceEntrance

Page 16: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

IntersectionIntersectionIntersectionIntersection

Page 17: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

AirtrainAirtrainAirtrainAirtrain

Page 18: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Lot DDLot DDLot DDLot DD

Page 19: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

West SideWest SideWest SideWest Side

Page 20: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

South SideSouth SideSouth SideSouth Side

Page 21: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

LightwellLightwellLightwellLightwell

Page 22: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

LightwellLightwellLightwellLightwell ‘Data Tower’‘Data Tower’‘Data Tower’‘Data Tower’

Page 23: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Lobby at Level 5Lobby at Level 5Lobby at Level 5Lobby at Level 5

Page 24: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Interior Floor IdentificationInterior Floor IdentificationInterior Floor IdentificationInterior Floor Identification

Colored level and area

identification on columns

Graphic accent using level color

scheme at vertical circulation

Page 25: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Lighting and ParkLighting and ParkLighting and ParkLighting and Park----assistassistassistassist

Park-assist indicators

Page 26: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Facade MaterialsFacade MaterialsFacade MaterialsFacade Materials

Trespa – Silver/Aluminum Trespa - High Gloss White Cast-in-place ConcreteColumn

Interior Accent at Vertical Circulation

Page 27: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

Surface MaterialsSurface MaterialsSurface MaterialsSurface Materials

Grass, Gravel and Pebbles at Planting Areas

Asphalt and Concrete at Driving Surfaces

Precast Pavers and Natural

Rock at Lightwells

Page 28: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

PlantingPlantingPlantingPlanting

Page 29: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and

LandscapeLandscapeLandscapeLandscape

Entrance Planting

Blvd Planting

Bay Trail Planting