![Page 1: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/1.jpg)
SFO LONG TERM PARKING GARAGE 2
CIVIC DESIGN REVIEW PRESENTATION
OCTOBER 17, 2016
Project Site
![Page 2: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/2.jpg)
AgendaAgendaAgendaAgenda
1. Project ContextLong Term Parking and Existing Site
2. Functioning and OperationSite Plan and Floor Plans
3. DesignElevations and Renderings
4. MaterialsPrimary Exterior Wall and Floor Areas
5. LandscapePlants and plan
6. Questions and Discussion
![Page 3: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/3.jpg)
Project Narrative Project Narrative Project Narrative Project Narrative (printed version only)(printed version only)(printed version only)(printed version only)
Located at the northwest corner of lot DD, the proposed long term parking garage no. 2 is a new 6 level parking structure, with a vehicular connector to the existing LTPG 1 at levels 3 and 5. The most prominent feature of the new structure will be the pedestrian connector at level 5 linking the new garage to LTPG 1, to the future AirTrain station, and to the future CONRAC. This feature lines up with the vehicular gates to create an entry portal to the SFO long-term parking garage campus.
The new garage 2 is designed to provide a parking structure with world-class functionality for vehicles and pedestrian traffic. It includes innovative technology features and advanced wayfinding systems, including APGS, PARCS, and FID’s. 3% of the parking stalls will have electric vehicle charging stations (EVCS) installed with infrastructure for future 100% EV charging. The project will pursue parksmart 1.0 gold certification by incorporating sustainability features, such as net zero energy consumption utilizing photovoltaic panels at the roof level. Two light wells provide relief from the darkness of the large floor plates and feature towers housing the data & electrical rooms.
The building maximizes the use of the triangular geometry of the site. The internal configuration features drive/parking aisles and speed ramp running diagonally, pointing in the direction of the elevator cores. Split elevator cores are located on the east and south sides. The ground floor includes 5,000 sf of space for potential amenities and back-of-house options, including baggage services, car wash services, kennel services, laundry drop-off, valet parking, and other ancillary uses. Amenities are accessed by temporary parking on the garage's exterior. Storage and utility rooms are located on each level, while restrooms are located on the ground level and level 5.
![Page 4: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/4.jpg)
Project ContextProject ContextProject ContextProject Context
FUTURE LTPG 3
FUTURE CONRAC
AIRTRAIN
SO AIRPORT BLVD
US 101
LTPG 1
N
![Page 5: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/5.jpg)
Site PhotographsSite PhotographsSite PhotographsSite Photographs
![Page 6: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/6.jpg)
Site PlanSite PlanSite PlanSite Plan
![Page 7: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/7.jpg)
Level 1 (ground)Level 1 (ground)Level 1 (ground)Level 1 (ground)
![Page 8: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/8.jpg)
Level 2Level 2Level 2Level 2
![Page 9: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/9.jpg)
Level 3Level 3Level 3Level 3
![Page 10: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/10.jpg)
Level 4Level 4Level 4Level 4
![Page 11: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/11.jpg)
Level 5Level 5Level 5Level 5
![Page 12: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/12.jpg)
Level 6 (roof)Level 6 (roof)Level 6 (roof)Level 6 (roof)
![Page 13: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/13.jpg)
Project OverviewProject OverviewProject OverviewProject Overview
![Page 14: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/14.jpg)
ElevationsElevationsElevationsElevations
North Façade (Entrance)
East Façade (Parking Lot)
West Façade (Freeway)
Aluminum Louvers
Aluminum Window Wall with Clear Glass
White High Gloss Trespa Panel
White High Gloss Trespa Panel at Crashwalls
Grey Cast-in-place Concrete Structure
Light Yellow, Columns Sides Only
Silver/Aluminum Trespa Panel Canopy
Dark Grey Stairs Beyond
Dark Grey Solar Array Beyond
![Page 15: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/15.jpg)
EntranceEntranceEntranceEntrance
![Page 16: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/16.jpg)
IntersectionIntersectionIntersectionIntersection
![Page 17: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/17.jpg)
AirtrainAirtrainAirtrainAirtrain
![Page 18: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/18.jpg)
Lot DDLot DDLot DDLot DD
![Page 19: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/19.jpg)
West SideWest SideWest SideWest Side
![Page 20: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/20.jpg)
South SideSouth SideSouth SideSouth Side
![Page 21: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/21.jpg)
LightwellLightwellLightwellLightwell
![Page 22: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/22.jpg)
LightwellLightwellLightwellLightwell ‘Data Tower’‘Data Tower’‘Data Tower’‘Data Tower’
![Page 23: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/23.jpg)
Lobby at Level 5Lobby at Level 5Lobby at Level 5Lobby at Level 5
![Page 24: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/24.jpg)
Interior Floor IdentificationInterior Floor IdentificationInterior Floor IdentificationInterior Floor Identification
Colored level and area
identification on columns
Graphic accent using level color
scheme at vertical circulation
![Page 25: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/25.jpg)
Lighting and ParkLighting and ParkLighting and ParkLighting and Park----assistassistassistassist
Park-assist indicators
![Page 26: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/26.jpg)
Facade MaterialsFacade MaterialsFacade MaterialsFacade Materials
Trespa – Silver/Aluminum Trespa - High Gloss White Cast-in-place ConcreteColumn
Interior Accent at Vertical Circulation
![Page 27: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/27.jpg)
Surface MaterialsSurface MaterialsSurface MaterialsSurface Materials
Grass, Gravel and Pebbles at Planting Areas
Asphalt and Concrete at Driving Surfaces
Precast Pavers and Natural
Rock at Lightwells
![Page 28: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/28.jpg)
PlantingPlantingPlantingPlanting
![Page 29: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/29.jpg)
LandscapeLandscapeLandscapeLandscape
Entrance Planting
Blvd Planting
Bay Trail Planting
![Page 30: ProjectSite - San Francisco Long Term...SFO LONG TERM PARKING GARAGE 2 CIVIC DESIGN REVIEW PRESENTATION OCTOBER 17, 2016 ProjectSite Agenda 1. Project Context Long Term Parking and](https://reader035.vdocuments.net/reader035/viewer/2022071000/5fbc1b92107de67e3407c65d/html5/thumbnails/30.jpg)
Thank You!Thank You!Thank You!Thank You!