promatect ® 50 high impact walls › wp-content › files...deep impact when properly supported,...

48
[email protected] progressivematerials.com.au 08 9445 8300 PROMAtect ® 50 High impact walls

Upload: others

Post on 03-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

[email protected]

progressivematerials.com.au

08 9445 8300

PROMAtect ® 50High impact walls

Page 2: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

1

PROMATECT® 50 Cement Bound Matrix Board _________________________________________________

Introduction _________________________________________________

Aesthetics and Finishes _________________________________________________

CBM Internal Applied Finished (Painting) and Application Specification ______________________

Acoustic Design _________________________________________________

Services _________________________________________________

Thermal Insulation _________________________________________________

Fire Safety _________________________________________________

Fast, Easy Installation and Lightweight _________________________________________________

Durability, Versatility and Maintenance _________________________________________________

Optimum Profile _________________________________________________

Standardised Specifications and Door,

Window Fixing and Joint Details _________________________________________________

Moisture Tolerance and Point Accessibility _________________________________________________

Load factors _________________________________________________

Hospital Ward room _________________________________________________

School Corridors _________________________________________________

Bathrooms _________________________________________________

General Installation Details _________________________________________________

Wet Area Details _________________________________________________

Penetration Details _________________________________________________

Material Safety Data Sheet _________________________________________________

PR

OM

AT

EC

T® 5

0 —

CO

NT

EN

TS

4

2

5

8

7

12

13

14

15

16

18

19

20

21

23

24

25

41

26

43

38

Page 3: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

PROMATECT® 50

Cement Bound Matrix BoardP50

General Description

PROMATECT® 50 is Promat’s matrix technology of binding organic materials and inorganic minerals

within a calculated mineral matrix to form a monolithic core. Known as a Cement Bound Matrix board,

this low energy environmentally friendly manufacturing process makes excellent boards that offer not

only superior ire resistance but also exemplary physical strength, robustness and performance.

PROMATECT® 50 is off-white in colour. One face is extremely smooth and ready to form a inished

surface able to receive almost any form of architectural/inish treatment. The reverse face has a

(visible) ibre mesh reinforcement.

PROMATECT® 50 is resistant to the effects of moisture and will not physically deteriorate when used

in damp or humid conditions. Performance characteristics are not degraded by moisture. A fully

saturated, standard PROMATECT® 50 board retains up to 95% of its physical strength.

A health and safety data sheet is available from Promat and, as with any other material, should be

read before working with the board. The board is not classiied as a dangerous substance so no

special provisions are required regarding the transportation and the disposal of the product to landill.

They can be placed in on-site rubbish skips with other general building waste which should then be

disposed by a registered contractor in the appropriate and approved manner.

Typical Mechanical Properties

Flexural strength, Frupture

Longitudinal N/mm²

(EN 12467: 2000) Transverse N/mm²

13.76

10.80

Tensile strength, Trupture

N/mm²

(EN 12467: 2000)4.2

Compressive strength (average, perpendicular on board face) N/mm²

(BS 5669: Part 1: 1989)13.10

General Technical Properties

Product generic description PromaX® technology Cement Bound Matrix board

Material class (BS 476: Part 4: 1970 and EN ISO 1182: 2002) Non combustible

Surface spread of flame (BS 476: Part 7: 1997) Class 1

Surface spread of flame for bare floors (AS ISO 9239: Part 1: 2003) No ignition

Building regulations classification Class 0

Heat and smoke release rates (AS/NZS 3837) Group 1

Fire propagation of product (BS 476: Part 6: 1989) I = 0; i1 = 0; i

2 = 0; i

3 = 0

Simultaneous determination of ignitability, flame propagation, heat and

smoke release (AS 1530: Part 3: 1999)Indices 0/0/0/0-1

Density kg/m³ Nominal 1100

Thermal conductivity (approximate) at 20°C (ASTM C518: 1991) W/m°K 0.193

Typical moisture content, ambient to dry condition (BS 5669: Part 1: 1989, Clause 9) 2.4%

Emission test (ASTM D5116-90 for Green Label Singapore) Within limits set out by the Singapore Environment Council

Thickness tolerance of standard boards mm ± 0.5

Length x Width tolerance of standard boards mm ± 5

Surface conditionFront face: smooth, fair

Back face: smooth with ibre mesh reinforcement

Thickness

(mm)

Standard dimensions

(mm x mm)

Number of boards

per pallet

Surface per pallet

(m²/pallet)

Weight per m² of sheet

(approximate kg/m²)

Weight per pallet

(approximate kg)

7 2440 x 1220 78 232 7.7 1787

9 2440 x 1220 60 178 9.9 1763

12 2440 x 1220 45 134 13.2 1769

15 2440 x 1220 36 107 16.5 1766

18 2440 x 1220 30 89 19.8 1768

20 2440 x 1220 27 80 22.0 1762

25 2440 x 1220 21 63 27.5 1733

*Other dimensions are available upon request. The properties in above tables are mean values given for information and guidance only. If certain properties are critical for a particular application,

it is advisable to consult Promat.

PROMATECT® 50 is manufactured under a quality management system certiied in accordance with ISO 9001: 2008.

WHEN MACHINING THIS PRODUCT, AIRBORNE DUST MAY BE RELEASED, WHICH MAY BE HAZARDOUS TO HEALTH. DO NOT INHALE THE DUST. AVOID CONTACT WITH SKIN AND EYES. USE DUST EXTRACTION EQUIPMENT. RESPECT REGULATORY OCCUPATIONAL EXPOSURE LIMITS FOR TOTAL INHALABLE AND RESPIRABLE DUST. FOR MORE INFORMATION PLEASE CHECK THE APPROPRIATE MATERIAL SAFETY DATA SHEET, AVAILABLE UPON REQUEST.

Applicationsl Steel and timber stud partitions, solid/frameless partitions

l Self-supporting ceilings, suspended ceilings

l Membrane ceilings, timber loor protection

l Cladding to steel ducts

l M&E services enclosure, riser pipes enclosure

Annotation and/or video of the applications is available in digital

format. For system details, please refer to http://www.promat-

ap.com.

ww

w.p

rom

at-a

p.com

Page 4: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

3

PROMATECT® 50

Introduction

Page 5: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

4

P50

This informational brochure outlines a range of PROMATECT® 50

internal partition systems offered by Promat. It covers both general

recommendations and fire resistant solutions to meet most design

criteria for the installation of lightweight walls in buildings where high

impact, acoustic and/or fire resistance are critical factors, e.g. Hospitals,

Aged Care Education, Student Accommodation, Hotels, Sporting Venues,

Laboratories and Sole Occupancy Units etc. The information herein

provides the designer with a general overview of lightweight partition

design and the basic guidance to choose the system appropriate to

their particular project needs. If similar information is required for ceiling

systems, please contact your local Promat office.

In the modern world, any construction that involves accommodation or

community use on a daily basis is mainly concerned with establishing,

providing and sustaining exceptional standards of comfort, security and

service. These in turn are an integral component of the unique image

of many buildings and are central to their successful management and

business strategies. Buildings that aspire to leadership in their industry

must deliver quality in all aspects of their business, from the drawing board

right through to guest checkout ensuring satisfied customers ready to

repeat the experience on their next visit. It is a case of the whole being

greater than the sum of parts and for hotels for example, this can mean

structural standards from the foundations up, including critically important

walls and partitions.

For most buildings, no two walls are the same because different areas

in each type of building have different structural and performance based

requirements, from fire to acoustic to physical and aesthetic considerations.

While traditional brick or masonry wall techniques are still prevalent in some

parts of the construction industry, modern manufacturing technologies

and building techniques — including flat sheets for lightweight

structures — are fast gaining widespread recognition and acceptance.

As a leading worldwide manufacturer of architectural boards, Promat has

responded to the needs of the construction industry and the community

with PROMATECT® 50, a Cement Bound Matrix (CBM) board ideal for

partitions and wall systems.

Following is a brief summary of design and performance benefits that make

PROMATECT® 50 wall systems a popular choice in the demanding service

industry:

1. Fire Safety Performance

PROMATECT® 50 boards incorporate PromaX® technology and

meet the specifications of BS 476: Parts 4, 6 and 7 and AS 1530: 3,

and BS 476: Part 22 and AS 1530.4: 2005 for up to 120/120/120 minute

fire resistance.

2. Acoustic PerformancePROMATECT® 50 installed in fire resisting wall systems provides excellent

acoustic performance and high levels of privacy between adjacent rooms,

spaces and compartments.

3. Thermal insulationThe thermal insulation properties of PROMATECT® 50 reduce

air conditioning (cooling/heating) loads, creating real energy saving

incentives in high traffic, multi purpose structures such as hotels, hospitals,

schools etc.

4. Quick, easy installationPROMATECT® 50 is easy to work and install, allowing for on time

completion and thus earlier occupancy of the building. Similarly, installation

teams can be quickly brought up to speed with appropriate techniques,

acquired with on site training, well within the capabilities of most skilled

labour and experienced contractors.

5. Strong, durable but lightweightWall and partition systems comprised of PROMATECT® 50 CBM boards

add little to the dead load of the overall structure, even large spans need

little by way of heavy support.

6. ServicesPROMATECT® 50 is easily configured to accommodate the plethora of

services required within walls and partitions in most rooms. Accessibility

to these services is also easily accomplished with adequate preplanning.

7. Aesthetics

PROMATECT® 50 accepts a multiplicity of wall finishes. Refer to Page 5 for

finishing recommendations

8. MaintenanceWall and partition systems configured from PROMATECT® 50 are easy to

maintain and if necessary are simple to repair.

9. Planning lexibility PROMATECT® 50 provides designers a large degree of flexibility to

introduce additional internal partitions at any stage of the project.

10. Minimal footprintThe profile of PROMATECT® 50 architectural systems is less than

many competitor systems, creating more floor space allowing for, larger

and indeed more rooms.

11. Standardised speciicationsThe standardised quality, sizes, physical characteristics and

performance criteria of PROMATECT® 50 creates reassuring ease of use

valued by architects, engineers, quantity surveyors, builders, building

owners, managers and customers alike.

12. Doors and windowsTo maximise layout flexibility of space, wall and partition systems must

accommodate door and window openings while also being easily

adjustable to changes in design and layout. PROMATECT® 50 fits the bill.

13. Moisture tolerance and robust durabilityWalls and partition systems have to multitask as they are expected to

handle different customers and different functions. PROMATECT® 50 is

durable, impact resistant and exceptionally tolerant to ambient moisture.

Page 6: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

5

PROMATECT® 50

Aesthetics and FinishesP50

Application of decorative wall inishes

Apart from utilitarian and physical functionality, wall and partition systems

are also a common substrate for secondary decorative linings ranging from

cladding, tiling, laminating or paint. It it therefore essential to assure that

wall and partition structures can accommodate final surface finishing works

as and when required.

A typical PROMATECT® 50 wall system has one layer of PROMATECT® 50

on either side of a metal or timber framework. The PROMATECT® 50 CBM

board itself forms a monolithic core with a smooth surface on one face,

while the other is reinforced with fibre mesh for added strength. The face

with the smooth surface is ready to receive virtually any form of architectural

finishing and treatment.

After fixing of PROMATECT® 50 to a metal framework, all joints are sealed

with jointing compound and paper tape. The surface forms an ideal

platform to accept wall finishes such as emulsion or textured paint. Note

should be made that tiles, laminates or wallpapers may also be attached to

PROMATECT® 50 boards using appropriate adhesives.

Below are the common finishings applicable to PROMATECT® 50 boards.

Water based acrylic or emulsion paints:-

Surface preparation

• After completing jointing and finishing, lightly sand the surface of the

joints with fine grade paper.

• Remove any dust from the board surface with a clean bristle brush or

damp, clean cloth.

Application

• Apply first coat of paint with roller/brush.

• Lightly sand the surface again to de-nib any rough surface.

• Two more coats of the paint can then be applied to achieve the final

finish.

Epoxy based finish in paint:-

Epoxy based finishing paint has high resistance to impact and abrasion. It

can also be also resistant to spillage of petrol, mineral oils, vegetable and

animal oils.

Surface preparation

• After completing jointing and finishing, lightly sand the surface with fine

grade paper.

• Remove any dust from the board surface with a clean bristle brush or

damp, clean cloth.

Application

• Apply first coat of epoxy based finishing paint with an ordinary paint

roller, brush or spray gun.

• Fill any surface irregularities and undulations with joint filler and level with

glasspaper, as above.

• Two more coats of the paint can then be applied to achieve the

final finish. Follow manufacturer’s recommendations at all times.• For best results, engage professional labour or craftsmen only from

reputable, experienced agencies.

Polyurethane paint:-

Polyurethane enamel paint with excellent gloss and colour retention can be

resistant to weather impact, abrasion and industrial corrosive atmosphere.

Surface preparation

• After completing jointing and finishing, lightly sand the surface with

fine grade paper.

• Clean off any dust from the board surface by means of brush or damped

cloths.

Application

• Smooth surface with fine paper.

• Apply first coat of polyurethane paint to the prepared clean, dry surface

with brush or spray gun.

• Check for undulations on the surface and where necessary fill holes or

gaps.

• Level with glasspaper.

• Apply two coats of paint to achieve final finish. Follow manufacturer’s

recommendations at all times.

Synthetic enamel paint:-

High gloss enamel paint comprised of synthetic resin and selected weather

resistant pigments for decoration and protection in humid conditions.

Surface preparation

• After completing jointing and finishing, lightly sand the surface with fine

grade paper.

• Fill any surface irregularities and undulations with joint filler and level with

sand paper.

Application

• Apply first coat of ready mixed synthetic enamel paint with brush, roller

or spray gun.

• Fill any surface irregularities and undulations and level with glasspaper,

as above.

• Two or more coats of paint can be applied to get final finish.

Follow manufacturer’s recommendations at all times.

Wall paper or vinyl ilm:-

Any type of wall paper and most standard vinyl films can be applied to the

surface of PROMATECT® 50 boards.

Surface preparation

• After completing jointing and finishing, lightly sand the surface with fine

grade paper.

• Remove any dust from the board surface with a clean bristle brush or

damp, recycled clean cloth.

Application

• Apply evenly a suitable adhesive to surface areas where wallpaper or

vinyl film are to be applied. Size the wall to seal against rapid drying.

• Paste wall paper or vinyl film uniformly working from one side,

as recommended by the manufacturer.• Work one small area at a time to ensure no air bubbles are trapped

between wall paper or vinyl film and the surface of the board.

• For best results, engage professional labour or craftsmen only from

reputable, experienced agencies.

Ceramic tiling:-

Ceramic tiles up to 12.5mm thick and a maximum weight of 32kg/m2

can be fixed to a PROMATECT® 50 surface by using a bed of adhesive

nominally 3mm thick. The framing structure strength may need to be

increased to cope with the extra weight of the tiles.

Surface preparation

• To provide good adhesion, the surface of PROMATECT® 50 should be

made slightly rough using coarse grade glasspaper or a wire brush.

• Remove any dust from the board surface with a clean bristle brush or

dampened, clean cloth.

Page 7: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

PROMATECT® 50

Aesthetics and FinishesP50

Application

• A thin bed of an appropriate water resistant tile adhesive is applied to the

PROMATECT® 50 surface. Work on one small area at a time and spread

the tile adhesive evenly using appropriate applicator.

• Before tiling commences, fill tapered edge joints under the tiling area

with tile adhesive or jointing compound.

• Tiles are then fixed in the desired pattern as per specifications of the

manufacturer or architect.

• Press firmly so that the tiles are embedded evenly in the layer of

adhesive.

• As normal practice, remove and clean any excess adhesive coming

through the joints on the tile surface.

• Grout as normal.

Texture paint finishes

Special techniques and textures are a relatively new concept in surface

finishing attire, with textured surfaces becoming increasingly common.

These can be achieved by the application of regular paints applied in the

normal fashion and then, using special applicator tools, are treated to a

variety of unusual finishing techniques such as stipling, combing, dragging

and stumbling. The little extra effort or expense involved produces unusual

and frequently attractive results.

Thin hard laminate:-

Flexible thin laminate of up to 1mm thick may be used and is a common

post installation lining added to the surface of a substrate such as

PROMATECT® 50. Such laminates are employed for the purposes of

decoration, scratch resistance and anti graffiti/anti vandalism properties.

Surface preparation

• After completing jointing and finishing, lightly sand the surface with fine

grade paper.

• Remove any dust from the board surface with a clean bristle brush or

dampened, recycled clean cloth.

Application

• Apply a thin, even coat of contact adhesive (as recommended by

manufacturer) on the surface for the area where laminate will

be positioned. Generally contact adhesive must be applied to both

surfaces: e.g. laminate and PROMATECT® 50 board.

• Wait 10-15 minutes for the adhesive to feel touch dry and then place

the laminate over the board surface starting from one end (at the width

dimension edge) and work towards the other end, lightly pinching the

laminate at board edges. It is important to ensure that both laminate and

board are properly aligned.

• Visually inspect to ensure that no air bubbles are trapped between the

board surface and the laminate.

• Press the laminate tightly towards the board surface by means of

rollers or similar mechanisms to ensure that a tight bond is properly

achieved.

• Continue applying adequate uniform loading across the board area as

per the adhesive manufacturer’s recommendations.

Laminates

The procedure for applying hard laminates to the surface of

PROMATECT® 50 include the following:

• Use square edge PROMATECT® 50 to avoid improper jointing and

irregular finishing. Check that the surface is even.

• Fill joints and screw heads with jointing compound, then using glass

paper if required smooth the surface.

• Promat recommends using a maximum size of 1220 x 1220mm size of

hard laminate which can then be further cut to desired sizes.

• Place the cut pieces of laminate on the PROMATECT® 50 surface,

starting from one end and marking the outlines.

• Then apply a thin, even layer of neoprene-based laminate adhesive or

other suitable adhesive to each of the cut pieces of laminate. Put aside

in a safe, clean and dry place until adhesive becomes tacky.

• Meanwhile, apply a thin layer of the same adhesive to the

PROMATECT® 50 surface and also allow to become tacky.

• When both surfaces become equally tacky, take the laminate to the

marked surface.

• Align one edge of the cut piece of laminate to the matching line on

the PROMATECT® 50 surface and start pressing the laminate slowly

onto the PROMATECT® 50 surface, ensuring no air bubbles are trapped

within.

• Use a smooth, straight piece of wood to knock lightly on the laminate,

especially around the edges. This will ensure that the bond is properly

set.

• Place a light support against the laminate, e.g. a plyboard board

1220 x 1220mm in size and leave it for three to four hours.

• Laminate the other pieces in the same manner, providing a gap between

the laminates.

• It is recommended that (wooden or aluminium) beading is placed along

the edge of the laminate, filling the gap between panels.

• At all times adhesive manufacturer’s recommendations are to be

followed.

Precautions to be noted

• Use skilled workers with relevant experience in hard laminate

application.

• Use Neoprene based adhesive as this medium drying, strong adhesive

is known for its easy workability and best results.

• Edges of hard laminate should be secured by wooden or aluminium

beading.

6

Page 8: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

PROMATECT® 50CBM Internal Applied Finished (Painting) and Application Specification

P50

AS2589.1 2007 (Gypsum linings - Application and finishing) defines quality of Gypsum lining application and finishing and the allowable deviations in

flatness of the framing surface to achieve the required level of finish for Gypsum linings. Promat recommends that unless otherwise stated in our literature,

this standard is adhered to for CBM board applications. Deviation from this standard will void any warranty offered.

AS2589.1 2007 refers to three levels of finishing, these are level 3; level 4 and level 5.

NOTE: Spray painting is NOT recommend for level 4 or 5. If spray painting is used, the best result can only be obtained when a fine roller is used between all coats and after the last coat.

AS2311:2009 (Guide to the painting of buildings) recommends a three coat paint system. Promat recommends that unless otherwise stated in our

literature, this is adhered to for CBM board applications. Deviation from this standard will void any warranty offered. Particular attention (but not exclusive)

should be paid to Clauses 2.4.5;2.4.6; 2.4.7;3.11 The cladding shall not be applied until all of the contracting parties are satisfied that the wall framing

complies with AS2589.1 2007.

The cladding shall not be painted until all of the contracting parties are satisfied that the surface is suitable to achieve the required level of finish without

further patching or flushing.

Level 3 shall be used for areas that do not require decoration (painting).

Level 4 shall be the default level unless otherwise specified.

Only flat and low sheen paints shall be used for level 4. Gloss or semi-gloss paints shall not be used. All joints and internal angles shall have

tape embedded in the jointing compound plus have a minimum of two separate coats of compound over all joints, angles and fastener heads

(flushing). For joints that do not have rebated/bevelled edge a minimum of two trowel widths of compound will be required.

All applications of compounds for finishing shall be carefully sanded to be free of all tool marks and ridges.

NOTE: Only roller coat application of paints is recommend.

In critical lighting conditions, surface imperfections and changes in texture between flushed and unflushed surfaces may still be apparent in

a level 4 finish. This is unavoidable.

Level 5 shall be used where gloss or semi-gloss paints are to be used or where critical lighting conditions occur on

flat or low sheen paints.

Even though this is the best possible finish achievable on linings it most certainly does NOT guarantee a blemish free finish. Only roller coating

is recommended for this level of finish and the surface texture shall be random in fashion and monolithic, concealing joints and fixing points.

Level 5 does NOT mean the surface is without texture variation.

Level 5 is difficult to achieve and will always require cooperation between the framer, plasterer and painter to establish suitable work practices

to achieve the agreed finish.

Promat does NOT recommend the use of CBM board where level 5 finish is required unless there is no glancing light (artificial or natural) and all trades

and interested parties have agreed on a level of finish that is obtainable and acceptable.

CBM board may be prone to have small pin holes on some of the surface. In these cases the installer or painter shall inspect the board before any

coating is applied and skim over these imperfections. A course roller is recommend for use in such situations.

A full specification is available on request.

For exterior applications and textured coating contact Promat.

7

Page 9: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

8

PROMATECT® 50

Acoustic DesignP50

Sound insulation walls

Privacy and a reasonable level of sound insulation are two basic requirements for all rooms and other facilities in every building type. Recognised fire

resistance coupled with effective acoustic performance of wall and partition systems, as well as other structural components, is therefore a major design

consideration.

Wall and partition systems with adequate acoustic performance are required to insulate and nullify acoustic disturbance from main sources of

unpleasant, unwanted ambient sound. These include but are not restricted to external traffic noise, audible sounds between rooms and noise from

hotel support facilities and service areas such as ventilation (HVAC) or exhaust ductwork, nearby escalators and lifts, as well as back-of-house facilities

such as engineering, power generation, administrative, convention and meeting rooms.

PROMATECT® 50 wall and partition systems are ideal wherever there is a need for sound insulation requirement from outside or within the building. It

is especially suitable for areas such as sole occupancy units, schools, hospitals, laboratories, conference rooms, auditoriums, seminar and convention

facilities, retail complexes, cinema and karaoke multiplexes, wherever big audiences and crowds are likely to congregate.

Configuring wall and partition systems

Depending on the levels of sound insulation level required, PROMATECT® 50 wall and partition systems can be configured in either single or double

independent layers. The steel stud dimensions depend upon the height and fire resistance performance requirements. These metal studs can be spaced

according to the overall wall thickness required to fulfil the desired acoustic rating, the system inclusive of boards, acoustic insulation and cross bracing.

Short length of horizontal backing channel must be evenly spaced to match horizontal board joints up to 2440mm maximum centres where appropriate.

If necessary, a layer of rated and specified sound absorber, such as glass or stone or rock wool batts etc, can be installed within the central air cavity to

further enhance sound insulation performance. It is important to note that the perimeters of such constructions should be sealed with a minimum of two

beads of appropriate acoustic sealant such as PROMASEAL® AN acrylic sealant, or equivalent.The thickness and number of layers of PROMATECT® 50

employed in such wall or partition systems depends on specified design performance. Each layer can be individually fixed to either side of the steel frame

structure.

Acoustic rating (STC/Rw

) and audibility through walls

STC / Rw

Audibility

30 ~ 35 Speech audible

40 Loud speech, still audible

45 Loud speech, almost audible

50 ~ 55 Speech cannot be heard

It is typical of the international hotel and conference centre industry to require acoustic performance of walls to have a minimum Rw = 50dB rating.

PROMATECT® 50, with its high density characteristic, is recognised as one of the most effective sound insulating materials capable of meeting industry

standards with sound insulation performances based on various configurations of PROMATECT® 50 partition system.

NOTE: Coniguration of partition systems obviously varies on a case by case basis. Please consult Promat Technical Department for speciic acoustic design information.

Standard wall system (with insulation) Double stud wall system

Vertical steel studs

at maximum 610mm

norminal spacing

PROMATECT® 50

Acoustic Insulation, e.g. rock or glass wool

or polyester insulation

Anchor bolt

Bottom track

PROMATECT® 50

Steel studs

(maximum 610mm centres)

Bottom track

Air cavity

Anchor bolt

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 10: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

9

PROMATECT® 50

Acoustic DesignP50

Acoustic performance

Type of Partition FRL Rw+C R

wR

w+C

trConstruction

Partition Nom. Thickness

Single steel stud

-/60/60

43 47 36

9mm thick board on both sides of

64 x 0.5mm studs, cavity filled with

50mm x 60kg/m3 mineral wool.

System mass = 24.6kg/m2

82mm

Staggered steel stud 49 53 43

10mm thick board on both sides

of 64 x 0.5mm staggered studs,

cavity filled with 50mm x

60kg/m3 mineral wool.

System mass = 27.0kg/m2

116mm

Single steel stud 51 54 44

2 x 9mm thick board on one side

of 64 x 0.5mm studs and 9mm

thick board on the other side,

cavity filled with 50mm x

60kg/m3 mineral wool.

System mass = 35.4kg/m2

91mm

Staggered steel stud 54 58 47

2 x 9mm thick board on one side

of 64 x 0.5mm staggered studs

and 9mm thick board on the

other side, cavity filled with

100mm x 60kg/m3 mineral wool.

System mass = 38.4kg/m2

123mm

Double steel stud 60 63 53

2 x 9mm thick board on one side

of 64 x 0.5mm double studs and

9mm thick board on the other

side, cavity filled with 50mm x

60kg/m3 mineral wool.

System mass = 35.4kg/m2

155mm

Single steel stud 49 51 43

12mm thick board on both sides

of 64mm studs, cavity filled with

50mm x 60kg/m3 mineral wool.

System mass = 31.8kg/m2

88mm

Staggered steel stud

53 56 46

12mm thick board on both sides

of 64mm staggered studs, cavity

filled with 50mm x 60kg/m3

mineral wool.

System mass = 31.8kg/m2

120mm

56 59 52

18mm thick board on both sides

of 64mm staggered studs, cavity

filled with 50mm x 60kg/m3

mineral wool.

System mass = 46.2kg/m2

132mm

Double steel stud

58 61 52

12mm thick board on both sides

of 64mm double studs, cavity

filled with 50mm x 60kg/m3

mineral wool.

System mass = 31.8kg/m2

172mm

-/90/90 61 64 55

15mm thick board on both sides

of 64mm x 0.5mm double studs,

cavity filled with 50 x 60kg/m3

mineral wool.

System mass = 39kg/m2

178mm

-/120/120 66 69 59

2 x 9mm thick boards on both

sides of 64mm double studs,

cavity filled with 50 x 60kg/m3

mineral wool.

System mass = 46.2kg/m3

184mm

Page 11: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

10

PROMATECT® 50

Acoustic DesignP50

Acoustic performance

Type of Partition FRL Rw+C R

wR

w+C

trConstruction

Partition Nom. Thickness

Double steel stud

Discontinuous construction

-/60/60

55 56 51

1x15mm PROMATECT® 50 each

side of 64mm steel stud with 75mm

Insulco ‘Acousti Therm’ Insulation in

one leaf

200mm

51 53 47

1x15mm PROMATECT® 50 each

side of 64mm steel stud with 85mm

“Tontine TSB5” 11.5kg/m3 Insulation

in one leaf.

200mm

-/90/90

59 60 55

1x15mm PROMATECT® 50 each

side of 64mm steel stud with

110mm “Bradford Glasswool 11kg/

m3 (R2.5) Insulation in both leafs.

200mm

58 59 53

1x15mm PROMATECT® 50 each

side of 64mm steel stud with 90mm

“Insulco Acousti Therm. 20kg/m3

(R2.5) Insulation in both leafs.

200mm

57 58 54

1x15mm PROMATECT® 50 each

side of 64mm steel stud with

110mm "Bradford Glasswool 11kg/

m3 (R2.5) Insulation in both leafs.

200mm

Single steel stud

-/120/120

47 49 42

2 x 9mm boards on both sides of

64 x 0.5mm studs.

System mass = 43.2kg/m2

100mm

55 58 49

2 x 9mm boards on both sides of

64 x 0.5mm studs, cavity filled

with 50mm x 60kg/m3 mineral wool.

System mass = 46.2kg/m2

100mm

48 50 42

2 x 9mm boards on both sides of

92 x 0.55mm studs.

System mass = 43.2kg/m2

128mm

Staggered steel stud 59 63 53

2 x 9mm boards on both sides of

64 x 0.5mm staggered studs,

cavity filled with 50mm x 60kg/m3

mineral wool.

System mass = 46.2kg/m2

132mm

Double steel stud

67 71 60

2 x 9mm boards on both sides

of 64 x 0.5mm double studs,

cavity filled with 100mm x 60kg/m3

mineral wool.

System mass = 49.2kg/m2

184mm

69 73 62

2 x 10mm boards on both sides

of 64 x 0.5mm double studs,

cavity filled with 100mm x 60kg/m3

mineral wool.

System mass = 54.0kg/m2

188mm

Page 12: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

11

PROMATECT® 50

Acoustic DesignP50

Acoustic performance

Type of Partition FRL Rw+C R

wR

w+C

trConstruction

Partition Nom. Thickness

Single steel stud

-/120/120

50 52 45

2 x 12mm boards on both sides

of 75 x 0.5mm studs.

System mass = 57.6kg/m2

123mm

55 58 49

2 x 9mm boards on both sides of

64 x 0.5mm studs, cavity filled

with 50mm x 60kg/m3 mineral wool.

System mass = 46.2kg/m2

100mm

Staggered steel stud 63 65 57

2 x 12mm boards on both sides

of 64 x 0.5mm staggered studs,

cavity filled with 50mm x 60kg/m3

mineral wool.

System mass = 60.6kg/m3

144mm

Double steel stud 70 73 64

2 x 12mm boards on both sides

of 64 x 0.5mm double studs,

cavity filled with 50mm x 60kg/m3

mineral wool.

System mass = 60.6kg/m2

196mm

Single steel stud 43 46 40

20mm thick board on both sides

of 64 x 0.5mm studs.

System mass = 48.0kg/m2

104mm

NOTE: Where applicable, 60kg/m3 mineral wool was used when testing the performance of PROMATECT® 50 walls. This however may be replaced with other insulation material such as Tontine, glass wool etc. where appropriate. If necessary, further assessment on such modiications can be performed. Please consult your local Promat ofice.

Page 13: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Accommodating essential services

Many walls and partitions in modern structures are also used to

accommodate essential services such as electrical and mechanical (E&M)

services, ductwork and water and exhaust piping and the like.

Some of these can of course be attached to the outer face of the wall

or partition. In most cases however it is preferable, mainly for aesthetics,

space saving and protective reasons, to conceal and accommodate these

services behind the PROMATECT® 50 board or — in the event of two

boards being used on a single stud or frame — in the empty air cavity

space between the PROMATECT® 50 boards.

The PROMATECT® 50 wall takes these factors into consideration

and is designed as a construction friendly type of wall system able to

accommodate many essential services.

The common usage of versatile steel stud systems such as the RONDO

system, with minimum base metal thickness of 0.55mm, are available with

built in slots and pre-drilled circular apertures at regular intervals.

These apertures facilitate installation of all types of services in both

directions along the length of wall. Vertical drops of services can also be

installed using tie wraps to the steel studs.

The creation of small openings or simply removing switch boxes or fixed

objects means that access to concealed services is relatively easy to

achieve. Regular maintenance is facilitated by provision of a purpose built

access panel, hinged or otherwise, within the wall or partition system.

If repair work or wall relocation is required, PROMATECT® 50 walls

can be quickly dismantled and re-used with little wastage. There is no

chasing, cutting, filling or messy repair with cement mortar/plaster finishes

required.

Fast and easy to install, PROMATECT® 50 walls and partitions offer

numerous advantages; from fire resistance and acoustic performance to

accomodating esssential services.

PROMATECT® 50

ServicesP50

1

2

Top track

Bottom track

Horizontal cross profile

Vertical stud profile

3

4

B

A

C

C

A

B

1

2

3

4

12

www.pro

mat-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 14: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Energy consumption and conservation

For every building, as with any profitable business, energy consumption and conservation have direct impact on daily operating costs, annual revenue

streams and bottom line profitably. A well designed and energy efficient building will therefore incorporate as many thermal insulation features as budget

and good planning sense will allow. Other green factors, such as carbon footprint and emmission values will become increasingly important and likely

weigh heavily on profits in the years ahead. Good thermal insulation is therefore essential, particularly for external and internal walls. It is usually specified

in terms of thermal conductivity.

The relationship between K and U values

The thermal properties of a building must balance heat loss and gain, thermal capacity and energy consumption. The loss and gain of heat through

surfaces of building elements (e.g. walls, floors, roofs and galzing, among others) depends on the temperature difference between ther air on both sides of

the system, the thermal resistance of the materials, their surfaces and the spaces between them.

K values represent the thermal conductivity of a building material while U values describe its thermal transmittance or air-to-air heat transmission coefficient.

These are calculated as follows:

R = K/Thickness U = i/R

R is resistance to heat loss and a higher R value means less heat loss.

Indeed, many of the different materials in use nowadays have at least one of these characteristics in common.

A material’s K value or thermal conductivity is based on the rate of heat transfer through a given thickness of the material. In general. Lower K values of

a material mean better insuation efficiency.

PROMATECT® 50 used as a wall or partition board is a perfect case in point because:

• the K value of PROMATECT® 50 is 0.193W/mK, as compared to 0.811W/mK for brick. PROMATECT® 50 insulation efficiency is therefore better by 75%.

• Its thermal insulation properties are further enhanced by the air cavity in the wall/partition.

• U-value of a standard 88mm thick PROMATECT® 50 partition wall — comprised of 12mm thick PROMATECT® 50 board on both sides of 64mm

studs — is approximately 1.82W/m2K compared to the U value of 114mm brick wall (with cement plaster and plaster finishing) of 4.55W/m2K,

representing thermal insulation efficiency better by approximately 60%. Please see below for calculation of U values.

Calculation of U values

Description Thermal resistance

Air (ambient) 0.123m2K/W

Thus,

U = 1/SR

= 1/0.55

= 1.82 W/m2K

PROMATECT® 50 (12mm) 0.062K/W

Air (inside cavity) 0.18m2K/W

PROMATECT® 50 (12mm) 0.062K/W

Air (internal) 0.123m2K/W

• Thermal as well as sound insulation properties can be substantially enhanced by an infill of mineral/rock/glass wool within the cavity.

• For specific higher improved requirements of U-value and sound insulation — separating the wall system with double frames thus creating a wider

internal cavity capable of accepting multi layers of infill insulation material — may also be designed.

PROMATECT® 50 partition and wall systems provide other advantages:

• Conserves energy and saves fossil fuels used to keep buildings warm in cold climatic conditions.

• Keeps air conditioned space cooler for longer duration in case of power failure (backup power systems are usually not designed to take air conditioning

load) drastically reducing the cost of energy.

• Reduced air conditioning load may be translated into lower investment and lower running costs for the air conditioning system.

PROMATECT® 50

Thermal InsulationP50

HOT COLD

PROMASEAL® AN

Acrylic Sealant 12mm PROMATECT® 50

64mm Steel Stud

13

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 15: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

14

PROMATECT® 50

Fire SafetyP50

Sustained international fire protection standards

Fire incidents can be disastrous and often very tragic, especially in densely populated built environments. Most fires usually occur without prior

warning. To minimise losses both to the local economy and to human life, measurable and scientifically tested preventive measures should be to a

universally recognised benchmark.

PROMATECT® 50 is used as a proactive fire protection building element in walls, partitions and ceiling systems. It has the following characteristics:

• Due to the natural fire resistant qualities at its core, PROMATECT® 50 does not ignite or burn by itself, and is classified as Class O material in accordance

with the criteria listed in many national Building Regulations. It complies with BS 476: Part 7: 1971 for surface spread flame, achieving Class 1 rating.

PROMATECT® 50 is non combustible to BS 476: Part 4 and also meets the requirements of AS/NZ 1530: 3 and AS/NZ 3837.

• Standard PROMATECT® 50 partitions with a single layer of board on both sides of a steel stud are capable of achieving fire resistance up to 120 minutes,

depending on thickness of board used.

• A typical overall wall thickness of 91mm PROMATECT® 50 partition, using 9mm thick boards, can provide a fire resistance period in excess of

120 minutes, meeting the criteria of stability, insulation and integrity in accordance with BS 476: Part 20 & 22 and AS 1530.4. No insulation material is

required within the wall cavity.

• Brick walls by nature also provide fire protection but being a non standard product, no precise data in terms of fire resistance is available. The fire

resistance characteristic depends upon the wall components, such as quality of bricks, specified mortar mix, locally available aggregate for cement

mortar mix and fine river sand for plastering, which vary from place to place. Consistent quality cannot be assured. Workmanship is also extremely

important.

• The recognised principle of compartmentation – dividing larger spaces into smaller, fire proofed compartments — can help to control the spread

of fire. PROMATECT® 50 wall and partition systems are lightweight and easy to install, encouraging flexibility on the part of the designer to

employ compartmentation, thus restricting spread of fire and smoke. Compartmentation of plenums for example, can also be designed by installing

an appropriate barrier of PROMATECT® 50 up to the soffit, preventing the horizontal spread of fire above ceiling level. For more details, please consult

Promat Technical Department.

• PROMATECT® 50 failed to ignite when tested to AS ISO 9239.1.

PROMATECT® 50 tested to international standards

Type of test Standard Result

Non combustibility testBS 476: Part 4: 1970

ISO 1182 : 2002Non-combustible

Fire propagation test BS 476: Part 6: 1981Fire propagation

index 1

Surface spread of flame

testBS 476: Part 7: 1971 Class 1

Simultaneous

determination of

ignitability, flame

propagation, heat release

and smoke release

AS 1530.3: 1997 0:0;0:0-1

Method of test for heat

and smoke release

rates for materials and

products using an oxygen

consumption calorimeter

AS 3837 Group 1

Approved ire resistance performance

For system performance, PROMATECT® 50 wall systems have been widely tested to a range of international standards such as BS 476: Part 21 and 22;

AS 1530.4 and EN standards.

Promat has an ongoing research and development programme for latest details of tested wall and partition systems, please consult your nearest Promat

Technical Department.

Other advantages of PROMATECT® 50

After a fire event, normal usage patterns can be resumed faster than normal because PROMATECT® 50 is quick and easy to install, saving time and money.

NOTE: Always ask for the oficial test report.

www.promat-ap.com

Page 16: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

15

PROMATECT® 50

Fast, Easy Installation and Lightweight P50

Lightweight and easy installation

Modern and efficient building techniques predicate fast construction. For hotels, cost effective construction means early guest check-in, a quick return to

positive cash flow projections and a faster return on investment. Hotel walls and partitions should therefore be easy to erect. This factor becomes even

more crucial if renovations are required in a functional and operational building. Closing a section or two is difficult to avoid if traditional brick and mortar

methods are employed, as is the control of noise and dust. PROMATECT® 50 wall and partition systems, however, eliminate most of these concerns.

Comparative advantages of PROMATECT® 50 over conventional wall and partition systems include:

• Even experienced bricklayers need to constantly and tediously check alignment with levels etc. Installation of PROMATECT® 50 employs a true frame

system, ensuring accurate alignment with minimal skill and supervision.

• Smooth surface of PROMATECT® 50 contributes significantly to better paint finish and less paint consumption.

• After jointing and finishing and application of top coat where required, the uniform primed background of PROMATECT® 50 helps to achieve much

smoother background surface, reducing significantly the cost of paint. Unlike masonry, no cement render is required to achieve a smooth surface.

• PROMATECT® 50 wall and partition systems are ready to accept a range of decorative finishes, saving time for surface decoration.

• PROMATECT® 50 wall and partition systems eliminate or substantially reduce water curing processes and messy cement render plastering associated

with brick walls, reducing costs and saving time.

Lightweight PROMATECT® 50 drywalls

The ultimate dead load of a building structure has a direct impact on building costs and savings. Using brick or masonry for wall construction means large

columns and beams are required to support massive loads. Minimising this factor wherever possible therefore makes a lot of structural and economic

sense.

In lightweight wall and partition structures, the size and number of beams can be significantly reduced, cutting costs and building materials generally.

Comparative advantages between PROMATECT® 50 wall and traditional brick wall include:

• Weight of standard 88mm deep PROMATECT® 50 wall (using 2 x 12mm thick board), is nominally 29kg/m2 while weight of 114mm brick wall is

270kg/m2 making a PROMATECT® 50 wall 89% lighter than a conventional brick wall equivalent.

• Weight of standard 104mm deep PROMATECT® 50 fire resistant wall (for FRL 120 minutes using 2 x 9mm thick board) is a nominal 43kg/m2 while the

weight of 228mm brick wall = 490kg/m2. This is 90% lighter than conventional brick wall construction

• Builders can install PROMATECT® 50 walls and partitions virtually anywhere with fewer concerns about position of structural grid or foundations.

• PROMATECT® 50 walls and partitions easily meet stability requirements for heights up to six metres. Heights beyond six metres are possible but require

careful design planning of frame structure. Please consult Promat Technical Department for full information.

• PROMATECT® 50 walls can be constructed to be loadbearing where required for heights up to four metres.

Page 17: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Maintenance free walls

A sensible schedule of routine maintenance is a pragmatic consideration in the life of every building, adding longevity and hence value, enhancing

functionality and optimising return on investment.

Fire resistant PROMATECT® 50 walls and partitions offer a number of advantages:

• Smooth, versatile surface easier to clean and maintain than conventional brick walls.

• Repairs easy and quick to realise using gypsum based plaster compound.

• Damaged boards can be replaced easily.

• Smooth surface free of cracks and other signs of shrinkage (subject to correct movement joint detailing in long and/or high walls).

• Flexible enough to tolerate normal building movement. Usage in higher movement environments is also possible with provision of extra clearance at fixing

points. Please contact Promat Technical Department for details.

Minor damage

Any minor, superficial damage such as small indentations or dented edges up to 5mm in depth can be smoothed down with fine sand paper, cleaned and

filled flush with two layers of surface compound. The first layer must be allowed to dry before application of the second. The application of a final troweled

topcoat will effectively conceal the damaged area and leave the surface ready for decoration.

Deep impact

When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive factor in many public area applications.

However, there will be times when damage is unavoidable and irreparable. Replacement is achieved simply by removing the damaged board, cleaning the

affected area before installing replacement PROMATECT® 50. All joints are then sealed with normal jointing compound and the refurbished wall is once

again complete.

Unlimited versatility

The application of PROMATECT® 50 in walls and partitions is limited only by the designer’s imagination.

• PROMATECT® 50 wall and partition systems facilitate the creation of internal divisions or changes to floor layout at any stage of the project.

• Installation of PROMATECT® 50 wall and partition systems can start immediately after flooring is completed. The installation sequence includes fixing

metal framework and fixing of door and window frame as per layout followed by fixing of board to enter side of framework.

• Standard fixing arrangement of T and L junctions etc makes the system monolithic and strong.

• Services can be installed and completed before board on other side of the frame is installed. Jointing and finishing is completed later and surface

decoration may be carried out at finishing stage.

• PROMATECT® 50 is so versatile that it can be used to encase or isolate any unwanted structure or walls with problems like seepage and cracks.

• PROMATECT® 50 wall and partition systems can be used to fit most shapes and contours to meet most aesthetic appearances.

• When construction timetables demand speedier completion, one side of the PROMATECT® 50 wall and partition systems can be finished as soon as

framework is installed in position while the other side can be finished after installation of services is completed.

• Other design and aesthetic criteria can be incorporated at any stage during and after main installation work is complete.

PROMATECT® 50

Durability, Versatility and MaintenanceP50

Typical corner detail

(with decorative lining)

Wall junctions

Set corner with external angle bead and compound

PROMATECT®

50

No. 6 drywall screws at nominal 200mm centres

AdhesiveDecorative finishes, e.g. tiles or wallpaper

Set corner with fabric tape and compound

Typical Wall detail

Set corner with external angle bead and compound

Track

Track

Track fixingTrack fixing

Steel studs, e.g. RONDO studs at maximum 610mm centres

Set corner with fabric tape and compound

PROMATECT®

50

100mm maximum

to first track

fixing

Fix at 500mm

maximum

centres along

track

Steel studs, e.g. RONDO system

16

www.prom

at-ap.com

www.prom

at-ap.com

Page 18: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

PROMATECT® 50

Durability, Versatility and MaintenanceP50

Intersection detail

Track fixing

Boxed stud at wall intersection

Track

Set corner with fabric tape and compound

Wall junctions

NOTE: Weather tight sealing and structural design under the responsibility of other parties. Please consult Promat.

PROMATECT®

50

100mm maximum

to first track fixing

Fix at 500mm

maximum centres

along track

Track fixing

Steel studs,e.g. RONDO

Set corner with internal angle bead or fabric tape and compound

Allow full height sheer support when wall angle is more than 25°

Set corner with external angle bead or skrim tape and compound

No. 6 drywall screws at nominal 200mm centres

Wall end detail

Angle wall intersection

100mm

maximum

PROMATECT®

50

Set corners

Track

PROMATECT®

50

No. 6 drywall screws at nominal 200mm centres

Steel studs, e.g. RONDO studs at max 610mm centres

Bottom track fastened to floor with expansion bolts

100mm

maximum

500mm

maximum

PROMATECT®

50

Insulation materialenhances thermalinsulation of building

PROMASEAL®

AN Acrylic Sealant

PROMASEAL®

Fire StripTrack

Track fixing

PROMATECT®

50

Steel studs, e.g. RONDO studs at maximum 610mm centres

Anchor bolt at 500mm maximum vertical centres

PROMASEAL®

AN Sealant

PROMATECT® 50 wall to masonry/

concrete wall intersection

100m

m

maxi

mum 10mm

maximum

17

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

www.pro

mat-a

p.com

ww

w.p

rom

at-ap.c

om

ww

w.p

rom

at-ap.c

om

Page 19: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

The science of space engineering

Conventional masonry walls and partition systems fabricated by traditional bricks are considerably thicker compared to a PROMATECT® 50 equivalent

performance. This has direct implications on how much lettable floor space can be appropriately measured and used effectively.

For example:

• 88mm thick PROMATECT® 50 drywall has physical properties and performance characteristics comparable to 149mm brick wall (115mm + 12mm

cement render on both sides + 5mm plaster on both sides).

• 104mm thick PROMATECT® 50 drywall has properties comparable to 259mm brick wall (225mm + 12mm cement render on both sides + 5mm plaster

on both sides).

• It occupies less floor space than masonry internal walls of comparable performance, thus maximising the floor area.

Advantages

• Optimum wall and/or partition thickness means more carpet area.

• More floor space means more saleable space.

A. Typical wall system using conventional bricks

No Wall description (in space of 3m x 3m) Carpet area

1 All four walls 267mm 6.08m2

2 External wall 267mm remaining three walls 150mm 6.97m2

3 All four walls 150mm 7.29m2

B. PROMATECT® 50 Wall System

Room

areaWall description (in space of 3m x 3m) Carpet area

1All four walls PROMATECT® 50 wall system

a) 78mm thick wall (15mm board) + 48mm stud frame 8.09m2

b) 104mm thick wall (20mm thick board) + 64mm stud frame 7.80m2

2

External wall 267mm remaining three walls PROMATECT® 50 system

a) 78mm thick wall (15mm board) + 48mm stud frame 7.55m2

b) 104mm thick wall (20mm thick board) + 64mm stud frame 7.34m2

PROMATECT® 50

Optimum ProfileP50

3m

2.844m 2.792m 2.844m 2.792m

2.844m 2.792m2.655m 2.629m

3m 3m 3m

3m 3m 3m 3m

External wall External wall

PROMATECT® 50 wallPROMATECT® 50 wall

PROMATECT® 50 wall PROMATECT® 50 wall

PROMATECT® 50 wallPROMATECT® 50 wall

Room area 1(a) Room area 1(b) Room area 2(a) Room area 2(b)

18

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 20: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Board specifications

PROMATECT® 50 architectural boards are manufactured under a quality management system certified in accordance with ISO 9001: 2000 certification.

Equally significant PROMATECT® 50 architectural boards include PromaX® technology, a low energy, environmentally friendly manufacturing process that

makes an excellent board with superior fire resistance, physical strength and performance characteristics. Similarly, all components of PROMATECT® 50

are produced to standard specifications so that consistent, optimum quality is always assured.

The same concept of quality is extended right through to construction and skilled, installation personnel. Promat’s free training programmes are available

upon request and through authorised dealers. Workers who qualify are awarded Promat certificates, ensuring that Promat and PROMATECT® 50 quality

are holistic and never compromised. On the other hand, bricklayers (in Asia) rarely receive formal training. Materials and structural standards are jeopardised

even further because raw materials typically used (in Asia) in bricks, sand and mortar are often not subject to quality standards and are especially

susceptible to on-site manipulation.

Doors, window fixing and joint details

Essential accessories such as doors, windows and joint details etc. are frequently incorporated into many wall and partition structures.

With the appropriate level of design planning, PROMATECT® 50 wall and partition systems easily cope with any realistic level of technical and aesthetic

accessories required.

For example, in a PROMATECT® 50 drywall framework of vertical metal studs at 610mm centres:

• Door/Window frames are easily fit in the openings made by introducing a perimeter horizontal member (track or channel) at the desired point (please

refer to diagrams on page 11).

• Full/half height openings are possible for any type of window, ventilator or door.

• In standard joint details, such as T or L junctions and drywall systems meeting with brick walls etc (see page 15), it is possible to employ single or double

layer board systems, depending on project criteria. Please consult Promat Technical Department for details.

PROMATECT® 50Standardised Specifications and Door, Window Fixing and Joint Details

P50

1

1

2

2

1 2

Timber architrave

Timber door jamb

Timber stiffener

reinforcement

Steel stud

PROMATECT® 50

Screw fixing

(norminal 200mm centres)

Screw fixing

(norminal 500mm centres)

PROMATECT® 50

Edge metal profile

Typical timber door jamb

Steel stud boxed

Screw fixing

(norminal 200mm centres)

3

3

4

4

5

5

6

7

5

5

64

4

3

1 2 3

7

Installation of door jamb details (with timber reinforcement)

Installation of door jamb details (with boxed steel stud)

19

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 21: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Unaffected by moisture

With a strong bonded surface and additional mesh reinforcement, PROMATECT® 50 is extremely durable and can be used within most environments. It

does not degrade or release toxicity over time and is chemically stable.

The monolithic core of the Cement Bound Matrix board also gives PROMATECT® 50 superior moisture tolerance. PROMATECT® 50 is therefore ideal for

use in wet areas such as kitchens, bathrooms, swimming pool and spa areas.

Excellent service point accessibility for easy repair and maintenance

If services concealed in a PROMATECT® 50 wall or partition system require emergency repairs, immediate access is possible simply by creating a hole at

the appropriate location.

This is resealed after repairs are realised with pieces of PROMATECT® 50 cut to size, fixed to steal trimmers using screws of 200mm centres on all four

edges, sealed with paper skrim tape and finished with jointing compound. Two layers of top coat make the joint invisible and ready to accept any decorative

finish without a hint of patching.

Alternatively, use proprietry access panels from Promat to create permanent services access points. See below. Please consult Promat for details of our

PROMATECT® 50 fire resistant access panels.

Access panel detail

PROMATECT® 50

Moisture Tolerance and Point AccessibilityP50

1

2

Hinges

Perimeter framing

Promat access panel

Steel stud

PROMATECT® 50

3

4

5

3

1

2

4

5

20

ww

w.p

rom

at-a

p.com

Page 22: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

Planned and unplanned loads

PROMATECT® 50 drywalls facilitate easy fixing of most type of loads or fixtures which can be attached either pre or post installation of the

PROMATECT® 50 drywall system.The basic concept is that the support or special fixers/fasteners to be used will also employ the support of the framework

of the drywall system. A wide range of propriety expanding fasteners are readily available to fix any load onto a PROMATECT® 50 wall or partition system.

Use fasteners in accordance with to the manufacturer’s recommendations.

Details for planned and unplanned loads on PROMATECT® 50 drywalls.

Positioning fixtures and accessories

Most types of wall hangings such as wash basins, kitchen cabinets and shelving etc can easily be installed to PROMATECT® 50 walls or partition systems.

Typical technical details include the following:

• Planned loads up to 25kg (e.g. cabinets and wash basins) can be easily added by fixing horizontal noggins made of timber members at the desired

location and securing to the steel stud frame.

• Unplanned loads up to 5kg (e.g. hanging picture frames, for example) can be added by inserting the screw or cavity fixture inclined downward at the

appropriate angle, as shown above.

• For planned loads up to 25kg, horizontal noggins can be fixed to the surface of the board via two additional studs and fixing the load to the

strengthening horizontal noggin.

• Fittings and fixtures such as lights and switches are easily fixed to PROMATECT® 50 drywalls. Please refer to page 36 for relevant recommendations.

• The fitting of toilet fixtures within PROMATECT® 50 wall or partition systems are fully outlined in recommendations on page 37.

PROMATECT® 50

Load factorsP50

Typical ixing detail for hangers on wall (up to maximum 5kg)

Typical installation details for wet areas

Unplanned load

Fixing of hangers to wall (up to maximum 25kg)

Planned load

Heavy duty

support frame

Steel studs at

maximum 610mm

spacing

PROMATECT® 50

Timber block

reinforcement

Timber block

acts as

reinforcement

Cavity within wall to

accomodate services,

e.g. pipes

Urinal bowl

Drainage system

PROMATECT® 50

Hook

Hook

PROMATECT® 50

Board fixing anchoring

eg. Fischer PD

Coarse thread

drywall stitching

scew

Typical toggle hook/

hanger for cavity

fixing

Typical toggle hook/

hanger for cavity

fixing

PROMATECT® 50

Toilet facility Heavy duty items

A

A

AA

21

www.pro

mat-a

p.com

www.pro

mat-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 23: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

22

PROMATECT® 50

Load FactorP50

Permissible Shelf Loadings For Steel Stud Walls

Maximum Allowable Load in kg Per Stud Per Shelf (For fasteners designed by Structural Engineer)

Wall Height (mm) 2400 2700 3000 3300 3600

Rondo Stud Size 65 x 0.55 BMT* 65 x 0.55 BMT* 76 x 0.55 BMT* 76 x 0.55 BMT* 92 x 0.55 BMT*

Shelf Width (mm) 200 300 400 200 300 400 200 300 400 200 300 400 200 300 400

Number of Shelves Equally

Spaced Over Full Height

1 127 95 77 58 43 33 140 107 87 62 45 38 73 57 47

2 102 80 65 58 43 33 120 93 77 58 45 38 73 57 47

3 63 47 38 28 22 17 70 53 43 30 23 18 37 28 23

4 53 40 33 27 20 17 60 47 38 30 23 18 35 27 22

5 42 32 25 18 13 12 47 35 28 20 15 12 23 18 15

6 37 27 22 17 13 10 42 32 25 18 15 12 23 18 15

Load Mulitplication FActor For Alternative Stud Sizes

64 x 0.75 BMT 1.75 1.75 1.75 1.75 1.75 1.75 1.20 1.20 1.20 1.20 1.20 1.20 NA NA NA

76 x 0.55 BMT 1.40 1.40 1.40 1.40 1.40 1.40 1.00 1.00 1.00 1.00 1.00 1.00 NA NA NA

76 x 0.75 BMT 2.20 2.20 2.20 2.20 2.20 2.20 1.55 1.55 1.55 1.55 1.55 1.55 NA NA NA

92 x 0.55 BMT 1.60 1.60 1.60 1.65 1.65 1.65 1.15 1.15 1.15 1.15 1.15 1.15 1.00 1.00 1.00

92 x 0.75 BMT 2.75 2.75 2.75 2.80 2.80 2.80 1.95 1.95 1.95 1.95 1.95 1.95 1.65 1.65 1.65

Maximum Allowable Load in kg Per Stud Per Shelf (For fasteners designed by Structural Engineer)

Wall Height (mm) 4200 4800 5400 6000

Rondo Stud Size 150 x 0.75 BMT* 150 x 0.75 BMT* 150 x 0.75 BMT* 150 x 1.15 BMT*

Shelf Width (mm) 200 300 400 200 300 400 200 300 400 200 300 400

Number of Shelves Equally

Spaced Over Bottom 3600mm

1 658 550 483 500 433 367 367 300 233 383 283 217

2 375 325 283 267 233 200 183 158 133 200 150 117

3 283 242 217 183 167 150 125 108 92 133 100 82

4 225 200 175 158 133 117 100 83 72 100 78 63

5 192 158 142 125 108 100 82 72 57 83 63 52

6 158 133 123 108 100 83 70 62 47 72 53 43

*BMT: Base Metal Thickness

22

Page 24: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

23

PROMATECT® 50

Hospital Ward RoomP50

Area of application

• Partitions

• Non combustible furniture

• Ceilings

• Floor

• Doors

• HVAC

• Spandrel walls

• Penetration seals of fire stopping

WardView

Page 25: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

24

PROMATECT® 50

School CorridorsP50

Area of application

• Walls

• Ceilings

• Floor

• Doors ( room doors & shaft doors)

• HVAC

• Access panels

CorridorView

Page 26: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

25

PROMATECT® 50

BathroomsP50

Area of application

• Walls

• Ceilings

• Floor

• Doors

• HVAC

• Fire stopping and penetration seals

• Wet area linings

BathroomView

Page 27: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

26

PROMATECT® 50

General Installation Details P50

123

4

5

6

610mm maximum centres500mm maximum centres

100mm maximum from

fastener to end of track25mm x 25mm x 0.8mm galvanised steel angleSteel studs at maximum

610mm spacingScrew fixing at nominal

200mm centresLoad support panel,

e.g. plywood, chipboard(water resistant for use in wet

areas)

Bottom track100mm wide PROMATECT® 50

cover strip behind horizontal

board joints

PROMATECT® 50

Nominal 50mmMinimum 12mmNominal100mmNominal 200mm centres

8

9

1

1

2

2

2

3

4

5

8

6

10

11

13

13

12Reinforcement to wall

framing for planned

loads

For maximum permitted stud loading

please refer to tables on page 21 or consult your framing supplier

Front

Reverse view

Track ixing details

Typical fixing details of

PROMATECT 50® wall system

(fire resistant & non fire resistant)

1011121314

14

7

6

97

5

8

ww

w.pro

mat-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 28: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

27

PROMATECT® 50

General Installation Details P50

123

PROMATECT® 50

Timber supporting batten

Steel stud

PROMASEAL® AN Acrylic Sealant for copper and steel pipes. Use PROMASEAL® Intumescent fire collars for plastic pipes

Plastic or copper or steel pipeworkCeramic tiles

4

5

6

4

6

53 2

2

1

3

Typical framing details for water

tap support and pipe penetrations

21 3 5 6

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-

ap

.co

m

Page 29: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

28

PROMATECT® 50

General Installation Details P50

1

A

2

Single stud wall system

3

4

A Extended height wall system

5

12

3

4

5

PROMATECT® 50

Top track ixed to substrate using all steel non combustible fixing at norminal 500mm centres

Steel studs dependent upon performance

requirements and partition heightBottom track ixed at maximum 500mm centresBoxed or larger dimension studs for extended heights

to 12m. Please consult Promat

NOTE: For walls greater than 3000mm in height, please consult Promat for details of

minimum stud and track dimensions and expansion allowance

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-

ap.c

om

Page 30: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

29

PROMATECT® 50

General Installation Details P50

1

2

3

4

5

6

Rock wool or other approved inill (optional dependent upon acoustic performance requirement)Top track ixed to substrate using all steel non combustible fixing at nominal 500mm centres

Steel studs 48mm or 64mm dependent upon performance requirements and partition height. Local equivalents may apply, consult Promat for detailsNo. 6 drywall screws at nominal 200mm centres length dependent upon board thicknessPROMATECT® 50

Bottom track ixed at maximum 500mm centres

A

3

2

1

4

5

6

A Double stud acoustic wall system

5

3

6

1

NOTE: For walls greater than 3000mm in height, please consult Promat for details of

minimum stud and track dimensions and expansion allowance

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-ap.c

om

Page 31: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

30

PROMATECT® 50

General Installation Details P50

1

2

3

4

5

Clearance minimum 8mm (for 3000mm high partition) to allow for expansion under fire conditions

Tape or cornice inishing based on requirement for asthetic appearance.Steel studs, e.g. RONDO, of 48mm or 64mm dependent upon performance requirements and partition heights, at maximum 610mm centresPROMATECT® 50 with thickness as Promat recommendation based upon performance requirementsTop track with leg length minimum nominal 35mm to act as delection head to accommodate vertical movement. If no movement expected, minimum leg length can be reduced to 25mm

Apply PROMASEAL® AN Sealant, above track and ix wall track to ceiling framingNo. 6 drywall screws at nominal 200mm centresMinimum 100mmOptional: Finishing bead to protect board edge from damage

due to construction of ceiling and fixing of accessories such

as lighting etc.Optional: Allow minimum 8mm clearance to accommodate

adjustment. Fixing should start at minimum 100mm from corner edge to prevent unnecessary breakage

6

7

8

9

Wall/ceiling junction

56

7

9

8

4

Wall/ceiling junction

2

5

56

2

1

1

4

NOTE: Additional 100m wide PROMATECT@ 50

cover illets/strips are required behind horizontal joints in boards that are not joined on metal

framing to maintain surface latness as well as integrity of the partition system

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

3

3

10

10

www.prom

at-ap.com

www.prom

at-ap.com

Page 32: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

31

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

PROMATECT® 50

General Installation Details P50

Flanking path for panel ceiling over wall

Flanking path for panel ceiling over wall

2

1

5 6

8

4

9

7

2

1

58

9

11

11

10

10

3

3

1

2

3

4

5

6

Use of anchor bolts at maximum 500mm centres to secure continous angles to concrete soffit

No. 6 drywall screws at nominal 200mm centres length dependent upon board thicknessMinimum 12mm thick PROMATECT® 50 runs over wall continously and ixed to sofit. Joints should be backed by strips of 100mm wide PROMATECT® 50 of similar thicknessFinishing head to protect board edge from damage due

to ceiling construction and fixing of accessories such as

lighting etc.PROMATECT® 50 with appropriate thickness based upon performance requirementExposed grid framing system, e.g. RONDO duo ceiling system. NOTE: Due to large number of joints in ceiling construction, not recommended where high performance acoustic rating

required

PROMATECT® 50 ceiling panel screw ixed to wall track to secure in position

PROMATECT® 50 wall system, thickness dependent upon acoustic performance requirementMinimum 50mm thick glass wool or equivalent sound absorbing material held in place with track or angle, should be continious to minimise sound leakageBead of PROMASEAL® AN Acrylic Sealant isolator be-

tween top track and ceiling panel to reduce conduction of sound frequenciesTape or cornice inishing based upon requirement of asthetic appearance

Top track of partition

7

8

9

10

11

12

12

www.prom

at-ap.com

www.prom

at-ap.com

Page 33: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

32

PROMATECT® 50

General Installation Details P50

8

Friction fit head

(with corner finishing)

7

6

6

5

5

4

4

1

1

3

3

2

2

Friction fit head

8

9

7

1

2

3

4

5

Anchor bolts with minimum 40mm penetration to concrete

substrate at maximum 500mm centres

Clearance minimum 8mm (for 3000mm high partition) to allow for expansion under fire conditions

Allow maximum 5mm clearance between board edge and

concrete sofit to accommodate uneven surface of structure. Any gap is to be sealed with PROMASEAL® AN Acrylic Sealant

Top track with minimum leg length nominal 35mm is ixed in place by anchor bolts . Depth of track dependent upon performance requirement and partition heightSteel studs, e.g. RONDO, are spaced at maximum 610mm centres for board fixing

PROMATECT® 50 with thickness based upon performance requirement. Please consult Promat PROMASEAL® AN Acrylic Sealant to ill gap and act as an isolator to limit sound transmission in acoustic

wall construction

Corner inishing, e.g. tape, cornice, angle etc. dependent upon requirement of aesthetic appearanceMinimum length leg nominal 35mm. If no movement expected, minimum leg length can be reduced to 25mm

6

7

8

9

1

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

ww

w.p

rom

at-ap.c

om

ww

w.p

rom

at-ap.c

om

Page 34: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

33

PROMATECT® 50

General Installation Details P50

6

7

4

4

5

5

Delection head

Delection head

NOTE: Requires stopping bead or cornice inish. Do not ix rigid cornice to walls where movement control joints are employed.

3

3

1

1

2

2

1

2

3

Anchor bolts with minimum 40mm penetration into

concrete substrate at maximum 500mm centres. For acoustic wall installation if concrete surface is uneven, apply a bead of PROMASEAL® AN Acrylic Sealant between the top track and concrete substrate to seal possible gaps

Fixing starts 100mm from corner edge to avoid possible breakage under structural movement. NOTE: Screw ixing goes into vertical stud and does not penetrate the top trackAllow maximum 20mm gap to accommodate vertical movement of structure. Gap is to be illed wth lexible sealant such as PROMASEAL® AN Acrylic Sealant in order to optimise integrity of partition

Edge finishing (optional) based upon performance

requirement to protect edge from damageTop track, minimum leg length to accommodate expected movement together with expansion under irePROMATECT® 50 with thickness based upon performance requirementOptional: Corner inishing, e.g. cornice based upon aesthetic requirementSteel studs, e.g. RONDO spaced at maximum 610mm centres for board ixing. Size of stud dependent upon performance requirement and partition height

4

5

6

7

8

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

ww

w.p

rom

at-ap.c

om

ww

w.p

rom

at-ap.c

om

Page 35: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

34

PROMATECT® 50

General Installation Details P50

Wall/ceiling junction

Wall/ceiling junction

3

4

7

7

1

1

2

2

4

9 8 6

3

4

5

1

2

34

5

6

Top track with minimum nominal 35mm leg length ixed to concrete soffit using anchor bolts with minimum 40mm

penetration to concrete substrate maximum spacing

500mm centres. If no movement expected, minimum leg length can be reduced to 25mmFixing point is minimum 100mm from corner edge of board to avoid unnecessary damage due to structure movement. Use No. 6 drywall screwsSet corner with tape and set or cornice finish

PROMATECT® 50

Concealed ceiling framing, e.g. RONDO key-lock system or equivalent, suspended from concrete sofitPerimeter angle fixed to steel studs of partition wall to

receive PROMATECT® 50 ceiling panels

Steel studs at maximum 610mm centresFinishing bead to protect board edge from damage and for

aesthetic appearance

Exposed grid ceiling framing, e.g. RONDO duo system, is suspended from concrete soffit

Anchor bolts fixed to concrete substrate at maximum

500mm centres. For acoustic wall installation, if concrete surface is uneven, apply a bead of PROMASEAL® AN Acrylic Sealant between the top track and concrete substrate to seal possible gap

8

7

9

10

10

10

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

ww

w.p

rom

at-ap.c

om

ww

w.p

rom

at-ap.c

om

Page 36: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

35

PROMATECT® 50

General Installation Details P50

Head for suspended

tie-locking ceiling

NOTE: This method of construction is not recommended for studs adjacent to windows

or doors or studs carrying loads > 0.25kPa

Head using aluminium

head track (non-ire resistance)

5

5

1

1

8

7

7

3

1

4

46

1

2

3

4

Top track with minimum nominal 35mm leg length ixed to concrete soffit using anchor bolts maximum spacing

500mm centres.If no movement expected, minimum leg length can be reduced to 25mmFixing point is minimum 100mm from corner edge of board to avoid unnecessary damage due to structural movement. Use No. 6 drywall screwsExtruded aluminium track for 64, 76 or 92mm studsNOTE: For ire resistant constructions framing must be of all steel construction

PROMATECT® 50

Concealed ceiling framing, e.g. RONDO key-lock system or equivalent, suspended from concrete sofitSteel studs of partition wall fixing PROMATECT® 50 at

10-15mm below head track langesSteel studs at maximum 610mm centresFinishing bead to protect board edge from damage and for

aesthetic appearance

6

5

7

8

2

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

www.pro

mat-a

p.com

www.pro

mat-a

p.com

Page 37: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

36

PROMATECT® 50

General Installation Details P50

Head for

suspended ceiling

1

6 4

2

10

2

3

5 4

4 9 5Wall control joint detail

7

A

8

11

10

1

2

34

5

67

Concealed ceiling framing, e.g. RONDO key-lock system or equivalent, suspended from concrete sofitTop track with minimum nominal 35mm leg length ixed to concrete sofit using No. 6 drywall screws Steel studs at maximum 610mm centresPROMATECT® 50

Fixing point is minimum 100mm from corner edge of board to avoid unnecessary damage due to structural movement. Use No. 6 drywall screwsRONDO P35 or equivalent control joint proile15-20mm gap

Minimum 12mmFinish surface as per external angles

PROMASEAL® AN Acrylic SealantBacking rodSee following page

98

1011

NOTE: For walls greater than 3000mm in height, please consult Promat for details of minimum stud and track dimensions and expansion allowance

A

www.promat-a

p.com

ww

w.p

rom

at-a

p.com

Page 38: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

37

PROMATECT® 50

General Installation Details P50

NOTE: For ire resistant walls, steel electrical switch boxes

should be employed to avoid degrading fire performance or

the PROMATECT® 50 wall system

2

1

3

5

Power outlet/light

switch installation

RONDO P35 or equivalentcontrol joint profile

A

1

2

3

Steel studs, e.g. RONDO, spaced at maximum 610mm centres. Stud size dependent upon performance requirement and partition heightPROMATECT® 50 with thickness dependant upon performance requirementPROMASEAL® AN Acrylic Sealant is used to seal gap to maintain integrity of partition system

Perforated locating wing

Proprietary fire resistant switch box with

PROMASEAL® Intumescent infill

4

5

1

1

1

5

5

5

5

2

2

2

4

ww

w.p

rom

at-

ap.c

omw

ww.p

rom

at-a

p.com

www.prom

at-ap.com

www.prom

at-ap.com

www.prom

at-ap.com

Page 39: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

38

PROMATECT® 50

Wet Area DetailsP50

1

2

5

6

8

7

13

10

10

Tiled shower recess with

in-situ wet area details

NOTE: Water prooing by specialist contractors

to manufacturer’s

specifications

Toilet bowl installation

3

12

11

1

2

4

5

6

3

Steel studs, spaced at maximum 610mm centres. Studs size dependent upon performance requirement and partition height

PROMATECT® 50 with thickness dependent upon performance requirementTop and bottom tracks ixed to concrete substrate using anchor bolts at maximum 500mm centres. For top track, use track with minumum nominal 35mm leg length to accommodate vertical movement of structurePROMASEAL® AN Acrylic Sealant is used to ill gap and seal joints whenever necessary to maintain integrity of wall system

Decorative tiling onto PROMATECT® 50 board

NOTE: Installation procedures of decorative tiling should be strictly in accordance with the recommendation of

manufacturer/supplier

Insitu internal membrane applied to face of wall lining to

prevent moisture related problems. Not required when lining is tiled and waterproof grout is applied

Mortar bed prepared according to manufacturers

speciication to receive loor inishing, e.g. tiles if required etc.Approved lashing when required by building regulation to prevent water egressReinforcement material, e.g. timber plate etc. of minimum 9mm thick to support loading Waste pipe made of PVC or uPVC etc. protected by PROMASEAL® FC or FCS retrofit collar to maintain

compartmentation during ire conditions. For option of collars please consult Promat

Plastic pipe, e.g. uPVC or PVC connection to main waste

pipe protected with appropriate Promat Intumescent pipe

collar for fire resistance application

No. 6 drywall screws ixed at maximum 200mm centres length dependent on board thickness used

7

8

9

&

10

12

13

11

94 4

9

ww

w.p

rom

at-a

p.com

Page 40: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

39

PROMATECT® 50

Wet Area DetailsP50

NOTE: Water prooing by specialist contractors to

manufacturer’s specifications

Bath tub installation

1

2

5

7

3

4

1

3

6

12

34

5

Decorative lining, e.g. ceramic or stone tilesUse adhesive to install decorative lining. Type of adhesive and application should strictly follow manufacturer’s recommendations

PROMATECT® 50

Use of lashing tape to prevent water ingress Supporting batten fixed to wall framing using appropriate

screw fixing to secure bath tub in position

Bottom track PROMASEAL® AN Acrylic Sealant is used to ill gap and seal joints whenever necessary to maintain integrity of wall system

Maximum 6mm gap is allow to accommodate ixing of bath tub. Any gap thereafter should be properly sealed with appropriate lexible sealantAnchor bolts bolts at maximum 500mm centres

8

9&

67

9

8

7

9

www.promat-a

p.com

ww

w.p

rom

at-ap.c

om

Page 41: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

40

PROMATECT® 50

Wet Area DetailsP50

Shower

Add-on hand basin

with accessories

1

1

2

2

3

6

4

8

4

5

5 7

7

12

910

1234

5

67

8

9PROMATECT® 50

Decorative lining, e.g. ceramic or stone tilesTimber reinforcement

Bottom trackAnchor bolt to concrete substrate

Typical shower head as specified by architect or designer

PROMASEAL® AN Acrylic Sealant is used to ill gap and seal joints whenever necessary to maintain integrity of wall system

Timber block ixed between steel studs acting as reinforcement to support loading from basin fixture

Water waste pipe, e.g. uPVC etc. connecting to main sewage system

For fire resistant application, apply appropriate Promat

Intumescent pipe collar

PromaSnap® loor waste collarConcrete loor slab

10

1112

12 11

ww

w.p

rom

at-a

p.c

om

ww

w.p

rom

at-ap.c

om

Page 42: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

41

PROMATECT® 50

Penetration DetailsP50

1234

PROMATECT® 50

Plastic piping, e.g. HDPE or uPVC etc.PROMASTOP® UC UniCollar®

Masonry or concrete loor slab/wall

PROMASEAL® IBSTM

PROMASEAL® FC Retrofit Collar

PROMASEAL® AN Acrylic Sealant required if FRL >90mins required

67

5

3

6

5

2

2

1

1

1

4

7

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 43: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

42

PROMATECT® 50

Penetration DetailsP50

1234

PROMATECT® 50

PROMASEAL® AN Acrylic SealantElectrical cables supported with steel cable tray

Plastic piping, e.g. HDPE or uPVC etc.

PROMASEAL® FCW Wall Collar

PROMASEAL® IBSTM

Ventilation duct

For full details of the Promat range of penetration seals and fire stopping systems, see Promat publication Proactive Fire Protection Systems Application and Technical Manual.

65

7

1

1

1

1

5

4

2

3

2

7

6

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

ww

w.p

rom

at-a

p.com

Page 44: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

43

PROMATECT® 50

Material Safety Data SheetP50

1. PRODUCT INFORMATIONPRODUCT NAME PROMATECT® 50

MARKETED BY Promat International (Asia Pacific) Ltd.

INTENDED USES Cement Bound Matrix board used for fire protection of buildings.

2. COMPOSITIONDESCRIPTION Cement Bound Matrix fire protective and insulating board in large dimensions.

CHEMICAL CHARACTERISATION This product is a manufactured article, not a substance nor a preparation. It is manufactured from Sorel type cement, wood particles, glass fibre mesh, perlite and water.

3. HAZARDS IDENTIFICATIONThe installed product in its final application, no hazards known. Not classified as hazardous or dangerous according to 67/548/EEC or 1999/45/EC.

By machining (drilling, cutting, sanding etc) the product, airborne dust can be released:

• As with most types of nuisance dust, excessive inhalation of dust may cause irritation of the airways.

• Eye contact with dust may lead to transient eye irritation or inflammation.

• Prolonged skin contact may lead to skin irritation.

• Long term hazards: see Section 11

• The handling and machining of this product may lead to the release of quartz containing dust. The inhalation of quartz from occupational/workplace sources may lead to chronic lung disease (silicosis) and an increased risk of cancer. According to the International Agency for Research on Cancer (IARC Monographs 1997) “Crystalline silica inhaled in the form of quartz or cristobalite from occupational/workplace sources is carcinogenic to humans (Group 1).”

4. FIRST AID MEASURESSKIN CONTACT Rinse the skin with water

EYE CONTACT Do not rub the eye, rinse out. If eye irritation or inflammation persists, seek medical advice.

INHALATION Remove to fresh air and drink water.

INGESTION Drink water.

5. FIRE FIGHTING MEASURESADDITIONAL INFORMATION The product is a non-combustible board, according to the local non-combustibility standard.

6. ACCIDENTAL RELEASE MEASURESCLEAN UP METHODS Shovel up small pieces. Dampen down any dust before putting into appropriate skips.

7. HANDLING AND STORAGEHANDLING Instructions for handling and machining

• Dust, generated during machining and processing must be exhausted and the regulatory Occupational Exposure Limits for total and respirable dust must be respected.

• Work in a well-ventilated area.

• Use tools with appropriate dust exhaust equipment.

• Always use respiratory protective equipment when exposure is likely or can be foreseen to exceed the Occupational Exposure Limits (refer to local regulations).

• Collect dust with a vacuum cleaner or soak with water before sweeping up.

STORAGE Store in dry, covered and frost proof area.

8. EXPOSURE CONTROLS/PERSONAL PROTECTIONEXPOSURE LIMITSWhen machining (drilling, cutting, sanding etc.) boards, respect Occupational Exposure Limits for inhalable and respirable dust and for respirable quartz dust. Check the latest Occupational Exposure Limits (OEL) for airborne contaminants that are applicable in country of use.

EXPOSURE CONTROL Ensure vacuum dust exhaust with correct filter when using motorised machining tools.

RESPIRATORY PROTECTION Use appropriate individual respiratory equipment when exposure is likely or can be foreseen to exceed the Occupational Exposure Limits (e.g. for exposures up to 10 times the OEL use at least a P2 type duct mask. For higher exposure, use a P3 type mask).

SKIN AND HAND PROTECTION Use working clothes and gloves to protect against mechanical injury and direct skin contact.

EYE PROTECTION Use safety glasses whenever tools are used and dust is produced.

SKIN AND BODY PROTECTION Protective clothing.

The information supplied in this Material Safety Data Sheet is designed only as guidance for the safe use, storage and handling of the product. This information is correct to the best available knowledge and

belief at the time of publication. However, no guarantee is made to its accuracy. This information relates only to the specific material designated and may not be valid for such material used in combination

with any other materials or in any other process. For further technical information, please consult your nearest Promat Technical Department office.

Page 45: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

44

PROMATECT® 50

Material Safety Data SheetP50

9. PHYSICAL AND CHEMICAL PROPERTIESDESCRIPTION Architectural board

COLOUR White to greyish white

RELATIVE DENSITY Approximately 1200kg/m³

WATER SOLUBILITY Insoluble

pH VALUE Approximately 7-9 (in aqueous solution)

OTHER PROPERTIES Not applicable

10. STABILITY AND REACTIVITYNo data is available on this product.

11. TOXICOLOGICAL INFORMATIONACUTE TOXICITY These Cement Bound Matrix boards are not expected to have significant acute toxicity. Apart from mild skin, throat, airway or eye irritation, workers producing these boards have reported no significant health complaints.

• As with most types of nuisance dust, excessive inhalation of dust may cause irritation of the airways.

• Eye contact with dust may lead to transient eye irritation or inflammation.

• Prolonged skin contact may lead to skin irritation.

FURTHER INFORMATION Inhalation of excessive concentrations of quartz containing dust can be hazardous to health. The

inhalation of quartz containing dust in high concentrations or over repeated or prolonged periods

of time may lead to chronic lung disease and an increased risk of lung cancer. This risk will be minimal if correct working practices are observed and applied. Please refer to Section 8.

12. ECOLOGICAL INFORMATIONNo data is available on this product.

13. DISPOSAL CONSIDERATIONSPRODUCT DISPOSAL Handle as construction industry waste and dispose in accordance with local legislation.

PAKAGING DISPOSAL Dispose according to local legislation.

14. TRANSPORT INFORMATIONThe product is not classified as dangerous in the context of transport regulations.

15. REGULATORY INFORMATIONLABELLING The product is classified in accordance with 67/548/EEC.

SYMBOLS i (Xi - Irritant)

RISK PHRASES Not applicable.

SAFETY PHRASES Not applicable.

16. OTHER INFORMATION

The recommendations for use and installation of the product have to be followed as indicated in the Promat literature.

The health and safety information contained herein is believed to be accurate and correct based on our current knowledge at the date of issue and

no liability can be accepted for any loss, injury or damage resulting from its use. It is intended as a guide for the safe handling, storage and use under

normal conditions, but does not necessarily refer to the particular requirements of a customer when further advise should be obtained.

This data sheet and the information it contains is not intended to supersede any terms or conditions of sale and does not constitute a specification.

Nothing contained herein is to be construed as a recommendation for use in violation of any patent or applicable laws or regulations.

This data sheet has been revised according to the Regulation (EC) N° 1907/2006 of 18 December 2006. (OJ 29.5.2007, L136/3)

The information supplied in this Material Safety Data Sheet is designed only as guidance for the safe use, storage and handling of the product. This information is correct to the best available

knowledge and belief at the time of publication. However, no guarantee is made to its accuracy. This information relates only to the specific material designated and may not be valid for such material

used in combination with any other materials or in any other process. For further technical information, please consult your nearest Promat Technical Department office.

Page 46: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

45

PROMATECT® 50

NotesP50

Page 47: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

46

PROMATECT® 50

NotesP50

Page 48: PROMAtect ® 50 High impact walls › wp-content › files...Deep impact When properly supported, PROMATECT® 50 walls and partitions can withstand high impact loadings, a decisive

6 Distinction Road

Wangara, WA 6065

T (08) 9445 8300

F (08) 9445 8400

[email protected]

progressivematerials.com.au