proposal for fy 2007-2008 wine duty taskforce. background n wine duty in hong kong is too high (80%...
TRANSCRIPT
Proposal for FY 2007-2008
Wine Duty Taskforce
BackgroundBackground
Wine duty in Hong Kong is too Wine duty in Hong Kong is too
high (80% since 2002)high (80% since 2002)
Ad Valorem duty system is Ad Valorem duty system is
expensive to administerexpensive to administer
High Wine DutyHigh Wine Duty
Brings no increase in duty revenueBrings no increase in duty revenue
Contradicts the pledge to become the Contradicts the pledge to become the
region’s wine centerregion’s wine center
Hinders imports of high quality winesHinders imports of high quality wines
Hampers HRI trade & tourismHampers HRI trade & tourism
Limits consumers’ choicesLimits consumers’ choices
Ad Valorem (AV) Ad Valorem (AV) Duty SystemDuty System
Expensive to administer for the Expensive to administer for the
government as well as for government as well as for
importers & tradersimporters & traders
Specific Duty (SD) system can do Specific Duty (SD) system can do
the same job at lower coststhe same job at lower costs
ObjectivesObjectives
Form a taskforce to work on a proposal to Form a taskforce to work on a proposal to
reduce wine duty and the replacement of reduce wine duty and the replacement of
the AV duty systemthe AV duty system
Take appropriate steps to support the Take appropriate steps to support the
taskforce’s proposaltaskforce’s proposal
Reach consensus on the proposalReach consensus on the proposal
Relate the message to the governmentRelate the message to the government
TaskforceTaskforce
Various consulatesVarious consulates
Wine tradeWine trade
Tourism tradeTourism trade
HRI tradeHRI trade
ActionsActions
Survey on the general public, wine trade, Survey on the general public, wine trade,
HRI trade & the tourism sectorHRI trade & the tourism sector
Study the time/costs spent on the AV Study the time/costs spent on the AV
duty system by the wine trade and the duty system by the wine trade and the
governmentgovernment
On-going discussions with Legislators & On-going discussions with Legislators &
government officialsgovernment officials
Time-line (2006)Time-line (2006)
Meeting potential members of the taskforceMeeting potential members of the taskforce Jul/AugJul/Aug
Formation of the taskforceFormation of the taskforce End AugEnd Aug
Agreeing on the objectives/plans of the taskforceAgreeing on the objectives/plans of the taskforce Early SepEarly Sep
Inviting & evaluating proposals for surveys/studiesInviting & evaluating proposals for surveys/studies SepSep
Surveys & Study (AV system v. SD system)Surveys & Study (AV system v. SD system) OctOct
Analysis and drafting of the proposalAnalysis and drafting of the proposal NovNov
Present the final proposal to the governmentPresent the final proposal to the government DecDec
Discussions with Legislators & government officialsDiscussions with Legislators & government officials (On-(On-
going)going)
Presentation to the mediaPresentation to the media (Optional)(Optional)