proposed highway 99 updates

Upload: mail-tribune

Post on 04-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Proposed Highway 99 updates

    1/13

    Rogu e Va l l ey OR 99

    Co r r i d o r P l a n U p d a t e

    J a ck so n Coun t y Com m i ssi o n er s

    B r i e f i n gJ a n u a r y 28 , 20 14

  • 8/13/2019 Proposed Highway 99 updates

    2/13

    OR 99 Rogu e Va l l ey Co r r i d o r

    1. History

    Began in 2010:

    Initiated to evaluate the OR 99 corridor from South

    Medford to North Ashland (out to 2034):

    Mobility, Safety, Livability, and Multi-modal goals;

    Several pauses for additional analysiss;

    2. Public Involvement

    Technical Advisory (Jackson Co., Talent, Ashland, Phoenix,Medford, RVTD, RVCOG, and ODOT)

    Citizen Advisory

    Open Houses (4 open houses in Talent and Phoenix)

  • 8/13/2019 Proposed Highway 99 updates

    3/13

    Co r r i d o r P l a n n i n g A r ea

  • 8/13/2019 Proposed Highway 99 updates

    4/13

    15,600

    14,900

    18,000

    18,600

    LEGEND

    12,800

    12,200

    15,100

    16,100

    14,300

    13,600

    16,800

    18,500

    4,800

    4,600

    5,800

    6,100

    7,700

    7,300

    8,700

    9,500

    14,300

    13,700

    17,50018,000

    15,800

    15,000

    18,000

    18,100

    7,200

    6,800

    8,400

    9,300

    4,800

    4,600

    6,200

    6,200

    8,300

    7,900

    10,000

    10,900

    9,200

    8,800

    11,000

    10,900

    8,200

    7,800

    10,000

    9,800

    8,800

    8,400

    9,300

    9,400

    18,200

    16,600

    18,700

    19,900

    2010 Volume (vehicles)

    2012 Volume (vehicles)

    2007 Volume (vehicles)

    2004 Volume (vehicles)

  • 8/13/2019 Proposed Highway 99 updates

    5/13

    I d eas an d Con cep t s Developed from feedback at TAC and CAC meetings and

    requests for additional analysis from various agencies;

    Concepts identified and presented:

    Improved lighting;

    Better access to transit facilities;

    Charlotte Ann Rd to Coleman Creek Culvert Implement a 5-lane Cross-section and Add Bike

    Lanes and Sidewalks;

    Coleman Creek Crossing - Add Bicycle and Pedestrian

    Facilities;

    Phoenix South End of Couplet to South City Limits -

    Implement a 3-lane Cross-section and Add BikeLanes and Sidewalks;

    Phoenix South City Limits to Talent Implement a 3-

    lane Cross-section and Widen Shoulders;

    Enhanced Bear Creek Greenway Connections and

    improved signage

  • 8/13/2019 Proposed Highway 99 updates

    6/13

    Cha r l o t t e An n Rd t o Co l em an Cr eek Cu l v er t I m p l em en t a 5 -

    l a n e r est r i p ed sect i o n a n d a d d B i k e L a n e s a n d Si d ew a l k s

    14'Median

    Intermittent

    Sidewalk

    12'Travel Lane

    14-18'Travel Lane

    14-16'Travel Lane

    Intermittent

    Sidewalk

    66-72' Pavement Width (Existing)

    EXISTING 5-LANE CROSS-SECTION

    70' Right of Way

    12'Travel Lane

    70-foot ROW in manysections;

    Paved width is 66 to 72 feet;

    5 travel lanes ;

    Sidewalks are outside ROW;

    Volume too high for 3-lane(est. future 17,000 to 22,000vpd);

    Restriping is more feasible;

    Minimal ROW needed for

    additional sidewalkimprovements;

    12'Median

    6'Sidewalk

    5'Bike Lane

    11-12'Travel Lane

    11-12'Travel Lane

    11-12'Travel Lane

    6'Sidewalk

    5'Bike Lane

    66-72' Pavement Width

    OPTION A - 5-LANE RESTRIPED CROSS-SECTION

    70-100' Existing Rightof Way

    11-12'Travel Lane

  • 8/13/2019 Proposed Highway 99 updates

    7/13

    Charlotte Ann Road to Coleman Creek

    Concept(s): Concept 3A Lane restriping - $3.5 million;

    Concept 3B Widening to full standard - $9.7 million;

    Concept 34 Lane Reduction with sidewalks in ROW - $7.3 million;

    Recommendation:

    Option A

    12'Median

    6'Sidewalk

    5'Bike Lane

    11-12'Travel Lane

    11-12'Travel Lane

    11-12'Travel Lane

    6'Sidewalk

    5'Bike Lane

    66-72' Pavement Width

    OPTION A - 5-LANE RESTRIPED CROSS-SECTION

    70-100' Existing Right of Way

    11-12'Travel Lane

  • 8/13/2019 Proposed Highway 99 updates

    8/13

    Co l em an Cr eek Cr o ssi n g - Add B i cy cl e an d Pedest r i a n Faci l i t i e s

    O p t i o n A

    Culvert that carries Coleman Creekunder OR 99 is 75 feet wide

    Currently supports approximately 70

    feet of roadway structure

    Could modify 70-foot structure to include: 6-foot sidewalks on both sides

    5-foot bike lanes on both sides

    11-foot travel lanes (same as FVI) 4-foot painted or raise median

    OPTION A: COLEMAN CREEK CROSSING

    11'TravelLane

    11'TravelLane

    5'Bike Lane

    6'Sidewalk

    5'Bike Lane

    6'Sidewalk

    11'TravelLane

    58' Paved Surface

    70' Minimum Right of Way Required

    11'TravelLane4'

    EXISTING COLEMAN CREEK CROSSING

    14'TravelLane

    12'TravelLane

    14'TravelLane

    2'Sidewalk

    2'Sidewalk

    14'TravelLane

    66' Paved Surface

    70' Minimum Right of Way Required

    12'TravelLane

  • 8/13/2019 Proposed Highway 99 updates

    9/13

    OPTION B: COLEMAN CREEK CROSSING

    11'Travel Lane

    11'Travel Lane

    10'Path

    10'Path

    12'Travel Lane

    50' Paved Surface

    70' Minimum Right of Way Required

    12'Travel Lane4'

    Co l em an Cr eek Cr o ssi n g - Add B i cy cl e an d Pedest r i a n

    Fac i l i t i es Op t i on B

    Culvert that carries Coleman Creek under OR 99

    is 75 feet wide

    Currently supports approximately 70 feet of

    roadway structure

    Could modify 70-foot structure to include: 10-foot multi-use path on both sides

    11- to 12-foot travel lanes (similar to FVI)

    4-foot painted or raise median

    EXISTING COLEMAN CREEK CROSSING

    14'TravelLane

    12'TravelLane

    14'TravelLane

    2'Sidewalk

    2'Sidewalk

    14'TravelLane

    66' Paved Surface

    70' Minimum Right of Way Required

    12'TravelLane

  • 8/13/2019 Proposed Highway 99 updates

    10/13

    Phoen i x Sou t h End o f Coup l e t t o Sou t h Ci t y L i m i t s - I m p l em en t

    a l a n e r ed u ct i o n a n d a d d B i k e L a n e s a n d Si d ew a l k

    75-foot ROW available

    Paved width is 50 to 52 feet

    4 travel lanes

    No sidewalks or bike lanes

    Entire cross section within existing ROW Could modify existing to include:

    6-foot bike lanes on both sides

    12-foot travel lanes and 14-foot center

    lane

    Add sidewalks on both sides (could

    include landscape buffers within ROW)

    2'

    Shoulder

    2'11-12'

    Travel Lane

    12'Travel Lane

    12'Travel Lane

    11-12'Travel Lane

    50-52' Paved Surface

    EXISTING 4-LANE CROSS-SECTION

    Shoulder

    75' Right of Way Available

    12'TravelLane12'TravelLane 6'Bike Lane6'Sidewalk 6'Bike Lane 6'Sidewalk14'Center Lane

    50'Paved Surface

    3 LANE CROSS-SECTION-

    64' MinimumRight of Way Required

  • 8/13/2019 Proposed Highway 99 updates

    11/13

    7'Shoulder

    7'Shoulder

    12'Travel Lane

    14'Left-TurnLa ne

    12'Travel Lane

    52' Paved Surface

    POTENTIAL RURAL INTERSECTION OR 3-LANE CROSS-SECTION

    70' Minimum Right of Way Available

    Phoen i x Sou t h Ci t y L i m i t s t o T a l en t I m p l em en t a L a n e Redu ct i o n

    a n d W i d en Shou l d er s

    70-foot minimum ROW available

    Paved width is 50 to 52 feet

    4 travel lanes, no shoulders

    No change in paved surface

    Could modify to a 2-lane cross section:

    10-foot shoulders both sides

    12-foot travel lanes and 8-foot median

    Could modify to a 3-lane cross section:

    7-foot shoulders both sides

    12-foot travel lanes and 14-foot center lane

    2'

    Shoulder

    2'12'

    Travel Lane

    12'TravelLane

    12'TravelLane

    12'TravelLane

    52' Paved Surface

    EXISTING 4-LANE RURAL CROSS-SECTION

    Shoulder

    70' Minimum Right of Way Available

    Wider shoulders (7-10 feet) accommodate bicyclists

    or pedestrians and allow vehicles to pull off the

    roadway, if necessary

    3-lane cross-section has lower predicted crash ratethan 4-lane cross-section

  • 8/13/2019 Proposed Highway 99 updates

    12/13

    Enh an ced Bea r Cr eek G r eenw ay Conn ect i o n s an d

    S ignage

    Location of new trail connection

    Location of enhanced trail signage

    OR Highway 99

    Bear Creek GreenwayStreet connection to Bear Creek Greenway

    New trail connection to Bear Creek Greenway

  • 8/13/2019 Proposed Highway 99 updates

    13/13